Raspberry Pi® User Guide
Table of Contents
Introduction
Programming is fun!
A bit of history
So what can you do with the Raspberry Pi?
Part I: Connecting the Board
Chapter 1: Meet the Raspberry Pi
ARM vs. x86
Windows vs. Linux
Getting Started with the Raspberry Pi
Connecting a Display
Connecting Audio
Connecting a Keyboard and Mouse
Flashing the SD Card
Connecting External Storage
Connecting the Network
Connecting Power
Chapter 2: Linux System Administration
Linux: An Overview
Linux Basics
Introducing Debian
Using External Storage Devices
Creating a New User Account
File System Layout
Logical Layout
Physical Layout
Installing and Uninstalling Software
Finding Software
Installing Software
Uninstalling Software
Upgrading Software
Chapter 3: Troubleshooting
Keyboard and Mouse Diagnostics
Power Diagnostics
Display Diagnostics
Boot Diagnostics
Network Diagnostics
The Emergency Kernel
Chapter 4: Network Configuration
Wired Networking
Wireless Networking
Chapter 5: Partition Management
Creating a New Partition
Resizing Existing Partitions
Automatic Resizing
Manual Resizing
Moving to a Bigger SD Card
Imaging from Linux
Imaging from OS X
Imaging from Windows
Chapter 6: Configuring the Raspberry Pi
Hardware Settings—config.txt
Modifying the Display
Boot Options
Overclocking the Raspberry Pi
Disabling L2 Cache
Enabling Test Mode
Memory Partitioning—start.elf
Software Settings—cmdline.txt
Part II: Using the Pi as a Media Centre, Productivity Machine and Web Server
Chapter 7: The Pi as a Home Theatre PC
Playing Music at the Console
Dedicated HTPC with Rasbmc
Streaming Internet Media
Streaming Local Network Media
Configuring Rasbmc
Chapter 8: The Pi as a Productivity Machine
Using Cloud-Based Apps
Using OpenOffice.org
Image Editing with The Gimp
Chapter 9: The Pi as a Web Server
Installing a LAMP Stack
Installing WordPress
Part III: Programming and Hacking
Chapter 10: An Introduction to Scratch
Introducing Scratch
Example 1: Hello World
Example 2: Animation and Sound
Example 3: A Simple Game
Robotics and Sensors
Sensing with the PicoBoard
Robotics with LEGO
Further Reading
Chapter 11: An Introduction to Python
Introducing Python
Example 1: Hello World
Example 2: Comments, Inputs, Variables and Loops
Example 3: Gaming with pygame
Example 4: Python and Networking
Further Reading
Chapter 12: Hardware Hacking
Electronic Equipment
Reading Resistor Colour Codes
Sourcing Components
Online Sources
Offline Sources
Hobby Specialists
The GPIO Port
UART Serial Bus
I²C Bus
SPI Bus
Using the GPIO Port in Python
Installing the GPIO Python Library
GPIO Output: Flashing an LED
GPIO Input: Reading a Button
Moving Up From the Breadboard
A Brief Guide to Soldering
Chapter 13: Add-on Boards
Ciseco Slice of Pi
Adafruit Prototyping Pi Plate
Fen Logic Gertboard
Part IV: Appendixes
Appendix A: Python Recipes
Appendix B: HDMI Display Modes
Raspberry Pi® User Guide
Eben Upton and Gareth Halfacree
Raspberry Pi® User Guide
This edition first published 2012
© 2012 Eben Upton and Gareth Halfacree
Registered office
John Wiley & Sons Ltd., The Atrium, Southern Gate, Chichester, West Sussex, PO19 8SQ, United
Kingdom
For details of our global editorial offices, for customer services and for information about how to apply
for permission to reuse the copyright material in this book please see our website at www.wiley.com.
The right of the authors to be identified as the authors of this work has been asserted in accordance
with the Copyright, Designs and Patents Act 1988.
All rights reserved. No part of this publication may be reproduced, stored in a retrieval system, or
transmitted, in any form or by any means, electronic, mechanical, photocopying, recording or
otherwise, except as permitted by the UK Copyright, Designs and Patents Act 1988, without the prior
permission of the publisher.
Wiley also publishes its books in a variety of electronic formats. Some content that appears in print may
not be available in electronic books.
Designations used by companies to distinguish their products are often claimed as trademarks. All
brand names and product names used in this book are trade names, service marks, trademarks or
registered trademarks of their respective owners. The publisher is not associated with any product or
vendor mentioned in this book. This publication is designed to provide accurate and authoritative
information in regard to the subject matter covered. It is sold on the understanding that the publisher is
not engaged in rendering professional services. If professional advice or other expert assistance is
required, the services of a competent professional should be sought.
Trademarks: Wiley and the Wiley logo are trademarks or registered trademarks of John Wiley and
Sons, Ltd. and/or its affiliates in the United States and/or other countries, and may not be used without
written permission. Raspberry Pi and the Raspberry Pi logo are registered trademarks of the Raspberry
Pi Foundation. All other trademarks are the property of their respective owners. John Wiley & Sons,
Ltd. is not associated with any product or vendor mentioned in the book.
Google Drive™ is a registered trademark of Google™.
A catalogue record for this book is available from the British Library.
ISBN 978-1-118-46446-5 (pbk); ISBN 978-1-118-46448-9 (ebk); ISBN 978-1-118-46447-2 (ebk); ISBN
978-1-118-46449-6 (ebk)
Set in 10 pt. Chaparral Pro by Indianapolis Composition Services
Printed simultaneously in Great Britain and the United States
Publisher’s Acknowledgements
Some of the people who helped bring this book to market include the following:
Editorial and Production
VP Consumer and Technology Publishing Director
Michelle Leete
Associate Director–Book Content Management
Martin Tribe
Associate Publisher
Chris Webb
Executive Commissioning Editor
Craig Smith
Assistant Editor
Ellie Scott
Project Editor
Kathryn Duggan
Copy Editor
Kathryn Duggan
Technical Editor
Omer Kilic
Editorial Manager
Jodi Jensen
Senior Project Editor
Sara Shlaer
Editorial Assistant
Leslie Saxman
Marketing
Associate Marketing Director
Louise Breinholt
Marketing Manager
Lorna Mein
Senior Marketing Executive
Kate Parrett
Composition Services
Compositor
Erin Zeltner
Proofreader
Wordsmith Editorial
Indexer
BIM Indexing & Proofreading Services
About the Authors
EbenUptonis a founder and trustee ofthe RaspberryPiFoundation, and serves as its Executive Director. He is responsible for
the overallsoftware and hardware architecture ofthe RaspberryPi, and for the Foundation's relationships withits keysuppliers
and customers. Inanearlier life, he founded two successfulmobile games and middleware companies, Ideaworks 3d Ltd. and
PodfunLtd., and held the post ofDirector ofStudies for Computer Science at St John's College, Cambridge. He holds a BA, a
PhDand anMBAfromthe UniversityofCambridge.
Inhis dayjob, Ebenworks for Broadcomas anASIC architect and generaltroublemaker.
GarethHalfacree is a freelance technologyjournalist and the co-author ofthe RaspberryPiUser Guide alongside project co-
founder EbenUpton. Formerlya systemadministrator workinginthe educationsector, Gareth’s passionfor opensource
projects has followed himfromone career to another, and he canoftenbe seenreviewing, documentingor evencontributingto
projects includingGNU/Linux, LibreOffice, Fritzingand Arduino. He is also the creator ofthe Sleepduino and Burnduino open
hardware projects, whichextend the capabilities ofthe Arduino electronics prototypingsystem. Asummaryofhis current work
canbe found at http://freelance.halfacree.co.uk.
For Liz, who made it all possible.
—Eben
For my father, the enthusiastic past, and my daughter, the exciting future.
—Gareth
Introduction
“Childrentoday are digitalnatives”, said a manI got talkingto at a fireworks partylast year. “I don’t understand whyyou’re
makingthis thing. Mykids knowmore about settingup our PC thanI do.”
I asked himiftheycould program, to whichhe replied:“Whywould theywant to? The computers do allthe stufftheyneed for
themalready, don’t they? Isn’t that the point?”
As it happens, plentyofkids todayaren’t digitalnatives. We have yet to meet anyofthese imagined wild digitalchildren,
swingingfromropes oftwisted-pair cable and chantingwar songs innicelyparsed Python. Inthe RaspberryPiFoundation’s
educationaloutreachwork, we do meet a lot ofkids whose entire interactionwithtechnologyis limited to closed platforms with
graphicaluser interfaces (GUIs) that theyuse to playmovies, do a spot ofword-processed homework and playgames. They
canbrowse the web, upload pictures and video, and evendesignweb pages. (They’re oftenbetter at settingthe satellite TVbox
thanMumor Dad, too.) It’s a usefultoolset, but it’s shockinglyincomplete, and ina countrywhere 20%ofhouseholds stilldon’t
have a computer inthe home, eventhis toolset is not available to allchildren.
Despite the most fervent wishes ofmynewacquaintance at the fireworks party, computers don’t programthemselves. We need
anindustryfullofskilled engineers to keep technologymovingforward, and we need youngpeople to be takingthose jobs to fill
the pipeline as older engineers retire and leave the industry. But there’s muchmore to teachinga skilllike programmatic thinking
thanbreedinga newgenerationofcoders and hardware hackers. Beingable to structure your creative thoughts and tasks in
complex, non-linear ways is a learned talent, and one that has huge benefits for everyone who acquires it, fromhistorians to
designers, lawyers and chemists.
Programming is fun!
It’s enormous, rewarding, creative fun. Youcancreate gorgeous intricacies, as wellas (muchmore gorgeous, inmyopinion)
clever, devastatinglyquick and deceptivelysimple-lookingroutes through, under and over obstacles. Youcanmake stuffthat’ll
have other people lookingonjealously, and that’llmake youfeelwonderfullysmugallafternoon. Inmydayjob, where I design
the sort ofsiliconchips that we use inthe RaspberryPias a processor and work onthe low-levelsoftware that runs onthem, I
basicallyget paid to sit around alldayplaying. What could be better thanequippingpeople to be able to spend a lifetime doing
that?
It’s not evenas ifwe’re comingfroma positionwhere childrendon’t want to get involved inthe computer industry. Abigkick
up the backside came a fewyears ago, whenwe were movingquite slowlyonthe RaspberryPiproject. Allthe development
work onRaspberryPiwas done inthe spare evenings and weekends ofthe Foundation’s trustees and volunteers—we’re a
charity, so the trustees aren’t paid bythe Foundation, and we allhave full-time jobs to paythe bills. This meant that occasionally,
motivationwas hard to come bywhenallI wanted to do inthe eveningwas slump infront ofthe Arrested Development boxed
set witha glass ofwine. One evening, whennot slumping, I was talkingto a neighbour’s nephewabout the subjects he was
takingfor his GeneralCertificate ofSecondaryEducation(GCSE, the Britishsystemofpublic examinations takeninvarious
subjects fromthe age ofabout 16), and I asked himwhat he wanted to do for a livinglater on.
“I want to write computer games”, he said.
“Awesome. What sort ofcomputer do youhave at home? I’ve got some programmingbooks youmight be interested in.”
“AWiiand anXbox.”
Ontalkingwithhima bit more, it became clear that this perfectlysmart kid had never done anyrealprogrammingat all; that there
wasn’t anymachine that he could programinthe house; and that his informationand communicationtechnology(ICT) classes—
where he shared a computer and was taught about web page design, usingspreadsheets and word processing—hadn’t really
equipped himto use a computer eveninthe barest sense. But computer games were a passionfor him(and there’s nothing
peculiar about wantingto work onsomethingyou’re passionate about). So that was what he was hopingthe GCSEsubjects
he’d chosenwould enable himto do. He certainlyhad the artistic skills that the games industrylooks for, and his maths and
science marks weren’t bad. But his schoolinghad skirted around anyprogramming—there were no Computingoptions onhis
syllabus, just more ofthe same ICTclasses, withits emphasis onend users rather thanprogramming. And his home interactions
withcomputingmeant that he stood a vanishinglysmallchance ofacquiringthe skills he needed inorder to do what he really
wanted to do withhis life.
This is the sort ofsituationI want to see the back of, where potentialand enthusiasmis squandered to no purpose. Now,
obviously, I’mnot monomaniacalenoughto imagine that simplymakingthe RaspberryPiis enoughto effect allthe changes that
are needed. But I do believe that it canact as a catalyst. We’re alreadyseeingbigchanges inthe UK schools’ curriculum, where
Computingis arrivingonthe syllabus and ICTis beingreshaped, and we’ve seena massive change inawareness ofa gap inour
educationaland culturalprovisionfor kids just inthe short time since the RaspberryPiwas launched.
Too manyofthe computingdevices a child willinteract withdailyare so locked downthat theycan’t be used creativelyas a tool
—eventhoughcomputingis a creative subject. Tryusingyour iPhone to act as the brains ofa robot, or gettingyour PS3 to play
a game you’ve written. Sure, youcanprogramthe home PC, but there are significant barriers indoingthat whicha lot ofchildren
don’t overcome:the need to download specialsoftware, and havingthe sort ofparents who aren’t worried about youbreaking
somethingthat theydon’t knowhowto fix. And plentyofkids aren’t evenaware that doingsucha thingas programmingthe
home PC is possible. Theythink ofthe PC as a machine withnice clickyicons that give youaneasywayto do the things you
need to do so youdon’t need to think much. It comes ina sealed box, whichMumand Dad use to do the bankingand which
willcost lots ofmoneyto replace ifsomethinggoes wrong!
The RaspberryPiis cheap enoughto buywitha fewweeks’ pocket money, and youprobablyhave allthe equipment youneed
to make it work:a TV, anSDcard that cancome fromanold camera, a mobile phone charger, a keyboard and a mouse. It’s
not shared withthe family; it belongs to the kid; and it’s smallenoughto put ina pocket and take to a friend’s house. If
somethinggoes wrong, it’s no bigdeal—youjust swap out a newSDcard and your RaspberryPiis factory-newagain. And all
the tools, environments and learningmaterials that youneed to get started onthe long, smoothcurve to learninghowto program
your RaspberryPiare right there, waitingfor youas soonas youturnit on.
A bit of history
I started work ona tiny, affordable, bare-bones computer about sixyears ago, whenI was a Director ofStudies inComputer
Science at Cambridge University. I’d received a degree at the UniversityComputer Lab as wellas studyingfor a PhDwhile
teachingthere, and over that period, I’d noticed a distinct decline inthe skillset ofthe youngpeople who were applyingto read
Computer Science at the Lab. Froma positioninthe mid-1990s, when17-year-olds wantingto read Computer Science had
come to the Universitywitha groundinginseveralcomputer languages, knewa bit about hardware hacking, and ofteneven
worked inassemblylanguage, we graduallyfound ourselves ina positionwhere, by2005, those kids were arrivinghavingdone
some HTML—witha bit ofPHP and CascadingStyle Sheets ifyouwere lucky. Theywere stillfearsomelyclever kids withlots
ofpotential, but their experience withcomputers was entirelydifferent fromwhat we’d beenseeingbefore.
The Computer Science course at Cambridge includes about 60 weeks oflecture and seminar time over three years. Ifyou’re
usingthe whole first year to bringstudents up to speed, it’s harder to get themto a positionwhere theycanstart a PhDor go into
industryover the next two years. The best undergraduates—the ones who performed the best at the end oftheir three-year
course—were the ones who weren’t just programmingwhenthey’d beentold to for their weeklyassignment or for a class
project. Theywere the ones who were programmingintheir spare time. So the initialidea behind the RaspberryPiwas a very
parochialone witha verytight (and prettyunambitious) focus:I wanted to make a toolto get the smallnumber ofapplicants to
this smalluniversitycourse a kick start. Mycolleagues and I imagined we’d hand out these devices to schoolkids at opendays,
and iftheycame to Cambridge for aninterviewa fewmonths later, we’d ask what they’d done withthe free computer we’d
giventhem. Those who had done somethinginterestingwould be the ones that we’d be interested inhavinginthe program. We
thought maybe we’d make a fewhundred ofthese devices, or best case, a lifetime productionrunofa fewthousand.
Ofcourse, once work was seriouslyunderwayonthe project, it became obvious that there was a lot more we could address
witha cheap little computer like this. What we started withis a longwayindeed fromthe RaspberryPiyousee today. I began
bysolderingup the longest piece ofbreadboard youcanbuyat MaplinwithanAtmelchip at our kitchentable, and the first
crude prototypes used cheap microcontroller chips to drive a standard-definitionTVset directly. Withonly512 K ofRAM, and
a fewMIPS ofprocessingpower, these prototypes were verysimilar inperformance to the original8-bit microcomputers. It was
hard to imagine these machines capturingthe imaginations ofkids used to moderngames consoles and iPads.
There had beendiscussions at the UniversityComputer Lab about the generalstate ofcomputer education, and whenI left the
Lab for a non-academic job inthe industry, I noticed that I was seeingthe same issues inyoungjob applicants as I’d beenseeing
at the University. So I got together withmycolleagues Dr Rob Mullins and Professor AlanMycroft (two colleagues fromthe
Computer Lab), Jack Lang(who lectures inentrepreneurship at the University), Pete Lomas (a hardware guru) and David
Braben(a Cambridge games industryleadinglight withaninvaluable address book), and over beers (and, inJack’s case, cheese
and wine), we set up the RaspberryPiFoundation—a little charitywithbigideas.
Why “Raspberry Pi”?
We get askeda lot where the name “Raspberry Pi” came from. Bits of the name came fromdifferent trustees. It’s one of the very fewsuccessful bits
of design by committee I’ve seen, andto be honest, Ihatedit at first. (Ihave since come to love the name, because it works really well—but it took a
bit of getting usedto since I’dbeen calling the project the “ABC Micro” in my headforyears.) It’s “Raspberry” because there’s a long tradition of
fruit names in computercompanies (besides the obvious, there are the oldTangerine andApricot computers—andwe like to think of the Acorn as a
fruit as well). “Pi” is a mangling of “Python”, which we thought early on in development wouldbe the only programming language available on a
much less powerful platformthan the Raspberry Pi we endedupwith. As it happens, we still recommendPython as ourfavourite language for
learning anddevelopment, but there is a worldof otherlanguage options you can explore on the Raspberry Pi too.
Inmynewrole as a chip architect at Broadcom, a bigsemiconductor company, I had access to inexpensive but high-performing
hardware produced bythe companywiththe intentionofbeingused inveryhigh-end mobile phones—the sort withthe HD
video and the 14-megapixelcameras. I was amazed bythe difference betweenthe chips youcould buyfor $10 as a small
developer, and what youcould buyas a cell-phone manufacturer for roughlythe same amount ofmoney:generalpurpose
processing, 3Dgraphics, video and memorybundled into a single BGApackage the size ofa fingernail. These microchips
consume verylittle power, and have bigcapabilities. Theyare especiallygood at multimedia, and were alreadybeingused by
set-top boxcompanies to playhigh-definitionvideo. Achip like this seemed the obvious next step for the shape the RaspberryPi
was taking, so I worked ontapingout a low-cost variant that had anARM microprocessor onboard and could handle the
processinggrunt we needed.
We felt it was important to have a wayto get kids enthusiastic about usinga RaspberryPieveniftheydidn’t feelvery
enthusiastic about programming. Inthe 1980s, ifyouwanted to playa computer game, youhad to boot up a boxthat went
“bing”and fed youa command prompt. It required typinga little bit ofcode just to get started, and most users didn’t ever go
beyond that—but some did, and got beguiled into learninghowto programbythat little bit ofinteraction. We realised that the
RaspberryPicould work as a verycapable, verytiny, verycheap modernmedia centre, so we emphasised that capabilityto
suck inthe unwary—withthe hope that they’d pick up some programmingwhile they’re at it.
After about five years’ hard grind, we had created a verycute prototype board, about the size ofa thumb drive. We included a
permanent camera module ontop ofthe board to demonstrate the sort ofperipherals that caneasilybe added, and brought it
alongto a number ofmeetings withthe BBC’s R&Ddepartment. Those ofus who grewup inthe UK inthe 1980s had learned a
lot about 8-bit computingfromthe BBC Microcomputer and the ecosystemthat had grownup around it—withBBC-produced
books, magazines and TVprogrammes—so I’d hoped that theymight be interested indevelopingthe RaspberryPifurther. But
as it turned out, somethinghas changed since we were kids:various competitionlaws inthe UK and the EUmeant that “the
Beeb”couldn’t become involved inthe waywe’d hoped. Ina last-ditchattempt to get somethingorganised withthem, we
ditched the R&Ddepartment idea and David (he ofthe giant address book) organised a meetingwithRoryCellan-Jones, a
senior techjournalist, inMay2011. Rorydidn’t hold out muchhope for partnership withthe BBC, but he did ask ifhe could
take a video ofthe little prototype board withhis phone, to put onhis blog.
The next morning, Rory’s video had gone viral, and I realised that we had accidentallypromised the world that we’d make
everybodya $25 computer.
While Rorywent offto write another blogpost onexactlywhat it is that makes a video go viral, we went offto put our thinking
caps on. That original, thumb-drive-sized prototype didn’t fit the bill:withthe camera included as standard, it was waytoo
expensive to meet the cost modelwe’d suggested (the $25 figure came frommystatement to the BBC that the RaspberryPi
should cost around the same as a text book, and is a splendid demonstrationofthe fact that I had no idea howmuchtext books
cost these days), and the tinyprototype modeldidn’t have enoughroomaround its peripheryfor allthe ports we needed to
make it as useable as we wanted it to be. So we spent a year workingonengineeringthe board to lower cost as muchas
possible while retainingallthe features we wanted (engineeringcost downis a harder job thanyoumight think), and to get the
RaspberryPias useable as possible for people who might not be able to afford muchinthe wayofperipherals.
We knewwe wanted the RaspberryPito be used withTVs at home, just like the ZXSpectruminthe 1980s, savingthe user the
cost ofa monitor. But not everybodyhas access to anHDMI television, so we added a composite port to make the Raspberry
Piwork withanold cathode-raytelevisioninstead since SDcards are cheap and easyto find. We decided against microSDas
the storage medium, because the little fingernail-sized cards are so flimsyinthe hands ofchildrenand so easyto lose. And we
went throughseveraliterations ofpower supply, endingup witha micro USBcable. Recently, micro USBbecame the standard
charger cable for mobile telephones across the EU(and it’s becomingthe standard everywhere), whichmeans the cables are
becomingmore and more ubiquitous, and inmanycases, people alreadyhave themat home.
Bythe end of2011, witha projected Februaryrelease date, it was becomingobvious to us that things were movingfaster, and
demand was higher, thanwe were ever goingto be able to cope with. The initiallaunchwas always aimed at developers, with
the educationallaunchplanned for later in2012. We have a smallnumber ofverydedicated volunteers, but we need the wider
Linuxcommunityto help us prepare a software stack and ironout anyearly-life niggles withthe board before releasinginto the
educationalmarket. We had enoughcapitalinthe Foundationto buythe parts for and build 10,000 RaspberryPis over a period
ofa monthor so, and we thought that the people inthe communitywho would be interested inanearlyboard would come to
around that number. Fortunatelyand unfortunately, we’d beenreallysuccessfulinbuildinga bigonline communityaround the
device, and interest wasn’t limited to the UK, or to the educationalmarket. Tenthousand was lookingless and less realistic.
OurCommunity
The Raspberry Pi community is one of the things we’re proudest of. We startedwith a very bare-bones blog at www.raspberrypi.org just afterRory’s
May 2011 video, andput upa forumon the same website shortly afterthat. That forumnowhas more than 20,000 members—between themthey’ve
contributedmore than 100,000 posts of wit andwisdomabout the Raspberry Pi. If there’s any question, no matterhowabstruse, that you want to ask
about the Raspberry Pi orabout programming in general, someone there will have the answer(if it’s not in this book, you’ll findit in the forums).
Part of my jobat Raspberry Pi involves giving talks to hackergroups, computing conferences, teachers, programming collectives andthe like, and
there’s always someone in the audience who has talkedto me orto my wife Liz (who runs the community) on the Raspberry Pi website—andsome
of these people have become goodfriends of ours. The Raspberry Pi website gets aroundone request every single secondof the day.
There are nowhundreds of fan sites out there. There’s also a fan magazine calledThe MagPi (a free downloadfromwww.themagpi.com), which is
producedmonthly by community members, with type-in listings, lots of articles, project guides, tutorials andmore. Type-in games in magazines and
books providedan easy route into programming forme—my earliest programming experience with the BBC Micro was of modifying a type-in
helicoptergame to addenemies andpick-ups.
We blog something interesting about the device at www.raspberrypi.org at least once every day. Come andjoin in the conversation!
There were 100,000 people onour mailinglist wantinga RaspberryPi—and theyallput anorder inondayone! Not
surprisingly, this brought up a fewissues.
First off, there are the inevitable paper cuts you’re goingto get boxingup 100,000 little computers and mailingthemout—and
the fact was that we had absolutelyno moneyto hire people to do this for us. We didn’t have a warehouse—we had Jack’s
garage. There was no waywe could raise the moneyto build 100,000 units at once—we’d envisaged makingtheminbatches of
2,000 everycouple ofweeks, which, withthis levelofinterest, was goingto take so longthat the thingwould be obsolete before
we managed to fulfilallthe orders. Clearly, manufacturingand distributionwere somethingwe were goingto have to give up on
and hand over to somebodyelse who alreadyhad the infrastructure and capitalto do that, so we got intouchwithelement14
and RS Components, bothUK microelectronics suppliers withworldwide businesses, and contracted withthemto do the actual
manufacture and distributionside ofthings worldwide so we could concentrate ondevelopment and the RaspberryPi
Foundation’s charitable goals.
Demand onthe first daywas stillso large that RS and element14’s websites bothcrashed for most ofthe day—at one point in
the day, element14 were gettingsevenorders a second, and for a couple ofhours onFebruary29, Google showed more
searches were made worldwide for “RaspberryPi”thanwere made for “LadyGaga”. I’mwritingthis inearlyJune 2012, and
orders inthe three months since we opened for business have topped halfa millionunits, eventhoughwe’re stillat a point when
neither companywillsellyoumore thanone RaspberryPi(they’re tryingto get rid oftheir order backlogs before theyturnonthe
abilityto multiorder). At this point, ifwe’d gone withour originalplans, we’d have made 100 or so ofthese devices for
Universityopendays, and that would have beenit.
There is nothingthat affects the blood pressure quite like accidentallyendingup runninga large computer company!
So what can you do with the Raspberry Pi?
This book explores a number ofthings youcando withyour RaspberryPi, fromcontrollinghardware withPython, to usingit as
a media centre, or buildinggames inScratch. The beautyofthe RaspberryPiis that it’s just a verytinygeneral-purpose
computer (whichmaybe a little slower thanyou’re used to for some desktop applications, but muchbetter at some other stuff
thana regular PC), so youcando anythingyoucould do ona regular computer withit. Inaddition, the RaspberryPihas
powerfulmultimedia and 3Dgraphics capabilities, so it has the potentialto be used as a games platform, and we verymuchhope
to see people startingto write games for it.
We think physicalcomputing—buildingsystems usingsensors, motors, lights and microcontrollers—is somethingthat gets
overlooked infavour ofpure software projects ina lot ofinstances, and it’s a shame, because physicalcomputingis massive fun.
To the extent that there’s anychildren’s computingmovement at the moment, it’s a physicalcomputingmovement. The LOGO
turtles that represented physicalcomputingwhenwe were kids are nowfightingrobots, quadcopters or parent-sensingbedroom
doors, and we love it. However, the lack ofGeneralPurpose Input/Output (GPIO) onhome PCs is a realhandicap for many
people gettingstarted withrobotics projects. The RaspberryPiexposes GPIO so youcanget to work straight away.
I keep beingsurprised byideas the communitycomes up withwhichwouldn’t have crossed mymind ina thousand years:the
Australianschoolmeteor-trackingproject; the BoreattonScouts inthe UK and their robot, whichis controlled via an
electroencephalographyheadset (the world’s first robot controlled byScoutingbrainwaves); the familywho are buildinga robot
vacuumcleaner. And I’ma realspace cadet, so readingabout the people sendingRaspberryPis into near-earthorbit onrockets
and balloons gives me goosebumps.
Success for us would be another 1,000 people everyyear takingup Computer Science at the universitylevelinthe UK. That
would not onlybe beneficialfor the country, the software and hardware industries, and the economy; but it would be evenmore
beneficialfor everyone ofthose 1,000 people, who, I hope, discover that there’s a whole world ofpossibilities and a great deal
offunto be had out there. Buildinga robot whenyou’re a kid cantake youto places younever imagined—I knowbecause it
happened to me!
—EbenUpton
Part I: Connecting the Board
Chapter 1:Meet the RaspberryPi
Chapter 2:LinuxSystemAdministration
Chapter 3:Troubleshooting
Chapter 4:Network Configuration
Chapter 5:PartitionManagement
Chapter 6:Configuringthe RaspberryPi
Chapter 1: Meet the Raspberry Pi
YourRaspberry Pi board is a miniature marvel, packingconsiderable computingpower into a footprint no larger thana credit
card. It’s capable ofsome amazingthings, but there are a fewthings you’re goingto need to knowbefore youplunge head-first
into the bramble patch.
If you’re eagerto get started, skipaheada couple of pages to findout howto connect yourRaspberry Pi to a display, keyboardandmouse.
ARM vs. x86
The processor at the heart ofthe RaspberryPisystemis a BroadcomBCM2835 system-on-chip (SoC) multimedia processor.
This means that the vast majorityofthe system’s components, includingits centraland graphics processingunits alongwiththe
audio and communications hardware, are built onto that single component hiddenbeneaththe 256 MBmemorychip at the
centre ofthe board (see Figure 1-1).
It’s not just this SoC designthat makes the BCM2835 different to the processor found inyour desktop or laptop, however. It
also uses a different instructionset architecture (ISA), knownas ARM.
Figure 1-1:The BCM2835 SoC, located beneatha Hynixmemorychip
Developed byAcornComputers back inthe late 1980s, the ARM architecture is a relativelyuncommonsight inthe desktop
world. Where it excels, however, is inmobile devices:the phone inyour pocket almost certainlyhas at least one ARM-based
processingcore hiddenawayinside. Its combinationofa simple reduced instructionset (RISC) architecture and lowpower
drawmake it the perfect choice over desktop chips withhighpower demands and complexinstructionset (CISC) architectures.
The ARM-based BCM2835 is the secret ofhowthe RaspberryPiis able to operate onjust the 5V1Apower supplyprovided
bythe onboard micro-USBport. It’s also the reasonwhyyouwon’t find anyheat-sinks onthe device:the chip’s lowpower
drawdirectlytranslates into verylittle waste heat, evenduringcomplicated processingtasks.
It does, however, meanthat the RaspberryPiisn’t compatible withtraditionalPC software. The majorityofsoftware for
desktops and laptops is built withthe x86 instructionset architecture inmind, as found inprocessors fromthe likes ofAMD,
Inteland VIA. As a result, it won’t runonthe ARM-based RaspberryPi.
The BCM2835 uses a generationofARM’s processor designknownas ARM11, whichinturnis designed around a versionof
the instructionset architecture knownas ARMv6. This is worthremembering:ARMv6 is a lightweight and powerfularchitecture,
but has a rivalinthe more advanced ARMv7 architecture used bythe ARM Cortexfamilyofprocessors. Software developed
for ARMv7, like software developed for x86, is sadlynot compatible withthe RaspberryPi’s BCM2835—althoughdevelopers
canusuallyconvert the software to make it suitable.
That’s not to sayyou’re goingto be restricted inyour choices. As you’lldiscover later inthe book, there is plentyofsoftware
available for the ARMv6 instructionset, and as the RaspberryPi’s popularitycontinues to grow, that willonlyincrease. Inthis
book, you’llalso learnhowto create your ownsoftware for the Pievenifyouhave no experience withprogramming.
Windows vs. Linux
Another important difference betweenthe RaspberryPiand your desktop or laptop, other thanthe size and price, is the
operatingsystem—the software that allows youto controlthe computer.
The majorityofdesktop and laptop computers available todayrunone oftwo operatingsystems:Microsoft Windows or Apple
OS X. Bothplatforms are closed source, created ina secretive environment usingproprietarytechniques.
These operatingsystems are knownas closed source for the nature oftheir source code, the computer-language recipe that tells
the systemwhat to do. Inclosed-source software, this recipe is kept a closely-guarded secret. Users are able to obtainthe
finished software, but never to see howit’s made.
The RaspberryPi, bycontrast, is designed to runanoperatingsystemcalled GNU/Linux—hereafter referred to simplyas Linux.
Unlike Windows or OS X, Linuxis opensource:it’s possible to download the source code for the entire operatingsystemand
make whatever changes youdesire. Nothingis hidden, and allchanges are made infullviewofthe public. This opensource
development ethos has allowed Linuxto be quicklyaltered to runonthe RaspberryPi, a process knownas porting. At the time
ofthis writing, severalversions ofLinux—knownas distributions—have beenported to the RaspberryPi’s BCM2835 chip,
includingDebian, Fedora Remixand ArchLinux.
The different distributions cater to different needs, but theyallhave somethingincommon:they’re allopensource. They’re also
all, byand large, compatible witheachother:software writtenona Debiansystemwilloperate perfectlywellonArchLinuxand
vice versa.
Linuxisn’t exclusive to the RaspberryPi. Hundreds ofdifferent distributions are available for desktops, laptops and evenmobile
devices; and Google’s popular Android platformis developed ontop ofa Linuxcore. Ifyoufind that youenjoythe experience
ofusingLinuxonthe RaspberryPi, youcould consider addingit to other computingdevices youuse as well. It willhappily
coexist withyour current operatingsystem, allowingyouto enjoythe benefits ofbothwhile givingyoua familiar environment
whenyour Piis unavailable.
As withthe difference betweenARM and x86, there’s a keypoint to make about the practicaldifference betweenWindows,
OS Xand Linux:software writtenfor Windows or OS Xwon’t runonLinux. Thankfully, there are plentyofcompatible
alternatives for the overwhelmingmajorityofcommonsoftware products—better still, the majorityare free to use and as open
source as the operatingsystemitself.
Getting Started with the Raspberry Pi
Nowthat youhave a basic understandingofhowthe Pidiffers fromother computingdevices, it’s time to get started. Ifyou’ve
just received your Pi, take it out ofits protective anti-static bagand place it ona flat, non-conductive surface before continuing
withthis chapter.
Connecting a Display
Before youcanstart usingyour RaspberryPi, you’re goingto need to connect a display. The Pisupports three different video
outputs:composite video, HDMI video and DSI video. Composite video and HDMI video are readilyaccessible to the end
user, as described inthis section, while DSI video requires some specialised hardware.
Composite Video
Composite video, available via the yellow-and-silver port at the top ofthe Piknownas anRCAphono connector (see Figure 1-
2), is designed for connectingthe RaspberryPito older displaydevices. As the name suggests, the connector creates a
composite ofthe colours found withinanimage—red, greenand blue—and sends it downa single wire to the displaydevice,
typicallyanold cathode-raytube (CRT) TV.
Figure 1-2:The yellowRCAphono connector, for composite video output
Whenno other displaydevice is available, a composite video connectionwillget youstarted withthe Pi. The quality, however,
isn’t great. Composite video connections are significantlymore prone to interference, lack clarityand runat a limited resolution,
meaningthat youcanfit fewer icons and lines oftext onthe screenat once.
HDMI Video
Abetter-qualitypicture canbe obtained usingthe HDMI (HighDefinitionMultimedia Interface) connector, the onlyport found
onthe bottomofthe Pi(see Figure 1-3). Unlike the analogue composite connection, the HDMI port provides a high-speed
digitalconnectionfor pixel-perfect pictures onbothcomputer monitors and high-definitionTVsets. Usingthe HDMI port, a Pi
candisplayimages at the FullHD1920x1080 resolutionofmost modernHDTVsets. At this resolution, significantlymore detail
is available onthe screen.
Ifyou’re hopingto use the Piwithanexistingcomputer monitor, youmayfind that your displaydoesn’t have anHDMI input.
That’s not a disaster:the digitalsignals present onthe HDMI cable map to a commoncomputer monitor standard called DVI
(DigitalVideo Interconnect). BypurchasinganHDMI-to-DVI cable, you’llbe able to connect the Pi’s HDMI port to a monitor
withDVI-Dconnectivity.
Figure 1-3:The silver HDMI connector, for high-definitionvideo output
Ifyour monitor has a VGAinput—a D-shaped connector with15 pins, typicallycoloured silver and blue—the RaspberryPi
can’t connect to it. Adapters are available that willtake ina digitalDVI signaland convert it to ananalogue VGAsignal, but
these are expensive and bulky. The best optionhere is simplyto buya more-modernmonitor witha DVI or HDMI input.
DSI Video
The finalvideo output onthe Picanbe found above the SDcard slot onthe top ofthe printed circuit board—it’s a smallribbon
connector protected bya layer ofplastic. This is for a video standard knownas DisplaySerialInterface (DSI), whichis used in
the flat-paneldisplays oftablets and smartphones. Displays witha DSI connector are rarelyavailable for retailpurchase, and are
typicallyreserved for engineers lookingto create a compact, self-contained system. ADSI displaycanbe connected byinserting
a ribboncable into the matched connector onthe Pi, but for beginners, the use ofa composite or HDMI displayis
recommended.
Connecting Audio
Ifyou’re usingthe RaspberryPi’s HDMI port, audio is simple:whenproperlyconfigured, the HDMI port carries boththe video
signaland a digitalaudio signal. This means that youcanconnect a single cable to your displaydevice to enjoybothsound and
pictures.
Assumingyou’re connectingthe Pito a standard HDMI display, there’s verylittle to do at this point. For now, it’s enoughto
simplyconnect the cable.
Ifyou’re usingthe Piwitha DVI-Dmonitor via anadapter or cable, audio willnot be included. This highlights the maindifference
betweenHDMI and DVI:while HDMI cancarryaudio signals, DVI cannot.
For those withDVI-Dmonitors, or those usingthe composite video output, a black 3.5 mmaudio jack located onthe top edge
ofthe Pinext to the yellowphono connector provides analogue audio (see Figure 1-2). This is the same connector used for
headphones and microphones onconsumer audio equipment, and it’s wired inexactlythe same way. Ifyouwant, youcansimply
connect a pair ofheadphones to this port for quick access to audio.
While headphones can be connecteddirectly to the Raspberry Pi, you may findthe volume a little lacking. If possible, connect a pairof powered
speakers instead. The amplifierinside will helpboost the signal to a more audible level.
Ifyou’re lookingfor somethingmore permanent, youcaneither use standard PC speakers that have a 3.5 mmconnector or you
canbuysome adapter cables. For composite video users, a 3.5 mmto RCAphono cable is useful. This provides the two white-
and-red RCAphono connections that sit alongside the video connection, eachcarryinga channelofthe stereo audio signalto the
TV.
For those connectingthe Pito anamplifier or stereo system, you’lleither need a 3.5 mmto RCAphono cable or a 3.5 mmto
3.5 mmcable, dependingonwhat spare connections youhave onyour system. Bothcable types are readilyand cheaply
available at consumer electronics shops, or canbe purchased evencheaper at online retailers suchas Amazon.
Connecting a Keyboard and Mouse
Nowthat you’ve got your RaspberryPi’s output devices sorted, it’s time to think about input. As a bare minimum, you’re going
to need a keyboard, and for the majorityofusers, a mouse or trackballis a necessitytoo.
First, some bad news:ifyou’ve got a keyboard and mouse witha PS/2 connector—a round plugwitha horseshoe-shaped array
ofpins—thenyou’re goingto have to go out and buya replacement. The old PS/2 connectionhas beensuperseded, and the Pi
expects your peripherals to be connected over the UniversalSerialBus (USB) port.
Dependingonwhether youpurchased the ModelAor ModelB, you’llhave either one or two USBports available onthe right
side ofthe Pi(see Figure 1-4). Ifyou’re usingModelB, youcanconnect the keyboard and mouse directlyto these ports. If
you’re usingModelA, you’llneed to purchase a USBhub inorder to connect two USBdevices simultaneously.
Figure 1-4:ModelB’s two USBports
AUSBhub is a good investment for anyPiuser:evenifyou’ve got a ModelB, you’lluse up bothyour available ports just
connectingyour keyboard and mouse, leavingnothingfree for additionaldevices suchas anexternalopticaldrive, storage device
or joystick. Make sure youbuya powered USBhub:passive models are cheaper and smaller, but lack the abilityto runcurrent-
hungrydevices like CDdrives and externalhard drives.
If you want to reduce the numberof powersockets in use, connect the Raspberry Pi’s USBpowerleadto yourpoweredUSBhub. This way, the Pi
can drawits powerdirectly fromthe hub, ratherthan needing its own dedicatedpowersocket andmains adapter. This will only work on hubs with a
powersupply capable of providing 700mAto the Pi’s USBport, along with whateverpoweris requiredby otherperipherals.
Connectingthe keyboard and mouse is as simple as pluggingtheminto the USBports, either directlyinthe case ofa ModelB
or via a USBhub inthe case ofa ModelA.
A Note on Storage
As you’veprobably noticed, theRaspberry Pi doesn’t haveatraditional hard drive. Instead it uses aSecureDigital (SD) memory card, asolid-statestorage
systemtypically used in digital cameras. Almost any SD card will work with theRaspberry Pi, but becauseit holds theentireoperatingsystem, it is
necessary for thecard to beat least 2 GBin capacity to storeall therequired files.
SD cards with theoperatingsystempreloaded areavailablefromtheofficial Raspberry Pi Storealongwith numerous other sites on theInternet. If you’ve
purchased oneof these, or received it in abundlewith your Pi, you can simply plugit in to theSD card slot on thebottomsideof theleft-hand edge. If not,
you’ll need to install an operatingsystem—known as flashing—onto thecard beforeit’s ready to go.
SomeSD cards work better than others, with somemodels refusingto work at all with theRaspberry Pi. For an up-to-datelist of SD card models known to
work with thePi, visit theeLinuxWiki page: http://www.elinux.org/RPi_VerifiedPeripherals#SD_cards
Flashing the SD Card
To prepare a blank SDcard for use withthe RaspberryPi, you’llneed to flashanoperatingsystemonto the card. While this is
slightlymore complicated thansimplydraggingand droppingfiles onto the card, it shouldn’t take more thana fewminutes to
complete.
Firstly, you’llneed to decide whichLinuxdistributionyouwould like to use withyour RaspberryPi. Eachhas its advantages and
disadvantages. Don’t worryifyouchange your mind later and want to trya different versionofLinux:anSDcard canbe flashed
againwitha newoperatingsystemat anypoint.
The most up-to-date list ofLinuxreleases compatible withthe Piis available fromthe RaspberryPiwebsite at
http://www.raspberrypi.org/downloads.
The Foundationprovides BitTorrent links for eachdistribution. These are smallfiles that canbe used withBitTorrent software to
download the files fromother users. Usingthese links is anefficient and fast wayto distribute large files, and keeps the
Foundation’s download servers frombecomingoverloaded.
To use a BitTorrent link, you’llneed to have a compatible client installed. Ifyoudon’t alreadyhave a BitTorrent client installed,
download one and installit before tryingto download the RaspberryPiLinuxdistribution. One client for Windows, OS Xand
Linuxis µTorrent, available fromhttp://www.utorrent.com/downloads.
Whichdistributionyouchoose to download is up to you. Instructions inthe rest ofthe book willbe based onthe Debian
RaspberryPidistribution, a good choice for beginners. Where possible, we’llgive youinstructions for other distributions as well.
Linuxdistributions for the RaspberryPiare provided as a single image file, compressed to make it faster to download. Once
you’ve downloaded the Zip archive (a compressed file, whichtakes less time to download thanthe uncompressed files would)
for your chosendistribution, you’llneed to decompress it somewhere onyour system. Inmost operatingsystems, youcansimply
double-click the file to openit, and thenchoose Extract or Unzip to retrieve the contents.
After you’ve decompressed the archive, you’llend up withtwo separate files. The file endinginsha1 is a hash, whichcanbe
used to verifythat the download hasn’t beencorrupted intransit. The file endinginimg contains anexact copyofanSDcard set
up bythe distribution’s creators ina waythat the RaspberryPiunderstands. This is the file that needs to be flashed to the SD
card.
During the following, you’ll be using a software utility calleddd. Usedincorrectly dd will happily write the image to yourmain harddrive, erasing
youroperating systemandall yourstoreddata. Make sure you readthe instructions in each section thoroughly andnote the device address of your
SD cardcarefully. Readtwice, write once!
Flashing from Linux
Ifyour current PC is runninga variant ofLinuxalready, youcanuse the dd command to write the contents ofthe image file out to
the SDcard. This is a text-interface programoperated fromthe command prompt, knownas a terminalinLinuxparlance.
Followthese steps to flashthe SDcard:
1. Opena terminalfromyour distribution’s applications menu.
2. Plugyour blank SDcard into a card reader connected to the PC.
3. Type sudo fdisk -l to see a list ofdisks. Find the SDcard byits size, and note the device address (/dev/sdX, where
Xis a letter identifyingthe storage device. Some systems withintegrated SDcard readers mayuse the alternative format
/dev/mmcblkX—ifthis is the case, remember to change the target inthe followinginstructions accordingly).
4. Use cd to change to the directorywiththe .img file youextracted fromthe Zip archive.
5. Type sudo dd if=imagefilename.img of=/dev/sdX bs=2M to write the file imagefilename.img to the SDcard
connected to the device address fromstep 3. Replace imagefilename.imgwiththe actualname ofthe file extracted fromthe
Zip archive. This step takes a while, so be patient! Duringflashing, nothingwillbe shownonthe screenuntilthe process is
fullycomplete (see Figure 1-5).
Figure 1-5:Flashingthe SDcard usingthe dd command inLinux
Flashing from OS X
Ifyour current PC is a Mac runningApple OS X, you’llbe pleased to hear that things are as simple as withLinux. Thanks to a
similar ancestry, OS Xand Linuxbothcontainthe dd utility, whichyoucanuse to flashthe systemimage to your blank SDcard
as follows:
1. Select Utilities fromthe Applicationmenu, and thenclick onthe Terminalapplication.
2. Plugyour blank SDcard into a card reader connected to the Mac.
3. Type diskutil list to see a list ofdisks. Find the SDcard byits size, and note the device address (/dev/diskX,
where Xis a letter identifyingthe storage device).
4. Ifthe SDcard has beenautomaticallymounted and is displayed onthe desktop, type diskutil unmountdisk
/dev/diskXto unmount it before proceeding.
5. Use cd to change to the directorywiththe .img file youextracted fromthe Zip archive.
6. Type dd if=imagefilename.img of=/dev/diskX bs=2M to write the file imagefilename.img to the SDcard connected
to the device address fromstep 3. Replace imagefilename.imgwiththe actualname ofthe file extracted fromthe Zip archive.
This step takes a while, so be patient!
Flashing from Windows
Ifyour current PC is runningWindows, things are slightlytrickier thanwithLinuxor OS X. Windows does not have a utilitylike
dd, so some third-partysoftware is required to get the image file flashed onto the SDcard. Althoughit’s possible to installa
Windows-compatible versionofdd, there is aneasier way:the Image Writer for Windows. Designed specificallyfor creating
USBor SDcard images ofLinuxdistributions, it features a simple graphicaluser interface that makes the creationofa
RaspberryPiSDcard straightforward.
The latest versionofImage Writer for Windows canbe found at the officialwebsite:https://launchpad.net/win32-
image-writer. Followthese steps to download, installand use the Image Writer for Windows software to prepare the SD
card for the Pi:
1. Download the binary(not source) Image Writer for Windows Zip file, and extract it to a folder onyour computer.
2. Plugyour blank SDcard into a card reader connected to the PC.
3. Double-click the Win32DiskImager.exe file to openthe program, and click the blue folder iconto opena file browse
dialogue box.
4. Browse to the imagefilename.img file youextracted fromthe distributionarchive, replacingimagefilename.imgwiththe
actualname ofthe file extracted fromthe Zip archive, and thenclick the Openbutton.
5. Select the drive letter correspondingto the SDcard fromthe Device drop-downdialogue box. Ifyou’re unsure which
drive letter to choose, openMyComputer or Windows Explorer to check.
6. Click the Write buttonto flashthe image file to the SDcard. This process takes a while, so be patient!
No matterwhich operating systemyou’re writing from, it’s important to ensure you leave the SD cardconnecteduntil the image has been
completely written. If you don’t, you may findthat Pi doesn’t boot when the SD cardis connected. If this happens, start the process again.
When the image has been flashedonto the SD card, remove it fromthe computerandinsert it into the Raspberry Pi’s SD cardslot, located
underneath the circuit board. The SD cardshouldbe insertedwith the label facing away fromthe boardandpushedfully home to ensure a good
connection.
Connecting External Storage
While the RaspberryPiuses anSDcard for its mainstorage device—knownas a boot device—youmayfind that youruninto
space limitations quite quickly. Althoughlarge SDcards holding32 GB, 64 GBor more are available, theyare oftenprohibitively
expensive.
Thankfully, there are devices that provide anadditionalhard drive to anycomputer whenconnected via a USBcable. Knownas
USBMass Storage (UMS) devices, these canbe physicalhard drives, solid-state drives (SSDs) or evenportable pocket-sized
flashdrives (see Figure 1-6).
Figure 1-6:Two USBMass Storage devices:a pendrive and anexternalhard drive
The majorityofUSBMass Storage devices canbe read bythe Pi, whether or not theyhave existingcontent. Inorder for the Pi
to be able to access these devices, their drives must be mounted—a process youwilllearninChapter 2, “LinuxSystem
Administration”. For now, it’s enoughto connect the drives to the Piinreadiness.
Connecting the Network
While the majorityofthese setup instructions are equallyapplicable to boththe RaspberryPiModelAand the ModelB,
networkingis a specialexception. To keep the component count—and therefore the cost—as lowas possible, the ModelA
doesn’t feature anyonboard networking. Thankfully, that doesn’t meanyoucan’t network the ModelA; onlythat you’llneed
some additionalequipment to do so.
Networking the Model A
To givetheModel A thesamenetworkingcapabilities as its moreexpensiveModel Bcounterpart, you’ll need aUSB-connected Ethernet adapter. This
connects to afreeUSBport on theRaspberry Pi or aconnected hub and provides awired Ethernet connection with an RJ45 connector, thesameas is
availableon theModel B.
A 10/100 USBEthernet adapter—with thenumbers referringto its two-speed mode, 10 Mb/s and 100 Mb/s—can bepurchased fromonlineretailers for very
littlemoney. When buyingan Ethernet adapter, besureto check that Linuxis listed as asupported operatingsystem. A few models only work with
Microsoft Windows, and areincompatiblewith theRaspberry Pi.
Don’t betempted to go for agigabit-class adapter, which will bereferred to as a10/100/1000 USBEthernet adapter. Standard USBports, as used on the
Raspberry Pi, can’t copewith thespeed of agigabit Ethernet connection, and you’ll seeno benefit to themoreexpensiveadapter.
Wired Networking
To get your RaspberryPionthe network, you’llneed to connect anRJ45 Ethernet patchcable betweenthe Piand a switch,
router or hub. Ifyoudon’t have a router or hub, youcanget your desktop or laptop talkingto the Pibyconnectingthe two
directlytogether witha patchcable.
Usually, connectingtwo network clients together inthis wayrequires a specialcable, knownas a crossover cable. Ina crossover
cable, the receive and transmit pairs are swapped so that the two devices are prevented fromtalkingover eachother—a task
usuallyhandled bya network switchor hub.
The RaspberryPiis cleverer thanthat, however. The RJ45 port onthe side ofthe Pi(see Figure 1-7) includes a feature known
as auto-MDI, whichallows it to reconfigure itselfautomatically. As a result, youcanuse anyRJ45 cable—crossover or not—to
connect the Pito the network, and it willadjust its configurationaccordingly.
Figure 1-7:The RaspberryPiModelB’s Ethernet port
Ifyoudo connect the Pidirectlyto a PC or laptop, youwon’t be able to connect out onto the Internet bydefault. To do so,
you’llneed to configure your PC to bridge the wired Ethernet port and another (typicallywireless) connection. Doingso is
outside the scope ofthis book, but ifyouare completelyunable to connect the Pito the Internet inanyother way, youcantry
searchingyour operatingsystem’s help file for “bridge network”to find more guidance.
Witha cable connected, the Piwillautomaticallyreceive the details it needs to access the Internet whenit loads its operating
systemthroughthe Dynamic Host ConfigurationProtocol(DHCP). This assigns the PianInternet Protocol(IP) address onyour
network, and tells it the gatewayit needs to use to access the Internet (typicallythe IP address ofyour router or modem).
For some networks, there is no DHCP server to provide the PiwithanIP address. Whenconnected to sucha network, the Pi
willneed manualconfiguration. You’lllearnmore about this inChapter 4, “Network Configuration”.
Wireless Networking
Current RaspberryPimodels don’t feature anyformofwireless network capabilityonboard, but—as withaddingwired Ethernet
to the ModelA—it’s possible to add Wi-Fisupport to anyPiusinga USBwireless adapter (see Figure 1-8).
Figure 1-8:Two USBwireless adapters, suitable for use withthe RaspberryPi
Usingsucha device, the Picanconnect to a wide range ofwireless networks, includingthose runningonthe latest 802.11nhigh-
speed standard. Before purchasinga USBwireless adapter, check the following:
• Ensure that Linuxis listed as a supported operatingsystem. Some wireless adapters are provided withdrivers for Windows
and OS Xonly, makingthemincompatible withthe RaspberryPi. Alist ofWi-Fiadapters knownto work withthe
RaspberryPicanbe found onthe followingwebsite:
http://elinux.org/RPi_VerifiedPeripherals#USB_WiFi_Adapters
• Ensure that your Wi-Finetwork type is supported bythe USBwireless adapter. The network type willbe listed inthe
specifications as a number followed bya letter. Ifyour network type is 802.11a, for example, an802.11gwireless adapter
won’t work.
• Check the frequencies supported bythe card. Some wireless network standards, like 802.11a, support more thanone
frequency. Ifa USBwireless adapter is designed to work ona 2.4GHznetwork, it won’t connect to a 5GHznetwork.
• Check the encryptiontype used byyour wireless network. Most modernUSBwireless adapters support allforms of
encryption, but ifyou’re buyinga second-hand or older model, youmayfind it won’t connect to your network. Common
encryptiontypes include the outdated WEP and more modernWPAand WPA2.
Configurationofthe wireless connectionis done withinLinux, so for nowit’s enoughto simplyconnect the adapter to the Pi
(ideallythrougha powered USBhub.) You’lllearnhowto configure the connectioninChapter 4, “Network Configuration”.
Connecting Power
The RaspberryPiis powered bythe smallmicro-USBconnector found onthe lower left side ofthe circuit board. This connector
is the same as found onthe majorityofsmartphones and some tablet devices.
Manychargers designed for smartphones willwork withthe RaspberryPi, but not all. The Piis more power-hungrythanmost
micro-USBdevices, and requires up to 700mAinorder to operate. Some chargers canonlysupplyup to 500mA, causing
intermittent problems inthe Pi’s operation(see Chapter 3, “Troubleshooting”).
Connectingthe Pito the USBport ona desktop or laptop computer is possible, but not recommended. As withsmaller
chargers, the USBports ona computer can’t provide the power required for the Pito work properly.
Onlyconnect the micro-USBpower supplywhenyouare readyto start usingthe Pi. Withno power buttononthe device, it will
start workingthe instant power is connected and canonlybe turned offagainbyphysicallyremovingthe power cable.
Chapter 2: Linux System Administration
The majority of modernLinuxdistributions are user-friendly, witha graphicaluser interface (GUI) that provides aneasywayto
performcommontasks. It is, however, quite different to bothWindows and OS X, so ifyou’re goingto get the most out ofyour
RaspberryPi, you’llneed a quick primer inusingthe operatingsystem.
Linux: An Overview
As brieflyexplained inChapter 1, “Meet the RaspberryPi”, Linuxis anopen-source project whichwas originallyfounded to
produce a kernelthat would be free for anyone to use. The kernelis the heart ofanoperatingsystem, and handles the
communicationbetweenthe user and the hardware.
Althoughonlythe kernelitselfis rightlycalled Linux, the termis oftenused to refer to a collectionofdifferent open-source
projects froma varietyofcompanies. These collections come together to formdifferent flavours ofLinux, knownas distributions.
The originalversionofLinuxwas combined witha collectionoftools created bya group called GNU. The resultingsystem,
knownas GNU/Linux, was basic but powerful. Unlike other operatingsystems ofthe era, it offered facilities like multiple user
accounts where severalusers canshare a single computer. That’s somethingrivalclosed-source operatingsystems have takenon
board, withbothWindows and OS Xnowsupportingmultiple user accounts onthe same system. It’s also stillpresent inLinux,
and provides securityand protectionfor the operatingsystem.
InLinux, you’llspend most ofyour time runninga restricted user account. This doesn’t meanyou’re beinglimited inwhat you
cando. Instead, it prevents youfromaccidentallydoingsomethingthat willbreak the software onyour RaspberryPi. It also
prevents viruses and other malware frominfectingthe systembylockingdownaccess to criticalsystemfiles and directories.
Before youcanget started, it’s worthbecomingfamiliar withsome ofthe terms and concepts used inthe world ofLinux, as
defined inTable 2-1. Evenifyou’re experienced withother operatingsystems, it’s a good idea to reviewthis table before
bootingup your Pifor the first time.
The Terminal and the GUI
As in OSX and Windows, therearetypically two main ways to achieveagiven goal in Linux: through thegraphical user interface(GUI) and through the
command line(known in Linuxparlanceas theconsoleor theterminal).
Theappearanceof various Linuxdistributions can bequitedifferent, dependingon thedesktop environment in use. In this book, therecommended Debian
distribution is used, but most of thecommands you will belearningareentered at theterminal and aretypically thesameacross all distributions.
Whereother distributions differ, you will begiven alternativemethods of achievingthesamegoals.
Table 2.1 The Quick Linux Glossary
Term
/Concept Definition
Bash The most popular shell choice, used in the majority of Linux distributions.
Bootloader Software responsible for loading the Linux kernel. The most common is GRUB.
Console A version of the terminal which is always available, and the first thing you see on the Pi.
Desktop environment Software to make the GUI lookpretty. GNOME and KDE are popular desktop environments.
Directory The Linux term for what Windows calls folders, where files are stored.
Distribution A particular version of Linux. Fedora Remix, Arch and Debian are distributions.
Executable A file that can be run as a program. Linux files must be marked executable in order to run.
EXT2/3/4 The EXTended file system, the most common format used in Linux.
File system The way a hard drive or other storage device is formatted so it’s ready for file storage.
GNOME One of the most common Linux desktop environments around.
GNU A free software project, which provides many of the tools used in Linux distributions.
GRUB The GRand Unified Bootloader, created by GNU and used to load the Linux kernel.
GUI A graphical user interface, in which the user operates the computer via a mouse or touch.
KDE Another extremely popular Linux desktop environment.
Linux Properly, the kernel used by GNU/Linux. Popularly, an open-source operating system.
Live CD A Linux distribution provided as a CD or DVD, which doesn’t require installation.
Package A collection of files required to run an application, typically handled by the package manager.
Package manager A tool for keeping trackof, and installing new, software.
Partition A section of a hard drive which is ready to have a file system applied to it for storage.
Root The main user account in Linux, equivalent to the Windows administrator account.
Shell A text-based command prompt, loaded in a terminal.
sudo A program that allows restricted users to run a command as the root user.
Superuser See Root.
Terminal A text-based command prompt in which the user interacts with a shell program.
X11 The X Window system, a package that provides a graphical user interface (GUI).
Linux Basics
Althoughthere are hundreds ofdifferent Linuxdistributions available, theyallshare a commonset oftools. These tools, which
are operated via the terminal, are analogous to similar tools onWindows and OS X. To get started, you’llneed to learnthe
followingcommands:
• ls—Short for listing, ls provides a list ofthe contents ofthe current directory. Alternatively, it canbe called withan
argument ofthe directoryto be listed. As anexample, typingls /home willprovide a list ofthe contents of/home,
regardless ofyour current directory. The Windows equivalent is dir.
• cd—Aninitialismofchange directory, cd allows youto navigate your waythroughthe file system. Typingcd onits own
puts youback inyour home directory. Typingthe command alongwiththe name ofthe directoryyouwishto move to, by
contrast, switches to that directory. Note that directories canbe absolute or relative:cd boot willmove youto the directory
called boot under your current directory, but cd /boot willmove youstraight to the /boot directorywherever youare.
• mv—The move command has two purposes inLinux:it allows a file to be moved fromone directoryto another, and it also
allows files to be renamed. That latter feature mayseemout ofplace, but inLinuxterms, the file is beingmoved fromone
name to another. The command is called as mv oldfile newfile.
• rm—Short for remove, rm deletes files. Anyfile—or list offiles—provided after the command name willbe deleted. The
Windows equivalent is del, and the two share a commonrequirement that care should be takento ensure the right file is
deleted.
• rmdir—Byitself, rm cannot usuallyremove directories. As a result, rmdir is provided to delete directories once theyhave
beenemptied offiles byrm.
• mkdir—The opposite ofrmdir, the mkdir command creates newdirectories. For example, typingmkdir myfolder at
the terminalwillcreate a newdirectorycalled myfolder under the current workingdirectory. As withcd, directories
provided to the command canbe relative or absolute.
Introducing Debian
Debianis one ofthe oldest Linuxdistributions around, and a great choice for the RaspberryPithanks to its lightweight nature.
This is whythe RaspberryPiFoundationhas chosenit to be the recommended software for newcomers, and the one used for
the examples inthis book.
To keep the download size to a minimum, the RaspberryPiimage for Debianincludes onlya subset ofthe software you’d find
ona regular desktop version. These include tools for browsingthe web, programminginPython, and usingthe Piwitha GUI.
Additionalsoftware canbe quicklyinstalled thoughthe use ofthe distribution’s package manager apt.
The RaspberryPibuild ofDebianincludes a desktop environment knownas the Lightweight X11 Desktop Environment
(LXDE). Designed to offer anattractive user interface usingthe XWindowSystemsoftware, LXDEprovides a familiar point-
and-click interface whichwillbe immediatelyaccessible to anyone who has used Windows, OS Xor other GUI-based operating
systems inthe past.
The GUIdoesn’t loadby default in most Raspberry Pi distributions. To quickly loadit andleave the text-basedconsole behind, log in, type startx
andthen press the Enterkey.
Ifyou’re usingthe recommended Debiandistribution, you’llfind that youhave plentyofpreinstalled software to get started.
While hardlyanexhaustive example ofthe software available for the Pi, whichnumbers inthe thousands ofpackages, it’s a good
introductionto preciselywhat the systemcando.
The software provided withthe Debiandistributionis split into themed categories. To viewthese categories, youcanleft-click
the menuicon, located onthe bottom-left ofthe screeninLXDE(see Figure 2-1).
Figure 2-1:The LXDEdesktop, as loaded onthe DebianRaspberryPidistribution
The followinglists describe the software packages, grouped bycategory.
Accessories
• DebianReference—Abuilt-inreference guide, this provides a detailed explanationofthe DebianLinuxdistributionand how
programmers cancontribute to its development.
• File Manager—The PCManFM file manager provides a graphicalbrowser for files stored onthe Pior anyconnected
storage device.
• Image Viewer—The GPicViewlets youviewimages, suchas those froma digitalcamera or ona connected storage device.
• Leafpad—This is a simple text editor, whichis usefulfor makingquick notes or writingsimple programs.
• LXTerminal—This LXDEterminalpackage allows youto use the Linuxcommand line ina windowwithout leavingthe
graphicaluser interface.
• Root Terminal—Similar to LXTerminal, the Root Terminalautomaticallylogs youinas the root super-user account inorder
to carryout systemmaintenance tasks unavailable to a regular user account.
• Xarchiver—Ifyouneed to create or extract compressed files, suchas ZIP archives, this is the toolfor the job.
Education
• Scratch—Agraphicalprogramminglanguage aimed at youngchildren. You’lllearnmore about Scratchand its capabilities
inChapter 10, “AnIntroductionto Scratch”.
• Squeak—The platformonwhichScratchruns. Youwillrarelyneed to use this menuentry, and should instead use the
Scratchentryabove.
Internet
• Midori—Afast yet lightweight web browser, Midoriis equivalent to Internet Explorer inWindows or to SafarionOS X.
• MidoriPrivate Browsing—Clickingonthis menuentryloads the Midoriweb browser inprivate mode, meaningthat sites
youvisit aren’t saved into the browser’s history.
• NetSurfWeb Browser—Analternative to Midori, NetSurfcanperformbetter oncertaintypes ofweb page. Tryingboth
willallowyouto experiment and find the one whichworks best for you.
Programming
• IDLE—Anintegrated development environment (IDE) writtenspecificallyfor Python. You’lllearnmore about usingIDLE
to write your ownPythonprograms inChapter 11, “AnIntroductionto Python”.
• IDLE3—Clickingthis entryloads IDLEconfigured to use the newer Python3 programminglanguage, rather thanthe
default Python2.7 language. Bothare largelycompatible witheachother, but some programs mayrequire features ofPython
3.
• Scratch—This shortcut opens the Scratcheducationallanguage, and is the same as the Scratchentryfound inthe Education
category. Either canbe used to start the program.
• Squeak—As withScratch, this is a duplicate ofthe shortcut found inthe Educationcategory. Youwillrarelywant to click
this directly, and should instead use the Scratchshortcut.
Sound & Video
• Music Player—LXMusic is a simple and lightweight interface to the XMMS2 music playback software, allowingyouto
listento music files while youwork onthe Pi.
System Tools
• Task Manager—Atoolfor checkingthe amount offree memoryavailable onthe Pi, the current workload ofthe processor,
and for closingprograms whichhave crashed or are otherwise unresponsive.
Preferences
• Customise Look and Feel—Atoolkit for adjustingthe appearance ofthe GUI, includingthe style and colour ofwindows.
• Desktop SessionSettings—Atoolfor changinghowthe systemworks whenthe user is logged in, includingwhat programs
are automaticallyloaded and whichwindowmanager—the software that draws the borders and title bars ofwindows—is
used.
• Keyboard and Mouse—Atoolfor adjustinginput devices. Ifyour keyboard is typingthe wrongcharacters for certainkeys,
or your mouse is too sensitive, the settings canbe altered here.
• Monitor Settings—The resolutionthat the monitor or TVconnected to the Piruns at canbe altered here, althoughadvanced
changes require modificationofconfigurationfiles. You’lllearnabout this inChapter 6, “Configuringthe RaspberryPi”.
• OpenboxConfigurationManager—The LXDEGUI uses a desktop environment called Openbox, whichcanbe adjusted
here. Usingthist tool, youcanapplynewthemes to change the GUI’s appearance, or alter howcertainaspects ofthe
interface operate.
• Preferred Applications—Atoolfor changingwhichapplications are opened for particular file types. Ifyouchoose to use an
alternative web browser, the systemdefault canbe changed here.
Finding Help
Linuxis designed to beas user-friendly as possibleto new users, even at theterminal command prompt. Although you’ll learn themost common ways to use
each command in this chapter, not every option will becovered—to do so would requireamuch larger book.
If you find yourself stuck, or if you want to learn moreabout any of thetools that arediscussed in thefollowingpages, there’s acommand you should learn:
man.
Each Linuxapplication comes with ahelp file, known as aman page—short for “manual page”. It provides background on thesoftwareas well as details on
what its options do and how to usethem.
To access theman pagefor agiven tool, just typeman followed by thecommand name. To seetheman pagefor ls, atool for listingthecontents of
directories, just typeman ls.
Using External Storage Devices
The Pi’s SDcard, whichstores allthe various Pifiles and directories, isn’t verybig. The largest available SDcard at the time of
writingis 64 GB, whichis tinycompared to the 3,000 GB(3 TB) available fromthe largest full-size desktop hard drives.
Ifyou’re usingyour Pito playback video files (see Chapter 7, “The Pias a Home Theatre PC”) you’lllikelyneed more storage
thanyoucanget fromanSDcard. As youlearned inChapter 1, “Meet the RaspberryPi”, it’s possible to connect USBMass
Storage (UMS) devices to the Piinorder to gainaccess to more storage space.
Before these externaldevices are accessible, however, the operatingsystemneeds to knowabout them. InLinux, this process is
knownas mounting. Ifyou’re runninga versionofLinuxwitha desktop environment loaded—like the recommended Debian
distribution’s LXDE, loaded fromthe console withthe startx command—this process is automatic. Simplyconnect the device
to a free USBport onthe Pior a USBhub, and the device and its contents willbe immediatelyaccessible (see Figure 2-2).
Figure 2-2:LXDEautomaticallymountinga USBmass storage device
Fromthe console, things are onlyslightlymore difficult. To make a device accessible to Linuxwhenthe desktop environment
isn’t loaded, followthese steps:
1. Connect the USBstorage device to the Pi, either directlyor througha connected USBhub.
2. Type sudo fdisk -l to get a list ofdrives connected to the Pi, and find the USBstorage device bysize. Note the device
name:/dev/sdXN, where Xis the drive letter and N is the partitionnumber. Ifit is the onlydevice connected to the Pi, this
willbe /dev/sda1.
3. Before the USBstorage device is accessible, Linuxneeds a mount point for it. Create this bytypingsudo mkdir
/media/externaldrive.
4. Currently, the device is onlyaccessible to the root user. To make it accessible to allusers, type the followingas a single
line:
sudo chgrp -R users /media/externaldrive &&
sudo chmod -R g+w /media/externaldrive
5. Mount the USBstorage device withsudo mount /dev/sdXN /media/externaldrive -o=rw to gainaccess to the
device and its contents.
Creating a New User Account
Unlike Windows and OS X, whichare largelydesigned for use bya single individual, Linuxis at heart a socialoperatingsystem
designed to accommodate numerous users. Bydefault, Debianis configured withtwo user accounts:pi, whichis the normaluser
account, and root, whichis a superuser account withadditionalpermissions.
Don’t be temptedto log in as root all the time. Using a nonprivilegeduseraccount, you’re protectedagainst accidentally wrecking youroperating
systemandfromthe ravages of viruses andothermalware downloadedfromthe Internet.
While it’s certainlypossible for youto use the piaccount, it’s better ifyoucreate your owndedicated user account. Further
accounts canalso be created, for anyfriends or familymembers who might want to use the Pi.
Creatinga newaccount onthe Piis straightforward, and the same onalldistributions, except for the username and password
used to logonto the Piinitially. Just followthese steps:
1. Loginto the Piusingthe existinguser account (user name pi and password raspberry ifyou’re usingthe recommended
Debiandistribution).
2. Type the followingas a single line:
sudo useradd -m -G adm,dialout,cdrom,audio,plugdev,users,
lpadmin,sambashare,vchiq,powerdev username
This creates a new, blank user account. Note that the command should be typed as a single line, withno spaces after the
commas.
3. To set a password onthe newaccount, type sudo passwd username followed bythe newpassword whenprompted.
To explainwhat just happened:the command sudo tells the operatingsystemthat the command you’re typingshould be runas if
youwere logged inas the root account. The useradd command says youwant to create a newuser account. The -m section—
knownas a flagor anoption—tells the useradd programto create a home directorywhere the newuser canstore his or her
files. The biglist followingthe -G flagis the list ofgroups ofwhichthe user should be a member.
Users and Groups
In Linux, each user has threemain attributes: their User ID (UID), their Group ID (GID) and alist of supplementary group memberships. A user can bea
member of as many groups as heor shepleases, although only oneof thesecan betheuser’s primary group. This is usually aself-named group matchingthe
user name.
Group membership is important. Whileusers can begranted direct access to files and devices on thesystem, it’s morecommon for auser to receiveaccess to
theseviagroup membership. Thegroup audio, for example, grants all members theability to access thePi’s sound playback hardware. Without that
membership, theuser won’t belisteningto any music.
To seeauser’s group memberships, typegroups usernameat theterminal. If you usethis on thedefault user pi, you’ll seethelist of groups any new
member should join to makeuseof thePi. This is wheretheinformation used in step 2 of theprecedingprocedurewas found.
File System Layout
The content ofthe SDcard is knownas its file system, and is split into multiple sections eachwitha particular purpose. Although
it’s not necessaryfor youto understand what eachsectiondoes inorder to use the RaspberryPi, it canbe helpfulbackground
knowledge should anythinggo wrong.
Logical Layout
The wayLinuxdeals withdrives, files, folders and devices is somewhat different to other operatingsystems. Instead ofhaving
multiple drives labelled witha letter, everythingappears as a branchbeneathwhat is knownas the root file system.
Ifyouloginto the Piand type ls / you’llsee various directories displayed (see Figure 2-3). Some ofthese are areas ofthe SD
card for storingfiles, while others are virtualdirectories for accessingdifferent portions ofthe operatingsystemor hardware.
Figure 2-3:Adirectorylistingfor the Pi’s root file system
The directories visible onthe default Debiandistributionare as follows:
• boot—This contains the Linuxkerneland other packages needed to start the Pi.
• bin—Operatingsystem-related binaryfiles, like those required to runthe GUI, are stored here.
• dev—This is a virtualdirectory, whichdoesn’t actuallyexist onthe SDcard. Allthe devices connected to the system—
includingstorage devices, the sound card and the HDMI port—canbe accessed fromhere.
• etc—This stores miscellaneous configurationfiles, includingthe list ofusers and their encrypted passwords.
• home—Eachuser gets a subdirectorybeneaththis directoryto store alltheir personalfiles.
• lib—This is a storage space for libraries, whichare shared bits ofcode required bynumerous different applications.
• lost+found—This is a specialdirectorywhere file fragments are stored ifthe systemcrashes.
• media—This is a specialdirectoryfor removable storage devices, like USBmemorysticks or externalCDdrives.
• mnt—This folder is used to manuallymount storage devices, suchas externalhard drives.
• opt—This stores optionalsoftware that is not part ofthe operatingsystemitself. Ifyouinstallnewsoftware to your Pi, it will
usuallygo here.
• proc—This is another virtualdirectory, containinginformationabout runningprograms whichare knowninLinuxas
processes.
• selinux—Files related to SecurityEnhanced Linux, a suite ofsecurityutilities originallydeveloped bythe US National
SecurityAgency.
• sbin—This stores specialbinaryfiles, primarilyused bythe root (superuser) account for systemmaintenance.
• sys—This directoryis where specialoperatingsystemfiles are stored.
• tmp—Temporaryfiles are stored here automatically.
• usr—This directoryprovides storage for user-accessible programs.
• var—This is a virtualdirectorythat programs use to store changingvalues or variables.
Physical Layout
Althoughthe precedinglist is howthe file systemappears to the Linuxoperatingsystem, it’s not howit’s laid out onthe SDcard
itself. For the default Debiandistribution, the SDcard is organised into two mainsections, knownas partitions because theysplit
the device into different areas inmuchthe same wayas the chapters ofthis book help to organise its contents.
The first partitiononthe disk is a small(75 MB) partitionformatted as VFAT, the same partitionformat used byMicrosoft
Windows for removable drives. This is mounted, or made accessible, byLinuxinthe /boot directoryand contains allthe files
required to configure the RaspberryPiand to load Linuxitself.
The second partitionis far larger and formatted as EXT4, a native Linuxfile systemdesigned for high-speed access and data
safety. This partitioncontains the mainchunk ofthe distribution. Allthe programs, the desktop, the users’ files and anysoftware
that youinstallyourselfare stored here. This takes up the bulk ofthe SDcard.
Installing and Uninstalling Software
The default software installed withthe Debiandistributionis enoughto get youstarted, but chances are you’re goingto want to
customise your Piaccordingto your ownrequirements.
Installingnewsoftware onto the Piis simple. The Debiandistributionincludes a toolcalled apt, whichis a powerfulpackage
manager. Packages are what Linuxcalls a piece ofsoftware, or a collectionofdifferent pieces ofsoftware designed to work
together.
Althoughapt is designed to be operated fromthe command line, it’s veryuser-friendlyand easyto learn. There are GUIs for
apt, suchas the popular Synaptic Package Manager, but theyoftenstruggle to runonthe Pidue to the lack ofmemory. As a
result, we recommend that software be installed at the terminal.
Other Distributions
Debian, and distributions based on Debian, typically useapt as thepackagemanager. It’s not theonly tool out there, and other distributions makedifferent
choices. FedoraRemix, for example, uses thepacman tool.
Pacman is no moredifficult to usethan apt, but its syntax(theway it expects you to phraseinstructions to install new softwareor removeexistingsoftware)
is different. For instructions on how to usepacman instead of apt, typeman pacman at theFedoraRemixterminal.
Other distributions may usetheyum packagemanager. If you’retryingadistribution that uses yum, simply typeman yum at theterminal for instructions.
Apackage manager’s job is to keep track ofallthe software installed onthe system. It doesn’t just installnewsoftware—it also
keeps tabs onwhat is currentlyinstalled, allows old software to be removed and installs updates as theybecome available.
Package management is one ofthe areas where Linuxdiffers greatlyfromoperatingsystems like Windows or OS X. Although
it’s possible to manuallydownload newsoftware to install, it’s far more commonto use the built-inpackage management tools
instead.
Before trying to install newsoftware orupgrade existing software, you needto make sure the apt cache is upto date. To do this, simply type the
commandsudo apt-get update.
Finding Software
The first step to installinga newpiece ofsoftware is to find out what it’s called. The easiest wayto do this is to searchthe cache
ofavailable software packages. This cache is a list ofallthe software available to installvia apt, stored onInternet servers
knownas repositories.
The apt software includes a utilityfor managingthis cache, called apt-cache. Usingthis software, it’s possible to runa search
onallthe available software packages for a particular word or phrase.
For example, to find a game to play, youcantype the followingcommand:
apt-cache search game
That tells apt-cache to searchits list ofavailable software for anythingwhichhas the word “game”inits title or description. For
commonsearchterms, youcanend up withquite a list (see Figure 2-4), so tryto be as specific as youcan.
Figure 2-4:The last fewresults for anapt-cache “game”search
If yoursearch termbrings uptoo many different packages to see on a single screen display, you can tell Linux that you want it to pause on each
screenfull by piping the output of apt-cache through a tool calledless. Simply change the commandto apt-cache search game | less anduse the
cursorkeys to scroll through the list. Press the letterQ on the keyboardto exit.
Installing Software
Once youknowthe name ofthe package youwant to install, switchto the apt-get command inorder to installit. Installing
software is a privilege afforded onlyto the root user, as it affects allusers ofthe Pi. As a result, the commands willneed to be
prefaced withsudo to tellthe operatingsystemthat it should be runas the root user.
For example, to installthe package thrust (a Linuxversionofa popular Commodore 64 game fromdays gone by), youwould
simplyuse the install command withapt-get as follows:
sudo apt-get install thrust
Some packages relyonother packages inorder to operate. Aprogramminglanguage maydepend ona compiler, a game engine
ongraphics files, or anaudio player oncodecs for playingback different formats. These are knowninLinuxterms as
dependencies.
Dependencies are one ofthe biggest reasons for usinga package manager like apt rather thaninstallingsoftware manually. Ifa
package depends onother packages, apt willautomaticallyfind them(see Figure 2-5) and prepare themfor installation. Ifthis
happens, you’llbe showna prompt askingwhether youwant to continue. Ifyoudo, type the letter Yand press the Enter key.
Figure 2-5:Apt listingthe dependencies for the OpenOffice.orgpackage
Uninstalling Software
Ifyoudecide youno longer want a piece ofsoftware, apt-get also includes a remove command that cleanlyuninstalls the
package alongwithanydependencies whichare no longer required. Whenyou’re usinga smaller SDcard withthe Pi, the ability
to tryout software and quicklyremove it is extremelyuseful.
To remove thrust, simplyopenthe terminaland type the followingcommand:
sudo apt-get remove thrust
The remove command has a more powerfulbrother inthe formofthe purge command. Like remove, the purge command
gets rid ofsoftware youno longer require. Where remove leaves the software’s configurationfiles intact, however, purge
removes everything. Ifyou’ve got yourselfinto a mess customisinga particular package and it no longer works, purge is the
command to use. For example, to purge thrust, youwould just type this:
sudo apt-get purge thrust
Upgrading Software
Inadditionto installingand uninstallingpackages, apt canbe used to keep themup to date. Upgradinga package throughapt
ensures that you’ve received the latest updates, bugfixes and securitypatches.
Before tryingto upgrade a package, make sure the apt cache is as freshas possible byrunninganupdate:
sudo apt-get update
Whenupgradingsoftware, youhave two choices:youcanupgrade everythingonthe systemat once or upgrade individual
programs. Ifyoujust want to keep your distributionupdated, the former is achieved bytypingthe following:
sudo apt-get upgrade
To upgrade anindividualpackage, simplytellapt to installit again. For example, to installa thrust upgrade, youwould type
this:
sudo apt-get install thrust
Ifthe package is alreadyinstalled, apt willtreat it as anin-place upgrade. Ifyou’re alreadyrunningthe latest versionavailable,
apt willsimplytellyouit cannot upgrade the software and exit.
Formore information on package management with apt—in particular, howcertain packages can be “kept back” andexcludedfromupgrades—type
man apt at the terminal.
Chapter 3: Troubleshooting
Sometimes, things don’t go entirelysmoothly. The more complexthe device, the more complexthe problems that canoccur—
and the Piis anextremelycomplexdevice indeed.
Thankfully, manyofthe most commonproblems are straightforward to diagnose and fix. Inthis chapter, we’lllook at some of
the most commonreasons for the Pito misbehave and howto fixthem.
Keyboard and Mouse Diagnostics
Perhaps the most commonproblemthat users experience withthe RaspberryPiis whenthe keyboard repeats certaincharacters.
For example, ifthe command startx appears onscreenas sttttttttttartxxxxxxxxxxxx, it will, understandably, failto
work whenthe Enter keyis pressed.
There are typicallytwo reasons whya USBkeyboard fails to operate correctlywhenconnected to the RaspberryPi:it’s
drawingtoo muchpower, or its internalchipset is conflictingwiththe USBcircuitryonthe Pi.
Check the documentationfor your keyboard, or the labelonits underside, to see ifit has a power ratinggiveninmilliamps (mA).
This is howmuchpower the keyboard attempts to drawfromthe USBport whenit’s inuse.
The Pi’s USBports have a component called a polyfuse connected to them, whichprotects the Piinthe event that a device
attempts to drawtoo muchpower. Whenthis polyfuse is tripped, it causes the USBport to shut off, at around 150 mA. Ifyour
keyboard draws anywhere around that muchpower, it mayoperate strangely—or not at all. This canbe a problemfor
keyboards that have built-inLEDlighting, whichrequire far more power to operate thana standard keyboard.
Ifyoufind that your USBkeyboard maybe drawingtoo muchpower, tryconnectingit to a powered USBhub instead of
directlyto the Pi. This willallowthe keyboard to drawits power fromthe hub’s power supplyunit, instead offromthe Piitself.
Alternatively, swap the keyboard out for a modelwithlower power demands. The repeating-letter problemmayalso be traced
to aninadequate power supplyfor the Piitself, whichis addressed inthe next section, “Power Diagnostics”.
The issue ofcompatibility, sadly, is harder to diagnose. While the overwhelmingmajorityofkeyboards work just fine withthe Pi,
a smallnumber exhibit strange symptoms. These range fromintermittent response, the repeating-letter syndrome or evencrashes
that prevent the Pifromoperating. Sometimes, these issues don’t appear untilother USBdevices are connected to the Pi. Ifyour
keyboard was workingfine untilanother USBdevice, inparticular a USBwireless adapter, was connected, youmayhave an
issue ofincompatibility.
