Samsung mobile phone codes................................... see which ones can help you.........try to unlock, reset, or even just play around with them...............back up your phone first though, if not information might be lost
6. Samsung
*2767*6536245# Email...
*2767*6636245# Email...
*2767*8636245# Email...
*2767*85236245# Email...
samsung mobile code. - - - lock code.
*#7465625# = Check the locks.
*7465625*638*Code# = Enables Network lock.
#7465625*638*Code# = Disables Network lock.
*7465625*782*Code# = Enables Subset lock.
#7465625*782*Code# = Disables Subset lock.
*7465625*77*Code# = Enables SP lock.
#7465625*77*Code# = Disables SP lock.
*7465625*27*Code# = Enables CP lock.
#7465625*27*Code# = Disables CP lock.
*7465625*746*Code# = Enables SIM lock.
#7465625*746*Code# = Disables SIM lock.
*7465625*228# = Activa lock ON.
#7465625*228# = Activa lock OFF.
*7465625*28638# = Auto Network lock ON.
#7465625*28638# = Auto Network lock OFF.
*7465625*28782# = Auto subset lock ON.
#7465625*28782# = Auto subset lock OFF.
*7465625*2877# = Auto SP lock ON.
#7465625*2877# = Auto SP lock OFF.
*7465625*2827# = Auto CP lock ON.
#7465625*2827# = Auto CP lock OFF.
*7465625*28746# = Auto SIM lock ON.
#7465625*28746# = Auto SIM lock OFF.
samsung mobile code. - - - sound code.
Samsung phones.
Dial *#6984125*#
Test menu dial *#9072641*# (You need this one i think.)
Click 5 Audio - 2 AP volume config
Now you see zie je 4 things:
1 RCV config
2 EAR config
3 SPK config
4 BTH config
7. Samsung
Now you see this:
1 MP volume
2 Keytone volume
3 Ringtone volume
4 Rec volume
5 FM radio volume
6 Camera volume
7 Voice call volume
8 Vt call volume
9 Voice memo volume
( SPK = Speaker )( Ear = Headset )
Tune Headset volume:
*#9072641*# - 2 EAR config - 3 Ringtone volume - Stap 6 tune it to 10
Tune movie volume:
*#9072641*# - 3 SPK config - 3 Ringtone volume - Stap 6 tune it to 10
Note it works but don't forget to type somewhere your old settings.
8. Samsung
Free Samsung Unlock Codes
Are you Tired of getting the run around while trying to unlock you samsung? I have been in your shoe's
believe me it's a pain. So I am here to help Fallow these quick steps and you will be able to unlock your
phone in no time.
Okay lets get started I will show you many codes that I am sure will work for you Remote Code
Unlocking Samsung Mobile Phones and cells
Unlocking a Samsung mobile phone allows the use of any sim card in your handset. This removes
the restriction some GSM network providers put on phones to allow them only to work on their
network.
Samsung cells can be unlock by "remote code unlock" methods, which means all you need is a code
to enter in the phone to unlock it and allow it to be use on any network. We can provide these unlock
codes for any of the samsung mobile phones below, online and instantly.
We recommend to back up any phone settings before trying these codes. Save all phone numbers to
the sim card etc. Some phones clear the memory when reseting after removing the sim-lock.
Not all Samsung handsets are compatible with the unlocking methods. Even 20% of Samsung
Handsets listed below (in particular the A300, A800 & the E7' range) have an incompatible firmware
installed on the handset which rejects the unlock code.
Samsung Unlocking
It is possible to unlock older Samsung phones:
____________________________
9. Samsung
NOTE: This code may perform a phone reset. Please make sure your phone book is backed up before
entering any codes. We are NOT responsible for any damage to your mobile phone.
