The document summarizes production benchmarks for RMC Samalkot including: - The highest monthly production was 10,999 cubic meters in July 2011. - The maximum daily production was 919 cubic meters also in July 2011. - The total production to date is 45,700 cubic meters. - The average and maximum monthly pumping quantities are 7,000 and 9,500 cubic meters respectively. - The highest concrete grade and largest temperature controlled pour were M40 grade and 1,300 cubic meters over 16 hours.