Ifpossible, tryswappingthe keyboard out for another model. Ifthe newkeyboard works, your old one maybe incompatible
withthe Pi. For a list ofknown-incompatible keyboards, visit the eLinuxwiki:
http://elinux.org/RPi_VerifiedPeripherals#Problem_USB_Keyboards
The same advice oncheckingcompatibilityinadvance applies to problems withthe mouse:the majorityofUSBmice and
trackballs work fine, but some exhibit incompatibilitywiththe Pi’s ownUSBcircuitry. This usuallyresults insymptoms like a
jerkyor unresponsive mouse pointer, but it cansometimes lead to the Pifailingto load or crashingat randomintervals. Ifyou’re
lookingto buya newmouse, anup-to-date list ofmodels knownto work withthe Piis available at the eLinuxwikisite:
http://elinux.org/RPi_VerifiedPeripherals#Working_USB_Mouse_Devices
Power Diagnostics
Manyproblems withthe RaspberryPicanbe traced to aninadequate power supply. The ModelArequires a 5 Vsupply
capable ofprovidinga 500 mAcurrent, while the ModelB’s extra components bump up the current requirement to 700 mA.
Not allUSBpower adapters are designed to offer this muchpower, eveniftheir labellingclaims otherwise.
The formal USBstandardstates that devices shoulddrawno more than 500 mA, with even that level of poweronly available to the device following a
process callednegotiation. Because the Pi doesn’t negotiate forpower, it’s unlikely that it will work if you connect it to the USBports on a desktop
orlaptopcomputer.
Ifyou’re havingintermittent problems withyour Pi—particularlyifit works untilyouconnect somethingto a USBport or start a
processor-intensive operationlike playingvideo—the chances are that the power supplyinuse is inadequate. The Piprovides a
relativelyeasywayto check ifthis is the case inthe formoftwo voltage test points.
To use the voltage test points, you’llneed a voltmeter or multimeter withdirect current (DC) voltage measuringcapabilities. If
your meter has multiple inputs for different voltages, use anappropriate setting.
Avoidtouching the test probes to anything not labelledas a test point. It’s possible to bridge the 5 Vsupply that comes in to the Pi to the internal 3.3
Vsupply, creating a short circuit which can damage the device. Be especially careful aroundexposedheaderpins.
The two test points are small, copper-clad holes knownas vias, whichare connected to the Pi’s 5 Vand ground circuits. Put the
positive (red) meter probe onTP1, located to the left ofthe board just above a smallblack component called a regulator labelled
RG2. Connect the black (negative) meter probe to TP2, located betweenthe copper GPIO pins and the yellow-and-silver RCA
phono connector at the top-left ofthe board (see Figure 3-1).
Figure 3-1:The two voltage test points, labelled TP1 and TP2
The readingonthe voltmeter should be somewhere between4.8 Vand 5 V. Ifit’s lower than4.8 V, this indicates that the Piis
not beingprovided withenoughpower. Tryswappingthe USBadapter for a different model, and check that the labelsays it can
supply700 mAor more. Amodelrated at 1Ais recommended, but beware ofcheap models—theysometimes have inaccurate
labelling, and failto supplythe promised current. Genuine branded mobile phone chargers rarelyhave this problem, but cheap
unbranded devices—oftensold as compatible adapters—should be avoided
Ifyour voltmeter reads a negative number, don’t worry:this just means you’ve got the positive and negative probes inthe wrong
place. Either swap themaround or just ignore the negative signwhennotingyour reading.
Display Diagnostics
Althoughthe Piis designed to work withalmost anyHDMI, DVI or composite video displaydevice, it simplymaynot work as
expected whenyouplugit in. For example, youmayfind that your picture is shifted to the side or not fullydisplayed, or is only
visible as a postage-stamp-sized cut-out inthe middle ofthe screenor inblack-and-white—or evenmissingentirely.
First, check the type ofdevice to whichthe Piis connected. This is especiallyimportant whenyou’re usingthe composite RCA
connectionto plugthe Piinto a TV. Different countries use different standards for TVvideo, meaningthat a Piconfigured for one
countrymaynot work inanother. This is the usualexplanationfor a Pishowingblack-and-white video. You’lllearnhowto
adjust this settinginChapter 6, “Configuringthe RaspberryPi”.
Whenyouuse the HDMI output, the displaytype is usuallyautomaticallydetected. Ifyou’re usinganHDMI to DVI adapter to
plugthe Piinto a computer monitor, however, this occasionallygoes awry. Commonsymptoms include snow-like static, missing
picture portions or no displayat all. To fixthis, note the resolutionand refreshrate ofyour connected display, and thenjump to
Chapter 6 to find out howto set these manually.
Another issue is a too-large or too-smallimage, either missingportions at the edge ofthe screenor sittinginthe middle ofa large
black border. This is caused bya settingknownas overscan, whichis used whenthe Piis connected to TVs to avoid printingto
portions ofthe displaywhichmaybe hiddenunder a bezel. As withother display-related settings, youwilllearnhowto adjust—
or evencompletelydisable—overscaninChapter 6.
Boot Diagnostics
The most commoncause for a Pito failto boot is a problemwiththe SDcard. Unlike a desktop or laptop computer, the Pi
relies onfiles stored onthe SDcard for everything. IfPican’t talk to the card, it won’t displayanythingonthe screenor show
anysigns oflife at all.
Ifyour Pi’s power light glows whenyouconnect the micro-USBpower supply, but nothingelse happens and the OK light
remains dark, youhave anSDcard problem. First, ensure that the card works whenyouconnect it to a PC, and that it shows
the partitions and files expected ofa well-flashed card. (For more details, see Chapter 2, “LinuxSystemAdministration”,
particularlythe sectiontitled “File SystemLayout”inthat chapter.)
Ifthe card works ona PC but not inthe Pi, it maybe a compatibilityproblem. Some SDcards—especiallyhigh-speed cards
marked as Class 10 ontheir labelling—don’t operate correctlywhenconnected to the Pi’s onboard SDcard reader. Alist of
cards knownto cause compatibilityproblems withthe Picanbe found onthe eLinuxwiki:
http://elinux.org/RPi_VerifiedPeripherals#Problem_SD_Cards
Sadly, ifyouhave one ofthe cards onthe list, youmayneed to replace it witha different card inorder for the Pito work. As the
Pi’s software base is developed, however, work is beingcarried out to ensure that a wider range ofcards operate correctlywith
the Pi. Before givingup ona high-speed card completely, check to see ifanupdated versionofyour chosenLinuxdistributionis
available. (See Chapter 1, “Meet the RaspberryPi”, for more informationabout distributions.)
Network Diagnostics
The most usefultoolfor diagnosingnetwork problems is ifconfig. Ifyou’re usinga wireless network connection, jump to
Chapter 4, “Network Configuration”, for informationona similar toolfor those devices. Otherwise, read on.
Designed to provide informationonconnected network ports, ifconfig is a powerfultoolfor controllingand configuringthe
Pi’s network ports. For its most basic usage, simplytype the tool’s name inthe terminal:
ifconfig
Called inthis manner, ifconfig provides informationonallthe network ports it canfind (see Figure 3-2). For the standard
RaspberryPiModelB, there are two ports:the physicalEthernet port onthe right side ofthe board, and a virtualloopback
interface that allows programs onthe Pito talk to eachother.
Figure 3-2:The output ofifconfig ona RaspberryPiModelB
The output ofifconfig is split into the followingsections:
• Link encap—The type ofencapsulationused bythe network, whichonthe ModelBwilleither read Ethernet for the
physicalnetwork port or Local Loopback for the virtualloopback adaptor.
• Hwaddr—The Media Access Control(MAC) address ofthe network interface, writteninhexadecimal. This is unique for
everydevice onthe network, and eachPihas its ownMAC address, whichis set at the factory.
• inet addr—The internet protocol(IP) address ofthe network interface. This is howyoufind the Pionthe network ifyou’re
usingit to runa network-accessible service, suchas a web server or file server.
• Bcast—The broadcast address for the network to whichthe Piis connected. Anytraffic sent to this address willbe
received byeverydevice onthe network.
• Mask—The network mask, whichcontrols the maximumsize ofthe network to whichthe Piis connected. For most home
users, this willread 255.255.255.0.
• MTU—The maximumtransmissionunit size, whichis howbiga single packet ofdata canbe before the systemneeds to
split it into multiple packets.
• RX—This sectionprovides feedback onthe received network traffic, includingthe number oferrors and dropped packets
recorded. Ifyoustart to see errors appearinginthis section, there’s somethingwrongwiththe network.
• TX—This provides the same informationas the RXsection, but for transmitted packets. Again, anyerrors recorded here
indicate a problemwiththe network.
• collisions—Iftwo systems onthe network tryto talk at the same time, youget a collisionwhichrequires themto retransmit
their packets. Smallnumbers ofcollisions aren’t a problem, but a large number here indicates a network issue.
• txqueuelen—The lengthofthe transmissionqueue, whichwillusuallybe set to 1000 and rarelyneeds changing.
• RXbytes, TXbytes—Asummaryofthe amount oftraffic the network interface has passed.
Ifyou’re havingproblems withthe network onthe Pi, youshould first tryto disable and thenre-enable the network interface.
The easiest wayto do this is withtwo tools called ifup and ifdown.
Ifthe network is up, but not workingcorrectly—for example, ififconfig doesn’t list anythinginthe inet addr section—start
bydisablingthe network port. Fromthe terminal, type the followingcommand:
sudo ifdown eth0
Once the network is disabled, make sure that the cable is inserted tightlyat bothends, and that whatever network device the Pi
is connected to (hub, switchor router) is powered onand working. Thenbringthe interface back up againwiththe following
command:
sudo ifup eth0
Youcantest the networkingbyusingthe ping command, whichsends data to a remote computer and waits for a response. If
everything’s working, youshould see the same response as showninFigure 3-3. Ifnot, youmayneed to manuallyconfigure your
network settings, whichyou’lllearnhowto do inChapter 4, “Network Configuration”.
Figure 3-3:The result ofa successfultest ofthe network, usingthe pingcommand
The Emergency Kernel
The Linuxkernelis the heart ofthe operatingsystemthat drives the Pi. It’s responsible for everythingfrommakingsure that you
canaccess your files to allowingprograms to talk to other programs.
Whenswitched on, your Piwillload the normal, default kernel. There’s also a second kernelincluded inmost distributions,
whichsits unused. This is the emergencykernel, and as the name suggests, it is typicallyused onlywhenthe normalkernelisn’t
working.
It’s highlyunlikelythat you’llever need to boot a Piusingthe emergencykernel, but it’s worthlearninghowto do so just incase.
This is especiallyimportant ifyou’re upgradingyour kernelor are usinga newand potentiallypoorlytested distribution.
Sometimes, newly-released software canhave bugs whicharen’t spotted before its release. Whenencounteringstrange errors
after upgrading, the emergencykernelcanbe used to narrowdownthe problemto the newkernelversion.
The Linuxkernelis a single file located inthe /boot directorycalled kernel.img. Whenthe Piis first switched onand begins to
load the operatingsystem, it looks for this file, and ifthe file is missing, the Piwon’t work. The emergencykernelis a second file,
againinthe /boot directory, called kernel_emergency.img.
The emergencykernelis, inmost cases, almost identicalto the standard kernel. Whenchanges are made to the standard kernel,
to boost performance or add newfeatures for example, the emergencykernelis left unaltered. This way, ifthe changes to the
standard kernelcause stabilityproblems, a user cansimplytellthe Pito load the emergencykernelinstead.
There are two ways to boot into the emergencykernel, and bothrequire the use ofa PC and anSDcard reader ifthe Pican’t
boot. Otherwise, the followingcanbe carried out onthe Piitself.
The easiest wayto boot the emergencykernelis to rename the existingkernel.img file to kernel.img.bak, and thenrename
the kernel_emergency.img file to kernel.img. Whenthe Piloads, it willnowload the emergencykernelbydefault. To go
back to the standard kernel, simplyreverse the process:rename kernel.img to kernel_emergency.img and
kernel.img.bak to kernel.img.
Analternative method to load the emergencykernelis to edit the cmdline.xt file (located inthe /boot directory) byaddingthe
followingentryat the end ofthe existingcommand line:
kernel=kernel_emergency.img
This tells the Pithat it should load the kernelnamed kernel_emergency.img instead ofthe usualkernel.img. Reversingthe
process is as simple as openingcmdline.txt againand removingthe entry.
You’lllearnmore about cmdline.txt and howit affects the operationofthe RaspberryPiinChapter 6, “Configuringthe
RaspberryPi”.
Chapter 4: Network Configuration
Formost users, configuringthe Pi’s network is as easyas plugginga cable into the ModelB’s Ethernet port—or a USB
Ethernet adapter inthe case ofthe ModelA. For others, however, the network requires manualconfiguration.
Ifyouknowthat your network doesn’t have a Dynamic Host ConfigurationProtocol(DHCP) server—a systemthat tells the Pi
and other devices onthe network howtheyshould connect—or ifyouwant to use a USBwireless adapter withthe Pi, read on.
Wired Networking
Ifthe network stilldoesn’t work, youmayneed to configure it manually. Normally, the network ina home, schoolor office has a
DHCP server that tells the Piand other devices onthe network howtheyshould connect. Some networks, however, don’t have
a DHCP server and need to be set up manually.
The list ofnetwork interfaces, alongwithinformationabout howtheyshould be configured, is stored ina file called interfaces
located inthe folder /etc/network. This is a file onlythe root user canedit, because removinga network interface fromthis list
willcause it to stop working.
Fromthe terminal, youcanedit this file usinga varietyofdifferent text editors. For simplicity, the nano text editor should be used
for this process. Openthe file for editingwiththe followingcommand:
sudo nano /etc/network/interfaces
Nano is a powerfulyet lightweight text editor, witha simple user interface (see Figure 4-1). Youcanmove your cursor around
the document withthe arrowkeys, save byholdingdownthe CTRLkeyand pressingO, and quit byholdingdownthe CTRL
keyand pressingX.
The line youneed to edit for manualconfigurationstarts withiface eth0 inet. Delete dhcp fromthe end ofthis line and
replace it withstatic, press Enter to start a newline, and thenfillinthe remainingdetails inthe followingformat witha tab at
the start ofeachline:
[Tab] address xxx.xxx.xxx.xxx
[Tab] netmask xxx.xxx.xxx.xxx
[Tab] gateway xxx.xxx.xxx.xxx
Make sure that youpress the Tab keyat the start ofeachline, and don’t actuallytype [Tab]. The xcharacters inthe
configurationlines represent network addresses you’llneed to enter. For address, youshould enter the static IP address that
youwant to assignto the Pi. For netmask, youshould enter the network mask—whichcontrols the size ofthe connected
network—inwhat is knownas dotted-quad format. Ifyou’re usinga home network, this is typically255.255.255.0. For
gateway, youshould enter the IP address ofyour router or cable modem.
As anexample, the settings for a commonhome network would look like this:
iface eth0 inet static
[Tab] address 192.168.0.10
[Tab] netmask 255.255.255.0
[Tab] gateway 192.168.0.254
Figure 4-1:Editing/etc/network/interfaces withnano
Whenyou’ve finished editingthe file, press CTRL+ O to save it, and thenpress CTRL+ Xto leave nano and returnto the
terminal. To use your newnetwork settings, restart the networkingservice bytypingthe following:
sudo /etc/init.d/networking restart
Ifyouneed to returnto automatic settings via DHCP, youneed to edit the interfaces file againand delete the address,
netmask and gateway settings. Replace static withdhcp at the end ofthe iface line, and thenrestart the networkingservice
again.
Settinga manualIP address isn’t quite enoughto get your Piconnected to the outside world. Computers onmodernnetworks
have botha numericaladdress identifier knownas anIP address and a hostname or domainname. It’s this latter, friendlyname
whichmeans youcansimplytype www.raspberrypi.org into your browser, instead oftryingto remember 93.93.128.176.
Asystemcalled a DomainName Service (DNS) server is responsible for lookingup the friendlynames yousupplyand
convertingtheminto the numbers required to access the system. It operates muchlike anautomated telephone directory. Before
you’llbe able to access Internet-connected systems via their domainnames, you’llneed to tellthe PiwhichDNS servers to use.
The list ofDNS servers, knownas nameservers inLinuxparlance, is stored in/etc/resolv.conf. Whenthe systemgets its
details throughDHCP, this file is automaticallyfilled in. Whenyouset anaddress manually, youneed to provide the addresses of
the nameservers onyour network. Normally, this would be the address ofyour router as found inthe gateway line fromthe
interfaces file (described earlier inthis chapter).
To set the nameservers, openthe file withnano bytypingthe followingcommand at the terminal:
sudo nano /etc/resolv.conf
Add eachnameserver ona separate line, prefaced withnameserver and a space. As anexample, the resolv.conf
configurationfor a network whichuses Google’s publicly-accessible nameservers to resolve domainnames would appear like
this:
nameserver 8.8.8.8
nameserver 8.8.4.4
You’llnotice that the nameserver addresses need to be supplied as IP addresses, rather thandomainnames. Ifyouprovided
domainnames instead, the Piwould enter aninfinite loop oftryingto find a nameserver to ask howit canfind the nameservers.
Save the file bypressingCTRL+ O, and thenquit nano bypressingCTRL+ X. Restart the networkinginterface bytypingthe
following:
sudo /etc/init.d/networking restart
Thentest the settings byeither openinga web browser or usingthe followingping command (see Figure 4-2):
ping -c 1 www.raspberrypi.org
Figure 4-2:Asuccessfultest ofnetworkingonthe RaspberryPiModelB
Wireless Networking
Althoughno current models ofthe RaspberryPiinclude Wi-Finetworkinghardware onboard, it’s possible to add wireless
connectivitywitha simple USBWi-Fiadapter. However, youwillneed to configure the adapter before youcanuse it to get your
Pionline.
USBWi-Fi adapters are very power-hungry. If you connect one directly to the Pi’s USBport, the chances are it simply won’t work. Instead, connect a
poweredUSBhubto the Pi, andthen insert the Wi-Fi adapterinto that.
Before youstart to set up the wireless interface, you’llneed to knowthe Service Set Identifier (SSID)—also knownas the
network name—ofthe wireless router to whichyouwant to connect, alongwiththe type ofencryptioninuse and the password
required. You’llalso need to knowwhat type ofwireless network it is. AUSBadapter designed for 802.11a Wi-Fimaynot
connect to an802.11gnetwork, and vice versa.
Inorder for the USBwireless adapter to be addressed bythe system, a software bundle knownas a firmware is required. While
some distributions include a selectionofthe most commonWi-Fifirmware installed bydefault, others do not. At present, to save
space, most distributions designed for the RaspberryPineed the firmware files for a wireless card installingmanually.
This, unfortunately, canlead to a Catch-22 situation:inorder to download the firmware files, the Pimust be connected to the
Internet. Ifyoucanspare a wired port onyour router or gatewayfor a fewminutes, that’s not a problem. However, ifwireless is
your onlywayofgettingonline, you’llneed to manuallydownload the firmware installationpackage ona different computer, and
thentransfer it across to the Pibyeither copyingit to the Pi’s SDcard or connectinganexternalstorage device suchas a USB
flashdrive.
To find the correct firmware file to download, you’llneed to knowwhat type ofwireless adapter youhave. Althoughvarious
companies sellbranded USBwireless adapters, the number ofcompanies that actuallymanufacture the components is a lot
smaller. Severaldifferent manufacturers mayuse the same type ofchip inside their USBwireless adapters, makingthemall
compatible withthe same firmware. As a result, the labellingona device or its packagingis not enoughto knowwhichfirmware
youshould install. Instead, you’llneed to connect the device to the Piand check the kernelringbuffer for error messages. If
you’ve alreadyconnected the wireless adapter as instructed inChapter 1, “Meet the RaspberryPi”, youcancontinue. Ifnot,
connect the adapter now.
The kernelringbuffer is a specialportionofmemoryused bythe Linuxkernelto store its human-readable output. It’s an
important part ofthe Linuxoperatingsystem:the text flashes bytoo quicklyto read while the Piboots, so it’s criticalthat users
are able to viewthe messages at a later date to read errors and diagnose problems.
Withthe adapter connected but no wireless firmware packages installed, the kernelwillprint a series oferror messages to the
ringbuffer. To read these messages, youcanuse the dmesg command to print the contents ofthe buffer to the screen. At the
terminal, or at the console ifyouhaven’t loaded the desktop environment, simplytype the followingcommand to viewthe buffer:
dmesg
This willprint out the entire kernelringbuffer, whichwillcontainallmessages output bythe kernelsince the Piwas switched on.
Ifthe Pihas beenrunninga while, that canbe a lot oftext. To locate error message particular to the wireless adapter, it canhelp
to send the output ofdmesg througha toolcalled grep. Usinggrep, youcansearchthroughthe buffer for text relatingto missing
firmware. Bypipingthe output ofdmesg throughgrep witha searchterm, things become significantlyclearer. Type the following
at the terminal:
dmesg | grep ^usb
The | symbolis knownas a pipe, and tells Linuxto send the output ofone program—whichwould normallygo to a file or the
screen—to the input ofanother. Multiple programs canbe chained this way. Inthis example, grep is beingtold to search
throughthe output ofdmesg—the screens fulloftext fromthe earlier command—for anyuse ofthe termusb at the start ofthe
line (denoted bythe ^ character).
The exact output ofthat searchwilldepend onthe manufacturer ofyour USBwireless adapter. InFigure 4-3, the output is
shownwitha ZyxelNWD2015 Wireless USBAdapter connected to the Pi.
Figure 4-3:Searchingthe kernelringbuffer for usb witha Zyxelwireless adapter connected
The important part ofthis output is the line that reads Manufacturer. Inthe case ofthe example ZyxelNWD2105, this reads
Ralink, whichis the companythat makes the actualchip found inside ZyxelUSBwireless adapter. It’s this company’s firmware
that must be installed for the wireless adapter to work.
If you couldn’t findanything using usbas a search term, you can try the same commandusing the search termfirmware, wlan orwireless. If you
still can’t see anything useful, type lsusbfora list of all USBdevices connectedto the system.
Usingthe manufacturer name fromdmesg, searchfor the firmware files usingthe apt-cache searchtoolintroduced earlier inthis
chapter. For the example ZyxelNWD2015 adapter, the apt-cache command would be
apt-cache search ralink
Ifapt-cache fails to find the firmware, youmayneed to make a guess based onthe firmware packages inthe followinglist.
Don’t worryifyouinstallthe wrongone—anyfirmware canbe quicklyuninstalled usingapt-get remove, and havingmultiple
firmware packages does no harm. The followingwireless firmware packages are available inthe recommended Debian
distributiononthe RaspberryPi:
• atmel-firmware—For devices based onthe AtmelAT76C50Xchipset
• firmware-atheros—For devices based onAtheros chipsets
• firmware-brcm80211—For devices based onBroadcomchipsets
• firmware-intelwimax—For devices based onIntel’s WiMAXchipsets
• firmware-ipw2x00—For IntelPro Wireless adapters (including2100, 2200 and 2915)
• firmware-iwlwifi—For other Intelwireless adapters (including3945, 4965 and the 5000 series)
• firmware-ralink—For devices based onRalink chipsets
• firmware-realtek—For devices based onRealtek chipsets
• zd1211-firmware—For devices based onthe ZyDAS 1211 chipset
The firmware for the example Zyxelwireless adapter is provided bythe firmware-ralink package inthis list. This package
canbe installed usingapt-get, but onlywhile the Piis connected to the Internet throughits wired Ethernet port or a USB
Ethernet adapter. Whenconnected, installthe firmware bytypingthe following:
sudo apt-get install firmwarepackage
Replace firmwarepackage inthis command withthe name ofthe package that youfound byusingapt-cache. For the example
ZyxelNWD2105, the fullcommand would be sudo apt-get install firmware-ralink.
Installing Wireless Firmware Offline
If you can’t connect thePi to theInternet usingany method other than awireless connection, you’ll need to download thefirmwareon adifferent computer.
In aweb browser, load asearch engineand typethenameof thefirmwarepackagefollowed by thenameof thedistribution you’reusingand its version.
If you’reusingtherecommend Debian distribution, thefirmwarefor theRalink RT2x00 chipset fromtheexamplecan befound by searchingfor firmware-
ralink debian wheezy. Thesearch will lead you to apackagefileto download. In thecaseof Debian, this is a.deb file. For FedoraRemix, thesame
firmwareis provided as a.rpm file.
Download this file, and then copy it to thePi’s SD card in the/home/pi directory, or onto aUSBflash driveor other external storagedevice. Load thePi, and
then when it comes timeto install thefirmware, replacethepackagenamewith thenameof thefileyou downloaded. For theexampleZyxel NWD2105 card,
thecommand would bethefollowing:
sudo apt-get install firmware-ralink_0.35_all.deb
Withthe firmware installed, disconnect the USBwireless adapter and reconnect it to the Pi. This willrestart the kernel’s search
for the firmware files, whichit willnowbe able to find. These files willremaininplace, and load automaticallywhenthe USB
wireless adapter is connected. Youwillonlyhave to performthe installationprocess once.
Withthe firmware installed, settingthe wireless connectionup should be straightforward. First, check that the USBwireless
adapter is workingas it should byusingthe iwlist command to scanfor nearbywireless access points. This list willprobably
be larger thana single screen, so pipe the command’s output throughless to pause after eachscreenful, like this:
sudo iwlist scan | less
This command willreturna list ofallthe wireless networks reachable fromthe Piand their details (see Figure 4-4). Ifyoureceive
anerror message at this point—inparticular, one that claims the network or interface is down—check that youhave installed the
correct firmware, and that the USBwireless adapter is connected to a powered USBhub.
Figure 4-4:Scanningfor wireless networks withiwlist
Youcancheck the current status ofthe network usingthe iwconfig command. Like ifconfig, the iwconfig command
allows youto check the status ofa network interface and issue configurationcommands. Unlike ifconfig, however, iwconfig
is specificallydesigned for wireless networks and includes specific features for this. Type the command name at the terminalas
follows:
iwconfig
The output ofiwconfig, as showninFigure 4-5, is split into the followingsections:
• Interface Name—Eachdevice has its owninterface name, as withwired networks. Ifthe interface is a wireless connection,
additionaldetails willbe shown. The default name for a Pi’s wireless connectionis wlan0.
• Standard—The IEEE802.11 wireless standards have a varietyofdifferent types, distinguished bya letter suffix. This
sectionlists the standards supported bythe USBwireless adapter. For the example adapter, this reads IEEE 802.11bgn for
the network types it canaddress.
• ESSID—The SSIDofthe network to whichthe adapter is connected. Ifthe adapter is not currentlyconnected to a
network, this willread off/any.
• Mode—The mode that the adapter is currentlyoperatingin, whichwillbe one ofthe following:
• Managed—Astandard wireless network, withclients connectingto access points. This is the mode used for almost all
home and business networks.
• Ad-Hoc—Adevice-to-device wireless network, withno access points.
• Monitor—Aspecialmode inwhichthe card listens out for alltraffic whether or not it is the addressee. This mode is
typicallyused innetwork troubleshootingfor capturingwireless network traffic.
• Repeater—Aspecialmode that forces a wireless card to forward traffic onto other network clients, to boost signal
strength.
• Secondary—Asubset ofthe Repeater mode, whichforces the wireless card to act as a backup repeater.
• Access Point—The address ofthe access point to whichthe wireless adapter is currentlyconnected. Ifthe adapter isn’t
connected to a wireless access point, this willread Not-Associated.
• Tx-Power—The transmissionpower ofthe wireless adapter. The number displayed here indicates the strengthofthe signal
that the adapter is sending:the higher the number, the stronger the signal.
• Retry—The current settingfor the wireless adapter’s transmissionretry, used oncongested networks. This does not
normallyneed changing, and some cards won’t allowit to be changed.
• RTS—The adapter’s current settingfor ReadyTo Send and Clear To Send (RTS/CTS) handshaking, used onbusy
networks to prevent collisions. This is normallyset bythe access point onconnection.
• Fragment—The maximumfragment size, used onbusynetworks to split packets up into multiple fragments. This is normally
set bythe access point onconnection.
• Power Management—The current status ofthe adapter’s power management functionality, whichreduces the device’s
power demands whenthe wireless network is idle. This has little effect onthe Pi, but is typicallyenabled for battery-powered
devices like a laptop.
Figure 4-5:The output ofiwconfigwhennot connected to a wireless network
To connect the Pito a wireless network, youwillneed to add some lines into the /etc/network/interfaces file. (For full
details onhowthis file is laid out, see the “Wired Networking”sectionearlier inthis chapter.) First, openthe file inthe nano text
editor:
sudo nano /etc/network/interfaces
At the bottomofthe file, create a newentryfor the USBwireless adapter that reads as follows (see Figure 4-6):
auto wlan0
iface wlan0 inet dhcp
wpa-conf /etc/wpa.conf
Figure 4-6:Editingthe interfaces file for wireless network access
Once the entryis inplace, save the file bypressingCTRL+ O and thenquit nano withCTRL+ X.
The device ID of wlan0 is correct if this is the first wireless device you’ve set upon yourPi. If it isn’t, the numberat the endwill be different. Type
iwconfig to see a current list of wireless devices, andchange the lines in the preceding code example accordingly.
The last line ofthe interfaces file makes reference to a configurationfile, wpa.conf, whichdoes not yet exist. This file is used
bya toolknownas wpasupplicant, designed to provide Linuxwithaneasywayto connect to networks secured withWireless
Protected Access (WPA) encryption.
Usingwpasupplicant, youcanconnect the Pito almost anywireless network—regardless ofwhether it’s protected byWPA
or its newer replacement WPA2—inbothAdvanced EncryptionStandard (AES) and TemporalKeyIntegrityProtocol(TKIP)
modes. Despite its name, wpasupplicant also allows connectionto wireless networks usingthe older Wired Equivalent
Privacy(WEP) encryptionstandard.
The wpasupplicant programstores its configurationina file called wpa.conf, located inthe /etc directory. To begin
configuringthe Pifor wireless access, first opena newblank file for editingbytypingthe following:
sudo nano /etc/wpa.conf
Enter the followingtwo lines, whichagain, are the same for anywireless network type. Replace Your_SSIDwiththe SSIDfor
the wireless network to whichyouwant to connect, and thenfinishthe file withthe lines that matchyour network’s encryption
type.
network={
[Tab] ssid=”Your_SSID”
At this point inthe configurationfile, the details required differ dependingonthe type ofwireless network youare configuring.
The followingsubsections provide instructions for completingthe configurationfor unencrypted, WEP and WPAnetworks.
No Encryption
Ifyour wireless network has no encryptioninplace, finishthe wpa.conf file as follows:
[Tab] key_mgmt=NONE
}
Save the file withCTRL+ O, and thenexit nano withCTRL+ X.
WEP Encryption
Ifyour wireless network uses WEP encryption, finishthe wpa.conf file as follows:
[Tab] key_mgmt=NONE
[Tab] wep_key0=”Your_WEP_Key”
}
Replace Your_WEP_Keywiththe ASCII keyfor your wireless network’s WEP encryption. Save the file withCTRL+ O, and
thenexit nano withCTRL+ X.
WEPencryption is extremely insecure. Readily-available software can break the encryption on a WEP-protectednetwork in just a fewminutes,
allowing a thirdparty to use yournetwork. If you’re still running WEP, considerswitching to WPAorWPA2 forbettersecurity.
WPA/WPA2 Encryption
Ifyour wireless network uses WPAor WPA2 encryption, finishthe wpa.conf file as follows:
[Tab] key_mgmt=WPA-PSK
[Tab] psk=”Your_WPA_Key”
}
Replace Your_WPA_Keywiththe pass phrase for your wireless network’s encryption. Figure 4-7 shows anexample
configurationfor a wireless network withthe SSID“Private_Router” and the WPApass phrase “Private Wireless
Network”. Save the file withCTRL+ O, and thenexit nano withCTRL+ X.
Figure 4-7:Editingthe wpa.conf file for a WPA-protected network
Connecting to the Wireless Network
The Pi’s wireless networkingis nowconfigured, and willbeginthe next time the Piis restarted. To start the wireless network
without rebooting, type the following:
sudo ifup wlan0
To make sure that the network is operational, unplugthe Pi’s Ethernet cable (ifattached) and type the following:
ping -c 1 www.raspberrypi.org
If you start having problems with yourPi following the installation of a USBwireless adapter, it couldbe due to a conflict with otherUSBdevices.
Some adaptermodels are known to cause problems with certain USBkeyboards. Foran up-to-date list of adapters that are known to be good, as well
as those that are known to cause conflicts, visit http://www.element14.com/community/docs/DOC-44703/l/raspberry-pi-wifi-adapter-testing orthe
eLinux wiki at http://elinux.org/RPi_VerifiedPeripherals#Working_USB_Wifi_Adapters.
Chapter 5: Partition Management
Having the Raspberry Pi’s operatingsystemprovided as animage ofsomebodyelse’s SDcard is convenient, but a little
inflexible. Most distributionimages available for download assume a 2 GBor 4 GBSDcard, meaningthat people with8 GBor
larger cards find muchoftheir space wasted.
Creating a New Partition
One wayto make the most ofa large SDonthe RaspberryPiis to create a newpartitioninthe emptyspace at the end ofthe
card. This partitioncanbe used to store anylarge files that youwant your Pito be able to access without havingto use an
externalstorage device.
Allthe tasks required for this canbe carried out directlyonthe Pi, without havingto remove the SDcard and connect it to a PC.
Allyouneed is anSDcard flashed withone ofthe RaspberryPiLinuximages (as described inChapter 1, “Meet the Raspberry
Pi”) and some free space.
When using tools that can modify the partitions on a disk, it’s important not to delete any existing partitions. In particular, be careful not to delete
the /boot orroot file systempartitions, orthe Pi will be unable to load.
Followthese steps to create a newpartitiononanSDcard:
1. Opena terminalwindow, and type sudo fdisk -l to list the storage devices connected to the Piand their current
partitions. The SDcard willappear as /dev/mmcblk0 witha series ofpartitions numbered p0, p1 and so on.
2. Load the cfdisk menu-based partitionmanagement toolbytypingsudo cfdisk /dev/mmcblk0. This willuse the SD
card as the target device. Ifyou’re tryingto create a partitionona USBMass Storage device, replace mmcblk0 withthe
device identifier for the storage device (for example, sda).
3. Usingthe cursor keys, move the partitionselectionhighlight—whichprints the currentlyselected partitionininverse video,
typicallyblack onwhite—downthe partitionlist to the sectionlabelled Free Space at the bottom.
4. Againusingthe cursor keys, move the optionselectionhighlight, located at the bottomofthe screenand displayed in
inverse video, right to the Newoptionand press Enter (see Figure 5-1).
Figure 5-1:Creatinga newpartitionusingcfdisk
5. Youwillbe prompted to create a Primaryor Logicalpartition. The default is to create a Primarypartition, so just press
Enter to accept this.
6. The next prompt willask youhowbigthe partitionshould be, inmegabytes (MB). The default is to create a partitionthat
fills the entire available free space onthe device, so again, just press Enter.
7. Next, the newdetails—knownas a partitiontable—need to be writtento the disk. Use the cursor keys to move the option
selectionhighlight to Write and press Enter.
8. Youwillbe prompted to make sure that the changes are correct. Double-check that you’ve created the partitionas
instructed, and thentype yes and press Enter.
9. Exit cfdisk bymovingthe optionselectionhighlight at the bottomofthe screento Quit withthe cursor keys and then
pressingEnter.
Althoughthe partitiontable has nowbeenupdated withthe freshlycreated partition, it won’t be visible to the operatingsystem
untilit has beenreloaded. The easiest wayto achieve that is to restart the Pibytypingthe following:
sudo reboot
Whenthe Pihas restarted and you’ve logged back in, youcanuse fdisk to verifythat the newpartitionis readyfor use withthe
followingcommand:
sudo fdisk -l
Before youcanstore files onthe newpartition, however, youneed to put a file systeminplace byformattingthe drive usingthe
mkfs toolas follows.
1. Type fdisk -l to list the storage devices connected to the Piand their current partitions. Note the newpartition, which
willappear as /dev/mmcblk0pN where N is the partitionnumber. Ifyou’re doingthis onthe recommended Debian
distribution, the partitionwillbe /dev/mmcblk0p3.
2. Create a newEXT4 file systeminthe partitionbytypingsudo mkfs.ext4 /dev/mmcblk0pN, replacingN withthe new
partition’s number. Make sure that you’ve picked the right partition:the mkfs (make file system) command willwipe anydata
onthe partitionit is told to format.
3. Before the newfile systemcanbe used, it must be mounted. Create a mount point (anemptydirectory) bytypingsudo
mkdir /storage at the terminal.
4. Use the mount command to make the newpartitionaccessible onthe mount point youjust created bytypingsudo mount
/dev/mmcblk0pN /storage, where N is the newpartitionnumber.
When using mkfs to create a new, blank file systemon a partition, always double-check the partition details before continuing. If you give mkfs the
wrong partition, it will erase any files you have storedthere. If it’s the /boot orroot file systemthat has been wiped, the Pi will no longerloaduntil
you flash the SD cardagain.
While this gives youa storage device that the root superuser canaccess, the pistandard user and anyuser accounts you’ve
created yourselfdon’t currentlyhave permissionto store files there. That canbe changed witha trio ofcommands:chown,
chgrp and chmod.
The first command, chown, is short for change ownership and allows files created byone user to be passed across to another;
chgrp changes the group to whicha file belongs so allthe members ofthat group canaccess it; and chmod modifies the
permissions ona file or directory.
To allowallusers to access your newpartition, change the group membership fromroot to users withthe chgrp command,
usingthe -R (recursive) flagto affect the directory’s entire contents as follows:
sudo chgrp -R users /storage
You’llalso need to allowallmembers ofthe group to write to the directory. To do this, youuse the chmod command withthe
optiong+w, whichtells chmod to allowwrite access fromthe group:
sudo chmod -R g+w /storage
The newpartitionis nowreadyfor use, but there’s stillone more task to carryout. At present, the partitionneeds to be manually
mounted (usingthe mount command combined withthe sudo command for runningas the root user) eachtime the Pireboots.
To save time, youcantellthe Pito automaticallymount the newpartitioninstead byeditingthe fstab file.
Short for file systemtable, the fstab file—located inthe /etc directory—tells Linuxwhat file systems should be mounted on
whichmount points. This table maylook complicated at first glance, but its layout follows a logicaltabular pattern.
Fromleft to right, the columns tellLinuxthe locationofthe device to be mounted, the directorywhere the device should be
accessible (the mount point), the file systemtype, anyoptions required, and finally, two numbers that controlwhether the file
systemshould be dumped inthe event ofa systemproblemand whether it should be checked bythe fsck (file systemcheck)
tool.
To make the systemmount the newpartitionautomatically, first openthe fstab file innano:
sudo nano /etc/fstab
Add a newline at the bottomofthe file, definingthe various options required bythe newpartition, withtabs betweeneachfield:
/dev/mmcblk0pN [Tab]/storage[Tab] ext4[Tab] defaults[Tab] 0[Tab] 2
Remember to change N for the partitionnumber ofthe newpartition(see Figure 5-2). Ifyou’re usingfstab to mount external
storage devices, use the device name /dev/sdXN where Xis the device letter and N is the partitionnumber. Save the file with
CTRL+ W, and thenexit nano withCTRL+ X. Whenyou’re back at the terminal, reboot your systemand check if/storage
is mounted automaticallybytypingmount. Ifnot, double-check your newfstab entry. Remember that youneed to press the
Tab keyeachtime youcome to the end ofa field.
Figure 5-2:Editingfstab to automaticallymount the newpartition
Resizing Existing Partitions
Creatinga newpartitionis one wayto make use ofa larger SDcard, but it’s not the most flexible. Abetter method is to resize
existingpartitions to make use ofthe free space. To do this reliably, you’llneed to unplugthe Pi, remove the SDcard and insert
it into a desktop or laptop througha card reader.
Automatic Resizing
The DebianLinuxdistributionfor the RaspberryPicomes witha toolcalled raspi-config, whichloads whenthe systemis
booted for the first time. It canalso be loaded manuallyat anytime bytypingsudo raspi-config at the console or ina
terminalwindow. This toolprovides aninterface for manycommonconfigurationtasks, includingthe abilityto resize the root file
systemto make fulluse ofthe available space onanSDcard automatically.
Using the raspi-config tool to resize the root file systemcan, in rare cases, result in data corruption. If you have data storedon the Pi which you
can’t affordto lose, back it upfirst orconsiderfollowing the more reliable manual resizing instructions foundlaterin this chapter.
To resize the root file systemusingthe raspi-config tool, followthese instructions:
1. Ifthis is the first time youhave loaded Debianonthe RaspberryPi, raspi-config willload automatically. Ifit does not,
type sudo raspi-config at the console or terminalto load the toolmanually.
2. Inthe raspi-config menu(see Figure 5-3), press the downarrowonthe keyboard to highlight the expand_rootfs
optionand thenpress Enter.
Figure 5-3:The raspi-configtool’s menuscreen
3. The resizingoperationtakes just a fewseconds, and is followed bya message tellingyouthat the process willcomplete
whenthe Piis next restarted. Press Enter to dismiss this message.
4. Press the Tab keytwice to highlight Exit, and thenpress Enter to quit raspi-config.
5. Type sudo reboot to restart the Pi. The reboot process willtake longer thanusual, because the file systemwillneed to
be resized. This process happens onlyonce per resize—the next time the Piis rebooted, it willtake no longer thanusual.
Whenthe Pihas fullyrebooted, the root file systemwillnowbe as large as the SDcard allows. To verifythis, type df -h at the
terminalto list the free space onallconnected storage devices.
Manual Resizing
The most reliable wayto resize Linuxpartitions ona desktop or laptop computer is to use a toolcalled Parted Magic, a free
bootable CDthat is designed specificallyfor adjustingfile systems. The disc works onbothPCs and Macs, and operates entirely
frommemory. As a result, it won’t tryto replace your existingoperatingsystem. It’s also compatible withanydistributionfor the
RaspberryPi, unlike the Debian-specific raspi-config tool.
If you’re a Linux user, you can install gparted—the graphical partitioning tool usedin PartedMagic—insteadof having to boot fromthe CD. For
Debian-baseddistributions, you just type sudo apt-get install gpartedfollowedby sudo gpartedto loadthe program.
Download the Parted Magic ISO image file fromhttp://partedmagic.com and write it to a CDor DVDusingthe CD
writingprogramprovided onyour PC. Withthe disc stillinthe drive, reboot your computer and it willload into the Parted Magic
menusystem. Fromhere, choose Standard Settings to load the software itself.
Parted Magic is a customised Linuxoperatingsystemthat includes tools specificallydesigned for managingstorage devices.
Connect the RaspberryPi’s SDcard to your computer and load PartitionEditor fromthe desktop bydouble-clickingthe icon
(see Figure 5-4).
Figure 5-4:The Parted Magic desktop
Bydefault, the partitioneditor willlook at the first drive it finds inyour system, whichis usuallyyour PC’s hard drive. Youdon’t
want to make changes to that, so make sure to click onthe device selector inthe top-right corner and choose the device
correspondingto the SDcard. Ona single-drive system, this willusuallybe /dev/sdb (see Figure 5-5).
Figure 5-5:Parted Magic’s PartitionEditor tool, before resizingthe partition
Resizing andmoving partitions is a risky process. If the SD cardis removedwhile the resize is in progress, orthe PC loses power, it will corrupt the
contents of the card. Always make sure you’ve backedupany irreplaceable personal files fromthe cardbefore editing the partitions.
The exact partitions that need to be resized and moved willdiffer accordingto the distributionchosen. Inthe case ofDebian, you
willneed to resize the second partition, whichwillusuallybe sdb2. Withthe partitioneditor loaded, do the following:
1. Some Linuxdistributions include a swap partitionat the end ofthe image. This appears as a smallpartitionoftype linux-
swap inthe partitioneditor. Ifthis is present, continue withthese instructions; ifnot, skip straight to step 5.
2. Click onthe swap partition, whichwillbe the last partitioninthe list, and choose Resize/Move fromthe toolbar.
3. Inthe dialogue boxthat appears, click and dragthe boxat the top left over to the top right (see Figure 5-6). Once
complete, the Free Space Followingboxshould read 0.
Figure 5-6:Movingthe swap partitioninthe partitioneditor
4. Click the Resize/Move buttonto confirmthe change. Movingthe partitionwilltrigger a warningabout the potentialfor the
newpartitiontable to lead to bootingproblems. That doesn’t applyto this change, because you’re not movingthe boot
partition, so just click OK.
5. Click onthe largest partitioninthe list, whichis typicallylabelled sdb2, and click Resize/Move onthe toolbar again.
6. This time, click and hold the right arrowonthe coloured boxand dragit to the right edge ofthe greybox(see Figure 5-7).
This willmake the partitionlarger, rather thanjust movingit.
Figure 5-7:Resizingthe root file systeminthe partitioneditor
7. Click the Resize/Move buttonto confirmyour change, and againclick OK onthe warningboxthat appears.
8. Click Applyonthe toolbar, and againonthe dialogue boxthat appears. Dependingonthe speed ofyour SDcard, the
resizingprocess maytake a fewminutes to complete.
9. Whenthe resize has completed, youcanturnoffyour PC and put the SDcard back into your Pi.
Thanks to the changes made inthe partitioneditor (see Figure 5-8), the mainpartitiononthe SDcard is nowas bigas the card
willallowit to be. As this is where most Linuxdistributions store boththeir ownfiles and the users’ files, the Pishould nowhave
plentyofspace available to use.
Figure 5-8:Parted Magic’s PartitionEditor tool, after resizingthe partition
Moving to a Bigger SD Card
Ifyou’ve beenusingthe Pifor a while, youmayfind that the 4 GBSDcard youthought would be large enoughfor your needs
has become full. Buyinga newSDcard with8 GB, 16 GBor evenmore storage is cheap enough, but youdon’t want to lose
your files.
Thankfully, it’s prettystraightforward to move the contents ofyour existingSDcard across to a bigger card. The latter halfofthe
process is no different to howyouflashed the SDcard back inChapter 1, “Meet the RaspberryPi”. Where it differs, however,
is that youwillbe usingthe existingSDcard as the source rather thana downloaded image file.
The process of cloning an SD cardis nondestructive, andwill result in both cards having the same data on them. If you have personal files on the old
SD card, make sure to wipe it clean before passing it on to a thirdparty.vIn addition to youroriginal SD cardandthe newer, largercard, you’ll need
access to a PC orMac, an SD cardreaderand—if you’re a Windows user—the PartedMagicdiscusedto resize the partitions earlierin this chapter.
The first step to movingto a larger SDcard is to create animage ofthe existingcard. Ifyouhave access to two SDcard
readers, youcanskip this step and, inthe later instructions, replace the name ofthe image file withthe device address ofthe SD
card reader withthe Pi’s originalcard inserted.
Imaging from Linux
Creatinganimage ofthe SDcard under Linuxis no more difficult thanflashingthe card was inChapter 1. Before starting, make
sure youhave enoughdisk space onyour computer to hold a file the size ofthe SDcard. Thenfollowthese steps:
1. Opena terminalfromyour distribution’s applications menu.
2. Plugyour Pi’s smaller SDcard into a card reader connected to the PC.
3. Type sudo fdisk -l to see a list ofdisks. Find the SDcard byits size, and note the device address (/dev/sdX, where
Xis a letter correspondingto the device. For some computers within-built SDcard readers, this mayappear as
/dev/mmcblkXwhere Xis a letter correspondingto the device. Ifso, use that address inthe followinginstructions.).
4. Type sudo dd of=temporaryimage.imgif=/dev/sdXbs=2M to read the contents ofthe SDcard and write it to a file called
temporaryimage.img (see Figure 5-9).
Figure 5-9:Creatinganimage ofanexistingSDcard usingdd
Imaging from OS X
Imagingthe Pi’s SDcard onOS Xis almost exactlythe same as flashingthe SDcard was back inChapter 1. Again, make sure
youhave enoughhard disk space to hold a file the size ofthe SDcard. Thenfollowthese steps:
1. Select Utilities fromthe Applicationmenu, and thenclick onthe Terminalapplication.
2. Plugyour Pi’s smaller SDcard into a card reader connected to the PC.
3. Type diskutil list to see a list ofstorage devices. Find the SDcard byits size, and note the device address
(/dev/diskX, where Xis a letter correspondingto the device).
4. Ifthe SDcard has beenautomaticallymounted and appears onthe desktop, type diskutil unmountdisk
/dev/diskXto unmount it before proceeding.
5. Type dd of=temporaryimage.img if=/dev/diskX bs=2M to read the contents ofthe SDcard and write it to a file
called temporaryimage.img.
Imaging from Windows
The Windows Image Writer toolthat youused to flashthe SDcard inChapter 1, “Meet the RaspberryPi”, doesn’t support the
creationofimages. Instead, you’llneed to use the Parted Magic disc to gainaccess to the Linuxdd utility, as follows:
1. Insert the Parted Magic CDinto your PC, reboot and choose Standard Settings.
2. Opena terminalwindowusingthe third iconfromthe left onthe bottomtoolbar, whichlooks like a computer monitor (see
Figure 5-10).
3. Type fdisk -l to get a list ofdrives onyour PC, and find your mainhard drive bysize. Note the device name:
/dev/sdXN, where Xis the drive letter and N the partitionnumber. For some computers within-built SDcard readers, this
mayappear as /dev/mmcblkXwhere Xis a letter correspondingto the device. Ifso, use that address inthe following
instructions.
4. Create a mount point for your PC’s hard drive bytypingmkdir /media/harddrive, and thenmount the drive with
mount /dev/sdXN /media/harddrive -o=rw to gainaccess.
5. Insert your SDcard reader withthe Pi’s smaller SDcard into the PC, and thenuse fdisk -l to find its device node
(/dev/sdYwhere Yis the drive letter).
6. Type dd of=/media/harddrive/temporaryimage.img if=/dev/sdY bs=2M to read the contents ofthe SDcard
and write it to a file called temporaryimage.img onyour hard drive.
Figure 5-10:The terminaliconinParted Magic
Nowthat youhave your disk image, use the instructions onflashinganSDcard fromChapter 1, “Meet the RaspberryPi”, to
write it to the newcard. Remember that writinganimage takes time, so be patient and let it finishfully.
Whenthe image writinghas finished, you’llhave two SDcards containingthe exact same data, includingthe same partitiontable.
This means that while the newcard might be 16 GBor 32 GB, the Piwillonlybe able to access the same 2 GBor 4 GBofthe
originalcard.
To ensure the Picanmake use ofthe space onthe newcard, followthe instructions in“ResizingExistingPartitions”earlier inthis
chapter.
Chapter 6: Configuring the Raspberry Pi
Because of its origins inembedded computing, the BCM2835 chip at the heart ofthe RaspberryPidoesn’t have anythinglike a
PC’s BIOS menuwhere various low-levelsystemsettings canbe configured. Instead, it relies ontext files containing
configurationstrings that are loaded bythe chip whenthe power is switched on.
Before takinga look at the various options available inthese files—config.txt, cmdline.txt and start.elf—a word of
warning:changingsome ofthese settings awayfromtheir defaults canresult ina Pithat, best case, doesn’t boot untilthe files are
reverted and, worst case, canphysicallydamage the system. These potentiallydangerous settings willbe highlighted with
warnings inthis chapter.
Hardware Settings—config.txt
The Pi’s hardware is controlled bysettings contained ina file called config.txt, whichis located inthe /boot directory(see
Figure 6-1). This file tells the Pihowto set up its various inputs and outputs, and at what speed the BCM2835 chip and its
connected memorymodule should run.
Figure 6-1:The contents ofthe /boot directory, withconfig.txt highlighted
Ifyou’re havingproblems withgraphics output, suchas the image not fillingthe screenor spillingover the edge, config.txt is
where you’llbe able to fixit. Normally, the file is emptyor—onsome distributions—simplynot present; this just means that the
Piwilloperate usingits preset defaults. Ifyouwant to make changes and the file isn’t there, just create a newtext file called
config.txt and fillinthe settings youwant to change.
The config.txt file cancontrolalmost allaspects ofthe Pi’s hardware, withthe exceptionofthe waythe centralprocessing
unit (CPU) and graphics processingunit (GPU) sections ofthe BCM2835 apportionthe memory. You’lllearnhowto alter that
split inthe “MemoryPartitioning—start.elf”section, later inthis chapter.
The config.txt file is onlyread whenthe systemfirst starts up. Anychanges made while the Piis runningwon’t take effect
untilthe systemis restarted, or switched offand back onagain. Inthe event that the changes are unwanted, simplydeletingthe
file fromthe /boot directoryshould be enoughto restore the defaults once more. Ifthe Piwon’t boot withyour newsettings,
just remove the SDcard and delete config.txt fromthe boot partitiononanother PC, and thenreinsert it into the Piand try
again.
Modifying the Display
Usually, the RaspberryPiwilldetect the type ofdisplaythat’s connected and alter its settings accordingly. Sometimes, however,
this automatic detectiondoesn’t work. This is oftenthe case whena RaspberryPifromone countryis connected to anolder TV
fromanother country. Ifyouconnect your Pito your TVand there’s nothingto see, youmayneed to override these defaults.
Various settings inthe config.txt file canbe used to improve or alter the video output. These settings, and their possible
values, are described inthe followinglist.
Manually adjusting the HDMIorcomposite video output settings can leave yourPi unable to communicate with yourmonitor. It’s usually best to
use the automatically-detectedsettings, unless you’re unable to see a picture in the first place.
• overscan_left—This moves the picture inwards a set number ofpixels to compensate for a TV’s overscan. Ifthe text onthe
Piis disappearingoffthe edge ofthe screen, adjustingthe overscanwillfixit. Values should be givenas the number ofpixels
to skip.
• overscan_right—This does the same job as overscan_left, but onthe right side ofthe screen.
• overscan_top—Again, this ignores a certainnumber ofpixels, but this time onthe top ofthe screen.
• overscan_bottom—This canbe used to skip a number ofpixels fromthe bottomofthe display. Typically, the values for all
the overscan_ settings would be the same, creatinga regular border around the display.
• disable_overscan—Ifyouuse a monitor or TVvia HDMI, youmayfind that your image has a black border around it. To
get rid ofthis border, anydefault overscansettings canbe disabled bysettingthis value to 1.
• framebuffer_width—This value is measured inpixels, and adjustingit willchange the widthofthe console. Iftext appears
too smallonyour screen, trychangingthis to a lower value thanthe default widthofthe connected display.
• framebuffer_height—This affects the size ofthe console inthe same wayas framebuffer_width, but verticallyrather than
horizontally.
• framebuffer_depth—Controls the colour depthofthe console inbits per pixel. The default is 16 bits per pixel, whichgives
65,536 colours. Other values, including8 bits per pixel(256 colours), 24 bits per pixel(around 16.7 millioncolours) and 32
bits per pixel(around 1 billioncolours) are valid, but maycause graphicalcorruption.
• framebuffer_ignore_alpha—Set to 1, this value disables the alpha channel, whichcontrols transparencyinthe console.
Disablingthe alpha channelis not normallyrequired, but maycorrect graphicalcorruptioncaused whensetting
framebuffer_depth to 32 bits per pixel.
• sdtv_mode—This value affects the analogue composite video output ofthe Pi, adjustingit to operate invarious countries.
Bydefault, the Piuses the NorthAmericanversionofthe NTSC video standard; users inother countries mayneed to change
this value to get a picture onananalogue TV. Possible values are:
• 0—NTSC, the NorthAmericanvideo standard
• 1—NTSC-J, the Japanese video standard
• 2—PAL, the video standard for the UK and other countries
• 3—PAL-M, the Brazilianvideo standard
• sdtv_aspect—Controls the aspect ratio ofthe analogue composite output. Ifthe picture looks stretched or squished, alter
this to correspond to your TV’s aspect ratio. Possible values are:
• 1—4:3 aspect ratio, commononolder sets
• 2—14:9 aspect ratio, commonfor smaller widescreenTVs
• 3—16:9 aspect ratio, commonfor modernwidescreenTVs
• hdmi_mode—Inadditionto settingthe video mode for the analogue composite output, it’s also possible to override
automatic resolutiondetectiononthe HDMI port. This is handyifyouwant to runyour Piat a lower resolutionthanthe
display’s native resolutioninorder to make things more readable froma distance. AppendixB, “HDMI DisplayModes”, lists
the possible values for this setting.
• hdmi_drive—It’s also possible to alter the voltage output bythe HDMI port. This is important whenyou’re usinganHDMI
to DVI adapter, because HDMI and DVI voltages differ slightly. Ifyoufind that your picture is snowyor blownout withtoo
bright animage, tryalteringthis setting. Possible values are:
• 1—DVI output voltages. Inthis mode, no audio is included onthe HDMI cable.
• 2—HDMI output voltages. Inthis mode, audio is included onthe HDMI cable.
• hdmi_force_hotplug—Forces the RaspberryPito use the HDMI port, evenifit doesn’t detect a connected display. A
value of0 allows the Pito attempt to detect the display, while a value of1 forces the Pito use HDMI regardless.
• hdmi_group—Sets the HDMI group mode to CEAor DMT. Youshould change this settingaccordingto the displaytype
you’re tryingto connect, before usinghdmi_mode to controlthe output resolutionand frequency. The two possible values
are:
• 1—Sets the HDMI group to that defined bythe Consumer Electronics AssociationofAmerica (CEA). Use this setting
whenthe Piis connected to a high-definitiontelevision(HDTV) over HDMI and use the first settings list fromAppendixB,
“HDMI DisplayModes”.
• 2—Sets the HDMI group to that defined bythe Video Electronics Standards Association(VESA) inthe Display
Monitor Timings (DMT) specification. Use this settingwhenthe Piis connected to a computer monitor over DVI and use
the second settings list fromAppendixB, “HDMI DisplayModes”.
• hdmi_safe—Forces the Pito use a pre-set collectionofHDMI settings designed to provide maximumcompatibilitywith
displays connected to the HDMI port. Settingthis to a value of1 is the equivalent ofsettinghdmi_force_hotpug=1,
config_hdmi_boost=4, hdmi_group=1, hdmi_mode=1 and disable_overscan=0.
• config_hdmi_boost—Some monitors require more power onthe HDMI output to operate. Ifyour picture is covered in
snow, tryincreasingthis value instages from1 (for short cables) to 7 (for longcables).
Eachoptioninconfig.txt should be onits ownline, withthe optionname followed byanequals sign(=) and thenthe required
value. For example, to tellthe Pito use a PAL-format analogue TVwitha 4:3 aspect ratio and a 20-pixeloverscanonallsides,
put the followinglines into config.txt:
sdtv_mode=2
sdtv_aspect=1
overscan_left=20
overscan_right=20
overscan_top=20
overscan_bottom=20
To tellthe Pito use a DVI displaythroughthe HDMI port inthe 720p60 format withno overscanat all, use the followingvalues
instead:
hdmi_group=1
hdmi_mode=4
hdmi_drive=1
disable_overscan=1
For the changes to take effect, the Pimust be restarted. Ifyoufind that your changes have disabled the Pi’s video output onyour
monitor, simplyinsert the SDcard into another computer and either modifythe config.txt file withnewsettings or delete it
altogether to restore the defaults.
Boot Options
The config.txt file canalso be used to controlhowLinuxis loaded onthe RaspberryPi. Althoughthe most commonmethod
for controllingthe loadingofthe Linuxkernelis to use a separate file called cmdline.txt (whichyou’lllearnabout later inthis
chapter), it is possible to use just config.txt. The followingoptions controlthe boot process:
• disable_commandline_tags—This tells the start.elf module (discussed later inthis chapter) to skip fillinginmemory
locations past 0x100 before loadingthe Linuxkernel. This optionshould not be disabled, as doingso cancause Linuxto load
incorrectlyand crash.
• cmdline—The command line parameters to be passed to the Linuxkernel. This canbe used inplace ofthe cmdline.txt
file, usuallyfound inthe /boot directory.
• kernel—The name ofthe kernelfile to be loaded. This canbe used as a wayto load the emergencykernel(see Chapter 3,
“Troubleshooting”).
• ramfsfile—The name ofthe initialRAM file system(RAMFS) to be loaded. This should rarelybe modified, unless you’ve
built a newinitialfile systemwithwhichto experiment.
• init_uart_baud—The speed ofthe serialconsole, inbits per second. The default is 115200, but lower values mayimprove
the connectionifthe Piis used withanolder hardware serialterminal.
Overclocking the Raspberry Pi
The config.txt file not onlycontrols the graphics outputs ofthe Pi’s BCM2835 processor, but it also enables youto control
the chip inother ways as well. Inparticular, it allows youto alter the speed at whichthe chip runs, increasingits performance at
the expense ofthe part’s lifespan—a process knownas overclocking.
Adjusting any of the settings listedin this section can result in damage to yourPi. In particular, changing settings corresponding to memory, GPU
orCPUvoltages will set a fuse in the chip, which invalidates the Raspberry Pi’s warranty even if the setting is returnedback to normal before any
damage is done. Damage causedwhen using these settings will not be put right by the Raspberry Pi Foundation orby the retailerfromwhomyou
purchasedyourPi. If in doubt, don’t alterthese settings: the performance gains through overclocking are rarely worth the risk to the Pi.
The BCM2835 multimedia processor at the heart ofthe Piis a system-on-chip (SoC) designsplit into two mainparts:the
graphics processor (GPU) and the centralprocessor (CPU). Simplyput, the CPUhandles allthe day-to-dayprocessingtasks
while the GPUhandles drawingthings onthe screen, inboth2Dand 3D.
Usingconfig.txt, youcanoverclock one or bothparts ofthe BCM2835. Youcanalso increase the speed at whichthe
memorymodule—located ontop ofthe chip ina package-on-package (PoP) mountingformat—operates.
Boostingthe operatingfrequencyofthese components results ina smallincrease inthe Pi’s performance:anincrease to the
GPU’s clock frequencymeans that 3Dgraphics (suchas game graphics) willrender at a faster pace, and video willbe decoded
quicker for smoother playback; and increasingthe CPU’s clock frequencywillboost overallperformance ofthe device, as will
increasingthe memory’s frequency.
The reasonthe Piisn’t provided withhigher operatingspeeds inthe first place is related to the chips’ lifespan. The BCM2835 is
rated byits manufacturer, Broadcom, to operate at a speed of700 MHz. Increasingthe speed above this officially-rated level
maywork, but it willalso have a deleterious effect onthe lifespanofthe chip. Unlike a desktop processor, SoC designs rarely
have muchheadroomfor overclocking.
Overclocking Settings
Ifyou’re willingto take the risk ofbreakingthe Pi—a process knownas brickinginembedded device circles—for the sake ofa
smallperformance gain, there are settings inconfig.txt whichcanhelp. The followingsettings controlperformance ofthe Pi’s
SoC:
• arm_freq—Sets the core clock frequencyofthe CPUportionofthe BCM2835, for a boost ingeneral-purpose
performance. The default speed is 700 MHz.
• gpu_freq—Sets the clock frequencyofthe GPUportionofthe BCM2835, for a boost ingraphics performance across all
operations. The default speed is 250 MHz. Additionally, youcanadjust individualportions ofthe GPU’s hardware usingthe
followingoptions:
• core_freq—Sets the core clock frequencyofthe GPU, leavingthe other frequencies alone, to improve overallGPU
performance. The default speed is 250 MHz.
• h264_freq—Sets the clock frequencyofthe GPU’s hardware video decoder to improve playback ofH.264 video data.
The default speed is 250 MHz.
• isp_freq—Sets the clock frequencyofthe image sensor pipeline, for improvingthe capture rate ofconnected video
hardware (suchas a camera). The default speed is 250 MHz.
• v3d_freq—Sets the clock frequencyofthe GPU’s 3Drenderinghardware, for a boost invisualisationand gaming
performance. The default speed is 250 MHz.
• sdram_freq—Sets the clock speed ofthe randomaccess memory(RAM) chip onthe Pi, to give the entire systema small
increase inperformance. The default speed is 400 MHz.
• init_uart_clock—Sets the default clock speed ofthe UniversalAsynchronous Receiver/Transmitter (UART), used to
controlthe serialconsole. The default is 3000000, whichsets a speed of3 MHz. Alteringthis is likelyto have little effect
beyond corruptingthe output ofthe serialconsole.
• init_emmc_clock—Sets the default clock speed ofthe SDcard controller. The default is 80000000, whichsets a speed of
80 MHz. Increasingthis value canresult infaster readingand writingfromthe SDcard, but canalso lead to data corruption.
As anexample, to overclock the CPUto 800 MHz, the GPUto 280 MHzand the RAM to 420 MHz, enter the following
options into config.txt, one per line:
arm_freq=800
gpu_freq=280
sdram_freq=420
As withadjustingthe displayconfiguration, anychanges made regardingoverclockingwon’t take effect untilthe Piis restarted.
To returnthe settings to normal, youcaneither delete the entire config.txt file or—ifyou’re usingit to controlthe display
settings as well—simplydelete the lines that dealwithoverclocking, and thenrestart the Pi.
Overvoltage Settings
Ifyou’re overclockingyour Pi, youwilleventuallyhit a brick wallpast whichthe device won’t go. The precise point at whichthe
Piwon’t reliablyoverclock depends onthe individualdevice, due to naturalvariations inthe chip introduced duringthe
manufacturingstage. For some users, this limit maybe as lowas 800 MHz; others mayfind that theycanpushtheir Pias highas
1 GHz(1,000 MHz) without issue.
Ifyouwant to eke a little more performance out ofyour Pi, there is a wayto potentiallyboost this upper limit:a process known
as overvoltage or overvolting. The Pi’s BCM2835 system-on-chip processor and the associated memorymodule usuallyrunat
1.2 volts. It’s possible, althoughpotentiallyinadvisable, to override this default and force the components to runat higher or
lower voltages. Boostingthe voltage means boostingthe signalwithinthe chip, makingit more likelyto hit higher speeds—it also
means that the chip runs hotter, reducingits lifespandramaticallycompared to overclockingalone.
Setting any of the voltage options in config.txt causes a fuse within the BCM2835 to tripin a way that cannot be reset. It’s a foolproof way to tell if
someone has been attempting to overclock the chipoutside its ratedspecifications, andrenders yourwarranty null andvoid—even if the cause of
failure is unrelatedto overclocking. If you return a Pi forreplacement underwarranty andthe fuse is tripped, it will not be replaced. Do not attempt
to overvolt a Pi that you cannot affordto replace yourself.
Unlike the previouslydescribed settings, whichare provided inconfig.txt as absolute values, the voltage adjustment is carried
out usingvalues relative to the Pi’s stock 1.2 Vsetting. For eachwhole number above zero, the voltage is increased by0.025 V
fromstock. For eachwhole number belowzero, the voltage is decreased by0.025 Vfromstock.
The voltage adjustment settings have upper and lower limits of8 and -16, equivalent to 0.2 Vabove stock voltage or 1.4 V
absolute and 0.4 Vbelowstock voltage or 0.8 Vabsolute. The voltage must be adjusted inwhole numbers, and it cannot be
adjusted below0.8 V(-16) or above 1.4 V(8.)
The followingsettings are accessible fromconfig.txt:
• over_voltage—Adjusts the BCM2835’s core voltage. Values are givenas a whole number (aninteger) correspondingto
0.025 Vabove or belowthe default value (0,) witha lower limit of-16 and anupper limit of8.
• over_voltage_sdram—Adjusts the voltage givento the memorychip onthe Pi. As withover_voltage, values are givenas
a whole number correspondingto 0.025 Vabove or belowthe stock (0,) witha lower limit of-16 and anupper limit of8.
Additionally, youcanadjust voltages for individualmemorycomponents usingthe followingoptions:
• over_voltage_sdram_c—Adjusts the voltage givento the memorycontroller. Acceptable values are the same as with
over_voltage_sdram.
• over_voltage_sdram_i—Adjusts the voltage givento the memory’s input/output (I/O) system. Acceptable values are the
same as withover_voltage_sdram.
• over_voltage_sdram_p—Adjusts the voltage givento the memory’s physicallayer (PHY) components. Acceptable
values are the same as withover_voltage_sdram.
As anexample, the followinglines entered into config.txt willgive the BCM2835 a smallboost of0.05 Vto 1.25 Vand the
memorychip a bigger boost of0.1 Vto 1.3 V:
over_voltage=2
over_voltage_sdram=4
As withother settings, deletingthe lines fromconfig.txt or deletingthe file itselfwillreturnthings to normal. Unlike the other
settings inthis section, however, the evidence willremaininthe formofa blownfuse inthe BCM2835—renderingthe Pi’s
warrantynulland void evenafter the default settings are restored.
Disabling L2 Cache
The Pi’s BCM2835 SoC processor has 128 KBofLayer 2 cache memoryonboard. Althoughthis memoryis small, it’s
extremelyfast. It’s used to temporarilystore—aka cache—data and instructions betweenthe slower mainmemoryand the
processor itselfto improve performance.
Because ofthe BCM2835’s origins as a multimedia processor targeted at set-top boxes, this L2 cache is designed to be used by
the GPUportionofthe chip alone. Unlike a traditionalprocessor, the CPUdoesn’t have anyL2 cache ofits own.
Usingconfig.txt, youcantellthe BCM2835 to allowits CPUportionaccess to the L2 cache memory. Insome cases, this
canimprove performance. Inother cases, this canharmperformance, due to the physicallocationofthe cache beinga relatively
longdistance awayfromthe CPUsectionofthe chip and closer to the GPU.
Use ofthe L2 cache memoryalso requires a Linuxdistributionthat has beencompiled withthe cache memoryinmind. Enabling
the L2 cache ona distributionbuilt for a standard Piwithcache disabled mayresult instrange and unwanted behaviour.
To switchthe L2 cache onfor CPUaccess, simplyadd the followingline to the config.txt file:
disable_l2cache=0
As withallconfig.txt settings, the systemmust be rebooted before the change willtake place. To disable the CPU’s access
to the cache memory, replace the 0 witha 1.
Enabling Test Mode
This finaloptioninconfig.txt is one the overwhelmingmajorityofPiusers won’t need to touch, but is included here for
completeness:test mode. Used duringproductionofthe RaspberryPiat the factory, the test mode—combined withspecial
hardware used to electricallycheck the board—allows the factorystaffto make sure the Piis operatingas it should.
Enabling test mode won’t do any permanent damage, but the Pi won’t boot into its operating systemuntil the mode is disabledagain andthe power
to the Pi is switchedoff andback on.
Ifyou’re curious to see what the Pilooks like to factorystaff, youcanenable test mode byenteringthe followingoptioninto the
config.txt file:
test_mode=1
As withother config.txt settings, test mode won’t be enabled untilthe Piis restarted. Test mode canbe disabled againby
removingthe line inconfig.txt, deletingthe file altogether, or replacingthe 1 witha 0.
Memory Partitioning—start.elf
Althoughthe RaspberryPionlyhas a single 256 MBmemorychip, that memorycanbe apportioned to the hardware ina variety
ofways. The BCM2835 is split into two mainsections:the general-purpose CPUand the graphics-oriented GPU. Bothofthese
sections require memoryto operate, meaningthat the 256 MBofmemoryonthe RaspberryPineeds to be shared betweenthe
two. This split is controlled bya file called start.elf.
The typicalsplit is chosenbythe maintainers ofthe Linuxdistributioninstalled onthe Pi. Some choose to split the memory
straight downthe middle, at 128 MBeachfor CPUand GPU, ensuringthat the graphics hardware canperformto its fullest
potential. Others allowthe CPUto have a larger share inorder to improve general-purpose performance.
The majorityofdistributions include three copies ofstart.elf inadditionto the one that’s loaded whenthe Piboots:
arm128_start.elf, arm192_start.elf, and arm224_start.elf (see Figure 6-2). These three files are identicalexcept
for one smallchange:the amount ofmemoryreserved for the BCM2835’s CPU.
Figure 6-2:The various start.elffiles inthe /boot directory
The first file, arm128_start.elf, is configured to split the memorydownthe middle, with128 MBavailable to the
BCM2835’s ARM CPUand 128 MBavailable to the VideoCore IVGPU.
The second and third files graduallyreduce the amount ofmemoryavailable to the GPU. arm192_start.elf gives 192 MBto
the CPUand 64 MBto the GPU, while arm224_start.elf gives 224 MBto the CPUand 32 MBto the GPU. Bytellingthe
Pito use these files, youcanincrease the amount ofmemoryavailable for general-purpose computing.
Applications that do heavy graphics work, such as 3D games andhigh-definition video playback software, typically need128 MBof memory forthe
GPU. Reducing this can result in a dramaticdropin performance.
Most general-purpose distributions work ona 192 MB/64 MBsplit, but youcanfree up more memoryfor programs byforcing
the Pito use the 224 MB/32 MBsplit. This canimprove general-purpose performance without the risks associated with
overclockingthe Pi.
To change howthe memoryis apportioned, simplydelete start.elf fromthe /boot directoryand copyone ofthe three other
versions inits place. Make sure yourename the file to start.elf, or the Piwon’t boot. The easiest wayto achieve this is to
type the followingat the terminal:
sudo cp /boot/arm224_start.elf /boot/start.elf
Whenyounext reboot the Pi, it willhave more memoryavailable to the ARM CPU. To check the amount ofmemoryavailable,
type free at the terminal. To change to another memorysplit, simplyrepeat the precedingcommand witha different versionof
start.elf as the source file:arm_192_start.elf or arm128_start.elf.
Software Settings—cmdline.txt
Inadditionto config.txt, whichcontrols various features ofthe Pi’s hardware, there’s another important text file inthe /boot
directory:cmdline.txt (see Figure 6-3). This file contains what is knownas the kernelmode line—options passed to the Linux
kernelas the Piboots up.
Figure 6-3:The cmdline.txt file in/boot
Ina Linux-based desktop or laptop, these options are normallypassed to the kernelbya toolknownas a bootloader, whichhas
its ownconfigurationfile. Onthe Pi, the options are simplyentered directlyinto cmdline.txt to be read bythe Piat startup.
Almost anykerneloptionsupported byLinuxcanbe entered into the cmdline.txt file, to alter things like the appearance ofthe
console or whichkernelis loaded. As anexample, here is the cmdline.txt file fromthe Debiandistribution, whichshould be
writteninthe file as one continuous line:
dwc_otg.lpm_enable=0 console=ttyAMA0,115200
kgdboc=ttyAMA0,115200 console=tty1 root=/dev/mmcblk0p2
rootfstype=ext4 rootwait
The first option, dwg_otc.lpm_enable, tells the Pito disable the On-The-Go (OTG) mode ofits USBcontroller, to prevent
problems that canoccur whenthe functionalityis enabled without proper support inthe operatingsystem. The majorityofLinux
distributions for the Pidisable this mode.
The console optiontells Linuxthat it should create a serialconsole—device ttyAMA0—and at what speed it should operate. In
most cases, the speed should be left at the default of115,200 Kb/s (kilobytes per second). Ifthe Piis beingused to
communicate witholder devices, this canbe reduced accordingly.
The kgdboc kerneloptionenables debuggingofthe Linuxkernelover the serialconsole created usingthe console parameter.
For most users, this is unnecessary. For developers, havingaccess to kerneldebuggingover a serialconnectionis most useful.
Manydistributions leave this enabled just incase.
The second console entrycreates the device tty1, whichis the text-filled screenyousee whenyoufirst boot the Pi. Without
this entry, youwouldn’t be able to use the Piwithout connectingsomethingto the serialconsole created bythe first console
option.
The root optiontells the Linuxkernelwhere it canfind its root file system, containingallthe files and directories required for the
systemto operate. Inthe case ofthe default Debiandistribution, this is onthe second partitionofthe SDcard—device
mmcblk0p2. This optioncanbe altered to address anexternalstorage device connected over USB, whichcanspeed up the
operationofthe Piconsiderablycompared to havingthe root file systemstored onthe SDcard.
Inadditionto tellingthe kernelwhere to find its root file system, it also needs to knowwhat format the partitionwas created in.
Because Linuxsupports a varietyofdifferent file systems, the rootfstype optionspecificallytells the Debiandistributionuses
anEXT4 file system.
Finally, the rootwait parameter tells the kernelthat it should not tryto boot the systemanyfurther untilthe device containingthe
root file systemis available. Without this option, the Picanget stuck as it begins to boot before the relativelyslowSDcard is
fullyreadyfor access.
Withthe exceptionofthe dwc_otg setting, none ofthese kernelparameters are unique to the Pi. The bootloader configurationof
anyLinuxdistributionwillinclude a list ofoptions verysimilar to those ofcmdline.txt.
Typically, youshould leave the cmdline.txt alone. It’s created bythe distributionmaintainers specificallyfor that versionof
Linux, and maydiffer fromone distributionto the next. Entries that work onFedora Remixmaynot work onDebian, and vice
versa. The options available to cmdline.txt depend onwhat kernelthe distributionis usingand what features were included
whenthe kernelwas built.
Ifyou’re a kerneldeveloper, youcanuse cmdline.txt to pass parameters for enablingor disablingnewfunctionalitythat
you’ve compiled into the kernel. As withconfig.txt, anychanges require a reboot to take effect.
Part II: Using the Pi as a Media Centre, Productivity
Machine and Web Server
Chapter 7:The Pias a Home Theatre PC
Chapter 8:The Pias a ProductivityMachine
Chapter 9:The Pias a Web Server
Chapter 7: The Pi as a Home Theatre PC
One of the most popular tasks for a Pito carryout is that ofa home theatre PC, or HTPC. The BroadcomBCM2835 at the
Pi’s heart is specificallydesigned as a multimedia powerhouse, originallydeveloped for use inHTPCs.
The graphics portionofthe BCM2835 system-on-chip (SoC) design, a BroadcomVideoCore IVmodule, is capable offull-
speed high-definitionvideo playback usingthe popular H.264 format. The chip is also able to playback audio files ina varietyof
formats, boththroughthe analogue 3.5 mmaudio output and digitallyvia the HDMI port.
The smallsize, lowpower drawand silent operationcombine to make the Pia temptingdevice for home theatre enthusiasts. A
varietyofdistributions and software packages designed to turnthe Piinto a user-friendlyhome theatre PC have appeared since
its launch, but youdon’t necessarilyneed to give up your existingoperatingsystemto get started.
Playing Music at the Console
Ifyou’re a developer, youwilllikelyspend most ofyour time at the Pi’s console. Withthe majorityofmusic playback software
beingaimed at desktop use, it canbe a quiet experience—but it doesn’t have to be.
The Pisupports a powerfultext-based music playback package called moc (whichstands for music onconsole). Unlike other
tools (suchas LXMusic), moc canbe installed and used evenwhenthere is no graphicaluser interface (GUI) installed onthe Pi.
To get started, installthe moc package fromyour distribution’s repositories. For the Debiandistribution, this is as simple as
typingthe followingcommand at the console or ina terminalwindow:
sudo apt-get install moc
Some distributions already have anothertool calledmoc, which has nothing to do with audio playback. If you findthat installing mocdoesn’t give
you the result you’re expecting, try substituting mocpas the package name.
Ifyouspend a lot oftime outside ofthe graphicaluser interface and workingat the console, moc is a great choice for music
playback. Unlike other tools, it runs inthe background, meaningthere’s no interruptionto your music ifyoustart doingsomething
else.
To load moc, the command is mocp rather thanmoc. The reasonfor this is that there’s another toolwhichuses the command
moc, so a different name was chosento prevent the operatingsystemfromgettingconfused betweenthe two packages.
To get started, just enter the console—or a terminalwindowifyou’re usinga desktop environment—and type the following:
mocp
The standard mocp interface is split into two panes (see Figure 7-1). The left pane is a file browser, whichallows youto look for
music to play. The cursor keys scrollup and downthe list, while the Enter keystarts playback fromthe currentlyhighlighted
song. Ifyoupress Enter ona directoryname, the browser willenter that directory, while pressingit at the ../ entryat the top of
the list goes back one directorylevel. The right pane shows the current playlist.
Figure 7-1:The standard interface ofthe mocp console-based music player
Where the power ofmocp becomes apparent is whenyouexit the applicationbypressingthe Q key. Ifmocp is inthe middle of
playingback music, it willcontinue to do so evenas youuse the console or terminalwindowfor other tasks. Runningthe mocp
command againwillrestore the interface, allowingyouto change songs, pause or stop playback. Youcanalso controlmocp
directlyfromthe terminal, without havingto use the interface. Runningthe mocp command withflags—the options that followa
command, prefixed witha hyphencharacter—allowyouto start, stop, pause, skip and otherwise change the playback without
havingto go into the software.
The most commonlyused mocp flags are the following:
• -s—Stop the current playback
• -G—Pause playback, or resume playback ifcurrentlypaused
• -f—Skip to the next songinthe directoryor playlist
• -r—Returnto the previous songinthe directoryor playlist
• -i—Print informationonthe current songto the terminalor console
• -x—Stop playback and quit mocp altogether
For more informationoncontrollingmocp, type manmocp.
Dedicated HTPC with Rasbmc
Beingable to playmusic onthe RaspberryPiis one thing, but the BCM2835 cando muchmore thanthat. Usingits VideoCore
IVGPU, it candecode and playback FullHD1080p H.264 video, makingthe Pia powerfulmedia centre machine ina tiny
package and withincrediblylowpower demands.
To get the most fromthe Pias a home theatre PC, however, some additionalsoftware is required. This software canbe installed
inthe Debiandistribution, but there’s aneasier wayto get started:switchingto the Rasbmc distribution.
Rasbmc, created bySamNazarko, is a distributionaimed specificallyat turningthe RaspberryPiinto a fully-featured media
centre system, complete withvideo and music playback, photo viewingand Internet streamingcapabilities. It’s based onthe
popular Xbmc distribution, whichhas beenchosenbyseveraldevice manufacturers to power their commercialset-top box
systems.
Ifyou’re planningonmakinguse ofthe Pi’s high-definitionvideo output and H.264 decodingcapabilities inyour home theatre
setup, Rasbmc is anexcellent choice and no more complicated to get up and runningonthe Pithananyother Linuxdistribution.
First, download the installer fromthe officialwebsite at http://www.raspbmc.com/download/. This is the easiest wayto get
Rasbmc up and running. Installers for Linux, OS Xand Windows are provided whichautomaticallydownload the image file for
Rasbmc and write it to anSDcard connected to the system. Althoughyoucanalso download animage file and use the
instructions fromChapter 1, “Meet the RaspberryPi”, it’s not necessaryto do so.
If you already have an SD cardyou use with the Pi, be aware that installing Rasbmcon it will delete the contents of the card. Back upany files you
want to keep, orif you want to be able to switch between the two distributions, buy a secondSD cardspecifically forRasbmcuse.
Whenthe Rasbmc installer has finished, insert the SDcard into the Piand re-connect the power supply—but make sure the
Ethernet cable is connected as well, because Rasbmc needs to download some data fromthe Internet whenit first loads. The
initialload ofRasbmc cantake 10 or 15 minutes to complete as it downloads updates and partitions the SDcard, but
subsequent loads are significantlyfaster. Don’t panic ifthe first boot hangs at the FormattingPartitions stage—anelongated
pause here is normal.
Whenloaded, Rasbmc automaticallystarts the Xbmc service (see Figure 7-2). This provides a customuser interface specifically
designed for living-roomuse. Everythingis accessible throughthe keyboard or mouse, withlarge and easilyreadable text and
categorised menus to make it easier to find things. Youcanalso purchase infrared remote controls, whichcome witha receiver
that plugs into the Pi’s USBport and a transmitter that allows for a true home theatre experience withno bulkykeyboard or
trailingwires.
Figure 7-2:The Xbmc home screen, loaded byRasbmc
Streaming Internet Media
Bydefault, Xbmc is configured to playonlyfiles it canfind onthe RaspberryPiitself. Ifyouchoose Add-ons frombeneaththe
Video menu, you’llbe able to add some impressive Internet streamingcapabilities to the device, includingaccess to various TV
channels and Internet-onlystreamingservices. After clickingAdd-ons, choose Get More to access the fulllist ofcompatible
plug-ins (see Figure 7-3).
Figure 7-3:Addingnewvideo add-ons inRasbmc
Scrollthroughthe list withthe mouse or cursor keys, and click onanentryor press the Enter keyto access more information. To
installanadd-on, just click Installfromthe pop-up informationboxthat appears whenyouclick onanentryinthe list. This will
download the add-onfromthe Internet and automaticallyinstallit into Xbmc. Watchout for add-ons listed as Broken—these
have beenreported as not workingcorrectly, and should not be installed untilthe problemis fixed bythe add-ondeveloper.