((SUPER CODE #1))Model: A137,A227, A237, A437, A737, A767 (Propel), A837 Rugby, A798 Mythic, SGH-
E250, SGH-E370, SGH-E590, SGH-F400, SGH-G600, SGH-J700, SGH-L760, SGH-S366, SGH-T309, SGH-
T319, SGH-T349, SGH-T409, SGH-T429, SGH-T439, T459 (Gravity), SGH-T509, SGH-T919 Behold, SGH-
X497, SGH-Z560 SGH-T139
1. Turn ON your phone without Sim Card
2. Enter #7465625*638*99435020#
3. Device should say "Network Lock Deactivated"
4. The phone may reboot and the unlock is completed
code #2
THIS CODE WILL UNLOCK ALL OF THE NEW MODEL SAMSUNG PHONES EXCEPT
SMART PHONES. (X495-AND UP) HAS BEEN TESTED WITH MY T459,
T469(PASSED),T809(PASSED)
Remove all sims from phone then enter
*7465625*638*00000000*00000000#
NEXT ENTER
#7465625*638*00000000#
AND THEN *#7465625# to check the locks....all locks are inactive...these are all the locks...
Network lock - inactive
subset lock - inactive
sp lock - inactive
cp lock - inactive
sim lock - inactive
active lock - inactive
phone lock - inactive
auto network - inactive
auto subset lock - inactive
auto sp lock - inactive
auto cp lock - inactive
auto sim lock - inactive
_________________________________________________________________________________
____________
10. Samsung
Code#3
How to Unlock Code & Instructions FOR SAMSUNG E335 - E635 - X495 - X497 -T429
1. With the power on the phone off, place an unaccepted SIM card into your phone; i.e., a SIM card
from a network other than the one that locked to your phone.
2. Turn the power on. The phone will display WRONG CARD.
3. Type *2767*3855# and wait a few seconds for the phone to reboot. The phone should display a
welcome screen when it powers back on.
Note: If your phone is still displaying WRONG CARD after 30 seconds, GENTLY tap the power
button to get it to reboot. DO NOT PRESS THE POWER BUTTON TOO HARD; JUST PRESS
LIGHTLY ENOUGH TO START THE REBOOT PROCESS!!
4. At the welcome screen enter: *7465625*638*00000000*
00000000#
Note: You should get a message stating the phone has been personalized and the welcome screen
should appear again. This step resets your NCK (SIM pin number) to 00000000 (eight zeros).
5... At this welcome screen enter: #7465625*638*00000000#
Note: You should get a message stating that the network lock is deactivated.
6. You can check the lock status by entering the following: *#7465625#
Note: You should get a message stating that all locks are inactive.
7. Youre done! Youre phone is now permanently unlocked!
11. Samsung
Please note: On some models, the phone will ask for SIM pin number when you switch out the SIM
card to another one. Just type 00000000 (eight zeros) to continue and that will take care of it
Now Your phone is PERMANENTLY unlocked (Meaning you can now use on any carrier that is on
the same form of Network.)
For the U.S.
GSM Network- T-Mobile, AT&T, SimpleMobile (T-mobile)
CDMA Network- Sprint, Verizon, MetroPCS
If I was of Help, please click on one of the banners or ads on the side of this page thank
you Anything is appreciated : )
CONFIRMED Samsung phones that this works on...
Model:
E335
E635
X495
X497
T429
T229
T319
T459
Category:
Howto & Style
Tags:
12. Samsung
Samsung Unlock T Mobile AT&T ATT GSM SIM CARD SIM T-Mobile Cell Phone Free E335
E635 X495 X497 T139 T429 T229 T319 T-429 T-229 T-319 T459 Gravity KHANTOUR How to
UNLOCK Tmobile cellular unlock unlocked
_________________________________________________________________________________
_____________
Code # 4
below is the information i have found to correct the MMS and Browser issues with the t-Mobile
Samsung Gravity unlocked for AT&T...
Once you have unlocked your phone, however, although the SIM card will work and you can
send/receive both texts and phone calls, you will find that when trying to send a picture message, you
get an error that says, "Unknown subscriber", and the message will not send or download on your
phone.
Enter *#87927#
Highlight Profile 2
Select Options
Select Edit
Enter these settings, case sensitive.
Profile Name: ATT
Home URL: http://m.divx.com
Bearer: GPRS only
Proxy: Enable
GPRS Settings:
Proxy IP: 66.209.11.32
Proxy port: 8080
APN: wap. cingular
Login ID: WAP@CINGULARGPRS.COM
Password: CINGULAR1
Save.
Highlight "ATT" and hit okay to use this profile. Exit back to main screen.
Enter *#87667#
Select MMS Profiles
Select Profile settings
Select Profile 2
Enter these settings, case sensitive:
Profile Name: ATT MMS
Server URL: http://mmsc.cingular.com
Proxy: Enable
GPRS Settings:
IP address: 66.209.11.32
Proxy port: 8080
APN: wap.cingular
Login ID: WAP@CINGULARGPRS.COM
Password: CINGULAR1
Save.
