This document is a curriculum vitae for Md. Sadre Alam Khan that outlines his professional experience and qualifications. It describes his educational background in ecology, environment, and limnology as well as his professional accreditation as an EIA coordinator and functional area expert in ecology and biodiversity. The CV then details his employment history working on various EIA projects in sectors like roads, mining, municipal waste management, hydropower, and more. It provides examples of international projects he has worked on and responsibilities he has held in previous roles conducting environmental assessments.
Brooks Road Environmental Limited (formerly Edwards Landfill), Vertical Capacity Expansion Environmental Assessment has opened a Public Open House to present the contents for the draft EA report,describe the draft EA review process, meet the Project Team & ask questions and outline the next steps in the EA process.Visit website for more info: http://www.brenvironmental.com/history.
Brooks Road Environmental Limited (formerly Edwards Landfill), Vertical Capacity Expansion Environmental Assessment has opened a Public Open House to present the contents for the draft EA report,describe the draft EA review process, meet the Project Team & ask questions and outline the next steps in the EA process.Visit website for more info: http://www.brenvironmental.com/history.
Dear Sir / Madam,
Greetings and Good morning!!!!
Please find attached to this email a copy of my latest Resume. I am interested in applying for the Sr Hydrogeologist position. I have more than 16 years of experience in the field of Geological / Hydrogeological / and Geotechnical investigations in India, Singapore, Papua New Guinea and Bangladesh for soil & rock investigations for offshore and onshore. I believe that my strong technical experience and educational qualifications will make me a very competitive candidate for this position. I am immediately available for joining. If you have any questions or would like to set up a discussion, please let me know.
I look forward to hearing from you
Many Thanks,
Dr John Devadas. Dakey
drjohndevadas@yahoo.co.in
+91 8374568847
Dear Sir / Madam,
Greetings and Good morning!!!!
Please find attached to this email a copy of my latest Resume. I am interested in applying for the Sr Hydrogeologist position. I have more than 16 years of experience in the field of Geological / Hydrogeological / and Geotechnical investigations in India, Singapore, Papua New Guinea and Bangladesh for soil & rock investigations for offshore and onshore. I believe that my strong technical experience and educational qualifications will make me a very competitive candidate for this position. I am immediately available for joining. If you have any questions or would like to set up a discussion, please let me know.
I look forward to hearing from you
Many Thanks,
Dr John Devadas. Dakey
drjohndevadas@yahoo.co.in
+91 8374568847
Dear Sir / Madam,
Greetings and Good morning!!!!
Please find attached to this email a copy of my latest Resume. I am interested in applying for the Sr Hydrogeologist position. I have more than 16 years of experience in the field of Geological / Hydrogeological / and Geotechnical investigations in India, Singapore, Papua New Guinea and Bangladesh for soil & rock investigations for offshore and onshore. I believe that my strong technical experience and educational qualifications will make me a very competitive candidate for this position. I am immediately available for joining. If you have any questions or would like to set up a discussion, please let me know.
I look forward to hearing from you
Many Thanks,
Dr John Devadas. Dakey
drjohndevadas@yahoo.co.in
+91 8374568847
Dear Sir / Madam,
Greetings and Good morning!!!!
Please find attached to this email a copy of my latest Resume. I am interested in applying for the Sr Hydrogeologist position. I have more than 16 years of experience in the field of Geological / Hydrogeological / and Geotechnical investigations in India, Singapore, Papua New Guinea and Bangladesh for soil & rock investigations for offshore and onshore. I believe that my strong technical experience and educational qualifications will make me a very competitive candidate for this position. I am immediately available for joining. If you have any questions or would like to set up a discussion, please let me know.