After youfinishchoosingand installingvideo add-ons, click the Home buttoninthe bottom-right corner ofthe screento returnto
the mainXbmc interface. Nowclick onthe word Video inthe centre ofthe screenor press Enter, and thenchoose Video Add-
ons fromthe options that appear. This provides access to your installed add-ons. Click onone to download a list offiles for
viewing. Ifanadd-onhas various categories, it willdownload those categories first—inthis case, click onanindividualcategory
to see the files it contains (see Figure 7-4).
Figure 7-4:Alist ofvideos available throughthe CollegeHumor Xbmc add-on
Similar add-ons are available under the Music and Video menus, and operate inthe same way. Usingthese add-ons, youcan
viewpicture content and streamaudio content fromsites suchas Flickr, Picasa, The BigPicture, Grooveshark, Sky.fmand
SoundCloud.
Streaming Local Network Media
The Xbmc software supports the UniversalPlugand Play(UPnP) media streamingstandard, allowingit to connect to a range of
devices onyour home network. UPnP support is included inmost modernmobile phones, games consoles and network-
attached storage (NAS) devices for sharingand streamingvideos, music and pictures. Manylaptops and desktops also come
withsupport for UPnP or the closelylinked DigitalLivingNetwork Alliance (DLNA) standard—check your documentationto
find out howto enable this feature onyour owndevices.
Xbmc isn’t just limited to UPnP connections, however—the software canalso connect to network servers runningthe Network
File System(NFS) standard commonto Unix-based systems, the Server Message Block (SMB) standard commonto Windows
servers and the Zeroconfstandard commonto OS Xdevices. No matter what network-attached device youuse to store your
media content, it’s likelythat Xbmc willsupport at least one wayofconnectingto it.
To configure Xbmc to connect to a server onyour home network, choose the media type—Video, Music or Pictures—and click
the Add Source option. Inthe windowthat appears, choose Browse to retrieve a list ofsource types (see Figure 7-5). These
source types include localdrives connected to the RaspberryPi, whichare highlighted witha blue iconas wellas network
devices, whichare highlighted witha red icon. Choose the type ofserver you’re tryingto connect to fromthe list, and thenclick
onthe server that appears.
Ifthe server youselect has multiple folders available—suchas folders for different genres, artists, albums or file types—select the
folder youwant Xbmc to connect to and click the OK button. This willreturnyouto the Add Source screen(see Figure 7-6)
withthe required informationfilled in. Ifadditionaldetails are required—suchas a user name and password for a protected
server—you’llneed to fillthese inbefore clickingOK.
Figure 7-5:Choosinga network source inXbmc
Figure 7-6:Addinga UPnP music source to Xbmc
Youcanalso use the same menuto add anexternalhard drive as a source to Xbmc byselectingits entryinthe initiallist. Most
externaldrives willappear automatically, and do not need to be added explicitly—youonlyneed to add a drive as a source ifits
contents do not appear inXbmc’s menus.
Configuring Rasbmc
The Programs menuonthe home screenprovides access to the Rasbmc Settings menu(showninFigure 7-7) where network
settings, software upgrade settings and various systemsettings canbe adjusted. Normally, this menucanbe ignored—however,
ifyou’re havingproblems connectingto the Internet or the Rasbmc systemis continuouslycrashing, the Programs menucan
provide important tools for resolvingthe issue.
Clickingthe Rasbmc Settings optionunder the Programs menuwillopena windowwiththree tabs. The first tab allows youto
adjust the network settings, includingdisablingDHCP and settinga manualnetwork configuration(see Chapter 4, “Network
Configuration”, for more details). Ifyouneeded to set the RaspberryPito use a manualnetwork configurationinother
distributions, this is the place to do the same inRasbmc.
Figure 7-7:ConfiguringRasbmc inthe Settings menu
The second tab, marked XBMC, allows youto installthe nightlybuild ofthe XBMC software. The nightlybuild is so called
because it is created fromthe program’s source code automaticallyeverynight, and contains the latest changes made bythe
software’s developers. As a result, it canhave fixes for anybugs youmayencounter—but it canalso have untested changes that
maymake matters worse. This same screenallows youto switchbetweendifferent versions ofXMBC, makingit easyto test the
nightlybuild and returnto the default versionifa problemis found.
Finally, the Systemtab allows youto set a newpassword for the piuser account to secure Rasbmc for network access. As with
the general-purpose Debiandistribution, this password is set to raspberrybydefault. The Systemtab also allows youto disable
automatic upgradingofthe Rasbmc software. This should be left enabled where possible, as it willensure youget the latest
securityand bugfixes delivered automatically, but ifyou’re ona per-megabyte metered Internet connection, youcandisable the
feature.
Chapter 8: The Pi as a Productivity Machine
The flexibility of the RaspberryPimakes it a good choice as a low-power general-purpose desktop computer. Althoughit will
never reachthe same levels ofperformance as a standard desktop or laptop, its lowcost and environmentally-friendlypower
consumptionhelp to make up for anyproblems withoccasionallysluggishperformance.
Althoughthe RaspberryPi-specific Debiandistributionprovided onthe officialwebsite doesn’t include anyofthe usual
productivitysoftware youmight expect ofa general-purpose PC—suchas a word processor, spreadsheet or image editing—this
software canbe installed via the apt-get command. Youcanalso skip the localinstallationand use cloud-based software
throughthe web browser, whichcanoffer improved performance over locally-installed packages at the cost offlexibilityand
advanced functionality.
Usingeither ofthe methods described inthis chapter—locally-installed applications or cloud-based services—the Picanbe used
as a day-to-daymachine for office and schoolwork, while not harmingits usabilityas a platformfor programmingand
experimentation.
If you’re planning to use the Pi as a pure productivity machine, it’s a goodidea to reserve more of the 256 MBof memory forgeneral-purpose use
andless forthe graphics processor. To learn howto change this split, see the section on “Memory Partitioning—start.elf” in Chapter6,
“Configuring the Raspberry Pi”.
Using Cloud-Based Apps
Ifyouuse your Piconnected to the Internet the majorityofthe time, either throughthe ModelB’s integrated Ethernet port or a
USBwired or wireless adapter onthe ModelA, cloud-based software offers a powerfulyet lightweight means ofusingoffice-
centric software onthe Pi.
Cloud-based software is so called because it doesn’t live locallyonyour computer like a regular piece ofsoftware. Instead, it’s
stored onpowerfulservers located indata centres throughout the world and accessed over the Internet usinga web browser. By
tappinginto the processingand storage capabilities ofa far more powerfulremote server, it’s possible for the Pito work on
more complicated documents and tasks without slowingdown.
Cloud-based software has other advantages over locally-installed applications, too. Anygivencloud-based applicationwilllook
the same onanygivendevice, and manyofthese applications include mobile-oriented versions designed for access from
smartphones and tablets. Files are also stored onthe remote servers, makingthemaccessible fromanydevice without takingup
anyroomonthe Pi’s SDcard.
Cloud-based applications aren’t perfect, however. Theytypicallylagbehind their locally-installed counterparts infunctionality,
and oftenlack advanced features or support fewer file formats. Theyare also inaccessible whenno Internet connectionis
available, makingthema poor choice for users withunreliable connections.
Ifyouthink that the improved performance and saved space onyour Pi’s SDcard is worththe trade-off, continue reading. If
not, skip to the next sectionofthis chapter to learnhowto installOpenOffice.org, anopen-source office suite equivalent to
Microsoft Office.
The most popular cloud-based office suites are the following:
• Google Drive—Runbythe searchand advertisinggiant Google, Google Drive (formerlyknownas Google Docs) includes a
word processor, a spreadsheet and a presentationtool(see Figure 8-1). Corporate users canalso signup for a Google Apps
account, whichprovides improved functionality. Ifyouhave a Gmailweb-based emailaccount, it willautomaticallywork for
Google Drive. Youcanaccess the service at http://docs.google.com.
Figure 8-1:Google Drive runninginChromiumonthe RaspberryPi
• Zoho—Withfive millionregistered users, Zoho is another popular choice. As withGoogle Drive, a word processor,
spreadsheet and presentationpackage are included, but Zoho also offers enhanced business-centric features like a wiki-
based knowledge base system, web conferencing, financialmanagement and evencustomer relationship management. Many
ofthe advanced features, however, require a paid account. Youcanaccess the service at http://www.zoho.com.
• Office 365—Ifyou’re a Microsoft Office user, Office 365 is a great choice. Based onthe same user interface as the current
editions ofthe Microsoft Office suite for desktops, Office 365 is powerfuland flexible. Unlike Zoho and Google Drive, Office
365 has no free user leveland requires a monthlysubscription. Additionally, some features won’t work whenthe software is
accessed froma Linuxcomputer. Youcansubscribe the service at http://office365.microsoft.com.
• ThinkFree Online—Aweb-based interface to the HancomThinkFree Office software, ThinkFree Online offers word
processing, spreadsheet and presentationsoftware for free with1 GBofstorage. The systemalso ties into ThinkFree Mobile
for tablets and smartphones, as wellas the enterprise-targeted ThinkFree Server software. Youcansubscribe to the service
at http://online.thinkfree.com.
Unfortunately, manyofthese web-based services require a browser more capable thanMidori, whichis provided as the default
withthe recommended Debiandistribution. As a result, you’llhave to installa different browser inorder to make use ofanyof
these packages. The followinginstructions are for installingthe Chromiumbrowser, whichis anopen-source project onwhich
Google’s Chrome browser is based. Its relativelylightweight memoryusage makes Chromiuma good choice for the Pi. Ifyou’re
runningthe Fedora Remixdistribution, whichcomes withMozilla Firefoxas its default browser, youcanskip these instructions
and proceed to the next section.
To installthe Chromiumbrowser under Debian, opena terminaland type the following:
sudo apt-get install chromium-browser
Make sure you install the chromium-browserpackage, andnot the chromiumpackage—the latteris a top-down shoot-’em-uparcade game, and
although it’s fun, it won’t helpyou in yourquest to use cloud-basedoffice suites on yourPi!
WithChromiuminstalled, usinga cloud-based office suite is as simple as visitingthe site, signingup for anaccount—providing
your credit card details inthe case ofpremiumservices like Microsoft Office 365—and loggingin. Ifyoufind performance slow,
changingthe memorypartitioningto give the ARM processor a larger share canhelp. Chapter 6, “Configuringthe RaspberryPi”,
has fullinstructions for howto do this.
Using OpenOffice.org
Ifyouwould prefer not to use a cloud-based service, the alternative is to installOpenOffice.org. Designed as anopen-source,
cross-platformalternative to the popular Microsoft Office suite, OpenOffice.orgis powerfuland offers just as muchfunctionality
as its closed-source inspiration.
That functionalitycomes at a cost, however. The OpenOffice.orgpackage is large, takingup nearly400 MBofspace onthe Pi’s
SDcard once allthe dependencies are included. That canbe a problem:inits default setup, the recommended Debian
distributionhas less free space available onthe SDcard thanOpenOffice.orgrequires. (For more informationonthe partition
layout ofthe Debiandistribution, see the “File SystemLayout”sectioninChapter 2, “LinuxSystemAdministration”.)
Ifyouwant to installOpenOffice.org, you’llneed a 4 GBor larger SDcard. You’llalso need to resize the root filesystemto
make use ofthe SDcard’s free space. For instructions ondoingthis, see Chapter 5, “PartitionManagement”. Make sure you
performthis task before continuingwiththis chapter, or you’llfind your Pi’s SDcard runningout ofspace before youcanuse
OpenOffice.org.
Withenoughfree space onthe SDcard, installingOpenOffice.orgis no more complexthaninstallinganyother package.
Althoughit comes bundled witha great dealofadditionalpackages, a single metapackage takes care ofeverythingand installs
the software witha single command. Opena terminalwindowand type the following:
sudo apt-get install openoffice.org
If you receive errormessages saying files are missing when you’re installing software like OpenOffice.org, the package cache is likely out of date.
Run the commandsudo apt-get update to refresh the cache, andthen try again. (See Chapter2, “Linux SystemAdministration” formore details.)
Wheninstalled, OpenOffice.orgwillappear as a series ofentries inthe Applications Menuinthe Pi’s desktop environment.
These entries are as follows:
• OpenOffice.org—The mainapplication, whichprovides links to the individualsections ofthe suite
• OpenOffice.orgCalc—The spreadsheet application, equivalent to Microsoft Excel
• OpenOffice.orgDraw—Avector illustrationapplication, designed for drawinghigh-qualityscalable images for use as clipart
inother OpenOffice.orgprograms
• OpenOffice.orgImpress—The presentationapplication, equivalent to Microsoft PowerPoint
• OpenOffice.orgMath—Asmallyet powerfulpackage designed to make it easyto create and edit scientific formulae and
equations for embeddinginother OpenOffice.orgprograms
• OpenOffice.orgWriter—The word processor application, equivalent to Microsoft Word (see Figure 8-2)
Figure 8-2:OpenOffice.orgWriter runningonthe RaspberryPi
Bydefault, OpenOffice.orgsaves and loads files ina format knownas the OpenDocument Format (ODF). This is a standards-
based, royalty-free file format supported bythe majorityofoffice suite packages—includingnewer versions ofMicrosoft Office.
Whensavinga file inOpenOffice.org, youcanchange the format usinga drop-downmenuinthe Save As dialogue. Under File
Type, youcanselect a varietyofformats, includingseveralwhichare fullycompatible witholder versions ofMicrosoft Office.
Whenyou’re sharingfiles created onthe PiinOpenOffice.orgwithusers ofolder software, remember to change the format to
ensure that everyone canopenthe files. Alternatively, youcould convince themto installOpenOffice.orgthemselves, whichis
available free for Linux, Windows and OS X.
Image Editing with The Gimp
OpenOffice.orgis a powerfulpiece ofsoftware, but one area where it lacks is inimage editing. AlthoughOpenOffice.orgDraw
is a powerfultoolfor illustrative work, unfortunately, youcan’t use it to touchup digitalphotographs. These are knownas
bitmapped images, and are verydifferent to the vector images Drawis designed to edit.
For image editing, one ofthe most powerfultools available for Linuxis the GNUImage ManipulationProgram, usuallyreferred
to as The Gimp. The Gimp is one ofthe most popular projects inopensource, because it offers powerfulfeatures for editing
bitmapped images witha user interface that is similar to the interface that’s used bythe commercialAdobe Photoshop package
(see Figure 8-3).
Figure 8-3:The Gimp runningonthe RaspberryPi
The Gimp is not installed bydefault inmost RaspberryPidistributions, so you’llhave to connect your Pito the Internet and install
it throughthe package management system(see Chapter 2, “LinuxSystemAdministration”, for details). The Gimp takes up quite
a lot ofspace onthe SDcard—althoughnot as muchas OpenOffice.org—so make sure youhave enoughfree space before
installingit.
To installThe Gimp, opena terminalwindowand type the following:
sudo apt-get install gimp
The Gimp cantake a little while to get used to, because its user interface uses three different windows rather thanjust one. By
default, the windowonthe left contains the Toolbox; the windowonthe right displays the Layers, Channels, and Gradients
options; and the middle windowdisplays the image you’re currentlyediting. Ifyouopenmore thanone image, you’llget more
thanone mainwindow—but stillonlyone eachofthe Toolboxand the Layers, Channels, and Gradients windows.
Bydefault, The Gimp User Manualis not installed. For the Pi, this is a good thing:The Gimp is a powerfultool, and its user
manualtakes up a not-inconsiderable amount ofspace onthe SDcard. Ifyoutryto access the manualbypressingthe F1 keyor
choosingHelp fromthe Help menu, you’llbe prompted to read anonline, web-based versioninstead. Click the Read Online
buttonto openthe user manualinyour browser.
The Gimp is a verypowerfulutility, and uses a lot ofmemory. As a result, it runs relativelyslowlyonthe RaspberryPi—although
it is definitelyusable. Be patient withit, especiallyifyou’re openinglarge photographs froma digitalcamera. It mayhelp to
increase the amount ofsystemmemoryavailable bychangingthe start.elf file (see Chapter 6, “Configuringthe Raspberry
Pi”, for more details onhowthis is achieved).
Whensavingfiles inThe Gimp, youcanuse a varietyoffile formats. Ifyou’re planningoncomingback to the file and doingmore
editing, youshould use The Gimp’s default XCF file format. This keeps important metadata intact, uses lossless compressionto
maximise image qualityand supports images comprised ofmultiple layers.
Ifyou’re planningonuploadingyour image to the Internet or otherwise sharingit withothers, a more-portable format like JPGor
PNGis recommended. To change the format ofthe file, choose the Export optionfromthe File menurather thanthe Save option
(see Figure 8-4). This allows youto choose the file format froma wide varietyoffile types.
Figure 8-4:Exportinga file fromThe Gimp
Chapter 9: The Pi as a Web Server
Althoughthe Pi is significantlyless powerfulthanmost devices youwould find ina data centre, that doesn’t meanthat it can’t
act as a usefulserver ina home or business environment. Despite a smallamount ofmemoryand relativelyunderpowered
processor, the Pi’s lowpower drawand silent runningmakes it a great choice for servinglow-traffic simple pages to a local
network or evenout onto the Internet.
Alarge proportionofmodernweb servers runa combinationofLinux, Apache, MySQLand PHP—commonlyreferred to as a
LAMP stack. Linuxprovides the underlyingoperatingsystem; MySQLthe database back-end; Apache the web server; and
PHP a scriptinglanguage for dynamic pages. Usinga LAMP-based server, youcanrunsome quite complexpackages ranging
fromcontent management systems like WordPress to interactive forums like phpBB. Allofthis is possible withthe RaspberryPi,
so longas youdon’t expect performance similar to that ofa powerfulcommercialserver.
Webservers work best with plenty of memory. To ensure maximumperformance, switch the Pi’s memory partitioning to a 224/32 MBsplit (see
Chapter6, “Configuring the Raspberry Pi”) anddon’t run a graphical userinterface (GUI) at the same time.
Installing a LAMP Stack
Ifyou’re runningthe recommended Debiandistributionfor the RaspberryPi, you’re alreadyone-quarter ofthe wayto havinga
fully-operationalLAMP stack—specifically, you’ve alreadygot the Linuxportioninstalled. The next step is to installthe missing
components:Apache, MySQLand PHP. At the terminalor console, type the followingcommands to installthese packages:
sudo apt-get update
sudo apt-get install apache2 php5 php5-mysql mysql-server
This willprompt the apt package manager (see Chapter 2, “LinuxSystemAdministration”) to find a number ofdependencies
required to get a fully-functionalLAMP stack running(see Figure 9-1). These packages and their dependencies take up a lot of
roomonthe Pi’s SDcard—around 113 MBintotal—so ifyouhaven’t resized the root partitiononthe SDcard, turnto
Chapter 5, “PartitionManagement”, for instructions onhowto free up more space.
Installationofthe fullLAMP stack cantake quite some time onthe Pi. Don’t panic ifthe systemappears to freeze for a minute or
two; the installationshould continue normallyafter. Partwaythroughthe installationprocess, MySQLwillprompt youfor a
password (see Figure 9-2). Make sure youpick a secure password, as this protects the MySQLdatabase—which, depending
onwhat your web server is designed to do, canstore user names, payment details and other personallyidentifiable information.
Also make sure youpick a password youcanremember! You’llbe asked to confirmthe password—to check for typingerrors
—and thenthe installationwillcontinue.
Figure 9-1:Installingthe LAMP stack onDebian
Figure 9-2:Choosinga password for MySQL
Whenthe software installationhas finished, boththe MySQLand Apache servers—knowninLinuxparlance as daemons—will
be runninginthe background. To check that the server is workingcorrectly, use another computer onthe network to connect to
the RaspberryPiusinga web browser. Inthe address bar, type the IP address ofthe Pito displaythe default Apache installation
page (see Figure 9-3). Ifyou’re not sure what IP address the Piis using, type ifconfig at the terminaland look for the IP
address listed inthe eth0 section, or the sectioncorrespondingto the network adapter inuse onyour Piifyou’re not usingthe
ModelB’s built-inEthernet port. For more informationoncheckingand adjustingnetwork settings onthe Pi, see Chapter 4,
“Network Configuration”.
Figure 9-3:Connectingto the Pi’s Apache server usinga web browser
The finalstep is to confirmthat the PHP scriptingmodule is loaded correctlyinApache. This module is important:it allows the
Apache web server to runPHP scripts to serve dynamic content. Without a workingPHP module—or analternative module for
another scriptinglanguage like Python—Apache is onlyable to server static pages. To test the Apache PHP module, create a
newPHP script file usingthe followingcommand, typed as a single line:
sudo sh -c ‘echo “<?php phpinfo(); ?>” >
/var/www/phptest.php’
This command creates a newfile called phptest.php inthe /var/www directory. This file tells PHP to create aninformation
page for diagnostic purposes. Visit this usingeither a browser onanother computer bytypinghttp://ipaddress/phptest.php
(replacingipaddress withthe IP address ofthe RaspberryPi) or onthe Piitselfbytypinghttp://localhost/phptest.php
into the address bar (see Figure 9-4).
Figure 9-4:TestingApache’s PHP module onthe RaspberryPi
Whenyou’ve finished testing, remove the phptest.php file withthe followingcommand:
sudo rm /var/www/phptest.php
Although Apache is the most common webserver, there are others. If you findthe performance of Apache too slow, experiment with lighttpd—a
lightweight webserverdesignedto use less memory than Apache. It can be installedunderDebian with the commandsudo apt-get install lighttpd.
Withthe LAMP stack installed and working, youcannowcreate your ownwebsites that willbe served bythe Pi. As longas the
sites aren’t too complex, and don’t receive too manysimultaneous users, the Pishould be able to cope withthe task admirably
—and the device’s smallsize and extremelylowpower drawmore thanmake up for anyslowdownshould your site become
popular.
Bydefault, files for the web server are stored inthe /var/www folder, whichis writeable onlybythe root user. To adjust where
Apache looks for its files—to move the website onto more capacious externalstorage, for example—edit the text file 000-
default found inthe folder /etc/apache2/sites-enabled. For more informationonconfiguringApache, PHP and
MySQL, type the followingcommands at the terminalor console:
man apache2
man php5
man mysql
Installing WordPress
One ofthe most popular bloggingplatforms around, WordPress is anopen-source project that aims to give users a simple yet
powerfulplatformto create attractive, interactive websites. WordPress is built ona base ofPHP and Javascript, and offers an
attractive web-based interface for creatingrichwebsites. For example, some ofthe most popular news sites inthe world are built
ona customised WordPress platform.
To installWordPress onthe RaspberryPi, type the followingcommand at the terminalor console:
sudo apt-get install wordpress
Like the LAMP stack, WordPress comes witha selectionofdependencies (see Figure 9-5). You’llneed to make sure youhave
around 37 MBoffree space onthe Pi’s SDcard for the fullinstallation, inadditionto the 113 MBrequired for the LAMP stack.
Ifyouhave enoughfree space, type Yto continue the installationprocess.
WhenWordPress has finished installing, its default installationdirectory—/usr/share/wordpress—needs to be linked into
the /var/www directoryinorder for Apache to see the files. Type the followingcommand at the terminal:
sudo ln -s /usr/share/wordpress /var/www/wordpress
Figure 9-5:InstallingWordPress onthe RaspberryPi
Linkinga file or directoryis different to moving:the files for WordPress nowexist inboth/usr/share and /var/www
simultaneously, without takingup anyextra space onthe Pi’s SDcard. Ifyou’ve told Apache to use a different directoryfor the
default website, change the linkingcommand accordingly. Next, runthe WordPress MySQLconfigurationscript usingthe
followingcommand, typed as a single line:
sudo bash /usr/share/doc/wordpress/examples/setup-mysql
-n wordpress localhost
This adds a newdatabase into MySQL, installed as part ofthe LAMP stack, for WordPress to use. This database stores your
user accounts, posts, comments and other details. Once this script has completed, you’llbe told to visit http://localhost in
a browser onthe RaspberryPito continue the installation. This instructionis slightlyincorrect:the address youneed to visit to
finishthe WordPress installationis http://localhost/wordpress (see Figure 9-6).
Figure 9-6:ConfiguringWordPress inthe NetSurfweb browser
Fillinthe formthat loads inthe web browser, pickinga descriptive name for your site and settinga secure—but memorable—
password for your user. Be sure to change the Username field fromadmin to somethingelse inorder to make it more secure.
Whenyouhave filled inallthe fields, click the InstallWordPress buttonat the bottomofthe page.
The installationprocess willtake a minute or two to complete, and thena newpage confirmingthe successfulinstallationof
WordPress willload inthe browser. To start usingWordPress, click the LogInbuttonat the bottomofthis page to loginto
WordPress withthe user name and password youchose at the earlier screen(see Figure 9-7).
Figure 9-7:Logginginto WordPress onthe RaspberryPi
Before youcanaccess WordPress fromanother computer, you’llneed to create anadditionalconfigurationfile. This is created
bylinkingthe existingconfigurationfile—set up for localaccess—usingthe followingcommand, typed as a single line:
sudo ln -s /etc/wordpress/config-localhost.php
/etc/wordpress/config-ipaddress.php
Replace ipaddress inthis code withthe IP address ofyour RaspberryPi. Ifyou’ve giventhe RaspberryPia hostname inDNS,
youcanalso create a configurationfile for that hostname usingthe same command, but replacingipaddress withthe chosen
hostname. Ifyoudo not have a hostname, simplyuse the Pi’s IP address. For example, the command for a PionIP address
192.168.0.115 would be as follows:
sudo ln -s /etc/wordpress/config-localhost.php
/etc/wordpress/config-192.168.0.115.php
To complete configurationfor externalaccess, choose Generalfromthe Settings menuthat’s located onthe left side ofthe
WordPress Dashboard, and change the URLto matcheither the IP address ofthe Pior the chosenhostname (see Figure 9-8).
Figure 9-8:Alteringthe URLinthe WordPress GeneralSettings menu
WordPress is very memory intensive. Forbest results, use the Pi as a headless server, which is a systemthat runs without a graphical userinterface
loaded. Then use a webbrowseron anothercomputerconnectedto the network to access the WordPress Dashboardat http://ipaddress/wordpress/wp-
login.php. Accessing the WordPress Dashboarddirectly on the Pi can result in a very long wait!
The WordPress software includes anautomatic update feature, whichensures that your installationis runningthe latest version.
Because ofits popularity, WordPress is oftenthe target ofmalware attacks, and frequent updates are released to patchsecurity
holes or add newfeatures. However, wheninstalled via APT, WordPress lacks the permissions required to keep itselfup-to-
date. To correct this, type the followingcommand at the terminal:
sudo chown -R www-data /usr/share/wordpress
This gives the www-data user—the account used bythe Apache web server—the rights to change files located inthe
/usr/share/wordpress folder. This willallowautomatic upgradingto operate whenchosenfromthe WordPress Dashboard.
For more informationonusingWordPress, visit the officialwebsite at http://www.wordpress.org.
Part III: Programming and Hacking
Chapter 10:AnIntroductionto Scratch
Chapter 11:AnIntroductionto Python
Chapter 12:Hardware Hacking
Chapter 13:Add-onBoards
Chapter 10: An Introduction to Scratch
So farinthis book, you’ve learned a lot about howto use programs that other people have writtenonyour RaspberryPi. The
chiefgoalofthe RaspberryPiproject is to get people writingtheir ownprograms, however—and not just adults. The Raspberry
PiFoundationis workingto get the device adopted as aneducationaltoolfor allage ranges.
Akeyrequirement for reachingthat goalis ensuringthat youngchildrencanexperience the joyofcreatingtheir ownsoftware,
rather thanjust consumingother people’s code. The secret to this is Scratch.
Introducing Scratch
Created bythe LifelongKindergartengroup at the Massachusetts Institute ofTechnologyMedia Lab in2006 as anoffshoot of
the Squeak and Smalltalk languages, Scratchtakes the core concepts ofprogrammingand makes themaccessible to all. Long-
winded typing—tiringand dullfor younger children—is replaced witha simple jigsaw-like drag-and-drop environment, which
nevertheless encourages programmatic thinkingand introduces the core concepts used byallprogramminglanguages.
Officiallyconsidered a programfor ages eight and above, but accessible to evenyounger programmers witha little help and
guidance, Scratchis deceptivelypowerful. Behind its colourfuland mouse-drivenuser interface is a programminglanguage that
includes impressive multimedia functionality. It should come as no surprise thenthat, ofthe more thantwo-and-a-halfmillion
Scratchprojects shared byusers ofthe software onthe officialwebsite, the majorityare games.
Encouragingchildrento learnhowto make their owngames canbe a great wayofsneakinga little learninginto their playtimes.
Scratch’s friendlyuser interface and excellent handlingofcore concepts meanthat childrenare unlikelyto get frustrated bya
suddensteep learningcurve. Better still, the concepts learned inScratchoffer anexcellent foundationfor progressionto a more
flexible language like Python(see Chapter 11, “PythonBasics”).
Evenbefore movingonto another language, Scratchoffers more thanjust a framework for games. It canbe used to create
interactive presentations and cartoons, as wellas interfaces withexternalsensors and motors throughthe use ofadd-on
hardware suchas the PicoBoard and the LEGO WeDo robotics kit.
The recommended Debiandistributionfor the RaspberryPicomes withthe latest versionofthe Scratchdevelopment
environment pre-loaded, so ifyou’ve beenfollowingthe recommendations throughout this book you’re readyto start. Ifyou’re
usinga different operatingsystem, visit the officialScratchwebsite at http://scratch.mit.edu to download the software—
and youcanfind versions for Windows and Apple’s OS Xinthe same place.
Example 1: Hello World
Whenlearninga newprogramminglanguage, it’s traditionalto start witha verybasic program:one that displays a single line of
text. This is typicallyreferred to as a Hello World program, and it’s the first step towards learninghowto create your own
programs.
Unlike a traditionalprogramminglanguage, Scratchdoesn’t expect the user to memorise the names ofinstructions like print or
inkey$. Instead, almost everythingis done bydraggingand droppingblocks ofcode and arrangingtheminto a logicalpattern.
To begin, load Scratchbydouble-clickingits icononthe desktop or clickingonits entryinthe Programmingmenu. After a few
seconds, the mainScratchinterface willappear (see Figure 10-1). Ifit’s off-centre or small, press the Maximise button—the
middle ofthe three windowcontrolbuttons onthe right side ofthe top title bar—to fillthe screen.
The Scratchinterface is split into multiple panes. At the left is the block palette, whichholds allthe different code blocks youcan
use to create a program. Alist ofobjects inthe program, knownas sprites, appears at the bottom-right alongwitha controlfor
the stage onwhichthe sprites appear. The stage itselfis at the top-right ofthe window, whichis where youwillsee the program
running. Finally, the middle ofthe windowis where the programitselfis constructed.
Figure 10-1:The mainScratchinterface, shownrunningonthe RaspberryPi
To get the user started, a newScratchproject alreadyincludes a blank stage and a single sprite. What it lacks is a program, so
clickingthe greenflagiconat the top-right ofthe windowachieves nothing, because Scratchdoesn’t yet knowwhat youwant it
to do.
For the Hello World program, you’llneed to change the blocks palette at the left ofthe screento the Looks mode byclickingon
its button. Partwaydownthe list ofLooks blocks is one that reads say Hello!—click this block and dragit into the empty
space inthe middle ofthe windowlabelled Scripts. To obeythe decades oftraditionbehind this type ofprogram, youcanalso
click onthe block where it says Hello! and customise it to read Hello World! ifyouso desire (see Figure 10-2).
Figure 10-2:The first block placed ina Scratchprogram
Ifyouclick the greenflagagain, the programstilldoes nothing. That’s because althoughScratchknows that it is supposed to
make the cat sprite saysomething, it doesn’t knowwhen. The event requires a trigger block, whichcanbe found inthe Control
sectionofthe block palette.
Enter this sectionnowbyclickingControl, and thendragthe top entry—marked when [flag icon] clicked—and place it
just above the purple say brick (see Figure 10-3). Ifyoudrop it close enough, it should automaticallyjointo the existingbrick
like a jigsawpiece.
Figure 10-3:AControlblock joined to a Looks block inScratch
This concept ofconnectingmultiple bricks together is the heart ofScratch. Ifyoulook at the Controlbrick youjust placed, you’ll
see there’s no connectinghole at the top. This means that youcan’t stack another brick ontop, because this Controlbrick is
designed to trigger a series ofother bricks directlyand must come at the start ofa stack. The bottomofthe say brick,
meanwhile, has a connector that fits into the top ofother bricks, whichindicates that more bricks canbe placed underneath.
Withthe two bricks inplace, click the greenflagiconat the top-right ofthe screenagain. This time, a speechbubble willappear
fromthe cat’s mouth(see Figure 10-4), and the Hello World programis complete.
Before movingonto the next example, take the time to save your work usingthe File menu. Scratchis designed to have a single
project openat a time, so ifyoucreate a newblank file, the current file willbe closed to make room. Don’t worryifyouforget
about this whenyougo to create a newfile—ifthere are unsaved changes inthe existingfile, Scratchwillprompt youto save
these changes before closingit.
Figure 10-4:The Hello World programexecutinginScratch
Example 2: Animation and Sound
While Hello World is a verytraditionalexample, it’s not particularlyinteresting. It also fails to showoffthe true power of
Scratch, whichlies inits impressive multimedia capabilities and sprite-handlingsystem. This systemis particularlywellsuited to
simple animations, whichcanformthe basis ofaninteractive game.
To begin, start a newproject inScratchbyeither loadingthe programafreshor choosingNewfromthe File menu. As withany
starter project, Scratchwillprovide a default sprite—it’s this sprite that youwillbe controlling.
To controla simple animationinScratch, youuse the Motionsectionofthe blocks palette. Whenyoustart a newproject, this is
the default palette. Dragthe block labelled move 10 steps to the Scripts area. As its name suggests, this block tells the
selected sprite to move 10 steps inthe directionit is currentlyfacing. The default sprite inScratchis always started facingdirectly
to the right—thus, the move 10 steps block willmove the sprite 10 steps to the right.
Tensteps isn’t a verylarge value, so click onthe value 10 and change it to 30. The block should thenread move 30 steps. An
animationofa cat movingto the right ofthe stage isn’t that interesting, however, so switchto the Sound block palette and drag
the play sound meow block to the Scripts area and link it beneaththe existingmove block. To keep the cat inthis positionfor
a while, add ina wait 1 secs block fromthe Controlblock palette. Without this, the sprite willappear to flick quickly
betweenits startingpositionand the target position.
To make it so the programcanbe runmultiple times without the cat sprite disappearingoffthe edge ofthe stage, add another
move 10 steps block beneaththe play sound block and modifyit to read move -30 steps. Scratchwillhappilyallowyou
to use negative figures like this:ifa value of30 makes the sprite move a certaindistance to the right, -30 willmake it move the
exact same distance inthe opposite direction.
Finally, add the when [flag icon] clicked block fromthe Controlblock palette to the top ofthe Script area’s stack of
blocks to complete the programas showninFigure 10-5. Clickingthe greenflagicononthe top-right ofthe screenwilltrigger
the program—make sure you’ve got speakers or headphones connected to the Pifor the fulleffect!
Figure 10-5:The completed animationprograminScratch
This simple animationprogramcanbe extended ina varietyofways. Usingthe NewSprite optionjust belowthe stage onthe
right side ofthe Scratchwindowallows the programmer to add more sprites that canmove and playsounds independently.
Addinginthe say block fromthe first example—or the similar think block, whichcreates a thought bubble rather thana
speechbubble—allows for the creationofananimated comic strip.
More importantly, eventhis simple example teaches important programmingconcepts:despite beinga mere five blocks long, it
covers sprite movement inpositive and negative distances, sound playback and the concept ofdelays ina program. To introduce
yet another concept—at the risk ofdrivingyourselfinsane withrepetitive noises—tryaddinga forever block fromthe Control
block palette (see Figure 10-6). This adds a loop to the program, causingit to runthroughits list forever—or at least untilthe
noise becomes too muchand youclick the red stop buttonat the top ofthe stage!
Figure 10-6:Addinganinfinite loop to the simple Scratchanimation
Example 3: A Simple Game
UsingScratchfor simple animationis one thing, but the software also allows users to read inputs fromthe keyboard to introduce
interactivity. Bycombiningsome simple animationcontrols to the previouslydescribed program, youcancreate a simple game—
and, at the same time, introduce the concepts ofsprite collision, ifstatements and input.
For this example, start a newScratchproject—rememberingto save the previous example, ifyouhaven’t alreadydone so—and
beginbydragginga move 10 steps block to the Scripts area. This time, rather thantellingthe code blocks to execute whenthe
flagiconis clicked, go to the Controlblock palette and draga when space key pressed block above the move block.
As the name suggests, the when space key pressed block looks for input fromthe user—inthis instance, the spacebar being
pressed—and uses that as the trigger for executinga list ofblocks. The block works at anytime—ifyoupress the spacebar
now, the sprite willobeyits instructions and move 10 steps to the right.
The when space key pressed block also differs fromthe when [flag icon] clicked block inanother important way:it
canbe customised. Click the down-arrowbuttonnext to the word space to see a list ofallthe keys the block canwatch, and
thenselect right arrow fromthe list to change the block into a when right arrow key pressed block.
Agame inwhichthe player canmove inonlyone directionisn’t muchfun, so draga newwhen space key pressed block
into the Scripts area. This can’t link to the existingblock list—youcanonlyhave a single trigger block—so start a newlist
somewhere further down. As before, use the down-arrowbuttonnext to the word space to customise the block, turningit into a
when left arrow key pressed block. Finally, switchthe block palette back to Motionmode and connect a move 10
steps block beneaththe newwhen left arrow key pressed block before changingit to read move -10 steps.
Ifyoupress the left and right arrowkeys now, you’llsee that the cat moves accordingto your input (see Figure 10-7):pressing
the left arrowmoves the cat 10 steps to the left (although, as far as Scratchis concerned, it’s movingminus 10 steps to the right),
and pressingthe right arrowmoves the cat 10 steps to the right.
Figure 10-7:Usinginput blocks to controlthe motionofa sprite inScratch
Nowthat the sprite canbe moved bythe player, it’s time to give the sprite somethingto do. As this is just a verysimple game,
the goalshould also be simple:to collect some food. Click the Choose NewSprite FromFile button, found inthe middle ofthe
three buttons above the Sprite palette at the bottom-right ofthe Scratchwindow.
Adialogue boxwillappear askingyouto pick a sprite:double-click onthe Things folder, and thendouble-click onthe Cheesy-
Puffs sprite (showninFigure 10-8). This willplace the sprite as a newentryinthe Sprite palette, givingyoua newobject to
controlinthe game.
The Scratch language is naturally multi-threadedandpartially object-oriented. This means that each object in the program, including sprites, can
have its own code attached, andthat each section of code runs simultaneously andindependently of any otherblock. Usedproperly, these features
allowforsome quite complex programs to be created.
Figure 10-8:Addingthe Cheesy-Puffs sprite to the Scratchgame project
Bydefault, anysprite added into a Scratchproject willappear inthe dead centre ofthe stage. As a result, this obscures the
existingcat sprite. Click onthe newsprite and dragit to the right ofthe cat to fixthe problem.
Withthe bowlofCheesy-Puffs moved, it’s stilltoo large for our anthropomorphic two-legged cat to eat. Click the Shrink Sprite
button, whichis located at the top-right ofthe stage area and looks like four arrows pointinginwards. Ifyou’re not sure which
one it is, hover the mouse pointer over eachiconfor a short descriptionofwhat it does.
Clickingthe Shrink Sprite button—or the GrowSprite button, whichdoes exactlythe opposite—changes the mouse cursor into
a duplicate ofthe button’s icon. Usingthis newcursor, click onthe Cheesy-Puffs sprite to shrink it. Keep clicking, and the sprite
willcontinue to shrink. Once it’s a sensible-lookingsize, click anywhere outside ofthe stage area to returnthe mouse cursor to
normal. Youcanthendragthe bowlcloser to the right edge ofthe stage, ifyouso choose.
Tryusingthe arrowkeys onthe keyboard to move the cat sprite towards the Cheesy-Puffs sprite now. As youcansee, when
the two sprites meet, nothinghappens. That’s because the programdoesn’t containanyinstructions for what to do whenthe two
sprites overlap—knownas a sprite collision—so it doesn’t do anything. This canbe rectified witha newtype ofblock:a Sensing
block.
Withthe Cheesy-Puffs sprite currentlyactive (its image should appear at the top ofthe Scripts pane, but ifit doesn’t, just
double-click the sprite onthe stage), switchthe Blocks palette into Sensingmode byclickingthe Sensingbutton. Fromthe
Sensingpalette, draga touching ? block into the Scripts pane.
Like the when space key pressed block used to controlthe cat sprite’s motion, the touching ? block canbe customised.
Click the down-arrowbuttonnext to the questionmark, and choose Sprite1 (the cat sprite) fromthe list. This block willnowbe
activated whenthe two sprites collide.
You can name a sprite by clicking on the box next to its image in the Scripts pane andtyping in a name. Giving the sprites sensible names—such as
Cat, CheesyPuffs, andso forth—makes it significantly easierto track what’s going on in the program.
Look at the shape ofthe touching Sprite1? block. As youcansee, it has no jigsaw-like connectors onthe top or the
bottom, and it’s shaped like a diamond—the same shape used for a decisionpoint ina flowchart. That’s no accident:the
majorityofthe Sensingblocks need to be embedded ina Controlblock inorder to operate.
Switchthe Blocks pallete to Controlmode, and look for the if block—it’s shaped like a squished and bumpyletter C. Note
that the if block has a diamond-shaped indentation—the same shape as the touching Sprite1? block. Dragthe if block
onto the Scripts pane, and thendragthe touching Sprite1? block onto its diamond-shaped indentation. The result is a two-
coloured block that nowreads if touching Sprite1?.
This represents anifconditionalinthe program:whenthis point is reached, anycode located withinits confines willbe executed
ifand onlyifthe conditionis met. Inthis case, the conditionis that Sprite2 is beingtouched bySprite1. Withthe use ofand, or
and not logic blocks fromthe Operators block palette, some quite complexscenarios canbe accommodated.
Fromthe Looks block palette, draga say Hello! For 2 secs block into the centre ofthe if touching Sprite1?
conditional. Change the text to read Don’t eat me!, and thenadd a wait 1 secs Controlblock, changingthe value to 2.
Add a when space key pressed block to the top, changingthe value to read when right arrow key pressed. Finally,
draga hide block fromthe Looks palette to the bottomofthe loop to end up withthe block list that’s showninFigure 10-9.
Figure 10-9:Controllingthe Cheesy-Puffs witha Scratchifblock
Boolean Logic
Named for GeorgeBoole, Boolean logicor Boolean algebrais akey concept to understandinghow computers work. In Scratch, Boolean logicis implemented
in threeOperators bricks: and, or and not.
Theand operator requires that two inputs—in Scratch’s case, Sensingblocks—areboth truebeforeits own output will betrue. If neither of its inputs is true,
or if both inputs arefalse, its own output will befalse. You can usethis operator to check to seeif aspriteis touchingtwo other sprites, as an example.
Theor operator requires that oneor theother of its two inputs aretrue. If either input is true, theoperator’s output will also betrue. This is ahandy way of
re-usingcode: if you havemultiplesprites that arelethal to theplayer sprite, asingleblock of codecan beused with theor operator to trigger when any of
theenemy sprites aretouched.
Finally, thenot operator is known as an inverter: whatever its singleinput is, it outputs theopposite. If its input is false, then theoutput is true; if theinput
is true, then theoutput is false.
Double-click the cat sprite onthe stage to returnto editingits scripts. The script youcreated for the Cheesy-Puffs sprite will
disappear, but don’t worry—it’s stillsaved but onlyappears whenyou’re editingthat particular sprite.
Draganother if block fromthe Controlpalette alongwithanother touching ? sensingblock, and this time, change the Sensing
block so bothblocks together read if touching Sprite2?. Into this block, insert a wait 1 secs Controlblock withthe
value changed to 2 and a say Hello! for 2 secs Looks block withthe message changed to read Yum-yum-yum!. Finally,
dragthe whole stacked block up so it connects to the bottomofthe existingwhen right arrow key pressed block,
beneaththe move 10 steps block. The finalcode for the cat sprite should look like the blocks inFigure 10-10.
Figure 10-10:The completed code for the simple Scratchgame’s cat sprite
Ifyoumove the cat towards the Cheesy-Puffs withthe right-arrowkeyonthe keyboard, the game starts. Whenthe cat reaches
the Cheesy-Puffs, the dialogue exchange takes place and the bowlshould disappear.
Althoughthis example is effective for introducingsome important programmingconcepts, it’s hardlythe best waythe game could
be coded. Scratchincludes a message broadcast systemthat allows code attached to one object to communicate withcode
attached to another, whichenables youto create muchneater collisionresults that don’t relyoncarefully-timed pauses inorder
to make sense.
To experiment withbroadcasting, tryusingthe broadcast and when I receive blocks fromthe Controlpalette. Amessage
created for a broadcast block inanyobject cantrigger code inanyother object usingthe when I receive flag, meaningyou
canuse it to link multiple objects and their code together.
Robotics and Sensors
Inadditionto purelysoftware-based inputs and outputs, it’s also possible to tie Scratchinto externalhardware usingsensor
boards and robotics systems. Thanks to its multithreaded nature and powerfulinter-process messagingsystem, Scratchcanbe
used to create a surprisinglyadvanced robotics engine and is byfar the easiest wayto place a RaspberryPiat the heart ofa
simple robot.
Unlike Python, whichis a more powerfulbut significantlymore complexprogramminglanguage, Scratchcan’t make use ofthe
RaspberryPi’s GPIO port to communicate withexternalhardware. As a result, it needs some additionalequipment before it can
interact withthe physicalworld.
Sensing with the PicoBoard
Designed bythe SparkFunelectronics company, the PicoBoard is anadd-onmodule that connects to a computer running
Scratchand provides a variable slider input, a light sensor, a button, a sound sensor and four pairs ofalligator clips that canbe
used to monitor externalelectricaldevices.
There are currentlytwo types ofPicoBoard:the originalmodel, whichuses a serialconnection, and its replacement, whichuses a
USBconnection. The latter is supported bythe RaspberryPi. Simplyconnect it to a free USBport or a port ona USBhub
connected to the Pi, restart Scratch, and you’llbe able to use its various functions withinthe Scratchinterface.
Details onthe PicoBoard canbe found at http://www.sparkfun.com/products/10311.
Robotics with LEGO
Inadditionto add-insensor modules, it’s possible to controlanexternalrobotics systemthroughScratch. The LEGO Education
WeDo robotics kit is designed to connect motors, distance sensors, and speed sensors to a computer—allofwhichcanbe
controlled usingspecialised blocks found inScratch.
For children, the WeDo kit is anexcellent wayto get started withrobotics:the components clip together just like regular LEGO,
and there are no risks ofreceivinganelectric shock should anythingbe badlyconnected. The WeDo kit boasts compatibilitywith
regular LEGO and LEGO Technik kits, too, meaningit’s possible to build large projects quicklyand easily.
More informationonusinga LEGO EducationWeDo kit withScratchcanbe found at
http://info.scratch.mit.edu/WeDo.
Further Reading
Althoughthis chapter serves as a briefintroductionto Scratch, it’s far fromexhaustive. It’s also a little verbose for younger
readers, who tend to learnmore quicklywhentheir lessons are accompanied bylots ofcolour pictures.
The Support sectionofthe officialScratchwebsite, hosted byMITat http://info.scratch.mit.edu/support, includes a
link to a GettingStarted Guide inPDF format. The guide describes howto work withScratchina colourful, child-friendly
manner, and is a great educationaltool. This learningexperience canbe enhanced evenfurther whencombined withScratch
Cards, whichare downloadable flashcards containingexplanations for eachofthe block types found inScratch.
MITalso runs a user forumfor Scratch, allowingenthusiasts ofthe software to learntogether and share solutions for common
problems. Membership is free, and the site works wellusingthe Midoriweb browser included inthe Debiandistributionfor the
RaspberryPi. The forums canbe accessed at http://scratch.mit.edu/forums/.
The easiest wayto advance your Scratchskills, however, is to play. The name Scratchhas its roots inturntablism:whena DJ
spins a record, the needle creates a scratchingsound. Just as DJs remixexistingsongs into somethingnew, Scratchenthusiasts
are encouraged to submit their creations to the officialwebsite for others to download, examine, modifyand remix. The official
Scratchsite currentlyhosts more than2.5 millionScratchprograms, makingit a perfect source for learninghowScratchis being
used to create projects and for sharingyour ownideas withothers. Alist ofthe most recentlyshared projects canbe found at
http://scratch.mit.edu/latest/shared.
Chapter 11: An Introduction to Python
The Raspberry Pi gets the first halfofits name froma long-standingtraditionofusingfruit to name newcomputingsystems—
fromclassic microcomputers like the Acorn, Apricot and Tangerine to more recognisablymodernbrands includingApple and
BlackBerry—but the second halfcomes courtesyofthe Pythonprogramminglanguage.
Introducing Python
Flexible and powerful, Pythonwas originallydeveloped inthe late 1980s at the NationalResearchInstitute for Mathematics and
Computer Science byGuido vanRossumas a successor to the ABC language. Since its introduction, Pythonhas grownin
popularitythanks to what is seenas a clear and expressive syntaxdeveloped witha focus onensuringthat code is readable.
Pythonis a high-levellanguage. This means that Pythoncode is writteninlargelyrecognisable English, providingthe Piwith
commands ina manner that is quick to learnand easyto follow. This is inmarked contrast to low-levellanguages, like assembler,
whichare closer to howthe computer “thinks”but almost impossible for a humanto followwithout experience. The high-level
nature and clear syntaxofPythonmake it a valuable toolfor anyone who wants to learnto program. It is also the language that is
recommended bythe RaspberryPiFoundationfor those lookingto progress fromthe simple Scratch(described inChapter 10,
“AnIntroductionto Scratch”) to more “hands-on”programming.
Pythonis published under anopen-source licence, and is freelyavailable for Linux, OS Xand Windows computer systems. This
cross-platformsupport means that software writtenusingPythononthe Picanbe used oncomputers runningalmost anyother
operatingsystemas well—except where the programmakes use ofPi-specific hardware suchas the GPIO Port. To learnhow
Pythoncanbe used to address this port, see Chapter 12, “Hardware Hacking”.
Example 1: Hello World
As youlearned inChapter 10, “AnIntroductionto Scratch”, the easiest wayto learna newprogramminglanguage is to create a
project that prints “Hello World!”onthe screen. InScratch, youjust had to dragand drop bricks ofprewrittencode, but in
Python, youneed to write this programentirelybyhand.
APythonproject is, at heart, nothingmore thana text file containingwritteninstructions for the computer to follow. This file can
be created usinganytext editor. For example, ifyouenjoyworkingat the console or ina terminalwindow, youcanuse nano; or
ifyouprefer a graphicaluser interface (GUI), youcanuse Leafpad. Another alternative is to use anintegrated development
environment (IDE) suchas IDLE, whichprovides Python-specific functionalitythat’s missingfroma standard text editor,
includingsyntaxchecking, debuggingfacilities and the abilityto runyour programwithout havingto leave the editor. This chapter
gives youinstructions onhowto create Pythonfiles usingIDLE, but ofcourse, the IDEprogramthat youchoose to use for
programmingis up to you. The chapter also includes instructions for runningyour created files directlyfromthe terminal, which
canbe used inconjunctionwithanytext editor or other IDE.
To beginthe Hello World project, openIDLEfromthe Programmingmenuinthe Debiandistribution’s desktop environment. If
you’re not usingIDLE, create a blank document inyour favourite text editor and skip the rest ofthis paragraph. Bydefault,
IDLEopens up inPythonshellmode (see Figure 11-1), so anythingyoutype inthe initialwindowwillbe immediatelyexecuted.
To opena newPythonproject whichcanbe executed later, click onthe File menuand choose NewWindowto opena blank
file.
Figure 11-1:The IDLEPythonShellwindow
Choosing IDLE3 fromthe Programming menu insteadof IDLEloads the Python 3.0 version. This includes features not available in the version of
Python usedby IDLE, but none of those features are usedin this chapter. You can safely loadeitherversion, andthese examples will still work.
It’s good practice to start allPythonprograms witha line knownas a shebang, whichgets its name fromthe # and ! characters
at the beginningofthe line. This line tells the operatingsystemwhere it should look for the Pythonfiles. Althoughthis is not
entirelynecessaryfor programs that willbe runfromwithinIDLEor willcallPythonexplicitlyat the terminal, it is required for
programs that are rundirectlybycallingthe program’s filename.
To ensure the programruns regardless ofwhere the Pythonexecutable is installed, the first line ofyour programshould read as
follows:
#!/usr/bin/env python
This line tells the operatingsystemto look at the $PATHenvironment variable—whichis where Linuxstores the locationoffiles
that canbe executed as programs—for the locationofPython, whichshould work onanyLinuxdistributionused onthe Pi. The
$PATHvariable contains a list ofdirectories where executable files are stored, and is used to find programs whenyoutype their
name at the console or ina terminalwindow.
To achieve the goalofprintingout a message, youshould use Python’s print command. As its name suggests, this command
prints text to anoutput device—bydefault, to the console or terminalwindowfromwhichthe programis beingexecuted. Its
usage is simple:anytext followingthe word print and placed betweenquotationmarks willbe printed to the standard output
device. Enter the followingline inyour newproject:
print “Hello, World!”
The finalprogramshould look like this:
#!/usr/bin/env python
print “Hello, World!”
Ifyou’re creatingthe example programinIDLErather thana plaintext editor, you’llnotice that the text is multicoloured (see
Figure 11-2, where colours are represented as differingshades ofgreyinthe print edition). This is a feature knownas syntax
highlighting, and is a feature ofIDEs and the more-advanced text editingtools. Syntaxhighlightingchanges the colour ofsections
ofthe text accordingto their function, inorder to make the programeasier to understand at a glance. It also makes it easyto
spot so-called syntaxerrors caused byforgettingto put anend-quote ina print command or forgettingto comment out a
remark. For this short example, syntaxhighlightingisn’t necessary—but inlarger programs, it canbe aninvaluable toolfor finding
errors.
Figure 11-2:SyntaxhighlightinginIDLE
Before yourunyour program, save it as helloworld.py usingthe File menu. Ifyou’re usingIDLE, the file willbe giventhe
extension.py automatically. Ifyou’re usinga text editor, be sure to type .py at the end ofthe filename (not .txt) whenyou
save it. This extensionindicates that the file contains Pythoncode—althoughPythonis clever enoughto runthe programevenif
it’s saved witha different file extension.
Howyourunthe file willdepend onwhether you’re usingIDLEor a text editor. InIDLE, simplychoose RunModule fromthe
Runmenu, or press the F5 keyonthe keyboard. This willswitchIDLEback to the Pythonshellwindowand runthe program.
Youshould thensee the message Hello, World! appear onscreeninblue (see Figure 11-3). Ifnot, check your syntax—in
particular, check that youhave quotationmarks at boththe beginningand end ofthe message onthe print line.
Figure 11-3:Runninghelloworld.pyinIDLE
Ifyoucreated the helloworld.py programina text editor, you’llneed to opena terminalwindowfromthe Accessories menu
onthe desktop. Ifyousaved the file anywhere except your home directory, you’llalso have to use the cd command to change to
that directory(see Chapter 2, “LinuxSystemAdministration”). Once you’re inthe right directory, youcanrunyour programby
typingthe following:
python helloworld.py
This tells the operatingsystemto runPythonand thenload the helloworld.py file for execution. Unlike the Pythonshellin
IDLE, Pythonwillquit whenit reaches the end ofthe file and returnyouto the terminal. The result, however, is the same:the
message Hello, World! is printed to the standard output (see Figure 11-4).
Figure 11-4:Runninghelloworld.pyat the terminal
Making Python Programs Executable
Normally, theonly way to run aPython programis to tell thePython softwareto open thefile. With theshebanglineat thetop of thefile, however, it’s
possibleto executethefiledirectly without havingto call Python first. This can beauseful way of makingyour own tools that can beexecuted at the
terminal: oncecopied into alocation in thesystem’s $PATH environment variable, thePython programcan becalled simply by typingits name.
First, you need to tell Linuxthat thePython fileshould bemarked as executable—an attributethat means thefileis aprogram. To protect thesystemfrom
malwarebeingdownloaded fromtheInternet this attributeisn’t automatically set, sinceonly files that aremarked as executablewill run. To makethe
helloworld.py fileexecutable, usethechmod command (described in detail in Chapter 2, “LinuxSystemAdministration”) by typingthefollowing:
chmod +x helloworld.py
Now try runningtheprogramdirectly by typingthefollowing:
./helloworld.py
Despitethefact that you didn’t call thePython program, thehelloworld.py programshould run just thesameas if you’d typed python helloworld.py.
Theprogramcan only berun by callingit with its full location—/home/pi/helloworld.py—or fromthecurrent directory by using./ as thelocation. To
makethefileaccessiblein thesameway as any other terminal command, it needs to becopied to /usr/local/bin with thefollowingcommand:
sudo cp helloworld.py /usr/local/bin/
Thesudo prefixis required because, for security reasons, non-privileged users cannot writeto the/usr/local/bin directory. With thehelloworld.py file
located in /usr/local/bin, which is included in the$PATH variable, it can beexecuted fromany directory by simply typingits name. Try changingto a
different directory, and then run theprogramby typingthefollowing:
helloworld.py
To makeyour custom-madeprograms seemmorelikenativeutilities, you can renamethemto removethe.py fileextension. To changethehelloworld.py
programin this way, just typethefollowinglineat theterminal as asingleline:
sudo mv /usr/local/bin/helloworld.py
/usr/local/bin/helloworld
Oncerenamed, theprogramcan berun simply by typinghelloworld at theterminal or console.
Example 2: Comments, Inputs, Variables and Loops
Althoughthe Hello World programis a useful, gentle introductionto a language, it’s not terriblyexciting. Byits nature, it covers
onlythe basics and fails to introduce some ofthe concepts required for creatingusefulor interestingprograms. The next example,
however, uses some ofthe basic tools required to make interactive programs inPython.
As inExample 1, beginbyopeninga newblank document inIDLEor your text editor, and thenstart the programwiththe
followingshebangline:
#!/usr/bin/env python
As previouslydiscussed, this line isn’t strictlynecessaryunless the programis goingto be made executable, but it does no harm
and is a good habit to develop.
Next, add a comment to the programto provide context ifyouneed to openthe file at a later date. Note that this needs to be
entered as a single line, as withallcode lines that end ina symbol:
# Example 2: A Python program from the
Raspberry Pi User Guide
InPython, anythingfollowinga hashsymbol—withthe exceptionofthe shebangline—is treated as a comment. Whena
comment is found, Pythonignores it and skips to the next line. Commentingyour code is good practice:althoughyoumight know
what a particular sectionofcode does now, things might not be so clear whenyouopenthe file againsixmonths downthe line.
Comments also help make code more maintainable, and ifyoudecide to share your code withother people, your comments help
themunderstand what eachsectionis supposed to do. For simple programs, it’s not strictlynecessaryto include comments—but
as withaddingthe shebangline, it’s a verygood habit to get into. Comments canbe ontheir ownline, as withthe preceding
comment, or at the end ofa line, inwhichcase Pythonwillrunthe code line up untilit reaches the hashsymbol.
Next, ask the user for his or her name usingthe followingline:
userName = raw_input(“What is your name? “)
This smallline actuallyachieves quite a lot. The first part, userName =, tells Pythonto create a newvariable—a locationfor
storinga piece ofinformation—called userName. The equals symboltells Pythonthat the variable should be set to whatever
follows. However, inthis case what follows isn’t just a piece ofinformation, but another command:raw_input. This is a tool
designed to accept string(text) input fromthe keyboard, and allows for a message to be printed to the default output so the user
knows what to type. This helps keep the programsimple—without the abilityto print a prompt tellingthe user what to type, a
second line witha print command would be required. Remember to leave a space at the end ofthe prompt; otherwise, the
user’s input willbeginimmediatelyafter the questionmark.
When asking the userto type in text, always use raw_input. This provides security that the input commandalone does not—if you just use input, a
usermay inject his orherown code into yourprogramandhave it crash orwork contrary to yourintentions.
Withthe user’s name nowstored safelyinthe userName variable, the programcanbeginto get clever. Welcome the user using
the followingline:
print “Welcome to the program,”, userName
This line demonstrates a secondaryfunctionofthe print command introduced inExample 1:the abilityto print out the contents
ofvariables. This print command is split into two:the first sectionprints everythingbetweenthe two quotationmarks, and the
comma tells print that more should be printed to the same line. Simplytypingthe variable name userName is enoughfor
Pythonto knowthat it should print the contents ofthat variable, resultingina message customised to the user’s ownname.
An easy way to achieve neat formatting when printing output is to use the .format instruction at the endof a print command. If you’re using .format,
the print line couldbe as follows instead:
print “Welcome, {0}, to this program.”.format(userName)
This example programis goingto take the formofa simple but friendlycalculator. Unlike Example 1, it willcontinue to rununtil
the user tells it otherwise. This is achieved usinga loop, just as inScratch. Beginthe loop bytypingthe followingtwo lines:
goAgain = 1
while goAgain == 1:
Why ==?
Previously, you’vebeen usingasingleequals symbol to set thevalueof variables. Thewhile loop, however, uses two. Usingtwo equals symbols next to
each other performs an evaluation, which compares avariable’s valueto whatever follows. A singleequals symbol instead sets thevariableto thevaluethat
follows.
Thereareother evaluations as well as thedouble-equals, which is only trueif thevariablematches thegiven valueexactly: > means greater than, < means less
than, >= means greater than or equal to, <= means less than or equal to, and != means not equal to.
Usingtheseevaluation symbols, you can control theflow of aprogramaccordingto therules of Boolean logic. For moreinformation on Boolean logic, see
Chapter 10, “An Introduction to Scratch”.
The first line creates a newvariable called goAgain and sets it to 1. The second line begins the loop, and tells Pythonthat while
the goAgain variable is equalto 1, it should continue to loop throughthe followingcode. As the next fewlines are written, they
willneed to be indented byinsertingfour spaces at the start ofeachline. These spaces tellPythonwhichlines are part ofthe loop
and whichlines are outside the loop. Ifyou’re usingIDLE, the spaces willbe inserted automatically; ifyou’re usinga text editor,
remember to insert the spaces manually.
Inits most basic form, a calculator takes two numbers as input and performs a mathematicaloperationonthem. To make your
calculator work, first take the two numbers fromthe user withthe followinglines:
firstNumber = int(raw_input(“Type the first number: “))
secondNumber = int(raw_input(“Type the second number: “))
These lines not onlyuse the raw_input instructionto ask for two numbers, but theyalso use int. Short for integer, the int
instructiontells Pythonto treat input as a number rather thana string. Obviously, this is important for a calculator programsince it
won’t be calculatingwords.
Withthe two numbers stored as variables, the programcanperformits calculations. Type the followinglines, whichadd, subtract
and multiplythe two numbers and send the output to the user:
print firstNumber, “added to”, secondNumber, “equals”,
firstNumber + secondNumber
print firstNumber, “minus”, secondNumber, “equals”,
firstNumber - secondNumber
print firstNumber, “multiplied by”, secondNumber, “equals”,
firstNumber * secondNumber
Notice that while the additionand subtractionoperations use the expected plus and minus symbols, multiplicationuses the *
symbol. Also notice that there are no formattingspaces betweenthe quotationmarks. This is because Pythonautomaticallyadds
spaces where required whenit prints integers and strings together. Finally, note that there is no divisionoperation(whichwould
be indicated withthe / symbol). This is because the example calculator programuses integers, whichcanonlybe whole numbers,
withno decimalplaces or fractions allowed.
Althoughthe calculationpart ofthe programis nowcomplete, it willrunforever because there is currentlynothingto tellPython
whenit’s time to exit the loop. To provide the user witha wayto exit the program, add the followingline:
goAgain = int(raw_input(“Type 1 to enter more numbers,
or any other number to quit: “))
This allows the user to change the goAgain variable, whichcontrols the while loop. Ifthe user enters the number 1, the
goAgain variable is stillequalto 1 and the loop willrunagain. However, ifthe user enters anyother number, the evaluationis no
longer true (goAgain is no longer equalto 1), and the loop willend.
The finished programshould look like this, rememberingthat anythingmarked with should be entered onto a single line:
#!/usr/bin/env python
# Example 2: A Python program from the
Raspberry Pi User Guide
userName = raw_input(“What is your name? “)
print “Welcome to the program,”, userName
goAgain = 1
while goAgain == 1:
firstNumber = int(raw_input(“Type the first number: “))
secondNumber = int(raw_input(“Type the second number: “))
print firstNumber, “added to”, secondNumber, “equals”,
firstNumber + secondNumber
print firstNumber, “minus”, secondNumber, “equals”,
firstNumber - secondNumber
print firstNumber, “multiplied by”, secondNumber, “equals”,
firstNumber * secondNumber
goAgain = int(raw_input(“Type 1 to enter more numbers, or
any other number to quit: “))
Save the programas calculator.py, and runit bychoosingRunModule fromthe RunmenuinIDLEor bytypingpython
calculator.py at the terminal. Enter your user name whenprompted, and thenprovide the numbers that youwant to calculate
(see Figure 11-5) untilyouget bored and type anythingother than1 to exit the program.
Figure 11-5:Runningcalculator.pyinIDLE
For more short programs that introduce important Pythonconcepts, visit the officialPythonSimple Programs wikipage at
http://wiki.python.org/moin/SimplePrograms.
Example 3: Gaming with pygame
To illustrate the power ofPython, this example creates a fully-functionalarcade game based onthe classic game ofSnake or
Nibbles. To accomplishthis, it uses anexternalPythonlibrarycalled pygame.
OriginallywrittenbyPete Shinners, pygame is a collectionofpythonmodules designed to add newfunctionalityto the language
—functionalityspecificallydesigned to make it easyto write a game inPython. Eachpygame module provides a function
required bya moderngame, includingsound, graphics and evennetworkingsupport. Althoughit’s possible to write a game in
Pythonwithout usingpygame, it’s a lot easier ifyoutake advantage ofthe code alreadywritteninthe pygame library.
Before youcanwrite a pygame program, youneed to installthe pygame library. Ifyou’re usingthe recommended Debian
distribution, this is as simple as typingthe followingat the console or terminal:
sudo apt-get install python-pygame
For other distributions, the pygame source files canbe downloaded fromthe officialpygame website at
http://www.pygame.org/download.shtml. Instructions for installationare provided onthe same page.
Startinga pygame programis the same as startinganyother Pythonproject. Opena newblank document ineither IDLEor a
text editor, and add the followingshebangline to the top:
#!/usr/bin/env python
Next youneed to tellPythonthat this programuses the pygame modules. To do this, youuse animport instruction, whichtells
Pythonto load anexternalmodule (another Pythonfile) and make it accessible fromthe current program. Type the followingtwo
lines to import the necessarymodules into your newproject:
import pygame, sys, time, random
from pygame.locals import *
The first line imports the mainpygame module alongwiththe Pythonmodules sys, time and random, whichwillalso be used in
this program. Typically, a module must thenbe called bytypingits name followed bya fullstop and the name ofthe instruction
fromwithinthe module, but the second line inthe precedingcode tells Pythonto load allthe instructions fromthe
pygame.locals module as thoughthey’re native instructions. As a result, youwillneed to do less typingwhenusingthese
instructions. Other module names—suchas pygame.clock, whichis separate to pygame.locals—willstillneed to be typed
infull.
Enter the next two lines to set up pygame so it’s readyto use inthe example program:
pygame.init()
fpsClock = pygame.time.Clock()
The first line tells pygame to initialise itself, and the second line sets up a newvariable called fpsClock, whichwillbe used to
controlthe speed ofthe game. Next, set up a newpygame displaysurface—the canvas onto whichin-game objects willbe
drawn—withthe followingtwo lines:
playSurface = pygame.display.set_mode((640, 480))
pygame.display.set_caption(‘Raspberry Snake’)
Next, youshould define some colours for the programto use. Althoughthis step isn’t strictlynecessary, it againsaves ontyping:
ifyouwant to set a particular object to be red, youcansimplyuse the redColour variable rather thanhavingto callthe
pygame.Color instructionand remember the three colour values for red, greenand blue. To define the colours for this example
program, type the followinglines:
redColour = pygame.Color(255, 0, 0)
blackColour = pygame.Color(0, 0, 0)
whiteColour = pygame.Color(255, 255, 255)
greyColour = pygame.Color(150, 150, 150)
The next fewlines initialise some ofthe game’s variables so they’re readyfor use. This is animportant step, because ifthese
variables are left blank whenthe game begins, Pythonwon’t knowwhat to do. Don’t worryabout what eachvariable does for
now—just type inthe followinglines:
snakePosition = [100,100]
snakeSegments = [[100,100],[80,100],[60,100]]
raspberryPosition = [300,300]
raspberrySpawned = 1
direction = ‘right’
changeDirection = direction
Notice that three ofthe variables—snakePosition, snakeSegments and raspberryPosition—are set to a list ofcomma-
separated values. This causes Pythonto create the variables as lists—a number ofdifferent values stored ina single variable
name. Later, you’llsee howyoucanaccess individualvalues stored ina list.
Next, youneed to define a newfunction—a fragment ofPythoncode whichcanbe called uponlater inthe program. Functions
are usefulfor avoidingcode repetitionand makingthe programeasier to understand. Ifyouhave a particular set ofinstructions
that are needed at multiple points inthe same program, usingdef to create a functionmeans you’llonlyhave to type themonce
—and onlyhave to change themina single place ifyoualter the programlater. Type the followinglines to define the gameOver
function:
def gameOver():
gameOverFont = pygame.font.Font
(‘freesansbold.ttf’, 72)
gameOverSurf = gameOverFont.render
(‘Game Over’, True, greyColour)
gameOverRect = gameOverSurf.get_rect()
gameOverRect.midtop = (320, 10)
playSurface.blit(gameOverSurf, gameOverRect)
pygame.display.flip()
time.sleep(5)
pygame.quit()
sys.exit()
As withloops, the code for a functionshould be indented. Everyline after the def instructionshould have four spaces at the start
—ifyou’re usingIDLE, these spaces willbe inserted automatically, but ifyou’re usinga text editor, youwillneed to insert the
spaces yourself. After the finalline ofthe function—sys.exit()—youcanstop indenting.
The gameOver functionuses a selectionofpygame’s commands to performa simple task:write the words Game Over to the
screenina large font, pause for 5 seconds, and thenquit bothpygame and Pythonitself. It mayseemstrange to set up the
instructions for quittingthe game before the game has evenbegun, but functions should always be defined before theyare called.
Pythonwon’t execute these instructions untilit is told to do so usingthe newly-created gameOver instruction.
Withthe beginningofthe programcomplete, it’s time to start the mainsection. This takes place inaninfinite loop—a while loop
that never exits. This is so that the game cancontinue to rununtilthe player dies byhittinga wallor eatinghis or her owntail.
Beginthe mainloop withthe followingline:
while True:
Without anythingto evaluate, Pythonwillcheck to see ifTrue is true. Because that’s always the case, the loop willcontinue to
runforever—or, at least untilyoutellPythonto quit out ofthe loop bycallingthe gameOver function.
Continue the programwiththe followinglines, payingattentionto the indentationlevels:
for event in pygame.event.get():
if event.type == QUIT:
pygame.quit()
sys.exit()
elif event.type == KEYDOWN:
The first line, whichcomes right after the while loop begins, should be indented four spaces—but it’s a loop ofits own, usinga
for instructionto check for pygame events like keypresses. As a result, the line under that needs to be indented anadditional
four spaces for a totalofeight—but that line, too, is a loop, usinganif instructionto check whether the user has pressed a key.
As a result, the next line—pygame.quit()—is indented anadditionalfour spaces for a totalof12 spaces. This logical
progressionofindentationtells Pythonwhere eachloop begins and ends, whichis important:ifthe wrongnumber ofspaces is
used, the programwon’t work correctly. This is whyusinga development environment like IDLE, whichattempts to
automaticallyindent code where required, canbe easier thanusinga plaintext editor to create Pythonprograms.
Anif loop tells Pythonto check to see ifa particular evaluationis true. The first check, if event.type == QUIT, tells
Pythonto execute the indented code belowifpygame reports a QUIT message (whichhappens whenthe user presses the
Escape key). The two lines beneaththat should be familiar fromthe gameOver function:theytellpygame and Pythonto close
downand exit.
The line beginningelif is used to extend if loops. Short for else if, anelif instructionis evaluated whena previous if
instructionwas found to be false. Inthis case, the elif instructionis used to see ifpygame is reportinga KEYDOWN event, which
is returned whenthe user is pressinga keyonthe keyboard. As withthe if instruction, code to be executed whenanelif is
true should be indented byanadditionalfour spaces plus whatever indentationthe elif instructionitselfhas. Type the following
lines to give the elif instructionsomethingto do whenthe user presses a key:
if event.key == K_RIGHT or event.key == ord(‘d’):
changeDirection = ‘right’
if event.key == K_LEFT or event.key == ord(‘a’):
changeDirection = ‘left’
if event.key == K_UP or event.key == ord(‘w’):
changeDirection = ‘up’
if event.key == K_DOWN or event.key == ord(‘s’):
changeDirection = ‘down’
if event.key == K_ESCAPE:
pygame.event.post(pygame.event.Event(QUIT))
These instructions modifythe value ofthe changeDirection variable, used to controlthe directionthe player’s snake is
travellingduringthe game. Usingor withanif statement allows more thanone evaluationto be made. Inthis case, it provides
two ways ofcontrollingthe snake:the player canuse the cursor keys, or the W, A, S and Dkeys to make the snake go up, right,
downor left. Untila keyis pressed, the snake travels to the right accordingto the value set for changeDirection at the start of
the program.
Ifyoulook back at the variables youinitialised at the start ofthe program, you’llsee that there’s another variable called
direction. This is used alongside changeDirection to see ifthe instructionthe user has givenis valid. The snake should not
be allowed to turnimmediatelyback onitself—ifit does, the snake dies and the game is over. To prevent this fromhappening,
the directionrequested bythe player—stored inchangeDirection—is compared to the current directioninwhichthe snake is
travelling—stored indirection. Iftheyare opposite directions, the instructionis ignored and the snake continues inthe same
directionas before. Type the followinglines to set up the comparisons:
if changeDirection == ‘right’ and not
direction == ‘left’:
direction = changeDirection
if changeDirection == ‘left’ and not
direction == ‘right’:
direction = changeDirection
if changeDirection == ‘up’ and not
direction == ‘down’:
direction = changeDirection
if changeDirection == ‘down’ and not
direction == ‘up’:
direction = changeDirection
Withthe user’s input checked to make sure it makes sense, the snake—whichappears onthe screenas a series ofblocks—can
be moved. Duringeachturn, the snake moves a distance equalto the size ofone ofits blockysegments. Witheachsegment
measuring20 pixels, youcantellpygame to move the snake a single segment inanydirection. Type inthe followingcode:
if direction == ‘right’:
snakePosition[0] += 20
if direction == ‘left’:
snakePosition[0] -= 20
if direction == ‘up’:
snakePosition[1] -= 20
if direction == ‘down’:
snakePosition[1] += 20
The += and -= operators are used to change the value ofa variable bya certainamount:+= sets the variable to its previous value
plus the newvalue, while -= sets the variable to its previous value minus the newvalue. Bywayofexample,
snakePosition[0] += 20 is a shorthand wayofwritingsnakePosition[0] = snakePosition[0] + 20. The number in
square brackets followingthe snakePosition variable name is the positioninthe list beingaffected:the first value inthe
snakePosition list stores the snake’s positionalongthe Xaxis, while the second value stores the positionalongthe Yaxis.
Pythonbegins countingat zero, so the Xaxis is controlled withsnakePosition[0] and the Yaxis withsnakePosition[1].
Ifthe list were longer, additionalentries could be affected byincreasingthe number:[2], [3] and so on.
Althoughthe snakePosition list is always two values long, another list created at the start ofthe programis not:
snakeSegments. This list stores the locationofthe snake’s body, behind the head. As the snake eats raspberries and grows
longer, this list increases insize and provides the difficultyinthe game:as the player progresses, it becomes harder to avoid
hittingthe bodyofthe snake withthe head. Ifthe head hits the body, the snake dies and the game is over. Type the followingline
to make the snake’s bodygrow:
snakeSegments.insert(0,list(snakePosition))
This uses the insert instructionto insert a newvalue into the snakeSegments list:the current positionofthe snake. Eachtime
Pythonreaches this line, it willincrease the lengthofthe snake’s bodybyone segment, and locate that segment at the current
positionofthe snake’s head. To the player, it willlook as thoughthe snake is growing. However, youonlywant this to happen
whenthe snake eats a raspberry—otherwise the snake willjust growand grow. Type the followinglines:
if snakePosition[0] == raspberryPosition[0]
and snakePosition[1] == raspberryPosition[1]:
raspberrySpawned = 0
else:
snakeSegments.pop()
The first instructionchecks the Xand Ycoordinates ofthe snake’s head to see ifit matches the Xand Ycoordinates ofthe
raspberry—the target the player is chasing. Ifthe values match, the raspberryis considered to have beeneatenbythe snake—
and the raspberrySpawned variable is set to 0. The else instructiontells Pythonwhat to do ifthe raspberryhas not been
eaten:pop the earliest value fromthe snakeSegments list.
The pop instructionis simple but clever:it returns the oldest value fromthe list but also removes it, makingthe list one item
shorter. Inthe case ofthe snakeSegment list, it tells Pythonto delete the portionofthe snake’s bodyfarthest awayfromthe
head. To the player, it willlook as thoughthe entire snake has moved without growing—inreality, it grewat one end and shrank
at the other. Because ofthe else statement, the pop instructiononlyruns whena raspberryhas not beeneaten. Ifa raspberry
has beeneaten, the last entryinthe list doesn’t get deleted—so the snake grows insize byone segment.
At this point inthe program, it’s possible that the player has eatena raspberry. Agame inwhichonlya single raspberryis
available is boring, so type the followinglines to add a newraspberryback to the playingsurface ifthe player has eatenthe
existingraspberry:
if raspberrySpawned == 0:
x = random.randrange(1,32)
y = random.randrange(1,24)
raspberryPosition = [int(x*20),int(y*20)]
raspberrySpawned = 1
This sectionofcode checks to see ifthe raspberryhas beeneatenbytestingifthe raspberrySpawned variable is set to 0, and
ifso, the code picks a randomlocationonthe playingsurface usingthe random module youimported at the start ofthe program.
This locationis thenmultiplied bythe size ofa snake’s segment—20 pixels wide and 20 pixels tall—to give Pythona place on
the playingfield to positionthe newraspberry. It’s important that the locationofthe raspberryis set randomly:this prevents the
player fromlearningwhere the raspberrywillappear next. Finally, the raspberrySpawned variable is set back to 1, to make
sure that there willonlybe a single raspberryonthe playingsurface at anygiventime.
Nowyouhave the code required to make the snake move and grow, and cause raspberries to be eatenand created—a process
knowningamingas respawning. However, nothingis beingdrawnto the screen. Type the followinglines:
playSurface.fill(blackColour)
for position in snakeSegments:
pygame.draw.rect(playSurface,whiteColour,Rect
(position[0], position[1], 20, 20))
pygame.draw.rect(playSurface,redColour,Rect
(raspberryPosition[0], raspberryPosition[1], 20, 20))
pygame.display.flip()
These tellpygame to fillinthe background ofthe playingsurface inblack, drawthe snake’s head and bodysegments inwhite,
and finally, drawa raspberryinred. The last line, pygame.display.flip(), tells pygame to update the screen—without this
instruction, items willbe invisible to the player. Everytime youfinishdrawingobjects onto the screen, remember to use
pygame.display.flip() so the user cansee the changes.
Currently, it’s impossible for the snake to die. Agame where the player cannever die would rapidlyget boring, so enter the
followinglines to set up some scenarios for the snake’s death:
if snakePosition[0] > 620 or snakePosition[0] < 0:
gameOver()
if snakePosition[1] > 460 or snakePosition[1] < 0:
gameOver()
The first if statement checks to see ifthe snake has gone offthe playingsurface vertically, while the second if statement checks
ifthe snake has gone offthe playingsurface horizontally. Ineither case, it’s bad news for the snake:the gameOver function,
defined earlier inthe program, is called to print a message to the screenand quit the game. The snake should also die ifits head
hits anyportionofits body, so add the followinglines:
for snakeBody in snakeSegments[1:]:
if snakePosition[0] == snakeBody[0] and
snakePosition[1] == snakeBody[1]:
gameOver()
The for statement runs througheachofthe snake segments’ locations, fromthe second list entryto the end ofthe list, and
compares it to the current positionofthe snake’s head. It’s important to start the comparisonat the second entryusing
snakeSegments[1:] and not the first. The first entryis always set to the positionofthe head, and startingthe comparisonhere
would result ininstant deathfor the snake as soonas the game begins.
Finally, allthat is required for the game to be complete is to controlthe speed usingthe fpsClock variable. Without the variable,
whichyoucreated at the start ofthe program, the game would runtoo quicklyto play. Type inthe followingline to finishthe
program:
fpsClock.tick(20)
Ifyouthink the game is too easyor too slow, youcanincrease this number; or ifthe game is too hard or too fast, decrease the
number. Save the programas raspberrysnake.py, and runit either byusingIDLE’s RunModule optioninthe Runmenuor
fromthe terminalbytypingpython raspberrysnake.py. The game willstart as soonas it has loaded (see Figure 11-6), so
make sure you’re ready!
Figure 11-6:PlayingRaspberrySnake onthe RaspberryPi
Afullcopyofthe programlistingfor RaspberrySnake is included inAppendixA, “PythonRecipes”, and onthe RaspberryPi
User Guide website at http://www.wiley.com/go/raspberrypiuserguide. Downloadingthe source code fromthe
website willsave yousome typing, but enteringthe code byhand is a good wayofensuringthat youunderstand what each
sectiondoes. Inadditionto the functions used inRaspberrySnake, pygame provides lots offeatures not used inthis program,
includingaudio playback, sprite handlingfor better graphics and mouse control. The best place to learnabout pygame’s more-
advanced functions is onthe officialwebsite, http://www.pygame.org/wiki/tutorials, where youcandownload tutorials
and example programs to get a handle onhowthings work.
Example 4: Python and Networking
So far, youhave learned howPythoncanbe used to create standalone programs, but the language canalso be used to create
programs that communicate withthe outside world over a computer’s network connection. This next example, writtenbyTom
Hudson, offers a briefglimpse ofthese possibilities witha toolfor monitoringthe users connected to anInternet RelayChat
(IRC) channel.
As usual, create a newproject inIDLEor a text editor and enter the shebangline alongwitha comment describingthe purpose
ofthe program:
#!/usr/bin/env python
# IRC Channel Checker, written for the
Raspberry Pi User Guide by Tom Hudson
Next, import the modules required bythe program—sys, socket and time—withthe followingline:
import sys, socket, time
Youused the sys and time modules previouslyinthe RaspberrySnake program, but youhave not yet used socket. The
socket module provides Pythonwiththe abilityto open, close, read fromand write to network sockets—givingPython
programs rudimentarynetworkingcapabilities. It’s the socket module that provides this example withits abilityto connect to a
remote IRC server.