Highlight "ATT MMS" and hit okay to use this profile.
13. Samsung
That should do it. I do not have web browsing capabilities as part of my AT&T account, so I am not
positive, but you should be able to set the above "Home URL" in step one to whatever you want it to
be, ie google.com, etc.
This solution is offered only as a suggestion, and I cannot guarantee any results. I am not responsible
for any unexpected results.
To reset your WAP settings to the factory defaults, enter *2767*927# into your phone.
Are you Tired of getting the run around while trying to unlock you samsung? I have been in your
shoe's believe me it's a pain. So I am here to help Fallow these quick steps and you will be able to
unlock your phone in no time.
Well there you have it there are two Codes that have been tested to work well I will post more codes
if I come across then you can also comment below if there is a phone you would like me to find
codes for. well Good luck and hope this was helpful.
_________________________________________________________________________
Free Samsung unlock codes for a specific phone model are hard to find as I found out. Therefore, I
decided to write this unlock guide that has the unlock codes for 22 different Samsung phone models.
If you need the steps on how to unlock a Samsung mobile phone, then check out my previous phone
guide.
Additionally, if your Samsung cell phone is not in this list, then you should first try and call your
phone carrier requesting a free unlock code. In exchange for your Samsung unlock code, they will
need your mobile’s IMEI number which you can get simply by typing *#06# and hitting your send or
enter button. If your phone carrier will not give you an unlock code, then finally you may end up
having to pay for one. In this case I would recommend checking out the how to get an unlock code
section beneath this article.
Remember when you are entering these unlock codes you only have four chances, otherwise your
phone could permanently lock. Alright, here is the list:
Free Samsung Unlock Codes
Samsung SGH-a300
*2767*637#
Samsung SGH-a400
14. Samsung
*2767*637#
Samsung SGH-a800
*2767*637#
Samsung SGH-e400
*2767*688#
In newer phones:
#*7337#
Samsung SGH-e500
*2767*688#
In newer phones:
#*7337#
Samsung SGH-e700
*2767*688#
In newer phones:
#*7337#
Samsung SGH-E715
Turn off the phone. Put a non-accepted SIM Card and turn it on. Type *#9998*3323#. Press Exit.
Choose menu #7. After phone reboots type *0141# and hit the Call button. Turn off and insert
another SIM Card. Turn on. The code is 00000000.
In newer phones:
15. Samsung
#*7337#
Samsung SGH-m100
Type *#9998*627837793#. Then type *#9998*737#. Press >/[] (Play Stop) until phone shows
NCK/SPCK number. Press Exit. Type #0111*CODE# (Code is the last 8 digits of the NCK/SPCK)
Samsung SGH-P400
*2767*3855# or *2767*688# or *2767*927#
In newer Samsung models:
#*7337#
Samsung SGH-s100
*2767*7822573738#
Samsung SGH-s105
Remove SIM Card. Enter *2767*7822573738# and after phone reboots, enter #0111*00000000#
Samsung SGH-s300
*2767*7822573738#
Samsung SGH-s307
Turn off the phone. Put a non-accepted SIM Card and turn it on. Type *#9998*3323#. Press Exit.
Choose menu #7. After phone reboots type *0141# and hit the Call button. Turn off and insert
another SIM Card. Turn on. The code is 00000000.
In newer phones:
16. Samsung
#*7337#
Samsung SGH-S500
*2767*3855# or *2767*688# or *2767*927#
In newer phones:
#*7337#
Samsung SGH-600
*2767*3855# or *2767*2878#
Samsung SGH-2100
*2767*3855# or *2767*2878#
Samsung SGH-V200
*2767*7822573738#
Samsung SGH-X100
Turn off the phone. Put a non-accepted SIM Card and turn it on. Type *#9998*3323#. Press Exit.
Choose menu #7. After phone reboots type *0141# and hit the Call button. Turn off and insert
another SIM Card. Turn on. The code is 00000000.
In newer phones:
#*7337#
Samsung SGH-X600
Turn off the phone. Put a non-accepted SIM Card and turn it on. Type *#9998*3323#. Press Exit.