I look forward to hearing from you
Many Thanks,
Dr John Devadas. Dakey
drjohndevadas@yahoo.co.in
+91 8374568847
1. Curriculum Vitae – Md. Sadre Alam Khan
Page 1 of 7
1. Proposed Position : EIA Coordinator & Functional Area Expert
2. Name of Personnel : Md Sadre Alam Khan
3. Date of Birth : 11th November 1979
4. Nationality : Indian
5. Educational Qualification:
Master of Science ( Ecology, Environment and Limnology)
Perusing P.hD in Environment Sciences
6. Professional Accreditation By QCI/NABET – Approved Coordinator for Sectors:
1. River Valley, Hydel, Drainage & Irrigation projects
2. Highways, Railways, transport terminals, mass rapid transport systems
3. Mining of minerals
4. Building and large construction projects including shopping malls,
multiplexes, commercial complexes, housing estates, hospitals, institutions
5. Townships and Area development Projects
Functional Area Expert: Ecology & Biodiversity (EB) – Category A
7. Employment Record :
Duration Firm’s Name Position
1 Sep 2015 till Date. Yes Enviro Solutions. General Manager
5th Jan 2015 to 30
August 2015
Greenmount Environmental
Services
Senior Manager
March 2014 – 3rd Jan
2015
ICT Pvt. Ltd, Green Park New
Delhi.
Senior Manager
August2011– March
2014
Voyants Solutions Pvt. Ltd.,
Gurgaon
Manager
Feb. 11 – July 11 EQMS India Pvt.Ltd Specialist
July 2010 to Feb
2011
GRC India Pvt. Ltd Sr. Research Officer
Feb 2007 to June
2010
SENES Consultants India Pvt. Ltd,
Canada
Ecologist
May 2005 – Feb
2006
Grc India (P) Ltd Research Officer
8. International Assignment:
EIA and EMP Study for Dualization of Exisitng Kaduna –Kawara- Niger- Jebba – Ilorine road for 480 km
stretch in state of Kaduna, Kawara and Niger. Cleint Name: ITNL Africa. State: Kaduna, Kawara, Niger.
Country: Nigeria, Africa
Singroba 44 MW Hydro Electric Power Project. Bankable Feasibility Report. Client: IVOIRE Hydro
Energy; South Africa. Country: REPUBLIC OF COTE’D IVOIRE; South Africa.
Consulting Services: Environmental and Social Safeguards Studies related to the Yemen International
Corridor Highway Project section between Taiz and the city of Aden (140 km). Country: Yamen. Client:
World Bank
2. Curriculum Vitae – Md. Sadre Alam Khan
Page 2 of 7
9. 5th June to 31st August 2015: Greenmounts Environment Services, Vasundhara
Ghaziabad.
10. March 2014 to 3rd Jan 2015: Intercontinental Consultants and Technocrats Pvt.Ltd.,
Green Park New Delhi
Project Name (Road Sector) Description of Responsibilities
Development of Vadodara Mumbai Expressway
(Phase –I) from Km 104 +700 (Km 390+864 of NH -
8 to Km 378+722 (Km 80 of NE -1) in the State of
Gujarat, Maharashtra and Union Territory of
Dadra & Nagar Havelli. Project Cost: 14203.36
Crore (National Highway Authority of India)
Site visit, preparation of EIA report, public hearing,
forest clearance application, follow up of forest
clearance, wildlife clearance, meeting with different
offices, etc.
Consultancy services for preparation of DPR for
Rehabilitation and up gradation to two lane/two lane
with paved shoulder configuration and strengthening of
Bankura to Purulia section (km 0.00 to 84) of NH-60A
in the State of West Bengal
Client: MoRTH
Funding Agency: World Bank
Engaged in site visit, EIA report writing and
Identification of environmental Impact Assessment
and preparation of environmental Management Plan.