There are some constants needed for this programto operate. Constants are like variables inthat theycanhave values assigned
to them—but unlike variables, the value ina constant shouldn’t change. To help differentiate a constant froma variable, it’s good
practice to use all-capitalletters for their names—that wayit’s easyto see at glance whether a particular sectionofthe code is
usinga constant or a variable. Type the followingtwo lines into the program:
RPL_NAMREPLY = ‘353’
RPL_ENDOFNAMES = ‘366’
These are IRC status codes, provided bythe server to indicate whenparticular operations have completed. These are used by
the programto knowwhenit has received the required list ofnames fromthe IRC server. Next, set up the variables for the
server connectionbyenteringthe followinglines:
irc = {
‘host’ : ‘chat.freenode.net’,
‘port’ : 6667,
‘channel’ : ‘#raspiuserguide’,
‘namesinterval’ : 5
}
The first line tells Pythonto create a dict data type. Short for dictionary, this allows multiple variables to be stored ina single
master variable—inthis case, irc. These individualvariables canthenbe recalled later inthe program. Althoughyoucould write
this programwithout usingdicts to store variables, it would make the programsignificantlymore difficult to read. The dict begins
withthe openingcurlybrace, and ends withthe closingcurlybrace onthe finalline.
The host variable should be set to the fully-qualified domainname (FQDN) ofthe IRC server to whichthe programwill
connect. Inthis example, chat.freenode.net is used, but ifyouwant to customise the programto use a different server,
change the domainname here. The port variable tells the programwhichnetwork port IRC is runningon, whichwillusuallybe
6667. The channel variable tells Pythonwhichchannelto joininorder to monitor the users, while namesinterval controls
howlongthe programwaits to refreshthe list ofusers, measured inseconds.
Set up a second dict to store the user-specific variables bytypinginthe followinglines:
user = {
‘nick’ : ‘botnick’,
‘username’ : ‘botuser’,
‘hostname’ : ‘localhost’,
‘servername’ : ‘localhost’,
‘realname’ : ‘Raspberry Pi Names Bot’
}
As withirc, allthese variables are stored withina dict called user to make it clear whichvariables pertainto whichsection. The
nick variable should be set to the IRC nickname the programwilluse. Don’t use your usualnickname ifyou’re planningto
connect to the IRC server at the same time; instead, tryappending-bot to the end ofyour name to make it clear that the user is
a programrather thana realperson. Do the same withusername, and fillinthe realname variable witha descriptive message
about whomthe bot belongs to. The hostname and servername variables canbe left set to localhost, or altered to match
your Internet address.
The socket module requires the user to create a socket object. This object provides network connectivityto the rest ofthe
program. Create the socket object bytypinginthe followingline:
s = socket.socket(socket.AF_INET, socket.SOCK_STREAM)
Next, youneed to tellthe programto tryconnectingto the IRC server specified inthe variables at the start ofthe program. Type
the followinglines:
print ‘Connecting to %(host)s:%(port)s...’ % irc
try:
s.connect((irc[‘host’], irc[‘port’]))
except socket.error:
print ‘Error connecting to IRC server
%(host)s:%(port)s’ % irc
sys.exit(1)
The try and except commands are included inthis code for error handling. Ifthe systemfails to connect to the server—
because the Piisn’t connected to the Internet, for example, or because the server is downfor maintenance—the programwill
print anerror message and gracefullyexit. The s.connect line tells the socket module to tryconnectingto the IRC server, using
the host and port variables held inthe irc dict.
Ifthe programdoesn’t quit fromthe exception, it has successfullyconnected to the IRC server. Before youcanget a list of
names ina channel, however, youneed to identifyyourselfto the server and issue some commands usingthe send functionofthe
socket module. Type the followinglines into the program:
s.send(‘NICK %(nick)srn’ % user)
s.send(‘USER %(username)s %(hostname)s
%(servername)s :%(realname)srn’ % user)
s.send(‘JOIN %(channel)srn’ % irc)
s.send(‘NAMES %(channel)srn’ % irc)
The send functionworks inalmost exactlythe same wayas the print function, except that instead ofprintingto the standard
output—usuallythe terminalwindowor console—it sends the output throughthe network connection. Inthis case, the program
is sendingstrings oftext to the IRC server and tellingit to register the programusingthe nickname held inthe nick variable and
the user details held inthe username, hostname, servername and realname variables. Next, the programsends the
command to jointhe channelspecified inthe channel variable, and finally, it sends the command to receive the list ofusers in
that channel. Althoughthis example is tailored to IRC, the same basic principle canbe used to issue commands to anynetwork
service—withmodifications, this programcould be used to list the files onanFTP server, or unread emails ona POP3 server.
Receivingdata fromthe socket is a little more complicated. First, you’llneed to create anemptystringvariable that willact as the
receive buffer, holdingdata fromthe server as it’s received untilit canbe processed. Initialise the buffer bytypinginthe following
line:
read_buffer = ‘‘
Note that there are two single quotes after the equals sign, not one double quote.
Next, create anemptylist ,whichwillbe used to store the names ofusers, bytypingthe followingline:
names = []
The list data type is the same as youused to store the locations inthe RaspberrySnake game. Unlike a normalvariable, it can
store multiple values—inthis case, the names ofusers present inthe IRC channel.
The next step is to create aninfinite loop, duringwhichthe programwillcontinuouslyquerythe server for user names and print
themto the screen. Start the loop bytyping:
while True:
read_buffer += s.recv(1024)
The first line ofthe loop, followingwhile True:, tells the socket module to receive 1,024 bytes (1 KB) ofdata fromthe IRC
server and place it into the read_buffer variable. Because the += operator is used, rather thanjust =, the received data willbe
appended to anythingalreadyinthe buffer. The value of1024 bytes is more or less arbitrary.
The next step is to split the buffer into individuallines oftext, usingthe followingprogramlines:
lines = read_buffer.split(‘rn’)
read_buffer = lines.pop();
The first line sets the lines variable to a fullline oftext fromthe receive buffer, byusingthe split functionto find end ofline
characters—signified byrn. These characters onlyoccur at the end ofa line, so whenthe buffer has beensplit inthis wayyou
knowthat lines contains onlyfull-line responses fromthe server. The pop instructioninthe second line makes sure that onlyfull
lines are removed fromthe read_buffer:because responses fromthe server are read in1 KBchunks, it’s likelythat at any
giventime the buffer willcontainonlyfractions ofa line. Whenthat’s the case, the fractionis left inthe buffer readyto receive the
remainder ofthe line the next time the loop runs and the next 1 KBchunk is received fromthe server.
At this point, the lines variable contains a list offullresponses—fulllines—received fromthe server. Type the followingto
process these lines and find the names ofchannelparticipants:
for line in lines:
response = line.rstrip().split(‘ ‘, 3)
response_code = response[1]
if response_code == RPL_NAMREPLY:
names_list = response[3].split(‘:’)[1]
names += names_list.split(‘ ‘)
This runs througheveryline found inthe lines variable, and looks for the numericalIRC response code provided bythe server.
Althoughthere are plentyofdifferent response codes, this programis onlyinterested inthe two defined as constants at the start
ofthe program:353, whichmeans a list ofnames follows, and 366, whichmeans the list has ended. The if statement looks for
the first ofthese responses, and thenuses the split functionto retrieve these names and add themto the names list.
Now, the names list contains allthe names received fromthe server inresponse to the program’s query. This maynot be allthe
names, however:untilthe 366 response, whichsignals the end ofthe member names, is received, the list is incomplete. That is
whythe last line—names += names_list.split(‘ ‘)—is appendingthe newly-received names to the existinglist, rather
thanblankingit out entirely:eachtime that sectionofthe code runs, the programis onlylikelyto have received a sub-sectionof
the entire member list. To tellPythonwhat to do whenthe fulllist has beenreceived, enter the followinglines:
if response_code == RPL_ENDOFNAMES:
# Display the names
print ‘rnUsers in %(channel)s:’ % irc
for name in names:
print name
names = []
This tells Pythonthat whenthe 366 response has beenreceived, it should print out the now-complete list ofnames to the
standard output before blankingthe names list again. This last line—names = []—is important:without it, eachtime the loop
runs it willadd users’ names to the list eventhoughtheyalreadyexist fromanearlier run.
Finally, finishthe programbyenteringthe followinglines:
time.sleep(irc[‘namesinterval’])
s.send(‘NAMES %(channel)srn’ % irc)
This tells Pythonto wait the namesinterval number ofseconds before sendinganother request for user names and beginning
the loop again. Be carefulto set namesinterval to a reasonable value—ifthe IRC server receives too manyrequests intoo
short a space oftime, it mayforciblydisconnect youfor flooding.
Save the programas ircuserlist.py, and runit either byusingIDLE’s RunModule optioninthe Runmenuor fromthe
terminalbytypingpython ircuserlist.py. Whenthe programfirst runs, it maytake a while to connect to the server; once
connected, however, the list ofnames (see Figure 11-7) should refreshquickly. To quit the program, press CRTL+ C.
Figure 11-7:UsingPythonto list users inanIRC channel
Afullcopyofthe programlistingfor the IRC user list is included inAppendixA, “PythonRecipes”, and onthe RaspberryPi
User Guide website at http://www.wiley.com/go/raspberrypiuserguide. Downloadingthe source code fromthe
website willsave yousome typing, but enteringthe code byhand is a good wayofensuringthat youunderstand what each
sectiondoes.
Further Reading
Hopefully, this chapter has givenyoua taste ofwhat youcando withPython. It’s far fromexhaustive—to do the language full
justice would take a considerablylarger book. However, there are plentyofresources out there for learningmore about the
Pythonlanguage, includingthe following:
• The officialBeginner’s Guide to Python, whichyoucanaccess at http://wiki.python.org/moin/BeginnersGuide.
• Afree, interactive tutorialthat runs entirelyinyour browser is available for download at
http://www.learnpython.org/.
• Zed A. Shaw’s LearnPythonThe Hard Way(ShavianPublishing, 2012) offers great insight into best-practice codingfor
Python, and despite the name, it’s suitable for beginners. This book is commerciallyavailable, or youcanread it for free at
http://learnpythonthehardway.org/.
• Althoughsomewhat outdated and since replaced byDive Into Python3 (APRESS, 2009), Dive Into PythonbyMark
Pilgrim(APRESS, 2004) does a good job ofaddressingthe basics ofwritingprograms inPython. It’s available for free
download at http://www.diveintopython.net/ or for purchase inprinted format fromallgood booksellers.
• Ifyouprefer hands-onlearningwithother interested individuals, a list oflocalPythonUser Groups—sometimes called
PIGgies—canbe found at http://wiki.python.org/moin/LocalUserGroups.
• For learningpygame, AlSweigart’s book MakingGames withPython&Pygame (CreateSpace, 2012) is a great
introductionwithpracticalexamples. Youcanpurchase the hardcopybook or downloaded it for free at
http://inventwithpython.com/.
Chapter 12: Hardware Hacking
Inearlierchapters, youlearned howthe RaspberryPicanbe turned into a flexible platformfor runninga varietyofsoftware.
Inthis, it’s not alone:anydesktop or laptop canrunthe same software, and inmanycases runit far faster thanthe Pi’s low-
power processor canmanage.
The Pihas another trick up its sleeve, though, whichplaces it above and beyond the capabilities ofthe average PC:its 26-pin
general-purpose input-output (GPIO) port, located onthe top-left ofthe Pi’s printed circuit board.
The GPIO enables the Pito communicate withother components and circuits, and allows it to act as a controller ina larger
electronic circuit. Throughthe GPIO port, it’s possible to have the Pisense temperatures, move servos and talk to other
computingdevices usinga varietyofdifferent protocols includingSerialPeripheralInterface (SPI) and Inter-Integrated Circuit
(I²C).
Before youcanget beginbuildingcircuits to use withthe Pi’s GPIO port, however, you’re goingto need some additional
equipment.
Electronic Equipment
To start buildingcircuits that canbe controlled bythe Pi’s GPIO port, you’llneed various components and tools. The following
list provides a sample shoppinglist for gettingstarted withelectronics:
• Breadboard—Anelectronic breadboard provides a grid ofholes spaced at 2.54 mmintervals into whichcomponents can
be inserted and removed. Beloweachgrid is a series ofelectricalcontacts, whichallowcomponents inthe same rowto be
connected together without wires. Abreadboard is a valuable toolfor electronics work, because it allows youto quickly
make mock-up circuits that canbe modified without needingto be soldered or desoldered.
• Wires—While a breadboard allows some components to be joined without wiring, you’llstillneed wires to connect one
rowto another. These are knownas jumper wires, and ifyou’re workingona breadboard, it’s a good idea to get solid-core
wire rather thanstranded-core wire. Solid-core wire is easier to insert into the breadboard’s holes compared to stranded. It’s
also helpfulto get various colours, so youcancolour-code eachconnectionaccordingto its purpose.
• Resistors—The vast majorityofelectricalcircuits make use ofcomponents called resistors, and the example projects inthis
chapter are no exception. Resistors are measured inohms, writtenas the symbolΩ. Always tryto have a handfuleachofa
varietyofcommonvalues:2.2 KΩ, 10 KΩ, and 68Ω are good values to start with. Some retailers carryresistor kits, which
include a wide range ofusefulvalues.
• Push-Buttons—Averycommoninput component, a push-buttoncompletes anelectricalcircuit whenpushed. At the most
basic level, a keyboard is little more thana collectionofpush-buttons. Ifyou’re designinga circuit to provide a simple input to
the Pi, pick the buttonlabelled momentaryswitch.
• LEDs—Light-emittingdiodes (LEDs) are the most commonoutput device inexistence. AnLEDlights up whenvoltage is
applied, givingyouvisualfeedback onwhether a pinonthe Pi’s GPIO port is highor low. Whenyou’re buyingLEDs for use
withthe Pi, opt for low-power ones. The GPIO port isn’t that powerful, and high-current LEDs—suchas bright-white or
bright-blue models—willrequire anexternalpower supplyand anextra component knownas a transistor.
Additionally, ifyou’re planningonmakingsomethingmore permanent once you’ve finished your breadboard prototype (which
you’lllearnabout later inthis chapter), you’llalso need the following:
• Stripboard—This canbe thought ofas a single-use breadboard. As withbreadboards, holes are arranged ina 2.54 mm
grid. Unlike breadboards, the components need to be soldered into place—after whichyou’ve got a permanent electronic
circuit.
• SolderingIron—Whenyouneed to connect a component permanentlyinto a circuit, youneed to solder it. Youdon’t have
to spend a fortune ona solderingiron, but ifyour budget stretches to a temperature-controlled model, it’s a wise investment.
Make sure anysolderingironyoubuyhas a small, pointed tip—chisel-tip irons aren’t suitable for delicate electronic work.
• Solder—Your solderingironneeds solder. Solder is a mixture ofconductive metals mixed witha cleaningsubstance known
as flux. Make sure the solder youbuyis suitable for electronics work—thick, plumbingsolder is cheap but maydamage
delicate circuits, because it requires too muchheat to melt.
• Stand and Sponge—It’s important to have somewhere to put the hot solderingironwhenit’s not inuse, and a wayof
cleaningthe tip ofthe ironwhile you’re usingit. Some solderingirons come witha stand witha built-incleaningsponge—if
yours didn’t, buya separate stand-and-sponge set.
• Side Cutters—Through-hole components have longlegs, whichare left stickingout after you’ve soldered theminplace.
Side cutters allowyouto cleanlyand quicklytrimthese excess legs without damagingthe solder joint.
• Tweezers—Electronics components canbe smalland fiddly, and a good pair oftweezers is invaluable. Ifyou’re thinkingof
usingsurface-mount components, instead ofthe easier-to-solder through-hole components, tweezers are anabsolute
necessity—without tweezers, you’llburnyour fingers ifyoutryto hold the component and solder it at the same time!
• Work Stand—Commonlyreferred to as helpinghands, these are weighted stands withclamps or clips that hold the itemto
be soldered inplace. Some work stands include anintegrated magnifyingglass for delicate work, while the most expensive
work stands add a light to help illuminate the work area.
• Multimeter—Multimeters are test meters that have multiple functions includingvoltage, resistance and capacitance
measurement, alongwithcontinuitytestingfor findingbreaks incircuits. Althougha multimeter is not anabsolute necessity, it
canbe extremelyusefulfor diagnosingissues withcircuits. Professionalmultimeter units canbe quite expensive, but a simple
modelis fairlyinexpensive and is a sound investment for anyone gettingstarted inelectronics.
• DesolderingWick—Mistakes happen, but theydon’t have to be permanent. Adesolderingwick is a braided metaltape
that canbe placed over a solder joint and heated, pullingthe solder awayfromthe component and into the wick. With
practice, it’s possible to use a desolderingwick to salvage components fromdiscarded electronic equipment—a handyway
to gather commoncomponents cheaply.
Reading Resistor Colour Codes
Most electronic components are clearlylabelled. For example, capacitors willhave their capacitance, measured infarads, printed
directlyonthem, while crystals willhave their frequencylikewise marked.
The major exceptionis a resistor, whichtypicallyhas no writingonits surface. Instead, the resistance value inohms is calculated
fromthe colour bands that adornthe resistor’s surface. Learningto decode these bands is animportant skillfor a hardware
hacker to learn, because once a resister is removed fromits packaging, the onlywayto figure out its value is to use a multimeter,
whichis anawkward and slowmeasuringtoolfor this particular job.
Thankfully, the resistor colour codes followa logicalpattern. Figure 12-1 shows a typicalfour-band resistor. Ahigh-resolution
colour versionofthis diagramis available onthe RaspberryPiUser Guide website at
http://www.wiley.com/go/raspberrypiuserguide. The first two bands are assigned a colour that equates to a resistance
value inohms. The third band is the multiplier, bywhichthe first two numbers are multiplied to arrive at the actualresistance
value. The finalband indicates the tolerance ofthe resistor, or howaccurate it is. Aresistor witha lower tolerance willbe closer
to its marked value thana resistor witha higher tolerance, but you’llpaymore for the component.
Figure 12-1:Afour-band resistor and the decodingtable for its colour code
To read the example resistor, first take the two resistance bands startingfromthe left:these are coloured red and red. Red, on
the table included inFigure 12-1, equates to the value 2, so the initialreadingis 22. The next band is green, whichis the multiplier
and equates to 105 or 100,000 (10 followed byfive zeros). Multiplying22 by100,000 equals 2,200,000, whichis the
resistance value inohms:2,200,000 Ω.
There are 1,000 ohms ina kiloohm, and 1,000 kiloohms ina megaohm. Thus, 2,200,000 Ω would typicallybe writtenas 2,2
MΩ. The finalband, located onthe right side ofthe resistor, is gold and details the tolerance, or accuracy, ofthe resistor, which
is plus or minus 5 percent inthe example showninFigure 12-1.
There are also five-band resistors. Youread these inthe same wayas a four-band resistor, except that the first three bands offer
resistance figures, the fourththe multiplier, and the fifththe resistance.
Sourcing Components
Ifyouhaven’t dabbled inelectronics before, it canbe difficult to find components and tools. Thankfully, there are plentyofonline
and offline sources that specialise inthe hard-to-find components youmight need to complete your project.
Online Sources
Two ofthe largest retailers ofelectronic components and tools inthe world are RS Components and Farnell. Bothoperate
offices and warehouses across the world, and bothhave a substantialselectionofhardware fromwhichto choose. Chances are
you’re familiar withat least one ofthe two retailers. At the time ofthis writingRS Components and Farnellwere the onlytwo
companies licensed to produce the RaspberryPihardware bythe RaspberryPiFoundation, so unless you’re readingthis book
while consideringthe purchase ofa RaspberryPi, you’llhave ordered the device fromone ofthe two.
BothRS Components and Farnellfocus onbusiness-to-business transactions, meaningthat their mainsource ofincome is from
electronics companies buyinglarge quantities ofcomponents. However, bothwillhappilyallowconsumers to register withtheir
respective web stores and place orders as smallas individualcomponents.
Whenyou’re placingsmallorders, be aware that there maybe additionalcharges incurred. RS Components charges for its next-
daydeliveryservice, and while the charge is quite reasonable for larger orders, it cancost significantlymore thanthe components
beingpurchased for smaller orders. Onthe other hand, Farnelldoesn’t charge for next-daydeliverybut does mandate a
minimumtotalvalue for orders placed throughits website.
Dependingonwhere youlive, youmaybe able to reserve items for collectionat one ofRS Components’ or Farnell’s trade
counters. This saves onthe cost ofpostage and gets youthe goods faster, but it maynot be anoptionat your location. The
websites for bothretailers canbe found here:
RS Components:http://www.rs-online.com
Farnell:http://www.farnell.com
Offline Sources
Youmayfind that youneed a component immediately, and evennext-daydeliverywould not be soonenough. Or youmayonly
need a single resistor or a smalllengthofwire and can’t justifya highdeliverycost or minimumorder value for one ofthe online
retailers. Thankfully, there are brick-and-mortar stores that specialise inelectronic components. Althoughthere are not as many
ofthese types ofstores as inprevious decades, most major towns and cities willinclude at least one physicalshop that stocks the
most commonlyrequired tools and components.
Inthe UK, the most popular chainofelectronic component shops is MaplinElectronics. Established inEssexin1972, the
companyhas grownfroma smallmail-order outlet to include 187 stores across the UK. Inhabitants ofmost cities willfind
themselves withinreachofa MaplinElectronics store, whichcanbe a handysource ofhardware ifyou’re runninglowon
commonparts.
MaplinElectronics also offers a mail-order and click-and-reserve service throughits website, but beware its business-to-
consumer focus. Manycomponents are significantlymore expensive whenordered fromMaplinthanfromRS Components or
Premier Farnell, because the companyrelies onmark-up rather thanhigh-volume trade to make a profit.
Inthe US and other countries, Radio Shack remains the most popular chainofelectronics stores. Founded in1921 and boasting
over 7,150 stores across the world, the companystocks a wide selectionofcommonelectronic components and tools that can
be purchased inpersonor ordered for deliverythroughits website.
As withMaplinElectronics inthe UK, Radio Shack is a business-to-consumer operation. As a result, buyers canexpect to pay
more for components purchased at Radio Shack thanthe same parts ordered fromRS Components or Farnell. However, the
large number ofRadio Shack stores make it a convenient choice for buyers who are ina hurryor who are lookingfor one-off
items.
BothMaplinand Radio Shack also have the advantage ofbeingstaffed bypeople to whomyoucanspeak. Manyemployees of
bothcompanies have significant knowledge inelectronics, and are happyto offer advice and assistance ifyou’re unsure ofwhat
parts youneed for a givenproject. The websites for bothretailers canbe found here:
MaplinElectronics:http://www.maplin.co.ukhttp://www.maplin.co.uk
Radio Shack:http://www.radioshack.com
Hobby Specialists
Inadditionto the major chains, there are smaller companies that specialise inworkingwithhobbyists. Althoughtheir selectionis
dwarfed bythose ofthe larger chains, it’s typicallyhand-picked and comes withthe personalrecommendationofthe people
behind the company.
Manyofthese hobbyshops sprangup inthe wake ofthe Arduino, anopen-source project to create aneducational-friendly
microcontroller prototypingplatform. Withthe RaspberryPiappealingto muchthe same audience as the Arduino—albeit for
verydifferent tasks—the majorityare investigatingsupport for the Piinadditionto their existingproduct lines.
Buyingfroma hobbyspecialist has severaladvantages. Ifthe products are sold as workingwiththe Pi, thenthey’ve beentested
for that specific reason—takingmuchofthe guesswork out ofthe equation. Severalcompanies also designtheir ownadd-on
hardware for various platforms, withthe Pibeingno exception. These devices, designed to address a need inthe community,
mayinclude additionalports and/or extra hardware, or canotherwise extend the functionalityofthe target device.
Inthe UK, one ofthe most popular hobbyspecialists is oomlout. Founded byopen-source enthusiasts workingwithArduino
hardware, it’s anexcellent source ofadd-onkits as wellas commoncomponents includingpush-buttons, displays and
transistors. Unlike the larger retailers, oomlout equips its components withallnecessaryextras—suchas pull-up resistors for the
push-buttons—and a circuit schematic for easyassembly. Where possible, sample source code is also provided to get youup
and runningas quicklyas possible.
Inthe US, Adafruit offers a similar service. Founded withthe intentionofmakingopen-source add-ons for the Arduino boards,
Adafruit offers a wide selectionofcomponents and kits—includingone ofthe first add-onboards designed specificallyfor the
RaspberryPi(see Chapter 13, “Add-onBoards”, for more details).
The websites for bothretailers canbe found here:
oomlout:http://www.oomlout.co.uk
Adafruit:http://www.adafruit.com
The GPIO Port
The RaspberryPi’s GPIO port is located onthe top-left ofthe printed circuit board, labelled P1. It’s a 26-pinport, fitted with
two rows of13 male 2.54 mmheaders at the factory. The spacingofthese headers is particularlyimportant:2.54 mmpin
spacing(0.1 inches inimperialmeasurements) is a verycommonsight inelectronics, and is the standard spacingfor prototyping
platforms that include stripboards and breadboards.
Eachpinofthe GPIO port has its ownpurpose, withseveralpins workingtogether to formparticular circuits. The layout ofthe
GPIO port canbe seeninFigure 12-2.
Figure 12-2:The RaspberryPi’s GPIO port and its pindefinitions
Pinnumbers for the GPIO port are split into two rows, withthe bottomrowtakingthe odd numbers and the top rowthe even
numbers. It’s important to keep this inmind whenworkingwiththe Pi’s GPIO port:most other devices use a different systemfor
numberingpins, and because there are no markings onthe Piitself, it’s easyto get confused as to whichpinis which.
Neverconnect anything to the pins markedDo Not Connect; these are reservedforinternal functions of the Pi’s BCM2835 system-on-chip(SoC)
hardware. Connecting anything to these will result in damage to the Pi.
Althoughthe Pi’s GPIO port provides a 5 Vpower supply, tapped fromthe incomingpower onthe micro-USBhub, onPin2,
the Pi’s internalworkings are based on3.3 Vlogic. This means that the components onthe Piwork froma 3.3 Vpower supply.
Ifyou’re planningoncreatinga circuit that willinterface withthe Pithroughits GPIO port, make sure youare usingcomponents
compatible with3.3 Vlogic or are passingthe circuit througha voltage regulator before it reaches the Pi.
Connecting a 5 Vsupply to any pin on the Raspberry Pi’s GPIO port, ordirectly shorting eitherof the powersupply pins (Pin 1 andPin 2) to any
otherpin will result in damage to the Pi. Because the port is wireddirectly to pins on the BroadcomBCM2835 SoC processor, you will not be able to
repairany damage you do to it. Always be extra careful when working aroundthe GPIO port.
The GPIO port provides sevenpins for general-purpose use bydefault:Pin11, Pin12, Pin13, Pin15, Pin16, Pin18 and Pin
22. Additionally, Pin7—while defaultingto providinga clock signalfor generalpurpose use—canalso be used as a general-
purpose pin, givingeight pins intotal. These pins canbe toggled betweentwo states:high, where theyare providinga positive
voltage of3.3 V; and low, where theyare equalto ground or 0 V. This equates to the 1 and 0 ofbinarylogic, and canbe used
to turnother components onor off. You’lllearnmore about this later inthe chapter.
The Pi’s internal logicoperates at 3.3 V. This is in contrast to many common microcontrollerdevices, such as the popularArduino andits variants,
which typically operate at 5 V. Devices designedforthe Arduino may not work with the Pi unless a level translatororoptical isolatoris used
between the two. Likewise, connecting pins on a 5 Vmicrocontrollerdirectly to the Raspberry Pi’s GPIO port will not work andmay permanently
damage the Pi.
Inadditionto these general-purpose pins, the GPIO port has pins dedicated to particular buses. These buses are described in
the followingsubsections.
UART Serial Bus
The UniversalAsynchronous Receiver/Transmitter (UART) serialbus provides a simple two-wire serialinterface. Whena serial
port is configured inthe cmdline.txt file (as described inChapter 6, “Configuringthe RaspberryPi”), it’s this serialbus that is
used as the port for the messages. Connectingthe Pi’s UARTserialbus to a device capable ofdisplayingthe data willreveal
messages fromthe Linuxkernel. Ifyou’re havingtrouble gettingthe Pito boot, this canbe a handydiagnostic tool—especiallyif
nothingis showingonthe display.
The UARTserialbus canbe accessed onPins 8 and 10, withPin8 carryingthe transmit signaland Pin10 carryingthe receive
signal. The speed canbe set inthe cmdline.txt file, and is usually115,200 bits per second (bps).
I²C Bus
As the name suggests, the Inter-Integrated Circuit (I²C) bus is designed to provide communications betweenmultiple integrated
circuits (ICs). Inthe case ofthe Pi, one ofthose integrated circuits is the BroadcomBCM2835 SoC processor at the heart of
the system. These pins include access to pull-up resistors located onthe Pi, meaningno externalresistors are required to access
the I²C functionality.
The I²C bus canbe accessed onPins 3 and 5, withPin3 providingthe SerialData Line (SDA) signaland Pin5 providingthe
SerialClock (SCL) signal. The I²C bus available onthese pins is actuallyonlyone oftwo provided bythe BCM2835 chip itself,
and is knownas I²C0. The second, I²C1, is terminated at resistors onthe RaspberryPicircuit board itselfand is not available for
general-purpose use.
SPI Bus
The SerialPeripheralInterface (SPI) bus is a synchronous serialbus designed primarilyfor in-systemprogramming(ISP) of
microcontrollers and other devices. Unlike the UARTand I²C buses, it’s a four-wire bus withmultiple Chip Select lines which
allowit to communicate withmore thanone target device.
The Pi’s SPI bus is available onPins 19, 21 and 23, witha pair ofChip Select lines onPin24 and Pin26. Pin19 provides the
SPI Master Output, Slave Input (MOSI) signal; Pin21 provides the SPI Master Input, Slave Output (MISO) signal; Pin23
provides the SerialClock (SLCK) used to synchronise communication; and Pins 24 and 26 provide the Chip Select signals for
up to two independent slave devices.
Althoughadditionalbuses are present inthe RaspberryPi’s BCM2835 SoC processor, theyare not brought out to the GPIO
port and are thus unavailable for use.
Using the GPIO Port in Python
Withthe theoryout ofthe way, it’s time to get practical. Inthis section, you’lllearnhowto installa libraryto alloweasyaccess
to the general-purpose pins onthe RaspberryPi’s GPIO port inPython. You’llalso be showntwo simple electronic circuits
whichdemonstrate howto use the GPIO port for input and output.
As yousawinChapter 11, “PythonBasics”, Pythonis a friendlyyet powerfulprogramminglanguage. It’s not, however, the
perfect choice for everyscenario. Althoughit works fine for the simple circuits you’llbe creatinginthis chapter, it does not offer
what is knownas deterministic real-time operation. For the majorityofusers, this doesn’t matter; ifyou’re planningonusingthe
Piat the heart ofa nuclear reactor or a complexrobotics platform, however, youmaywant to investigate a lower-levellanguage
suchas C++ or evenassembler runningona dedicated real-time microcontroller.
Iftrue real-time operationis required for your project, the Pimaybe a bad choice. Instead, consider usinga microcontroller
platformsuchas the popular open-source Arduino, or one ofthe MSP430 familyofmicrocontrollers fromTexas Instruments.
Bothofthese devices caninterface withthe Pieither throughthe GPIO header or over USB, and provide a specialised real-time
environment for controland sensing.
Installing the GPIO Python Library
Since the launchofthe Pi, numerous developers have created software modules knownas libraries for makingfulluse ofits
various functions. Inparticular, programmers have addressed the Piusers’ need to access the GPIO port without havingto know
low-levelprogramming.
These libraries are designed to extend the functionalityofthe base Pythonlanguage, muchlike the pygame software described in
Chapter 11, “PythonBasics”. Installingone ofthese libraries gives Pythonthe abilityto easilyaddress the Pi’s GPIO port,
althoughit means that anyone planningto use the software youcreate willalso have to download and installthe librarybefore it
willwork.
There are severalGPIO Pythonlibraries available, but for the purpose ofthis section, we recommend that youuse the
raspberry-gpio-python library, whichwas at version0.2.0 at the time ofwriting. Youcanaccess this libraryfromthe
Google Code website at the followingaddress:http://code.google.com/p/raspberry-gpio-python/
Althoughit’s possible to download the Pythonlibrarythrougha web browser, it’s significantlyquicker to do so throughthe
terminalas part ofthe installationprocess. Just followthese steps:
1. Opena terminalwindowonyour RaspberryPifromthe Accessories menu, or use the console ifyouhaven’t loaded a
desktop environment.
2. Type wget http://raspberry-gpio-python.googlecode.com/files/RPi.GPIO-0.2.0.tar.gz to download
the libraryto your home directory. Ifa newer versionhas beenreleased, replace the versionnumber—0.2.0—withthe
current version.
3. Type tar xvzf RPi.GPIO-0.2.0.tar.gz to extract the contents ofthe file. This command is case-sensitive, so make
sure to type the capitalletters.
4. Type cd RPi.GPIO-0.2.0 to change to the newlycreated directory. Again, ifyoudownloaded a newer versionofthe
library, replace the versionnumber withthat ofthe downloaded version.
5. Type sudo python setup.py install to installthe libraryinto Python.
Althoughthe GPIO libraryis nowinstalled inPython, it won’t be loaded bydefault. Like pygame, the libraryneeds to be
explicitlyimported into your program. To use the library, start your programwithimport RPi.GPIO as GPIO at the top.
You’lllearnmore about this inthe followingexamples.
The Raspberry Pi’s GPIO port does not provide any protection against voltage spikes orelectrical shorts. Always make sure you’ve checkedthat
yourcircuit is soundbefore connecting it to the Pi. If possible, use an isolation boardsuch as the Gertboard(discussedin Chapter13, “Add-on
Boards”) to provide protection.
Calculating Limiting Resistor Values
An LED needs acurrent limitingresistor to protect it fromburningout. Without aresistor, an LED will likely only work for ashort timebeforefailingand
An LED needs acurrent limitingresistor to protect it fromburningout. Without aresistor, an LED will likely only work for ashort timebeforefailingand
needingto bereplaced. Knowingaresistor is required is onething, but it’s also important to pick theright resistor for thejob. Too high avalueand theLED
will beextremely dimor fail to light at all; too low avalueand it will burn out.
To calculatetheresistor valuerequired, you will need to know theforward current of your LED. This is themaximumcurrent theLED can draw beforebeing
damaged, and is measured in milliamps (mA). You’ll also need to know theforward voltageof theLED. This latter value, measured in volts, should be3.3 V
or lower—any higher, and theLED will requirean external power supply and aswitchingdeviceknown as atransistor beforeit will work with thePi.
Theeasiest way to work out how largearesistor is required is with theformulaR=(V-F)/I, whereR is resistancein ohms, V is thevoltageapplied to the
LED, F is theforward voltageof theLED and I is themaximumforward current of theLED in amps (with athousand mA to theamp).
Takingatypical red LED with aforward current of 25 mA and aforward voltageof 1.7 V, and poweringit usingthe3.3 Vsupplied by thePi’s GPIO port,
you can calculatetheresistor needed as (3.3 – 1.7) / 0.025 = 64. Thus, aresistor of 64 Ωor higher will protect theLED. Thesefigures rarely comeout
to match thecommon resistor values as sold, so when you’rechoosingaresistor, always round up to ensuretheLED is protected. Thenearest commonly
availablevalueis 68 Ω, which will adequately protect theLED.
If you don’t know theforward voltageand forward current of your LEDs (for example, if theLEDs did not comewith documentation or weresalvaged from
scrap electronics), err on thesideof caution and fit areasonably largeresistor. If theLED is too dim, you can revisedownwards—but it’s impossibleto repair
an LED that has been blown.
GPIO Output: Flashing an LED
For the first example, you’llneed to build a simple circuit consistingofanLEDand a resistor. The LEDwillprovide visual
confirmationthat the Pi’s GPIO port is doingwhat your Pythonprogramtells it to do, and the resistor willlimit the current drawn
bythe LEDto protect it fromburningout.
To assemble the circuit, you’llneed a breadboard, two jumper wires, anLEDand anappropriate current-limitingresistor (as
described inthe “CalculatingLimitingResistor Values”sidebar). Althoughit’s possible to assemble the circuit without a
breadboard bytwistingwires together, a breadboard is a sound investment and makes assemblingand disassemblingprototype
circuits straightforward.
Assumingthe use ofa breadboard, assemble the circuit inthe followingmanner to matchFigure 12-3:
1. Insert the LEDinto the breadboard so that the longleg(the anode) is inone rowand the shorter leg(the cathode) is in
another. Ifyouput the LED’s legs into the same row, it won’t work.
2. Insert one legofthe resistor into the same rowas the LED’s shorter leg, and the other resistor leginto anemptyrow. The
directioninwhichthe resistor’s legs are placed doesn’t matter, as a resistor is a non-polarised (direction-insensitive) device.
3. Usinga jumper wire, connect Pin11 ofthe RaspberryPi’s GPIO port (or the correspondingpinonaninterface board
connected to the GPIO port) to the same rowas the longlegofthe LED.
4. Usinganother jumper wire, connect Pin6 ofthe RaspberryPi’s GPIO port (or the correspondingpinonaninterface
board connected to the GPIO port) to the rowthat contains onlyone legofthe resistor and none ofthe LED’s legs.
Be very careful when connecting wires to the Raspberry Pi’s GPIO port. As discussedearlierin the chapter, you may do serious damage to the Pi if
you connect the wrong pins.
Figure 12-3:Abreadboard circuit for a simple LEDoutput
At this point, nothingwillhappen. That’s perfectlynormal:bydefault, the RaspberryPi’s GPIO pins are switched off. Ifyou
want to check your circuit immediately, move the wire fromPin11 to Pin1 to make the LEDlight up. Be carefulnot to connect
it to Pin2, though:a current-limitingresistor suitable for a 3.3 Vpower supplywillbe inadequate to protect the LEDwhen
connected to 5 V. Remember to move the wire back to Pin11 before continuing.
To make the LEDdo somethinguseful, start a newPythonproject. As withthe projects inChapter 11, “AnIntroductionto
Python”, youcanuse a plaintext editor or the IDLEsoftware included inthe recommended Debiandistributionfor this project
as well.
Before youcanuse the GPIO libraryyouinstalled earlier inthis chapter, you’llneed to import it into your Pythonproject.
Accordingly, start the file withthe followingline:
import RPi.GPIO as GPIO
Remember that Pythonis case-sensitive, so be sure to type RPi.GPIO exactlyas it appears. To allowPythonto understand the
concept oftime (inother words, to make the LEDblink, rather thanjust turningit onand off), you’llalso need to import the time
module. Add the followingline to the project:
import time
Withthe libraries imported, it’s time to address the GPIO ports. The GPIO librarymakes it easyto address the general-purpose
ports throughthe instructions GPIO.output and GPIO.input, but before youcanuse them, you’llneed to initialise the pins as
either inputs or outputs. Inthis example, Pin11 is anoutput, so add the followingline to the project:
GPIO.setup(11, GPIO.OUT)
This tells the GPIO librarythat Pin11 onthe RaspberryPi’s GPIO port should be set up as anoutput. Ifyouwere controlling
additionaldevices, youcould add more GPIO.setup lines into the project. For now, however, one willsuffice.
Withthe pinconfigured as anoutput, youcanswitchits 3.3 Vsupplyonand offina simple demonstrationofbinarylogic. The
instructionGPIO.output(11, True) willturnthe pinon, while GPIO.output(11, False) switches it offagain. The pinwill
remember its last state, so ifyouonlygive the command to turnthe pinonand thenexit your Pythonprogram, the pinwillremain
onuntiltold otherwise.
Althoughyoucould just add GPIO.output(11, True) to the Pythonproject to switchthe pinon, it’s more interestingto make
it blink. First, add the followingline to create aninfinite loop inthe program:
while True:
Next, add the followinglines to switchthe pinon, wait 2 seconds, and thenswitchit offagainbefore waitinganother 2 seconds.
Make sure eachline starts withfour spaces, to signifythat it is part ofthe infinite while loop:
GPIO.output(11, True)
time.sleep(2)
GPIO.output(11, False)
time.sleep(2)
The finished programshould look like this (see Figure 12-4):
import RPi.GPIO as GPIO
import time
GPIO.setup(11, GPIO.OUT)
while True:
GPIO.output(11, True)
time.sleep(2)
GPIO.output(11, False)
time.sleep(2)
Figure 12-4:The gpiooutput.pyprogram, beingedited innano, and waitingfor its finalline
Save the file as gpiooutput.py. Ifyou’re usinga Pythondevelopment environment suchas SPE, don’t tryto runthe program
fromwithinthe editor. Most RaspberryPiLinuxdistributions restrict the use ofthe GPIO port to the root user, so the program
willneed to be runusingthe command sudo python gpiooutput.py at the terminalto get it started. Ifallhas gone well, you
should see the LEDbeginto blink onand offat regular intervals—and you’ve created your first home-made output device for
the Pi.
Ifthings don’t work, don’t panic. First, check allyour connections. The holes ina breadboard are quite small, and it’s easyto
think you’ve inserted a component into one rowonlyto find it’s actuallyinanother. Next, check that you’ve connected the circuit
to the right pins onthe GPIO port—withno labellingonthe Piitself, mistakes are unfortunatelyeasyto make. Finally, double-
check your components—ifthe forward voltage ofyour LEDis higher than3.3 Vor ifyour current limitingresistor is too large,
the LEDwon’t light up.
Althoughthis example is basic, it’s a good demonstrationofsome fundamentalconcepts. To extend its functionality, the LED
could be replaced witha buzzer to make anaudible alert, or a servo or motor as part ofa robotics platform. The code used to
activate and deactivate the GPIO pincanbe integrated into other programs, causinganLEDto come onwhennewemailarrives
or a flagto be raised whena friend has joined anIRC channel.
GPIO Input: Reading a Button
Beingable to use the GPIO as anoutput is undeniablyuseful, but it becomes significantlymore so whenyoucancombine that
withone or more inputs. Inthe followingexample, you’llsee howto connect a push-buttonswitchto another pinonthe GPIO
port and read its status inPython.
As withthe earlier LEDoutput example, this input example makes use ofthe PythonGPIO library. Assumingthat youhave this
libraryinstalled, youcanbeginto build the circuit. (Ifyouhaven’t installed the PythonGPIO libraryyet, skip back a fewpages
and followthe installationinstructions.)
Ifyou’ve alreadybuilt the GPIO output example, youcaneither disconnect that fromyour Pior leave it connected—this
example uses different pins, so bothcanco-exist quite happily. Ifyoudo leave the previous example connected, make sure to
use different rows onthe breadboard for the newcomponents or you’llfind things don’t work quite as planned.
Build the circuit as follows:
1. Insert the push-buttonswitchinto the breadboard. Most switches have either two or four legs. Youonlyneed worryabout
two ofthe legs inthe circuit. Ifthe buttonhas four legs, they’llbe set up ininpairs:check the push-button’s data sheet to find
out whichlegs are paired together.
2. Connect a 10 KΩ resistor to the same rowas one ofthe push-button’s legs and anunused row. This is a pull-up resistor,
and willprovide the Piwitha reference voltage so it knows whenthe buttonhas beenpressed.
3. Connect the unused legofthe pull-up resistor to Pin1 ofthe RaspberryPi’s GPIO port. This provides the 3.3 Vreference
voltage.
4. Connect the unused legofthe push-buttonswitchto Pin6 ofthe RaspberryPi’s GPIO port. This provides the ground
connection.
5. Finally, connect Pin12 ofthe RaspberryPi’s GPIO port to the other legofthe push-buttonswitchinthe same rowas the
10 KΩ resistor. Your breadboard should nowlook like Figure 12-5.
Figure 12-5:The example breadboard layout for a simple push-buttoninput
The circuit youjust built creates a situationwherebythe input pin, whichinthis instance is Pin12 ofthe RaspberryPi’s GPIO
port, is constantlyhighthanks to the pull-up resistor connected to a 3.3 Vsupply. Whenthe push-buttonis pressed, the circuit is
grounded and becomes low, providingthe cue for your Pythonprogramto knowthat the buttonhas beenactivated.
Youmaywonder whythe resistor is required at all, and whythe switchdoes not simplyconnect Pin12 to Pin6 or Pin1 directly.
While this is possible, it creates what is knownas a floatingpin, whichis a pinthat doesn’t knowwhether it’s highor low. As a
result, the circuit willact as thoughthe buttonis beingpressed evenwhenit isn’t, and mayfailto detect the buttonbeingpressed
evenwhenit is.
Opena newPythonfile, either ina text editor or usingone ofthe Pythonintegrated development environments (IDEs) available
onthe RaspberryPi. To begin, youwillneed to import the same GPIO libraryas inthe previous GPIO output example:
import RPi.GPIO as GPIO
Youdon’t need to import the time library, because this example doesn’t need anytiminginstructions. Instead, youcanget right
to settingup Pin12 as aninput. This is done inthe same wayas settinga pinas anoutput, withjust the finalpart ofthe instruction
changed accordingly:
GPIO.setup(12, GPIO.IN)
Ifyou’re not usingPin12 for this, make sure youchange the pinnumber inthe precedinginstruction.
As withthe previous example, the next step is to create aninfinite loop that constantlychecks the input pinto see ifit’s been
brought low(inother words, ifit’s beenpressed). Beginthe loop withthe followingcode line:
while True:
Readingthe status ofaninput pinis verysimilar to settingthe status ofanoutput pin, withone exception:before youcando
anythingusefulwiththe resultingvalue, you’llneed to store it ina variable. The followinginstructiontells Pythonto create a new
variable called input_value (as described inChapter 11, “AnIntroductionto Python”) and set it to the current value ofPin12:
input_value = GPIO.input(12)
Althoughthe programcould be executed nowand work, it doesn’t do anythinguseful. To make sure youknowwhat’s goingon,
add the followingprint instructionto get feedback:
if input_value == False:
print(“The button has been pressed.”)
while input_value == False:
input_value = GPIO.input(12)
The last two lines—the second while and the second input_value, anembedded loop—are important. Evenonthe
RaspberryPi’s processor, whichis relativelyunderpowered whencompared to high-performance desktop and laptop
processors, Pythonruns veryquickly. This embedded loop tells Pythonto keep checkingthe status ofPin12 untilit’s no longer
low, at whichpoint it knows the buttonhas beenreleased. Without this loop, the programwillloop while the buttonis being
pressed—and no matter howquick your reflexes, you’llsee the message printed to the screenmultiple times, whichis
misleading.
The finalprogramshould look like this:
import RPi.GPIO as GPIO
GPIO.setup(12, GPIO.IN)
while True:
input_value = GPIO.input(12)
if input_value == False:
print(“The button has been pressed.”)
while input_value == False:
input_value = GPIO.input(12)
Save the file as gpioinput.py, and thenexecute it fromthe terminalwithsudo python gpioinput.py. At first, nothingwill
happen—but ifyoupress the push-buttonswitch, the programwillprint the message fromline sixto the terminal(see Figure 12-
6). Release the buttonand press it again, and the message willbe repeated.
As withthe previous input example, this is a deceptivelysimple programthat canbe used for manypurposes. Inadditionto being
able to read whena switchis pressed, the same code canbe used to read whenthe pins ofa separate device—suchas a sensor
or externalmicrocontroller—have beenpulled highor low.
Figure 12-6:The output ofthe gpioinput.pyprogram
Byextendingthe code to look for multiple push-buttons, eachonanindividualGPIO pin, youcould evencreate a simple four-
buttongame controller. For example, youcould combine the precedingcode withthe RaspberrySnake game fromChapter 11,
“AnIntroductionto Python”, to turnthe RaspberryPiinto a simple games console. Youcanalso combine bothinput and output
examples into a single program, whichwaits for the buttonto be pushed and thenturns onthe LEDbysendingthe output pin
high. To ensure that you’ve understood the concepts inthis section, trycreatingthat combined programnow. Ifyouget stuck, or
youwant to check your method, turnto AppendixA, “PythonRecipes”, for a sample solution.
Moving Up From the Breadboard
As the previous examples inthis chapter have shown, breadboards are excellent for quicklycreatingprototype circuits for
experimentation. They’re fast and reusable, and theydon’t damage components.
However, breadboards also have some disadvantages. They’re bulky, expensive, and prone to loose connections—whichcan
result incriticalcomponents fallingout, especiallywhile the breadboard is beingtransported fromplace to place. Figure 12-7
demonstrates this perfectly:despite best efforts, the push-buttoncomponent is onlylooselysecured inthe breadboard, and is
likelyto fallout ifthe circuit is handled roughly.
Figure 12-7:Asample breadboard circuit, withloose-fittingcomponents
This, amongother reasons, is whythe RaspberryPiitselfis built ona printed circuit board (PCB) rather thana breadboard—
althoughthe breadboard method was certainlyused inthe earlydays ofprototypingthe device. It’s possible to print and etch
your ownPCBs at home, but there is a simpler intermediate step youcantake:usingstripboard to create permanent stand-alone
circuits.
At first glance, stripboard looks similar to breadboard, because its surface is covered insmallholes at 2.54 mmspacing. Unlike a
breadboard, however, there’s no clever mechanismfor ensuringthat electronic components placed into these holes stayinplace
—instead, you’llhave to solder themonto the stripboard. Stripboard is oftenreferred to bythe trade name Veroboard, whichis
a trademark ofVero Technologies inthe UK and PixelPrint inCanada.
Creatinga stripboard circuit has manyadvantages over usinga breadboard. Asheet ofstripboard is significantlycheaper thanan
equivalently-sized breadboard, and it canbe snapped to size for smaller circuits. This also allows a single, large piece of
stripboard to be used inthe creationofseveralsmaller, independent circuits.
Because components are soldered onto stripboard, it’s also significantlymore robust thana breadboard prototype. Astripboard
circuit canbe carried around fromplace to place withlittle risk that one ofits components willbecome dislodged and lost. Figure
12-8 shows a piece ofstripboard flipped to showthe copper tracks onits underside.
Figure 12-8:The copper tracks onthe underside ofa piece ofstripboard
Stripboard is extremelyeasyto use, whichmakes it a great stepping-stone to customcircuit board designand manufacturing.
However, youshould be aware ofthe followingbefore youbuystripboard:
• There are different types ofstripboard. Some stripboards have copper tracks onthe underside, whichgo allthe wayacross
a rowor downa column, while other stripboards are split into two separate rows witha gap inthe middle like a breadboard.
Yet another type ofstripboard, oftencalled a project board, has no copper tracks at alland requires the use ofwires to join
components together electrically.
• Stripboard canbe made indifferent thicknesses and withdifferent materials, and one type ofstripboard maybe more suited
to a particular project thananother. For example, a heatproofstripboard is good for a circuit that is goingto be ina high-
temperature environment, while thicker stripboard should be used for circuits that maybe exposed to roughhandling.
• To make the component layout ona stripboard neater, it’s possible to break the tracks onthe underside to separate
components electrically. This avoids wasted board space and is anabsolute necessityinmore complexcircuits—but to
achieve the neatest results, you’llneed a smallhand-held toolcalled a track cutter. Remember to add that to your shopping
list ifyou’re planningonusingstripboard, althougha smalldrillbit canalso be used.
There are also some tricks to handlingstripboard that, ifignored, canmake things harder thantheyhave anyreasonto be:
• The copper tracks onthe underside ofstripboard are not usuallycoated inanyway. As youtouchthe tracks, youwill
tarnishthe copper and make it difficult to solder. Avoid touchingthe underside ofstripboard unless you’re goingto use it
immediately; ifit’s too late, get some steelwooland give the copper a gentle brushto remove the corrosionbefore attempting
to solder.
• Unlike a printed circuit board, stripboard has no solder mask—a substance that prevents solder fromgoinganywhere it
isn’t supposed to. As a result, solderingis somewhat trickier thanit is ona PCB—it’s alltoo easyto accidentallyjointracks
together withtoo-large a blob ofsolder. Ifthis happens, use your desolderingwick to remove the excess solder and tryagain.
• The holes instripboard make it easyto snap into customsizes, but leave the edges ragged. After snappingstripboard, take
the time to file downthe edges before assemblingyour circuit. Make sure youwear a face mask whendoingthis, because the
dust fromstripboard isn’t particularlyhealthyto breathe.
A Brief Guide to Soldering
Havinga solderingironis one thing, but youalso need to knowhowto use it. Soldering, like anyskill, takes practice to become
proficient. Ifyoufollowthe tips inthis sectionand keep practising, you’llbe creatingclean, tidysolder joins inno time.
This may seemobvious, but it’s worth pointing out: soldering irons get extremely hot during use. Make sure you don’t touch any exposedmetal
surface, even away fromthe tip, andbe careful where you put the iron down. If possible, buy an iron with a stand, orobtain a separate heatproof
stand. Neverleave a hot iron unattended, andif you dropan iron, don’t be temptedto try to catch it!
Solderingworks bymeltinga smallquantityofmetalto forma joinbetweentwo components. Ifyouturnthe RaspberryPiover,
you’llsee plentyofevidence ofthis. Allthe larger components are connected usingwhat’s called through-hole soldering, where
the components’ leads are passed throughholes inthe printed circuit board and thensoldered into place. Smaller components
are attached via surface-mount soldering.
Solder isn’t pure metal—it also contains a substance called flux, whichis designed to etchawayanytarnishonthe surfaces to be
soldered inorder to ensure as cleana joinas possible. Most electronic solder includes three to five cores offlux. Youcanalso
buyfluxseparatelyas a paste or inliquid form, althoughfor most hobbysoldering, this isn’t necessary.
Whenyou’re startinga solderingproject, make sure youhave a clean, well-lit workspace. Also make sure the area is well
ventilated. Solder fumes aren’t veryhealthy, and while they’re extremelyunlikelyto build up to dangerous levels inlow-volume
hobbysoldering, it’s stilla good idea to keep exposure to a minimum.
Inaddition, youshould protect the work surface insome way. It’s not uncommonfor smallblobs ofmoltensolder to fall, which
canburnand mark tables. Youcanpurchase ananti-static workmat (see Figure 12-9 for anexample), but a glossymagazine
works just as well. Don’t be tempted to use a fewsheets ofcheap newspaper—solder canburnthroughthinpaper before it
cools.
Figure 12-9:Anexample solderingwork area, witha protective anti-static workmat
Ifyou’re doingdelicate, close-up work, youshould wear protective glasses. Sometimes the boilingfluxinside the solder can
cause it to spit upwards, and ifit hits youinthe eye, you’llbe infor a world ofpain.
Don’t let these warnings put youoffsoldering, however. Althoughsolder is extremelyhot, it cools quicklyand burns are not only
rare but nearlyinconsequential. Respect the equipment, but don’t fear it.
Withyour work surface chosenand protected, layout your equipment. The ironshould be placed onthe side ofyour dominant
hand, and positioned so that the cable isn’t trailingacross your work area. Make sure youcanmove the ironfreelybefore
pluggingit in. Ifthe cable gets caught onsomething, youmayend up burningyourself.
Dampenyour solderingsponge withwater—it should be damp, but not drippingwet. This is important:the damp sponge willbe
used to cleanthe iron, and ifit’s dry, it willburnand maydamage the iron’s delicate tip.
It willtake a fewminutes for the solderingironto reachits operatingtemperature. Ifyou’ve purchased a temperature-controlled
iron, this willnormallybe indicated either bya light that switches onor offto indicate the temperature has beenreached or bya
numericaltemperature read-out. (See the operatingmanualthat came withyour solderingironto find out howtemperatures are
indicated onit.)
Once the operatingtemperature has beenreached, it’s time to prepare the solderingironusinga process knownas tinning.
Followthese steps:
1. Pushthe tip ofthe solder against the tip ofthe iron, allowinga smallamount to melt onto the iron. Be carefulnot to melt too
muchonto the iron:not onlyis this a waste ofsolder, but it cancause excess solder to fallonto the work area.
2. Wipe the tip ofthe irononto the sponge. Ifit hisses and spits, the sponge is too wet; allowit to cool, thenremove it from
the stand and wringit out.
3. Keep wipingthe tip ofthe ironuntilit is coated ina silver layer ofsolder (see Figure 12-10). Ifnecessary, applymore
solder to the tip.
Figure 12-10:Asolderingirontip that is inthe process ofbeingtinned withsolder
This process oftinningthe tip protects it against damage and ensures that it willefficientlytransfer heat onto the surfaces to be
soldered. Failure to properlytinthe iron’s tip is one ofthe most commoncauses ofbad solder joints. Youmayneed to repeat
this process more thanonce ifyou’re solderinga lot ofconnections, and you’llneed to do it againat the end ofthe soldering
session. Ingeneral, ifthe tip ofthe solderingironloses its shinycoating, repeat the tinningprocess.
Withthe ironprepared, it’s time to start soldering. Place the items to be soldered—suchas a printed circuit board and the legs of
a component—into the work stand and ensure that you’ve got a good view. Extend a lengthofsolder fromthe container or reel,
and beginto solder the components usingthese basic steps:
1. Ifyou’re solderingthrough-hole components into a printed circuit board, stripboard or similar through-hole board, place
the legs ofthe component throughthe holes and bend themoutwards so the component doesn’t fallout whenthe board is
flipped over.
2. Withthe board secured inthe work stand, pushthe tip ofthe ironagainst boththe component and the copper contact on
the board. It’s important that the irontouches bothitems:ifthe ironis onlyincontact withone, the finished joint willbe bad.
3. It onlytakes a fewseconds for the area to heat up. Count to three, and thenpushthe solder against the component and
copper contact (see Figure 12-11). Ifthe solder doesn’t melt, withdrawit, count a couple ofseconds more, and thentry
again. Ifit stilldoesn’t melt, tryrepositioningthe solderingiron.
Figure 12-11:Solderinga through-hole component into a printed circuit board
4. As the solder flows, you’llsee it drawndowninto the hole inthe board. This is anindicationthat the area is hot enoughfor
a good solder join. Ifthe solder floats, it indicates that the area is not yet hot enough.
5. Remove the solder fromthe joinfirst, followed bythe iron. (Ifyouremove the ironfirst, the solder willhardenand leave
your spoolofsolder stuck to the contact!)
Ifallwent well, you’llbe left witha solid solder jointhat willlast for manyyears. Ifnot, don’t be disheartened—just press the
ironagainst the jointo reflowthe solder, and use the desolderingwick ifyouneed to cleanup a spillor anyexcess. Aperfect
solder joint should have a shape somewhat like a volcano, risingup fromthe surface ofthe board to meet the legofthe
component.
Never leave the ironincontact withthe parts for more thana fewseconds. This is especiallyimportant whensolderingheat-
sensitive components like integrated circuits, whichcanbe damaged byprolonged contact witha hot solderingiron. Ifyou’re
usinga temperature-controlled solder station, make sure the temperature is set to anappropriate levelfor the solder beingused
(check the solder’s packagingor data sheet for details).
Whenyou’ve finished, remember to re-tinthe tip ofthe iron. Ifyoudon’t, the tip maycorrode instorage and need to be
replaced significantlysooner thanwould otherwise be the case.
Rememberto heat both surfaces with the iron. Heating only one surface results in what is known as a dry joint orcoldjoint, where the solderis not
properly matedto one surface. Overtime, these joints will fail andneedto be re-soldered.
As withanyskill, solderingtakes practice. Manyelectronics shops sellkits that include a printed circuit board and a selectionof
components, whichyoucanuse to practice solderingthrough-hole components. Some add-onboards for the RaspberryPiare
also provided inkit formand require soldering, includingthe Slice ofPifromCiseco. You’lllearnabout these inChapter 13,
“Add-onBoards”.
Chapter 13: Add-on Boards
Althoughyoucanto use the RaspberryPi’s general-purpose input-output (GPIO) header directly, as youlearned inChapter
12, “Hardware Hacking”, a muchbetter idea is to use a specialist prototypingboard. Prototypingboards are add-onboards
designed to sit betweenyour project and the RaspberryPi, and range fromthe relativelysimple—suchas Ciseco’s Slice ofPi—
to the complexand powerfulGertboard.
At their most basic, add-onboards simplyprovide easier access to the RaspberryPi’s GPIO pins. This maymeantheycanbe
connected to a breadboard easier, or are spaced further apart and labelled to make connectingother devices simpler. Some
boards include circuitryto connect specific add-ondevices, suchas a smallXBee wireless transceiver, and stillothers provide a
smallsurface onto whichyoucansolder your owncomponents to make a customboard.
The hardware market is constantlyand rapidlychanging, and the RaspberryPiFoundationcontinues to encourage developers to
create more add-ondevices. It would be impossible to create anexhaustive list ofallthe add-onboards available or planned for
release inthe near future, but inthis chapter, you’lllearnabout three ofthe most commonboards and howtheycanbe used.
Ciseco Slice of Pi
The most basic ofboards, Ciseco’s Slice ofPi(see Figure 13-1) is nevertheless useful. Supplied inkit form, Slice ofPifeatures
a smallprototypingarea, a space for anXBee wireless module and fullaccess to the RaspberryPi’s GPIO pins.
The compact Slice ofPiis designed to be connected directlyto the GPIO headers onthe top ofthe RaspberryPi, withthe rest
ofthe board coveringpart ofthe Pi’s surface—but not extendingbeyond the edges ofthe board nor obscuringanycommonly
used ports. The Slice ofPidoes, however, sit over the DSI video output connector. Inmost cases where this connector is used,
the ribboncable canbe routed underneaththe Slice ofPiboard without trouble.
Figure 13-1:The Ciseco Slice ofPi
The primaryadvantages over usingthe low-cost Slice ofPirather thanjust connectingdirectlyto the Pi’s GPIO header are the
labellingonthe circuit board, whichthe GPIO header lacks, and the use offemale headers. These allowyouto use male-to-male
jumper leads or evenjust lengths oftrimmed wire to connect the board to a breadboard (as showninFigure 13-2) or other
circuit board—or evento connect components directlyinto the headers. The Pi’s male headers, incontrast, require the use of
specialised male-to-female jumper leads.
The Slice ofPialso offers a smallamount ofprotectionfor the Pi. The use offemale headers means it’s harder to accidentally
short-circuit two pins, and the spacingofthe headers—withthe eight general-purpose pins brought to one header and the other
specialised pins brought to another—makes wiringmistakes less likely. More importantly, the Slice ofPidoesn’t provide direct
access to anyofthe pins labelled as Do Not Connect (see Chapter 12, “Hardware Hacking”), so there’s less risk ofdamaging
the Piwitha wrongconnection.
Figure 13-2:Connectingthe Slice ofPito a breadboard
The connections for anXBee wireless interface could also prove usefulifyouare consideringusingthe Piinanembedded
computingproject. Whencombined witha compatible transceiver—suchas anXBee, RF-BEEor RN-XVmodule—it allows
for wireless access to the Pi’s UARTserialport. Suchaccess could be used to read sensor details fromthe Pi, take controlof
the Pi’s software or evencontrola Pi-powered robot froma remote location.
Finally, the prototypingarea provides analternative to breadboards or stripboards for smaller circuit designs. Ifyouare
consideringdevelopinga smalladd-onmodule for the RaspberryPi, suchas a sensor board for readingtemperatures or
detectingmoisture, the required components canbe soldered directlyto the Slice ofPi. Thanks to the lowcost ofthe board, this
provides aneasywayto create bespoke add-onmodules for the Pithat are entirelyself-contained, withno wiringrequired—just
connect the Slice ofPito the RaspberryPi’s GPIO port and the device is readyto go (see Figure 13-3).
The disadvantage ofthe Slice ofPilies inits simplicity. Its compact size means that it is unsuitable for the creationoflarger or
more complexprototypes, and while the header layout provides some protectionagainst short circuits, there’s no protection
against the use of5 Vcomponents that candamage the Pi’s 3.3 Vlogic circuits. The labellingis also different to that used to
typicallydescribe the RaspberryPi’s GPIO pins, whichcanlead to confusionwhenusinga GPIO librarynot writtenwiththe
Slice ofPiinmind. Table 13-1 provides a translationfromone labellingsystemto another.
Figure 13-3:The Slice ofPi, connected to the Pi’s GPIO port
Table 13.1 Slice of Pi GPIO Translations
PhysicalPinNum
ber OfficialDesignation Sliceof PiLabel
7 General Purpose Clock(or GPIO Pin 4) GP7
11 GPIO Pin 17 GP0
12 GPIO Pin 18 GP1
13 GPIO Pin 21 GP2
15 GPIO Pin 22 GP3
16 GPIO Pin 23 GP4
18 GPIO Pin 24 GP5
22 GPIO Pin 25 GP6
The Slice ofPiis available fromCiseco’s web shop at http://shop.ciseco.co.uk/slice-of-pi/.
Adafruit Prototyping Pi Plate
The PrototypingPiPlate byAdafruit is based around the same generalprinciple as Ciseco’s Slice ofPi. The add-onis provided
inkit form, and offers youa prototypingsurface alongwitheasyaccess to the Pi’s GPIO pins (see Figure 13-4). Unlike the Slice
ofPi, however, the PrototypingPiPlate is a full-coverage board built to the same size as the Piitself. As a result, the plate offers
a muchlarger area to work withthanthe Slice ofPi, allowingfor larger circuits to be constructed. The PrototypingPlate also
features 3.5 mmscrewterminals for connectingthe pins, makingit easyto use ordinarywire to make strongtemporary
connections—although2.54 mmholes for male or female headers are also provided should youwant to use those instead.
Figure 13-4:The Adafruit PrototypingPiPlate
The designand layout ofthe PrototypingPiPlate willbe familiar to anyone who has used anArduino microcontroller. Anadd-on
board withthe same footprint as the target device, designed to connect to on-board headers and sit above the surface ofthe
originalboard is a commonsight inthe Arduino world, where suchadd-onboards are knownas shields. The idea for the
PrototypingPiPlate, infact, comes fromAdafruit’s self-designed Protoshield add-onfor the Arduino.
As a full-coverage add-onboard, the PiPlate is designed to connect to the GPIO header and cover the entire surface ofthe Pi.
This positioningabove the Picanmake it difficult to access the DSI video output and MIPI CSI-2 camera input connectors,
althoughlonger ribboncables should route beneaththe PiPlate without trouble. Ifyou’re planningto use anadd-oncamera
module or DSI-connected display, be sure to check the lengthofribboncable provided before planningyour project around the
PiPlate.
The prototypingsurface ofthe PiPlate is split into two, withbothhalves offeringthrough-hole constructionincommon2.54 mm
spacing. The first halfofthe prototypingsurface is set up ina similar wayto a breadboard:copper tracks onthe underside link
rows together, and a centralbus inthe middle provides commonpower and ground connectivity. The second halfofthe
prototypingsurface does not have suchtracks, allowingmore customcircuits to be constructed. Overall, the surface provided
for circuit creationis significantlylarger thanthat ofthe Slice ofPi, makingthe PiPlate suitable for more-complexprojects. It
additionallyoffers anSOIC surface, designed for solderinga surface-mount component for parts that aren’t available inthrough-
hole format.
Thanks to its large size, youcanalso use the PiPlate witha quarter-size breadboard (sold inthe Adafruit shop as a “tiny
breadboard”). This small, two-sectionbreadboard comes witha self-adhesive foambackingand canbe stuck to the top ofthe
PiPlate over the prototypingarea (see Figure 13-5). Doingso means that it’s impossible to use the prototypingarea to make a
permanent circuit, but the combinationoffers a self-contained add-onfor rapid temporaryprototypingofsmaller circuits.
As withthe Slice ofPi, the PrototypingPiPlate is at heart a basic device. The kit contains no active components, but simply
headers, terminals and the board itself. As a result, it provides little extra protectionfor the Pi’s GPIO ports beyond makingit
more difficult to accidentallyshort-circuit two connections. Unlike the Slice ofPi, the PiPlate provides access to all26 ofthe
Pi’s GPIO header pins—meaningthat youcould accidentallyconnect things to the pins marked as Do Not Connect onthe
GPIO header diagram(see Chapter 12, “Hardware Hacking”). As withconnectingthings to these pins directly, this is
inadvisable and canresult inpermanent damage to the Pi.
Figure 13-5:APiPlate witha quarter-size breadboard
Perhaps the biggest reasonfor choosinga PiPlate over the Slice ofPiis its clever design. Once connected to the GPIO header
onthe Pi, there is little reasonto remove it unless youneed access to the DSI or MIPI CSI-2 camera connectors. Because it
onlyincreases the height ofthe Pi, rather thanthe widthor length, and because it includes the screwterminals for side-onaccess
to GPIO pins, it’s also compatible witha surprisingnumber ofRaspberryPicases (see Figure 13-6). Ifyou’re planningto use
the Piand PiPlate combinationwitha case, however, be sure to check that the case canbe adjusted for height or has access to
the GPIO port throughits lid.
Figure 13-6:The PiPlate connected to a cased RaspberryPi
Youcanpurchase the PrototypingPiPlate Kit fromAdafruit at http://www.adafruit.com/products/801.
Fen Logic Gertboard
Properlytermed the RaspberryPiI/O Extension, the Gertboard (showninFigure 13-7) is named for its inventor Gert vanLoo.
Anemployee ofBroadcomand a member ofthe teamthat designed the BCM2835 SoC processor at the heart ofthe Raspberry
Pi, vanLoo created the Gertboard as a wayofunlockingsome ofthe power ofthe chip hiddenbythe Pi’s overalldesignand
providinga powerfuland versatile platformfor electronic tinkering.
Figure 13-7:The Gertboard, designed byGert vanLoo
Unlike the Slice ofPiand PrototypingPiPlate, the Gertboard is anactive add-onboard withnumerous components designed to
extend the functionalityofthe Pi. The Gertboard provides 12 buffered IO ports withstatus LEDs, three push-buttonswitches,
sixopencollector drivers, a 48 V4 Amotor controller, a two-channeldigitalto analogue converter (ADC) and a two-channel
analogue to digitalconverter (DAC). Additionally, the Gertboard has support for anadditional28-pinmicrocontroller, suchas
the AtmelATmega328 used inthe Arduino prototypingsystem, whichcanbe inserted into a socket onthe Gertboard and
programmed directlyfromthe RaspberryPi.
As the list offeatures indicates, the Gertboard is a powerfuland complexdevice. Its flexibilitymakes it a great choice for more
complexprojects—but that same complexityaffects its size. The Gertboard is almost two-and-a-halftimes larger thanthe
RaspberryPiitself, makingit boththe most powerfuland the largest add-onboard for the Piavailable at the time ofwriting. To
counteract its size, the Gertboard connects to the Pithrougha ribboncable terminated inmale sockets (see Figure 13-8). This
cable allows the Gertboard to sit awayfromthe Pi, or to be mounted ina project permanentlyyet stillbe quicklydetached from
the Piifnecessary.
Figure 13-8:The Gertboard connected to a RaspberryPi
Perhaps the most important feature ofthe Gertboard is the protectionit offers to the Pi. Usinga 3.3 Vregulator, the Gertboard is
designed to prevent the Pi’s GPIO port fromreceivingvoltages it cannot handle. Like the Slice ofPi, it also attempts to restrict
access to the sixpins labelled Do Not Connect as wellas the 3.3 Vand 5 Vpins to help prevent accidentalshorting. Although
care must be takenwhile wiringup circuits, followingthe instructions included inthe Gertboard’s user manualguarantees the Pi’s
safety.
The motor controller functionalityofthe Gertboard makes it easyto integrate the Piinto a robotics project. It’s suitable for
motors ofup to 48 Vat 4 A, whichis easilypowerfulenoughto drive a smallrobot vehicle. Sadly, the motor is not included as
standard withthe Gertboard. Instead, youare asked to supplyyour owncontroller—withthe L6203 package being
recommended—ifmotor controlforms part ofyour project. Withthe motor controller soldered into place, the Gertboard canbe
used to controlsurprisinglypowerfulmotors either throughinstructions received fromthe Piitselfor fromthe optionalAtmel
microcontroller module. Figure 13-9 shows anexample circuit that’s usingthe Gertboard to drive a 12 Vmotor froma battery
pack power supply.
Figure 13-9:Usingthe Gertboard motor controller
For project building, the Gertboard offers significantlymore functionalitythana bare RaspberryPi. The 12 buffered IO ports,
located at the top ofthe board, canbe configured as inputs or outputs and provide more connectivitythanthe sevenor eight
general-purpose IO pins provided onthe Pi’s ownGPIO port. The inclusionofLEDs, whichindicate whena pinis highor low,
helps withbothcircuit troubleshootingand electronics education, makingit easyto see what the various inputs and outputs are
doingat anygiventime.
For sensingor feedback projects, the Gertboard’s ADC and DAC components are handyadditions. Unlike the GPIO pins on
the Piitself, whichcanonlyreceive and send digitalsignals, the Gertboard includes two ADC and two DAC connections. The
ADC pins, located onthe upper-left ofthe Gertboard, allowanalogue components to be converted into digitalsignals compatible
withthe Pi. As anexample, Figure 13-10 shows howyoucanuse the ADC pins to read the status ofa potentiometer—a
component whichvaries its resistance accordingto the positionofa slider or knob. This circuit could be used to controlthe Pi’s
volume ina media centre application, or to alter the speed ofanattached motor. The DAC pins provide the opposite
functionality, takinga digitalsignalfromthe Piand convertingit to analogue. This could drive a speaker to create audio, or alter
the speed ofa motor or the brightness ofanLED.
For more complexprojects, the Gertboard provides anopencollector driver, whichuses transistors to switchonand offdevices
that have different power requirements to the 3.3 Vused bythe Gertboard or that drawa large amount ofcurrent and require an
externalpower supplyto operate. The opencollector driver cancontrolthe power supplies ofup to sixdevices simultaneously
without requiringanyhardware. This gives the Gertboard a large amount offlexibility—althoughtransistors or relays canbe used
withpassive add-onboards like the PrototypingPiPlate to achieve the same goal.
Figure 13-10:Connectinga potentiometer to the Gertboard’s ADC pins
Finally, the Gertboard provides access to a 28-pinmicrocontroller, whichcanbe fitted to a socket located onthe board itself.
Whenfitted, the Gertboard canbe wired to address either the RaspberryPi’s GPIO port or the microcontroller, or a
combinationofthe two. The Gertboard is designed to operate withanAtmelATmega168 or ATmega328 microcontroller—the
same type ofmicrocontroller used inthe Arduino prototypingproject. Whenfitted, youcanwrite programs for the Gertboards’
ATmega microcontroller inthe AtmelIDE, givingthe Pia usefullevelofcompatibilitywiththe wide arrayofexistingATmega-
targeted software available to download. It also gives the Pithe abilityto address externalhardware ina real-time manner, with
the microcontroller takingover responsibilityfor hardware interfacingand simplyprovidingfeedback to the Pi.
The Gertboard is a veryadvanced device, and isn’t suitable for everyproject. For manysimple uses, a cheaper passive add-on
board like the Slice ofPiwillusuallybe enough. However, for in-depthexperimentationofjust what is possible withthe
RaspberryPi’s BC2835 processor and/or to ensure that you’llbe able to interface almost anyhardware withyour Pi, it’s a great
choice and a powerfulextensionto the Pi’s alreadyimpressive abilities.
The Gertboard is available throughFarnellat http://www.farnell.com/.
Part IV: Appendixes
AppendixA:PythonRecipes
AppendixB:HDMI DisplayModes
Appendix A: Python Recipes
The following recipes provide the programcode for Example 3 and Example 4 inChapter 11, “AnIntroductionto Python”,
and a sample solutionfor the combined input-output programsuggested inChapter 12, “Hardware Hacking”. Eachrecipe is also
available for download fromthe RaspberryPiUser Guide website at http://www.wiley.com/go/raspberrypiuserguide.
Ifyou’re typingthe code inbyhand, look out for the symbol:this indicates that the line is wrapped due to space constraints in
the book. Ifyousee the symbolat the end ofa line, don’t press Enter untilyoureachthe end that doesn’t have a symbolpresent.
Raspberry Snake (Chapter 11, Example 3)
#!/usr/bin/env python
# Raspberry Snake
# Written by Gareth Halfacree for the Raspberry Pi User Guide
import pygame, sys, time, random
from pygame.locals import *
pygame.init()
fpsClock = pygame.time.Clock()
playSurface = pygame.display.set_mode((640, 480))
pygame.display.set_caption(‘Raspberry Snake’)
redColour = pygame.Color(255, 0, 0)
blackColour = pygame.Color(0, 0, 0)
whiteColour = pygame.Color(255, 255, 255)
greyColour = pygame.Color(150, 150, 150)
snakePosition = [100,100]
snakeSegments = [[100,100],[80,100],[60,100]]
raspberryPosition = [300,300]
raspberrySpawned = 1
direction = ‘right’
changeDirection = direction
def gameOver():
gameOverFont = pygame.font.Font(‘freesansbold.ttf’, 72)
gameOverSurf = gameOverFont.render
(‘Game Over’, True, greyColour)
gameOverRect = gameOverSurf.get_rect()
gameOverRect.midtop = (320, 10)
playSurface.blit(gameOverSurf, gameOverRect)
pygame.display.flip()
time.sleep(5)
pygame.quit()
sys.exit()
while True:
for event in pygame.event.get():
if event.type == QUIT:
pygame.quit()
elif event.type == KEYDOWN:
if event.key == K_RIGHT or event.key == ord(‘d’):
changeDirection = ‘right’
if event.key == K_LEFT or event.key == ord(‘a’):
changeDirection = ‘left’
if event.key == K_UP or event.key == ord(‘w’):
changeDirection = ‘up’
if event.key == K_DOWN or event.key == ord(‘s’):
changeDirection = ‘down’
if event.key == K_ESCAPE:
pygame.event.post(pygame.event.Event(QUIT))
if changeDirection == ‘right’ and not direction == ‘left’:
direction = changeDirection
if changeDirection == ‘left’ and not direction == ‘right’:
direction = changeDirection
if changeDirection == ‘up’ and not direction == ‘down’:
direction = changeDirection
if changeDirection == ‘down’ and not direction == ‘up’:
direction = changeDirection
if direction == ‘right’:
snakePosition[0] += 20
if direction == ‘left’:
snakePosition[0] -= 20
if direction == ‘up’:
snakePosition[1] -= 20
if direction == ‘down’:
snakePosition[1] += 20
snakeSegments.insert(0,list(snakePosition))
if snakePosition[0] == raspberryPosition[0] and
snakePosition[1] == raspberryPosition[1]:
raspberrySpawned = 0
else:
snakeSegments.pop()
if raspberrySpawned == 0:
x = random.randrange(1,32)
y = random.randrange(1,24)
raspberryPosition = [int(x*20),int(y*20)]
raspberrySpawned = 1
playSurface.fill(blackColour)
for position in snakeSegments:
pygame.draw.rect(playSurface,whiteColour,Rect
(position[0], position[1], 20, 20))
pygame.draw.rect(playSurface,redColour,Rect
(raspberryPosition[0], raspberryPosition[1], 20, 20))
pygame.display.flip()
if snakePosition[0] > 620 or snakePosition[0] < 0:
gameOver()
if snakePosition[1] > 460 or snakePosition[1] < 0:
for snakeBody in snakeSegments[1:]:
if snakePosition[0] == snakeBody[0] and
snakePosition[1] == snakeBody[1]:
gameOver()
fpsClock.tick(30)
IRC User List (Chapter 11, Example 4)
#!/usr/bin/env python
# IRC User List
# Written by Tom Hudson for the Raspberry Pi User Guide
# http://tomhudson.co.uk/
import sys, socket, time
RPL_NAMREPLY = ‘353’
RPL_ENDOFNAMES = ‘366’
irc = {
‘host’: ‘chat.freenode.net’,
‘port’: 6667,
‘channel’: ‘#raspiuserguide’,
‘namesinterval’: 5
}
user = {
‘nick’: ‘botnick’,
‘username’: ‘botuser’,
‘hostname’: ‘localhost’,
‘servername’: ‘localhost’,
‘realname’: ‘Raspberry Pi Names Bot’
}
s = socket.socket(socket.AF_INET, socket.SOCK_STREAM)
print ‘Connecting to %(host)s:%(port)s...’ % irc
try:
s.connect((irc[‘host’], irc[‘port’]))
except socket.error:
print ‘Error connecting to IRC server
%(host)s:%(port)s’ % irc
sys.exit(1)
s.send(‘NICK %(nick)srn’ % user)
s.send(‘USER %(username)s %(hostname)s %(servername)s :
%(realname)srn’ % user)
s.send(‘JOIN %(channel)srn’ % irc)
s.send(‘NAMES %(channel)srn’ % irc)
read_buffer = ‘’
names = []
while True:
read_buffer += s.recv(1024)
lines = read_buffer.split(‘rn’)
read_buffer = lines.pop();
for line in lines:
response = line.rstrip().split(‘ ‘, 3)
response_code = response[1]
if response_code == RPL_NAMREPLY:
names_list = response[3].split(‘:’)[1]
names += names_list.split(‘ ‘)
if response_code == RPL_ENDOFNAMES:
print ‘rnUsers in %(channel)s:’ % irc
for name in names:
print name
names = []
time.sleep(irc[‘namesinterval’])
s.send(‘NAMES %(channel)srn’ % irc)
GPIO Input and Output (Chapter 12)
#!/usr/bin/env python
# Raspberry Pi GPIO Input/Output example
# Written by Gareth Halfacree for the Raspberry Pi User Guide
import RPi.GPIO as GPIO
GPIO.setup(11, GPIO.OUT)
GPIO.setup(12, GPIO.IN)
GPIO.output(11, False)
while True:
input_value = GPIO.input(12)
if input_value == False:
print “The button has been pressed. Lighting LED.”
GPIO.output(11, True)
while input_value == False:
input_value = GPIO.input(12)
print “The button has been released. Extinguishing LED.”
if input_value == True:
GPIO.output(11, False)
Appendix B: HDMI Display Modes
Youcanuse the values inTable B-1 and Table B-2 withthe hdmi_mode optioninconfig.txt to alter the HDMI video
output stream. For more information, see Chapter 6, “Configuringthe RaspberryPi”.