Choose menu #7. After phone reboots type *0141# and hit the Call button. Turn off and insert
another SIM Card. Turn on. The code is 00000000.
17. Samsung
In newer phones:
#*7337#
Samsung SGH-R210
*2767*3855#
*2767*2878#
Samsung SGH-D500
#*7337#
Samsung Universal Type
TEMPORARY UNLOCK:
Put a non-accepted SIM Card and turn it on. Type *#9998*3323#. Press Exit. You will get a new
menu. Select Malloc Fail.
In newer phones:
#*7337#
If these unlock instructions for your Samsung phone are not in the above list, you can try reading my
newest Samsung unlock guide for newer phones. I will post any updates as I find them. If you have
any questions or comments please feel free to leave them below.
Share this Review:
Get a Samsung GSM Phone Unlock Code
18. Samsung
Getting a free code from your carrier doesn't always work. Alternatively, I recommend this unlock
service when trying to find an unlock code. If they do not support your cell phone then you can also
try this website that supports tons of specific phone models.
New to our product review site? Subscribe below to get our free news and updates.
Enter your email address:
Related Samsung GSM Phone Photos
Unlock Samsung SGH-X427
Unlock Samsung X475 Free
How To Unlock A Samsung Mobile Phone
Unlock Samsung E715, Free Unlock Code
Latest Samsung GSM Phone Reviews
Unlock a Samsung Phone for Free
How To Unlock A Samsung Mobile Phone
About Our Review
Our Samsung GSM Phone review was released on Thursday, July 9th, 2009 at 5:31 am. Some of the
details and Samsung GSM Phone information on our website may come from a leaked or preliminary
source and as such cannot always be guaranteed.
Note: Any instructions provided in this guide are not guarenteed to work with all models and
entering 3 or more incorrect unlocking codes could enable a security lock on your SIM card. If you
19. Samsung
are unsure about unlocking your cell phone, try reviewing some of the professional services below:
You can subscribe to any user comments for this Samsung GSM Phone article through this RSS feed.
You can write a user review, or leave a trackback from your own site.
Comment on "Free Samsung Unlock Codes for 22 Models"
______________________________________________________________
Code#5
Model: SGH-P207
1. Reset to original factory setting by typing *2767*3855#, your phone will reboot
2. Insert an unauthorized Sim Card and turn ON your phone
3. A Wrong Sim message will appear
4. Enter * #9998*3323#
5. Exit white screen appear, tap the right soft key, (occasionally it will not go to the next screen, if so
press the down key)
6. Menu appear, scroll down to the malloc Fail option, this will reboot, and normal service screen
will appear
7. Enter *0141# and press the green Call key
8. Personalized screen appear, the name of the current Sim Card provider will appear on the screen
9. Turn phone OFF, and then turn back ON
10. Go to menu by tapping left soft key
11. Settings is in bottom right hand corner
12. Select option 7 = Security
13. Select option 6 = Sim Lock
14. Select option 1 = Disable
15. Enter 00000000 (eight zeros), the message will come up Sim lock disabled with a check mark;
your phone is now unlocked to use with other carriers.
20. Samsung
______________________________________________________________
Code #6
Samsung A167
*2767*2878# *2767*3855# *7465625*638*00000000*00000000# #7465625*638*00000000#
*2767*68 imei #
________________________________________________________________
Code #7 (please note this code is only for if you have locked yourself out of your net10 cell phone
some how)
Samsung SGH - T401G
Step one- Take out all sim's
Step Two- Turn on phone
Step Three- phone should say enter sim but instead of entering sim enter code *2767*782257378#
Then wait for phone to shut itself off and then back on
Step Four- now put your sim of choice in, Turn on and your done
Phone should now be unlocked
_________________________________________________________
Your Unlock code is:
Model: Samsung SGH-A300
*2767*637#
21. Samsung
To enter put in a non accepted sim card and enter the above code on the
keypad. If this does not work try without a simcard and then enter the code.
----------------------------
Model: Samsung Universal
TEMPORARY UNLOCK:
Put a non-accepted SIM Card and turn it on. Type *#9998*3323#. Press Exit.
You will get a new menu. Select Malloc Fail.
In newer phones: #*7337#
______________________________________________________________
_
NOTE: This code may perform a phone reset. Please make sure your phone
book is backed up before entering any codes. We are NOT responsible for
any damage to your mobile phone.