11. August. 2011- March 2014: Voyants Solutions Pvt. Ltd., Gurgaon.
Project Name (Road Sector) Description of Responsibilities
Preparation of Feasibility-Cum-Preliminary Design for 4-
laning of existing 2-lane National Highway No. 17 from
chainage 161/00 (Kashedi) to 260/000 (Ozarkhol) of NH-17 to
be executed as BOT (Toll) project on DBFOT pattern (100.10
km, 4 Lane), Project Cost: 874.14 Cr (Client : P W Circle,
Ratnagiri, Maharashtra)
As Environmental Expert responsible for
:
Responsible for Reconnaissance survey,
Preliminary environmental screening,
Identification of environmental impacts.
Preparation of environmental management
plan (EMP) Preparation of Post project
monitoring plan; and Assessment of the
costs of the environmental impact
mitigation measures.
Preparation of ToR and presentation to
MoEF.
Public hearing presentation
Preparation and Presentation for
Environmental Clearance before the
MoEF
Preparation of Feasibility Report for Four laning with paved
shoulders of Kashipur – Sitarganj Section of NH-74 through
Public Private Partnership on Design, Build, Finance, Operate
and Transfer Basis (77.2 km, 4 Lane) , Project Cost: 685.84 Cr
(Client : National Highways Authority of India)
Preparation of Feasibility Report for Four laning with paved
shoulders of the section from Kiratpur – Bilaspur Section of
NH-21 through Public Private Partnership on Design, Build,
Finance, Operate and Transfer Basis (26.462 km, 4 Lane),
Project Cost: 724.82 Cr, (Client :NationalHighways Authority of
India)
Project Name (Mining Sector) Description of Responsibilities
Raibazar Kaolinised Sand Stone, Silica Sand and
China Clay. Area 65.197 Ha. Cat.A project.
Client: M/s Standard Mercantile Company (Mining
Division) Pvt.Ltd.
Involve in preparation of EIA/EMP report.
Preparation of biodiversity report. Preparation of
mine closure plan. Technical presentation to SPCB,
Ranchi, Jharkand. Coordination with SPCB for
Public Hearing. Prepared and conducted public
hearing.
Rajmahal Kaolinized Sandstone and China Clay
Mine. Area 24.28 Ha Area. Cat.A
Client: M/s Dalmia Agencies Private Limited
Involve in preparation of EIA/EMP report.
Preparation of biodiversity report. Preparation of
mine closure plan. Technical presentation to SPCB,
Ranchi, Jharkand. Coordination with SPCB for
Public Hearing. Prepared and conducted public
hearing.
3. Curriculum Vitae – Md. Sadre Alam Khan
Page 3 of 7
National Highway – 24 B for Two laning with paved shoulder
and augmentation to 4 lane of the section for Rae Bareilly to
Allahabad through PPP on DBFOT Basis.
(Client : National Highways Authority of India)
EIA Preparation: collection,
documentation, and analysis of ecological
status of flora and fauna in the proposed
project area. Impact prediction and EMP
formulation & to Conduct Public Hearing
meeting under EIA notification 2006 and
draft notification, 2009,
Final Environmental Clearance
presentation before the MoEF
National Highway - 86 Development and operation of existing
from 2 – lane to 2 – lane with paved shoulder for Nagaur –
Bikaner section ( from km 161.00 to km 267.325), in state of
rajasthan.
( Client:PWD, Rajasthan
EIA Preparation: collection,
documentation, and analysis of ecological
status of flora and fauna in the proposed
project area. Impact prediction and EMP
formulation & to Conduct Public Hearing
meeting under EIA notification 2006 and
draft notification, 2009.
Forest Clearance application to District
Forest Office
Consultancy Service for Preparation of Detailed Project Report for
Rehabilitation and up gradation to 2 lanes/ 2lanes with paved
shoulders configuration and strengthening of Betiah – Kushinagar
Section (Km 25 to Km 112) of NH – 28B in the state of Bihar.
Client: MoRTH
Funding Agency: World Bank
As Environmental Expert
responsible for :
Responsible for Reconnaissance
survey, Preliminary environmental
screening, Identification of
environmental impacts. Preparation of
environmental management plan
(EMP) Preparation of Post project
monitoring plan; and Assessment of
the costs of the environmental impact
mitigation measures.