Table B-1 HDMI Group 1 (CEA)
Value Description
1 VGA (640x480)
2 480p 60Hz
3 480p 60Hz(16:9 aspect ratio)
4 720p 60Hz
5 1080i 60Hz
6 480i 60Hz
7 480i 60Hz(16:9 aspect ratio)
8 240p 60Hz
9 240p 60Hz(16:9 aspect ratio)
10 480i 60Hz(Pixel quadrupling enabled)
11 480i 60Hz(Pixel quadrupling enabled) (16:9 aspect ratio)
12 240p 60Hz(Pixel quadrupling enabled)
13 240p 60Hz(Pixel quadrupling enabled) (16:9 aspect ratio)
14 480p 60Hz(Pixel doubling enabled)
15 480p 60Hz(Pixel doubling enabled) (16:9 aspect ratio)
16 1080p 60Hz
17 576p 50Hz
18 576p 50Hz(16:9 aspect ratio)
19 720p 50Hz
20 1080i 50Hz
21 576i 50Hz
22 576i 50Hz(16:9 aspect ratio)
23 288p 50Hz
24 288p 50Hz(16:9 aspect ratio)
25 576i 50Hz(Pixel quadrupling enabled)
26 576i 50Hz(Pixel quadrupling enabled) (16:9 aspect ratio)
27 288p 50Hz(Pixel quadrupling enabled)
28 288p 50Hz(Pixel quadrupling enabled) (16:9 aspect ratio)
29 576p 50Hz(Pixel doubling enabled)
30 576p 50Hz(Pixel doubling enabled) (16:9 aspect ratio)
31 1080p 50Hz
32 1080p 24Hz
33 1080p 25Hz
34 1080p 30Hz
35 480p 60Hz(Pixel quadrupling enabled)
36 480p 60Hz(Pixel quadrupling enabled) (16:9 aspect ratio)
37 576p 50Hz(Pixel quadrupling enabled)
38 576p 50Hz(Pixel quadrupling enabled) (16:9 aspect ratio)
39 1080i 50Hz(Reduced blanking)
40 1080i 100Hz
41 720p 100Hz
42 576p 100Hz
43 576p 100Hz(16:9 aspect ratio)
44 576i 100Hz
45 576i 100Hz(16:9 aspect ratio)
46 1080i 120Hz
47 720p 120Hz
48 480p 120Hz
49 480p 120Hz(16:9 aspect ratio)
50 480i 120Hz
51 480i 120Hz(16:9 aspect ratio)
52 576p 200Hz
53 576p 200Hz(16:9 aspect ratio)
54 576i 200Hz
55 576i 200Hz(16:9 aspect ratio)
56 480p 24Hz0
57 480p 24Hz0 (16:9 aspect ratio)
58 480i 240Hz
59 480i 240Hz(16:9 aspect ratio)
Table B-2 HDMI Group 2 (DMT)
Value Description
1 640×350 85Hz
2 640×400 85Hz
3 720×400 85Hz
4 640×480 60Hz
5 640×480 72Hz
6 640×480 75Hz
7 640×480 85Hz
8 800×600 56Hz
9 800×600 60Hz
10 800×600 72Hz
11 800×600 75Hz
12 800×600 85Hz
13 800×600 120Hz
14 848×480 60Hz
15 1024×768 43Hz, incompatible with the Raspberry Pi
16 1024×768 60Hz
17 1024×768 70Hz
18 1024×768 75Hz
19 1024×768 85Hz
20 1024×768 120Hz
21 1152×864 75Hz
22 1280×768 (Reduced blanking)
23 1280×768 60Hz
24 1280×768 75Hz
25 1280×768 85Hz
26 1280×768 120Hz(Reduced blanking)
27 1280×800 (Reduced blanking)
28 1280×800 60Hz
29 1280×800 75Hz
30 1280×800 85Hz
31 1280×800 120Hz(Reduced blanking)
32 1280×960 60Hz
33 1280×960 85Hz
34 1280×960 120Hz(Reduced blanking)
35 1280×1024 60Hz
36 1280×1024 75Hz
37 1280×1024 85Hz
38 1280×1024 120Hz(Reduced blanking)
39 1360×768 60Hz
40 1360×768 120Hz(Reduced blanking)
41 1400×1050 (Reduced blanking)
42 1400×1050 60Hz
43 1400×1050 75Hz
44 1400×1050 85Hz
45 1400×1050 120Hz(Reduced blanking)
46 1440×900 (Reduced blanking)
47 1440×900 60Hz
48 1440×900 75Hz
49 1440×900 85Hz
50 1440×900 120Hz(Reduced blanking)
51 1600×1200 60Hz
52 1600×1200 65Hz
53 1600×1200 70Hz
54 1600×1200 75Hz
55 1600×1200 85Hz
56 1600×1200 120Hz(Reduced blanking)
57 1680×1050 (Reduced blanking)
58 1680×1050 60Hz
59 1680×1050 75Hz
60 1680×1050 85Hz
61 1680×1050 120Hz(Reduced blanking)
62 1792×1344 60Hz
63 1792×1344 75Hz
64 1792×1344 120Hz(Reduced blanking)
65 1856×1392 60Hz
66 1856×1392 75Hz
67 1856×1392 120Hz(Reduced blanking)
68 1920×1200 (Reduced blanking)
69 1920×1200 60Hz
70 1920×1200 75Hz
71 1920×1200 85Hz
72 1920×1200 120Hz(Reduced blanking)
73 1920×1440 60Hz
74 1920×1440 75Hz
75 1920×1440 120Hz(Reduced blanking)
76 2560×1600 (Reduced blanking)
77 2560×1600 60Hz
78 2560×1600 75Hz
79 2560×1600 85Hz
80 2560×1600 120Hz(Reduced blanking)
81 1366×768 60Hz
82 1920×1080 (1080p) 60Hz
83 1600×900 (Reduced blanking)
84 2048×1152 (Reduced blanking)
85 1280×720 (720p) 60Hz
86 1366×768 (Reduced blanking)

RPiUsersGuide.pdf

  • 2.
    Raspberry Pi® UserGuide Table of Contents Introduction Programming is fun! A bit of history So what can you do with the Raspberry Pi? Part I: Connecting the Board Chapter 1: Meet the Raspberry Pi ARM vs. x86 Windows vs. Linux Getting Started with the Raspberry Pi Connecting a Display Connecting Audio Connecting a Keyboard and Mouse Flashing the SD Card Connecting External Storage Connecting the Network Connecting Power Chapter 2: Linux System Administration Linux: An Overview Linux Basics Introducing Debian Using External Storage Devices Creating a New User Account File System Layout Logical Layout Physical Layout Installing and Uninstalling Software Finding Software Installing Software Uninstalling Software
  • 3.
    Upgrading Software Chapter 3:Troubleshooting Keyboard and Mouse Diagnostics Power Diagnostics Display Diagnostics Boot Diagnostics Network Diagnostics The Emergency Kernel Chapter 4: Network Configuration Wired Networking Wireless Networking Chapter 5: Partition Management Creating a New Partition Resizing Existing Partitions Automatic Resizing Manual Resizing Moving to a Bigger SD Card Imaging from Linux Imaging from OS X Imaging from Windows Chapter 6: Configuring the Raspberry Pi Hardware Settings—config.txt Modifying the Display Boot Options Overclocking the Raspberry Pi Disabling L2 Cache Enabling Test Mode Memory Partitioning—start.elf Software Settings—cmdline.txt Part II: Using the Pi as a Media Centre, Productivity Machine and Web Server
  • 4.
    Chapter 7: ThePi as a Home Theatre PC Playing Music at the Console Dedicated HTPC with Rasbmc Streaming Internet Media Streaming Local Network Media Configuring Rasbmc Chapter 8: The Pi as a Productivity Machine Using Cloud-Based Apps Using OpenOffice.org Image Editing with The Gimp Chapter 9: The Pi as a Web Server Installing a LAMP Stack Installing WordPress Part III: Programming and Hacking Chapter 10: An Introduction to Scratch Introducing Scratch Example 1: Hello World Example 2: Animation and Sound Example 3: A Simple Game Robotics and Sensors Sensing with the PicoBoard Robotics with LEGO Further Reading Chapter 11: An Introduction to Python Introducing Python Example 1: Hello World Example 2: Comments, Inputs, Variables and Loops Example 3: Gaming with pygame Example 4: Python and Networking Further Reading
  • 5.
    Chapter 12: HardwareHacking Electronic Equipment Reading Resistor Colour Codes Sourcing Components Online Sources Offline Sources Hobby Specialists The GPIO Port UART Serial Bus I²C Bus SPI Bus Using the GPIO Port in Python Installing the GPIO Python Library GPIO Output: Flashing an LED GPIO Input: Reading a Button Moving Up From the Breadboard A Brief Guide to Soldering Chapter 13: Add-on Boards Ciseco Slice of Pi Adafruit Prototyping Pi Plate Fen Logic Gertboard Part IV: Appendixes Appendix A: Python Recipes Appendix B: HDMI Display Modes
  • 6.
    Raspberry Pi® UserGuide Eben Upton and Gareth Halfacree
  • 7.
    Raspberry Pi® UserGuide This edition first published 2012 © 2012 Eben Upton and Gareth Halfacree Registered office John Wiley & Sons Ltd., The Atrium, Southern Gate, Chichester, West Sussex, PO19 8SQ, United Kingdom For details of our global editorial offices, for customer services and for information about how to apply for permission to reuse the copyright material in this book please see our website at www.wiley.com. The right of the authors to be identified as the authors of this work has been asserted in accordance with the Copyright, Designs and Patents Act 1988. All rights reserved. No part of this publication may be reproduced, stored in a retrieval system, or transmitted, in any form or by any means, electronic, mechanical, photocopying, recording or otherwise, except as permitted by the UK Copyright, Designs and Patents Act 1988, without the prior permission of the publisher. Wiley also publishes its books in a variety of electronic formats. Some content that appears in print may not be available in electronic books. Designations used by companies to distinguish their products are often claimed as trademarks. All brand names and product names used in this book are trade names, service marks, trademarks or registered trademarks of their respective owners. The publisher is not associated with any product or vendor mentioned in this book. This publication is designed to provide accurate and authoritative information in regard to the subject matter covered. It is sold on the understanding that the publisher is not engaged in rendering professional services. If professional advice or other expert assistance is required, the services of a competent professional should be sought. Trademarks: Wiley and the Wiley logo are trademarks or registered trademarks of John Wiley and Sons, Ltd. and/or its affiliates in the United States and/or other countries, and may not be used without written permission. Raspberry Pi and the Raspberry Pi logo are registered trademarks of the Raspberry Pi Foundation. All other trademarks are the property of their respective owners. John Wiley & Sons, Ltd. is not associated with any product or vendor mentioned in the book. Google Drive™ is a registered trademark of Google™. A catalogue record for this book is available from the British Library. ISBN 978-1-118-46446-5 (pbk); ISBN 978-1-118-46448-9 (ebk); ISBN 978-1-118-46447-2 (ebk); ISBN 978-1-118-46449-6 (ebk) Set in 10 pt. Chaparral Pro by Indianapolis Composition Services Printed simultaneously in Great Britain and the United States Publisher’s Acknowledgements Some of the people who helped bring this book to market include the following:
  • 8.
    Editorial and Production VPConsumer and Technology Publishing Director Michelle Leete Associate Director–Book Content Management Martin Tribe Associate Publisher Chris Webb Executive Commissioning Editor Craig Smith Assistant Editor Ellie Scott Project Editor Kathryn Duggan Copy Editor Kathryn Duggan Technical Editor Omer Kilic Editorial Manager Jodi Jensen Senior Project Editor Sara Shlaer Editorial Assistant Leslie Saxman Marketing Associate Marketing Director Louise Breinholt Marketing Manager Lorna Mein
  • 9.
    Senior Marketing Executive KateParrett Composition Services Compositor Erin Zeltner Proofreader Wordsmith Editorial Indexer BIM Indexing & Proofreading Services
  • 10.
    About the Authors EbenUptonisa founder and trustee ofthe RaspberryPiFoundation, and serves as its Executive Director. He is responsible for the overallsoftware and hardware architecture ofthe RaspberryPi, and for the Foundation's relationships withits keysuppliers and customers. Inanearlier life, he founded two successfulmobile games and middleware companies, Ideaworks 3d Ltd. and PodfunLtd., and held the post ofDirector ofStudies for Computer Science at St John's College, Cambridge. He holds a BA, a PhDand anMBAfromthe UniversityofCambridge. Inhis dayjob, Ebenworks for Broadcomas anASIC architect and generaltroublemaker. GarethHalfacree is a freelance technologyjournalist and the co-author ofthe RaspberryPiUser Guide alongside project co- founder EbenUpton. Formerlya systemadministrator workinginthe educationsector, Gareth’s passionfor opensource projects has followed himfromone career to another, and he canoftenbe seenreviewing, documentingor evencontributingto projects includingGNU/Linux, LibreOffice, Fritzingand Arduino. He is also the creator ofthe Sleepduino and Burnduino open hardware projects, whichextend the capabilities ofthe Arduino electronics prototypingsystem. Asummaryofhis current work canbe found at http://freelance.halfacree.co.uk. For Liz, who made it all possible. —Eben
  • 11.
    For my father,the enthusiastic past, and my daughter, the exciting future. —Gareth
  • 12.
    Introduction “Childrentoday are digitalnatives”,said a manI got talkingto at a fireworks partylast year. “I don’t understand whyyou’re makingthis thing. Mykids knowmore about settingup our PC thanI do.” I asked himiftheycould program, to whichhe replied:“Whywould theywant to? The computers do allthe stufftheyneed for themalready, don’t they? Isn’t that the point?” As it happens, plentyofkids todayaren’t digitalnatives. We have yet to meet anyofthese imagined wild digitalchildren, swingingfromropes oftwisted-pair cable and chantingwar songs innicelyparsed Python. Inthe RaspberryPiFoundation’s educationaloutreachwork, we do meet a lot ofkids whose entire interactionwithtechnologyis limited to closed platforms with graphicaluser interfaces (GUIs) that theyuse to playmovies, do a spot ofword-processed homework and playgames. They canbrowse the web, upload pictures and video, and evendesignweb pages. (They’re oftenbetter at settingthe satellite TVbox thanMumor Dad, too.) It’s a usefultoolset, but it’s shockinglyincomplete, and ina countrywhere 20%ofhouseholds stilldon’t have a computer inthe home, eventhis toolset is not available to allchildren. Despite the most fervent wishes ofmynewacquaintance at the fireworks party, computers don’t programthemselves. We need anindustryfullofskilled engineers to keep technologymovingforward, and we need youngpeople to be takingthose jobs to fill the pipeline as older engineers retire and leave the industry. But there’s muchmore to teachinga skilllike programmatic thinking thanbreedinga newgenerationofcoders and hardware hackers. Beingable to structure your creative thoughts and tasks in complex, non-linear ways is a learned talent, and one that has huge benefits for everyone who acquires it, fromhistorians to designers, lawyers and chemists. Programming is fun! It’s enormous, rewarding, creative fun. Youcancreate gorgeous intricacies, as wellas (muchmore gorgeous, inmyopinion) clever, devastatinglyquick and deceptivelysimple-lookingroutes through, under and over obstacles. Youcanmake stuffthat’ll have other people lookingonjealously, and that’llmake youfeelwonderfullysmugallafternoon. Inmydayjob, where I design the sort ofsiliconchips that we use inthe RaspberryPias a processor and work onthe low-levelsoftware that runs onthem, I basicallyget paid to sit around alldayplaying. What could be better thanequippingpeople to be able to spend a lifetime doing that? It’s not evenas ifwe’re comingfroma positionwhere childrendon’t want to get involved inthe computer industry. Abigkick up the backside came a fewyears ago, whenwe were movingquite slowlyonthe RaspberryPiproject. Allthe development work onRaspberryPiwas done inthe spare evenings and weekends ofthe Foundation’s trustees and volunteers—we’re a charity, so the trustees aren’t paid bythe Foundation, and we allhave full-time jobs to paythe bills. This meant that occasionally, motivationwas hard to come bywhenallI wanted to do inthe eveningwas slump infront ofthe Arrested Development boxed set witha glass ofwine. One evening, whennot slumping, I was talkingto a neighbour’s nephewabout the subjects he was takingfor his GeneralCertificate ofSecondaryEducation(GCSE, the Britishsystemofpublic examinations takeninvarious subjects fromthe age ofabout 16), and I asked himwhat he wanted to do for a livinglater on. “I want to write computer games”, he said. “Awesome. What sort ofcomputer do youhave at home? I’ve got some programmingbooks youmight be interested in.” “AWiiand anXbox.” Ontalkingwithhima bit more, it became clear that this perfectlysmart kid had never done anyrealprogrammingat all; that there wasn’t anymachine that he could programinthe house; and that his informationand communicationtechnology(ICT) classes— where he shared a computer and was taught about web page design, usingspreadsheets and word processing—hadn’t really equipped himto use a computer eveninthe barest sense. But computer games were a passionfor him(and there’s nothing peculiar about wantingto work onsomethingyou’re passionate about). So that was what he was hopingthe GCSEsubjects he’d chosenwould enable himto do. He certainlyhad the artistic skills that the games industrylooks for, and his maths and science marks weren’t bad. But his schoolinghad skirted around anyprogramming—there were no Computingoptions onhis syllabus, just more ofthe same ICTclasses, withits emphasis onend users rather thanprogramming. And his home interactions withcomputingmeant that he stood a vanishinglysmallchance ofacquiringthe skills he needed inorder to do what he really wanted to do withhis life.
  • 13.
    This is thesort ofsituationI want to see the back of, where potentialand enthusiasmis squandered to no purpose. Now, obviously, I’mnot monomaniacalenoughto imagine that simplymakingthe RaspberryPiis enoughto effect allthe changes that are needed. But I do believe that it canact as a catalyst. We’re alreadyseeingbigchanges inthe UK schools’ curriculum, where Computingis arrivingonthe syllabus and ICTis beingreshaped, and we’ve seena massive change inawareness ofa gap inour educationaland culturalprovisionfor kids just inthe short time since the RaspberryPiwas launched. Too manyofthe computingdevices a child willinteract withdailyare so locked downthat theycan’t be used creativelyas a tool —eventhoughcomputingis a creative subject. Tryusingyour iPhone to act as the brains ofa robot, or gettingyour PS3 to play a game you’ve written. Sure, youcanprogramthe home PC, but there are significant barriers indoingthat whicha lot ofchildren don’t overcome:the need to download specialsoftware, and havingthe sort ofparents who aren’t worried about youbreaking somethingthat theydon’t knowhowto fix. And plentyofkids aren’t evenaware that doingsucha thingas programmingthe home PC is possible. Theythink ofthe PC as a machine withnice clickyicons that give youaneasywayto do the things you need to do so youdon’t need to think much. It comes ina sealed box, whichMumand Dad use to do the bankingand which willcost lots ofmoneyto replace ifsomethinggoes wrong! The RaspberryPiis cheap enoughto buywitha fewweeks’ pocket money, and youprobablyhave allthe equipment youneed to make it work:a TV, anSDcard that cancome fromanold camera, a mobile phone charger, a keyboard and a mouse. It’s not shared withthe family; it belongs to the kid; and it’s smallenoughto put ina pocket and take to a friend’s house. If somethinggoes wrong, it’s no bigdeal—youjust swap out a newSDcard and your RaspberryPiis factory-newagain. And all the tools, environments and learningmaterials that youneed to get started onthe long, smoothcurve to learninghowto program your RaspberryPiare right there, waitingfor youas soonas youturnit on. A bit of history I started work ona tiny, affordable, bare-bones computer about sixyears ago, whenI was a Director ofStudies inComputer Science at Cambridge University. I’d received a degree at the UniversityComputer Lab as wellas studyingfor a PhDwhile teachingthere, and over that period, I’d noticed a distinct decline inthe skillset ofthe youngpeople who were applyingto read Computer Science at the Lab. Froma positioninthe mid-1990s, when17-year-olds wantingto read Computer Science had come to the Universitywitha groundinginseveralcomputer languages, knewa bit about hardware hacking, and ofteneven worked inassemblylanguage, we graduallyfound ourselves ina positionwhere, by2005, those kids were arrivinghavingdone some HTML—witha bit ofPHP and CascadingStyle Sheets ifyouwere lucky. Theywere stillfearsomelyclever kids withlots ofpotential, but their experience withcomputers was entirelydifferent fromwhat we’d beenseeingbefore. The Computer Science course at Cambridge includes about 60 weeks oflecture and seminar time over three years. Ifyou’re usingthe whole first year to bringstudents up to speed, it’s harder to get themto a positionwhere theycanstart a PhDor go into industryover the next two years. The best undergraduates—the ones who performed the best at the end oftheir three-year course—were the ones who weren’t just programmingwhenthey’d beentold to for their weeklyassignment or for a class project. Theywere the ones who were programmingintheir spare time. So the initialidea behind the RaspberryPiwas a very parochialone witha verytight (and prettyunambitious) focus:I wanted to make a toolto get the smallnumber ofapplicants to this smalluniversitycourse a kick start. Mycolleagues and I imagined we’d hand out these devices to schoolkids at opendays, and iftheycame to Cambridge for aninterviewa fewmonths later, we’d ask what they’d done withthe free computer we’d giventhem. Those who had done somethinginterestingwould be the ones that we’d be interested inhavinginthe program. We thought maybe we’d make a fewhundred ofthese devices, or best case, a lifetime productionrunofa fewthousand. Ofcourse, once work was seriouslyunderwayonthe project, it became obvious that there was a lot more we could address witha cheap little computer like this. What we started withis a longwayindeed fromthe RaspberryPiyousee today. I began bysolderingup the longest piece ofbreadboard youcanbuyat MaplinwithanAtmelchip at our kitchentable, and the first crude prototypes used cheap microcontroller chips to drive a standard-definitionTVset directly. Withonly512 K ofRAM, and a fewMIPS ofprocessingpower, these prototypes were verysimilar inperformance to the original8-bit microcomputers. It was hard to imagine these machines capturingthe imaginations ofkids used to moderngames consoles and iPads. There had beendiscussions at the UniversityComputer Lab about the generalstate ofcomputer education, and whenI left the Lab for a non-academic job inthe industry, I noticed that I was seeingthe same issues inyoungjob applicants as I’d beenseeing at the University. So I got together withmycolleagues Dr Rob Mullins and Professor AlanMycroft (two colleagues fromthe Computer Lab), Jack Lang(who lectures inentrepreneurship at the University), Pete Lomas (a hardware guru) and David Braben(a Cambridge games industryleadinglight withaninvaluable address book), and over beers (and, inJack’s case, cheese and wine), we set up the RaspberryPiFoundation—a little charitywithbigideas. Why “Raspberry Pi”? We get askeda lot where the name “Raspberry Pi” came from. Bits of the name came fromdifferent trustees. It’s one of the very fewsuccessful bits
  • 14.
    of design bycommittee I’ve seen, andto be honest, Ihatedit at first. (Ihave since come to love the name, because it works really well—but it took a bit of getting usedto since I’dbeen calling the project the “ABC Micro” in my headforyears.) It’s “Raspberry” because there’s a long tradition of fruit names in computercompanies (besides the obvious, there are the oldTangerine andApricot computers—andwe like to think of the Acorn as a fruit as well). “Pi” is a mangling of “Python”, which we thought early on in development wouldbe the only programming language available on a much less powerful platformthan the Raspberry Pi we endedupwith. As it happens, we still recommendPython as ourfavourite language for learning anddevelopment, but there is a worldof otherlanguage options you can explore on the Raspberry Pi too. Inmynewrole as a chip architect at Broadcom, a bigsemiconductor company, I had access to inexpensive but high-performing hardware produced bythe companywiththe intentionofbeingused inveryhigh-end mobile phones—the sort withthe HD video and the 14-megapixelcameras. I was amazed bythe difference betweenthe chips youcould buyfor $10 as a small developer, and what youcould buyas a cell-phone manufacturer for roughlythe same amount ofmoney:generalpurpose processing, 3Dgraphics, video and memorybundled into a single BGApackage the size ofa fingernail. These microchips consume verylittle power, and have bigcapabilities. Theyare especiallygood at multimedia, and were alreadybeingused by set-top boxcompanies to playhigh-definitionvideo. Achip like this seemed the obvious next step for the shape the RaspberryPi was taking, so I worked ontapingout a low-cost variant that had anARM microprocessor onboard and could handle the processinggrunt we needed. We felt it was important to have a wayto get kids enthusiastic about usinga RaspberryPieveniftheydidn’t feelvery enthusiastic about programming. Inthe 1980s, ifyouwanted to playa computer game, youhad to boot up a boxthat went “bing”and fed youa command prompt. It required typinga little bit ofcode just to get started, and most users didn’t ever go beyond that—but some did, and got beguiled into learninghowto programbythat little bit ofinteraction. We realised that the RaspberryPicould work as a verycapable, verytiny, verycheap modernmedia centre, so we emphasised that capabilityto suck inthe unwary—withthe hope that they’d pick up some programmingwhile they’re at it. After about five years’ hard grind, we had created a verycute prototype board, about the size ofa thumb drive. We included a permanent camera module ontop ofthe board to demonstrate the sort ofperipherals that caneasilybe added, and brought it alongto a number ofmeetings withthe BBC’s R&Ddepartment. Those ofus who grewup inthe UK inthe 1980s had learned a lot about 8-bit computingfromthe BBC Microcomputer and the ecosystemthat had grownup around it—withBBC-produced books, magazines and TVprogrammes—so I’d hoped that theymight be interested indevelopingthe RaspberryPifurther. But as it turned out, somethinghas changed since we were kids:various competitionlaws inthe UK and the EUmeant that “the Beeb”couldn’t become involved inthe waywe’d hoped. Ina last-ditchattempt to get somethingorganised withthem, we ditched the R&Ddepartment idea and David (he ofthe giant address book) organised a meetingwithRoryCellan-Jones, a senior techjournalist, inMay2011. Rorydidn’t hold out muchhope for partnership withthe BBC, but he did ask ifhe could take a video ofthe little prototype board withhis phone, to put onhis blog. The next morning, Rory’s video had gone viral, and I realised that we had accidentallypromised the world that we’d make everybodya $25 computer. While Rorywent offto write another blogpost onexactlywhat it is that makes a video go viral, we went offto put our thinking caps on. That original, thumb-drive-sized prototype didn’t fit the bill:withthe camera included as standard, it was waytoo expensive to meet the cost modelwe’d suggested (the $25 figure came frommystatement to the BBC that the RaspberryPi should cost around the same as a text book, and is a splendid demonstrationofthe fact that I had no idea howmuchtext books cost these days), and the tinyprototype modeldidn’t have enoughroomaround its peripheryfor allthe ports we needed to make it as useable as we wanted it to be. So we spent a year workingonengineeringthe board to lower cost as muchas possible while retainingallthe features we wanted (engineeringcost downis a harder job thanyoumight think), and to get the RaspberryPias useable as possible for people who might not be able to afford muchinthe wayofperipherals. We knewwe wanted the RaspberryPito be used withTVs at home, just like the ZXSpectruminthe 1980s, savingthe user the cost ofa monitor. But not everybodyhas access to anHDMI television, so we added a composite port to make the Raspberry Piwork withanold cathode-raytelevisioninstead since SDcards are cheap and easyto find. We decided against microSDas the storage medium, because the little fingernail-sized cards are so flimsyinthe hands ofchildrenand so easyto lose. And we went throughseveraliterations ofpower supply, endingup witha micro USBcable. Recently, micro USBbecame the standard charger cable for mobile telephones across the EU(and it’s becomingthe standard everywhere), whichmeans the cables are becomingmore and more ubiquitous, and inmanycases, people alreadyhave themat home. Bythe end of2011, witha projected Februaryrelease date, it was becomingobvious to us that things were movingfaster, and demand was higher, thanwe were ever goingto be able to cope with. The initiallaunchwas always aimed at developers, with the educationallaunchplanned for later in2012. We have a smallnumber ofverydedicated volunteers, but we need the wider Linuxcommunityto help us prepare a software stack and ironout anyearly-life niggles withthe board before releasinginto the educationalmarket. We had enoughcapitalinthe Foundationto buythe parts for and build 10,000 RaspberryPis over a period ofa monthor so, and we thought that the people inthe communitywho would be interested inanearlyboard would come to around that number. Fortunatelyand unfortunately, we’d beenreallysuccessfulinbuildinga bigonline communityaround the device, and interest wasn’t limited to the UK, or to the educationalmarket. Tenthousand was lookingless and less realistic.
  • 15.
    OurCommunity The Raspberry Picommunity is one of the things we’re proudest of. We startedwith a very bare-bones blog at www.raspberrypi.org just afterRory’s May 2011 video, andput upa forumon the same website shortly afterthat. That forumnowhas more than 20,000 members—between themthey’ve contributedmore than 100,000 posts of wit andwisdomabout the Raspberry Pi. If there’s any question, no matterhowabstruse, that you want to ask about the Raspberry Pi orabout programming in general, someone there will have the answer(if it’s not in this book, you’ll findit in the forums). Part of my jobat Raspberry Pi involves giving talks to hackergroups, computing conferences, teachers, programming collectives andthe like, and there’s always someone in the audience who has talkedto me orto my wife Liz (who runs the community) on the Raspberry Pi website—andsome of these people have become goodfriends of ours. The Raspberry Pi website gets aroundone request every single secondof the day. There are nowhundreds of fan sites out there. There’s also a fan magazine calledThe MagPi (a free downloadfromwww.themagpi.com), which is producedmonthly by community members, with type-in listings, lots of articles, project guides, tutorials andmore. Type-in games in magazines and books providedan easy route into programming forme—my earliest programming experience with the BBC Micro was of modifying a type-in helicoptergame to addenemies andpick-ups. We blog something interesting about the device at www.raspberrypi.org at least once every day. Come andjoin in the conversation! There were 100,000 people onour mailinglist wantinga RaspberryPi—and theyallput anorder inondayone! Not surprisingly, this brought up a fewissues. First off, there are the inevitable paper cuts you’re goingto get boxingup 100,000 little computers and mailingthemout—and the fact was that we had absolutelyno moneyto hire people to do this for us. We didn’t have a warehouse—we had Jack’s garage. There was no waywe could raise the moneyto build 100,000 units at once—we’d envisaged makingtheminbatches of 2,000 everycouple ofweeks, which, withthis levelofinterest, was goingto take so longthat the thingwould be obsolete before we managed to fulfilallthe orders. Clearly, manufacturingand distributionwere somethingwe were goingto have to give up on and hand over to somebodyelse who alreadyhad the infrastructure and capitalto do that, so we got intouchwithelement14 and RS Components, bothUK microelectronics suppliers withworldwide businesses, and contracted withthemto do the actual manufacture and distributionside ofthings worldwide so we could concentrate ondevelopment and the RaspberryPi Foundation’s charitable goals. Demand onthe first daywas stillso large that RS and element14’s websites bothcrashed for most ofthe day—at one point in the day, element14 were gettingsevenorders a second, and for a couple ofhours onFebruary29, Google showed more searches were made worldwide for “RaspberryPi”thanwere made for “LadyGaga”. I’mwritingthis inearlyJune 2012, and orders inthe three months since we opened for business have topped halfa millionunits, eventhoughwe’re stillat a point when neither companywillsellyoumore thanone RaspberryPi(they’re tryingto get rid oftheir order backlogs before theyturnonthe abilityto multiorder). At this point, ifwe’d gone withour originalplans, we’d have made 100 or so ofthese devices for Universityopendays, and that would have beenit. There is nothingthat affects the blood pressure quite like accidentallyendingup runninga large computer company! So what can you do with the Raspberry Pi? This book explores a number ofthings youcando withyour RaspberryPi, fromcontrollinghardware withPython, to usingit as a media centre, or buildinggames inScratch. The beautyofthe RaspberryPiis that it’s just a verytinygeneral-purpose computer (whichmaybe a little slower thanyou’re used to for some desktop applications, but muchbetter at some other stuff thana regular PC), so youcando anythingyoucould do ona regular computer withit. Inaddition, the RaspberryPihas powerfulmultimedia and 3Dgraphics capabilities, so it has the potentialto be used as a games platform, and we verymuchhope to see people startingto write games for it. We think physicalcomputing—buildingsystems usingsensors, motors, lights and microcontrollers—is somethingthat gets overlooked infavour ofpure software projects ina lot ofinstances, and it’s a shame, because physicalcomputingis massive fun. To the extent that there’s anychildren’s computingmovement at the moment, it’s a physicalcomputingmovement. The LOGO turtles that represented physicalcomputingwhenwe were kids are nowfightingrobots, quadcopters or parent-sensingbedroom doors, and we love it. However, the lack ofGeneralPurpose Input/Output (GPIO) onhome PCs is a realhandicap for many people gettingstarted withrobotics projects. The RaspberryPiexposes GPIO so youcanget to work straight away. I keep beingsurprised byideas the communitycomes up withwhichwouldn’t have crossed mymind ina thousand years:the Australianschoolmeteor-trackingproject; the BoreattonScouts inthe UK and their robot, whichis controlled via an electroencephalographyheadset (the world’s first robot controlled byScoutingbrainwaves); the familywho are buildinga robot vacuumcleaner. And I’ma realspace cadet, so readingabout the people sendingRaspberryPis into near-earthorbit onrockets and balloons gives me goosebumps. Success for us would be another 1,000 people everyyear takingup Computer Science at the universitylevelinthe UK. That would not onlybe beneficialfor the country, the software and hardware industries, and the economy; but it would be evenmore beneficialfor everyone ofthose 1,000 people, who, I hope, discover that there’s a whole world ofpossibilities and a great deal
  • 16.
    offunto be hadout there. Buildinga robot whenyou’re a kid cantake youto places younever imagined—I knowbecause it happened to me! —EbenUpton
  • 17.
    Part I: Connectingthe Board Chapter 1:Meet the RaspberryPi Chapter 2:LinuxSystemAdministration Chapter 3:Troubleshooting Chapter 4:Network Configuration Chapter 5:PartitionManagement Chapter 6:Configuringthe RaspberryPi
  • 18.
    Chapter 1: Meetthe Raspberry Pi YourRaspberry Pi board is a miniature marvel, packingconsiderable computingpower into a footprint no larger thana credit card. It’s capable ofsome amazingthings, but there are a fewthings you’re goingto need to knowbefore youplunge head-first into the bramble patch. If you’re eagerto get started, skipaheada couple of pages to findout howto connect yourRaspberry Pi to a display, keyboardandmouse. ARM vs. x86 The processor at the heart ofthe RaspberryPisystemis a BroadcomBCM2835 system-on-chip (SoC) multimedia processor. This means that the vast majorityofthe system’s components, includingits centraland graphics processingunits alongwiththe audio and communications hardware, are built onto that single component hiddenbeneaththe 256 MBmemorychip at the centre ofthe board (see Figure 1-1). It’s not just this SoC designthat makes the BCM2835 different to the processor found inyour desktop or laptop, however. It also uses a different instructionset architecture (ISA), knownas ARM. Figure 1-1:The BCM2835 SoC, located beneatha Hynixmemorychip Developed byAcornComputers back inthe late 1980s, the ARM architecture is a relativelyuncommonsight inthe desktop world. Where it excels, however, is inmobile devices:the phone inyour pocket almost certainlyhas at least one ARM-based processingcore hiddenawayinside. Its combinationofa simple reduced instructionset (RISC) architecture and lowpower drawmake it the perfect choice over desktop chips withhighpower demands and complexinstructionset (CISC) architectures. The ARM-based BCM2835 is the secret ofhowthe RaspberryPiis able to operate onjust the 5V1Apower supplyprovided bythe onboard micro-USBport. It’s also the reasonwhyyouwon’t find anyheat-sinks onthe device:the chip’s lowpower drawdirectlytranslates into verylittle waste heat, evenduringcomplicated processingtasks. It does, however, meanthat the RaspberryPiisn’t compatible withtraditionalPC software. The majorityofsoftware for desktops and laptops is built withthe x86 instructionset architecture inmind, as found inprocessors fromthe likes ofAMD, Inteland VIA. As a result, it won’t runonthe ARM-based RaspberryPi. The BCM2835 uses a generationofARM’s processor designknownas ARM11, whichinturnis designed around a versionof the instructionset architecture knownas ARMv6. This is worthremembering:ARMv6 is a lightweight and powerfularchitecture, but has a rivalinthe more advanced ARMv7 architecture used bythe ARM Cortexfamilyofprocessors. Software developed
  • 19.
    for ARMv7, likesoftware developed for x86, is sadlynot compatible withthe RaspberryPi’s BCM2835—althoughdevelopers canusuallyconvert the software to make it suitable. That’s not to sayyou’re goingto be restricted inyour choices. As you’lldiscover later inthe book, there is plentyofsoftware available for the ARMv6 instructionset, and as the RaspberryPi’s popularitycontinues to grow, that willonlyincrease. Inthis book, you’llalso learnhowto create your ownsoftware for the Pievenifyouhave no experience withprogramming. Windows vs. Linux Another important difference betweenthe RaspberryPiand your desktop or laptop, other thanthe size and price, is the operatingsystem—the software that allows youto controlthe computer. The majorityofdesktop and laptop computers available todayrunone oftwo operatingsystems:Microsoft Windows or Apple OS X. Bothplatforms are closed source, created ina secretive environment usingproprietarytechniques. These operatingsystems are knownas closed source for the nature oftheir source code, the computer-language recipe that tells the systemwhat to do. Inclosed-source software, this recipe is kept a closely-guarded secret. Users are able to obtainthe finished software, but never to see howit’s made. The RaspberryPi, bycontrast, is designed to runanoperatingsystemcalled GNU/Linux—hereafter referred to simplyas Linux. Unlike Windows or OS X, Linuxis opensource:it’s possible to download the source code for the entire operatingsystemand make whatever changes youdesire. Nothingis hidden, and allchanges are made infullviewofthe public. This opensource development ethos has allowed Linuxto be quicklyaltered to runonthe RaspberryPi, a process knownas porting. At the time ofthis writing, severalversions ofLinux—knownas distributions—have beenported to the RaspberryPi’s BCM2835 chip, includingDebian, Fedora Remixand ArchLinux. The different distributions cater to different needs, but theyallhave somethingincommon:they’re allopensource. They’re also all, byand large, compatible witheachother:software writtenona Debiansystemwilloperate perfectlywellonArchLinuxand vice versa. Linuxisn’t exclusive to the RaspberryPi. Hundreds ofdifferent distributions are available for desktops, laptops and evenmobile devices; and Google’s popular Android platformis developed ontop ofa Linuxcore. Ifyoufind that youenjoythe experience ofusingLinuxonthe RaspberryPi, youcould consider addingit to other computingdevices youuse as well. It willhappily coexist withyour current operatingsystem, allowingyouto enjoythe benefits ofbothwhile givingyoua familiar environment whenyour Piis unavailable. As withthe difference betweenARM and x86, there’s a keypoint to make about the practicaldifference betweenWindows, OS Xand Linux:software writtenfor Windows or OS Xwon’t runonLinux. Thankfully, there are plentyofcompatible alternatives for the overwhelmingmajorityofcommonsoftware products—better still, the majorityare free to use and as open source as the operatingsystemitself. Getting Started with the Raspberry Pi Nowthat youhave a basic understandingofhowthe Pidiffers fromother computingdevices, it’s time to get started. Ifyou’ve just received your Pi, take it out ofits protective anti-static bagand place it ona flat, non-conductive surface before continuing withthis chapter. Connecting a Display Before youcanstart usingyour RaspberryPi, you’re goingto need to connect a display. The Pisupports three different video outputs:composite video, HDMI video and DSI video. Composite video and HDMI video are readilyaccessible to the end user, as described inthis section, while DSI video requires some specialised hardware. Composite Video Composite video, available via the yellow-and-silver port at the top ofthe Piknownas anRCAphono connector (see Figure 1- 2), is designed for connectingthe RaspberryPito older displaydevices. As the name suggests, the connector creates a composite ofthe colours found withinanimage—red, greenand blue—and sends it downa single wire to the displaydevice, typicallyanold cathode-raytube (CRT) TV.
  • 20.
    Figure 1-2:The yellowRCAphonoconnector, for composite video output Whenno other displaydevice is available, a composite video connectionwillget youstarted withthe Pi. The quality, however, isn’t great. Composite video connections are significantlymore prone to interference, lack clarityand runat a limited resolution, meaningthat youcanfit fewer icons and lines oftext onthe screenat once. HDMI Video Abetter-qualitypicture canbe obtained usingthe HDMI (HighDefinitionMultimedia Interface) connector, the onlyport found onthe bottomofthe Pi(see Figure 1-3). Unlike the analogue composite connection, the HDMI port provides a high-speed digitalconnectionfor pixel-perfect pictures onbothcomputer monitors and high-definitionTVsets. Usingthe HDMI port, a Pi candisplayimages at the FullHD1920x1080 resolutionofmost modernHDTVsets. At this resolution, significantlymore detail is available onthe screen. Ifyou’re hopingto use the Piwithanexistingcomputer monitor, youmayfind that your displaydoesn’t have anHDMI input. That’s not a disaster:the digitalsignals present onthe HDMI cable map to a commoncomputer monitor standard called DVI (DigitalVideo Interconnect). BypurchasinganHDMI-to-DVI cable, you’llbe able to connect the Pi’s HDMI port to a monitor withDVI-Dconnectivity. Figure 1-3:The silver HDMI connector, for high-definitionvideo output
  • 21.
    Ifyour monitor hasa VGAinput—a D-shaped connector with15 pins, typicallycoloured silver and blue—the RaspberryPi can’t connect to it. Adapters are available that willtake ina digitalDVI signaland convert it to ananalogue VGAsignal, but these are expensive and bulky. The best optionhere is simplyto buya more-modernmonitor witha DVI or HDMI input. DSI Video The finalvideo output onthe Picanbe found above the SDcard slot onthe top ofthe printed circuit board—it’s a smallribbon connector protected bya layer ofplastic. This is for a video standard knownas DisplaySerialInterface (DSI), whichis used in the flat-paneldisplays oftablets and smartphones. Displays witha DSI connector are rarelyavailable for retailpurchase, and are typicallyreserved for engineers lookingto create a compact, self-contained system. ADSI displaycanbe connected byinserting a ribboncable into the matched connector onthe Pi, but for beginners, the use ofa composite or HDMI displayis recommended. Connecting Audio Ifyou’re usingthe RaspberryPi’s HDMI port, audio is simple:whenproperlyconfigured, the HDMI port carries boththe video signaland a digitalaudio signal. This means that youcanconnect a single cable to your displaydevice to enjoybothsound and pictures. Assumingyou’re connectingthe Pito a standard HDMI display, there’s verylittle to do at this point. For now, it’s enoughto simplyconnect the cable. Ifyou’re usingthe Piwitha DVI-Dmonitor via anadapter or cable, audio willnot be included. This highlights the maindifference betweenHDMI and DVI:while HDMI cancarryaudio signals, DVI cannot. For those withDVI-Dmonitors, or those usingthe composite video output, a black 3.5 mmaudio jack located onthe top edge ofthe Pinext to the yellowphono connector provides analogue audio (see Figure 1-2). This is the same connector used for headphones and microphones onconsumer audio equipment, and it’s wired inexactlythe same way. Ifyouwant, youcansimply connect a pair ofheadphones to this port for quick access to audio. While headphones can be connecteddirectly to the Raspberry Pi, you may findthe volume a little lacking. If possible, connect a pairof powered speakers instead. The amplifierinside will helpboost the signal to a more audible level. Ifyou’re lookingfor somethingmore permanent, youcaneither use standard PC speakers that have a 3.5 mmconnector or you canbuysome adapter cables. For composite video users, a 3.5 mmto RCAphono cable is useful. This provides the two white- and-red RCAphono connections that sit alongside the video connection, eachcarryinga channelofthe stereo audio signalto the TV. For those connectingthe Pito anamplifier or stereo system, you’lleither need a 3.5 mmto RCAphono cable or a 3.5 mmto 3.5 mmcable, dependingonwhat spare connections youhave onyour system. Bothcable types are readilyand cheaply
  • 22.
    available at consumerelectronics shops, or canbe purchased evencheaper at online retailers suchas Amazon. Connecting a Keyboard and Mouse Nowthat you’ve got your RaspberryPi’s output devices sorted, it’s time to think about input. As a bare minimum, you’re going to need a keyboard, and for the majorityofusers, a mouse or trackballis a necessitytoo. First, some bad news:ifyou’ve got a keyboard and mouse witha PS/2 connector—a round plugwitha horseshoe-shaped array ofpins—thenyou’re goingto have to go out and buya replacement. The old PS/2 connectionhas beensuperseded, and the Pi expects your peripherals to be connected over the UniversalSerialBus (USB) port. Dependingonwhether youpurchased the ModelAor ModelB, you’llhave either one or two USBports available onthe right side ofthe Pi(see Figure 1-4). Ifyou’re usingModelB, youcanconnect the keyboard and mouse directlyto these ports. If you’re usingModelA, you’llneed to purchase a USBhub inorder to connect two USBdevices simultaneously. Figure 1-4:ModelB’s two USBports AUSBhub is a good investment for anyPiuser:evenifyou’ve got a ModelB, you’lluse up bothyour available ports just connectingyour keyboard and mouse, leavingnothingfree for additionaldevices suchas anexternalopticaldrive, storage device or joystick. Make sure youbuya powered USBhub:passive models are cheaper and smaller, but lack the abilityto runcurrent- hungrydevices like CDdrives and externalhard drives. If you want to reduce the numberof powersockets in use, connect the Raspberry Pi’s USBpowerleadto yourpoweredUSBhub. This way, the Pi can drawits powerdirectly fromthe hub, ratherthan needing its own dedicatedpowersocket andmains adapter. This will only work on hubs with a powersupply capable of providing 700mAto the Pi’s USBport, along with whateverpoweris requiredby otherperipherals. Connectingthe keyboard and mouse is as simple as pluggingtheminto the USBports, either directlyinthe case ofa ModelB or via a USBhub inthe case ofa ModelA. A Note on Storage As you’veprobably noticed, theRaspberry Pi doesn’t haveatraditional hard drive. Instead it uses aSecureDigital (SD) memory card, asolid-statestorage systemtypically used in digital cameras. Almost any SD card will work with theRaspberry Pi, but becauseit holds theentireoperatingsystem, it is necessary for thecard to beat least 2 GBin capacity to storeall therequired files. SD cards with theoperatingsystempreloaded areavailablefromtheofficial Raspberry Pi Storealongwith numerous other sites on theInternet. If you’ve
  • 23.
    purchased oneof these,or received it in abundlewith your Pi, you can simply plugit in to theSD card slot on thebottomsideof theleft-hand edge. If not, you’ll need to install an operatingsystem—known as flashing—onto thecard beforeit’s ready to go. SomeSD cards work better than others, with somemodels refusingto work at all with theRaspberry Pi. For an up-to-datelist of SD card models known to work with thePi, visit theeLinuxWiki page: http://www.elinux.org/RPi_VerifiedPeripherals#SD_cards Flashing the SD Card To prepare a blank SDcard for use withthe RaspberryPi, you’llneed to flashanoperatingsystemonto the card. While this is slightlymore complicated thansimplydraggingand droppingfiles onto the card, it shouldn’t take more thana fewminutes to complete. Firstly, you’llneed to decide whichLinuxdistributionyouwould like to use withyour RaspberryPi. Eachhas its advantages and disadvantages. Don’t worryifyouchange your mind later and want to trya different versionofLinux:anSDcard canbe flashed againwitha newoperatingsystemat anypoint. The most up-to-date list ofLinuxreleases compatible withthe Piis available fromthe RaspberryPiwebsite at http://www.raspberrypi.org/downloads. The Foundationprovides BitTorrent links for eachdistribution. These are smallfiles that canbe used withBitTorrent software to download the files fromother users. Usingthese links is anefficient and fast wayto distribute large files, and keeps the Foundation’s download servers frombecomingoverloaded. To use a BitTorrent link, you’llneed to have a compatible client installed. Ifyoudon’t alreadyhave a BitTorrent client installed, download one and installit before tryingto download the RaspberryPiLinuxdistribution. One client for Windows, OS Xand Linuxis µTorrent, available fromhttp://www.utorrent.com/downloads. Whichdistributionyouchoose to download is up to you. Instructions inthe rest ofthe book willbe based onthe Debian RaspberryPidistribution, a good choice for beginners. Where possible, we’llgive youinstructions for other distributions as well. Linuxdistributions for the RaspberryPiare provided as a single image file, compressed to make it faster to download. Once you’ve downloaded the Zip archive (a compressed file, whichtakes less time to download thanthe uncompressed files would) for your chosendistribution, you’llneed to decompress it somewhere onyour system. Inmost operatingsystems, youcansimply double-click the file to openit, and thenchoose Extract or Unzip to retrieve the contents. After you’ve decompressed the archive, you’llend up withtwo separate files. The file endinginsha1 is a hash, whichcanbe used to verifythat the download hasn’t beencorrupted intransit. The file endinginimg contains anexact copyofanSDcard set up bythe distribution’s creators ina waythat the RaspberryPiunderstands. This is the file that needs to be flashed to the SD card. During the following, you’ll be using a software utility calleddd. Usedincorrectly dd will happily write the image to yourmain harddrive, erasing youroperating systemandall yourstoreddata. Make sure you readthe instructions in each section thoroughly andnote the device address of your SD cardcarefully. Readtwice, write once! Flashing from Linux Ifyour current PC is runninga variant ofLinuxalready, youcanuse the dd command to write the contents ofthe image file out to the SDcard. This is a text-interface programoperated fromthe command prompt, knownas a terminalinLinuxparlance. Followthese steps to flashthe SDcard: 1. Opena terminalfromyour distribution’s applications menu. 2. Plugyour blank SDcard into a card reader connected to the PC. 3. Type sudo fdisk -l to see a list ofdisks. Find the SDcard byits size, and note the device address (/dev/sdX, where Xis a letter identifyingthe storage device. Some systems withintegrated SDcard readers mayuse the alternative format /dev/mmcblkX—ifthis is the case, remember to change the target inthe followinginstructions accordingly). 4. Use cd to change to the directorywiththe .img file youextracted fromthe Zip archive. 5. Type sudo dd if=imagefilename.img of=/dev/sdX bs=2M to write the file imagefilename.img to the SDcard connected to the device address fromstep 3. Replace imagefilename.imgwiththe actualname ofthe file extracted fromthe Zip archive. This step takes a while, so be patient! Duringflashing, nothingwillbe shownonthe screenuntilthe process is fullycomplete (see Figure 1-5).
  • 24.
    Figure 1-5:Flashingthe SDcardusingthe dd command inLinux Flashing from OS X Ifyour current PC is a Mac runningApple OS X, you’llbe pleased to hear that things are as simple as withLinux. Thanks to a similar ancestry, OS Xand Linuxbothcontainthe dd utility, whichyoucanuse to flashthe systemimage to your blank SDcard as follows: 1. Select Utilities fromthe Applicationmenu, and thenclick onthe Terminalapplication. 2. Plugyour blank SDcard into a card reader connected to the Mac. 3. Type diskutil list to see a list ofdisks. Find the SDcard byits size, and note the device address (/dev/diskX, where Xis a letter identifyingthe storage device). 4. Ifthe SDcard has beenautomaticallymounted and is displayed onthe desktop, type diskutil unmountdisk /dev/diskXto unmount it before proceeding. 5. Use cd to change to the directorywiththe .img file youextracted fromthe Zip archive. 6. Type dd if=imagefilename.img of=/dev/diskX bs=2M to write the file imagefilename.img to the SDcard connected to the device address fromstep 3. Replace imagefilename.imgwiththe actualname ofthe file extracted fromthe Zip archive. This step takes a while, so be patient! Flashing from Windows Ifyour current PC is runningWindows, things are slightlytrickier thanwithLinuxor OS X. Windows does not have a utilitylike dd, so some third-partysoftware is required to get the image file flashed onto the SDcard. Althoughit’s possible to installa Windows-compatible versionofdd, there is aneasier way:the Image Writer for Windows. Designed specificallyfor creating USBor SDcard images ofLinuxdistributions, it features a simple graphicaluser interface that makes the creationofa RaspberryPiSDcard straightforward. The latest versionofImage Writer for Windows canbe found at the officialwebsite:https://launchpad.net/win32- image-writer. Followthese steps to download, installand use the Image Writer for Windows software to prepare the SD card for the Pi: 1. Download the binary(not source) Image Writer for Windows Zip file, and extract it to a folder onyour computer. 2. Plugyour blank SDcard into a card reader connected to the PC. 3. Double-click the Win32DiskImager.exe file to openthe program, and click the blue folder iconto opena file browse dialogue box. 4. Browse to the imagefilename.img file youextracted fromthe distributionarchive, replacingimagefilename.imgwiththe actualname ofthe file extracted fromthe Zip archive, and thenclick the Openbutton. 5. Select the drive letter correspondingto the SDcard fromthe Device drop-downdialogue box. Ifyou’re unsure which
  • 25.
    drive letter tochoose, openMyComputer or Windows Explorer to check. 6. Click the Write buttonto flashthe image file to the SDcard. This process takes a while, so be patient! No matterwhich operating systemyou’re writing from, it’s important to ensure you leave the SD cardconnecteduntil the image has been completely written. If you don’t, you may findthat Pi doesn’t boot when the SD cardis connected. If this happens, start the process again. When the image has been flashedonto the SD card, remove it fromthe computerandinsert it into the Raspberry Pi’s SD cardslot, located underneath the circuit board. The SD cardshouldbe insertedwith the label facing away fromthe boardandpushedfully home to ensure a good connection. Connecting External Storage While the RaspberryPiuses anSDcard for its mainstorage device—knownas a boot device—youmayfind that youruninto space limitations quite quickly. Althoughlarge SDcards holding32 GB, 64 GBor more are available, theyare oftenprohibitively expensive. Thankfully, there are devices that provide anadditionalhard drive to anycomputer whenconnected via a USBcable. Knownas USBMass Storage (UMS) devices, these canbe physicalhard drives, solid-state drives (SSDs) or evenportable pocket-sized flashdrives (see Figure 1-6). Figure 1-6:Two USBMass Storage devices:a pendrive and anexternalhard drive The majorityofUSBMass Storage devices canbe read bythe Pi, whether or not theyhave existingcontent. Inorder for the Pi to be able to access these devices, their drives must be mounted—a process youwilllearninChapter 2, “LinuxSystem Administration”. For now, it’s enoughto connect the drives to the Piinreadiness. Connecting the Network While the majorityofthese setup instructions are equallyapplicable to boththe RaspberryPiModelAand the ModelB, networkingis a specialexception. To keep the component count—and therefore the cost—as lowas possible, the ModelA doesn’t feature anyonboard networking. Thankfully, that doesn’t meanyoucan’t network the ModelA; onlythat you’llneed some additionalequipment to do so. Networking the Model A To givetheModel A thesamenetworkingcapabilities as its moreexpensiveModel Bcounterpart, you’ll need aUSB-connected Ethernet adapter. This connects to afreeUSBport on theRaspberry Pi or aconnected hub and provides awired Ethernet connection with an RJ45 connector, thesameas is availableon theModel B. A 10/100 USBEthernet adapter—with thenumbers referringto its two-speed mode, 10 Mb/s and 100 Mb/s—can bepurchased fromonlineretailers for very littlemoney. When buyingan Ethernet adapter, besureto check that Linuxis listed as asupported operatingsystem. A few models only work with Microsoft Windows, and areincompatiblewith theRaspberry Pi.
  • 26.
    Don’t betempted togo for agigabit-class adapter, which will bereferred to as a10/100/1000 USBEthernet adapter. Standard USBports, as used on the Raspberry Pi, can’t copewith thespeed of agigabit Ethernet connection, and you’ll seeno benefit to themoreexpensiveadapter. Wired Networking To get your RaspberryPionthe network, you’llneed to connect anRJ45 Ethernet patchcable betweenthe Piand a switch, router or hub. Ifyoudon’t have a router or hub, youcanget your desktop or laptop talkingto the Pibyconnectingthe two directlytogether witha patchcable. Usually, connectingtwo network clients together inthis wayrequires a specialcable, knownas a crossover cable. Ina crossover cable, the receive and transmit pairs are swapped so that the two devices are prevented fromtalkingover eachother—a task usuallyhandled bya network switchor hub. The RaspberryPiis cleverer thanthat, however. The RJ45 port onthe side ofthe Pi(see Figure 1-7) includes a feature known as auto-MDI, whichallows it to reconfigure itselfautomatically. As a result, youcanuse anyRJ45 cable—crossover or not—to connect the Pito the network, and it willadjust its configurationaccordingly. Figure 1-7:The RaspberryPiModelB’s Ethernet port Ifyoudo connect the Pidirectlyto a PC or laptop, youwon’t be able to connect out onto the Internet bydefault. To do so, you’llneed to configure your PC to bridge the wired Ethernet port and another (typicallywireless) connection. Doingso is outside the scope ofthis book, but ifyouare completelyunable to connect the Pito the Internet inanyother way, youcantry searchingyour operatingsystem’s help file for “bridge network”to find more guidance. Witha cable connected, the Piwillautomaticallyreceive the details it needs to access the Internet whenit loads its operating systemthroughthe Dynamic Host ConfigurationProtocol(DHCP). This assigns the PianInternet Protocol(IP) address onyour network, and tells it the gatewayit needs to use to access the Internet (typicallythe IP address ofyour router or modem). For some networks, there is no DHCP server to provide the PiwithanIP address. Whenconnected to sucha network, the Pi willneed manualconfiguration. You’lllearnmore about this inChapter 4, “Network Configuration”. Wireless Networking Current RaspberryPimodels don’t feature anyformofwireless network capabilityonboard, but—as withaddingwired Ethernet to the ModelA—it’s possible to add Wi-Fisupport to anyPiusinga USBwireless adapter (see Figure 1-8).
  • 27.
    Figure 1-8:Two USBwirelessadapters, suitable for use withthe RaspberryPi Usingsucha device, the Picanconnect to a wide range ofwireless networks, includingthose runningonthe latest 802.11nhigh- speed standard. Before purchasinga USBwireless adapter, check the following: • Ensure that Linuxis listed as a supported operatingsystem. Some wireless adapters are provided withdrivers for Windows and OS Xonly, makingthemincompatible withthe RaspberryPi. Alist ofWi-Fiadapters knownto work withthe RaspberryPicanbe found onthe followingwebsite: http://elinux.org/RPi_VerifiedPeripherals#USB_WiFi_Adapters • Ensure that your Wi-Finetwork type is supported bythe USBwireless adapter. The network type willbe listed inthe specifications as a number followed bya letter. Ifyour network type is 802.11a, for example, an802.11gwireless adapter won’t work. • Check the frequencies supported bythe card. Some wireless network standards, like 802.11a, support more thanone frequency. Ifa USBwireless adapter is designed to work ona 2.4GHznetwork, it won’t connect to a 5GHznetwork. • Check the encryptiontype used byyour wireless network. Most modernUSBwireless adapters support allforms of encryption, but ifyou’re buyinga second-hand or older model, youmayfind it won’t connect to your network. Common encryptiontypes include the outdated WEP and more modernWPAand WPA2. Configurationofthe wireless connectionis done withinLinux, so for nowit’s enoughto simplyconnect the adapter to the Pi (ideallythrougha powered USBhub.) You’lllearnhowto configure the connectioninChapter 4, “Network Configuration”. Connecting Power The RaspberryPiis powered bythe smallmicro-USBconnector found onthe lower left side ofthe circuit board. This connector is the same as found onthe majorityofsmartphones and some tablet devices. Manychargers designed for smartphones willwork withthe RaspberryPi, but not all. The Piis more power-hungrythanmost micro-USBdevices, and requires up to 700mAinorder to operate. Some chargers canonlysupplyup to 500mA, causing intermittent problems inthe Pi’s operation(see Chapter 3, “Troubleshooting”). Connectingthe Pito the USBport ona desktop or laptop computer is possible, but not recommended. As withsmaller chargers, the USBports ona computer can’t provide the power required for the Pito work properly. Onlyconnect the micro-USBpower supplywhenyouare readyto start usingthe Pi. Withno power buttononthe device, it will start workingthe instant power is connected and canonlybe turned offagainbyphysicallyremovingthe power cable.
  • 28.
    Chapter 2: LinuxSystem Administration The majority of modernLinuxdistributions are user-friendly, witha graphicaluser interface (GUI) that provides aneasywayto performcommontasks. It is, however, quite different to bothWindows and OS X, so ifyou’re goingto get the most out ofyour RaspberryPi, you’llneed a quick primer inusingthe operatingsystem. Linux: An Overview As brieflyexplained inChapter 1, “Meet the RaspberryPi”, Linuxis anopen-source project whichwas originallyfounded to produce a kernelthat would be free for anyone to use. The kernelis the heart ofanoperatingsystem, and handles the communicationbetweenthe user and the hardware. Althoughonlythe kernelitselfis rightlycalled Linux, the termis oftenused to refer to a collectionofdifferent open-source projects froma varietyofcompanies. These collections come together to formdifferent flavours ofLinux, knownas distributions. The originalversionofLinuxwas combined witha collectionoftools created bya group called GNU. The resultingsystem, knownas GNU/Linux, was basic but powerful. Unlike other operatingsystems ofthe era, it offered facilities like multiple user accounts where severalusers canshare a single computer. That’s somethingrivalclosed-source operatingsystems have takenon board, withbothWindows and OS Xnowsupportingmultiple user accounts onthe same system. It’s also stillpresent inLinux, and provides securityand protectionfor the operatingsystem. InLinux, you’llspend most ofyour time runninga restricted user account. This doesn’t meanyou’re beinglimited inwhat you cando. Instead, it prevents youfromaccidentallydoingsomethingthat willbreak the software onyour RaspberryPi. It also prevents viruses and other malware frominfectingthe systembylockingdownaccess to criticalsystemfiles and directories. Before youcanget started, it’s worthbecomingfamiliar withsome ofthe terms and concepts used inthe world ofLinux, as defined inTable 2-1. Evenifyou’re experienced withother operatingsystems, it’s a good idea to reviewthis table before bootingup your Pifor the first time. The Terminal and the GUI As in OSX and Windows, therearetypically two main ways to achieveagiven goal in Linux: through thegraphical user interface(GUI) and through the command line(known in Linuxparlanceas theconsoleor theterminal). Theappearanceof various Linuxdistributions can bequitedifferent, dependingon thedesktop environment in use. In this book, therecommended Debian distribution is used, but most of thecommands you will belearningareentered at theterminal and aretypically thesameacross all distributions. Whereother distributions differ, you will begiven alternativemethods of achievingthesamegoals. Table 2.1 The Quick Linux Glossary Term /Concept Definition Bash The most popular shell choice, used in the majority of Linux distributions. Bootloader Software responsible for loading the Linux kernel. The most common is GRUB. Console A version of the terminal which is always available, and the first thing you see on the Pi. Desktop environment Software to make the GUI lookpretty. GNOME and KDE are popular desktop environments. Directory The Linux term for what Windows calls folders, where files are stored. Distribution A particular version of Linux. Fedora Remix, Arch and Debian are distributions. Executable A file that can be run as a program. Linux files must be marked executable in order to run. EXT2/3/4 The EXTended file system, the most common format used in Linux. File system The way a hard drive or other storage device is formatted so it’s ready for file storage. GNOME One of the most common Linux desktop environments around. GNU A free software project, which provides many of the tools used in Linux distributions. GRUB The GRand Unified Bootloader, created by GNU and used to load the Linux kernel. GUI A graphical user interface, in which the user operates the computer via a mouse or touch. KDE Another extremely popular Linux desktop environment. Linux Properly, the kernel used by GNU/Linux. Popularly, an open-source operating system. Live CD A Linux distribution provided as a CD or DVD, which doesn’t require installation.
  • 29.
    Package A collectionof files required to run an application, typically handled by the package manager. Package manager A tool for keeping trackof, and installing new, software. Partition A section of a hard drive which is ready to have a file system applied to it for storage. Root The main user account in Linux, equivalent to the Windows administrator account. Shell A text-based command prompt, loaded in a terminal. sudo A program that allows restricted users to run a command as the root user. Superuser See Root. Terminal A text-based command prompt in which the user interacts with a shell program. X11 The X Window system, a package that provides a graphical user interface (GUI). Linux Basics Althoughthere are hundreds ofdifferent Linuxdistributions available, theyallshare a commonset oftools. These tools, which are operated via the terminal, are analogous to similar tools onWindows and OS X. To get started, you’llneed to learnthe followingcommands: • ls—Short for listing, ls provides a list ofthe contents ofthe current directory. Alternatively, it canbe called withan argument ofthe directoryto be listed. As anexample, typingls /home willprovide a list ofthe contents of/home, regardless ofyour current directory. The Windows equivalent is dir. • cd—Aninitialismofchange directory, cd allows youto navigate your waythroughthe file system. Typingcd onits own puts youback inyour home directory. Typingthe command alongwiththe name ofthe directoryyouwishto move to, by contrast, switches to that directory. Note that directories canbe absolute or relative:cd boot willmove youto the directory called boot under your current directory, but cd /boot willmove youstraight to the /boot directorywherever youare. • mv—The move command has two purposes inLinux:it allows a file to be moved fromone directoryto another, and it also allows files to be renamed. That latter feature mayseemout ofplace, but inLinuxterms, the file is beingmoved fromone name to another. The command is called as mv oldfile newfile. • rm—Short for remove, rm deletes files. Anyfile—or list offiles—provided after the command name willbe deleted. The Windows equivalent is del, and the two share a commonrequirement that care should be takento ensure the right file is deleted. • rmdir—Byitself, rm cannot usuallyremove directories. As a result, rmdir is provided to delete directories once theyhave beenemptied offiles byrm. • mkdir—The opposite ofrmdir, the mkdir command creates newdirectories. For example, typingmkdir myfolder at the terminalwillcreate a newdirectorycalled myfolder under the current workingdirectory. As withcd, directories provided to the command canbe relative or absolute. Introducing Debian Debianis one ofthe oldest Linuxdistributions around, and a great choice for the RaspberryPithanks to its lightweight nature. This is whythe RaspberryPiFoundationhas chosenit to be the recommended software for newcomers, and the one used for the examples inthis book. To keep the download size to a minimum, the RaspberryPiimage for Debianincludes onlya subset ofthe software you’d find ona regular desktop version. These include tools for browsingthe web, programminginPython, and usingthe Piwitha GUI. Additionalsoftware canbe quicklyinstalled thoughthe use ofthe distribution’s package manager apt. The RaspberryPibuild ofDebianincludes a desktop environment knownas the Lightweight X11 Desktop Environment (LXDE). Designed to offer anattractive user interface usingthe XWindowSystemsoftware, LXDEprovides a familiar point- and-click interface whichwillbe immediatelyaccessible to anyone who has used Windows, OS Xor other GUI-based operating systems inthe past. The GUIdoesn’t loadby default in most Raspberry Pi distributions. To quickly loadit andleave the text-basedconsole behind, log in, type startx andthen press the Enterkey. Ifyou’re usingthe recommended Debiandistribution, you’llfind that youhave plentyofpreinstalled software to get started. While hardlyanexhaustive example ofthe software available for the Pi, whichnumbers inthe thousands ofpackages, it’s a good introductionto preciselywhat the systemcando.
  • 30.
    The software providedwiththe Debiandistributionis split into themed categories. To viewthese categories, youcanleft-click the menuicon, located onthe bottom-left ofthe screeninLXDE(see Figure 2-1). Figure 2-1:The LXDEdesktop, as loaded onthe DebianRaspberryPidistribution The followinglists describe the software packages, grouped bycategory. Accessories • DebianReference—Abuilt-inreference guide, this provides a detailed explanationofthe DebianLinuxdistributionand how programmers cancontribute to its development. • File Manager—The PCManFM file manager provides a graphicalbrowser for files stored onthe Pior anyconnected storage device. • Image Viewer—The GPicViewlets youviewimages, suchas those froma digitalcamera or ona connected storage device. • Leafpad—This is a simple text editor, whichis usefulfor makingquick notes or writingsimple programs. • LXTerminal—This LXDEterminalpackage allows youto use the Linuxcommand line ina windowwithout leavingthe graphicaluser interface. • Root Terminal—Similar to LXTerminal, the Root Terminalautomaticallylogs youinas the root super-user account inorder to carryout systemmaintenance tasks unavailable to a regular user account. • Xarchiver—Ifyouneed to create or extract compressed files, suchas ZIP archives, this is the toolfor the job. Education • Scratch—Agraphicalprogramminglanguage aimed at youngchildren. You’lllearnmore about Scratchand its capabilities inChapter 10, “AnIntroductionto Scratch”. • Squeak—The platformonwhichScratchruns. Youwillrarelyneed to use this menuentry, and should instead use the Scratchentryabove. Internet • Midori—Afast yet lightweight web browser, Midoriis equivalent to Internet Explorer inWindows or to SafarionOS X. • MidoriPrivate Browsing—Clickingonthis menuentryloads the Midoriweb browser inprivate mode, meaningthat sites youvisit aren’t saved into the browser’s history. • NetSurfWeb Browser—Analternative to Midori, NetSurfcanperformbetter oncertaintypes ofweb page. Tryingboth willallowyouto experiment and find the one whichworks best for you. Programming
  • 31.
    • IDLE—Anintegrated developmentenvironment (IDE) writtenspecificallyfor Python. You’lllearnmore about usingIDLE to write your ownPythonprograms inChapter 11, “AnIntroductionto Python”. • IDLE3—Clickingthis entryloads IDLEconfigured to use the newer Python3 programminglanguage, rather thanthe default Python2.7 language. Bothare largelycompatible witheachother, but some programs mayrequire features ofPython 3. • Scratch—This shortcut opens the Scratcheducationallanguage, and is the same as the Scratchentryfound inthe Education category. Either canbe used to start the program. • Squeak—As withScratch, this is a duplicate ofthe shortcut found inthe Educationcategory. Youwillrarelywant to click this directly, and should instead use the Scratchshortcut. Sound & Video • Music Player—LXMusic is a simple and lightweight interface to the XMMS2 music playback software, allowingyouto listento music files while youwork onthe Pi. System Tools • Task Manager—Atoolfor checkingthe amount offree memoryavailable onthe Pi, the current workload ofthe processor, and for closingprograms whichhave crashed or are otherwise unresponsive. Preferences • Customise Look and Feel—Atoolkit for adjustingthe appearance ofthe GUI, includingthe style and colour ofwindows. • Desktop SessionSettings—Atoolfor changinghowthe systemworks whenthe user is logged in, includingwhat programs are automaticallyloaded and whichwindowmanager—the software that draws the borders and title bars ofwindows—is used. • Keyboard and Mouse—Atoolfor adjustinginput devices. Ifyour keyboard is typingthe wrongcharacters for certainkeys, or your mouse is too sensitive, the settings canbe altered here. • Monitor Settings—The resolutionthat the monitor or TVconnected to the Piruns at canbe altered here, althoughadvanced changes require modificationofconfigurationfiles. You’lllearnabout this inChapter 6, “Configuringthe RaspberryPi”. • OpenboxConfigurationManager—The LXDEGUI uses a desktop environment called Openbox, whichcanbe adjusted here. Usingthist tool, youcanapplynewthemes to change the GUI’s appearance, or alter howcertainaspects ofthe interface operate. • Preferred Applications—Atoolfor changingwhichapplications are opened for particular file types. Ifyouchoose to use an alternative web browser, the systemdefault canbe changed here. Finding Help Linuxis designed to beas user-friendly as possibleto new users, even at theterminal command prompt. Although you’ll learn themost common ways to use each command in this chapter, not every option will becovered—to do so would requireamuch larger book. If you find yourself stuck, or if you want to learn moreabout any of thetools that arediscussed in thefollowingpages, there’s acommand you should learn: man. Each Linuxapplication comes with ahelp file, known as aman page—short for “manual page”. It provides background on thesoftwareas well as details on what its options do and how to usethem. To access theman pagefor agiven tool, just typeman followed by thecommand name. To seetheman pagefor ls, atool for listingthecontents of directories, just typeman ls. Using External Storage Devices The Pi’s SDcard, whichstores allthe various Pifiles and directories, isn’t verybig. The largest available SDcard at the time of writingis 64 GB, whichis tinycompared to the 3,000 GB(3 TB) available fromthe largest full-size desktop hard drives. Ifyou’re usingyour Pito playback video files (see Chapter 7, “The Pias a Home Theatre PC”) you’lllikelyneed more storage thanyoucanget fromanSDcard. As youlearned inChapter 1, “Meet the RaspberryPi”, it’s possible to connect USBMass Storage (UMS) devices to the Piinorder to gainaccess to more storage space.
  • 32.
    Before these externaldevicesare accessible, however, the operatingsystemneeds to knowabout them. InLinux, this process is knownas mounting. Ifyou’re runninga versionofLinuxwitha desktop environment loaded—like the recommended Debian distribution’s LXDE, loaded fromthe console withthe startx command—this process is automatic. Simplyconnect the device to a free USBport onthe Pior a USBhub, and the device and its contents willbe immediatelyaccessible (see Figure 2-2). Figure 2-2:LXDEautomaticallymountinga USBmass storage device Fromthe console, things are onlyslightlymore difficult. To make a device accessible to Linuxwhenthe desktop environment isn’t loaded, followthese steps: 1. Connect the USBstorage device to the Pi, either directlyor througha connected USBhub. 2. Type sudo fdisk -l to get a list ofdrives connected to the Pi, and find the USBstorage device bysize. Note the device name:/dev/sdXN, where Xis the drive letter and N is the partitionnumber. Ifit is the onlydevice connected to the Pi, this willbe /dev/sda1. 3. Before the USBstorage device is accessible, Linuxneeds a mount point for it. Create this bytypingsudo mkdir /media/externaldrive. 4. Currently, the device is onlyaccessible to the root user. To make it accessible to allusers, type the followingas a single line: sudo chgrp -R users /media/externaldrive && sudo chmod -R g+w /media/externaldrive 5. Mount the USBstorage device withsudo mount /dev/sdXN /media/externaldrive -o=rw to gainaccess to the device and its contents. Creating a New User Account Unlike Windows and OS X, whichare largelydesigned for use bya single individual, Linuxis at heart a socialoperatingsystem designed to accommodate numerous users. Bydefault, Debianis configured withtwo user accounts:pi, whichis the normaluser account, and root, whichis a superuser account withadditionalpermissions. Don’t be temptedto log in as root all the time. Using a nonprivilegeduseraccount, you’re protectedagainst accidentally wrecking youroperating systemandfromthe ravages of viruses andothermalware downloadedfromthe Internet. While it’s certainlypossible for youto use the piaccount, it’s better ifyoucreate your owndedicated user account. Further accounts canalso be created, for anyfriends or familymembers who might want to use the Pi. Creatinga newaccount onthe Piis straightforward, and the same onalldistributions, except for the username and password
  • 33.
    used to logontothe Piinitially. Just followthese steps: 1. Loginto the Piusingthe existinguser account (user name pi and password raspberry ifyou’re usingthe recommended Debiandistribution). 2. Type the followingas a single line: sudo useradd -m -G adm,dialout,cdrom,audio,plugdev,users, lpadmin,sambashare,vchiq,powerdev username This creates a new, blank user account. Note that the command should be typed as a single line, withno spaces after the commas. 3. To set a password onthe newaccount, type sudo passwd username followed bythe newpassword whenprompted. To explainwhat just happened:the command sudo tells the operatingsystemthat the command you’re typingshould be runas if youwere logged inas the root account. The useradd command says youwant to create a newuser account. The -m section— knownas a flagor anoption—tells the useradd programto create a home directorywhere the newuser canstore his or her files. The biglist followingthe -G flagis the list ofgroups ofwhichthe user should be a member. Users and Groups In Linux, each user has threemain attributes: their User ID (UID), their Group ID (GID) and alist of supplementary group memberships. A user can bea member of as many groups as heor shepleases, although only oneof thesecan betheuser’s primary group. This is usually aself-named group matchingthe user name. Group membership is important. Whileusers can begranted direct access to files and devices on thesystem, it’s morecommon for auser to receiveaccess to theseviagroup membership. Thegroup audio, for example, grants all members theability to access thePi’s sound playback hardware. Without that membership, theuser won’t belisteningto any music. To seeauser’s group memberships, typegroups usernameat theterminal. If you usethis on thedefault user pi, you’ll seethelist of groups any new member should join to makeuseof thePi. This is wheretheinformation used in step 2 of theprecedingprocedurewas found. File System Layout The content ofthe SDcard is knownas its file system, and is split into multiple sections eachwitha particular purpose. Although it’s not necessaryfor youto understand what eachsectiondoes inorder to use the RaspberryPi, it canbe helpfulbackground knowledge should anythinggo wrong. Logical Layout The wayLinuxdeals withdrives, files, folders and devices is somewhat different to other operatingsystems. Instead ofhaving multiple drives labelled witha letter, everythingappears as a branchbeneathwhat is knownas the root file system. Ifyouloginto the Piand type ls / you’llsee various directories displayed (see Figure 2-3). Some ofthese are areas ofthe SD card for storingfiles, while others are virtualdirectories for accessingdifferent portions ofthe operatingsystemor hardware. Figure 2-3:Adirectorylistingfor the Pi’s root file system
  • 34.
    The directories visibleonthe default Debiandistributionare as follows: • boot—This contains the Linuxkerneland other packages needed to start the Pi. • bin—Operatingsystem-related binaryfiles, like those required to runthe GUI, are stored here. • dev—This is a virtualdirectory, whichdoesn’t actuallyexist onthe SDcard. Allthe devices connected to the system— includingstorage devices, the sound card and the HDMI port—canbe accessed fromhere. • etc—This stores miscellaneous configurationfiles, includingthe list ofusers and their encrypted passwords. • home—Eachuser gets a subdirectorybeneaththis directoryto store alltheir personalfiles. • lib—This is a storage space for libraries, whichare shared bits ofcode required bynumerous different applications. • lost+found—This is a specialdirectorywhere file fragments are stored ifthe systemcrashes. • media—This is a specialdirectoryfor removable storage devices, like USBmemorysticks or externalCDdrives. • mnt—This folder is used to manuallymount storage devices, suchas externalhard drives. • opt—This stores optionalsoftware that is not part ofthe operatingsystemitself. Ifyouinstallnewsoftware to your Pi, it will usuallygo here. • proc—This is another virtualdirectory, containinginformationabout runningprograms whichare knowninLinuxas processes. • selinux—Files related to SecurityEnhanced Linux, a suite ofsecurityutilities originallydeveloped bythe US National SecurityAgency. • sbin—This stores specialbinaryfiles, primarilyused bythe root (superuser) account for systemmaintenance. • sys—This directoryis where specialoperatingsystemfiles are stored. • tmp—Temporaryfiles are stored here automatically. • usr—This directoryprovides storage for user-accessible programs. • var—This is a virtualdirectorythat programs use to store changingvalues or variables. Physical Layout Althoughthe precedinglist is howthe file systemappears to the Linuxoperatingsystem, it’s not howit’s laid out onthe SDcard itself. For the default Debiandistribution, the SDcard is organised into two mainsections, knownas partitions because theysplit the device into different areas inmuchthe same wayas the chapters ofthis book help to organise its contents. The first partitiononthe disk is a small(75 MB) partitionformatted as VFAT, the same partitionformat used byMicrosoft Windows for removable drives. This is mounted, or made accessible, byLinuxinthe /boot directoryand contains allthe files required to configure the RaspberryPiand to load Linuxitself.
  • 35.
    The second partitionisfar larger and formatted as EXT4, a native Linuxfile systemdesigned for high-speed access and data safety. This partitioncontains the mainchunk ofthe distribution. Allthe programs, the desktop, the users’ files and anysoftware that youinstallyourselfare stored here. This takes up the bulk ofthe SDcard. Installing and Uninstalling Software The default software installed withthe Debiandistributionis enoughto get youstarted, but chances are you’re goingto want to customise your Piaccordingto your ownrequirements. Installingnewsoftware onto the Piis simple. The Debiandistributionincludes a toolcalled apt, whichis a powerfulpackage manager. Packages are what Linuxcalls a piece ofsoftware, or a collectionofdifferent pieces ofsoftware designed to work together. Althoughapt is designed to be operated fromthe command line, it’s veryuser-friendlyand easyto learn. There are GUIs for apt, suchas the popular Synaptic Package Manager, but theyoftenstruggle to runonthe Pidue to the lack ofmemory. As a result, we recommend that software be installed at the terminal. Other Distributions Debian, and distributions based on Debian, typically useapt as thepackagemanager. It’s not theonly tool out there, and other distributions makedifferent choices. FedoraRemix, for example, uses thepacman tool. Pacman is no moredifficult to usethan apt, but its syntax(theway it expects you to phraseinstructions to install new softwareor removeexistingsoftware) is different. For instructions on how to usepacman instead of apt, typeman pacman at theFedoraRemixterminal. Other distributions may usetheyum packagemanager. If you’retryingadistribution that uses yum, simply typeman yum at theterminal for instructions. Apackage manager’s job is to keep track ofallthe software installed onthe system. It doesn’t just installnewsoftware—it also keeps tabs onwhat is currentlyinstalled, allows old software to be removed and installs updates as theybecome available. Package management is one ofthe areas where Linuxdiffers greatlyfromoperatingsystems like Windows or OS X. Although it’s possible to manuallydownload newsoftware to install, it’s far more commonto use the built-inpackage management tools instead. Before trying to install newsoftware orupgrade existing software, you needto make sure the apt cache is upto date. To do this, simply type the commandsudo apt-get update. Finding Software The first step to installinga newpiece ofsoftware is to find out what it’s called. The easiest wayto do this is to searchthe cache ofavailable software packages. This cache is a list ofallthe software available to installvia apt, stored onInternet servers knownas repositories. The apt software includes a utilityfor managingthis cache, called apt-cache. Usingthis software, it’s possible to runa search onallthe available software packages for a particular word or phrase. For example, to find a game to play, youcantype the followingcommand: apt-cache search game That tells apt-cache to searchits list ofavailable software for anythingwhichhas the word “game”inits title or description. For commonsearchterms, youcanend up withquite a list (see Figure 2-4), so tryto be as specific as youcan. Figure 2-4:The last fewresults for anapt-cache “game”search
  • 36.
    If yoursearch termbringsuptoo many different packages to see on a single screen display, you can tell Linux that you want it to pause on each screenfull by piping the output of apt-cache through a tool calledless. Simply change the commandto apt-cache search game | less anduse the cursorkeys to scroll through the list. Press the letterQ on the keyboardto exit. Installing Software Once youknowthe name ofthe package youwant to install, switchto the apt-get command inorder to installit. Installing software is a privilege afforded onlyto the root user, as it affects allusers ofthe Pi. As a result, the commands willneed to be prefaced withsudo to tellthe operatingsystemthat it should be runas the root user. For example, to installthe package thrust (a Linuxversionofa popular Commodore 64 game fromdays gone by), youwould simplyuse the install command withapt-get as follows: sudo apt-get install thrust Some packages relyonother packages inorder to operate. Aprogramminglanguage maydepend ona compiler, a game engine ongraphics files, or anaudio player oncodecs for playingback different formats. These are knowninLinuxterms as dependencies. Dependencies are one ofthe biggest reasons for usinga package manager like apt rather thaninstallingsoftware manually. Ifa package depends onother packages, apt willautomaticallyfind them(see Figure 2-5) and prepare themfor installation. Ifthis happens, you’llbe showna prompt askingwhether youwant to continue. Ifyoudo, type the letter Yand press the Enter key. Figure 2-5:Apt listingthe dependencies for the OpenOffice.orgpackage
  • 37.
    Uninstalling Software Ifyoudecide younolonger want a piece ofsoftware, apt-get also includes a remove command that cleanlyuninstalls the package alongwithanydependencies whichare no longer required. Whenyou’re usinga smaller SDcard withthe Pi, the ability to tryout software and quicklyremove it is extremelyuseful. To remove thrust, simplyopenthe terminaland type the followingcommand: sudo apt-get remove thrust The remove command has a more powerfulbrother inthe formofthe purge command. Like remove, the purge command gets rid ofsoftware youno longer require. Where remove leaves the software’s configurationfiles intact, however, purge removes everything. Ifyou’ve got yourselfinto a mess customisinga particular package and it no longer works, purge is the command to use. For example, to purge thrust, youwould just type this: sudo apt-get purge thrust Upgrading Software Inadditionto installingand uninstallingpackages, apt canbe used to keep themup to date. Upgradinga package throughapt ensures that you’ve received the latest updates, bugfixes and securitypatches. Before tryingto upgrade a package, make sure the apt cache is as freshas possible byrunninganupdate: sudo apt-get update Whenupgradingsoftware, youhave two choices:youcanupgrade everythingonthe systemat once or upgrade individual programs. Ifyoujust want to keep your distributionupdated, the former is achieved bytypingthe following: sudo apt-get upgrade To upgrade anindividualpackage, simplytellapt to installit again. For example, to installa thrust upgrade, youwould type this: sudo apt-get install thrust Ifthe package is alreadyinstalled, apt willtreat it as anin-place upgrade. Ifyou’re alreadyrunningthe latest versionavailable, apt willsimplytellyouit cannot upgrade the software and exit. Formore information on package management with apt—in particular, howcertain packages can be “kept back” andexcludedfromupgrades—type
  • 38.
    man apt atthe terminal.
  • 39.
