1. NAME: Sam Coley
ADDRESS: 9 Bursill Ct Wyndhamvale
3024 Victoria
MOBILE: 0431 292 911
EMAIL: samcoley50@gmail.com
QUALIFICATIONS: Qualified Mechanical Fitter and Turner
Cert. III in Engineering (Mechanical Trade)
Cert. IV in Engineering
Diploma of Engineering Technology
Forklift License
EWP License
BHP WAIO Inducted
BHP Billiton Rail Infrastructure Card
Confined Space
Gas Test Atmosphere
Working at Heights Certificate (BHPBIO Approved)
Demonstrate First Attack Firefighting Equipment (BHPBIO Approved)
Prevention of Electrical Shock while Welding (BHPBIO Approved)
Hot Work Level 2 (BHPBIO Approved)
Chemical Handling and Awareness Training
Construction White Card
Mates Trained
WORK EXPERIENCE
May 2015- Jan 2016 Tempo
Barrow Island
Construction of Lng Plant
Alignments of Rotary equipment
Installing mechanical equipment on transformers
Nitrogen purge and oil fill of transformers
Flange Management
Installation of pipe spools and valves
Punch list and completions
Commissioning and Operations Card
Mar 2015- May 2015 Charterhouse
Construction of Bhp iron ore cart repair shed
Installation of mechanical equipment
Installation of guarding
Alignments
Jan 2015 - Mar 2015 Visy
Alignment of drives and pulley’s
Overhaul of ovens and stackers
Installation of mechanical components
Identifying worn and damaged components and replacing
Reading of technical drawings
Aligning and tensioning belts
2. Dec 2014 Apex contracting
CSL shutdown
Pharmaceutical
Replace valves, gasket, and elastomers
Flange management
Jul 2014 – Oct 2014 Bechtel
GLNG Curtis Island (Construction of gas plant)
Flange management
Jetty work
Bolt Tensioning (Hydra tight)
Bolt Torqueing (High Torque)
Torque Wrenches
Installation of blinds for hydrostatic testing
Feb 2014 – May 2014 Ottoway Engineering
Santos Roma Hub 02 Construction
GLNG Project
FIFO (Queensland)
Install Pipe rack/ cable tray
Hydrostatic testing
Flange management
Mechanical equipment installation
Bolt Tensioning (Hydratight)
Bolt Torqueing (High Torque)
Torque Wrenches
Jul 2013 – Nov 2013 GoodLine
BHPBIO Sp3 Deconstruction project at Nelson point Port headland
FIFO (Western Australia)
Upgrade of transfer stations
Shutdowns
Finucane Island Construction / shutdowns
Align pulleys and roller frames
Conveyor installations
Steel erection
Pipe
Mar 2013 – Jul 2013 Yarra Trams
Removal and change of stanchions
Removal of ticketing machines
Installation of seats,stanchions,windows and other parts
Dec 2012 – Mar 2013 Apex Contracting
ABBE Christmas Shutdown
Construction of new factory
Removal and relocation of machinery
Installation and leveling of conveyors
Installation of machinery and piping
Fabrication of parts and brackets
Flange alignment
3. Mar 2012 - Dec 2012 Guala closures
Maintenance / Shutdowns and breakdowns
Preventative maintenance
Construction and installation of new machines
General machining / fabrication of parts and brackets
Cutting, Grinding, welding and installation of handrails.
Feb 2008 - Mar 2012 Coca Cola Amatil
Breakdowns / Preventative maintenance
Line upgrades
Line Shutdowns
General machining
General fabrication
Nov 2007 – Feb 2008 Laborer / concreter
Nov 2007 Finished yr 12
REFERENCES:
Danny Benneit Barrow Island Supervisor 0439 629 315
Brian Flannery GLNG Supervisor 0418 408 495
Terry Cox Yarra Trams Supervisor 0412 815 890
James Barrie Printing Department Manager
Guala Closures 0422 077 752
Joe McKenzie CCA Maintenance Manager 0419 306 927
Gary Taylor CCA Leading Hand 0409 933 668
Chris Buckby Visy leading hand 0434 629 110
Please feel free to contact the above references.