22. Samsung
Your Unlock code is:
Model: Samsung SGH-E700
*2767*688#
In newer phones: #*7337#
To enter put in a non accepted sim card and enter the above code on the
keypad. If this does not work try without a simcard and then enter the code.
----------------------------
Model: Samsung Universal
TEMPORARY UNLOCK: Put a non-accepted SIM Card and turn it on. Type
*#9998*3323#. Press Exit. You will get a new menu. Select Malloc Fail.
23. Samsung
In newer phones: #*7337#
_______________________________________________
NOTE: This code may perform a phone reset. Please make sure your phone
book is backed up before entering any codes. We are NOT responsible for
any damage to your mobile phone.
Your Unlock code is:
Model: Samsung SGH-S100
*2767*7822573738#
To enter put in a non accepted sim card and enter the above code on the
keypad. If this does not work try without a simcard and then enter the code.
----------------------------
24. Samsung
Model: Samsung Universal
TEMPORARY UNLOCK:
Put a non-accepted SIM Card and turn it on. Type *#9998*3323#. Press Exit.
You will get a new menu. Select Malloc Fail.
In newer phones: #*7337#
___________________________________________________
NOTE: This code may perform a phone reset. Please make sure your phone
book is backed up before entering any codes. We are NOT responsible for
any damage to your mobile phone.
Your Unlock code is:
Model: Samsung SGH-600
*2767*3855# *2767*2878#
To enter put in a non accepted sim card and enter the above code on the
25. Samsung
keypad. If this does not work try without a simcard and then enter the code.
----------------------------
Model: Samsung Universal
TEMPORARY UNLOCK:
Put a non-accepted SIM Card and turn it on. Type *#9998*3323#. Press Exit.
You will get a new menu. Select Malloc Fail.
In newer phones: #*7337#
________________________________________________
NOTE: This code may perform a phone reset. Please make sure your phone
book is backed up before entering any codes. We are NOT responsible for
any damage to your mobile phone.
26. Samsung
Your Unlock code is:
Model: Samsung SGH-A400
*2767*637#
To enter put in a non accepted sim card and enter the above code on the
keypad. If this does not work try without a simcard and then enter the code.
----------------------------
Model: Samsung Universal
TEMPORARY UNLOCK:
Put a non-accepted SIM Card and turn it on. Type *#9998*3323#. Press Exit.
You will get a new menu. Select Malloc Fail.
27. Samsung
In newer phones: #*7337#
______________________________________________
NOTE: This code may perform a phone reset. Please make sure your phone
book is backed up before entering any codes. We are NOT responsible for
any damage to your mobile phone.
Your Unlock code is:
Model: Samsung SGH-E715
Turn off the phone. Put a non-accepted SIM Card and turn it on. Type
*#9998*3323#. Press Exit. Choose menu #7. After phone reboots type *0141#
and hit the Call button. Turn off and insert another SIM Card. Turn on. The
code is 00000000.
In newer phones: #*7337#
----------------------------
28. Samsung
Model: Samsung Universal
TEMPORARY UNLOCK:
Put a non-accepted SIM Card and turn it on. Type *#9998*3323#. Press Exit.
You will get a new menu. Select Malloc Fail.
In newer phones: #*7337#
_________________________________________
NOTE: This code may perform a phone reset. Please make sure your phone
book is backed up before entering any codes. We are NOT responsible for
any damage to your mobile phone.
Your Unlock code is:
Model: Samsung SGH-S105
Remove SIM Card. Enter *2767*7822573738# and after phone reboots, enter
#0111*00000000#
29. Samsung
----------------------------
Model: Samsung Universal
TEMPORARY UNLOCK:
Put a non-accepted SIM Card and turn it on. Type *#9998*3323#. Press Exit.
You will get a new menu. Select Malloc Fail.
In newer phones: #*7337#
______________________________________
NOTE: This code may perform a phone reset. Please make sure your phone
book is backed up before entering any codes. We are NOT responsible for
any damage to your mobile phone.
Your Unlock code is:
Model: Samsung SGH-V200
30. Samsung
*2767*7822573738#
To enter put in a non accepted sim card and enter the above code on the
keypad. If this does not work try without a simcard and then enter the code.