    Chapter 3: Troubleshooting Sometimes,things don’t go entirelysmoothly. The more complexthe device, the more complexthe problems that canoccur— and the Piis anextremelycomplexdevice indeed. Thankfully, manyofthe most commonproblems are straightforward to diagnose and fix. Inthis chapter, we’lllook at some of the most commonreasons for the Pito misbehave and howto fixthem. Keyboard and Mouse Diagnostics Perhaps the most commonproblemthat users experience withthe RaspberryPiis whenthe keyboard repeats certaincharacters. For example, ifthe command startx appears onscreenas sttttttttttartxxxxxxxxxxxx, it will, understandably, failto work whenthe Enter keyis pressed. There are typicallytwo reasons whya USBkeyboard fails to operate correctlywhenconnected to the RaspberryPi:it’s drawingtoo muchpower, or its internalchipset is conflictingwiththe USBcircuitryonthe Pi. Check the documentationfor your keyboard, or the labelonits underside, to see ifit has a power ratinggiveninmilliamps (mA). This is howmuchpower the keyboard attempts to drawfromthe USBport whenit’s inuse. The Pi’s USBports have a component called a polyfuse connected to them, whichprotects the Piinthe event that a device attempts to drawtoo muchpower. Whenthis polyfuse is tripped, it causes the USBport to shut off, at around 150 mA. Ifyour keyboard draws anywhere around that muchpower, it mayoperate strangely—or not at all. This canbe a problemfor keyboards that have built-inLEDlighting, whichrequire far more power to operate thana standard keyboard. Ifyoufind that your USBkeyboard maybe drawingtoo muchpower, tryconnectingit to a powered USBhub instead of directlyto the Pi. This willallowthe keyboard to drawits power fromthe hub’s power supplyunit, instead offromthe Piitself. Alternatively, swap the keyboard out for a modelwithlower power demands. The repeating-letter problemmayalso be traced to aninadequate power supplyfor the Piitself, whichis addressed inthe next section, “Power Diagnostics”. The issue ofcompatibility, sadly, is harder to diagnose. While the overwhelmingmajorityofkeyboards work just fine withthe Pi, a smallnumber exhibit strange symptoms. These range fromintermittent response, the repeating-letter syndrome or evencrashes that prevent the Pifromoperating. Sometimes, these issues don’t appear untilother USBdevices are connected to the Pi. Ifyour keyboard was workingfine untilanother USBdevice, inparticular a USBwireless adapter, was connected, youmayhave an issue ofincompatibility. Ifpossible, tryswappingthe keyboard out for another model. Ifthe newkeyboard works, your old one maybe incompatible withthe Pi. For a list ofknown-incompatible keyboards, visit the eLinuxwiki: http://elinux.org/RPi_VerifiedPeripherals#Problem_USB_Keyboards The same advice oncheckingcompatibilityinadvance applies to problems withthe mouse:the majorityofUSBmice and trackballs work fine, but some exhibit incompatibilitywiththe Pi’s ownUSBcircuitry. This usuallyresults insymptoms like a jerkyor unresponsive mouse pointer, but it cansometimes lead to the Pifailingto load or crashingat randomintervals. Ifyou’re lookingto buya newmouse, anup-to-date list ofmodels knownto work withthe Piis available at the eLinuxwikisite: http://elinux.org/RPi_VerifiedPeripherals#Working_USB_Mouse_Devices Power Diagnostics Manyproblems withthe RaspberryPicanbe traced to aninadequate power supply. The ModelArequires a 5 Vsupply capable ofprovidinga 500 mAcurrent, while the ModelB’s extra components bump up the current requirement to 700 mA. Not allUSBpower adapters are designed to offer this muchpower, eveniftheir labellingclaims otherwise. The formal USBstandardstates that devices shoulddrawno more than 500 mA, with even that level of poweronly available to the device following a process callednegotiation. Because the Pi doesn’t negotiate forpower, it’s unlikely that it will work if you connect it to the USBports on a desktop orlaptopcomputer. Ifyou’re havingintermittent problems withyour Pi—particularlyifit works untilyouconnect somethingto a USBport or start a processor-intensive operationlike playingvideo—the chances are that the power supplyinuse is inadequate. The Piprovides a
  • 40.
    relativelyeasywayto check ifthisis the case inthe formoftwo voltage test points. To use the voltage test points, you’llneed a voltmeter or multimeter withdirect current (DC) voltage measuringcapabilities. If your meter has multiple inputs for different voltages, use anappropriate setting. Avoidtouching the test probes to anything not labelledas a test point. It’s possible to bridge the 5 Vsupply that comes in to the Pi to the internal 3.3 Vsupply, creating a short circuit which can damage the device. Be especially careful aroundexposedheaderpins. The two test points are small, copper-clad holes knownas vias, whichare connected to the Pi’s 5 Vand ground circuits. Put the positive (red) meter probe onTP1, located to the left ofthe board just above a smallblack component called a regulator labelled RG2. Connect the black (negative) meter probe to TP2, located betweenthe copper GPIO pins and the yellow-and-silver RCA phono connector at the top-left ofthe board (see Figure 3-1). Figure 3-1:The two voltage test points, labelled TP1 and TP2 The readingonthe voltmeter should be somewhere between4.8 Vand 5 V. Ifit’s lower than4.8 V, this indicates that the Piis not beingprovided withenoughpower. Tryswappingthe USBadapter for a different model, and check that the labelsays it can supply700 mAor more. Amodelrated at 1Ais recommended, but beware ofcheap models—theysometimes have inaccurate labelling, and failto supplythe promised current. Genuine branded mobile phone chargers rarelyhave this problem, but cheap unbranded devices—oftensold as compatible adapters—should be avoided Ifyour voltmeter reads a negative number, don’t worry:this just means you’ve got the positive and negative probes inthe wrong place. Either swap themaround or just ignore the negative signwhennotingyour reading. Display Diagnostics Althoughthe Piis designed to work withalmost anyHDMI, DVI or composite video displaydevice, it simplymaynot work as expected whenyouplugit in. For example, youmayfind that your picture is shifted to the side or not fullydisplayed, or is only visible as a postage-stamp-sized cut-out inthe middle ofthe screenor inblack-and-white—or evenmissingentirely. First, check the type ofdevice to whichthe Piis connected. This is especiallyimportant whenyou’re usingthe composite RCA connectionto plugthe Piinto a TV. Different countries use different standards for TVvideo, meaningthat a Piconfigured for one countrymaynot work inanother. This is the usualexplanationfor a Pishowingblack-and-white video. You’lllearnhowto
  • 41.
    adjust this settinginChapter6, “Configuringthe RaspberryPi”. Whenyouuse the HDMI output, the displaytype is usuallyautomaticallydetected. Ifyou’re usinganHDMI to DVI adapter to plugthe Piinto a computer monitor, however, this occasionallygoes awry. Commonsymptoms include snow-like static, missing picture portions or no displayat all. To fixthis, note the resolutionand refreshrate ofyour connected display, and thenjump to Chapter 6 to find out howto set these manually. Another issue is a too-large or too-smallimage, either missingportions at the edge ofthe screenor sittinginthe middle ofa large black border. This is caused bya settingknownas overscan, whichis used whenthe Piis connected to TVs to avoid printingto portions ofthe displaywhichmaybe hiddenunder a bezel. As withother display-related settings, youwilllearnhowto adjust— or evencompletelydisable—overscaninChapter 6. Boot Diagnostics The most commoncause for a Pito failto boot is a problemwiththe SDcard. Unlike a desktop or laptop computer, the Pi relies onfiles stored onthe SDcard for everything. IfPican’t talk to the card, it won’t displayanythingonthe screenor show anysigns oflife at all. Ifyour Pi’s power light glows whenyouconnect the micro-USBpower supply, but nothingelse happens and the OK light remains dark, youhave anSDcard problem. First, ensure that the card works whenyouconnect it to a PC, and that it shows the partitions and files expected ofa well-flashed card. (For more details, see Chapter 2, “LinuxSystemAdministration”, particularlythe sectiontitled “File SystemLayout”inthat chapter.) Ifthe card works ona PC but not inthe Pi, it maybe a compatibilityproblem. Some SDcards—especiallyhigh-speed cards marked as Class 10 ontheir labelling—don’t operate correctlywhenconnected to the Pi’s onboard SDcard reader. Alist of cards knownto cause compatibilityproblems withthe Picanbe found onthe eLinuxwiki: http://elinux.org/RPi_VerifiedPeripherals#Problem_SD_Cards Sadly, ifyouhave one ofthe cards onthe list, youmayneed to replace it witha different card inorder for the Pito work. As the Pi’s software base is developed, however, work is beingcarried out to ensure that a wider range ofcards operate correctlywith the Pi. Before givingup ona high-speed card completely, check to see ifanupdated versionofyour chosenLinuxdistributionis available. (See Chapter 1, “Meet the RaspberryPi”, for more informationabout distributions.) Network Diagnostics The most usefultoolfor diagnosingnetwork problems is ifconfig. Ifyou’re usinga wireless network connection, jump to Chapter 4, “Network Configuration”, for informationona similar toolfor those devices. Otherwise, read on. Designed to provide informationonconnected network ports, ifconfig is a powerfultoolfor controllingand configuringthe Pi’s network ports. For its most basic usage, simplytype the tool’s name inthe terminal: ifconfig Called inthis manner, ifconfig provides informationonallthe network ports it canfind (see Figure 3-2). For the standard RaspberryPiModelB, there are two ports:the physicalEthernet port onthe right side ofthe board, and a virtualloopback interface that allows programs onthe Pito talk to eachother. Figure 3-2:The output ofifconfig ona RaspberryPiModelB
  • 42.
    The output ofifconfigis split into the followingsections: • Link encap—The type ofencapsulationused bythe network, whichonthe ModelBwilleither read Ethernet for the physicalnetwork port or Local Loopback for the virtualloopback adaptor. • Hwaddr—The Media Access Control(MAC) address ofthe network interface, writteninhexadecimal. This is unique for everydevice onthe network, and eachPihas its ownMAC address, whichis set at the factory. • inet addr—The internet protocol(IP) address ofthe network interface. This is howyoufind the Pionthe network ifyou’re usingit to runa network-accessible service, suchas a web server or file server. • Bcast—The broadcast address for the network to whichthe Piis connected. Anytraffic sent to this address willbe received byeverydevice onthe network. • Mask—The network mask, whichcontrols the maximumsize ofthe network to whichthe Piis connected. For most home users, this willread 255.255.255.0. • MTU—The maximumtransmissionunit size, whichis howbiga single packet ofdata canbe before the systemneeds to split it into multiple packets. • RX—This sectionprovides feedback onthe received network traffic, includingthe number oferrors and dropped packets recorded. Ifyoustart to see errors appearinginthis section, there’s somethingwrongwiththe network. • TX—This provides the same informationas the RXsection, but for transmitted packets. Again, anyerrors recorded here indicate a problemwiththe network. • collisions—Iftwo systems onthe network tryto talk at the same time, youget a collisionwhichrequires themto retransmit their packets. Smallnumbers ofcollisions aren’t a problem, but a large number here indicates a network issue. • txqueuelen—The lengthofthe transmissionqueue, whichwillusuallybe set to 1000 and rarelyneeds changing. • RXbytes, TXbytes—Asummaryofthe amount oftraffic the network interface has passed. Ifyou’re havingproblems withthe network onthe Pi, youshould first tryto disable and thenre-enable the network interface. The easiest wayto do this is withtwo tools called ifup and ifdown. Ifthe network is up, but not workingcorrectly—for example, ififconfig doesn’t list anythinginthe inet addr section—start bydisablingthe network port. Fromthe terminal, type the followingcommand: sudo ifdown eth0 Once the network is disabled, make sure that the cable is inserted tightlyat bothends, and that whatever network device the Pi is connected to (hub, switchor router) is powered onand working. Thenbringthe interface back up againwiththe following command: sudo ifup eth0
  • 43.
    Youcantest the networkingbyusingtheping command, whichsends data to a remote computer and waits for a response. If everything’s working, youshould see the same response as showninFigure 3-3. Ifnot, youmayneed to manuallyconfigure your network settings, whichyou’lllearnhowto do inChapter 4, “Network Configuration”. Figure 3-3:The result ofa successfultest ofthe network, usingthe pingcommand The Emergency Kernel The Linuxkernelis the heart ofthe operatingsystemthat drives the Pi. It’s responsible for everythingfrommakingsure that you canaccess your files to allowingprograms to talk to other programs. Whenswitched on, your Piwillload the normal, default kernel. There’s also a second kernelincluded inmost distributions, whichsits unused. This is the emergencykernel, and as the name suggests, it is typicallyused onlywhenthe normalkernelisn’t working. It’s highlyunlikelythat you’llever need to boot a Piusingthe emergencykernel, but it’s worthlearninghowto do so just incase. This is especiallyimportant ifyou’re upgradingyour kernelor are usinga newand potentiallypoorlytested distribution. Sometimes, newly-released software canhave bugs whicharen’t spotted before its release. Whenencounteringstrange errors after upgrading, the emergencykernelcanbe used to narrowdownthe problemto the newkernelversion. The Linuxkernelis a single file located inthe /boot directorycalled kernel.img. Whenthe Piis first switched onand begins to load the operatingsystem, it looks for this file, and ifthe file is missing, the Piwon’t work. The emergencykernelis a second file, againinthe /boot directory, called kernel_emergency.img. The emergencykernelis, inmost cases, almost identicalto the standard kernel. Whenchanges are made to the standard kernel, to boost performance or add newfeatures for example, the emergencykernelis left unaltered. This way, ifthe changes to the standard kernelcause stabilityproblems, a user cansimplytellthe Pito load the emergencykernelinstead. There are two ways to boot into the emergencykernel, and bothrequire the use ofa PC and anSDcard reader ifthe Pican’t boot. Otherwise, the followingcanbe carried out onthe Piitself. The easiest wayto boot the emergencykernelis to rename the existingkernel.img file to kernel.img.bak, and thenrename the kernel_emergency.img file to kernel.img. Whenthe Piloads, it willnowload the emergencykernelbydefault. To go back to the standard kernel, simplyreverse the process:rename kernel.img to kernel_emergency.img and kernel.img.bak to kernel.img. Analternative method to load the emergencykernelis to edit the cmdline.xt file (located inthe /boot directory) byaddingthe followingentryat the end ofthe existingcommand line:
  • 44.
    kernel=kernel_emergency.img This tells thePithat it should load the kernelnamed kernel_emergency.img instead ofthe usualkernel.img. Reversingthe process is as simple as openingcmdline.txt againand removingthe entry. You’lllearnmore about cmdline.txt and howit affects the operationofthe RaspberryPiinChapter 6, “Configuringthe RaspberryPi”.
  • 45.
    Chapter 4: NetworkConfiguration Formost users, configuringthe Pi’s network is as easyas plugginga cable into the ModelB’s Ethernet port—or a USB Ethernet adapter inthe case ofthe ModelA. For others, however, the network requires manualconfiguration. Ifyouknowthat your network doesn’t have a Dynamic Host ConfigurationProtocol(DHCP) server—a systemthat tells the Pi and other devices onthe network howtheyshould connect—or ifyouwant to use a USBwireless adapter withthe Pi, read on. Wired Networking Ifthe network stilldoesn’t work, youmayneed to configure it manually. Normally, the network ina home, schoolor office has a DHCP server that tells the Piand other devices onthe network howtheyshould connect. Some networks, however, don’t have a DHCP server and need to be set up manually. The list ofnetwork interfaces, alongwithinformationabout howtheyshould be configured, is stored ina file called interfaces located inthe folder /etc/network. This is a file onlythe root user canedit, because removinga network interface fromthis list willcause it to stop working. Fromthe terminal, youcanedit this file usinga varietyofdifferent text editors. For simplicity, the nano text editor should be used for this process. Openthe file for editingwiththe followingcommand: sudo nano /etc/network/interfaces Nano is a powerfulyet lightweight text editor, witha simple user interface (see Figure 4-1). Youcanmove your cursor around the document withthe arrowkeys, save byholdingdownthe CTRLkeyand pressingO, and quit byholdingdownthe CTRL keyand pressingX. The line youneed to edit for manualconfigurationstarts withiface eth0 inet. Delete dhcp fromthe end ofthis line and replace it withstatic, press Enter to start a newline, and thenfillinthe remainingdetails inthe followingformat witha tab at the start ofeachline: [Tab] address xxx.xxx.xxx.xxx [Tab] netmask xxx.xxx.xxx.xxx [Tab] gateway xxx.xxx.xxx.xxx Make sure that youpress the Tab keyat the start ofeachline, and don’t actuallytype [Tab]. The xcharacters inthe configurationlines represent network addresses you’llneed to enter. For address, youshould enter the static IP address that youwant to assignto the Pi. For netmask, youshould enter the network mask—whichcontrols the size ofthe connected network—inwhat is knownas dotted-quad format. Ifyou’re usinga home network, this is typically255.255.255.0. For gateway, youshould enter the IP address ofyour router or cable modem. As anexample, the settings for a commonhome network would look like this: iface eth0 inet static [Tab] address 192.168.0.10 [Tab] netmask 255.255.255.0 [Tab] gateway 192.168.0.254 Figure 4-1:Editing/etc/network/interfaces withnano
  • 46.
    Whenyou’ve finished editingthefile, press CTRL+ O to save it, and thenpress CTRL+ Xto leave nano and returnto the terminal. To use your newnetwork settings, restart the networkingservice bytypingthe following: sudo /etc/init.d/networking restart Ifyouneed to returnto automatic settings via DHCP, youneed to edit the interfaces file againand delete the address, netmask and gateway settings. Replace static withdhcp at the end ofthe iface line, and thenrestart the networkingservice again. Settinga manualIP address isn’t quite enoughto get your Piconnected to the outside world. Computers onmodernnetworks have botha numericaladdress identifier knownas anIP address and a hostname or domainname. It’s this latter, friendlyname whichmeans youcansimplytype www.raspberrypi.org into your browser, instead oftryingto remember 93.93.128.176. Asystemcalled a DomainName Service (DNS) server is responsible for lookingup the friendlynames yousupplyand convertingtheminto the numbers required to access the system. It operates muchlike anautomated telephone directory. Before you’llbe able to access Internet-connected systems via their domainnames, you’llneed to tellthe PiwhichDNS servers to use. The list ofDNS servers, knownas nameservers inLinuxparlance, is stored in/etc/resolv.conf. Whenthe systemgets its details throughDHCP, this file is automaticallyfilled in. Whenyouset anaddress manually, youneed to provide the addresses of the nameservers onyour network. Normally, this would be the address ofyour router as found inthe gateway line fromthe interfaces file (described earlier inthis chapter). To set the nameservers, openthe file withnano bytypingthe followingcommand at the terminal: sudo nano /etc/resolv.conf Add eachnameserver ona separate line, prefaced withnameserver and a space. As anexample, the resolv.conf configurationfor a network whichuses Google’s publicly-accessible nameservers to resolve domainnames would appear like this: nameserver 8.8.8.8 nameserver 8.8.4.4 You’llnotice that the nameserver addresses need to be supplied as IP addresses, rather thandomainnames. Ifyouprovided domainnames instead, the Piwould enter aninfinite loop oftryingto find a nameserver to ask howit canfind the nameservers. Save the file bypressingCTRL+ O, and thenquit nano bypressingCTRL+ X. Restart the networkinginterface bytypingthe following: sudo /etc/init.d/networking restart
  • 47.
    Thentest the settingsbyeither openinga web browser or usingthe followingping command (see Figure 4-2): ping -c 1 www.raspberrypi.org Figure 4-2:Asuccessfultest ofnetworkingonthe RaspberryPiModelB Wireless Networking Althoughno current models ofthe RaspberryPiinclude Wi-Finetworkinghardware onboard, it’s possible to add wireless connectivitywitha simple USBWi-Fiadapter. However, youwillneed to configure the adapter before youcanuse it to get your Pionline. USBWi-Fi adapters are very power-hungry. If you connect one directly to the Pi’s USBport, the chances are it simply won’t work. Instead, connect a poweredUSBhubto the Pi, andthen insert the Wi-Fi adapterinto that. Before youstart to set up the wireless interface, you’llneed to knowthe Service Set Identifier (SSID)—also knownas the network name—ofthe wireless router to whichyouwant to connect, alongwiththe type ofencryptioninuse and the password required. You’llalso need to knowwhat type ofwireless network it is. AUSBadapter designed for 802.11a Wi-Fimaynot connect to an802.11gnetwork, and vice versa. Inorder for the USBwireless adapter to be addressed bythe system, a software bundle knownas a firmware is required. While some distributions include a selectionofthe most commonWi-Fifirmware installed bydefault, others do not. At present, to save space, most distributions designed for the RaspberryPineed the firmware files for a wireless card installingmanually. This, unfortunately, canlead to a Catch-22 situation:inorder to download the firmware files, the Pimust be connected to the Internet. Ifyoucanspare a wired port onyour router or gatewayfor a fewminutes, that’s not a problem. However, ifwireless is your onlywayofgettingonline, you’llneed to manuallydownload the firmware installationpackage ona different computer, and thentransfer it across to the Pibyeither copyingit to the Pi’s SDcard or connectinganexternalstorage device suchas a USB flashdrive. To find the correct firmware file to download, you’llneed to knowwhat type ofwireless adapter youhave. Althoughvarious companies sellbranded USBwireless adapters, the number ofcompanies that actuallymanufacture the components is a lot smaller. Severaldifferent manufacturers mayuse the same type ofchip inside their USBwireless adapters, makingthemall compatible withthe same firmware. As a result, the labellingona device or its packagingis not enoughto knowwhichfirmware youshould install. Instead, you’llneed to connect the device to the Piand check the kernelringbuffer for error messages. If you’ve alreadyconnected the wireless adapter as instructed inChapter 1, “Meet the RaspberryPi”, youcancontinue. Ifnot, connect the adapter now.
  • 48.
    The kernelringbuffer isa specialportionofmemoryused bythe Linuxkernelto store its human-readable output. It’s an important part ofthe Linuxoperatingsystem:the text flashes bytoo quicklyto read while the Piboots, so it’s criticalthat users are able to viewthe messages at a later date to read errors and diagnose problems. Withthe adapter connected but no wireless firmware packages installed, the kernelwillprint a series oferror messages to the ringbuffer. To read these messages, youcanuse the dmesg command to print the contents ofthe buffer to the screen. At the terminal, or at the console ifyouhaven’t loaded the desktop environment, simplytype the followingcommand to viewthe buffer: dmesg This willprint out the entire kernelringbuffer, whichwillcontainallmessages output bythe kernelsince the Piwas switched on. Ifthe Pihas beenrunninga while, that canbe a lot oftext. To locate error message particular to the wireless adapter, it canhelp to send the output ofdmesg througha toolcalled grep. Usinggrep, youcansearchthroughthe buffer for text relatingto missing firmware. Bypipingthe output ofdmesg throughgrep witha searchterm, things become significantlyclearer. Type the following at the terminal: dmesg | grep ^usb The | symbolis knownas a pipe, and tells Linuxto send the output ofone program—whichwould normallygo to a file or the screen—to the input ofanother. Multiple programs canbe chained this way. Inthis example, grep is beingtold to search throughthe output ofdmesg—the screens fulloftext fromthe earlier command—for anyuse ofthe termusb at the start ofthe line (denoted bythe ^ character). The exact output ofthat searchwilldepend onthe manufacturer ofyour USBwireless adapter. InFigure 4-3, the output is shownwitha ZyxelNWD2015 Wireless USBAdapter connected to the Pi. Figure 4-3:Searchingthe kernelringbuffer for usb witha Zyxelwireless adapter connected The important part ofthis output is the line that reads Manufacturer. Inthe case ofthe example ZyxelNWD2105, this reads Ralink, whichis the companythat makes the actualchip found inside ZyxelUSBwireless adapter. It’s this company’s firmware that must be installed for the wireless adapter to work. If you couldn’t findanything using usbas a search term, you can try the same commandusing the search termfirmware, wlan orwireless. If you still can’t see anything useful, type lsusbfora list of all USBdevices connectedto the system. Usingthe manufacturer name fromdmesg, searchfor the firmware files usingthe apt-cache searchtoolintroduced earlier inthis chapter. For the example ZyxelNWD2015 adapter, the apt-cache command would be apt-cache search ralink
  • 49.
    Ifapt-cache fails tofind the firmware, youmayneed to make a guess based onthe firmware packages inthe followinglist. Don’t worryifyouinstallthe wrongone—anyfirmware canbe quicklyuninstalled usingapt-get remove, and havingmultiple firmware packages does no harm. The followingwireless firmware packages are available inthe recommended Debian distributiononthe RaspberryPi: • atmel-firmware—For devices based onthe AtmelAT76C50Xchipset • firmware-atheros—For devices based onAtheros chipsets • firmware-brcm80211—For devices based onBroadcomchipsets • firmware-intelwimax—For devices based onIntel’s WiMAXchipsets • firmware-ipw2x00—For IntelPro Wireless adapters (including2100, 2200 and 2915) • firmware-iwlwifi—For other Intelwireless adapters (including3945, 4965 and the 5000 series) • firmware-ralink—For devices based onRalink chipsets • firmware-realtek—For devices based onRealtek chipsets • zd1211-firmware—For devices based onthe ZyDAS 1211 chipset The firmware for the example Zyxelwireless adapter is provided bythe firmware-ralink package inthis list. This package canbe installed usingapt-get, but onlywhile the Piis connected to the Internet throughits wired Ethernet port or a USB Ethernet adapter. Whenconnected, installthe firmware bytypingthe following: sudo apt-get install firmwarepackage Replace firmwarepackage inthis command withthe name ofthe package that youfound byusingapt-cache. For the example ZyxelNWD2105, the fullcommand would be sudo apt-get install firmware-ralink. Installing Wireless Firmware Offline If you can’t connect thePi to theInternet usingany method other than awireless connection, you’ll need to download thefirmwareon adifferent computer. In aweb browser, load asearch engineand typethenameof thefirmwarepackagefollowed by thenameof thedistribution you’reusingand its version. If you’reusingtherecommend Debian distribution, thefirmwarefor theRalink RT2x00 chipset fromtheexamplecan befound by searchingfor firmware- ralink debian wheezy. Thesearch will lead you to apackagefileto download. In thecaseof Debian, this is a.deb file. For FedoraRemix, thesame firmwareis provided as a.rpm file. Download this file, and then copy it to thePi’s SD card in the/home/pi directory, or onto aUSBflash driveor other external storagedevice. Load thePi, and then when it comes timeto install thefirmware, replacethepackagenamewith thenameof thefileyou downloaded. For theexampleZyxel NWD2105 card, thecommand would bethefollowing: sudo apt-get install firmware-ralink_0.35_all.deb Withthe firmware installed, disconnect the USBwireless adapter and reconnect it to the Pi. This willrestart the kernel’s search for the firmware files, whichit willnowbe able to find. These files willremaininplace, and load automaticallywhenthe USB wireless adapter is connected. Youwillonlyhave to performthe installationprocess once. Withthe firmware installed, settingthe wireless connectionup should be straightforward. First, check that the USBwireless adapter is workingas it should byusingthe iwlist command to scanfor nearbywireless access points. This list willprobably be larger thana single screen, so pipe the command’s output throughless to pause after eachscreenful, like this: sudo iwlist scan | less This command willreturna list ofallthe wireless networks reachable fromthe Piand their details (see Figure 4-4). Ifyoureceive anerror message at this point—inparticular, one that claims the network or interface is down—check that youhave installed the correct firmware, and that the USBwireless adapter is connected to a powered USBhub. Figure 4-4:Scanningfor wireless networks withiwlist
  • 50.
    Youcancheck the currentstatus ofthe network usingthe iwconfig command. Like ifconfig, the iwconfig command allows youto check the status ofa network interface and issue configurationcommands. Unlike ifconfig, however, iwconfig is specificallydesigned for wireless networks and includes specific features for this. Type the command name at the terminalas follows: iwconfig The output ofiwconfig, as showninFigure 4-5, is split into the followingsections: • Interface Name—Eachdevice has its owninterface name, as withwired networks. Ifthe interface is a wireless connection, additionaldetails willbe shown. The default name for a Pi’s wireless connectionis wlan0. • Standard—The IEEE802.11 wireless standards have a varietyofdifferent types, distinguished bya letter suffix. This sectionlists the standards supported bythe USBwireless adapter. For the example adapter, this reads IEEE 802.11bgn for the network types it canaddress. • ESSID—The SSIDofthe network to whichthe adapter is connected. Ifthe adapter is not currentlyconnected to a network, this willread off/any. • Mode—The mode that the adapter is currentlyoperatingin, whichwillbe one ofthe following: • Managed—Astandard wireless network, withclients connectingto access points. This is the mode used for almost all home and business networks. • Ad-Hoc—Adevice-to-device wireless network, withno access points. • Monitor—Aspecialmode inwhichthe card listens out for alltraffic whether or not it is the addressee. This mode is typicallyused innetwork troubleshootingfor capturingwireless network traffic. • Repeater—Aspecialmode that forces a wireless card to forward traffic onto other network clients, to boost signal strength. • Secondary—Asubset ofthe Repeater mode, whichforces the wireless card to act as a backup repeater. • Access Point—The address ofthe access point to whichthe wireless adapter is currentlyconnected. Ifthe adapter isn’t connected to a wireless access point, this willread Not-Associated. • Tx-Power—The transmissionpower ofthe wireless adapter. The number displayed here indicates the strengthofthe signal that the adapter is sending:the higher the number, the stronger the signal. • Retry—The current settingfor the wireless adapter’s transmissionretry, used oncongested networks. This does not normallyneed changing, and some cards won’t allowit to be changed. • RTS—The adapter’s current settingfor ReadyTo Send and Clear To Send (RTS/CTS) handshaking, used onbusy networks to prevent collisions. This is normallyset bythe access point onconnection. • Fragment—The maximumfragment size, used onbusynetworks to split packets up into multiple fragments. This is normally
  • 51.
    set bythe accesspoint onconnection. • Power Management—The current status ofthe adapter’s power management functionality, whichreduces the device’s power demands whenthe wireless network is idle. This has little effect onthe Pi, but is typicallyenabled for battery-powered devices like a laptop. Figure 4-5:The output ofiwconfigwhennot connected to a wireless network To connect the Pito a wireless network, youwillneed to add some lines into the /etc/network/interfaces file. (For full details onhowthis file is laid out, see the “Wired Networking”sectionearlier inthis chapter.) First, openthe file inthe nano text editor: sudo nano /etc/network/interfaces At the bottomofthe file, create a newentryfor the USBwireless adapter that reads as follows (see Figure 4-6): auto wlan0 iface wlan0 inet dhcp wpa-conf /etc/wpa.conf Figure 4-6:Editingthe interfaces file for wireless network access
  • 52.
    Once the entryisinplace, save the file bypressingCTRL+ O and thenquit nano withCTRL+ X. The device ID of wlan0 is correct if this is the first wireless device you’ve set upon yourPi. If it isn’t, the numberat the endwill be different. Type iwconfig to see a current list of wireless devices, andchange the lines in the preceding code example accordingly. The last line ofthe interfaces file makes reference to a configurationfile, wpa.conf, whichdoes not yet exist. This file is used bya toolknownas wpasupplicant, designed to provide Linuxwithaneasywayto connect to networks secured withWireless Protected Access (WPA) encryption. Usingwpasupplicant, youcanconnect the Pito almost anywireless network—regardless ofwhether it’s protected byWPA or its newer replacement WPA2—inbothAdvanced EncryptionStandard (AES) and TemporalKeyIntegrityProtocol(TKIP) modes. Despite its name, wpasupplicant also allows connectionto wireless networks usingthe older Wired Equivalent Privacy(WEP) encryptionstandard. The wpasupplicant programstores its configurationina file called wpa.conf, located inthe /etc directory. To begin configuringthe Pifor wireless access, first opena newblank file for editingbytypingthe following: sudo nano /etc/wpa.conf Enter the followingtwo lines, whichagain, are the same for anywireless network type. Replace Your_SSIDwiththe SSIDfor the wireless network to whichyouwant to connect, and thenfinishthe file withthe lines that matchyour network’s encryption type. network={ [Tab] ssid=”Your_SSID” At this point inthe configurationfile, the details required differ dependingonthe type ofwireless network youare configuring. The followingsubsections provide instructions for completingthe configurationfor unencrypted, WEP and WPAnetworks. No Encryption Ifyour wireless network has no encryptioninplace, finishthe wpa.conf file as follows: [Tab] key_mgmt=NONE } Save the file withCTRL+ O, and thenexit nano withCTRL+ X. WEP Encryption Ifyour wireless network uses WEP encryption, finishthe wpa.conf file as follows:
  • 53.
    [Tab] key_mgmt=NONE [Tab] wep_key0=”Your_WEP_Key” } ReplaceYour_WEP_Keywiththe ASCII keyfor your wireless network’s WEP encryption. Save the file withCTRL+ O, and thenexit nano withCTRL+ X. WEPencryption is extremely insecure. Readily-available software can break the encryption on a WEP-protectednetwork in just a fewminutes, allowing a thirdparty to use yournetwork. If you’re still running WEP, considerswitching to WPAorWPA2 forbettersecurity. WPA/WPA2 Encryption Ifyour wireless network uses WPAor WPA2 encryption, finishthe wpa.conf file as follows: [Tab] key_mgmt=WPA-PSK [Tab] psk=”Your_WPA_Key” } Replace Your_WPA_Keywiththe pass phrase for your wireless network’s encryption. Figure 4-7 shows anexample configurationfor a wireless network withthe SSID“Private_Router” and the WPApass phrase “Private Wireless Network”. Save the file withCTRL+ O, and thenexit nano withCTRL+ X. Figure 4-7:Editingthe wpa.conf file for a WPA-protected network Connecting to the Wireless Network The Pi’s wireless networkingis nowconfigured, and willbeginthe next time the Piis restarted. To start the wireless network without rebooting, type the following: sudo ifup wlan0 To make sure that the network is operational, unplugthe Pi’s Ethernet cable (ifattached) and type the following: ping -c 1 www.raspberrypi.org If you start having problems with yourPi following the installation of a USBwireless adapter, it couldbe due to a conflict with otherUSBdevices. Some adaptermodels are known to cause problems with certain USBkeyboards. Foran up-to-date list of adapters that are known to be good, as well as those that are known to cause conflicts, visit http://www.element14.com/community/docs/DOC-44703/l/raspberry-pi-wifi-adapter-testing orthe eLinux wiki at http://elinux.org/RPi_VerifiedPeripherals#Working_USB_Wifi_Adapters.
  • 54.
    Chapter 5: PartitionManagement Having the Raspberry Pi’s operatingsystemprovided as animage ofsomebodyelse’s SDcard is convenient, but a little inflexible. Most distributionimages available for download assume a 2 GBor 4 GBSDcard, meaningthat people with8 GBor larger cards find muchoftheir space wasted. Creating a New Partition One wayto make the most ofa large SDonthe RaspberryPiis to create a newpartitioninthe emptyspace at the end ofthe card. This partitioncanbe used to store anylarge files that youwant your Pito be able to access without havingto use an externalstorage device. Allthe tasks required for this canbe carried out directlyonthe Pi, without havingto remove the SDcard and connect it to a PC. Allyouneed is anSDcard flashed withone ofthe RaspberryPiLinuximages (as described inChapter 1, “Meet the Raspberry Pi”) and some free space. When using tools that can modify the partitions on a disk, it’s important not to delete any existing partitions. In particular, be careful not to delete the /boot orroot file systempartitions, orthe Pi will be unable to load. Followthese steps to create a newpartitiononanSDcard: 1. Opena terminalwindow, and type sudo fdisk -l to list the storage devices connected to the Piand their current partitions. The SDcard willappear as /dev/mmcblk0 witha series ofpartitions numbered p0, p1 and so on. 2. Load the cfdisk menu-based partitionmanagement toolbytypingsudo cfdisk /dev/mmcblk0. This willuse the SD card as the target device. Ifyou’re tryingto create a partitionona USBMass Storage device, replace mmcblk0 withthe device identifier for the storage device (for example, sda). 3. Usingthe cursor keys, move the partitionselectionhighlight—whichprints the currentlyselected partitionininverse video, typicallyblack onwhite—downthe partitionlist to the sectionlabelled Free Space at the bottom. 4. Againusingthe cursor keys, move the optionselectionhighlight, located at the bottomofthe screenand displayed in inverse video, right to the Newoptionand press Enter (see Figure 5-1). Figure 5-1:Creatinga newpartitionusingcfdisk 5. Youwillbe prompted to create a Primaryor Logicalpartition. The default is to create a Primarypartition, so just press
  • 55.
    Enter to acceptthis. 6. The next prompt willask youhowbigthe partitionshould be, inmegabytes (MB). The default is to create a partitionthat fills the entire available free space onthe device, so again, just press Enter. 7. Next, the newdetails—knownas a partitiontable—need to be writtento the disk. Use the cursor keys to move the option selectionhighlight to Write and press Enter. 8. Youwillbe prompted to make sure that the changes are correct. Double-check that you’ve created the partitionas instructed, and thentype yes and press Enter. 9. Exit cfdisk bymovingthe optionselectionhighlight at the bottomofthe screento Quit withthe cursor keys and then pressingEnter. Althoughthe partitiontable has nowbeenupdated withthe freshlycreated partition, it won’t be visible to the operatingsystem untilit has beenreloaded. The easiest wayto achieve that is to restart the Pibytypingthe following: sudo reboot Whenthe Pihas restarted and you’ve logged back in, youcanuse fdisk to verifythat the newpartitionis readyfor use withthe followingcommand: sudo fdisk -l Before youcanstore files onthe newpartition, however, youneed to put a file systeminplace byformattingthe drive usingthe mkfs toolas follows. 1. Type fdisk -l to list the storage devices connected to the Piand their current partitions. Note the newpartition, which willappear as /dev/mmcblk0pN where N is the partitionnumber. Ifyou’re doingthis onthe recommended Debian distribution, the partitionwillbe /dev/mmcblk0p3. 2. Create a newEXT4 file systeminthe partitionbytypingsudo mkfs.ext4 /dev/mmcblk0pN, replacingN withthe new partition’s number. Make sure that you’ve picked the right partition:the mkfs (make file system) command willwipe anydata onthe partitionit is told to format. 3. Before the newfile systemcanbe used, it must be mounted. Create a mount point (anemptydirectory) bytypingsudo mkdir /storage at the terminal. 4. Use the mount command to make the newpartitionaccessible onthe mount point youjust created bytypingsudo mount /dev/mmcblk0pN /storage, where N is the newpartitionnumber. When using mkfs to create a new, blank file systemon a partition, always double-check the partition details before continuing. If you give mkfs the wrong partition, it will erase any files you have storedthere. If it’s the /boot orroot file systemthat has been wiped, the Pi will no longerloaduntil you flash the SD cardagain. While this gives youa storage device that the root superuser canaccess, the pistandard user and anyuser accounts you’ve created yourselfdon’t currentlyhave permissionto store files there. That canbe changed witha trio ofcommands:chown, chgrp and chmod. The first command, chown, is short for change ownership and allows files created byone user to be passed across to another; chgrp changes the group to whicha file belongs so allthe members ofthat group canaccess it; and chmod modifies the permissions ona file or directory. To allowallusers to access your newpartition, change the group membership fromroot to users withthe chgrp command, usingthe -R (recursive) flagto affect the directory’s entire contents as follows: sudo chgrp -R users /storage You’llalso need to allowallmembers ofthe group to write to the directory. To do this, youuse the chmod command withthe optiong+w, whichtells chmod to allowwrite access fromthe group: sudo chmod -R g+w /storage The newpartitionis nowreadyfor use, but there’s stillone more task to carryout. At present, the partitionneeds to be manually mounted (usingthe mount command combined withthe sudo command for runningas the root user) eachtime the Pireboots. To save time, youcantellthe Pito automaticallymount the newpartitioninstead byeditingthe fstab file. Short for file systemtable, the fstab file—located inthe /etc directory—tells Linuxwhat file systems should be mounted on
  • 56.
    whichmount points. Thistable maylook complicated at first glance, but its layout follows a logicaltabular pattern. Fromleft to right, the columns tellLinuxthe locationofthe device to be mounted, the directorywhere the device should be accessible (the mount point), the file systemtype, anyoptions required, and finally, two numbers that controlwhether the file systemshould be dumped inthe event ofa systemproblemand whether it should be checked bythe fsck (file systemcheck) tool. To make the systemmount the newpartitionautomatically, first openthe fstab file innano: sudo nano /etc/fstab Add a newline at the bottomofthe file, definingthe various options required bythe newpartition, withtabs betweeneachfield: /dev/mmcblk0pN [Tab]/storage[Tab] ext4[Tab] defaults[Tab] 0[Tab] 2 Remember to change N for the partitionnumber ofthe newpartition(see Figure 5-2). Ifyou’re usingfstab to mount external storage devices, use the device name /dev/sdXN where Xis the device letter and N is the partitionnumber. Save the file with CTRL+ W, and thenexit nano withCTRL+ X. Whenyou’re back at the terminal, reboot your systemand check if/storage is mounted automaticallybytypingmount. Ifnot, double-check your newfstab entry. Remember that youneed to press the Tab keyeachtime youcome to the end ofa field. Figure 5-2:Editingfstab to automaticallymount the newpartition Resizing Existing Partitions Creatinga newpartitionis one wayto make use ofa larger SDcard, but it’s not the most flexible. Abetter method is to resize existingpartitions to make use ofthe free space. To do this reliably, you’llneed to unplugthe Pi, remove the SDcard and insert it into a desktop or laptop througha card reader. Automatic Resizing The DebianLinuxdistributionfor the RaspberryPicomes witha toolcalled raspi-config, whichloads whenthe systemis booted for the first time. It canalso be loaded manuallyat anytime bytypingsudo raspi-config at the console or ina terminalwindow. This toolprovides aninterface for manycommonconfigurationtasks, includingthe abilityto resize the root file systemto make fulluse ofthe available space onanSDcard automatically. Using the raspi-config tool to resize the root file systemcan, in rare cases, result in data corruption. If you have data storedon the Pi which you can’t affordto lose, back it upfirst orconsiderfollowing the more reliable manual resizing instructions foundlaterin this chapter.
  • 57.
    To resize theroot file systemusingthe raspi-config tool, followthese instructions: 1. Ifthis is the first time youhave loaded Debianonthe RaspberryPi, raspi-config willload automatically. Ifit does not, type sudo raspi-config at the console or terminalto load the toolmanually. 2. Inthe raspi-config menu(see Figure 5-3), press the downarrowonthe keyboard to highlight the expand_rootfs optionand thenpress Enter. Figure 5-3:The raspi-configtool’s menuscreen 3. The resizingoperationtakes just a fewseconds, and is followed bya message tellingyouthat the process willcomplete whenthe Piis next restarted. Press Enter to dismiss this message. 4. Press the Tab keytwice to highlight Exit, and thenpress Enter to quit raspi-config. 5. Type sudo reboot to restart the Pi. The reboot process willtake longer thanusual, because the file systemwillneed to be resized. This process happens onlyonce per resize—the next time the Piis rebooted, it willtake no longer thanusual. Whenthe Pihas fullyrebooted, the root file systemwillnowbe as large as the SDcard allows. To verifythis, type df -h at the terminalto list the free space onallconnected storage devices. Manual Resizing The most reliable wayto resize Linuxpartitions ona desktop or laptop computer is to use a toolcalled Parted Magic, a free bootable CDthat is designed specificallyfor adjustingfile systems. The disc works onbothPCs and Macs, and operates entirely frommemory. As a result, it won’t tryto replace your existingoperatingsystem. It’s also compatible withanydistributionfor the RaspberryPi, unlike the Debian-specific raspi-config tool. If you’re a Linux user, you can install gparted—the graphical partitioning tool usedin PartedMagic—insteadof having to boot fromthe CD. For Debian-baseddistributions, you just type sudo apt-get install gpartedfollowedby sudo gpartedto loadthe program. Download the Parted Magic ISO image file fromhttp://partedmagic.com and write it to a CDor DVDusingthe CD writingprogramprovided onyour PC. Withthe disc stillinthe drive, reboot your computer and it willload into the Parted Magic menusystem. Fromhere, choose Standard Settings to load the software itself. Parted Magic is a customised Linuxoperatingsystemthat includes tools specificallydesigned for managingstorage devices. Connect the RaspberryPi’s SDcard to your computer and load PartitionEditor fromthe desktop bydouble-clickingthe icon (see Figure 5-4). Figure 5-4:The Parted Magic desktop
  • 58.
    Bydefault, the partitioneditorwilllook at the first drive it finds inyour system, whichis usuallyyour PC’s hard drive. Youdon’t want to make changes to that, so make sure to click onthe device selector inthe top-right corner and choose the device correspondingto the SDcard. Ona single-drive system, this willusuallybe /dev/sdb (see Figure 5-5). Figure 5-5:Parted Magic’s PartitionEditor tool, before resizingthe partition Resizing andmoving partitions is a risky process. If the SD cardis removedwhile the resize is in progress, orthe PC loses power, it will corrupt the contents of the card. Always make sure you’ve backedupany irreplaceable personal files fromthe cardbefore editing the partitions. The exact partitions that need to be resized and moved willdiffer accordingto the distributionchosen. Inthe case ofDebian, you willneed to resize the second partition, whichwillusuallybe sdb2. Withthe partitioneditor loaded, do the following: 1. Some Linuxdistributions include a swap partitionat the end ofthe image. This appears as a smallpartitionoftype linux-
  • 59.
    swap inthe partitioneditor.Ifthis is present, continue withthese instructions; ifnot, skip straight to step 5. 2. Click onthe swap partition, whichwillbe the last partitioninthe list, and choose Resize/Move fromthe toolbar. 3. Inthe dialogue boxthat appears, click and dragthe boxat the top left over to the top right (see Figure 5-6). Once complete, the Free Space Followingboxshould read 0. Figure 5-6:Movingthe swap partitioninthe partitioneditor 4. Click the Resize/Move buttonto confirmthe change. Movingthe partitionwilltrigger a warningabout the potentialfor the newpartitiontable to lead to bootingproblems. That doesn’t applyto this change, because you’re not movingthe boot partition, so just click OK. 5. Click onthe largest partitioninthe list, whichis typicallylabelled sdb2, and click Resize/Move onthe toolbar again. 6. This time, click and hold the right arrowonthe coloured boxand dragit to the right edge ofthe greybox(see Figure 5-7). This willmake the partitionlarger, rather thanjust movingit. Figure 5-7:Resizingthe root file systeminthe partitioneditor 7. Click the Resize/Move buttonto confirmyour change, and againclick OK onthe warningboxthat appears. 8. Click Applyonthe toolbar, and againonthe dialogue boxthat appears. Dependingonthe speed ofyour SDcard, the resizingprocess maytake a fewminutes to complete. 9. Whenthe resize has completed, youcanturnoffyour PC and put the SDcard back into your Pi. Thanks to the changes made inthe partitioneditor (see Figure 5-8), the mainpartitiononthe SDcard is nowas bigas the card willallowit to be. As this is where most Linuxdistributions store boththeir ownfiles and the users’ files, the Pishould nowhave plentyofspace available to use. Figure 5-8:Parted Magic’s PartitionEditor tool, after resizingthe partition
  • 60.
    Moving to aBigger SD Card Ifyou’ve beenusingthe Pifor a while, youmayfind that the 4 GBSDcard youthought would be large enoughfor your needs has become full. Buyinga newSDcard with8 GB, 16 GBor evenmore storage is cheap enough, but youdon’t want to lose your files. Thankfully, it’s prettystraightforward to move the contents ofyour existingSDcard across to a bigger card. The latter halfofthe process is no different to howyouflashed the SDcard back inChapter 1, “Meet the RaspberryPi”. Where it differs, however, is that youwillbe usingthe existingSDcard as the source rather thana downloaded image file. The process of cloning an SD cardis nondestructive, andwill result in both cards having the same data on them. If you have personal files on the old SD card, make sure to wipe it clean before passing it on to a thirdparty.vIn addition to youroriginal SD cardandthe newer, largercard, you’ll need access to a PC orMac, an SD cardreaderand—if you’re a Windows user—the PartedMagicdiscusedto resize the partitions earlierin this chapter. The first step to movingto a larger SDcard is to create animage ofthe existingcard. Ifyouhave access to two SDcard readers, youcanskip this step and, inthe later instructions, replace the name ofthe image file withthe device address ofthe SD card reader withthe Pi’s originalcard inserted. Imaging from Linux Creatinganimage ofthe SDcard under Linuxis no more difficult thanflashingthe card was inChapter 1. Before starting, make sure youhave enoughdisk space onyour computer to hold a file the size ofthe SDcard. Thenfollowthese steps: 1. Opena terminalfromyour distribution’s applications menu. 2. Plugyour Pi’s smaller SDcard into a card reader connected to the PC. 3. Type sudo fdisk -l to see a list ofdisks. Find the SDcard byits size, and note the device address (/dev/sdX, where Xis a letter correspondingto the device. For some computers within-built SDcard readers, this mayappear as /dev/mmcblkXwhere Xis a letter correspondingto the device. Ifso, use that address inthe followinginstructions.). 4. Type sudo dd of=temporaryimage.imgif=/dev/sdXbs=2M to read the contents ofthe SDcard and write it to a file called temporaryimage.img (see Figure 5-9). Figure 5-9:Creatinganimage ofanexistingSDcard usingdd
  • 61.
    Imaging from OSX Imagingthe Pi’s SDcard onOS Xis almost exactlythe same as flashingthe SDcard was back inChapter 1. Again, make sure youhave enoughhard disk space to hold a file the size ofthe SDcard. Thenfollowthese steps: 1. Select Utilities fromthe Applicationmenu, and thenclick onthe Terminalapplication. 2. Plugyour Pi’s smaller SDcard into a card reader connected to the PC. 3. Type diskutil list to see a list ofstorage devices. Find the SDcard byits size, and note the device address (/dev/diskX, where Xis a letter correspondingto the device). 4. Ifthe SDcard has beenautomaticallymounted and appears onthe desktop, type diskutil unmountdisk /dev/diskXto unmount it before proceeding. 5. Type dd of=temporaryimage.img if=/dev/diskX bs=2M to read the contents ofthe SDcard and write it to a file called temporaryimage.img. Imaging from Windows The Windows Image Writer toolthat youused to flashthe SDcard inChapter 1, “Meet the RaspberryPi”, doesn’t support the creationofimages. Instead, you’llneed to use the Parted Magic disc to gainaccess to the Linuxdd utility, as follows: 1. Insert the Parted Magic CDinto your PC, reboot and choose Standard Settings. 2. Opena terminalwindowusingthe third iconfromthe left onthe bottomtoolbar, whichlooks like a computer monitor (see Figure 5-10). 3. Type fdisk -l to get a list ofdrives onyour PC, and find your mainhard drive bysize. Note the device name: /dev/sdXN, where Xis the drive letter and N the partitionnumber. For some computers within-built SDcard readers, this mayappear as /dev/mmcblkXwhere Xis a letter correspondingto the device. Ifso, use that address inthe following instructions. 4. Create a mount point for your PC’s hard drive bytypingmkdir /media/harddrive, and thenmount the drive with mount /dev/sdXN /media/harddrive -o=rw to gainaccess. 5. Insert your SDcard reader withthe Pi’s smaller SDcard into the PC, and thenuse fdisk -l to find its device node (/dev/sdYwhere Yis the drive letter). 6. Type dd of=/media/harddrive/temporaryimage.img if=/dev/sdY bs=2M to read the contents ofthe SDcard and write it to a file called temporaryimage.img onyour hard drive. Figure 5-10:The terminaliconinParted Magic
  • 62.
    Nowthat youhave yourdisk image, use the instructions onflashinganSDcard fromChapter 1, “Meet the RaspberryPi”, to write it to the newcard. Remember that writinganimage takes time, so be patient and let it finishfully. Whenthe image writinghas finished, you’llhave two SDcards containingthe exact same data, includingthe same partitiontable. This means that while the newcard might be 16 GBor 32 GB, the Piwillonlybe able to access the same 2 GBor 4 GBofthe originalcard. To ensure the Picanmake use ofthe space onthe newcard, followthe instructions in“ResizingExistingPartitions”earlier inthis chapter.
  • 63.
    Chapter 6: Configuringthe Raspberry Pi Because of its origins inembedded computing, the BCM2835 chip at the heart ofthe RaspberryPidoesn’t have anythinglike a PC’s BIOS menuwhere various low-levelsystemsettings canbe configured. Instead, it relies ontext files containing configurationstrings that are loaded bythe chip whenthe power is switched on. Before takinga look at the various options available inthese files—config.txt, cmdline.txt and start.elf—a word of warning:changingsome ofthese settings awayfromtheir defaults canresult ina Pithat, best case, doesn’t boot untilthe files are reverted and, worst case, canphysicallydamage the system. These potentiallydangerous settings willbe highlighted with warnings inthis chapter. Hardware Settings—config.txt The Pi’s hardware is controlled bysettings contained ina file called config.txt, whichis located inthe /boot directory(see Figure 6-1). This file tells the Pihowto set up its various inputs and outputs, and at what speed the BCM2835 chip and its connected memorymodule should run. Figure 6-1:The contents ofthe /boot directory, withconfig.txt highlighted Ifyou’re havingproblems withgraphics output, suchas the image not fillingthe screenor spillingover the edge, config.txt is where you’llbe able to fixit. Normally, the file is emptyor—onsome distributions—simplynot present; this just means that the Piwilloperate usingits preset defaults. Ifyouwant to make changes and the file isn’t there, just create a newtext file called config.txt and fillinthe settings youwant to change. The config.txt file cancontrolalmost allaspects ofthe Pi’s hardware, withthe exceptionofthe waythe centralprocessing unit (CPU) and graphics processingunit (GPU) sections ofthe BCM2835 apportionthe memory. You’lllearnhowto alter that split inthe “MemoryPartitioning—start.elf”section, later inthis chapter. The config.txt file is onlyread whenthe systemfirst starts up. Anychanges made while the Piis runningwon’t take effect untilthe systemis restarted, or switched offand back onagain. Inthe event that the changes are unwanted, simplydeletingthe file fromthe /boot directoryshould be enoughto restore the defaults once more. Ifthe Piwon’t boot withyour newsettings, just remove the SDcard and delete config.txt fromthe boot partitiononanother PC, and thenreinsert it into the Piand try again.
  • 64.
    Modifying the Display Usually,the RaspberryPiwilldetect the type ofdisplaythat’s connected and alter its settings accordingly. Sometimes, however, this automatic detectiondoesn’t work. This is oftenthe case whena RaspberryPifromone countryis connected to anolder TV fromanother country. Ifyouconnect your Pito your TVand there’s nothingto see, youmayneed to override these defaults. Various settings inthe config.txt file canbe used to improve or alter the video output. These settings, and their possible values, are described inthe followinglist. Manually adjusting the HDMIorcomposite video output settings can leave yourPi unable to communicate with yourmonitor. It’s usually best to use the automatically-detectedsettings, unless you’re unable to see a picture in the first place. • overscan_left—This moves the picture inwards a set number ofpixels to compensate for a TV’s overscan. Ifthe text onthe Piis disappearingoffthe edge ofthe screen, adjustingthe overscanwillfixit. Values should be givenas the number ofpixels to skip. • overscan_right—This does the same job as overscan_left, but onthe right side ofthe screen. • overscan_top—Again, this ignores a certainnumber ofpixels, but this time onthe top ofthe screen. • overscan_bottom—This canbe used to skip a number ofpixels fromthe bottomofthe display. Typically, the values for all the overscan_ settings would be the same, creatinga regular border around the display. • disable_overscan—Ifyouuse a monitor or TVvia HDMI, youmayfind that your image has a black border around it. To get rid ofthis border, anydefault overscansettings canbe disabled bysettingthis value to 1. • framebuffer_width—This value is measured inpixels, and adjustingit willchange the widthofthe console. Iftext appears too smallonyour screen, trychangingthis to a lower value thanthe default widthofthe connected display. • framebuffer_height—This affects the size ofthe console inthe same wayas framebuffer_width, but verticallyrather than horizontally. • framebuffer_depth—Controls the colour depthofthe console inbits per pixel. The default is 16 bits per pixel, whichgives 65,536 colours. Other values, including8 bits per pixel(256 colours), 24 bits per pixel(around 16.7 millioncolours) and 32 bits per pixel(around 1 billioncolours) are valid, but maycause graphicalcorruption. • framebuffer_ignore_alpha—Set to 1, this value disables the alpha channel, whichcontrols transparencyinthe console. Disablingthe alpha channelis not normallyrequired, but maycorrect graphicalcorruptioncaused whensetting framebuffer_depth to 32 bits per pixel. • sdtv_mode—This value affects the analogue composite video output ofthe Pi, adjustingit to operate invarious countries. Bydefault, the Piuses the NorthAmericanversionofthe NTSC video standard; users inother countries mayneed to change this value to get a picture onananalogue TV. Possible values are: • 0—NTSC, the NorthAmericanvideo standard • 1—NTSC-J, the Japanese video standard • 2—PAL, the video standard for the UK and other countries • 3—PAL-M, the Brazilianvideo standard • sdtv_aspect—Controls the aspect ratio ofthe analogue composite output. Ifthe picture looks stretched or squished, alter this to correspond to your TV’s aspect ratio. Possible values are: • 1—4:3 aspect ratio, commononolder sets • 2—14:9 aspect ratio, commonfor smaller widescreenTVs • 3—16:9 aspect ratio, commonfor modernwidescreenTVs • hdmi_mode—Inadditionto settingthe video mode for the analogue composite output, it’s also possible to override automatic resolutiondetectiononthe HDMI port. This is handyifyouwant to runyour Piat a lower resolutionthanthe display’s native resolutioninorder to make things more readable froma distance. AppendixB, “HDMI DisplayModes”, lists the possible values for this setting. • hdmi_drive—It’s also possible to alter the voltage output bythe HDMI port. This is important whenyou’re usinganHDMI to DVI adapter, because HDMI and DVI voltages differ slightly. Ifyoufind that your picture is snowyor blownout withtoo bright animage, tryalteringthis setting. Possible values are: • 1—DVI output voltages. Inthis mode, no audio is included onthe HDMI cable. • 2—HDMI output voltages. Inthis mode, audio is included onthe HDMI cable. • hdmi_force_hotplug—Forces the RaspberryPito use the HDMI port, evenifit doesn’t detect a connected display. A
  • 65.
    value of0 allowsthe Pito attempt to detect the display, while a value of1 forces the Pito use HDMI regardless. • hdmi_group—Sets the HDMI group mode to CEAor DMT. Youshould change this settingaccordingto the displaytype you’re tryingto connect, before usinghdmi_mode to controlthe output resolutionand frequency. The two possible values are: • 1—Sets the HDMI group to that defined bythe Consumer Electronics AssociationofAmerica (CEA). Use this setting whenthe Piis connected to a high-definitiontelevision(HDTV) over HDMI and use the first settings list fromAppendixB, “HDMI DisplayModes”. • 2—Sets the HDMI group to that defined bythe Video Electronics Standards Association(VESA) inthe Display Monitor Timings (DMT) specification. Use this settingwhenthe Piis connected to a computer monitor over DVI and use the second settings list fromAppendixB, “HDMI DisplayModes”. • hdmi_safe—Forces the Pito use a pre-set collectionofHDMI settings designed to provide maximumcompatibilitywith displays connected to the HDMI port. Settingthis to a value of1 is the equivalent ofsettinghdmi_force_hotpug=1, config_hdmi_boost=4, hdmi_group=1, hdmi_mode=1 and disable_overscan=0. • config_hdmi_boost—Some monitors require more power onthe HDMI output to operate. Ifyour picture is covered in snow, tryincreasingthis value instages from1 (for short cables) to 7 (for longcables). Eachoptioninconfig.txt should be onits ownline, withthe optionname followed byanequals sign(=) and thenthe required value. For example, to tellthe Pito use a PAL-format analogue TVwitha 4:3 aspect ratio and a 20-pixeloverscanonallsides, put the followinglines into config.txt: sdtv_mode=2 sdtv_aspect=1 overscan_left=20 overscan_right=20 overscan_top=20 overscan_bottom=20 To tellthe Pito use a DVI displaythroughthe HDMI port inthe 720p60 format withno overscanat all, use the followingvalues instead: hdmi_group=1 hdmi_mode=4 hdmi_drive=1 disable_overscan=1 For the changes to take effect, the Pimust be restarted. Ifyoufind that your changes have disabled the Pi’s video output onyour monitor, simplyinsert the SDcard into another computer and either modifythe config.txt file withnewsettings or delete it altogether to restore the defaults. Boot Options The config.txt file canalso be used to controlhowLinuxis loaded onthe RaspberryPi. Althoughthe most commonmethod for controllingthe loadingofthe Linuxkernelis to use a separate file called cmdline.txt (whichyou’lllearnabout later inthis chapter), it is possible to use just config.txt. The followingoptions controlthe boot process: • disable_commandline_tags—This tells the start.elf module (discussed later inthis chapter) to skip fillinginmemory locations past 0x100 before loadingthe Linuxkernel. This optionshould not be disabled, as doingso cancause Linuxto load incorrectlyand crash. • cmdline—The command line parameters to be passed to the Linuxkernel. This canbe used inplace ofthe cmdline.txt file, usuallyfound inthe /boot directory. • kernel—The name ofthe kernelfile to be loaded. This canbe used as a wayto load the emergencykernel(see Chapter 3, “Troubleshooting”). • ramfsfile—The name ofthe initialRAM file system(RAMFS) to be loaded. This should rarelybe modified, unless you’ve built a newinitialfile systemwithwhichto experiment. • init_uart_baud—The speed ofthe serialconsole, inbits per second. The default is 115200, but lower values mayimprove the connectionifthe Piis used withanolder hardware serialterminal. Overclocking the Raspberry Pi The config.txt file not onlycontrols the graphics outputs ofthe Pi’s BCM2835 processor, but it also enables youto control
  • 66.
    the chip inotherways as well. Inparticular, it allows youto alter the speed at whichthe chip runs, increasingits performance at the expense ofthe part’s lifespan—a process knownas overclocking. Adjusting any of the settings listedin this section can result in damage to yourPi. In particular, changing settings corresponding to memory, GPU orCPUvoltages will set a fuse in the chip, which invalidates the Raspberry Pi’s warranty even if the setting is returnedback to normal before any damage is done. Damage causedwhen using these settings will not be put right by the Raspberry Pi Foundation orby the retailerfromwhomyou purchasedyourPi. If in doubt, don’t alterthese settings: the performance gains through overclocking are rarely worth the risk to the Pi. The BCM2835 multimedia processor at the heart ofthe Piis a system-on-chip (SoC) designsplit into two mainparts:the graphics processor (GPU) and the centralprocessor (CPU). Simplyput, the CPUhandles allthe day-to-dayprocessingtasks while the GPUhandles drawingthings onthe screen, inboth2Dand 3D. Usingconfig.txt, youcanoverclock one or bothparts ofthe BCM2835. Youcanalso increase the speed at whichthe memorymodule—located ontop ofthe chip ina package-on-package (PoP) mountingformat—operates. Boostingthe operatingfrequencyofthese components results ina smallincrease inthe Pi’s performance:anincrease to the GPU’s clock frequencymeans that 3Dgraphics (suchas game graphics) willrender at a faster pace, and video willbe decoded quicker for smoother playback; and increasingthe CPU’s clock frequencywillboost overallperformance ofthe device, as will increasingthe memory’s frequency. The reasonthe Piisn’t provided withhigher operatingspeeds inthe first place is related to the chips’ lifespan. The BCM2835 is rated byits manufacturer, Broadcom, to operate at a speed of700 MHz. Increasingthe speed above this officially-rated level maywork, but it willalso have a deleterious effect onthe lifespanofthe chip. Unlike a desktop processor, SoC designs rarely have muchheadroomfor overclocking. Overclocking Settings Ifyou’re willingto take the risk ofbreakingthe Pi—a process knownas brickinginembedded device circles—for the sake ofa smallperformance gain, there are settings inconfig.txt whichcanhelp. The followingsettings controlperformance ofthe Pi’s SoC: • arm_freq—Sets the core clock frequencyofthe CPUportionofthe BCM2835, for a boost ingeneral-purpose performance. The default speed is 700 MHz. • gpu_freq—Sets the clock frequencyofthe GPUportionofthe BCM2835, for a boost ingraphics performance across all operations. The default speed is 250 MHz. Additionally, youcanadjust individualportions ofthe GPU’s hardware usingthe followingoptions: • core_freq—Sets the core clock frequencyofthe GPU, leavingthe other frequencies alone, to improve overallGPU performance. The default speed is 250 MHz. • h264_freq—Sets the clock frequencyofthe GPU’s hardware video decoder to improve playback ofH.264 video data. The default speed is 250 MHz. • isp_freq—Sets the clock frequencyofthe image sensor pipeline, for improvingthe capture rate ofconnected video hardware (suchas a camera). The default speed is 250 MHz. • v3d_freq—Sets the clock frequencyofthe GPU’s 3Drenderinghardware, for a boost invisualisationand gaming performance. The default speed is 250 MHz. • sdram_freq—Sets the clock speed ofthe randomaccess memory(RAM) chip onthe Pi, to give the entire systema small increase inperformance. The default speed is 400 MHz. • init_uart_clock—Sets the default clock speed ofthe UniversalAsynchronous Receiver/Transmitter (UART), used to controlthe serialconsole. The default is 3000000, whichsets a speed of3 MHz. Alteringthis is likelyto have little effect beyond corruptingthe output ofthe serialconsole. • init_emmc_clock—Sets the default clock speed ofthe SDcard controller. The default is 80000000, whichsets a speed of 80 MHz. Increasingthis value canresult infaster readingand writingfromthe SDcard, but canalso lead to data corruption. As anexample, to overclock the CPUto 800 MHz, the GPUto 280 MHzand the RAM to 420 MHz, enter the following options into config.txt, one per line: arm_freq=800 gpu_freq=280 sdram_freq=420 As withadjustingthe displayconfiguration, anychanges made regardingoverclockingwon’t take effect untilthe Piis restarted.
  • 67.
    To returnthe settingsto normal, youcaneither delete the entire config.txt file or—ifyou’re usingit to controlthe display settings as well—simplydelete the lines that dealwithoverclocking, and thenrestart the Pi. Overvoltage Settings Ifyou’re overclockingyour Pi, youwilleventuallyhit a brick wallpast whichthe device won’t go. The precise point at whichthe Piwon’t reliablyoverclock depends onthe individualdevice, due to naturalvariations inthe chip introduced duringthe manufacturingstage. For some users, this limit maybe as lowas 800 MHz; others mayfind that theycanpushtheir Pias highas 1 GHz(1,000 MHz) without issue. Ifyouwant to eke a little more performance out ofyour Pi, there is a wayto potentiallyboost this upper limit:a process known as overvoltage or overvolting. The Pi’s BCM2835 system-on-chip processor and the associated memorymodule usuallyrunat 1.2 volts. It’s possible, althoughpotentiallyinadvisable, to override this default and force the components to runat higher or lower voltages. Boostingthe voltage means boostingthe signalwithinthe chip, makingit more likelyto hit higher speeds—it also means that the chip runs hotter, reducingits lifespandramaticallycompared to overclockingalone. Setting any of the voltage options in config.txt causes a fuse within the BCM2835 to tripin a way that cannot be reset. It’s a foolproof way to tell if someone has been attempting to overclock the chipoutside its ratedspecifications, andrenders yourwarranty null andvoid—even if the cause of failure is unrelatedto overclocking. If you return a Pi forreplacement underwarranty andthe fuse is tripped, it will not be replaced. Do not attempt to overvolt a Pi that you cannot affordto replace yourself. Unlike the previouslydescribed settings, whichare provided inconfig.txt as absolute values, the voltage adjustment is carried out usingvalues relative to the Pi’s stock 1.2 Vsetting. For eachwhole number above zero, the voltage is increased by0.025 V fromstock. For eachwhole number belowzero, the voltage is decreased by0.025 Vfromstock. The voltage adjustment settings have upper and lower limits of8 and -16, equivalent to 0.2 Vabove stock voltage or 1.4 V absolute and 0.4 Vbelowstock voltage or 0.8 Vabsolute. The voltage must be adjusted inwhole numbers, and it cannot be adjusted below0.8 V(-16) or above 1.4 V(8.) The followingsettings are accessible fromconfig.txt: • over_voltage—Adjusts the BCM2835’s core voltage. Values are givenas a whole number (aninteger) correspondingto 0.025 Vabove or belowthe default value (0,) witha lower limit of-16 and anupper limit of8. • over_voltage_sdram—Adjusts the voltage givento the memorychip onthe Pi. As withover_voltage, values are givenas a whole number correspondingto 0.025 Vabove or belowthe stock (0,) witha lower limit of-16 and anupper limit of8. Additionally, youcanadjust voltages for individualmemorycomponents usingthe followingoptions: • over_voltage_sdram_c—Adjusts the voltage givento the memorycontroller. Acceptable values are the same as with over_voltage_sdram. • over_voltage_sdram_i—Adjusts the voltage givento the memory’s input/output (I/O) system. Acceptable values are the same as withover_voltage_sdram. • over_voltage_sdram_p—Adjusts the voltage givento the memory’s physicallayer (PHY) components. Acceptable values are the same as withover_voltage_sdram. As anexample, the followinglines entered into config.txt willgive the BCM2835 a smallboost of0.05 Vto 1.25 Vand the memorychip a bigger boost of0.1 Vto 1.3 V: over_voltage=2 over_voltage_sdram=4 As withother settings, deletingthe lines fromconfig.txt or deletingthe file itselfwillreturnthings to normal. Unlike the other settings inthis section, however, the evidence willremaininthe formofa blownfuse inthe BCM2835—renderingthe Pi’s warrantynulland void evenafter the default settings are restored. Disabling L2 Cache The Pi’s BCM2835 SoC processor has 128 KBofLayer 2 cache memoryonboard. Althoughthis memoryis small, it’s extremelyfast. It’s used to temporarilystore—aka cache—data and instructions betweenthe slower mainmemoryand the processor itselfto improve performance. Because ofthe BCM2835’s origins as a multimedia processor targeted at set-top boxes, this L2 cache is designed to be used by the GPUportionofthe chip alone. Unlike a traditionalprocessor, the CPUdoesn’t have anyL2 cache ofits own.
  • 68.
    Usingconfig.txt, youcantellthe BCM2835to allowits CPUportionaccess to the L2 cache memory. Insome cases, this canimprove performance. Inother cases, this canharmperformance, due to the physicallocationofthe cache beinga relatively longdistance awayfromthe CPUsectionofthe chip and closer to the GPU. Use ofthe L2 cache memoryalso requires a Linuxdistributionthat has beencompiled withthe cache memoryinmind. Enabling the L2 cache ona distributionbuilt for a standard Piwithcache disabled mayresult instrange and unwanted behaviour. To switchthe L2 cache onfor CPUaccess, simplyadd the followingline to the config.txt file: disable_l2cache=0 As withallconfig.txt settings, the systemmust be rebooted before the change willtake place. To disable the CPU’s access to the cache memory, replace the 0 witha 1. Enabling Test Mode This finaloptioninconfig.txt is one the overwhelmingmajorityofPiusers won’t need to touch, but is included here for completeness:test mode. Used duringproductionofthe RaspberryPiat the factory, the test mode—combined withspecial hardware used to electricallycheck the board—allows the factorystaffto make sure the Piis operatingas it should. Enabling test mode won’t do any permanent damage, but the Pi won’t boot into its operating systemuntil the mode is disabledagain andthe power to the Pi is switchedoff andback on. Ifyou’re curious to see what the Pilooks like to factorystaff, youcanenable test mode byenteringthe followingoptioninto the config.txt file: test_mode=1 As withother config.txt settings, test mode won’t be enabled untilthe Piis restarted. Test mode canbe disabled againby removingthe line inconfig.txt, deletingthe file altogether, or replacingthe 1 witha 0. Memory Partitioning—start.elf Althoughthe RaspberryPionlyhas a single 256 MBmemorychip, that memorycanbe apportioned to the hardware ina variety ofways. The BCM2835 is split into two mainsections:the general-purpose CPUand the graphics-oriented GPU. Bothofthese sections require memoryto operate, meaningthat the 256 MBofmemoryonthe RaspberryPineeds to be shared betweenthe two. This split is controlled bya file called start.elf. The typicalsplit is chosenbythe maintainers ofthe Linuxdistributioninstalled onthe Pi. Some choose to split the memory straight downthe middle, at 128 MBeachfor CPUand GPU, ensuringthat the graphics hardware canperformto its fullest potential. Others allowthe CPUto have a larger share inorder to improve general-purpose performance. The majorityofdistributions include three copies ofstart.elf inadditionto the one that’s loaded whenthe Piboots: arm128_start.elf, arm192_start.elf, and arm224_start.elf (see Figure 6-2). These three files are identicalexcept for one smallchange:the amount ofmemoryreserved for the BCM2835’s CPU. Figure 6-2:The various start.elffiles inthe /boot directory
  • 69.
    The first file,arm128_start.elf, is configured to split the memorydownthe middle, with128 MBavailable to the BCM2835’s ARM CPUand 128 MBavailable to the VideoCore IVGPU. The second and third files graduallyreduce the amount ofmemoryavailable to the GPU. arm192_start.elf gives 192 MBto the CPUand 64 MBto the GPU, while arm224_start.elf gives 224 MBto the CPUand 32 MBto the GPU. Bytellingthe Pito use these files, youcanincrease the amount ofmemoryavailable for general-purpose computing. Applications that do heavy graphics work, such as 3D games andhigh-definition video playback software, typically need128 MBof memory forthe GPU. Reducing this can result in a dramaticdropin performance. Most general-purpose distributions work ona 192 MB/64 MBsplit, but youcanfree up more memoryfor programs byforcing the Pito use the 224 MB/32 MBsplit. This canimprove general-purpose performance without the risks associated with overclockingthe Pi. To change howthe memoryis apportioned, simplydelete start.elf fromthe /boot directoryand copyone ofthe three other versions inits place. Make sure yourename the file to start.elf, or the Piwon’t boot. The easiest wayto achieve this is to type the followingat the terminal: sudo cp /boot/arm224_start.elf /boot/start.elf Whenyounext reboot the Pi, it willhave more memoryavailable to the ARM CPU. To check the amount ofmemoryavailable, type free at the terminal. To change to another memorysplit, simplyrepeat the precedingcommand witha different versionof start.elf as the source file:arm_192_start.elf or arm128_start.elf. Software Settings—cmdline.txt Inadditionto config.txt, whichcontrols various features ofthe Pi’s hardware, there’s another important text file inthe /boot directory:cmdline.txt (see Figure 6-3). This file contains what is knownas the kernelmode line—options passed to the Linux kernelas the Piboots up. Figure 6-3:The cmdline.txt file in/boot
  • 70.
    Ina Linux-based desktopor laptop, these options are normallypassed to the kernelbya toolknownas a bootloader, whichhas its ownconfigurationfile. Onthe Pi, the options are simplyentered directlyinto cmdline.txt to be read bythe Piat startup. Almost anykerneloptionsupported byLinuxcanbe entered into the cmdline.txt file, to alter things like the appearance ofthe console or whichkernelis loaded. As anexample, here is the cmdline.txt file fromthe Debiandistribution, whichshould be writteninthe file as one continuous line: dwc_otg.lpm_enable=0 console=ttyAMA0,115200 kgdboc=ttyAMA0,115200 console=tty1 root=/dev/mmcblk0p2 rootfstype=ext4 rootwait The first option, dwg_otc.lpm_enable, tells the Pito disable the On-The-Go (OTG) mode ofits USBcontroller, to prevent problems that canoccur whenthe functionalityis enabled without proper support inthe operatingsystem. The majorityofLinux distributions for the Pidisable this mode. The console optiontells Linuxthat it should create a serialconsole—device ttyAMA0—and at what speed it should operate. In most cases, the speed should be left at the default of115,200 Kb/s (kilobytes per second). Ifthe Piis beingused to communicate witholder devices, this canbe reduced accordingly. The kgdboc kerneloptionenables debuggingofthe Linuxkernelover the serialconsole created usingthe console parameter. For most users, this is unnecessary. For developers, havingaccess to kerneldebuggingover a serialconnectionis most useful. Manydistributions leave this enabled just incase. The second console entrycreates the device tty1, whichis the text-filled screenyousee whenyoufirst boot the Pi. Without this entry, youwouldn’t be able to use the Piwithout connectingsomethingto the serialconsole created bythe first console option. The root optiontells the Linuxkernelwhere it canfind its root file system, containingallthe files and directories required for the systemto operate. Inthe case ofthe default Debiandistribution, this is onthe second partitionofthe SDcard—device mmcblk0p2. This optioncanbe altered to address anexternalstorage device connected over USB, whichcanspeed up the operationofthe Piconsiderablycompared to havingthe root file systemstored onthe SDcard. Inadditionto tellingthe kernelwhere to find its root file system, it also needs to knowwhat format the partitionwas created in. Because Linuxsupports a varietyofdifferent file systems, the rootfstype optionspecificallytells the Debiandistributionuses anEXT4 file system. Finally, the rootwait parameter tells the kernelthat it should not tryto boot the systemanyfurther untilthe device containingthe
  • 71.
    root file systemisavailable. Without this option, the Picanget stuck as it begins to boot before the relativelyslowSDcard is fullyreadyfor access. Withthe exceptionofthe dwc_otg setting, none ofthese kernelparameters are unique to the Pi. The bootloader configurationof anyLinuxdistributionwillinclude a list ofoptions verysimilar to those ofcmdline.txt. Typically, youshould leave the cmdline.txt alone. It’s created bythe distributionmaintainers specificallyfor that versionof Linux, and maydiffer fromone distributionto the next. Entries that work onFedora Remixmaynot work onDebian, and vice versa. The options available to cmdline.txt depend onwhat kernelthe distributionis usingand what features were included whenthe kernelwas built. Ifyou’re a kerneldeveloper, youcanuse cmdline.txt to pass parameters for enablingor disablingnewfunctionalitythat you’ve compiled into the kernel. As withconfig.txt, anychanges require a reboot to take effect.
  • 72.
    Part II: Usingthe Pi as a Media Centre, Productivity Machine and Web Server Chapter 7:The Pias a Home Theatre PC Chapter 8:The Pias a ProductivityMachine Chapter 9:The Pias a Web Server
  • 73.
    Chapter 7: ThePi as a Home Theatre PC One of the most popular tasks for a Pito carryout is that ofa home theatre PC, or HTPC. The BroadcomBCM2835 at the Pi’s heart is specificallydesigned as a multimedia powerhouse, originallydeveloped for use inHTPCs. The graphics portionofthe BCM2835 system-on-chip (SoC) design, a BroadcomVideoCore IVmodule, is capable offull- speed high-definitionvideo playback usingthe popular H.264 format. The chip is also able to playback audio files ina varietyof formats, boththroughthe analogue 3.5 mmaudio output and digitallyvia the HDMI port. The smallsize, lowpower drawand silent operationcombine to make the Pia temptingdevice for home theatre enthusiasts. A varietyofdistributions and software packages designed to turnthe Piinto a user-friendlyhome theatre PC have appeared since its launch, but youdon’t necessarilyneed to give up your existingoperatingsystemto get started. Playing Music at the Console Ifyou’re a developer, youwilllikelyspend most ofyour time at the Pi’s console. Withthe majorityofmusic playback software beingaimed at desktop use, it canbe a quiet experience—but it doesn’t have to be. The Pisupports a powerfultext-based music playback package called moc (whichstands for music onconsole). Unlike other tools (suchas LXMusic), moc canbe installed and used evenwhenthere is no graphicaluser interface (GUI) installed onthe Pi. To get started, installthe moc package fromyour distribution’s repositories. For the Debiandistribution, this is as simple as typingthe followingcommand at the console or ina terminalwindow: sudo apt-get install moc Some distributions already have anothertool calledmoc, which has nothing to do with audio playback. If you findthat installing mocdoesn’t give you the result you’re expecting, try substituting mocpas the package name. Ifyouspend a lot oftime outside ofthe graphicaluser interface and workingat the console, moc is a great choice for music playback. Unlike other tools, it runs inthe background, meaningthere’s no interruptionto your music ifyoustart doingsomething else. To load moc, the command is mocp rather thanmoc. The reasonfor this is that there’s another toolwhichuses the command moc, so a different name was chosento prevent the operatingsystemfromgettingconfused betweenthe two packages. To get started, just enter the console—or a terminalwindowifyou’re usinga desktop environment—and type the following: mocp The standard mocp interface is split into two panes (see Figure 7-1). The left pane is a file browser, whichallows youto look for music to play. The cursor keys scrollup and downthe list, while the Enter keystarts playback fromthe currentlyhighlighted song. Ifyoupress Enter ona directoryname, the browser willenter that directory, while pressingit at the ../ entryat the top of the list goes back one directorylevel. The right pane shows the current playlist. Figure 7-1:The standard interface ofthe mocp console-based music player
  • 74.
    Where the powerofmocp becomes apparent is whenyouexit the applicationbypressingthe Q key. Ifmocp is inthe middle of playingback music, it willcontinue to do so evenas youuse the console or terminalwindowfor other tasks. Runningthe mocp command againwillrestore the interface, allowingyouto change songs, pause or stop playback. Youcanalso controlmocp directlyfromthe terminal, without havingto use the interface. Runningthe mocp command withflags—the options that followa command, prefixed witha hyphencharacter—allowyouto start, stop, pause, skip and otherwise change the playback without havingto go into the software. The most commonlyused mocp flags are the following: • -s—Stop the current playback • -G—Pause playback, or resume playback ifcurrentlypaused • -f—Skip to the next songinthe directoryor playlist • -r—Returnto the previous songinthe directoryor playlist • -i—Print informationonthe current songto the terminalor console • -x—Stop playback and quit mocp altogether For more informationoncontrollingmocp, type manmocp. Dedicated HTPC with Rasbmc Beingable to playmusic onthe RaspberryPiis one thing, but the BCM2835 cando muchmore thanthat. Usingits VideoCore IVGPU, it candecode and playback FullHD1080p H.264 video, makingthe Pia powerfulmedia centre machine ina tiny package and withincrediblylowpower demands. To get the most fromthe Pias a home theatre PC, however, some additionalsoftware is required. This software canbe installed inthe Debiandistribution, but there’s aneasier wayto get started:switchingto the Rasbmc distribution. Rasbmc, created bySamNazarko, is a distributionaimed specificallyat turningthe RaspberryPiinto a fully-featured media centre system, complete withvideo and music playback, photo viewingand Internet streamingcapabilities. It’s based onthe popular Xbmc distribution, whichhas beenchosenbyseveraldevice manufacturers to power their commercialset-top box systems. Ifyou’re planningonmakinguse ofthe Pi’s high-definitionvideo output and H.264 decodingcapabilities inyour home theatre setup, Rasbmc is anexcellent choice and no more complicated to get up and runningonthe Pithananyother Linuxdistribution. First, download the installer fromthe officialwebsite at http://www.raspbmc.com/download/. This is the easiest wayto get Rasbmc up and running. Installers for Linux, OS Xand Windows are provided whichautomaticallydownload the image file for Rasbmc and write it to anSDcard connected to the system. Althoughyoucanalso download animage file and use the
  • 75.
    instructions fromChapter 1,“Meet the RaspberryPi”, it’s not necessaryto do so. If you already have an SD cardyou use with the Pi, be aware that installing Rasbmcon it will delete the contents of the card. Back upany files you want to keep, orif you want to be able to switch between the two distributions, buy a secondSD cardspecifically forRasbmcuse. Whenthe Rasbmc installer has finished, insert the SDcard into the Piand re-connect the power supply—but make sure the Ethernet cable is connected as well, because Rasbmc needs to download some data fromthe Internet whenit first loads. The initialload ofRasbmc cantake 10 or 15 minutes to complete as it downloads updates and partitions the SDcard, but subsequent loads are significantlyfaster. Don’t panic ifthe first boot hangs at the FormattingPartitions stage—anelongated pause here is normal. Whenloaded, Rasbmc automaticallystarts the Xbmc service (see Figure 7-2). This provides a customuser interface specifically designed for living-roomuse. Everythingis accessible throughthe keyboard or mouse, withlarge and easilyreadable text and categorised menus to make it easier to find things. Youcanalso purchase infrared remote controls, whichcome witha receiver that plugs into the Pi’s USBport and a transmitter that allows for a true home theatre experience withno bulkykeyboard or trailingwires. Figure 7-2:The Xbmc home screen, loaded byRasbmc Streaming Internet Media Bydefault, Xbmc is configured to playonlyfiles it canfind onthe RaspberryPiitself. Ifyouchoose Add-ons frombeneaththe Video menu, you’llbe able to add some impressive Internet streamingcapabilities to the device, includingaccess to various TV channels and Internet-onlystreamingservices. After clickingAdd-ons, choose Get More to access the fulllist ofcompatible plug-ins (see Figure 7-3). Figure 7-3:Addingnewvideo add-ons inRasbmc
  • 76.