Preparation of ToR and presentation to
MoEF.
Survey of wildlife area, affected or
diverted for development. Preparation
of Wildlife Report, preparation of
wildlife clearance application form
and application for wildlife clearance
from Wildlife Standing Committee.
Municipal Solid Waste Management Facility
Environmental Clearance for the proposed Municipal Solid
waste management Facility at Jainpur and for engineered
landfill site at Jamalpur in the State of Punjab. Project Cost:
200.00 Cr. (Client: IL& FS)
Capacity; 475 TPD Capacity
Responsible for Reconnaissance
survey, Preliminary environmental
screening, Identification of
environmental impacts. Preparation of
environmental management plan
(EMP) Preparation of Post project
monitoring plan; and Assessment of
the costs of the environmental impact
mitigation measures as per CEEPHO
and Municipal Solid water Guideline.
Preparation and presentation for
Environmental Clearance before
SEAC and SEIAA in the state of
Punjab
4. Curriculum Vitae – Md. Sadre Alam Khan
Page 4 of 7
Environmental Clearance for the proposed Municipal Soils
waste management Facility at Mansa Road and for
engineered landfill site at Mandikhurd. Project Cost: 200
Cr. (Client: IL&FS)
Capacity: 375 TPD Capacity
Responsible for Reconnaissance
survey, Preliminary environmental
screening, Identification of
environmental impacts. Preparation of
environmental management plan
(EMP) Preparation of Post project
monitoring plan; and Assessment of
the costs of the environmental impact
mitigation measures as per CEEPHO
and Municipal Solid water Guideline.
Preparation and presentation for
Environmental Clearance before
MoEF
Mining
Environmental Clearance for the proposed expansion of 171
Ha of mining lease area Dilliparbat mine in Bokajan district
Kabri Anglong in the state of Assam. Project area 171 Ha.
(Client: Cement Corporation of India)
Expansion from 3 Lakh tonnes per annum to 6 Lakh tonnes
per annum.
Responsible for Reconnaissance survey,
Preliminary environmental screening,
Identification of environmental impacts.
Preparation of environmental management
plan (EMP) Preparation of Post project
monitoring plan; and Assessment of the
costs of the environmental impact
mitigation measures as per Mining Act
1954 and Technical guideline manual for
mining project.
Preparation of ToR and Public Hearing
Presentation before MoEF and State
Pollution Controll Board.
Hydropower Plant and Irrigations Project
Patne Medium Irrigation Project Panna (M.P). Catchment
Area – 1387.00 Sq.Km; Gross Storage Capacity – 162.00
MCM, Live Storage Capacity – 103.98 MCM, Gross
Command Area – 13795 Ha. Cultivable Command Area -
6670 Ha. At Village – Hada, Tehsil – Pawai, District – Panna
(M.P).
(Client: Water Resource Deptt. Bhopal)
Responsible for Reconnaissance survey,
Preliminary environmental screening,
Identification of environmental impacts.
Preparation of environmental management
plan (EMP), Command Area
Development Plan, Catchment Area
Treatment Plan, preparation of Post
project monitoring plan; and Assessment
of the costs of the environmental impact
mitigation measures.
Expert Feedback: Site visit and
preparation of Biodiversity report for
Study area, Catchment area, Submergence
area, Command area, Riparian Habitat,
Afforestation Plan, etc
5. Curriculum Vitae – Md. Sadre Alam Khan
Page 5 of 7
Pawai Medium Irrigation Project Panna (M.P) Catchment
Area 995.00 Sq.km, Gross Storage Capacity – 124.00 MCM,
Live Storage Capacity – 108.45 MCM, Gross Command
Area – 13785 Ha. Cultivable Command Area – 9952 Ha, at
Village – Pandheria, Tehsil – Shanagar, District – Panna.
(Client: Water Resource Deptt. Bhopal)
Responsible for Reconnaissance survey,
Preliminary environmental screening,
Identification of environmental impacts.