----------------------------
Model: Samsung Universal
TEMPORARY UNLOCK:
Put a non-accepted SIM Card and turn it on. Type *#9998*3323#. Press Exit.
You will get a new menu. Select Malloc Fail.
In newer phones: #*7337#
__________________________________________
31. Samsung
NOTE: This code may perform a phone reset. Please make sure your phone
book is backed up before entering any codes. We are NOT responsible for
any damage to your mobile phone.
Your Unlock code is:
Model: Samsung SGH-A800
*2767*637#
To enter put in a non accepted sim card and enter the above code on the
keypad. If this does not work try without a simcard and then enter the code.
----------------------------
Model: Samsung Universal
TEMPORARY UNLOCK:
32. Samsung
Put a non-accepted SIM Card and turn it on. Type *#9998*3323#. Press Exit.
You will get a new menu. Select Malloc Fail.
In newer phones: #*7337#
_______________________________________________
NOTE: This code may perform a phone reset. Please make sure your phone
book is backed up before entering any codes. We are NOT responsible for
any damage to your mobile phone.
Your Unlock code is:
Model: Samsung SGH-M100
Type *#9998*627837793#. Then type *#9998*737#. Press >/[] (Play Stop)
until phone shows NCK/SPCK number. Press Exit. Type #0111*CODE#
(Code is the last 8 digits of the NCK/SPCK)
----------------------------
33. Samsung
Model: Samsung Universal
TEMPORARY UNLOCK:
Put a non-accepted SIM Card and turn it on. Type *#9998*3323#. Press Exit.
You will get a new menu. Select Malloc Fail.
In newer phones: #*7337#
__________________________________________
NOTE: This code may perform a phone reset. Please make sure your phone
book is backed up before entering any codes. We are NOT responsible for
any damage to your mobile phone.
Your Unlock code is:
Model: Samsung SGH-S300
*2767*7822573738#
To enter put in a non accepted sim card and enter the above code on the
34. Samsung
keypad. If this does not work try without a simcard and then enter the code.
----------------------------
Model: Samsung Universal
TEMPORARY UNLOCK:
Put a non-accepted SIM Card and turn it on. Type *#9998*3323#. Press Exit.
You will get a new menu. Select Malloc Fail.
In newer phones: #*7337#
__________________________________________
NOTE: This code may perform a phone reset. Please make sure your phone
book is backed up before entering any codes. We are NOT responsible for
any damage to your mobile phone.
Your Unlock code is:
35. Samsung
Model: Samsung SGH-X100
Turn off the phone. Put a non-accepted SIM Card and turn it on. Type
*#9998*3323#. Press Exit. Choose menu #7. After phone reboots type *0141#
and hit the Call button. Turn off and insert another SIM Card. Turn on. The
code is 00000000.
In newer phones: #*7337#
----------------------------
Model: Samsung Universal
TEMPORARY UNLOCK:
Put a non-accepted SIM Card and turn it on. Type *#9998*3323#. Press Exit.
You will get a new menu. Select Malloc Fail.
36. Samsung
In newer phones: #*7337#
______________________________________________
NOTE: This code may perform a phone reset. Please make sure your phone
book is backed up before entering any codes. We are NOT responsible for
any damage to your mobile phone.
Your Unlock code is:
Model: Samsung SGH-E400
*2767*688#
In newer phones: #*7337#
To enter put in a non accepted sim card and enter the above code on the
keypad. If this does not work try without a simcard and then enter the code.
37. Samsung
----------------------------
Model: Samsung Universal
TEMPORARY UNLOCK:
Put a non-accepted SIM Card and turn it on. Type *#9998*3323#. Press Exit.
You will get a new menu. Select Malloc Fail.
In newer phones: #*7337#
___________________________________________
NOTE: This code may perform a phone reset. Please make sure your phone
book is backed up before entering any codes. We are NOT responsible for
any damage to your mobile phone.
Your Unlock code is:
Model: Samsung SGH-P400
*2767*3855# *2767*688# *2767*927#
38. Samsung
In newer phones: #*7337#
To enter put in a non accepted sim card and enter the above code on the
keypad. If this does not work try without a simcard and then enter the code.
----------------------------
Model: Samsung Universal
TEMPORARY UNLOCK:
Put a non-accepted SIM Card and turn it on. Type *#9998*3323#. Press Exit.