    Scrollthroughthe list withthemouse or cursor keys, and click onanentryor press the Enter keyto access more information. To installanadd-on, just click Installfromthe pop-up informationboxthat appears whenyouclick onanentryinthe list. This will download the add-onfromthe Internet and automaticallyinstallit into Xbmc. Watchout for add-ons listed as Broken—these have beenreported as not workingcorrectly, and should not be installed untilthe problemis fixed bythe add-ondeveloper. After youfinishchoosingand installingvideo add-ons, click the Home buttoninthe bottom-right corner ofthe screento returnto the mainXbmc interface. Nowclick onthe word Video inthe centre ofthe screenor press Enter, and thenchoose Video Add- ons fromthe options that appear. This provides access to your installed add-ons. Click onone to download a list offiles for viewing. Ifanadd-onhas various categories, it willdownload those categories first—inthis case, click onanindividualcategory to see the files it contains (see Figure 7-4). Figure 7-4:Alist ofvideos available throughthe CollegeHumor Xbmc add-on
  • 77.
    Similar add-ons areavailable under the Music and Video menus, and operate inthe same way. Usingthese add-ons, youcan viewpicture content and streamaudio content fromsites suchas Flickr, Picasa, The BigPicture, Grooveshark, Sky.fmand SoundCloud. Streaming Local Network Media The Xbmc software supports the UniversalPlugand Play(UPnP) media streamingstandard, allowingit to connect to a range of devices onyour home network. UPnP support is included inmost modernmobile phones, games consoles and network- attached storage (NAS) devices for sharingand streamingvideos, music and pictures. Manylaptops and desktops also come withsupport for UPnP or the closelylinked DigitalLivingNetwork Alliance (DLNA) standard—check your documentationto find out howto enable this feature onyour owndevices. Xbmc isn’t just limited to UPnP connections, however—the software canalso connect to network servers runningthe Network File System(NFS) standard commonto Unix-based systems, the Server Message Block (SMB) standard commonto Windows servers and the Zeroconfstandard commonto OS Xdevices. No matter what network-attached device youuse to store your media content, it’s likelythat Xbmc willsupport at least one wayofconnectingto it. To configure Xbmc to connect to a server onyour home network, choose the media type—Video, Music or Pictures—and click the Add Source option. Inthe windowthat appears, choose Browse to retrieve a list ofsource types (see Figure 7-5). These source types include localdrives connected to the RaspberryPi, whichare highlighted witha blue iconas wellas network devices, whichare highlighted witha red icon. Choose the type ofserver you’re tryingto connect to fromthe list, and thenclick onthe server that appears. Ifthe server youselect has multiple folders available—suchas folders for different genres, artists, albums or file types—select the folder youwant Xbmc to connect to and click the OK button. This willreturnyouto the Add Source screen(see Figure 7-6) withthe required informationfilled in. Ifadditionaldetails are required—suchas a user name and password for a protected server—you’llneed to fillthese inbefore clickingOK. Figure 7-5:Choosinga network source inXbmc
  • 78.
    Figure 7-6:Addinga UPnPmusic source to Xbmc Youcanalso use the same menuto add anexternalhard drive as a source to Xbmc byselectingits entryinthe initiallist. Most externaldrives willappear automatically, and do not need to be added explicitly—youonlyneed to add a drive as a source ifits contents do not appear inXbmc’s menus. Configuring Rasbmc
  • 79.
    The Programs menuonthehome screenprovides access to the Rasbmc Settings menu(showninFigure 7-7) where network settings, software upgrade settings and various systemsettings canbe adjusted. Normally, this menucanbe ignored—however, ifyou’re havingproblems connectingto the Internet or the Rasbmc systemis continuouslycrashing, the Programs menucan provide important tools for resolvingthe issue. Clickingthe Rasbmc Settings optionunder the Programs menuwillopena windowwiththree tabs. The first tab allows youto adjust the network settings, includingdisablingDHCP and settinga manualnetwork configuration(see Chapter 4, “Network Configuration”, for more details). Ifyouneeded to set the RaspberryPito use a manualnetwork configurationinother distributions, this is the place to do the same inRasbmc. Figure 7-7:ConfiguringRasbmc inthe Settings menu The second tab, marked XBMC, allows youto installthe nightlybuild ofthe XBMC software. The nightlybuild is so called because it is created fromthe program’s source code automaticallyeverynight, and contains the latest changes made bythe software’s developers. As a result, it canhave fixes for anybugs youmayencounter—but it canalso have untested changes that maymake matters worse. This same screenallows youto switchbetweendifferent versions ofXMBC, makingit easyto test the nightlybuild and returnto the default versionifa problemis found. Finally, the Systemtab allows youto set a newpassword for the piuser account to secure Rasbmc for network access. As with the general-purpose Debiandistribution, this password is set to raspberrybydefault. The Systemtab also allows youto disable automatic upgradingofthe Rasbmc software. This should be left enabled where possible, as it willensure youget the latest securityand bugfixes delivered automatically, but ifyou’re ona per-megabyte metered Internet connection, youcandisable the feature.
  • 80.
    Chapter 8: ThePi as a Productivity Machine The flexibility of the RaspberryPimakes it a good choice as a low-power general-purpose desktop computer. Althoughit will never reachthe same levels ofperformance as a standard desktop or laptop, its lowcost and environmentally-friendlypower consumptionhelp to make up for anyproblems withoccasionallysluggishperformance. Althoughthe RaspberryPi-specific Debiandistributionprovided onthe officialwebsite doesn’t include anyofthe usual productivitysoftware youmight expect ofa general-purpose PC—suchas a word processor, spreadsheet or image editing—this software canbe installed via the apt-get command. Youcanalso skip the localinstallationand use cloud-based software throughthe web browser, whichcanoffer improved performance over locally-installed packages at the cost offlexibilityand advanced functionality. Usingeither ofthe methods described inthis chapter—locally-installed applications or cloud-based services—the Picanbe used as a day-to-daymachine for office and schoolwork, while not harmingits usabilityas a platformfor programmingand experimentation. If you’re planning to use the Pi as a pure productivity machine, it’s a goodidea to reserve more of the 256 MBof memory forgeneral-purpose use andless forthe graphics processor. To learn howto change this split, see the section on “Memory Partitioning—start.elf” in Chapter6, “Configuring the Raspberry Pi”. Using Cloud-Based Apps Ifyouuse your Piconnected to the Internet the majorityofthe time, either throughthe ModelB’s integrated Ethernet port or a USBwired or wireless adapter onthe ModelA, cloud-based software offers a powerfulyet lightweight means ofusingoffice- centric software onthe Pi. Cloud-based software is so called because it doesn’t live locallyonyour computer like a regular piece ofsoftware. Instead, it’s stored onpowerfulservers located indata centres throughout the world and accessed over the Internet usinga web browser. By tappinginto the processingand storage capabilities ofa far more powerfulremote server, it’s possible for the Pito work on more complicated documents and tasks without slowingdown. Cloud-based software has other advantages over locally-installed applications, too. Anygivencloud-based applicationwilllook the same onanygivendevice, and manyofthese applications include mobile-oriented versions designed for access from smartphones and tablets. Files are also stored onthe remote servers, makingthemaccessible fromanydevice without takingup anyroomonthe Pi’s SDcard. Cloud-based applications aren’t perfect, however. Theytypicallylagbehind their locally-installed counterparts infunctionality, and oftenlack advanced features or support fewer file formats. Theyare also inaccessible whenno Internet connectionis available, makingthema poor choice for users withunreliable connections. Ifyouthink that the improved performance and saved space onyour Pi’s SDcard is worththe trade-off, continue reading. If not, skip to the next sectionofthis chapter to learnhowto installOpenOffice.org, anopen-source office suite equivalent to Microsoft Office. The most popular cloud-based office suites are the following: • Google Drive—Runbythe searchand advertisinggiant Google, Google Drive (formerlyknownas Google Docs) includes a word processor, a spreadsheet and a presentationtool(see Figure 8-1). Corporate users canalso signup for a Google Apps account, whichprovides improved functionality. Ifyouhave a Gmailweb-based emailaccount, it willautomaticallywork for Google Drive. Youcanaccess the service at http://docs.google.com. Figure 8-1:Google Drive runninginChromiumonthe RaspberryPi
  • 81.
    • Zoho—Withfive millionregisteredusers, Zoho is another popular choice. As withGoogle Drive, a word processor, spreadsheet and presentationpackage are included, but Zoho also offers enhanced business-centric features like a wiki- based knowledge base system, web conferencing, financialmanagement and evencustomer relationship management. Many ofthe advanced features, however, require a paid account. Youcanaccess the service at http://www.zoho.com. • Office 365—Ifyou’re a Microsoft Office user, Office 365 is a great choice. Based onthe same user interface as the current editions ofthe Microsoft Office suite for desktops, Office 365 is powerfuland flexible. Unlike Zoho and Google Drive, Office 365 has no free user leveland requires a monthlysubscription. Additionally, some features won’t work whenthe software is accessed froma Linuxcomputer. Youcansubscribe the service at http://office365.microsoft.com. • ThinkFree Online—Aweb-based interface to the HancomThinkFree Office software, ThinkFree Online offers word processing, spreadsheet and presentationsoftware for free with1 GBofstorage. The systemalso ties into ThinkFree Mobile for tablets and smartphones, as wellas the enterprise-targeted ThinkFree Server software. Youcansubscribe to the service at http://online.thinkfree.com. Unfortunately, manyofthese web-based services require a browser more capable thanMidori, whichis provided as the default withthe recommended Debiandistribution. As a result, you’llhave to installa different browser inorder to make use ofanyof these packages. The followinginstructions are for installingthe Chromiumbrowser, whichis anopen-source project onwhich Google’s Chrome browser is based. Its relativelylightweight memoryusage makes Chromiuma good choice for the Pi. Ifyou’re runningthe Fedora Remixdistribution, whichcomes withMozilla Firefoxas its default browser, youcanskip these instructions and proceed to the next section. To installthe Chromiumbrowser under Debian, opena terminaland type the following: sudo apt-get install chromium-browser Make sure you install the chromium-browserpackage, andnot the chromiumpackage—the latteris a top-down shoot-’em-uparcade game, and although it’s fun, it won’t helpyou in yourquest to use cloud-basedoffice suites on yourPi! WithChromiuminstalled, usinga cloud-based office suite is as simple as visitingthe site, signingup for anaccount—providing your credit card details inthe case ofpremiumservices like Microsoft Office 365—and loggingin. Ifyoufind performance slow, changingthe memorypartitioningto give the ARM processor a larger share canhelp. Chapter 6, “Configuringthe RaspberryPi”, has fullinstructions for howto do this.
  • 82.
    Using OpenOffice.org Ifyouwould prefernot to use a cloud-based service, the alternative is to installOpenOffice.org. Designed as anopen-source, cross-platformalternative to the popular Microsoft Office suite, OpenOffice.orgis powerfuland offers just as muchfunctionality as its closed-source inspiration. That functionalitycomes at a cost, however. The OpenOffice.orgpackage is large, takingup nearly400 MBofspace onthe Pi’s SDcard once allthe dependencies are included. That canbe a problem:inits default setup, the recommended Debian distributionhas less free space available onthe SDcard thanOpenOffice.orgrequires. (For more informationonthe partition layout ofthe Debiandistribution, see the “File SystemLayout”sectioninChapter 2, “LinuxSystemAdministration”.) Ifyouwant to installOpenOffice.org, you’llneed a 4 GBor larger SDcard. You’llalso need to resize the root filesystemto make use ofthe SDcard’s free space. For instructions ondoingthis, see Chapter 5, “PartitionManagement”. Make sure you performthis task before continuingwiththis chapter, or you’llfind your Pi’s SDcard runningout ofspace before youcanuse OpenOffice.org. Withenoughfree space onthe SDcard, installingOpenOffice.orgis no more complexthaninstallinganyother package. Althoughit comes bundled witha great dealofadditionalpackages, a single metapackage takes care ofeverythingand installs the software witha single command. Opena terminalwindowand type the following: sudo apt-get install openoffice.org If you receive errormessages saying files are missing when you’re installing software like OpenOffice.org, the package cache is likely out of date. Run the commandsudo apt-get update to refresh the cache, andthen try again. (See Chapter2, “Linux SystemAdministration” formore details.) Wheninstalled, OpenOffice.orgwillappear as a series ofentries inthe Applications Menuinthe Pi’s desktop environment. These entries are as follows: • OpenOffice.org—The mainapplication, whichprovides links to the individualsections ofthe suite • OpenOffice.orgCalc—The spreadsheet application, equivalent to Microsoft Excel • OpenOffice.orgDraw—Avector illustrationapplication, designed for drawinghigh-qualityscalable images for use as clipart inother OpenOffice.orgprograms • OpenOffice.orgImpress—The presentationapplication, equivalent to Microsoft PowerPoint • OpenOffice.orgMath—Asmallyet powerfulpackage designed to make it easyto create and edit scientific formulae and equations for embeddinginother OpenOffice.orgprograms • OpenOffice.orgWriter—The word processor application, equivalent to Microsoft Word (see Figure 8-2) Figure 8-2:OpenOffice.orgWriter runningonthe RaspberryPi
  • 83.
    Bydefault, OpenOffice.orgsaves andloads files ina format knownas the OpenDocument Format (ODF). This is a standards- based, royalty-free file format supported bythe majorityofoffice suite packages—includingnewer versions ofMicrosoft Office. Whensavinga file inOpenOffice.org, youcanchange the format usinga drop-downmenuinthe Save As dialogue. Under File Type, youcanselect a varietyofformats, includingseveralwhichare fullycompatible witholder versions ofMicrosoft Office. Whenyou’re sharingfiles created onthe PiinOpenOffice.orgwithusers ofolder software, remember to change the format to ensure that everyone canopenthe files. Alternatively, youcould convince themto installOpenOffice.orgthemselves, whichis available free for Linux, Windows and OS X. Image Editing with The Gimp OpenOffice.orgis a powerfulpiece ofsoftware, but one area where it lacks is inimage editing. AlthoughOpenOffice.orgDraw is a powerfultoolfor illustrative work, unfortunately, youcan’t use it to touchup digitalphotographs. These are knownas bitmapped images, and are verydifferent to the vector images Drawis designed to edit. For image editing, one ofthe most powerfultools available for Linuxis the GNUImage ManipulationProgram, usuallyreferred to as The Gimp. The Gimp is one ofthe most popular projects inopensource, because it offers powerfulfeatures for editing bitmapped images witha user interface that is similar to the interface that’s used bythe commercialAdobe Photoshop package (see Figure 8-3). Figure 8-3:The Gimp runningonthe RaspberryPi
  • 84.
    The Gimp isnot installed bydefault inmost RaspberryPidistributions, so you’llhave to connect your Pito the Internet and install it throughthe package management system(see Chapter 2, “LinuxSystemAdministration”, for details). The Gimp takes up quite a lot ofspace onthe SDcard—althoughnot as muchas OpenOffice.org—so make sure youhave enoughfree space before installingit. To installThe Gimp, opena terminalwindowand type the following: sudo apt-get install gimp The Gimp cantake a little while to get used to, because its user interface uses three different windows rather thanjust one. By default, the windowonthe left contains the Toolbox; the windowonthe right displays the Layers, Channels, and Gradients options; and the middle windowdisplays the image you’re currentlyediting. Ifyouopenmore thanone image, you’llget more thanone mainwindow—but stillonlyone eachofthe Toolboxand the Layers, Channels, and Gradients windows. Bydefault, The Gimp User Manualis not installed. For the Pi, this is a good thing:The Gimp is a powerfultool, and its user manualtakes up a not-inconsiderable amount ofspace onthe SDcard. Ifyoutryto access the manualbypressingthe F1 keyor choosingHelp fromthe Help menu, you’llbe prompted to read anonline, web-based versioninstead. Click the Read Online buttonto openthe user manualinyour browser. The Gimp is a verypowerfulutility, and uses a lot ofmemory. As a result, it runs relativelyslowlyonthe RaspberryPi—although it is definitelyusable. Be patient withit, especiallyifyou’re openinglarge photographs froma digitalcamera. It mayhelp to increase the amount ofsystemmemoryavailable bychangingthe start.elf file (see Chapter 6, “Configuringthe Raspberry Pi”, for more details onhowthis is achieved). Whensavingfiles inThe Gimp, youcanuse a varietyoffile formats. Ifyou’re planningoncomingback to the file and doingmore editing, youshould use The Gimp’s default XCF file format. This keeps important metadata intact, uses lossless compressionto maximise image qualityand supports images comprised ofmultiple layers. Ifyou’re planningonuploadingyour image to the Internet or otherwise sharingit withothers, a more-portable format like JPGor PNGis recommended. To change the format ofthe file, choose the Export optionfromthe File menurather thanthe Save option (see Figure 8-4). This allows youto choose the file format froma wide varietyoffile types. Figure 8-4:Exportinga file fromThe Gimp
  • 86.
    Chapter 9: ThePi as a Web Server Althoughthe Pi is significantlyless powerfulthanmost devices youwould find ina data centre, that doesn’t meanthat it can’t act as a usefulserver ina home or business environment. Despite a smallamount ofmemoryand relativelyunderpowered processor, the Pi’s lowpower drawand silent runningmakes it a great choice for servinglow-traffic simple pages to a local network or evenout onto the Internet. Alarge proportionofmodernweb servers runa combinationofLinux, Apache, MySQLand PHP—commonlyreferred to as a LAMP stack. Linuxprovides the underlyingoperatingsystem; MySQLthe database back-end; Apache the web server; and PHP a scriptinglanguage for dynamic pages. Usinga LAMP-based server, youcanrunsome quite complexpackages ranging fromcontent management systems like WordPress to interactive forums like phpBB. Allofthis is possible withthe RaspberryPi, so longas youdon’t expect performance similar to that ofa powerfulcommercialserver. Webservers work best with plenty of memory. To ensure maximumperformance, switch the Pi’s memory partitioning to a 224/32 MBsplit (see Chapter6, “Configuring the Raspberry Pi”) anddon’t run a graphical userinterface (GUI) at the same time. Installing a LAMP Stack Ifyou’re runningthe recommended Debiandistributionfor the RaspberryPi, you’re alreadyone-quarter ofthe wayto havinga fully-operationalLAMP stack—specifically, you’ve alreadygot the Linuxportioninstalled. The next step is to installthe missing components:Apache, MySQLand PHP. At the terminalor console, type the followingcommands to installthese packages: sudo apt-get update sudo apt-get install apache2 php5 php5-mysql mysql-server This willprompt the apt package manager (see Chapter 2, “LinuxSystemAdministration”) to find a number ofdependencies required to get a fully-functionalLAMP stack running(see Figure 9-1). These packages and their dependencies take up a lot of roomonthe Pi’s SDcard—around 113 MBintotal—so ifyouhaven’t resized the root partitiononthe SDcard, turnto Chapter 5, “PartitionManagement”, for instructions onhowto free up more space. Installationofthe fullLAMP stack cantake quite some time onthe Pi. Don’t panic ifthe systemappears to freeze for a minute or two; the installationshould continue normallyafter. Partwaythroughthe installationprocess, MySQLwillprompt youfor a password (see Figure 9-2). Make sure youpick a secure password, as this protects the MySQLdatabase—which, depending onwhat your web server is designed to do, canstore user names, payment details and other personallyidentifiable information. Also make sure youpick a password youcanremember! You’llbe asked to confirmthe password—to check for typingerrors —and thenthe installationwillcontinue. Figure 9-1:Installingthe LAMP stack onDebian
  • 87.
    Figure 9-2:Choosinga passwordfor MySQL Whenthe software installationhas finished, boththe MySQLand Apache servers—knowninLinuxparlance as daemons—will be runninginthe background. To check that the server is workingcorrectly, use another computer onthe network to connect to the RaspberryPiusinga web browser. Inthe address bar, type the IP address ofthe Pito displaythe default Apache installation page (see Figure 9-3). Ifyou’re not sure what IP address the Piis using, type ifconfig at the terminaland look for the IP address listed inthe eth0 section, or the sectioncorrespondingto the network adapter inuse onyour Piifyou’re not usingthe ModelB’s built-inEthernet port. For more informationoncheckingand adjustingnetwork settings onthe Pi, see Chapter 4, “Network Configuration”. Figure 9-3:Connectingto the Pi’s Apache server usinga web browser
  • 88.
    The finalstep isto confirmthat the PHP scriptingmodule is loaded correctlyinApache. This module is important:it allows the Apache web server to runPHP scripts to serve dynamic content. Without a workingPHP module—or analternative module for another scriptinglanguage like Python—Apache is onlyable to server static pages. To test the Apache PHP module, create a newPHP script file usingthe followingcommand, typed as a single line: sudo sh -c ‘echo “<?php phpinfo(); ?>” > /var/www/phptest.php’ This command creates a newfile called phptest.php inthe /var/www directory. This file tells PHP to create aninformation page for diagnostic purposes. Visit this usingeither a browser onanother computer bytypinghttp://ipaddress/phptest.php (replacingipaddress withthe IP address ofthe RaspberryPi) or onthe Piitselfbytypinghttp://localhost/phptest.php into the address bar (see Figure 9-4). Figure 9-4:TestingApache’s PHP module onthe RaspberryPi
  • 89.
    Whenyou’ve finished testing,remove the phptest.php file withthe followingcommand: sudo rm /var/www/phptest.php Although Apache is the most common webserver, there are others. If you findthe performance of Apache too slow, experiment with lighttpd—a lightweight webserverdesignedto use less memory than Apache. It can be installedunderDebian with the commandsudo apt-get install lighttpd. Withthe LAMP stack installed and working, youcannowcreate your ownwebsites that willbe served bythe Pi. As longas the sites aren’t too complex, and don’t receive too manysimultaneous users, the Pishould be able to cope withthe task admirably —and the device’s smallsize and extremelylowpower drawmore thanmake up for anyslowdownshould your site become popular. Bydefault, files for the web server are stored inthe /var/www folder, whichis writeable onlybythe root user. To adjust where Apache looks for its files—to move the website onto more capacious externalstorage, for example—edit the text file 000- default found inthe folder /etc/apache2/sites-enabled. For more informationonconfiguringApache, PHP and MySQL, type the followingcommands at the terminalor console: man apache2 man php5 man mysql Installing WordPress One ofthe most popular bloggingplatforms around, WordPress is anopen-source project that aims to give users a simple yet powerfulplatformto create attractive, interactive websites. WordPress is built ona base ofPHP and Javascript, and offers an attractive web-based interface for creatingrichwebsites. For example, some ofthe most popular news sites inthe world are built ona customised WordPress platform. To installWordPress onthe RaspberryPi, type the followingcommand at the terminalor console: sudo apt-get install wordpress Like the LAMP stack, WordPress comes witha selectionofdependencies (see Figure 9-5). You’llneed to make sure youhave around 37 MBoffree space onthe Pi’s SDcard for the fullinstallation, inadditionto the 113 MBrequired for the LAMP stack. Ifyouhave enoughfree space, type Yto continue the installationprocess. WhenWordPress has finished installing, its default installationdirectory—/usr/share/wordpress—needs to be linked into the /var/www directoryinorder for Apache to see the files. Type the followingcommand at the terminal: sudo ln -s /usr/share/wordpress /var/www/wordpress Figure 9-5:InstallingWordPress onthe RaspberryPi
  • 90.
    Linkinga file ordirectoryis different to moving:the files for WordPress nowexist inboth/usr/share and /var/www simultaneously, without takingup anyextra space onthe Pi’s SDcard. Ifyou’ve told Apache to use a different directoryfor the default website, change the linkingcommand accordingly. Next, runthe WordPress MySQLconfigurationscript usingthe followingcommand, typed as a single line: sudo bash /usr/share/doc/wordpress/examples/setup-mysql -n wordpress localhost This adds a newdatabase into MySQL, installed as part ofthe LAMP stack, for WordPress to use. This database stores your user accounts, posts, comments and other details. Once this script has completed, you’llbe told to visit http://localhost in a browser onthe RaspberryPito continue the installation. This instructionis slightlyincorrect:the address youneed to visit to finishthe WordPress installationis http://localhost/wordpress (see Figure 9-6). Figure 9-6:ConfiguringWordPress inthe NetSurfweb browser Fillinthe formthat loads inthe web browser, pickinga descriptive name for your site and settinga secure—but memorable— password for your user. Be sure to change the Username field fromadmin to somethingelse inorder to make it more secure. Whenyouhave filled inallthe fields, click the InstallWordPress buttonat the bottomofthe page. The installationprocess willtake a minute or two to complete, and thena newpage confirmingthe successfulinstallationof WordPress willload inthe browser. To start usingWordPress, click the LogInbuttonat the bottomofthis page to loginto WordPress withthe user name and password youchose at the earlier screen(see Figure 9-7). Figure 9-7:Logginginto WordPress onthe RaspberryPi
  • 91.
    Before youcanaccess WordPressfromanother computer, you’llneed to create anadditionalconfigurationfile. This is created bylinkingthe existingconfigurationfile—set up for localaccess—usingthe followingcommand, typed as a single line: sudo ln -s /etc/wordpress/config-localhost.php /etc/wordpress/config-ipaddress.php Replace ipaddress inthis code withthe IP address ofyour RaspberryPi. Ifyou’ve giventhe RaspberryPia hostname inDNS, youcanalso create a configurationfile for that hostname usingthe same command, but replacingipaddress withthe chosen hostname. Ifyoudo not have a hostname, simplyuse the Pi’s IP address. For example, the command for a PionIP address 192.168.0.115 would be as follows: sudo ln -s /etc/wordpress/config-localhost.php /etc/wordpress/config-192.168.0.115.php To complete configurationfor externalaccess, choose Generalfromthe Settings menuthat’s located onthe left side ofthe WordPress Dashboard, and change the URLto matcheither the IP address ofthe Pior the chosenhostname (see Figure 9-8). Figure 9-8:Alteringthe URLinthe WordPress GeneralSettings menu WordPress is very memory intensive. Forbest results, use the Pi as a headless server, which is a systemthat runs without a graphical userinterface loaded. Then use a webbrowseron anothercomputerconnectedto the network to access the WordPress Dashboardat http://ipaddress/wordpress/wp- login.php. Accessing the WordPress Dashboarddirectly on the Pi can result in a very long wait!
  • 92.
    The WordPress softwareincludes anautomatic update feature, whichensures that your installationis runningthe latest version. Because ofits popularity, WordPress is oftenthe target ofmalware attacks, and frequent updates are released to patchsecurity holes or add newfeatures. However, wheninstalled via APT, WordPress lacks the permissions required to keep itselfup-to- date. To correct this, type the followingcommand at the terminal: sudo chown -R www-data /usr/share/wordpress This gives the www-data user—the account used bythe Apache web server—the rights to change files located inthe /usr/share/wordpress folder. This willallowautomatic upgradingto operate whenchosenfromthe WordPress Dashboard. For more informationonusingWordPress, visit the officialwebsite at http://www.wordpress.org.
  • 93.
    Part III: Programmingand Hacking Chapter 10:AnIntroductionto Scratch Chapter 11:AnIntroductionto Python Chapter 12:Hardware Hacking Chapter 13:Add-onBoards
  • 94.
    Chapter 10: AnIntroduction to Scratch So farinthis book, you’ve learned a lot about howto use programs that other people have writtenonyour RaspberryPi. The chiefgoalofthe RaspberryPiproject is to get people writingtheir ownprograms, however—and not just adults. The Raspberry PiFoundationis workingto get the device adopted as aneducationaltoolfor allage ranges. Akeyrequirement for reachingthat goalis ensuringthat youngchildrencanexperience the joyofcreatingtheir ownsoftware, rather thanjust consumingother people’s code. The secret to this is Scratch. Introducing Scratch Created bythe LifelongKindergartengroup at the Massachusetts Institute ofTechnologyMedia Lab in2006 as anoffshoot of the Squeak and Smalltalk languages, Scratchtakes the core concepts ofprogrammingand makes themaccessible to all. Long- winded typing—tiringand dullfor younger children—is replaced witha simple jigsaw-like drag-and-drop environment, which nevertheless encourages programmatic thinkingand introduces the core concepts used byallprogramminglanguages. Officiallyconsidered a programfor ages eight and above, but accessible to evenyounger programmers witha little help and guidance, Scratchis deceptivelypowerful. Behind its colourfuland mouse-drivenuser interface is a programminglanguage that includes impressive multimedia functionality. It should come as no surprise thenthat, ofthe more thantwo-and-a-halfmillion Scratchprojects shared byusers ofthe software onthe officialwebsite, the majorityare games. Encouragingchildrento learnhowto make their owngames canbe a great wayofsneakinga little learninginto their playtimes. Scratch’s friendlyuser interface and excellent handlingofcore concepts meanthat childrenare unlikelyto get frustrated bya suddensteep learningcurve. Better still, the concepts learned inScratchoffer anexcellent foundationfor progressionto a more flexible language like Python(see Chapter 11, “PythonBasics”). Evenbefore movingonto another language, Scratchoffers more thanjust a framework for games. It canbe used to create interactive presentations and cartoons, as wellas interfaces withexternalsensors and motors throughthe use ofadd-on hardware suchas the PicoBoard and the LEGO WeDo robotics kit. The recommended Debiandistributionfor the RaspberryPicomes withthe latest versionofthe Scratchdevelopment environment pre-loaded, so ifyou’ve beenfollowingthe recommendations throughout this book you’re readyto start. Ifyou’re usinga different operatingsystem, visit the officialScratchwebsite at http://scratch.mit.edu to download the software— and youcanfind versions for Windows and Apple’s OS Xinthe same place. Example 1: Hello World Whenlearninga newprogramminglanguage, it’s traditionalto start witha verybasic program:one that displays a single line of text. This is typicallyreferred to as a Hello World program, and it’s the first step towards learninghowto create your own programs. Unlike a traditionalprogramminglanguage, Scratchdoesn’t expect the user to memorise the names ofinstructions like print or inkey$. Instead, almost everythingis done bydraggingand droppingblocks ofcode and arrangingtheminto a logicalpattern. To begin, load Scratchbydouble-clickingits icononthe desktop or clickingonits entryinthe Programmingmenu. After a few seconds, the mainScratchinterface willappear (see Figure 10-1). Ifit’s off-centre or small, press the Maximise button—the middle ofthe three windowcontrolbuttons onthe right side ofthe top title bar—to fillthe screen. The Scratchinterface is split into multiple panes. At the left is the block palette, whichholds allthe different code blocks youcan use to create a program. Alist ofobjects inthe program, knownas sprites, appears at the bottom-right alongwitha controlfor the stage onwhichthe sprites appear. The stage itselfis at the top-right ofthe window, whichis where youwillsee the program running. Finally, the middle ofthe windowis where the programitselfis constructed. Figure 10-1:The mainScratchinterface, shownrunningonthe RaspberryPi
  • 95.
    To get theuser started, a newScratchproject alreadyincludes a blank stage and a single sprite. What it lacks is a program, so clickingthe greenflagiconat the top-right ofthe windowachieves nothing, because Scratchdoesn’t yet knowwhat youwant it to do. For the Hello World program, you’llneed to change the blocks palette at the left ofthe screento the Looks mode byclickingon its button. Partwaydownthe list ofLooks blocks is one that reads say Hello!—click this block and dragit into the empty space inthe middle ofthe windowlabelled Scripts. To obeythe decades oftraditionbehind this type ofprogram, youcanalso click onthe block where it says Hello! and customise it to read Hello World! ifyouso desire (see Figure 10-2). Figure 10-2:The first block placed ina Scratchprogram Ifyouclick the greenflagagain, the programstilldoes nothing. That’s because althoughScratchknows that it is supposed to make the cat sprite saysomething, it doesn’t knowwhen. The event requires a trigger block, whichcanbe found inthe Control sectionofthe block palette.
  • 96.
    Enter this sectionnowbyclickingControl,and thendragthe top entry—marked when [flag icon] clicked—and place it just above the purple say brick (see Figure 10-3). Ifyoudrop it close enough, it should automaticallyjointo the existingbrick like a jigsawpiece. Figure 10-3:AControlblock joined to a Looks block inScratch This concept ofconnectingmultiple bricks together is the heart ofScratch. Ifyoulook at the Controlbrick youjust placed, you’ll see there’s no connectinghole at the top. This means that youcan’t stack another brick ontop, because this Controlbrick is designed to trigger a series ofother bricks directlyand must come at the start ofa stack. The bottomofthe say brick, meanwhile, has a connector that fits into the top ofother bricks, whichindicates that more bricks canbe placed underneath. Withthe two bricks inplace, click the greenflagiconat the top-right ofthe screenagain. This time, a speechbubble willappear fromthe cat’s mouth(see Figure 10-4), and the Hello World programis complete. Before movingonto the next example, take the time to save your work usingthe File menu. Scratchis designed to have a single project openat a time, so ifyoucreate a newblank file, the current file willbe closed to make room. Don’t worryifyouforget about this whenyougo to create a newfile—ifthere are unsaved changes inthe existingfile, Scratchwillprompt youto save these changes before closingit. Figure 10-4:The Hello World programexecutinginScratch
  • 97.
    Example 2: Animationand Sound While Hello World is a verytraditionalexample, it’s not particularlyinteresting. It also fails to showoffthe true power of Scratch, whichlies inits impressive multimedia capabilities and sprite-handlingsystem. This systemis particularlywellsuited to simple animations, whichcanformthe basis ofaninteractive game. To begin, start a newproject inScratchbyeither loadingthe programafreshor choosingNewfromthe File menu. As withany starter project, Scratchwillprovide a default sprite—it’s this sprite that youwillbe controlling. To controla simple animationinScratch, youuse the Motionsectionofthe blocks palette. Whenyoustart a newproject, this is the default palette. Dragthe block labelled move 10 steps to the Scripts area. As its name suggests, this block tells the selected sprite to move 10 steps inthe directionit is currentlyfacing. The default sprite inScratchis always started facingdirectly to the right—thus, the move 10 steps block willmove the sprite 10 steps to the right. Tensteps isn’t a verylarge value, so click onthe value 10 and change it to 30. The block should thenread move 30 steps. An animationofa cat movingto the right ofthe stage isn’t that interesting, however, so switchto the Sound block palette and drag the play sound meow block to the Scripts area and link it beneaththe existingmove block. To keep the cat inthis positionfor a while, add ina wait 1 secs block fromthe Controlblock palette. Without this, the sprite willappear to flick quickly betweenits startingpositionand the target position. To make it so the programcanbe runmultiple times without the cat sprite disappearingoffthe edge ofthe stage, add another move 10 steps block beneaththe play sound block and modifyit to read move -30 steps. Scratchwillhappilyallowyou to use negative figures like this:ifa value of30 makes the sprite move a certaindistance to the right, -30 willmake it move the exact same distance inthe opposite direction. Finally, add the when [flag icon] clicked block fromthe Controlblock palette to the top ofthe Script area’s stack of blocks to complete the programas showninFigure 10-5. Clickingthe greenflagicononthe top-right ofthe screenwilltrigger the program—make sure you’ve got speakers or headphones connected to the Pifor the fulleffect! Figure 10-5:The completed animationprograminScratch
  • 98.
    This simple animationprogramcanbeextended ina varietyofways. Usingthe NewSprite optionjust belowthe stage onthe right side ofthe Scratchwindowallows the programmer to add more sprites that canmove and playsounds independently. Addinginthe say block fromthe first example—or the similar think block, whichcreates a thought bubble rather thana speechbubble—allows for the creationofananimated comic strip. More importantly, eventhis simple example teaches important programmingconcepts:despite beinga mere five blocks long, it covers sprite movement inpositive and negative distances, sound playback and the concept ofdelays ina program. To introduce yet another concept—at the risk ofdrivingyourselfinsane withrepetitive noises—tryaddinga forever block fromthe Control block palette (see Figure 10-6). This adds a loop to the program, causingit to runthroughits list forever—or at least untilthe noise becomes too muchand youclick the red stop buttonat the top ofthe stage! Figure 10-6:Addinganinfinite loop to the simple Scratchanimation
  • 99.
    Example 3: ASimple Game UsingScratchfor simple animationis one thing, but the software also allows users to read inputs fromthe keyboard to introduce interactivity. Bycombiningsome simple animationcontrols to the previouslydescribed program, youcancreate a simple game— and, at the same time, introduce the concepts ofsprite collision, ifstatements and input. For this example, start a newScratchproject—rememberingto save the previous example, ifyouhaven’t alreadydone so—and beginbydragginga move 10 steps block to the Scripts area. This time, rather thantellingthe code blocks to execute whenthe flagiconis clicked, go to the Controlblock palette and draga when space key pressed block above the move block. As the name suggests, the when space key pressed block looks for input fromthe user—inthis instance, the spacebar being pressed—and uses that as the trigger for executinga list ofblocks. The block works at anytime—ifyoupress the spacebar now, the sprite willobeyits instructions and move 10 steps to the right. The when space key pressed block also differs fromthe when [flag icon] clicked block inanother important way:it canbe customised. Click the down-arrowbuttonnext to the word space to see a list ofallthe keys the block canwatch, and thenselect right arrow fromthe list to change the block into a when right arrow key pressed block. Agame inwhichthe player canmove inonlyone directionisn’t muchfun, so draga newwhen space key pressed block into the Scripts area. This can’t link to the existingblock list—youcanonlyhave a single trigger block—so start a newlist somewhere further down. As before, use the down-arrowbuttonnext to the word space to customise the block, turningit into a when left arrow key pressed block. Finally, switchthe block palette back to Motionmode and connect a move 10 steps block beneaththe newwhen left arrow key pressed block before changingit to read move -10 steps. Ifyoupress the left and right arrowkeys now, you’llsee that the cat moves accordingto your input (see Figure 10-7):pressing the left arrowmoves the cat 10 steps to the left (although, as far as Scratchis concerned, it’s movingminus 10 steps to the right), and pressingthe right arrowmoves the cat 10 steps to the right. Figure 10-7:Usinginput blocks to controlthe motionofa sprite inScratch Nowthat the sprite canbe moved bythe player, it’s time to give the sprite somethingto do. As this is just a verysimple game, the goalshould also be simple:to collect some food. Click the Choose NewSprite FromFile button, found inthe middle ofthe three buttons above the Sprite palette at the bottom-right ofthe Scratchwindow. Adialogue boxwillappear askingyouto pick a sprite:double-click onthe Things folder, and thendouble-click onthe Cheesy- Puffs sprite (showninFigure 10-8). This willplace the sprite as a newentryinthe Sprite palette, givingyoua newobject to controlinthe game.
  • 100.
    The Scratch languageis naturally multi-threadedandpartially object-oriented. This means that each object in the program, including sprites, can have its own code attached, andthat each section of code runs simultaneously andindependently of any otherblock. Usedproperly, these features allowforsome quite complex programs to be created. Figure 10-8:Addingthe Cheesy-Puffs sprite to the Scratchgame project Bydefault, anysprite added into a Scratchproject willappear inthe dead centre ofthe stage. As a result, this obscures the existingcat sprite. Click onthe newsprite and dragit to the right ofthe cat to fixthe problem. Withthe bowlofCheesy-Puffs moved, it’s stilltoo large for our anthropomorphic two-legged cat to eat. Click the Shrink Sprite button, whichis located at the top-right ofthe stage area and looks like four arrows pointinginwards. Ifyou’re not sure which one it is, hover the mouse pointer over eachiconfor a short descriptionofwhat it does. Clickingthe Shrink Sprite button—or the GrowSprite button, whichdoes exactlythe opposite—changes the mouse cursor into a duplicate ofthe button’s icon. Usingthis newcursor, click onthe Cheesy-Puffs sprite to shrink it. Keep clicking, and the sprite willcontinue to shrink. Once it’s a sensible-lookingsize, click anywhere outside ofthe stage area to returnthe mouse cursor to normal. Youcanthendragthe bowlcloser to the right edge ofthe stage, ifyouso choose. Tryusingthe arrowkeys onthe keyboard to move the cat sprite towards the Cheesy-Puffs sprite now. As youcansee, when the two sprites meet, nothinghappens. That’s because the programdoesn’t containanyinstructions for what to do whenthe two sprites overlap—knownas a sprite collision—so it doesn’t do anything. This canbe rectified witha newtype ofblock:a Sensing block. Withthe Cheesy-Puffs sprite currentlyactive (its image should appear at the top ofthe Scripts pane, but ifit doesn’t, just double-click the sprite onthe stage), switchthe Blocks palette into Sensingmode byclickingthe Sensingbutton. Fromthe Sensingpalette, draga touching ? block into the Scripts pane. Like the when space key pressed block used to controlthe cat sprite’s motion, the touching ? block canbe customised. Click the down-arrowbuttonnext to the questionmark, and choose Sprite1 (the cat sprite) fromthe list. This block willnowbe activated whenthe two sprites collide. You can name a sprite by clicking on the box next to its image in the Scripts pane andtyping in a name. Giving the sprites sensible names—such as Cat, CheesyPuffs, andso forth—makes it significantly easierto track what’s going on in the program. Look at the shape ofthe touching Sprite1? block. As youcansee, it has no jigsaw-like connectors onthe top or the
  • 101.
    bottom, and it’sshaped like a diamond—the same shape used for a decisionpoint ina flowchart. That’s no accident:the majorityofthe Sensingblocks need to be embedded ina Controlblock inorder to operate. Switchthe Blocks pallete to Controlmode, and look for the if block—it’s shaped like a squished and bumpyletter C. Note that the if block has a diamond-shaped indentation—the same shape as the touching Sprite1? block. Dragthe if block onto the Scripts pane, and thendragthe touching Sprite1? block onto its diamond-shaped indentation. The result is a two- coloured block that nowreads if touching Sprite1?. This represents anifconditionalinthe program:whenthis point is reached, anycode located withinits confines willbe executed ifand onlyifthe conditionis met. Inthis case, the conditionis that Sprite2 is beingtouched bySprite1. Withthe use ofand, or and not logic blocks fromthe Operators block palette, some quite complexscenarios canbe accommodated. Fromthe Looks block palette, draga say Hello! For 2 secs block into the centre ofthe if touching Sprite1? conditional. Change the text to read Don’t eat me!, and thenadd a wait 1 secs Controlblock, changingthe value to 2. Add a when space key pressed block to the top, changingthe value to read when right arrow key pressed. Finally, draga hide block fromthe Looks palette to the bottomofthe loop to end up withthe block list that’s showninFigure 10-9. Figure 10-9:Controllingthe Cheesy-Puffs witha Scratchifblock Boolean Logic Named for GeorgeBoole, Boolean logicor Boolean algebrais akey concept to understandinghow computers work. In Scratch, Boolean logicis implemented in threeOperators bricks: and, or and not. Theand operator requires that two inputs—in Scratch’s case, Sensingblocks—areboth truebeforeits own output will betrue. If neither of its inputs is true, or if both inputs arefalse, its own output will befalse. You can usethis operator to check to seeif aspriteis touchingtwo other sprites, as an example. Theor operator requires that oneor theother of its two inputs aretrue. If either input is true, theoperator’s output will also betrue. This is ahandy way of re-usingcode: if you havemultiplesprites that arelethal to theplayer sprite, asingleblock of codecan beused with theor operator to trigger when any of theenemy sprites aretouched. Finally, thenot operator is known as an inverter: whatever its singleinput is, it outputs theopposite. If its input is false, then theoutput is true; if theinput is true, then theoutput is false. Double-click the cat sprite onthe stage to returnto editingits scripts. The script youcreated for the Cheesy-Puffs sprite will disappear, but don’t worry—it’s stillsaved but onlyappears whenyou’re editingthat particular sprite.
  • 102.
    Draganother if blockfromthe Controlpalette alongwithanother touching ? sensingblock, and this time, change the Sensing block so bothblocks together read if touching Sprite2?. Into this block, insert a wait 1 secs Controlblock withthe value changed to 2 and a say Hello! for 2 secs Looks block withthe message changed to read Yum-yum-yum!. Finally, dragthe whole stacked block up so it connects to the bottomofthe existingwhen right arrow key pressed block, beneaththe move 10 steps block. The finalcode for the cat sprite should look like the blocks inFigure 10-10. Figure 10-10:The completed code for the simple Scratchgame’s cat sprite Ifyoumove the cat towards the Cheesy-Puffs withthe right-arrowkeyonthe keyboard, the game starts. Whenthe cat reaches the Cheesy-Puffs, the dialogue exchange takes place and the bowlshould disappear. Althoughthis example is effective for introducingsome important programmingconcepts, it’s hardlythe best waythe game could be coded. Scratchincludes a message broadcast systemthat allows code attached to one object to communicate withcode attached to another, whichenables youto create muchneater collisionresults that don’t relyoncarefully-timed pauses inorder to make sense. To experiment withbroadcasting, tryusingthe broadcast and when I receive blocks fromthe Controlpalette. Amessage created for a broadcast block inanyobject cantrigger code inanyother object usingthe when I receive flag, meaningyou canuse it to link multiple objects and their code together. Robotics and Sensors Inadditionto purelysoftware-based inputs and outputs, it’s also possible to tie Scratchinto externalhardware usingsensor boards and robotics systems. Thanks to its multithreaded nature and powerfulinter-process messagingsystem, Scratchcanbe used to create a surprisinglyadvanced robotics engine and is byfar the easiest wayto place a RaspberryPiat the heart ofa simple robot. Unlike Python, whichis a more powerfulbut significantlymore complexprogramminglanguage, Scratchcan’t make use ofthe RaspberryPi’s GPIO port to communicate withexternalhardware. As a result, it needs some additionalequipment before it can interact withthe physicalworld. Sensing with the PicoBoard Designed bythe SparkFunelectronics company, the PicoBoard is anadd-onmodule that connects to a computer running Scratchand provides a variable slider input, a light sensor, a button, a sound sensor and four pairs ofalligator clips that canbe used to monitor externalelectricaldevices. There are currentlytwo types ofPicoBoard:the originalmodel, whichuses a serialconnection, and its replacement, whichuses a
  • 103.
    USBconnection. The latteris supported bythe RaspberryPi. Simplyconnect it to a free USBport or a port ona USBhub connected to the Pi, restart Scratch, and you’llbe able to use its various functions withinthe Scratchinterface. Details onthe PicoBoard canbe found at http://www.sparkfun.com/products/10311. Robotics with LEGO Inadditionto add-insensor modules, it’s possible to controlanexternalrobotics systemthroughScratch. The LEGO Education WeDo robotics kit is designed to connect motors, distance sensors, and speed sensors to a computer—allofwhichcanbe controlled usingspecialised blocks found inScratch. For children, the WeDo kit is anexcellent wayto get started withrobotics:the components clip together just like regular LEGO, and there are no risks ofreceivinganelectric shock should anythingbe badlyconnected. The WeDo kit boasts compatibilitywith regular LEGO and LEGO Technik kits, too, meaningit’s possible to build large projects quicklyand easily. More informationonusinga LEGO EducationWeDo kit withScratchcanbe found at http://info.scratch.mit.edu/WeDo. Further Reading Althoughthis chapter serves as a briefintroductionto Scratch, it’s far fromexhaustive. It’s also a little verbose for younger readers, who tend to learnmore quicklywhentheir lessons are accompanied bylots ofcolour pictures. The Support sectionofthe officialScratchwebsite, hosted byMITat http://info.scratch.mit.edu/support, includes a link to a GettingStarted Guide inPDF format. The guide describes howto work withScratchina colourful, child-friendly manner, and is a great educationaltool. This learningexperience canbe enhanced evenfurther whencombined withScratch Cards, whichare downloadable flashcards containingexplanations for eachofthe block types found inScratch. MITalso runs a user forumfor Scratch, allowingenthusiasts ofthe software to learntogether and share solutions for common problems. Membership is free, and the site works wellusingthe Midoriweb browser included inthe Debiandistributionfor the RaspberryPi. The forums canbe accessed at http://scratch.mit.edu/forums/. The easiest wayto advance your Scratchskills, however, is to play. The name Scratchhas its roots inturntablism:whena DJ spins a record, the needle creates a scratchingsound. Just as DJs remixexistingsongs into somethingnew, Scratchenthusiasts are encouraged to submit their creations to the officialwebsite for others to download, examine, modifyand remix. The official Scratchsite currentlyhosts more than2.5 millionScratchprograms, makingit a perfect source for learninghowScratchis being used to create projects and for sharingyour ownideas withothers. Alist ofthe most recentlyshared projects canbe found at http://scratch.mit.edu/latest/shared.
  • 104.
    Chapter 11: AnIntroduction to Python The Raspberry Pi gets the first halfofits name froma long-standingtraditionofusingfruit to name newcomputingsystems— fromclassic microcomputers like the Acorn, Apricot and Tangerine to more recognisablymodernbrands includingApple and BlackBerry—but the second halfcomes courtesyofthe Pythonprogramminglanguage. Introducing Python Flexible and powerful, Pythonwas originallydeveloped inthe late 1980s at the NationalResearchInstitute for Mathematics and Computer Science byGuido vanRossumas a successor to the ABC language. Since its introduction, Pythonhas grownin popularitythanks to what is seenas a clear and expressive syntaxdeveloped witha focus onensuringthat code is readable. Pythonis a high-levellanguage. This means that Pythoncode is writteninlargelyrecognisable English, providingthe Piwith commands ina manner that is quick to learnand easyto follow. This is inmarked contrast to low-levellanguages, like assembler, whichare closer to howthe computer “thinks”but almost impossible for a humanto followwithout experience. The high-level nature and clear syntaxofPythonmake it a valuable toolfor anyone who wants to learnto program. It is also the language that is recommended bythe RaspberryPiFoundationfor those lookingto progress fromthe simple Scratch(described inChapter 10, “AnIntroductionto Scratch”) to more “hands-on”programming. Pythonis published under anopen-source licence, and is freelyavailable for Linux, OS Xand Windows computer systems. This cross-platformsupport means that software writtenusingPythononthe Picanbe used oncomputers runningalmost anyother operatingsystemas well—except where the programmakes use ofPi-specific hardware suchas the GPIO Port. To learnhow Pythoncanbe used to address this port, see Chapter 12, “Hardware Hacking”. Example 1: Hello World As youlearned inChapter 10, “AnIntroductionto Scratch”, the easiest wayto learna newprogramminglanguage is to create a project that prints “Hello World!”onthe screen. InScratch, youjust had to dragand drop bricks ofprewrittencode, but in Python, youneed to write this programentirelybyhand. APythonproject is, at heart, nothingmore thana text file containingwritteninstructions for the computer to follow. This file can be created usinganytext editor. For example, ifyouenjoyworkingat the console or ina terminalwindow, youcanuse nano; or ifyouprefer a graphicaluser interface (GUI), youcanuse Leafpad. Another alternative is to use anintegrated development environment (IDE) suchas IDLE, whichprovides Python-specific functionalitythat’s missingfroma standard text editor, includingsyntaxchecking, debuggingfacilities and the abilityto runyour programwithout havingto leave the editor. This chapter gives youinstructions onhowto create Pythonfiles usingIDLE, but ofcourse, the IDEprogramthat youchoose to use for programmingis up to you. The chapter also includes instructions for runningyour created files directlyfromthe terminal, which canbe used inconjunctionwithanytext editor or other IDE. To beginthe Hello World project, openIDLEfromthe Programmingmenuinthe Debiandistribution’s desktop environment. If you’re not usingIDLE, create a blank document inyour favourite text editor and skip the rest ofthis paragraph. Bydefault, IDLEopens up inPythonshellmode (see Figure 11-1), so anythingyoutype inthe initialwindowwillbe immediatelyexecuted. To opena newPythonproject whichcanbe executed later, click onthe File menuand choose NewWindowto opena blank file. Figure 11-1:The IDLEPythonShellwindow
  • 105.
    Choosing IDLE3 fromtheProgramming menu insteadof IDLEloads the Python 3.0 version. This includes features not available in the version of Python usedby IDLE, but none of those features are usedin this chapter. You can safely loadeitherversion, andthese examples will still work. It’s good practice to start allPythonprograms witha line knownas a shebang, whichgets its name fromthe # and ! characters at the beginningofthe line. This line tells the operatingsystemwhere it should look for the Pythonfiles. Althoughthis is not entirelynecessaryfor programs that willbe runfromwithinIDLEor willcallPythonexplicitlyat the terminal, it is required for programs that are rundirectlybycallingthe program’s filename. To ensure the programruns regardless ofwhere the Pythonexecutable is installed, the first line ofyour programshould read as follows: #!/usr/bin/env python This line tells the operatingsystemto look at the $PATHenvironment variable—whichis where Linuxstores the locationoffiles that canbe executed as programs—for the locationofPython, whichshould work onanyLinuxdistributionused onthe Pi. The $PATHvariable contains a list ofdirectories where executable files are stored, and is used to find programs whenyoutype their name at the console or ina terminalwindow. To achieve the goalofprintingout a message, youshould use Python’s print command. As its name suggests, this command prints text to anoutput device—bydefault, to the console or terminalwindowfromwhichthe programis beingexecuted. Its usage is simple:anytext followingthe word print and placed betweenquotationmarks willbe printed to the standard output device. Enter the followingline inyour newproject: print “Hello, World!” The finalprogramshould look like this: #!/usr/bin/env python print “Hello, World!” Ifyou’re creatingthe example programinIDLErather thana plaintext editor, you’llnotice that the text is multicoloured (see Figure 11-2, where colours are represented as differingshades ofgreyinthe print edition). This is a feature knownas syntax highlighting, and is a feature ofIDEs and the more-advanced text editingtools. Syntaxhighlightingchanges the colour ofsections ofthe text accordingto their function, inorder to make the programeasier to understand at a glance. It also makes it easyto spot so-called syntaxerrors caused byforgettingto put anend-quote ina print command or forgettingto comment out a remark. For this short example, syntaxhighlightingisn’t necessary—but inlarger programs, it canbe aninvaluable toolfor finding errors. Figure 11-2:SyntaxhighlightinginIDLE
  • 106.
    Before yourunyour program,save it as helloworld.py usingthe File menu. Ifyou’re usingIDLE, the file willbe giventhe extension.py automatically. Ifyou’re usinga text editor, be sure to type .py at the end ofthe filename (not .txt) whenyou save it. This extensionindicates that the file contains Pythoncode—althoughPythonis clever enoughto runthe programevenif it’s saved witha different file extension. Howyourunthe file willdepend onwhether you’re usingIDLEor a text editor. InIDLE, simplychoose RunModule fromthe Runmenu, or press the F5 keyonthe keyboard. This willswitchIDLEback to the Pythonshellwindowand runthe program. Youshould thensee the message Hello, World! appear onscreeninblue (see Figure 11-3). Ifnot, check your syntax—in particular, check that youhave quotationmarks at boththe beginningand end ofthe message onthe print line. Figure 11-3:Runninghelloworld.pyinIDLE Ifyoucreated the helloworld.py programina text editor, you’llneed to opena terminalwindowfromthe Accessories menu onthe desktop. Ifyousaved the file anywhere except your home directory, you’llalso have to use the cd command to change to that directory(see Chapter 2, “LinuxSystemAdministration”). Once you’re inthe right directory, youcanrunyour programby typingthe following: python helloworld.py This tells the operatingsystemto runPythonand thenload the helloworld.py file for execution. Unlike the Pythonshellin IDLE, Pythonwillquit whenit reaches the end ofthe file and returnyouto the terminal. The result, however, is the same:the message Hello, World! is printed to the standard output (see Figure 11-4). Figure 11-4:Runninghelloworld.pyat the terminal
  • 107.
    Making Python ProgramsExecutable Normally, theonly way to run aPython programis to tell thePython softwareto open thefile. With theshebanglineat thetop of thefile, however, it’s possibleto executethefiledirectly without havingto call Python first. This can beauseful way of makingyour own tools that can beexecuted at the terminal: oncecopied into alocation in thesystem’s $PATH environment variable, thePython programcan becalled simply by typingits name. First, you need to tell Linuxthat thePython fileshould bemarked as executable—an attributethat means thefileis aprogram. To protect thesystemfrom malwarebeingdownloaded fromtheInternet this attributeisn’t automatically set, sinceonly files that aremarked as executablewill run. To makethe helloworld.py fileexecutable, usethechmod command (described in detail in Chapter 2, “LinuxSystemAdministration”) by typingthefollowing: chmod +x helloworld.py Now try runningtheprogramdirectly by typingthefollowing: ./helloworld.py Despitethefact that you didn’t call thePython program, thehelloworld.py programshould run just thesameas if you’d typed python helloworld.py. Theprogramcan only berun by callingit with its full location—/home/pi/helloworld.py—or fromthecurrent directory by using./ as thelocation. To makethefileaccessiblein thesameway as any other terminal command, it needs to becopied to /usr/local/bin with thefollowingcommand: sudo cp helloworld.py /usr/local/bin/ Thesudo prefixis required because, for security reasons, non-privileged users cannot writeto the/usr/local/bin directory. With thehelloworld.py file located in /usr/local/bin, which is included in the$PATH variable, it can beexecuted fromany directory by simply typingits name. Try changingto a different directory, and then run theprogramby typingthefollowing: helloworld.py To makeyour custom-madeprograms seemmorelikenativeutilities, you can renamethemto removethe.py fileextension. To changethehelloworld.py programin this way, just typethefollowinglineat theterminal as asingleline: sudo mv /usr/local/bin/helloworld.py /usr/local/bin/helloworld Oncerenamed, theprogramcan berun simply by typinghelloworld at theterminal or console. Example 2: Comments, Inputs, Variables and Loops Althoughthe Hello World programis a useful, gentle introductionto a language, it’s not terriblyexciting. Byits nature, it covers
  • 108.
    onlythe basics andfails to introduce some ofthe concepts required for creatingusefulor interestingprograms. The next example, however, uses some ofthe basic tools required to make interactive programs inPython. As inExample 1, beginbyopeninga newblank document inIDLEor your text editor, and thenstart the programwiththe followingshebangline: #!/usr/bin/env python As previouslydiscussed, this line isn’t strictlynecessaryunless the programis goingto be made executable, but it does no harm and is a good habit to develop. Next, add a comment to the programto provide context ifyouneed to openthe file at a later date. Note that this needs to be entered as a single line, as withallcode lines that end ina symbol: # Example 2: A Python program from the Raspberry Pi User Guide InPython, anythingfollowinga hashsymbol—withthe exceptionofthe shebangline—is treated as a comment. Whena comment is found, Pythonignores it and skips to the next line. Commentingyour code is good practice:althoughyoumight know what a particular sectionofcode does now, things might not be so clear whenyouopenthe file againsixmonths downthe line. Comments also help make code more maintainable, and ifyoudecide to share your code withother people, your comments help themunderstand what eachsectionis supposed to do. For simple programs, it’s not strictlynecessaryto include comments—but as withaddingthe shebangline, it’s a verygood habit to get into. Comments canbe ontheir ownline, as withthe preceding comment, or at the end ofa line, inwhichcase Pythonwillrunthe code line up untilit reaches the hashsymbol. Next, ask the user for his or her name usingthe followingline: userName = raw_input(“What is your name? “) This smallline actuallyachieves quite a lot. The first part, userName =, tells Pythonto create a newvariable—a locationfor storinga piece ofinformation—called userName. The equals symboltells Pythonthat the variable should be set to whatever follows. However, inthis case what follows isn’t just a piece ofinformation, but another command:raw_input. This is a tool designed to accept string(text) input fromthe keyboard, and allows for a message to be printed to the default output so the user knows what to type. This helps keep the programsimple—without the abilityto print a prompt tellingthe user what to type, a second line witha print command would be required. Remember to leave a space at the end ofthe prompt; otherwise, the user’s input willbeginimmediatelyafter the questionmark. When asking the userto type in text, always use raw_input. This provides security that the input commandalone does not—if you just use input, a usermay inject his orherown code into yourprogramandhave it crash orwork contrary to yourintentions. Withthe user’s name nowstored safelyinthe userName variable, the programcanbeginto get clever. Welcome the user using the followingline: print “Welcome to the program,”, userName This line demonstrates a secondaryfunctionofthe print command introduced inExample 1:the abilityto print out the contents ofvariables. This print command is split into two:the first sectionprints everythingbetweenthe two quotationmarks, and the comma tells print that more should be printed to the same line. Simplytypingthe variable name userName is enoughfor Pythonto knowthat it should print the contents ofthat variable, resultingina message customised to the user’s ownname. An easy way to achieve neat formatting when printing output is to use the .format instruction at the endof a print command. If you’re using .format, the print line couldbe as follows instead: print “Welcome, {0}, to this program.”.format(userName) This example programis goingto take the formofa simple but friendlycalculator. Unlike Example 1, it willcontinue to rununtil the user tells it otherwise. This is achieved usinga loop, just as inScratch. Beginthe loop bytypingthe followingtwo lines: goAgain = 1 while goAgain == 1: Why ==?
  • 109.
    Previously, you’vebeen usingasingleequalssymbol to set thevalueof variables. Thewhile loop, however, uses two. Usingtwo equals symbols next to each other performs an evaluation, which compares avariable’s valueto whatever follows. A singleequals symbol instead sets thevariableto thevaluethat follows. Thereareother evaluations as well as thedouble-equals, which is only trueif thevariablematches thegiven valueexactly: > means greater than, < means less than, >= means greater than or equal to, <= means less than or equal to, and != means not equal to. Usingtheseevaluation symbols, you can control theflow of aprogramaccordingto therules of Boolean logic. For moreinformation on Boolean logic, see Chapter 10, “An Introduction to Scratch”. The first line creates a newvariable called goAgain and sets it to 1. The second line begins the loop, and tells Pythonthat while the goAgain variable is equalto 1, it should continue to loop throughthe followingcode. As the next fewlines are written, they willneed to be indented byinsertingfour spaces at the start ofeachline. These spaces tellPythonwhichlines are part ofthe loop and whichlines are outside the loop. Ifyou’re usingIDLE, the spaces willbe inserted automatically; ifyou’re usinga text editor, remember to insert the spaces manually. Inits most basic form, a calculator takes two numbers as input and performs a mathematicaloperationonthem. To make your calculator work, first take the two numbers fromthe user withthe followinglines: firstNumber = int(raw_input(“Type the first number: “)) secondNumber = int(raw_input(“Type the second number: “)) These lines not onlyuse the raw_input instructionto ask for two numbers, but theyalso use int. Short for integer, the int instructiontells Pythonto treat input as a number rather thana string. Obviously, this is important for a calculator programsince it won’t be calculatingwords. Withthe two numbers stored as variables, the programcanperformits calculations. Type the followinglines, whichadd, subtract and multiplythe two numbers and send the output to the user: print firstNumber, “added to”, secondNumber, “equals”, firstNumber + secondNumber print firstNumber, “minus”, secondNumber, “equals”, firstNumber - secondNumber print firstNumber, “multiplied by”, secondNumber, “equals”, firstNumber * secondNumber Notice that while the additionand subtractionoperations use the expected plus and minus symbols, multiplicationuses the * symbol. Also notice that there are no formattingspaces betweenthe quotationmarks. This is because Pythonautomaticallyadds spaces where required whenit prints integers and strings together. Finally, note that there is no divisionoperation(whichwould be indicated withthe / symbol). This is because the example calculator programuses integers, whichcanonlybe whole numbers, withno decimalplaces or fractions allowed. Althoughthe calculationpart ofthe programis nowcomplete, it willrunforever because there is currentlynothingto tellPython whenit’s time to exit the loop. To provide the user witha wayto exit the program, add the followingline: goAgain = int(raw_input(“Type 1 to enter more numbers, or any other number to quit: “)) This allows the user to change the goAgain variable, whichcontrols the while loop. Ifthe user enters the number 1, the goAgain variable is stillequalto 1 and the loop willrunagain. However, ifthe user enters anyother number, the evaluationis no longer true (goAgain is no longer equalto 1), and the loop willend. The finished programshould look like this, rememberingthat anythingmarked with should be entered onto a single line: #!/usr/bin/env python # Example 2: A Python program from the Raspberry Pi User Guide userName = raw_input(“What is your name? “) print “Welcome to the program,”, userName goAgain = 1 while goAgain == 1: firstNumber = int(raw_input(“Type the first number: “)) secondNumber = int(raw_input(“Type the second number: “)) print firstNumber, “added to”, secondNumber, “equals”,
  • 110.
    firstNumber + secondNumber printfirstNumber, “minus”, secondNumber, “equals”, firstNumber - secondNumber print firstNumber, “multiplied by”, secondNumber, “equals”, firstNumber * secondNumber goAgain = int(raw_input(“Type 1 to enter more numbers, or any other number to quit: “)) Save the programas calculator.py, and runit bychoosingRunModule fromthe RunmenuinIDLEor bytypingpython calculator.py at the terminal. Enter your user name whenprompted, and thenprovide the numbers that youwant to calculate (see Figure 11-5) untilyouget bored and type anythingother than1 to exit the program. Figure 11-5:Runningcalculator.pyinIDLE For more short programs that introduce important Pythonconcepts, visit the officialPythonSimple Programs wikipage at http://wiki.python.org/moin/SimplePrograms. Example 3: Gaming with pygame To illustrate the power ofPython, this example creates a fully-functionalarcade game based onthe classic game ofSnake or Nibbles. To accomplishthis, it uses anexternalPythonlibrarycalled pygame. OriginallywrittenbyPete Shinners, pygame is a collectionofpythonmodules designed to add newfunctionalityto the language —functionalityspecificallydesigned to make it easyto write a game inPython. Eachpygame module provides a function required bya moderngame, includingsound, graphics and evennetworkingsupport. Althoughit’s possible to write a game in Pythonwithout usingpygame, it’s a lot easier ifyoutake advantage ofthe code alreadywritteninthe pygame library. Before youcanwrite a pygame program, youneed to installthe pygame library. Ifyou’re usingthe recommended Debian distribution, this is as simple as typingthe followingat the console or terminal: sudo apt-get install python-pygame For other distributions, the pygame source files canbe downloaded fromthe officialpygame website at http://www.pygame.org/download.shtml. Instructions for installationare provided onthe same page. Startinga pygame programis the same as startinganyother Pythonproject. Opena newblank document ineither IDLEor a text editor, and add the followingshebangline to the top: #!/usr/bin/env python Next youneed to tellPythonthat this programuses the pygame modules. To do this, youuse animport instruction, whichtells Pythonto load anexternalmodule (another Pythonfile) and make it accessible fromthe current program. Type the followingtwo lines to import the necessarymodules into your newproject:
  • 111.
    import pygame, sys,time, random from pygame.locals import * The first line imports the mainpygame module alongwiththe Pythonmodules sys, time and random, whichwillalso be used in this program. Typically, a module must thenbe called bytypingits name followed bya fullstop and the name ofthe instruction fromwithinthe module, but the second line inthe precedingcode tells Pythonto load allthe instructions fromthe pygame.locals module as thoughthey’re native instructions. As a result, youwillneed to do less typingwhenusingthese instructions. Other module names—suchas pygame.clock, whichis separate to pygame.locals—willstillneed to be typed infull. Enter the next two lines to set up pygame so it’s readyto use inthe example program: pygame.init() fpsClock = pygame.time.Clock() The first line tells pygame to initialise itself, and the second line sets up a newvariable called fpsClock, whichwillbe used to controlthe speed ofthe game. Next, set up a newpygame displaysurface—the canvas onto whichin-game objects willbe drawn—withthe followingtwo lines: playSurface = pygame.display.set_mode((640, 480)) pygame.display.set_caption(‘Raspberry Snake’) Next, youshould define some colours for the programto use. Althoughthis step isn’t strictlynecessary, it againsaves ontyping: ifyouwant to set a particular object to be red, youcansimplyuse the redColour variable rather thanhavingto callthe pygame.Color instructionand remember the three colour values for red, greenand blue. To define the colours for this example program, type the followinglines: redColour = pygame.Color(255, 0, 0) blackColour = pygame.Color(0, 0, 0) whiteColour = pygame.Color(255, 255, 255) greyColour = pygame.Color(150, 150, 150) The next fewlines initialise some ofthe game’s variables so they’re readyfor use. This is animportant step, because ifthese variables are left blank whenthe game begins, Pythonwon’t knowwhat to do. Don’t worryabout what eachvariable does for now—just type inthe followinglines: snakePosition = [100,100] snakeSegments = [[100,100],[80,100],[60,100]] raspberryPosition = [300,300] raspberrySpawned = 1 direction = ‘right’ changeDirection = direction Notice that three ofthe variables—snakePosition, snakeSegments and raspberryPosition—are set to a list ofcomma- separated values. This causes Pythonto create the variables as lists—a number ofdifferent values stored ina single variable name. Later, you’llsee howyoucanaccess individualvalues stored ina list. Next, youneed to define a newfunction—a fragment ofPythoncode whichcanbe called uponlater inthe program. Functions are usefulfor avoidingcode repetitionand makingthe programeasier to understand. Ifyouhave a particular set ofinstructions that are needed at multiple points inthe same program, usingdef to create a functionmeans you’llonlyhave to type themonce —and onlyhave to change themina single place ifyoualter the programlater. Type the followinglines to define the gameOver function: def gameOver(): gameOverFont = pygame.font.Font (‘freesansbold.ttf’, 72) gameOverSurf = gameOverFont.render (‘Game Over’, True, greyColour) gameOverRect = gameOverSurf.get_rect() gameOverRect.midtop = (320, 10) playSurface.blit(gameOverSurf, gameOverRect) pygame.display.flip() time.sleep(5) pygame.quit() sys.exit() As withloops, the code for a functionshould be indented. Everyline after the def instructionshould have four spaces at the start
  • 112.
    —ifyou’re usingIDLE, thesespaces willbe inserted automatically, but ifyou’re usinga text editor, youwillneed to insert the spaces yourself. After the finalline ofthe function—sys.exit()—youcanstop indenting. The gameOver functionuses a selectionofpygame’s commands to performa simple task:write the words Game Over to the screenina large font, pause for 5 seconds, and thenquit bothpygame and Pythonitself. It mayseemstrange to set up the instructions for quittingthe game before the game has evenbegun, but functions should always be defined before theyare called. Pythonwon’t execute these instructions untilit is told to do so usingthe newly-created gameOver instruction. Withthe beginningofthe programcomplete, it’s time to start the mainsection. This takes place inaninfinite loop—a while loop that never exits. This is so that the game cancontinue to rununtilthe player dies byhittinga wallor eatinghis or her owntail. Beginthe mainloop withthe followingline: while True: Without anythingto evaluate, Pythonwillcheck to see ifTrue is true. Because that’s always the case, the loop willcontinue to runforever—or, at least untilyoutellPythonto quit out ofthe loop bycallingthe gameOver function. Continue the programwiththe followinglines, payingattentionto the indentationlevels: for event in pygame.event.get(): if event.type == QUIT: pygame.quit() sys.exit() elif event.type == KEYDOWN: The first line, whichcomes right after the while loop begins, should be indented four spaces—but it’s a loop ofits own, usinga for instructionto check for pygame events like keypresses. As a result, the line under that needs to be indented anadditional four spaces for a totalofeight—but that line, too, is a loop, usinganif instructionto check whether the user has pressed a key. As a result, the next line—pygame.quit()—is indented anadditionalfour spaces for a totalof12 spaces. This logical progressionofindentationtells Pythonwhere eachloop begins and ends, whichis important:ifthe wrongnumber ofspaces is used, the programwon’t work correctly. This is whyusinga development environment like IDLE, whichattempts to automaticallyindent code where required, canbe easier thanusinga plaintext editor to create Pythonprograms. Anif loop tells Pythonto check to see ifa particular evaluationis true. The first check, if event.type == QUIT, tells Pythonto execute the indented code belowifpygame reports a QUIT message (whichhappens whenthe user presses the Escape key). The two lines beneaththat should be familiar fromthe gameOver function:theytellpygame and Pythonto close downand exit. The line beginningelif is used to extend if loops. Short for else if, anelif instructionis evaluated whena previous if instructionwas found to be false. Inthis case, the elif instructionis used to see ifpygame is reportinga KEYDOWN event, which is returned whenthe user is pressinga keyonthe keyboard. As withthe if instruction, code to be executed whenanelif is true should be indented byanadditionalfour spaces plus whatever indentationthe elif instructionitselfhas. Type the following lines to give the elif instructionsomethingto do whenthe user presses a key: if event.key == K_RIGHT or event.key == ord(‘d’): changeDirection = ‘right’ if event.key == K_LEFT or event.key == ord(‘a’): changeDirection = ‘left’ if event.key == K_UP or event.key == ord(‘w’): changeDirection = ‘up’ if event.key == K_DOWN or event.key == ord(‘s’): changeDirection = ‘down’ if event.key == K_ESCAPE: pygame.event.post(pygame.event.Event(QUIT)) These instructions modifythe value ofthe changeDirection variable, used to controlthe directionthe player’s snake is travellingduringthe game. Usingor withanif statement allows more thanone evaluationto be made. Inthis case, it provides two ways ofcontrollingthe snake:the player canuse the cursor keys, or the W, A, S and Dkeys to make the snake go up, right, downor left. Untila keyis pressed, the snake travels to the right accordingto the value set for changeDirection at the start of the program. Ifyoulook back at the variables youinitialised at the start ofthe program, you’llsee that there’s another variable called direction. This is used alongside changeDirection to see ifthe instructionthe user has givenis valid. The snake should not be allowed to turnimmediatelyback onitself—ifit does, the snake dies and the game is over. To prevent this fromhappening, the directionrequested bythe player—stored inchangeDirection—is compared to the current directioninwhichthe snake is
  • 113.
    travelling—stored indirection. Iftheyareopposite directions, the instructionis ignored and the snake continues inthe same directionas before. Type the followinglines to set up the comparisons: if changeDirection == ‘right’ and not direction == ‘left’: direction = changeDirection if changeDirection == ‘left’ and not direction == ‘right’: direction = changeDirection if changeDirection == ‘up’ and not direction == ‘down’: direction = changeDirection if changeDirection == ‘down’ and not direction == ‘up’: direction = changeDirection Withthe user’s input checked to make sure it makes sense, the snake—whichappears onthe screenas a series ofblocks—can be moved. Duringeachturn, the snake moves a distance equalto the size ofone ofits blockysegments. Witheachsegment measuring20 pixels, youcantellpygame to move the snake a single segment inanydirection. Type inthe followingcode: if direction == ‘right’: snakePosition[0] += 20 if direction == ‘left’: snakePosition[0] -= 20 if direction == ‘up’: snakePosition[1] -= 20 if direction == ‘down’: snakePosition[1] += 20 The += and -= operators are used to change the value ofa variable bya certainamount:+= sets the variable to its previous value plus the newvalue, while -= sets the variable to its previous value minus the newvalue. Bywayofexample, snakePosition[0] += 20 is a shorthand wayofwritingsnakePosition[0] = snakePosition[0] + 20. The number in square brackets followingthe snakePosition variable name is the positioninthe list beingaffected:the first value inthe snakePosition list stores the snake’s positionalongthe Xaxis, while the second value stores the positionalongthe Yaxis. Pythonbegins countingat zero, so the Xaxis is controlled withsnakePosition[0] and the Yaxis withsnakePosition[1]. Ifthe list were longer, additionalentries could be affected byincreasingthe number:[2], [3] and so on. Althoughthe snakePosition list is always two values long, another list created at the start ofthe programis not: snakeSegments. This list stores the locationofthe snake’s body, behind the head. As the snake eats raspberries and grows longer, this list increases insize and provides the difficultyinthe game:as the player progresses, it becomes harder to avoid hittingthe bodyofthe snake withthe head. Ifthe head hits the body, the snake dies and the game is over. Type the followingline to make the snake’s bodygrow: snakeSegments.insert(0,list(snakePosition)) This uses the insert instructionto insert a newvalue into the snakeSegments list:the current positionofthe snake. Eachtime Pythonreaches this line, it willincrease the lengthofthe snake’s bodybyone segment, and locate that segment at the current positionofthe snake’s head. To the player, it willlook as thoughthe snake is growing. However, youonlywant this to happen whenthe snake eats a raspberry—otherwise the snake willjust growand grow. Type the followinglines: if snakePosition[0] == raspberryPosition[0] and snakePosition[1] == raspberryPosition[1]: raspberrySpawned = 0 else: snakeSegments.pop() The first instructionchecks the Xand Ycoordinates ofthe snake’s head to see ifit matches the Xand Ycoordinates ofthe raspberry—the target the player is chasing. Ifthe values match, the raspberryis considered to have beeneatenbythe snake— and the raspberrySpawned variable is set to 0. The else instructiontells Pythonwhat to do ifthe raspberryhas not been eaten:pop the earliest value fromthe snakeSegments list. The pop instructionis simple but clever:it returns the oldest value fromthe list but also removes it, makingthe list one item shorter. Inthe case ofthe snakeSegment list, it tells Pythonto delete the portionofthe snake’s bodyfarthest awayfromthe head. To the player, it willlook as thoughthe entire snake has moved without growing—inreality, it grewat one end and shrank at the other. Because ofthe else statement, the pop instructiononlyruns whena raspberryhas not beeneaten. Ifa raspberry has beeneaten, the last entryinthe list doesn’t get deleted—so the snake grows insize byone segment.
  • 114.
    At this pointinthe program, it’s possible that the player has eatena raspberry. Agame inwhichonlya single raspberryis available is boring, so type the followinglines to add a newraspberryback to the playingsurface ifthe player has eatenthe existingraspberry: if raspberrySpawned == 0: x = random.randrange(1,32) y = random.randrange(1,24) raspberryPosition = [int(x*20),int(y*20)] raspberrySpawned = 1 This sectionofcode checks to see ifthe raspberryhas beeneatenbytestingifthe raspberrySpawned variable is set to 0, and ifso, the code picks a randomlocationonthe playingsurface usingthe random module youimported at the start ofthe program. This locationis thenmultiplied bythe size ofa snake’s segment—20 pixels wide and 20 pixels tall—to give Pythona place on the playingfield to positionthe newraspberry. It’s important that the locationofthe raspberryis set randomly:this prevents the player fromlearningwhere the raspberrywillappear next. Finally, the raspberrySpawned variable is set back to 1, to make sure that there willonlybe a single raspberryonthe playingsurface at anygiventime. Nowyouhave the code required to make the snake move and grow, and cause raspberries to be eatenand created—a process knowningamingas respawning. However, nothingis beingdrawnto the screen. Type the followinglines: playSurface.fill(blackColour) for position in snakeSegments: pygame.draw.rect(playSurface,whiteColour,Rect (position[0], position[1], 20, 20)) pygame.draw.rect(playSurface,redColour,Rect (raspberryPosition[0], raspberryPosition[1], 20, 20)) pygame.display.flip() These tellpygame to fillinthe background ofthe playingsurface inblack, drawthe snake’s head and bodysegments inwhite, and finally, drawa raspberryinred. The last line, pygame.display.flip(), tells pygame to update the screen—without this instruction, items willbe invisible to the player. Everytime youfinishdrawingobjects onto the screen, remember to use pygame.display.flip() so the user cansee the changes. Currently, it’s impossible for the snake to die. Agame where the player cannever die would rapidlyget boring, so enter the followinglines to set up some scenarios for the snake’s death: if snakePosition[0] > 620 or snakePosition[0] < 0: gameOver() if snakePosition[1] > 460 or snakePosition[1] < 0: gameOver() The first if statement checks to see ifthe snake has gone offthe playingsurface vertically, while the second if statement checks ifthe snake has gone offthe playingsurface horizontally. Ineither case, it’s bad news for the snake:the gameOver function, defined earlier inthe program, is called to print a message to the screenand quit the game. The snake should also die ifits head hits anyportionofits body, so add the followinglines: for snakeBody in snakeSegments[1:]: if snakePosition[0] == snakeBody[0] and snakePosition[1] == snakeBody[1]: gameOver() The for statement runs througheachofthe snake segments’ locations, fromthe second list entryto the end ofthe list, and compares it to the current positionofthe snake’s head. It’s important to start the comparisonat the second entryusing snakeSegments[1:] and not the first. The first entryis always set to the positionofthe head, and startingthe comparisonhere would result ininstant deathfor the snake as soonas the game begins. Finally, allthat is required for the game to be complete is to controlthe speed usingthe fpsClock variable. Without the variable, whichyoucreated at the start ofthe program, the game would runtoo quicklyto play. Type inthe followingline to finishthe program: fpsClock.tick(20) Ifyouthink the game is too easyor too slow, youcanincrease this number; or ifthe game is too hard or too fast, decrease the number. Save the programas raspberrysnake.py, and runit either byusingIDLE’s RunModule optioninthe Runmenuor fromthe terminalbytypingpython raspberrysnake.py. The game willstart as soonas it has loaded (see Figure 11-6), so
  • 115.
    make sure you’reready! Figure 11-6:PlayingRaspberrySnake onthe RaspberryPi Afullcopyofthe programlistingfor RaspberrySnake is included inAppendixA, “PythonRecipes”, and onthe RaspberryPi User Guide website at http://www.wiley.com/go/raspberrypiuserguide. Downloadingthe source code fromthe website willsave yousome typing, but enteringthe code byhand is a good wayofensuringthat youunderstand what each sectiondoes. Inadditionto the functions used inRaspberrySnake, pygame provides lots offeatures not used inthis program, includingaudio playback, sprite handlingfor better graphics and mouse control. The best place to learnabout pygame’s more- advanced functions is onthe officialwebsite, http://www.pygame.org/wiki/tutorials, where youcandownload tutorials and example programs to get a handle onhowthings work. Example 4: Python and Networking So far, youhave learned howPythoncanbe used to create standalone programs, but the language canalso be used to create programs that communicate withthe outside world over a computer’s network connection. This next example, writtenbyTom Hudson, offers a briefglimpse ofthese possibilities witha toolfor monitoringthe users connected to anInternet RelayChat (IRC) channel. As usual, create a newproject inIDLEor a text editor and enter the shebangline alongwitha comment describingthe purpose ofthe program: #!/usr/bin/env python # IRC Channel Checker, written for the Raspberry Pi User Guide by Tom Hudson Next, import the modules required bythe program—sys, socket and time—withthe followingline: import sys, socket, time Youused the sys and time modules previouslyinthe RaspberrySnake program, but youhave not yet used socket. The socket module provides Pythonwiththe abilityto open, close, read fromand write to network sockets—givingPython programs rudimentarynetworkingcapabilities. It’s the socket module that provides this example withits abilityto connect to a remote IRC server. There are some constants needed for this programto operate. Constants are like variables inthat theycanhave values assigned to them—but unlike variables, the value ina constant shouldn’t change. To help differentiate a constant froma variable, it’s good
  • 116.
    practice to useall-capitalletters for their names—that wayit’s easyto see at glance whether a particular sectionofthe code is usinga constant or a variable. Type the followingtwo lines into the program: RPL_NAMREPLY = ‘353’ RPL_ENDOFNAMES = ‘366’ These are IRC status codes, provided bythe server to indicate whenparticular operations have completed. These are used by the programto knowwhenit has received the required list ofnames fromthe IRC server. Next, set up the variables for the server connectionbyenteringthe followinglines: irc = { ‘host’ : ‘chat.freenode.net’, ‘port’ : 6667, ‘channel’ : ‘#raspiuserguide’, ‘namesinterval’ : 5 } The first line tells Pythonto create a dict data type. Short for dictionary, this allows multiple variables to be stored ina single master variable—inthis case, irc. These individualvariables canthenbe recalled later inthe program. Althoughyoucould write this programwithout usingdicts to store variables, it would make the programsignificantlymore difficult to read. The dict begins withthe openingcurlybrace, and ends withthe closingcurlybrace onthe finalline. The host variable should be set to the fully-qualified domainname (FQDN) ofthe IRC server to whichthe programwill connect. Inthis example, chat.freenode.net is used, but ifyouwant to customise the programto use a different server, change the domainname here. The port variable tells the programwhichnetwork port IRC is runningon, whichwillusuallybe 6667. The channel variable tells Pythonwhichchannelto joininorder to monitor the users, while namesinterval controls howlongthe programwaits to refreshthe list ofusers, measured inseconds. Set up a second dict to store the user-specific variables bytypinginthe followinglines: user = { ‘nick’ : ‘botnick’, ‘username’ : ‘botuser’, ‘hostname’ : ‘localhost’, ‘servername’ : ‘localhost’, ‘realname’ : ‘Raspberry Pi Names Bot’ } As withirc, allthese variables are stored withina dict called user to make it clear whichvariables pertainto whichsection. The nick variable should be set to the IRC nickname the programwilluse. Don’t use your usualnickname ifyou’re planningto connect to the IRC server at the same time; instead, tryappending-bot to the end ofyour name to make it clear that the user is a programrather thana realperson. Do the same withusername, and fillinthe realname variable witha descriptive message about whomthe bot belongs to. The hostname and servername variables canbe left set to localhost, or altered to match your Internet address. The socket module requires the user to create a socket object. This object provides network connectivityto the rest ofthe program. Create the socket object bytypinginthe followingline: s = socket.socket(socket.AF_INET, socket.SOCK_STREAM) Next, youneed to tellthe programto tryconnectingto the IRC server specified inthe variables at the start ofthe program. Type the followinglines: print ‘Connecting to %(host)s:%(port)s...’ % irc try: s.connect((irc[‘host’], irc[‘port’])) except socket.error: print ‘Error connecting to IRC server %(host)s:%(port)s’ % irc sys.exit(1) The try and except commands are included inthis code for error handling. Ifthe systemfails to connect to the server— because the Piisn’t connected to the Internet, for example, or because the server is downfor maintenance—the programwill print anerror message and gracefullyexit. The s.connect line tells the socket module to tryconnectingto the IRC server, using the host and port variables held inthe irc dict. Ifthe programdoesn’t quit fromthe exception, it has successfullyconnected to the IRC server. Before youcanget a list of
  • 117.
    names ina channel,however, youneed to identifyyourselfto the server and issue some commands usingthe send functionofthe socket module. Type the followinglines into the program: s.send(‘NICK %(nick)srn’ % user) s.send(‘USER %(username)s %(hostname)s %(servername)s :%(realname)srn’ % user) s.send(‘JOIN %(channel)srn’ % irc) s.send(‘NAMES %(channel)srn’ % irc) The send functionworks inalmost exactlythe same wayas the print function, except that instead ofprintingto the standard output—usuallythe terminalwindowor console—it sends the output throughthe network connection. Inthis case, the program is sendingstrings oftext to the IRC server and tellingit to register the programusingthe nickname held inthe nick variable and the user details held inthe username, hostname, servername and realname variables. Next, the programsends the command to jointhe channelspecified inthe channel variable, and finally, it sends the command to receive the list ofusers in that channel. Althoughthis example is tailored to IRC, the same basic principle canbe used to issue commands to anynetwork service—withmodifications, this programcould be used to list the files onanFTP server, or unread emails ona POP3 server. Receivingdata fromthe socket is a little more complicated. First, you’llneed to create anemptystringvariable that willact as the receive buffer, holdingdata fromthe server as it’s received untilit canbe processed. Initialise the buffer bytypinginthe following line: read_buffer = ‘‘ Note that there are two single quotes after the equals sign, not one double quote. Next, create anemptylist ,whichwillbe used to store the names ofusers, bytypingthe followingline: names = [] The list data type is the same as youused to store the locations inthe RaspberrySnake game. Unlike a normalvariable, it can store multiple values—inthis case, the names ofusers present inthe IRC channel. The next step is to create aninfinite loop, duringwhichthe programwillcontinuouslyquerythe server for user names and print themto the screen. Start the loop bytyping: while True: read_buffer += s.recv(1024) The first line ofthe loop, followingwhile True:, tells the socket module to receive 1,024 bytes (1 KB) ofdata fromthe IRC server and place it into the read_buffer variable. Because the += operator is used, rather thanjust =, the received data willbe appended to anythingalreadyinthe buffer. The value of1024 bytes is more or less arbitrary. The next step is to split the buffer into individuallines oftext, usingthe followingprogramlines: lines = read_buffer.split(‘rn’) read_buffer = lines.pop(); The first line sets the lines variable to a fullline oftext fromthe receive buffer, byusingthe split functionto find end ofline characters—signified byrn. These characters onlyoccur at the end ofa line, so whenthe buffer has beensplit inthis wayyou knowthat lines contains onlyfull-line responses fromthe server. The pop instructioninthe second line makes sure that onlyfull lines are removed fromthe read_buffer:because responses fromthe server are read in1 KBchunks, it’s likelythat at any giventime the buffer willcontainonlyfractions ofa line. Whenthat’s the case, the fractionis left inthe buffer readyto receive the remainder ofthe line the next time the loop runs and the next 1 KBchunk is received fromthe server. At this point, the lines variable contains a list offullresponses—fulllines—received fromthe server. Type the followingto process these lines and find the names ofchannelparticipants: for line in lines: response = line.rstrip().split(‘ ‘, 3) response_code = response[1] if response_code == RPL_NAMREPLY: names_list = response[3].split(‘:’)[1] names += names_list.split(‘ ‘) This runs througheveryline found inthe lines variable, and looks for the numericalIRC response code provided bythe server. Althoughthere are plentyofdifferent response codes, this programis onlyinterested inthe two defined as constants at the start
  • 118.
    ofthe program:353, whichmeansa list ofnames follows, and 366, whichmeans the list has ended. The if statement looks for the first ofthese responses, and thenuses the split functionto retrieve these names and add themto the names list. Now, the names list contains allthe names received fromthe server inresponse to the program’s query. This maynot be allthe names, however:untilthe 366 response, whichsignals the end ofthe member names, is received, the list is incomplete. That is whythe last line—names += names_list.split(‘ ‘)—is appendingthe newly-received names to the existinglist, rather thanblankingit out entirely:eachtime that sectionofthe code runs, the programis onlylikelyto have received a sub-sectionof the entire member list. To tellPythonwhat to do whenthe fulllist has beenreceived, enter the followinglines: if response_code == RPL_ENDOFNAMES: # Display the names print ‘rnUsers in %(channel)s:’ % irc for name in names: print name names = [] This tells Pythonthat whenthe 366 response has beenreceived, it should print out the now-complete list ofnames to the standard output before blankingthe names list again. This last line—names = []—is important:without it, eachtime the loop runs it willadd users’ names to the list eventhoughtheyalreadyexist fromanearlier run. Finally, finishthe programbyenteringthe followinglines: time.sleep(irc[‘namesinterval’]) s.send(‘NAMES %(channel)srn’ % irc) This tells Pythonto wait the namesinterval number ofseconds before sendinganother request for user names and beginning the loop again. Be carefulto set namesinterval to a reasonable value—ifthe IRC server receives too manyrequests intoo short a space oftime, it mayforciblydisconnect youfor flooding. Save the programas ircuserlist.py, and runit either byusingIDLE’s RunModule optioninthe Runmenuor fromthe terminalbytypingpython ircuserlist.py. Whenthe programfirst runs, it maytake a while to connect to the server; once connected, however, the list ofnames (see Figure 11-7) should refreshquickly. To quit the program, press CRTL+ C. Figure 11-7:UsingPythonto list users inanIRC channel Afullcopyofthe programlistingfor the IRC user list is included inAppendixA, “PythonRecipes”, and onthe RaspberryPi User Guide website at http://www.wiley.com/go/raspberrypiuserguide. Downloadingthe source code fromthe website willsave yousome typing, but enteringthe code byhand is a good wayofensuringthat youunderstand what each sectiondoes. Further Reading
  • 119.