Preparation of environmental management
plan (EMP), Command Area
Development Plan, Catchment Area
Treatment Plan, preparation of Post
project monitoring plan; and Assessment
of the costs of the environmental impact
mitigation measures.
Expert Feedback: Site visit and
preparation of Biodiversity report for
Study area, Catchment area, Submergence
area, Command area, Riparian Habitat,
Afforestation Plan, etc
Runj Medium Irrigation Project Panna (M.P) Catchment
Area 890.00 Sq.km, Gross Storage Capacity – 114.00 MCM,
Live Storage Capacity – 102.45 MCM, Gross Command
Area – 13185 Ha. Cultivable Command Area – 7890 Ha, at
Village – Pandheria, Tehsil – Shanagar, District – Panna.
(Client: Water Resource Deptt. Bhopal)
Responsible for Reconnaissance survey,
Preliminary environmental screening,
Identification of environmental impacts.
Preparation of environmental management
plan (EMP), Command Area
Development Plan, Catchment Area
Treatment Plan, preparation of Post
project monitoring plan; and Assessment
of the costs of the environmental impact
mitigation measures.
Expert Feedback: Site visit and
preparation of Biodiversity report for
Study area, Catchment area, Submergence
area, Command area, Riparian Habitat,
Afforestation Plan, etc
Construction and Township Project
EIA for Project like Sahara City Home
Bareilly – Township and Area Development Project
Kashipur – Construction
Hardwar – Township and Area Development Projects
IGNOU Campus – Institution
Assotech Moonshine - Township and Area Development
Responsible for Reconnaissance survey,
Preliminary environmental screening,
Identification of environmental impacts.
Preparation of environmental management
plan (EMP), preparation of Post project
monitoring plan; and Assessment of the
costs of the environmental impact
mitigation measures.
Presentation to Respective State
committee
River Front Development Project
Consultancy Services For EIA study for Proposed River
Front Development in Patna.
Client: National Ganga River Basin Development Authority
Funding Agency: World Bank
As a team member - Responsible for
Reconnaissance survey, Preliminary
environmental screening, Identification of
environmental impacts. Preparation of
environmental management plan (EMP),
preparation of Post project monitoring
plan; and Assessment of the costs of the
environmental impact mitigation
measures.
6. Curriculum Vitae – Md. Sadre Alam Khan
Page 6 of 7
As Environmental Expert for Ecology & Biodiversity responsible for:
Responsible for Reconnaissance survey, Preliminary environmental screening, Preparation of Baseline Report,
Identification of environmental impacts; Preparation of environmental management plan (EMP) Preparation of
Post project monitoring plan; Green Belt and Afforestation Plan.
Feb. 11 – July. 11 EQMS India Pvt.Ltd Environment Specialist
Environmental Clearance for the proposed 98 MW Ganderbal Hydro Electric Project at District
Ganderbal in the State of Jammu & Kashmir. Capacity: 98 MW, (Client JKSPCD)
Environmental Clearance for the proposed 45 MW Pappu Valley Hydropower project on Papu River,
District West Kamengs District, Arunachal Pradesh. (Client: Venzar Engineering Ltd)
Environmental Clearance for the proposed 35 MW Phudun Hyrdopower Project on Phudun River at
Village Phudun in Dist East Kamengs District, Arunachal Pradesh. (Client: Patel Engineering Ltd )
Environmental Clearance for the proposed 45 MW Saskang Rong Hydro Electric Project, District East
Kameng District, Arunachal Pradesh. (Client: Patel Engineering Ltd )
Environmental Clearance for the proposed 660x 2 MW Coal Based thermal power Plant at Village
Harduagang, Kasimpur; District Aligarh. (Client: Uttar Pradesh Power Corporation)
Wildlife Clearance for the proposed flood spill channel through Hokersar Wetland, Declared
Conservation Reserve under Wildlife Protection act – 1978 (J&K). (Client: Lake & Water Way
Department; J&K)
Involve in Ecological and Biodiversity study of terrestrial and aquatic habitat. Conduction Reconnaissance
survey, collection primary and secondary data of the project affected area and study area. Calculation of
biodiversity indexes, Identification of impact based on primary survey and secondary data. Preparation of
Environmental Management Plan and proposal of mitigation measures in the impact zone. Preparation of
Afforestation and wildlife management plan.