You will get a new menu. Select Malloc Fail.
In newer phones: #*7337#
_____________________________________
39. Samsung
NOTE: This code may perform a phone reset. Please make sure your phone
book is backed up before entering any codes. We are NOT responsible for
any damage to your mobile phone.
Your Unlock code is:
Model: Samsung SGH-S307
Turn off the phone. Put a non-accepted SIM Card and turn it on. Type
*#9998*3323#. Press Exit. Choose menu #7. After phone reboots type *0141#
and hit the Call button. Turn off and insert another SIM Card. Turn on. The
code is 00000000.
In newer phones: #*7337#
----------------------------
Model: Samsung Universal
40. Samsung
TEMPORARY UNLOCK:
Put a non-accepted SIM Card and turn it on. Type *#9998*3323#. Press Exit.
You will get a new menu. Select Malloc Fail.
In newer phones: #*7337#
____________________________________-
NOTE: This code may perform a phone reset. Please make sure your phone
book is backed up before entering any codes. We are NOT responsible for
any damage to your mobile phone.
Your Unlock code is:
Model: Samsung SGH-X600
Turn off the phone. Put a non-accepted SIM Card and turn it on. Type
*#9998*3323#. Press Exit. Choose menu #7. After phone reboots type *0141#
and hit the Call button. Turn off and insert another SIM Card. Turn on. The
code is 00000000.
In newer phones: #*7337#
41. Samsung
----------------------------
Model: Samsung Universal
TEMPORARY UNLOCK:
Put a non-accepted SIM Card and turn it on. Type *#9998*3323#. Press Exit.
You will get a new menu. Select Malloc Fail.
In newer phones: #*7337#
____________________________________-
NOTE: This code may perform a phone reset. Please make sure your phone
book is backed up before entering any codes. We are NOT responsible for
any damage to your mobile phone.
Your Unlock code is:
Model: Samsung SGH-E500
42. Samsung
*2767*688#
In newer phones: #*7337#
To enter put in a non accepted sim card and enter the above code on the
keypad. If this does not work try without a simcard and then enter the code.
----------------------------
Model: Samsung Universal
TEMPORARY UNLOCK:
Put a non-accepted SIM Card and turn it on. Type *#9998*3323#. Press Exit.
You will get a new menu. Select Malloc Fail.
43. Samsung
In newer phones: #*7337#
___________________________________
NOTE: This code may perform a phone reset. Please make sure your phone
book is backed up before entering any codes. We are NOT responsible for
any damage to your mobile phone.
Your Unlock code is:
Model: Samsung SGH-R210
*2767*3855# *2767*2878#
To enter put in a non accepted sim card and enter the above code on the
keypad. If this does not work try without a simcard and then enter the code.
----------------------------
44. Samsung
Model: Samsung Universal
TEMPORARY UNLOCK:
Put a non-accepted SIM Card and turn it on. Type *#9998*3323#. Press Exit.
You will get a new menu. Select Malloc Fail.
In newer phones: #*7337#
_________________________________
NOTE: This code may perform a phone reset. Please make sure your phone
book is backed up before entering any codes. We are NOT responsible for
any damage to your mobile phone.
Your Unlock code is:
Model: Samsung SGH-S500
*2767*3855# *2767*688# *2767*927#
In newer phones: #*7337#
45. Samsung
To enter put in a non accepted sim card and enter the above code on the
keypad. If this does not work try without a simcard and then enter the code.
----------------------------
Model: Samsung Universal
TEMPORARY UNLOCK:
Put a non-accepted SIM Card and turn it on. Type *#9998*3323#. Press Exit.
You will get a new menu. Select Malloc Fail.
In newer phones: #*7337#
___________________________________________-
NOTE: This code may perform a phone reset. Please make sure your phone
book is backed up before entering any codes. We are NOT responsible for
any damage to your mobile phone.
46. Samsung
Your Unlock code is:
Model: Samsung SGH-2100
*2767*3855# *2767*2878#
To enter put in a non accepted sim card and enter the above code on the
keypad. If this does not work try without a simcard and then enter the code.
----------------------------
Model: Samsung Universal
TEMPORARY UNLOCK:
Put a non-accepted SIM Card and turn it on. Type *#9998*3323#. Press Exit.
You will get a new menu. Select Malloc Fail.