    Hopefully, this chapterhas givenyoua taste ofwhat youcando withPython. It’s far fromexhaustive—to do the language full justice would take a considerablylarger book. However, there are plentyofresources out there for learningmore about the Pythonlanguage, includingthe following: • The officialBeginner’s Guide to Python, whichyoucanaccess at http://wiki.python.org/moin/BeginnersGuide. • Afree, interactive tutorialthat runs entirelyinyour browser is available for download at http://www.learnpython.org/. • Zed A. Shaw’s LearnPythonThe Hard Way(ShavianPublishing, 2012) offers great insight into best-practice codingfor Python, and despite the name, it’s suitable for beginners. This book is commerciallyavailable, or youcanread it for free at http://learnpythonthehardway.org/. • Althoughsomewhat outdated and since replaced byDive Into Python3 (APRESS, 2009), Dive Into PythonbyMark Pilgrim(APRESS, 2004) does a good job ofaddressingthe basics ofwritingprograms inPython. It’s available for free download at http://www.diveintopython.net/ or for purchase inprinted format fromallgood booksellers. • Ifyouprefer hands-onlearningwithother interested individuals, a list oflocalPythonUser Groups—sometimes called PIGgies—canbe found at http://wiki.python.org/moin/LocalUserGroups. • For learningpygame, AlSweigart’s book MakingGames withPython&Pygame (CreateSpace, 2012) is a great introductionwithpracticalexamples. Youcanpurchase the hardcopybook or downloaded it for free at http://inventwithpython.com/.
  • 120.
    Chapter 12: HardwareHacking Inearlierchapters, youlearned howthe RaspberryPicanbe turned into a flexible platformfor runninga varietyofsoftware. Inthis, it’s not alone:anydesktop or laptop canrunthe same software, and inmanycases runit far faster thanthe Pi’s low- power processor canmanage. The Pihas another trick up its sleeve, though, whichplaces it above and beyond the capabilities ofthe average PC:its 26-pin general-purpose input-output (GPIO) port, located onthe top-left ofthe Pi’s printed circuit board. The GPIO enables the Pito communicate withother components and circuits, and allows it to act as a controller ina larger electronic circuit. Throughthe GPIO port, it’s possible to have the Pisense temperatures, move servos and talk to other computingdevices usinga varietyofdifferent protocols includingSerialPeripheralInterface (SPI) and Inter-Integrated Circuit (I²C). Before youcanget beginbuildingcircuits to use withthe Pi’s GPIO port, however, you’re goingto need some additional equipment. Electronic Equipment To start buildingcircuits that canbe controlled bythe Pi’s GPIO port, you’llneed various components and tools. The following list provides a sample shoppinglist for gettingstarted withelectronics: • Breadboard—Anelectronic breadboard provides a grid ofholes spaced at 2.54 mmintervals into whichcomponents can be inserted and removed. Beloweachgrid is a series ofelectricalcontacts, whichallowcomponents inthe same rowto be connected together without wires. Abreadboard is a valuable toolfor electronics work, because it allows youto quickly make mock-up circuits that canbe modified without needingto be soldered or desoldered. • Wires—While a breadboard allows some components to be joined without wiring, you’llstillneed wires to connect one rowto another. These are knownas jumper wires, and ifyou’re workingona breadboard, it’s a good idea to get solid-core wire rather thanstranded-core wire. Solid-core wire is easier to insert into the breadboard’s holes compared to stranded. It’s also helpfulto get various colours, so youcancolour-code eachconnectionaccordingto its purpose. • Resistors—The vast majorityofelectricalcircuits make use ofcomponents called resistors, and the example projects inthis chapter are no exception. Resistors are measured inohms, writtenas the symbolΩ. Always tryto have a handfuleachofa varietyofcommonvalues:2.2 KΩ, 10 KΩ, and 68Ω are good values to start with. Some retailers carryresistor kits, which include a wide range ofusefulvalues. • Push-Buttons—Averycommoninput component, a push-buttoncompletes anelectricalcircuit whenpushed. At the most basic level, a keyboard is little more thana collectionofpush-buttons. Ifyou’re designinga circuit to provide a simple input to the Pi, pick the buttonlabelled momentaryswitch. • LEDs—Light-emittingdiodes (LEDs) are the most commonoutput device inexistence. AnLEDlights up whenvoltage is applied, givingyouvisualfeedback onwhether a pinonthe Pi’s GPIO port is highor low. Whenyou’re buyingLEDs for use withthe Pi, opt for low-power ones. The GPIO port isn’t that powerful, and high-current LEDs—suchas bright-white or bright-blue models—willrequire anexternalpower supplyand anextra component knownas a transistor. Additionally, ifyou’re planningonmakingsomethingmore permanent once you’ve finished your breadboard prototype (which you’lllearnabout later inthis chapter), you’llalso need the following: • Stripboard—This canbe thought ofas a single-use breadboard. As withbreadboards, holes are arranged ina 2.54 mm grid. Unlike breadboards, the components need to be soldered into place—after whichyou’ve got a permanent electronic circuit. • SolderingIron—Whenyouneed to connect a component permanentlyinto a circuit, youneed to solder it. Youdon’t have to spend a fortune ona solderingiron, but ifyour budget stretches to a temperature-controlled model, it’s a wise investment. Make sure anysolderingironyoubuyhas a small, pointed tip—chisel-tip irons aren’t suitable for delicate electronic work. • Solder—Your solderingironneeds solder. Solder is a mixture ofconductive metals mixed witha cleaningsubstance known as flux. Make sure the solder youbuyis suitable for electronics work—thick, plumbingsolder is cheap but maydamage delicate circuits, because it requires too muchheat to melt. • Stand and Sponge—It’s important to have somewhere to put the hot solderingironwhenit’s not inuse, and a wayof cleaningthe tip ofthe ironwhile you’re usingit. Some solderingirons come witha stand witha built-incleaningsponge—if
  • 121.
    yours didn’t, buyaseparate stand-and-sponge set. • Side Cutters—Through-hole components have longlegs, whichare left stickingout after you’ve soldered theminplace. Side cutters allowyouto cleanlyand quicklytrimthese excess legs without damagingthe solder joint. • Tweezers—Electronics components canbe smalland fiddly, and a good pair oftweezers is invaluable. Ifyou’re thinkingof usingsurface-mount components, instead ofthe easier-to-solder through-hole components, tweezers are anabsolute necessity—without tweezers, you’llburnyour fingers ifyoutryto hold the component and solder it at the same time! • Work Stand—Commonlyreferred to as helpinghands, these are weighted stands withclamps or clips that hold the itemto be soldered inplace. Some work stands include anintegrated magnifyingglass for delicate work, while the most expensive work stands add a light to help illuminate the work area. • Multimeter—Multimeters are test meters that have multiple functions includingvoltage, resistance and capacitance measurement, alongwithcontinuitytestingfor findingbreaks incircuits. Althougha multimeter is not anabsolute necessity, it canbe extremelyusefulfor diagnosingissues withcircuits. Professionalmultimeter units canbe quite expensive, but a simple modelis fairlyinexpensive and is a sound investment for anyone gettingstarted inelectronics. • DesolderingWick—Mistakes happen, but theydon’t have to be permanent. Adesolderingwick is a braided metaltape that canbe placed over a solder joint and heated, pullingthe solder awayfromthe component and into the wick. With practice, it’s possible to use a desolderingwick to salvage components fromdiscarded electronic equipment—a handyway to gather commoncomponents cheaply. Reading Resistor Colour Codes Most electronic components are clearlylabelled. For example, capacitors willhave their capacitance, measured infarads, printed directlyonthem, while crystals willhave their frequencylikewise marked. The major exceptionis a resistor, whichtypicallyhas no writingonits surface. Instead, the resistance value inohms is calculated fromthe colour bands that adornthe resistor’s surface. Learningto decode these bands is animportant skillfor a hardware hacker to learn, because once a resister is removed fromits packaging, the onlywayto figure out its value is to use a multimeter, whichis anawkward and slowmeasuringtoolfor this particular job. Thankfully, the resistor colour codes followa logicalpattern. Figure 12-1 shows a typicalfour-band resistor. Ahigh-resolution colour versionofthis diagramis available onthe RaspberryPiUser Guide website at http://www.wiley.com/go/raspberrypiuserguide. The first two bands are assigned a colour that equates to a resistance value inohms. The third band is the multiplier, bywhichthe first two numbers are multiplied to arrive at the actualresistance value. The finalband indicates the tolerance ofthe resistor, or howaccurate it is. Aresistor witha lower tolerance willbe closer to its marked value thana resistor witha higher tolerance, but you’llpaymore for the component. Figure 12-1:Afour-band resistor and the decodingtable for its colour code
  • 122.
    To read theexample resistor, first take the two resistance bands startingfromthe left:these are coloured red and red. Red, on the table included inFigure 12-1, equates to the value 2, so the initialreadingis 22. The next band is green, whichis the multiplier and equates to 105 or 100,000 (10 followed byfive zeros). Multiplying22 by100,000 equals 2,200,000, whichis the resistance value inohms:2,200,000 Ω. There are 1,000 ohms ina kiloohm, and 1,000 kiloohms ina megaohm. Thus, 2,200,000 Ω would typicallybe writtenas 2,2 MΩ. The finalband, located onthe right side ofthe resistor, is gold and details the tolerance, or accuracy, ofthe resistor, which is plus or minus 5 percent inthe example showninFigure 12-1. There are also five-band resistors. Youread these inthe same wayas a four-band resistor, except that the first three bands offer resistance figures, the fourththe multiplier, and the fifththe resistance. Sourcing Components Ifyouhaven’t dabbled inelectronics before, it canbe difficult to find components and tools. Thankfully, there are plentyofonline and offline sources that specialise inthe hard-to-find components youmight need to complete your project. Online Sources
  • 123.
    Two ofthe largestretailers ofelectronic components and tools inthe world are RS Components and Farnell. Bothoperate offices and warehouses across the world, and bothhave a substantialselectionofhardware fromwhichto choose. Chances are you’re familiar withat least one ofthe two retailers. At the time ofthis writingRS Components and Farnellwere the onlytwo companies licensed to produce the RaspberryPihardware bythe RaspberryPiFoundation, so unless you’re readingthis book while consideringthe purchase ofa RaspberryPi, you’llhave ordered the device fromone ofthe two. BothRS Components and Farnellfocus onbusiness-to-business transactions, meaningthat their mainsource ofincome is from electronics companies buyinglarge quantities ofcomponents. However, bothwillhappilyallowconsumers to register withtheir respective web stores and place orders as smallas individualcomponents. Whenyou’re placingsmallorders, be aware that there maybe additionalcharges incurred. RS Components charges for its next- daydeliveryservice, and while the charge is quite reasonable for larger orders, it cancost significantlymore thanthe components beingpurchased for smaller orders. Onthe other hand, Farnelldoesn’t charge for next-daydeliverybut does mandate a minimumtotalvalue for orders placed throughits website. Dependingonwhere youlive, youmaybe able to reserve items for collectionat one ofRS Components’ or Farnell’s trade counters. This saves onthe cost ofpostage and gets youthe goods faster, but it maynot be anoptionat your location. The websites for bothretailers canbe found here: RS Components:http://www.rs-online.com Farnell:http://www.farnell.com Offline Sources Youmayfind that youneed a component immediately, and evennext-daydeliverywould not be soonenough. Or youmayonly need a single resistor or a smalllengthofwire and can’t justifya highdeliverycost or minimumorder value for one ofthe online retailers. Thankfully, there are brick-and-mortar stores that specialise inelectronic components. Althoughthere are not as many ofthese types ofstores as inprevious decades, most major towns and cities willinclude at least one physicalshop that stocks the most commonlyrequired tools and components. Inthe UK, the most popular chainofelectronic component shops is MaplinElectronics. Established inEssexin1972, the companyhas grownfroma smallmail-order outlet to include 187 stores across the UK. Inhabitants ofmost cities willfind themselves withinreachofa MaplinElectronics store, whichcanbe a handysource ofhardware ifyou’re runninglowon commonparts. MaplinElectronics also offers a mail-order and click-and-reserve service throughits website, but beware its business-to- consumer focus. Manycomponents are significantlymore expensive whenordered fromMaplinthanfromRS Components or Premier Farnell, because the companyrelies onmark-up rather thanhigh-volume trade to make a profit. Inthe US and other countries, Radio Shack remains the most popular chainofelectronics stores. Founded in1921 and boasting over 7,150 stores across the world, the companystocks a wide selectionofcommonelectronic components and tools that can be purchased inpersonor ordered for deliverythroughits website. As withMaplinElectronics inthe UK, Radio Shack is a business-to-consumer operation. As a result, buyers canexpect to pay more for components purchased at Radio Shack thanthe same parts ordered fromRS Components or Farnell. However, the large number ofRadio Shack stores make it a convenient choice for buyers who are ina hurryor who are lookingfor one-off items. BothMaplinand Radio Shack also have the advantage ofbeingstaffed bypeople to whomyoucanspeak. Manyemployees of bothcompanies have significant knowledge inelectronics, and are happyto offer advice and assistance ifyou’re unsure ofwhat parts youneed for a givenproject. The websites for bothretailers canbe found here: MaplinElectronics:http://www.maplin.co.ukhttp://www.maplin.co.uk Radio Shack:http://www.radioshack.com Hobby Specialists Inadditionto the major chains, there are smaller companies that specialise inworkingwithhobbyists. Althoughtheir selectionis dwarfed bythose ofthe larger chains, it’s typicallyhand-picked and comes withthe personalrecommendationofthe people behind the company.
  • 124.
    Manyofthese hobbyshops sprangupinthe wake ofthe Arduino, anopen-source project to create aneducational-friendly microcontroller prototypingplatform. Withthe RaspberryPiappealingto muchthe same audience as the Arduino—albeit for verydifferent tasks—the majorityare investigatingsupport for the Piinadditionto their existingproduct lines. Buyingfroma hobbyspecialist has severaladvantages. Ifthe products are sold as workingwiththe Pi, thenthey’ve beentested for that specific reason—takingmuchofthe guesswork out ofthe equation. Severalcompanies also designtheir ownadd-on hardware for various platforms, withthe Pibeingno exception. These devices, designed to address a need inthe community, mayinclude additionalports and/or extra hardware, or canotherwise extend the functionalityofthe target device. Inthe UK, one ofthe most popular hobbyspecialists is oomlout. Founded byopen-source enthusiasts workingwithArduino hardware, it’s anexcellent source ofadd-onkits as wellas commoncomponents includingpush-buttons, displays and transistors. Unlike the larger retailers, oomlout equips its components withallnecessaryextras—suchas pull-up resistors for the push-buttons—and a circuit schematic for easyassembly. Where possible, sample source code is also provided to get youup and runningas quicklyas possible. Inthe US, Adafruit offers a similar service. Founded withthe intentionofmakingopen-source add-ons for the Arduino boards, Adafruit offers a wide selectionofcomponents and kits—includingone ofthe first add-onboards designed specificallyfor the RaspberryPi(see Chapter 13, “Add-onBoards”, for more details). The websites for bothretailers canbe found here: oomlout:http://www.oomlout.co.uk Adafruit:http://www.adafruit.com The GPIO Port The RaspberryPi’s GPIO port is located onthe top-left ofthe printed circuit board, labelled P1. It’s a 26-pinport, fitted with two rows of13 male 2.54 mmheaders at the factory. The spacingofthese headers is particularlyimportant:2.54 mmpin spacing(0.1 inches inimperialmeasurements) is a verycommonsight inelectronics, and is the standard spacingfor prototyping platforms that include stripboards and breadboards. Eachpinofthe GPIO port has its ownpurpose, withseveralpins workingtogether to formparticular circuits. The layout ofthe GPIO port canbe seeninFigure 12-2. Figure 12-2:The RaspberryPi’s GPIO port and its pindefinitions Pinnumbers for the GPIO port are split into two rows, withthe bottomrowtakingthe odd numbers and the top rowthe even numbers. It’s important to keep this inmind whenworkingwiththe Pi’s GPIO port:most other devices use a different systemfor
  • 125.
    numberingpins, and becausethere are no markings onthe Piitself, it’s easyto get confused as to whichpinis which. Neverconnect anything to the pins markedDo Not Connect; these are reservedforinternal functions of the Pi’s BCM2835 system-on-chip(SoC) hardware. Connecting anything to these will result in damage to the Pi. Althoughthe Pi’s GPIO port provides a 5 Vpower supply, tapped fromthe incomingpower onthe micro-USBhub, onPin2, the Pi’s internalworkings are based on3.3 Vlogic. This means that the components onthe Piwork froma 3.3 Vpower supply. Ifyou’re planningoncreatinga circuit that willinterface withthe Pithroughits GPIO port, make sure youare usingcomponents compatible with3.3 Vlogic or are passingthe circuit througha voltage regulator before it reaches the Pi. Connecting a 5 Vsupply to any pin on the Raspberry Pi’s GPIO port, ordirectly shorting eitherof the powersupply pins (Pin 1 andPin 2) to any otherpin will result in damage to the Pi. Because the port is wireddirectly to pins on the BroadcomBCM2835 SoC processor, you will not be able to repairany damage you do to it. Always be extra careful when working aroundthe GPIO port. The GPIO port provides sevenpins for general-purpose use bydefault:Pin11, Pin12, Pin13, Pin15, Pin16, Pin18 and Pin 22. Additionally, Pin7—while defaultingto providinga clock signalfor generalpurpose use—canalso be used as a general- purpose pin, givingeight pins intotal. These pins canbe toggled betweentwo states:high, where theyare providinga positive voltage of3.3 V; and low, where theyare equalto ground or 0 V. This equates to the 1 and 0 ofbinarylogic, and canbe used to turnother components onor off. You’lllearnmore about this later inthe chapter. The Pi’s internal logicoperates at 3.3 V. This is in contrast to many common microcontrollerdevices, such as the popularArduino andits variants, which typically operate at 5 V. Devices designedforthe Arduino may not work with the Pi unless a level translatororoptical isolatoris used between the two. Likewise, connecting pins on a 5 Vmicrocontrollerdirectly to the Raspberry Pi’s GPIO port will not work andmay permanently damage the Pi. Inadditionto these general-purpose pins, the GPIO port has pins dedicated to particular buses. These buses are described in the followingsubsections. UART Serial Bus The UniversalAsynchronous Receiver/Transmitter (UART) serialbus provides a simple two-wire serialinterface. Whena serial port is configured inthe cmdline.txt file (as described inChapter 6, “Configuringthe RaspberryPi”), it’s this serialbus that is used as the port for the messages. Connectingthe Pi’s UARTserialbus to a device capable ofdisplayingthe data willreveal messages fromthe Linuxkernel. Ifyou’re havingtrouble gettingthe Pito boot, this canbe a handydiagnostic tool—especiallyif nothingis showingonthe display. The UARTserialbus canbe accessed onPins 8 and 10, withPin8 carryingthe transmit signaland Pin10 carryingthe receive signal. The speed canbe set inthe cmdline.txt file, and is usually115,200 bits per second (bps). I²C Bus As the name suggests, the Inter-Integrated Circuit (I²C) bus is designed to provide communications betweenmultiple integrated circuits (ICs). Inthe case ofthe Pi, one ofthose integrated circuits is the BroadcomBCM2835 SoC processor at the heart of the system. These pins include access to pull-up resistors located onthe Pi, meaningno externalresistors are required to access the I²C functionality. The I²C bus canbe accessed onPins 3 and 5, withPin3 providingthe SerialData Line (SDA) signaland Pin5 providingthe SerialClock (SCL) signal. The I²C bus available onthese pins is actuallyonlyone oftwo provided bythe BCM2835 chip itself, and is knownas I²C0. The second, I²C1, is terminated at resistors onthe RaspberryPicircuit board itselfand is not available for general-purpose use. SPI Bus The SerialPeripheralInterface (SPI) bus is a synchronous serialbus designed primarilyfor in-systemprogramming(ISP) of microcontrollers and other devices. Unlike the UARTand I²C buses, it’s a four-wire bus withmultiple Chip Select lines which allowit to communicate withmore thanone target device. The Pi’s SPI bus is available onPins 19, 21 and 23, witha pair ofChip Select lines onPin24 and Pin26. Pin19 provides the SPI Master Output, Slave Input (MOSI) signal; Pin21 provides the SPI Master Input, Slave Output (MISO) signal; Pin23 provides the SerialClock (SLCK) used to synchronise communication; and Pins 24 and 26 provide the Chip Select signals for up to two independent slave devices.
  • 126.
    Althoughadditionalbuses are presentinthe RaspberryPi’s BCM2835 SoC processor, theyare not brought out to the GPIO port and are thus unavailable for use. Using the GPIO Port in Python Withthe theoryout ofthe way, it’s time to get practical. Inthis section, you’lllearnhowto installa libraryto alloweasyaccess to the general-purpose pins onthe RaspberryPi’s GPIO port inPython. You’llalso be showntwo simple electronic circuits whichdemonstrate howto use the GPIO port for input and output. As yousawinChapter 11, “PythonBasics”, Pythonis a friendlyyet powerfulprogramminglanguage. It’s not, however, the perfect choice for everyscenario. Althoughit works fine for the simple circuits you’llbe creatinginthis chapter, it does not offer what is knownas deterministic real-time operation. For the majorityofusers, this doesn’t matter; ifyou’re planningonusingthe Piat the heart ofa nuclear reactor or a complexrobotics platform, however, youmaywant to investigate a lower-levellanguage suchas C++ or evenassembler runningona dedicated real-time microcontroller. Iftrue real-time operationis required for your project, the Pimaybe a bad choice. Instead, consider usinga microcontroller platformsuchas the popular open-source Arduino, or one ofthe MSP430 familyofmicrocontrollers fromTexas Instruments. Bothofthese devices caninterface withthe Pieither throughthe GPIO header or over USB, and provide a specialised real-time environment for controland sensing. Installing the GPIO Python Library Since the launchofthe Pi, numerous developers have created software modules knownas libraries for makingfulluse ofits various functions. Inparticular, programmers have addressed the Piusers’ need to access the GPIO port without havingto know low-levelprogramming. These libraries are designed to extend the functionalityofthe base Pythonlanguage, muchlike the pygame software described in Chapter 11, “PythonBasics”. Installingone ofthese libraries gives Pythonthe abilityto easilyaddress the Pi’s GPIO port, althoughit means that anyone planningto use the software youcreate willalso have to download and installthe librarybefore it willwork. There are severalGPIO Pythonlibraries available, but for the purpose ofthis section, we recommend that youuse the raspberry-gpio-python library, whichwas at version0.2.0 at the time ofwriting. Youcanaccess this libraryfromthe Google Code website at the followingaddress:http://code.google.com/p/raspberry-gpio-python/ Althoughit’s possible to download the Pythonlibrarythrougha web browser, it’s significantlyquicker to do so throughthe terminalas part ofthe installationprocess. Just followthese steps: 1. Opena terminalwindowonyour RaspberryPifromthe Accessories menu, or use the console ifyouhaven’t loaded a desktop environment. 2. Type wget http://raspberry-gpio-python.googlecode.com/files/RPi.GPIO-0.2.0.tar.gz to download the libraryto your home directory. Ifa newer versionhas beenreleased, replace the versionnumber—0.2.0—withthe current version. 3. Type tar xvzf RPi.GPIO-0.2.0.tar.gz to extract the contents ofthe file. This command is case-sensitive, so make sure to type the capitalletters. 4. Type cd RPi.GPIO-0.2.0 to change to the newlycreated directory. Again, ifyoudownloaded a newer versionofthe library, replace the versionnumber withthat ofthe downloaded version. 5. Type sudo python setup.py install to installthe libraryinto Python. Althoughthe GPIO libraryis nowinstalled inPython, it won’t be loaded bydefault. Like pygame, the libraryneeds to be explicitlyimported into your program. To use the library, start your programwithimport RPi.GPIO as GPIO at the top. You’lllearnmore about this inthe followingexamples. The Raspberry Pi’s GPIO port does not provide any protection against voltage spikes orelectrical shorts. Always make sure you’ve checkedthat yourcircuit is soundbefore connecting it to the Pi. If possible, use an isolation boardsuch as the Gertboard(discussedin Chapter13, “Add-on Boards”) to provide protection. Calculating Limiting Resistor Values An LED needs acurrent limitingresistor to protect it fromburningout. Without aresistor, an LED will likely only work for ashort timebeforefailingand
  • 127.
    An LED needsacurrent limitingresistor to protect it fromburningout. Without aresistor, an LED will likely only work for ashort timebeforefailingand needingto bereplaced. Knowingaresistor is required is onething, but it’s also important to pick theright resistor for thejob. Too high avalueand theLED will beextremely dimor fail to light at all; too low avalueand it will burn out. To calculatetheresistor valuerequired, you will need to know theforward current of your LED. This is themaximumcurrent theLED can draw beforebeing damaged, and is measured in milliamps (mA). You’ll also need to know theforward voltageof theLED. This latter value, measured in volts, should be3.3 V or lower—any higher, and theLED will requirean external power supply and aswitchingdeviceknown as atransistor beforeit will work with thePi. Theeasiest way to work out how largearesistor is required is with theformulaR=(V-F)/I, whereR is resistancein ohms, V is thevoltageapplied to the LED, F is theforward voltageof theLED and I is themaximumforward current of theLED in amps (with athousand mA to theamp). Takingatypical red LED with aforward current of 25 mA and aforward voltageof 1.7 V, and poweringit usingthe3.3 Vsupplied by thePi’s GPIO port, you can calculatetheresistor needed as (3.3 – 1.7) / 0.025 = 64. Thus, aresistor of 64 Ωor higher will protect theLED. Thesefigures rarely comeout to match thecommon resistor values as sold, so when you’rechoosingaresistor, always round up to ensuretheLED is protected. Thenearest commonly availablevalueis 68 Ω, which will adequately protect theLED. If you don’t know theforward voltageand forward current of your LEDs (for example, if theLEDs did not comewith documentation or weresalvaged from scrap electronics), err on thesideof caution and fit areasonably largeresistor. If theLED is too dim, you can revisedownwards—but it’s impossibleto repair an LED that has been blown. GPIO Output: Flashing an LED For the first example, you’llneed to build a simple circuit consistingofanLEDand a resistor. The LEDwillprovide visual confirmationthat the Pi’s GPIO port is doingwhat your Pythonprogramtells it to do, and the resistor willlimit the current drawn bythe LEDto protect it fromburningout. To assemble the circuit, you’llneed a breadboard, two jumper wires, anLEDand anappropriate current-limitingresistor (as described inthe “CalculatingLimitingResistor Values”sidebar). Althoughit’s possible to assemble the circuit without a breadboard bytwistingwires together, a breadboard is a sound investment and makes assemblingand disassemblingprototype circuits straightforward. Assumingthe use ofa breadboard, assemble the circuit inthe followingmanner to matchFigure 12-3: 1. Insert the LEDinto the breadboard so that the longleg(the anode) is inone rowand the shorter leg(the cathode) is in another. Ifyouput the LED’s legs into the same row, it won’t work. 2. Insert one legofthe resistor into the same rowas the LED’s shorter leg, and the other resistor leginto anemptyrow. The directioninwhichthe resistor’s legs are placed doesn’t matter, as a resistor is a non-polarised (direction-insensitive) device. 3. Usinga jumper wire, connect Pin11 ofthe RaspberryPi’s GPIO port (or the correspondingpinonaninterface board connected to the GPIO port) to the same rowas the longlegofthe LED. 4. Usinganother jumper wire, connect Pin6 ofthe RaspberryPi’s GPIO port (or the correspondingpinonaninterface board connected to the GPIO port) to the rowthat contains onlyone legofthe resistor and none ofthe LED’s legs. Be very careful when connecting wires to the Raspberry Pi’s GPIO port. As discussedearlierin the chapter, you may do serious damage to the Pi if you connect the wrong pins. Figure 12-3:Abreadboard circuit for a simple LEDoutput
  • 128.
    At this point,nothingwillhappen. That’s perfectlynormal:bydefault, the RaspberryPi’s GPIO pins are switched off. Ifyou want to check your circuit immediately, move the wire fromPin11 to Pin1 to make the LEDlight up. Be carefulnot to connect it to Pin2, though:a current-limitingresistor suitable for a 3.3 Vpower supplywillbe inadequate to protect the LEDwhen connected to 5 V. Remember to move the wire back to Pin11 before continuing. To make the LEDdo somethinguseful, start a newPythonproject. As withthe projects inChapter 11, “AnIntroductionto Python”, youcanuse a plaintext editor or the IDLEsoftware included inthe recommended Debiandistributionfor this project as well. Before youcanuse the GPIO libraryyouinstalled earlier inthis chapter, you’llneed to import it into your Pythonproject. Accordingly, start the file withthe followingline: import RPi.GPIO as GPIO Remember that Pythonis case-sensitive, so be sure to type RPi.GPIO exactlyas it appears. To allowPythonto understand the concept oftime (inother words, to make the LEDblink, rather thanjust turningit onand off), you’llalso need to import the time module. Add the followingline to the project: import time Withthe libraries imported, it’s time to address the GPIO ports. The GPIO librarymakes it easyto address the general-purpose ports throughthe instructions GPIO.output and GPIO.input, but before youcanuse them, you’llneed to initialise the pins as either inputs or outputs. Inthis example, Pin11 is anoutput, so add the followingline to the project: GPIO.setup(11, GPIO.OUT) This tells the GPIO librarythat Pin11 onthe RaspberryPi’s GPIO port should be set up as anoutput. Ifyouwere controlling additionaldevices, youcould add more GPIO.setup lines into the project. For now, however, one willsuffice. Withthe pinconfigured as anoutput, youcanswitchits 3.3 Vsupplyonand offina simple demonstrationofbinarylogic. The instructionGPIO.output(11, True) willturnthe pinon, while GPIO.output(11, False) switches it offagain. The pinwill remember its last state, so ifyouonlygive the command to turnthe pinonand thenexit your Pythonprogram, the pinwillremain onuntiltold otherwise. Althoughyoucould just add GPIO.output(11, True) to the Pythonproject to switchthe pinon, it’s more interestingto make
  • 129.
    it blink. First,add the followingline to create aninfinite loop inthe program: while True: Next, add the followinglines to switchthe pinon, wait 2 seconds, and thenswitchit offagainbefore waitinganother 2 seconds. Make sure eachline starts withfour spaces, to signifythat it is part ofthe infinite while loop: GPIO.output(11, True) time.sleep(2) GPIO.output(11, False) time.sleep(2) The finished programshould look like this (see Figure 12-4): import RPi.GPIO as GPIO import time GPIO.setup(11, GPIO.OUT) while True: GPIO.output(11, True) time.sleep(2) GPIO.output(11, False) time.sleep(2) Figure 12-4:The gpiooutput.pyprogram, beingedited innano, and waitingfor its finalline Save the file as gpiooutput.py. Ifyou’re usinga Pythondevelopment environment suchas SPE, don’t tryto runthe program fromwithinthe editor. Most RaspberryPiLinuxdistributions restrict the use ofthe GPIO port to the root user, so the program willneed to be runusingthe command sudo python gpiooutput.py at the terminalto get it started. Ifallhas gone well, you should see the LEDbeginto blink onand offat regular intervals—and you’ve created your first home-made output device for the Pi. Ifthings don’t work, don’t panic. First, check allyour connections. The holes ina breadboard are quite small, and it’s easyto think you’ve inserted a component into one rowonlyto find it’s actuallyinanother. Next, check that you’ve connected the circuit to the right pins onthe GPIO port—withno labellingonthe Piitself, mistakes are unfortunatelyeasyto make. Finally, double- check your components—ifthe forward voltage ofyour LEDis higher than3.3 Vor ifyour current limitingresistor is too large, the LEDwon’t light up. Althoughthis example is basic, it’s a good demonstrationofsome fundamentalconcepts. To extend its functionality, the LED could be replaced witha buzzer to make anaudible alert, or a servo or motor as part ofa robotics platform. The code used to activate and deactivate the GPIO pincanbe integrated into other programs, causinganLEDto come onwhennewemailarrives or a flagto be raised whena friend has joined anIRC channel. GPIO Input: Reading a Button Beingable to use the GPIO as anoutput is undeniablyuseful, but it becomes significantlymore so whenyoucancombine that
  • 130.
    withone or moreinputs. Inthe followingexample, you’llsee howto connect a push-buttonswitchto another pinonthe GPIO port and read its status inPython. As withthe earlier LEDoutput example, this input example makes use ofthe PythonGPIO library. Assumingthat youhave this libraryinstalled, youcanbeginto build the circuit. (Ifyouhaven’t installed the PythonGPIO libraryyet, skip back a fewpages and followthe installationinstructions.) Ifyou’ve alreadybuilt the GPIO output example, youcaneither disconnect that fromyour Pior leave it connected—this example uses different pins, so bothcanco-exist quite happily. Ifyoudo leave the previous example connected, make sure to use different rows onthe breadboard for the newcomponents or you’llfind things don’t work quite as planned. Build the circuit as follows: 1. Insert the push-buttonswitchinto the breadboard. Most switches have either two or four legs. Youonlyneed worryabout two ofthe legs inthe circuit. Ifthe buttonhas four legs, they’llbe set up ininpairs:check the push-button’s data sheet to find out whichlegs are paired together. 2. Connect a 10 KΩ resistor to the same rowas one ofthe push-button’s legs and anunused row. This is a pull-up resistor, and willprovide the Piwitha reference voltage so it knows whenthe buttonhas beenpressed. 3. Connect the unused legofthe pull-up resistor to Pin1 ofthe RaspberryPi’s GPIO port. This provides the 3.3 Vreference voltage. 4. Connect the unused legofthe push-buttonswitchto Pin6 ofthe RaspberryPi’s GPIO port. This provides the ground connection. 5. Finally, connect Pin12 ofthe RaspberryPi’s GPIO port to the other legofthe push-buttonswitchinthe same rowas the 10 KΩ resistor. Your breadboard should nowlook like Figure 12-5. Figure 12-5:The example breadboard layout for a simple push-buttoninput The circuit youjust built creates a situationwherebythe input pin, whichinthis instance is Pin12 ofthe RaspberryPi’s GPIO port, is constantlyhighthanks to the pull-up resistor connected to a 3.3 Vsupply. Whenthe push-buttonis pressed, the circuit is grounded and becomes low, providingthe cue for your Pythonprogramto knowthat the buttonhas beenactivated. Youmaywonder whythe resistor is required at all, and whythe switchdoes not simplyconnect Pin12 to Pin6 or Pin1 directly. While this is possible, it creates what is knownas a floatingpin, whichis a pinthat doesn’t knowwhether it’s highor low. As a
  • 131.
    result, the circuitwillact as thoughthe buttonis beingpressed evenwhenit isn’t, and mayfailto detect the buttonbeingpressed evenwhenit is. Opena newPythonfile, either ina text editor or usingone ofthe Pythonintegrated development environments (IDEs) available onthe RaspberryPi. To begin, youwillneed to import the same GPIO libraryas inthe previous GPIO output example: import RPi.GPIO as GPIO Youdon’t need to import the time library, because this example doesn’t need anytiminginstructions. Instead, youcanget right to settingup Pin12 as aninput. This is done inthe same wayas settinga pinas anoutput, withjust the finalpart ofthe instruction changed accordingly: GPIO.setup(12, GPIO.IN) Ifyou’re not usingPin12 for this, make sure youchange the pinnumber inthe precedinginstruction. As withthe previous example, the next step is to create aninfinite loop that constantlychecks the input pinto see ifit’s been brought low(inother words, ifit’s beenpressed). Beginthe loop withthe followingcode line: while True: Readingthe status ofaninput pinis verysimilar to settingthe status ofanoutput pin, withone exception:before youcando anythingusefulwiththe resultingvalue, you’llneed to store it ina variable. The followinginstructiontells Pythonto create a new variable called input_value (as described inChapter 11, “AnIntroductionto Python”) and set it to the current value ofPin12: input_value = GPIO.input(12) Althoughthe programcould be executed nowand work, it doesn’t do anythinguseful. To make sure youknowwhat’s goingon, add the followingprint instructionto get feedback: if input_value == False: print(“The button has been pressed.”) while input_value == False: input_value = GPIO.input(12) The last two lines—the second while and the second input_value, anembedded loop—are important. Evenonthe RaspberryPi’s processor, whichis relativelyunderpowered whencompared to high-performance desktop and laptop processors, Pythonruns veryquickly. This embedded loop tells Pythonto keep checkingthe status ofPin12 untilit’s no longer low, at whichpoint it knows the buttonhas beenreleased. Without this loop, the programwillloop while the buttonis being pressed—and no matter howquick your reflexes, you’llsee the message printed to the screenmultiple times, whichis misleading. The finalprogramshould look like this: import RPi.GPIO as GPIO GPIO.setup(12, GPIO.IN) while True: input_value = GPIO.input(12) if input_value == False: print(“The button has been pressed.”) while input_value == False: input_value = GPIO.input(12) Save the file as gpioinput.py, and thenexecute it fromthe terminalwithsudo python gpioinput.py. At first, nothingwill happen—but ifyoupress the push-buttonswitch, the programwillprint the message fromline sixto the terminal(see Figure 12- 6). Release the buttonand press it again, and the message willbe repeated. As withthe previous input example, this is a deceptivelysimple programthat canbe used for manypurposes. Inadditionto being able to read whena switchis pressed, the same code canbe used to read whenthe pins ofa separate device—suchas a sensor or externalmicrocontroller—have beenpulled highor low. Figure 12-6:The output ofthe gpioinput.pyprogram
  • 132.
    Byextendingthe code tolook for multiple push-buttons, eachonanindividualGPIO pin, youcould evencreate a simple four- buttongame controller. For example, youcould combine the precedingcode withthe RaspberrySnake game fromChapter 11, “AnIntroductionto Python”, to turnthe RaspberryPiinto a simple games console. Youcanalso combine bothinput and output examples into a single program, whichwaits for the buttonto be pushed and thenturns onthe LEDbysendingthe output pin high. To ensure that you’ve understood the concepts inthis section, trycreatingthat combined programnow. Ifyouget stuck, or youwant to check your method, turnto AppendixA, “PythonRecipes”, for a sample solution. Moving Up From the Breadboard As the previous examples inthis chapter have shown, breadboards are excellent for quicklycreatingprototype circuits for experimentation. They’re fast and reusable, and theydon’t damage components. However, breadboards also have some disadvantages. They’re bulky, expensive, and prone to loose connections—whichcan result incriticalcomponents fallingout, especiallywhile the breadboard is beingtransported fromplace to place. Figure 12-7 demonstrates this perfectly:despite best efforts, the push-buttoncomponent is onlylooselysecured inthe breadboard, and is likelyto fallout ifthe circuit is handled roughly. Figure 12-7:Asample breadboard circuit, withloose-fittingcomponents
  • 133.
    This, amongother reasons,is whythe RaspberryPiitselfis built ona printed circuit board (PCB) rather thana breadboard— althoughthe breadboard method was certainlyused inthe earlydays ofprototypingthe device. It’s possible to print and etch your ownPCBs at home, but there is a simpler intermediate step youcantake:usingstripboard to create permanent stand-alone circuits. At first glance, stripboard looks similar to breadboard, because its surface is covered insmallholes at 2.54 mmspacing. Unlike a breadboard, however, there’s no clever mechanismfor ensuringthat electronic components placed into these holes stayinplace —instead, you’llhave to solder themonto the stripboard. Stripboard is oftenreferred to bythe trade name Veroboard, whichis a trademark ofVero Technologies inthe UK and PixelPrint inCanada. Creatinga stripboard circuit has manyadvantages over usinga breadboard. Asheet ofstripboard is significantlycheaper thanan equivalently-sized breadboard, and it canbe snapped to size for smaller circuits. This also allows a single, large piece of stripboard to be used inthe creationofseveralsmaller, independent circuits. Because components are soldered onto stripboard, it’s also significantlymore robust thana breadboard prototype. Astripboard circuit canbe carried around fromplace to place withlittle risk that one ofits components willbecome dislodged and lost. Figure 12-8 shows a piece ofstripboard flipped to showthe copper tracks onits underside. Figure 12-8:The copper tracks onthe underside ofa piece ofstripboard
  • 134.
    Stripboard is extremelyeasytouse, whichmakes it a great stepping-stone to customcircuit board designand manufacturing. However, youshould be aware ofthe followingbefore youbuystripboard: • There are different types ofstripboard. Some stripboards have copper tracks onthe underside, whichgo allthe wayacross a rowor downa column, while other stripboards are split into two separate rows witha gap inthe middle like a breadboard. Yet another type ofstripboard, oftencalled a project board, has no copper tracks at alland requires the use ofwires to join components together electrically. • Stripboard canbe made indifferent thicknesses and withdifferent materials, and one type ofstripboard maybe more suited to a particular project thananother. For example, a heatproofstripboard is good for a circuit that is goingto be ina high- temperature environment, while thicker stripboard should be used for circuits that maybe exposed to roughhandling. • To make the component layout ona stripboard neater, it’s possible to break the tracks onthe underside to separate components electrically. This avoids wasted board space and is anabsolute necessityinmore complexcircuits—but to achieve the neatest results, you’llneed a smallhand-held toolcalled a track cutter. Remember to add that to your shopping list ifyou’re planningonusingstripboard, althougha smalldrillbit canalso be used. There are also some tricks to handlingstripboard that, ifignored, canmake things harder thantheyhave anyreasonto be: • The copper tracks onthe underside ofstripboard are not usuallycoated inanyway. As youtouchthe tracks, youwill tarnishthe copper and make it difficult to solder. Avoid touchingthe underside ofstripboard unless you’re goingto use it immediately; ifit’s too late, get some steelwooland give the copper a gentle brushto remove the corrosionbefore attempting to solder. • Unlike a printed circuit board, stripboard has no solder mask—a substance that prevents solder fromgoinganywhere it isn’t supposed to. As a result, solderingis somewhat trickier thanit is ona PCB—it’s alltoo easyto accidentallyjointracks together withtoo-large a blob ofsolder. Ifthis happens, use your desolderingwick to remove the excess solder and tryagain. • The holes instripboard make it easyto snap into customsizes, but leave the edges ragged. After snappingstripboard, take the time to file downthe edges before assemblingyour circuit. Make sure youwear a face mask whendoingthis, because the dust fromstripboard isn’t particularlyhealthyto breathe. A Brief Guide to Soldering Havinga solderingironis one thing, but youalso need to knowhowto use it. Soldering, like anyskill, takes practice to become proficient. Ifyoufollowthe tips inthis sectionand keep practising, you’llbe creatingclean, tidysolder joins inno time. This may seemobvious, but it’s worth pointing out: soldering irons get extremely hot during use. Make sure you don’t touch any exposedmetal surface, even away fromthe tip, andbe careful where you put the iron down. If possible, buy an iron with a stand, orobtain a separate heatproof stand. Neverleave a hot iron unattended, andif you dropan iron, don’t be temptedto try to catch it! Solderingworks bymeltinga smallquantityofmetalto forma joinbetweentwo components. Ifyouturnthe RaspberryPiover,
  • 135.
    you’llsee plentyofevidence ofthis.Allthe larger components are connected usingwhat’s called through-hole soldering, where the components’ leads are passed throughholes inthe printed circuit board and thensoldered into place. Smaller components are attached via surface-mount soldering. Solder isn’t pure metal—it also contains a substance called flux, whichis designed to etchawayanytarnishonthe surfaces to be soldered inorder to ensure as cleana joinas possible. Most electronic solder includes three to five cores offlux. Youcanalso buyfluxseparatelyas a paste or inliquid form, althoughfor most hobbysoldering, this isn’t necessary. Whenyou’re startinga solderingproject, make sure youhave a clean, well-lit workspace. Also make sure the area is well ventilated. Solder fumes aren’t veryhealthy, and while they’re extremelyunlikelyto build up to dangerous levels inlow-volume hobbysoldering, it’s stilla good idea to keep exposure to a minimum. Inaddition, youshould protect the work surface insome way. It’s not uncommonfor smallblobs ofmoltensolder to fall, which canburnand mark tables. Youcanpurchase ananti-static workmat (see Figure 12-9 for anexample), but a glossymagazine works just as well. Don’t be tempted to use a fewsheets ofcheap newspaper—solder canburnthroughthinpaper before it cools. Figure 12-9:Anexample solderingwork area, witha protective anti-static workmat Ifyou’re doingdelicate, close-up work, youshould wear protective glasses. Sometimes the boilingfluxinside the solder can cause it to spit upwards, and ifit hits youinthe eye, you’llbe infor a world ofpain. Don’t let these warnings put youoffsoldering, however. Althoughsolder is extremelyhot, it cools quicklyand burns are not only rare but nearlyinconsequential. Respect the equipment, but don’t fear it. Withyour work surface chosenand protected, layout your equipment. The ironshould be placed onthe side ofyour dominant hand, and positioned so that the cable isn’t trailingacross your work area. Make sure youcanmove the ironfreelybefore pluggingit in. Ifthe cable gets caught onsomething, youmayend up burningyourself. Dampenyour solderingsponge withwater—it should be damp, but not drippingwet. This is important:the damp sponge willbe used to cleanthe iron, and ifit’s dry, it willburnand maydamage the iron’s delicate tip. It willtake a fewminutes for the solderingironto reachits operatingtemperature. Ifyou’ve purchased a temperature-controlled iron, this willnormallybe indicated either bya light that switches onor offto indicate the temperature has beenreached or bya numericaltemperature read-out. (See the operatingmanualthat came withyour solderingironto find out howtemperatures are indicated onit.) Once the operatingtemperature has beenreached, it’s time to prepare the solderingironusinga process knownas tinning. Followthese steps: 1. Pushthe tip ofthe solder against the tip ofthe iron, allowinga smallamount to melt onto the iron. Be carefulnot to melt too
  • 136.
    muchonto the iron:notonlyis this a waste ofsolder, but it cancause excess solder to fallonto the work area. 2. Wipe the tip ofthe irononto the sponge. Ifit hisses and spits, the sponge is too wet; allowit to cool, thenremove it from the stand and wringit out. 3. Keep wipingthe tip ofthe ironuntilit is coated ina silver layer ofsolder (see Figure 12-10). Ifnecessary, applymore solder to the tip. Figure 12-10:Asolderingirontip that is inthe process ofbeingtinned withsolder This process oftinningthe tip protects it against damage and ensures that it willefficientlytransfer heat onto the surfaces to be soldered. Failure to properlytinthe iron’s tip is one ofthe most commoncauses ofbad solder joints. Youmayneed to repeat this process more thanonce ifyou’re solderinga lot ofconnections, and you’llneed to do it againat the end ofthe soldering session. Ingeneral, ifthe tip ofthe solderingironloses its shinycoating, repeat the tinningprocess. Withthe ironprepared, it’s time to start soldering. Place the items to be soldered—suchas a printed circuit board and the legs of a component—into the work stand and ensure that you’ve got a good view. Extend a lengthofsolder fromthe container or reel, and beginto solder the components usingthese basic steps: 1. Ifyou’re solderingthrough-hole components into a printed circuit board, stripboard or similar through-hole board, place the legs ofthe component throughthe holes and bend themoutwards so the component doesn’t fallout whenthe board is flipped over. 2. Withthe board secured inthe work stand, pushthe tip ofthe ironagainst boththe component and the copper contact on the board. It’s important that the irontouches bothitems:ifthe ironis onlyincontact withone, the finished joint willbe bad. 3. It onlytakes a fewseconds for the area to heat up. Count to three, and thenpushthe solder against the component and copper contact (see Figure 12-11). Ifthe solder doesn’t melt, withdrawit, count a couple ofseconds more, and thentry again. Ifit stilldoesn’t melt, tryrepositioningthe solderingiron. Figure 12-11:Solderinga through-hole component into a printed circuit board
  • 137.
    4. As thesolder flows, you’llsee it drawndowninto the hole inthe board. This is anindicationthat the area is hot enoughfor a good solder join. Ifthe solder floats, it indicates that the area is not yet hot enough. 5. Remove the solder fromthe joinfirst, followed bythe iron. (Ifyouremove the ironfirst, the solder willhardenand leave your spoolofsolder stuck to the contact!) Ifallwent well, you’llbe left witha solid solder jointhat willlast for manyyears. Ifnot, don’t be disheartened—just press the ironagainst the jointo reflowthe solder, and use the desolderingwick ifyouneed to cleanup a spillor anyexcess. Aperfect solder joint should have a shape somewhat like a volcano, risingup fromthe surface ofthe board to meet the legofthe component. Never leave the ironincontact withthe parts for more thana fewseconds. This is especiallyimportant whensolderingheat- sensitive components like integrated circuits, whichcanbe damaged byprolonged contact witha hot solderingiron. Ifyou’re usinga temperature-controlled solder station, make sure the temperature is set to anappropriate levelfor the solder beingused (check the solder’s packagingor data sheet for details). Whenyou’ve finished, remember to re-tinthe tip ofthe iron. Ifyoudon’t, the tip maycorrode instorage and need to be replaced significantlysooner thanwould otherwise be the case. Rememberto heat both surfaces with the iron. Heating only one surface results in what is known as a dry joint orcoldjoint, where the solderis not properly matedto one surface. Overtime, these joints will fail andneedto be re-soldered. As withanyskill, solderingtakes practice. Manyelectronics shops sellkits that include a printed circuit board and a selectionof components, whichyoucanuse to practice solderingthrough-hole components. Some add-onboards for the RaspberryPiare also provided inkit formand require soldering, includingthe Slice ofPifromCiseco. You’lllearnabout these inChapter 13, “Add-onBoards”.
  • 138.
    Chapter 13: Add-onBoards Althoughyoucanto use the RaspberryPi’s general-purpose input-output (GPIO) header directly, as youlearned inChapter 12, “Hardware Hacking”, a muchbetter idea is to use a specialist prototypingboard. Prototypingboards are add-onboards designed to sit betweenyour project and the RaspberryPi, and range fromthe relativelysimple—suchas Ciseco’s Slice ofPi— to the complexand powerfulGertboard. At their most basic, add-onboards simplyprovide easier access to the RaspberryPi’s GPIO pins. This maymeantheycanbe connected to a breadboard easier, or are spaced further apart and labelled to make connectingother devices simpler. Some boards include circuitryto connect specific add-ondevices, suchas a smallXBee wireless transceiver, and stillothers provide a smallsurface onto whichyoucansolder your owncomponents to make a customboard. The hardware market is constantlyand rapidlychanging, and the RaspberryPiFoundationcontinues to encourage developers to create more add-ondevices. It would be impossible to create anexhaustive list ofallthe add-onboards available or planned for release inthe near future, but inthis chapter, you’lllearnabout three ofthe most commonboards and howtheycanbe used. Ciseco Slice of Pi The most basic ofboards, Ciseco’s Slice ofPi(see Figure 13-1) is nevertheless useful. Supplied inkit form, Slice ofPifeatures a smallprototypingarea, a space for anXBee wireless module and fullaccess to the RaspberryPi’s GPIO pins. The compact Slice ofPiis designed to be connected directlyto the GPIO headers onthe top ofthe RaspberryPi, withthe rest ofthe board coveringpart ofthe Pi’s surface—but not extendingbeyond the edges ofthe board nor obscuringanycommonly used ports. The Slice ofPidoes, however, sit over the DSI video output connector. Inmost cases where this connector is used, the ribboncable canbe routed underneaththe Slice ofPiboard without trouble. Figure 13-1:The Ciseco Slice ofPi The primaryadvantages over usingthe low-cost Slice ofPirather thanjust connectingdirectlyto the Pi’s GPIO header are the labellingonthe circuit board, whichthe GPIO header lacks, and the use offemale headers. These allowyouto use male-to-male jumper leads or evenjust lengths oftrimmed wire to connect the board to a breadboard (as showninFigure 13-2) or other circuit board—or evento connect components directlyinto the headers. The Pi’s male headers, incontrast, require the use of
  • 139.
    specialised male-to-female jumperleads. The Slice ofPialso offers a smallamount ofprotectionfor the Pi. The use offemale headers means it’s harder to accidentally short-circuit two pins, and the spacingofthe headers—withthe eight general-purpose pins brought to one header and the other specialised pins brought to another—makes wiringmistakes less likely. More importantly, the Slice ofPidoesn’t provide direct access to anyofthe pins labelled as Do Not Connect (see Chapter 12, “Hardware Hacking”), so there’s less risk ofdamaging the Piwitha wrongconnection. Figure 13-2:Connectingthe Slice ofPito a breadboard The connections for anXBee wireless interface could also prove usefulifyouare consideringusingthe Piinanembedded computingproject. Whencombined witha compatible transceiver—suchas anXBee, RF-BEEor RN-XVmodule—it allows for wireless access to the Pi’s UARTserialport. Suchaccess could be used to read sensor details fromthe Pi, take controlof the Pi’s software or evencontrola Pi-powered robot froma remote location. Finally, the prototypingarea provides analternative to breadboards or stripboards for smaller circuit designs. Ifyouare consideringdevelopinga smalladd-onmodule for the RaspberryPi, suchas a sensor board for readingtemperatures or detectingmoisture, the required components canbe soldered directlyto the Slice ofPi. Thanks to the lowcost ofthe board, this provides aneasywayto create bespoke add-onmodules for the Pithat are entirelyself-contained, withno wiringrequired—just connect the Slice ofPito the RaspberryPi’s GPIO port and the device is readyto go (see Figure 13-3). The disadvantage ofthe Slice ofPilies inits simplicity. Its compact size means that it is unsuitable for the creationoflarger or more complexprototypes, and while the header layout provides some protectionagainst short circuits, there’s no protection against the use of5 Vcomponents that candamage the Pi’s 3.3 Vlogic circuits. The labellingis also different to that used to typicallydescribe the RaspberryPi’s GPIO pins, whichcanlead to confusionwhenusinga GPIO librarynot writtenwiththe Slice ofPiinmind. Table 13-1 provides a translationfromone labellingsystemto another. Figure 13-3:The Slice ofPi, connected to the Pi’s GPIO port
  • 140.
    Table 13.1 Sliceof Pi GPIO Translations PhysicalPinNum ber OfficialDesignation Sliceof PiLabel 7 General Purpose Clock(or GPIO Pin 4) GP7 11 GPIO Pin 17 GP0 12 GPIO Pin 18 GP1 13 GPIO Pin 21 GP2 15 GPIO Pin 22 GP3 16 GPIO Pin 23 GP4 18 GPIO Pin 24 GP5 22 GPIO Pin 25 GP6 The Slice ofPiis available fromCiseco’s web shop at http://shop.ciseco.co.uk/slice-of-pi/. Adafruit Prototyping Pi Plate The PrototypingPiPlate byAdafruit is based around the same generalprinciple as Ciseco’s Slice ofPi. The add-onis provided inkit form, and offers youa prototypingsurface alongwitheasyaccess to the Pi’s GPIO pins (see Figure 13-4). Unlike the Slice ofPi, however, the PrototypingPiPlate is a full-coverage board built to the same size as the Piitself. As a result, the plate offers a muchlarger area to work withthanthe Slice ofPi, allowingfor larger circuits to be constructed. The PrototypingPlate also features 3.5 mmscrewterminals for connectingthe pins, makingit easyto use ordinarywire to make strongtemporary connections—although2.54 mmholes for male or female headers are also provided should youwant to use those instead. Figure 13-4:The Adafruit PrototypingPiPlate
  • 141.
    The designand layoutofthe PrototypingPiPlate willbe familiar to anyone who has used anArduino microcontroller. Anadd-on board withthe same footprint as the target device, designed to connect to on-board headers and sit above the surface ofthe originalboard is a commonsight inthe Arduino world, where suchadd-onboards are knownas shields. The idea for the PrototypingPiPlate, infact, comes fromAdafruit’s self-designed Protoshield add-onfor the Arduino. As a full-coverage add-onboard, the PiPlate is designed to connect to the GPIO header and cover the entire surface ofthe Pi. This positioningabove the Picanmake it difficult to access the DSI video output and MIPI CSI-2 camera input connectors, althoughlonger ribboncables should route beneaththe PiPlate without trouble. Ifyou’re planningto use anadd-oncamera module or DSI-connected display, be sure to check the lengthofribboncable provided before planningyour project around the PiPlate. The prototypingsurface ofthe PiPlate is split into two, withbothhalves offeringthrough-hole constructionincommon2.54 mm spacing. The first halfofthe prototypingsurface is set up ina similar wayto a breadboard:copper tracks onthe underside link rows together, and a centralbus inthe middle provides commonpower and ground connectivity. The second halfofthe prototypingsurface does not have suchtracks, allowingmore customcircuits to be constructed. Overall, the surface provided for circuit creationis significantlylarger thanthat ofthe Slice ofPi, makingthe PiPlate suitable for more-complexprojects. It additionallyoffers anSOIC surface, designed for solderinga surface-mount component for parts that aren’t available inthrough- hole format. Thanks to its large size, youcanalso use the PiPlate witha quarter-size breadboard (sold inthe Adafruit shop as a “tiny breadboard”). This small, two-sectionbreadboard comes witha self-adhesive foambackingand canbe stuck to the top ofthe PiPlate over the prototypingarea (see Figure 13-5). Doingso means that it’s impossible to use the prototypingarea to make a permanent circuit, but the combinationoffers a self-contained add-onfor rapid temporaryprototypingofsmaller circuits. As withthe Slice ofPi, the PrototypingPiPlate is at heart a basic device. The kit contains no active components, but simply headers, terminals and the board itself. As a result, it provides little extra protectionfor the Pi’s GPIO ports beyond makingit more difficult to accidentallyshort-circuit two connections. Unlike the Slice ofPi, the PiPlate provides access to all26 ofthe Pi’s GPIO header pins—meaningthat youcould accidentallyconnect things to the pins marked as Do Not Connect onthe GPIO header diagram(see Chapter 12, “Hardware Hacking”). As withconnectingthings to these pins directly, this is inadvisable and canresult inpermanent damage to the Pi. Figure 13-5:APiPlate witha quarter-size breadboard
  • 142.
    Perhaps the biggestreasonfor choosinga PiPlate over the Slice ofPiis its clever design. Once connected to the GPIO header onthe Pi, there is little reasonto remove it unless youneed access to the DSI or MIPI CSI-2 camera connectors. Because it onlyincreases the height ofthe Pi, rather thanthe widthor length, and because it includes the screwterminals for side-onaccess to GPIO pins, it’s also compatible witha surprisingnumber ofRaspberryPicases (see Figure 13-6). Ifyou’re planningto use the Piand PiPlate combinationwitha case, however, be sure to check that the case canbe adjusted for height or has access to the GPIO port throughits lid. Figure 13-6:The PiPlate connected to a cased RaspberryPi Youcanpurchase the PrototypingPiPlate Kit fromAdafruit at http://www.adafruit.com/products/801.
  • 143.
    Fen Logic Gertboard Properlytermedthe RaspberryPiI/O Extension, the Gertboard (showninFigure 13-7) is named for its inventor Gert vanLoo. Anemployee ofBroadcomand a member ofthe teamthat designed the BCM2835 SoC processor at the heart ofthe Raspberry Pi, vanLoo created the Gertboard as a wayofunlockingsome ofthe power ofthe chip hiddenbythe Pi’s overalldesignand providinga powerfuland versatile platformfor electronic tinkering. Figure 13-7:The Gertboard, designed byGert vanLoo Unlike the Slice ofPiand PrototypingPiPlate, the Gertboard is anactive add-onboard withnumerous components designed to extend the functionalityofthe Pi. The Gertboard provides 12 buffered IO ports withstatus LEDs, three push-buttonswitches, sixopencollector drivers, a 48 V4 Amotor controller, a two-channeldigitalto analogue converter (ADC) and a two-channel analogue to digitalconverter (DAC). Additionally, the Gertboard has support for anadditional28-pinmicrocontroller, suchas the AtmelATmega328 used inthe Arduino prototypingsystem, whichcanbe inserted into a socket onthe Gertboard and programmed directlyfromthe RaspberryPi. As the list offeatures indicates, the Gertboard is a powerfuland complexdevice. Its flexibilitymakes it a great choice for more complexprojects—but that same complexityaffects its size. The Gertboard is almost two-and-a-halftimes larger thanthe RaspberryPiitself, makingit boththe most powerfuland the largest add-onboard for the Piavailable at the time ofwriting. To counteract its size, the Gertboard connects to the Pithrougha ribboncable terminated inmale sockets (see Figure 13-8). This cable allows the Gertboard to sit awayfromthe Pi, or to be mounted ina project permanentlyyet stillbe quicklydetached from the Piifnecessary. Figure 13-8:The Gertboard connected to a RaspberryPi
  • 144.
    Perhaps the mostimportant feature ofthe Gertboard is the protectionit offers to the Pi. Usinga 3.3 Vregulator, the Gertboard is designed to prevent the Pi’s GPIO port fromreceivingvoltages it cannot handle. Like the Slice ofPi, it also attempts to restrict access to the sixpins labelled Do Not Connect as wellas the 3.3 Vand 5 Vpins to help prevent accidentalshorting. Although care must be takenwhile wiringup circuits, followingthe instructions included inthe Gertboard’s user manualguarantees the Pi’s safety. The motor controller functionalityofthe Gertboard makes it easyto integrate the Piinto a robotics project. It’s suitable for motors ofup to 48 Vat 4 A, whichis easilypowerfulenoughto drive a smallrobot vehicle. Sadly, the motor is not included as standard withthe Gertboard. Instead, youare asked to supplyyour owncontroller—withthe L6203 package being recommended—ifmotor controlforms part ofyour project. Withthe motor controller soldered into place, the Gertboard canbe used to controlsurprisinglypowerfulmotors either throughinstructions received fromthe Piitselfor fromthe optionalAtmel microcontroller module. Figure 13-9 shows anexample circuit that’s usingthe Gertboard to drive a 12 Vmotor froma battery pack power supply. Figure 13-9:Usingthe Gertboard motor controller For project building, the Gertboard offers significantlymore functionalitythana bare RaspberryPi. The 12 buffered IO ports, located at the top ofthe board, canbe configured as inputs or outputs and provide more connectivitythanthe sevenor eight general-purpose IO pins provided onthe Pi’s ownGPIO port. The inclusionofLEDs, whichindicate whena pinis highor low, helps withbothcircuit troubleshootingand electronics education, makingit easyto see what the various inputs and outputs are doingat anygiventime.
  • 145.
    For sensingor feedbackprojects, the Gertboard’s ADC and DAC components are handyadditions. Unlike the GPIO pins on the Piitself, whichcanonlyreceive and send digitalsignals, the Gertboard includes two ADC and two DAC connections. The ADC pins, located onthe upper-left ofthe Gertboard, allowanalogue components to be converted into digitalsignals compatible withthe Pi. As anexample, Figure 13-10 shows howyoucanuse the ADC pins to read the status ofa potentiometer—a component whichvaries its resistance accordingto the positionofa slider or knob. This circuit could be used to controlthe Pi’s volume ina media centre application, or to alter the speed ofanattached motor. The DAC pins provide the opposite functionality, takinga digitalsignalfromthe Piand convertingit to analogue. This could drive a speaker to create audio, or alter the speed ofa motor or the brightness ofanLED. For more complexprojects, the Gertboard provides anopencollector driver, whichuses transistors to switchonand offdevices that have different power requirements to the 3.3 Vused bythe Gertboard or that drawa large amount ofcurrent and require an externalpower supplyto operate. The opencollector driver cancontrolthe power supplies ofup to sixdevices simultaneously without requiringanyhardware. This gives the Gertboard a large amount offlexibility—althoughtransistors or relays canbe used withpassive add-onboards like the PrototypingPiPlate to achieve the same goal. Figure 13-10:Connectinga potentiometer to the Gertboard’s ADC pins Finally, the Gertboard provides access to a 28-pinmicrocontroller, whichcanbe fitted to a socket located onthe board itself. Whenfitted, the Gertboard canbe wired to address either the RaspberryPi’s GPIO port or the microcontroller, or a combinationofthe two. The Gertboard is designed to operate withanAtmelATmega168 or ATmega328 microcontroller—the same type ofmicrocontroller used inthe Arduino prototypingproject. Whenfitted, youcanwrite programs for the Gertboards’ ATmega microcontroller inthe AtmelIDE, givingthe Pia usefullevelofcompatibilitywiththe wide arrayofexistingATmega- targeted software available to download. It also gives the Pithe abilityto address externalhardware ina real-time manner, with the microcontroller takingover responsibilityfor hardware interfacingand simplyprovidingfeedback to the Pi. The Gertboard is a veryadvanced device, and isn’t suitable for everyproject. For manysimple uses, a cheaper passive add-on board like the Slice ofPiwillusuallybe enough. However, for in-depthexperimentationofjust what is possible withthe RaspberryPi’s BC2835 processor and/or to ensure that you’llbe able to interface almost anyhardware withyour Pi, it’s a great choice and a powerfulextensionto the Pi’s alreadyimpressive abilities. The Gertboard is available throughFarnellat http://www.farnell.com/.
  • 146.
  • 147.
    Appendix A: PythonRecipes The following recipes provide the programcode for Example 3 and Example 4 inChapter 11, “AnIntroductionto Python”, and a sample solutionfor the combined input-output programsuggested inChapter 12, “Hardware Hacking”. Eachrecipe is also available for download fromthe RaspberryPiUser Guide website at http://www.wiley.com/go/raspberrypiuserguide. Ifyou’re typingthe code inbyhand, look out for the symbol:this indicates that the line is wrapped due to space constraints in the book. Ifyousee the symbolat the end ofa line, don’t press Enter untilyoureachthe end that doesn’t have a symbolpresent. Raspberry Snake (Chapter 11, Example 3) #!/usr/bin/env python # Raspberry Snake # Written by Gareth Halfacree for the Raspberry Pi User Guide import pygame, sys, time, random from pygame.locals import * pygame.init() fpsClock = pygame.time.Clock() playSurface = pygame.display.set_mode((640, 480)) pygame.display.set_caption(‘Raspberry Snake’) redColour = pygame.Color(255, 0, 0) blackColour = pygame.Color(0, 0, 0) whiteColour = pygame.Color(255, 255, 255) greyColour = pygame.Color(150, 150, 150) snakePosition = [100,100] snakeSegments = [[100,100],[80,100],[60,100]] raspberryPosition = [300,300] raspberrySpawned = 1 direction = ‘right’ changeDirection = direction def gameOver(): gameOverFont = pygame.font.Font(‘freesansbold.ttf’, 72) gameOverSurf = gameOverFont.render (‘Game Over’, True, greyColour) gameOverRect = gameOverSurf.get_rect() gameOverRect.midtop = (320, 10) playSurface.blit(gameOverSurf, gameOverRect) pygame.display.flip() time.sleep(5) pygame.quit() sys.exit() while True: for event in pygame.event.get(): if event.type == QUIT: pygame.quit() elif event.type == KEYDOWN: if event.key == K_RIGHT or event.key == ord(‘d’): changeDirection = ‘right’ if event.key == K_LEFT or event.key == ord(‘a’): changeDirection = ‘left’ if event.key == K_UP or event.key == ord(‘w’): changeDirection = ‘up’ if event.key == K_DOWN or event.key == ord(‘s’): changeDirection = ‘down’ if event.key == K_ESCAPE: pygame.event.post(pygame.event.Event(QUIT)) if changeDirection == ‘right’ and not direction == ‘left’: direction = changeDirection if changeDirection == ‘left’ and not direction == ‘right’: direction = changeDirection if changeDirection == ‘up’ and not direction == ‘down’: direction = changeDirection if changeDirection == ‘down’ and not direction == ‘up’: direction = changeDirection if direction == ‘right’: snakePosition[0] += 20
  • 148.
    if direction ==‘left’: snakePosition[0] -= 20 if direction == ‘up’: snakePosition[1] -= 20 if direction == ‘down’: snakePosition[1] += 20 snakeSegments.insert(0,list(snakePosition)) if snakePosition[0] == raspberryPosition[0] and snakePosition[1] == raspberryPosition[1]: raspberrySpawned = 0 else: snakeSegments.pop() if raspberrySpawned == 0: x = random.randrange(1,32) y = random.randrange(1,24) raspberryPosition = [int(x*20),int(y*20)] raspberrySpawned = 1 playSurface.fill(blackColour) for position in snakeSegments: pygame.draw.rect(playSurface,whiteColour,Rect (position[0], position[1], 20, 20)) pygame.draw.rect(playSurface,redColour,Rect (raspberryPosition[0], raspberryPosition[1], 20, 20)) pygame.display.flip() if snakePosition[0] > 620 or snakePosition[0] < 0: gameOver() if snakePosition[1] > 460 or snakePosition[1] < 0: for snakeBody in snakeSegments[1:]: if snakePosition[0] == snakeBody[0] and snakePosition[1] == snakeBody[1]: gameOver() fpsClock.tick(30) IRC User List (Chapter 11, Example 4) #!/usr/bin/env python # IRC User List # Written by Tom Hudson for the Raspberry Pi User Guide # http://tomhudson.co.uk/ import sys, socket, time RPL_NAMREPLY = ‘353’ RPL_ENDOFNAMES = ‘366’ irc = { ‘host’: ‘chat.freenode.net’, ‘port’: 6667, ‘channel’: ‘#raspiuserguide’, ‘namesinterval’: 5 } user = { ‘nick’: ‘botnick’, ‘username’: ‘botuser’, ‘hostname’: ‘localhost’, ‘servername’: ‘localhost’, ‘realname’: ‘Raspberry Pi Names Bot’ } s = socket.socket(socket.AF_INET, socket.SOCK_STREAM) print ‘Connecting to %(host)s:%(port)s...’ % irc try: s.connect((irc[‘host’], irc[‘port’])) except socket.error: print ‘Error connecting to IRC server %(host)s:%(port)s’ % irc sys.exit(1) s.send(‘NICK %(nick)srn’ % user) s.send(‘USER %(username)s %(hostname)s %(servername)s : %(realname)srn’ % user) s.send(‘JOIN %(channel)srn’ % irc) s.send(‘NAMES %(channel)srn’ % irc) read_buffer = ‘’
  • 149.
    names = [] whileTrue: read_buffer += s.recv(1024) lines = read_buffer.split(‘rn’) read_buffer = lines.pop(); for line in lines: response = line.rstrip().split(‘ ‘, 3) response_code = response[1] if response_code == RPL_NAMREPLY: names_list = response[3].split(‘:’)[1] names += names_list.split(‘ ‘) if response_code == RPL_ENDOFNAMES: print ‘rnUsers in %(channel)s:’ % irc for name in names: print name names = [] time.sleep(irc[‘namesinterval’]) s.send(‘NAMES %(channel)srn’ % irc) GPIO Input and Output (Chapter 12) #!/usr/bin/env python # Raspberry Pi GPIO Input/Output example # Written by Gareth Halfacree for the Raspberry Pi User Guide import RPi.GPIO as GPIO GPIO.setup(11, GPIO.OUT) GPIO.setup(12, GPIO.IN) GPIO.output(11, False) while True: input_value = GPIO.input(12) if input_value == False: print “The button has been pressed. Lighting LED.” GPIO.output(11, True) while input_value == False: input_value = GPIO.input(12) print “The button has been released. Extinguishing LED.” if input_value == True: GPIO.output(11, False)
  • 150.
    Appendix B: HDMIDisplay Modes Youcanuse the values inTable B-1 and Table B-2 withthe hdmi_mode optioninconfig.txt to alter the HDMI video output stream. For more information, see Chapter 6, “Configuringthe RaspberryPi”. Table B-1 HDMI Group 1 (CEA) Value Description 1 VGA (640x480) 2 480p 60Hz 3 480p 60Hz(16:9 aspect ratio) 4 720p 60Hz 5 1080i 60Hz 6 480i 60Hz 7 480i 60Hz(16:9 aspect ratio) 8 240p 60Hz 9 240p 60Hz(16:9 aspect ratio) 10 480i 60Hz(Pixel quadrupling enabled) 11 480i 60Hz(Pixel quadrupling enabled) (16:9 aspect ratio) 12 240p 60Hz(Pixel quadrupling enabled) 13 240p 60Hz(Pixel quadrupling enabled) (16:9 aspect ratio) 14 480p 60Hz(Pixel doubling enabled) 15 480p 60Hz(Pixel doubling enabled) (16:9 aspect ratio) 16 1080p 60Hz 17 576p 50Hz 18 576p 50Hz(16:9 aspect ratio) 19 720p 50Hz 20 1080i 50Hz 21 576i 50Hz 22 576i 50Hz(16:9 aspect ratio) 23 288p 50Hz 24 288p 50Hz(16:9 aspect ratio) 25 576i 50Hz(Pixel quadrupling enabled) 26 576i 50Hz(Pixel quadrupling enabled) (16:9 aspect ratio) 27 288p 50Hz(Pixel quadrupling enabled) 28 288p 50Hz(Pixel quadrupling enabled) (16:9 aspect ratio) 29 576p 50Hz(Pixel doubling enabled) 30 576p 50Hz(Pixel doubling enabled) (16:9 aspect ratio) 31 1080p 50Hz 32 1080p 24Hz 33 1080p 25Hz 34 1080p 30Hz 35 480p 60Hz(Pixel quadrupling enabled) 36 480p 60Hz(Pixel quadrupling enabled) (16:9 aspect ratio) 37 576p 50Hz(Pixel quadrupling enabled) 38 576p 50Hz(Pixel quadrupling enabled) (16:9 aspect ratio) 39 1080i 50Hz(Reduced blanking) 40 1080i 100Hz 41 720p 100Hz 42 576p 100Hz 43 576p 100Hz(16:9 aspect ratio) 44 576i 100Hz 45 576i 100Hz(16:9 aspect ratio) 46 1080i 120Hz 47 720p 120Hz 48 480p 120Hz 49 480p 120Hz(16:9 aspect ratio) 50 480i 120Hz 51 480i 120Hz(16:9 aspect ratio)
  • 151.
    52 576p 200Hz 53576p 200Hz(16:9 aspect ratio) 54 576i 200Hz 55 576i 200Hz(16:9 aspect ratio) 56 480p 24Hz0 57 480p 24Hz0 (16:9 aspect ratio) 58 480i 240Hz 59 480i 240Hz(16:9 aspect ratio) Table B-2 HDMI Group 2 (DMT) Value Description 1 640×350 85Hz 2 640×400 85Hz 3 720×400 85Hz 4 640×480 60Hz 5 640×480 72Hz 6 640×480 75Hz 7 640×480 85Hz 8 800×600 56Hz 9 800×600 60Hz 10 800×600 72Hz 11 800×600 75Hz 12 800×600 85Hz 13 800×600 120Hz 14 848×480 60Hz 15 1024×768 43Hz, incompatible with the Raspberry Pi 16 1024×768 60Hz 17 1024×768 70Hz 18 1024×768 75Hz 19 1024×768 85Hz 20 1024×768 120Hz 21 1152×864 75Hz 22 1280×768 (Reduced blanking) 23 1280×768 60Hz 24 1280×768 75Hz 25 1280×768 85Hz 26 1280×768 120Hz(Reduced blanking) 27 1280×800 (Reduced blanking) 28 1280×800 60Hz 29 1280×800 75Hz 30 1280×800 85Hz 31 1280×800 120Hz(Reduced blanking) 32 1280×960 60Hz 33 1280×960 85Hz 34 1280×960 120Hz(Reduced blanking) 35 1280×1024 60Hz 36 1280×1024 75Hz 37 1280×1024 85Hz 38 1280×1024 120Hz(Reduced blanking) 39 1360×768 60Hz 40 1360×768 120Hz(Reduced blanking) 41 1400×1050 (Reduced blanking) 42 1400×1050 60Hz 43 1400×1050 75Hz 44 1400×1050 85Hz 45 1400×1050 120Hz(Reduced blanking) 46 1440×900 (Reduced blanking) 47 1440×900 60Hz 48 1440×900 75Hz 49 1440×900 85Hz 50 1440×900 120Hz(Reduced blanking)
  • 152.
    51 1600×1200 60Hz 521600×1200 65Hz 53 1600×1200 70Hz 54 1600×1200 75Hz 55 1600×1200 85Hz 56 1600×1200 120Hz(Reduced blanking) 57 1680×1050 (Reduced blanking) 58 1680×1050 60Hz 59 1680×1050 75Hz 60 1680×1050 85Hz 61 1680×1050 120Hz(Reduced blanking) 62 1792×1344 60Hz 63 1792×1344 75Hz 64 1792×1344 120Hz(Reduced blanking) 65 1856×1392 60Hz 66 1856×1392 75Hz 67 1856×1392 120Hz(Reduced blanking) 68 1920×1200 (Reduced blanking) 69 1920×1200 60Hz 70 1920×1200 75Hz 71 1920×1200 85Hz 72 1920×1200 120Hz(Reduced blanking) 73 1920×1440 60Hz 74 1920×1440 75Hz 75 1920×1440 120Hz(Reduced blanking) 76 2560×1600 (Reduced blanking) 77 2560×1600 60Hz 78 2560×1600 75Hz 79 2560×1600 85Hz 80 2560×1600 120Hz(Reduced blanking) 81 1366×768 60Hz 82 1920×1080 (1080p) 60Hz 83 1600×900 (Reduced blanking) 84 2048×1152 (Reduced blanking) 85 1280×720 (720p) 60Hz 86 1366×768 (Reduced blanking)