July 2010 to Feb 2011 GRC India Pvt. Ltd Sr. Research Officer
Preparation of EIA report for river bed mining located in sensitive area like Reserve Forest and near Wildlife
Sanctuary & Wildlife Protected area, Doon Valley Reserve in the state of Uttarakhand for the Forest
Development Corporation. The details of the project are as under.
Gaula River - Mining Area 1497 Hector, Dist Nainital, Haldwani, Uttaranchal. (Client UKFDC)
Song – 1 – Mining Area ( 350 Hector) District – Dehradun, Uttaranchal. (Client UKFDC)
Song – II Mining Area (275 Hector) District – Dehradun, Uttaranchal. (Client UKFDC)
Song – III Mining Area 270 Hector) District – Dehradun, Uttaranchal. (Client UKFDC)
Jakhan – I Mining Area (195 Hector) District – Dehradun, Urraranchal. (Client UKFDC)
Jakhan – II, Mining Area ( 100 Hector) District – Dehradun, Uttaranchal. (Client UKFDC)
Dabka River, Mining area (223 Hector) District Nainital, Ramnagar, Uttaranchal. (Client
UKFDC)
7. Curriculum Vitae – Md. Sadre Alam Khan
Page 7 of 7
Kosi River, Mining Area (254 Hector) District, Nainital, Ramnagar, Uttaranchal. (Client
UKFDC)
Sharda River, Mining Area (385 Hector) District – Nainital, Tanakpur, Uttaranchal. (Client
UKFDC)
Feb 2007 to June 2010 SENES Consultants India Pvt. Ltd, Canada t
As Ecologist & Environmental Expert responsible for:
Environmental Clearance for the proposed expansion of Kushinagar International airport in
District Kushinagar in Uttar Pradesh. (Client: IL & FS).
Environmental Clearance for the proposed Municipal Solid Waste Management Facility at
District Bikaner in the state of Rajasthan. Capacity 250 MT/D. (Client: Unique Waste Processing
Company).
Environmental Study for three existing landfill site. Okhla, Bahlswa & Ghazipur for estimation
of gas traped in landfill and it environmental effect. (Client: World Bank)
Environmental Study for development of BRT Corridor for New Raipur City, in Raipur
District. Madhya Pradesh. (Client: World Bank).
Environmental Clearance for three ropeway project namely Dehradun – Missuori Ropeway
project, Yomunitori Ropeway Project & Gongotri Ropeway Project in the State Uttarakhand
and Himachal pradesh. (Client: RITES)
Environmental Clearance for the Eight Land Parcels (an area develop project) in eight district of
Uttar Pradesh. (Client: Jaypee).
Environmental Baseline study for 10 township project in the different district of Uttar Pradesh &
Madhya Pradesh. (Client: Sahara India).
Involve in Reconnaissance survey. Collection of primary and secondary data for the project site and
study area. Identification of impact on existing biological features at project site and study area due to
project development.
Case Study of Patnam Wetland in District Etah, Uttar Pradesh. The Case study involves
identification of pollution source, water quality, study of aquatic flora and terrestrial fauna.
Migratory season, habitat study, population and variety of bird’s species, effect of herbicides,
pesticides and organic manure and it magnification in aquatic species. Change in land use
nearby by using resent satellite map.
Md Sadre Alam Khan
Mob: +919953624100
+917065077477
E.Mail: sadresenes@gmail.com
April 2006 – December 2006 Departmental Project (AMU)