Project Name:
Roller Replacement
Current Problem(s):
Boxes (4X1’s,in particular) arecatchingon the roller
and tippingdue to the largegap between the rollers.
Suggested Solutions(s):
By getting rollers with a much smaller gap,the boxes
will havenothing to catch on, preventing them from
topplingover. This will allowDevin to keep his
attention on his machineinstead of manning the
conveyor belt. Itwill also preventthe boxes from
fallingdown and blockingthe flow throughout the
conveyor set up.
Suggested Products & Quotes:
 Conveyor #11F10EG15B15 - $1,300 (Ashland
Conveyor)
 Model: RS14G-18-1.5-30 - $1,503 (SJF Material
Handling)
 Roller Conveyors - $1,422 (IngallsConveyors)
 Gravity Conveyor - $1342 (FloStor Engineering)
Highlighted is not recommended, but still an option
*Does not includeshipping
Savings/Results:
Accordingto data compiled by Chris,the intern last
summer, the casepacker is responsiblefor
approximately 22%of machine downtime. With new
rollers,thatdowntime can reasonably cutby 2%,
consideringthatone of the issues Devin has is turning
the machine off to forcibly remove an incorrectly
oriented box from the box queue. I only estimate a 2%
elimination becausethe topplingoccurs primarily with
4X1’s,and keeping the boxes upright does not correct
the issueof the boxes being improperly turned.
ROI Calculation:
Estimatinga 2600 hour work year and usingChris’
calculationsof 26%of total worktime being occupied
with maintenance issues,
2600 hours X .26 X .02 X $200/hr = $2,704/yr
Estimated Cost: $1600
ROI: 1600/2,704 = 7 months (approximately)

More Related Content

Similar to Roller Replacement Project

Episode 38 : Bin and Hopper Design
Episode 38 :  Bin and Hopper DesignEpisode 38 :  Bin and Hopper Design
Episode 38 : Bin and Hopper Design
SAJJAD KHUDHUR ABBAS
 
Flexible Gravity conveyor
Flexible Gravity conveyorFlexible Gravity conveyor
Flexible Gravity conveyor
cowboysiva
 
How to unlock productivity savings in mining operations part 1
How to unlock productivity savings in mining operations part 1How to unlock productivity savings in mining operations part 1
How to unlock productivity savings in mining operations part 1
David Mallinson MAICD
 
TDAS 615 Tubing Design pitfalls 2005.ppt
TDAS 615 Tubing Design pitfalls 2005.pptTDAS 615 Tubing Design pitfalls 2005.ppt
TDAS 615 Tubing Design pitfalls 2005.ppt
aminpeyvand
 
Storage and Dispensing Platforms - DENIOS US
Storage and Dispensing Platforms - DENIOS USStorage and Dispensing Platforms - DENIOS US
Storage and Dispensing Platforms - DENIOS US
DENIOS US, Chemical Storage Buildings and Workplace Safety Products
 
Personal Dock Bbuilding 101
Personal Dock Bbuilding 101Personal Dock Bbuilding 101
Personal Dock Bbuilding 101Clean1Waterfront
 
Us Flood E Brochure
Us Flood E BrochureUs Flood E Brochure
Us Flood E BrochureCherylwitmer
 
IRJET- Design and Finite Element Analysis of Fabricated Panama Chock with 225...
IRJET- Design and Finite Element Analysis of Fabricated Panama Chock with 225...IRJET- Design and Finite Element Analysis of Fabricated Panama Chock with 225...
IRJET- Design and Finite Element Analysis of Fabricated Panama Chock with 225...
IRJET Journal
 
15 june 7 structural_modeling_2016_distribution_klymshyn
15 june 7 structural_modeling_2016_distribution_klymshyn15 june 7 structural_modeling_2016_distribution_klymshyn
15 june 7 structural_modeling_2016_distribution_klymshyn
leann_mays
 
Rotacaster Manual Materials Handling Solution Spotlights
Rotacaster Manual Materials Handling Solution SpotlightsRotacaster Manual Materials Handling Solution Spotlights
Rotacaster Manual Materials Handling Solution Spotlights
Tim Strube
 
dragline-operation.ppt
dragline-operation.pptdragline-operation.ppt
dragline-operation.ppt
DagmawiGenanaw
 
dragline-operation.ppt
dragline-operation.pptdragline-operation.ppt
dragline-operation.ppt
HARIDASSC0788
 
IRJET- A Study on Corrugated Bulkheads for Bulk Carriers
IRJET- A Study on Corrugated Bulkheads for Bulk CarriersIRJET- A Study on Corrugated Bulkheads for Bulk Carriers
IRJET- A Study on Corrugated Bulkheads for Bulk Carriers
IRJET Journal
 
A Review Paper on Analysis and Design of Precast Box Culvert Bridge
A Review Paper on Analysis and Design of Precast Box Culvert BridgeA Review Paper on Analysis and Design of Precast Box Culvert Bridge
A Review Paper on Analysis and Design of Precast Box Culvert Bridge
IRJET Journal
 
Thesis Poster Presentation
Thesis Poster PresentationThesis Poster Presentation
Thesis Poster PresentationPaul Trofimov
 
Angebot wsb englisch teil 2 2012
Angebot wsb englisch teil 2  2012Angebot wsb englisch teil 2  2012
Angebot wsb englisch teil 2 2012esregroup
 
Thesis Powerpoint
Thesis PowerpointThesis Powerpoint
Thesis Powerpointneha47
 
High strain dynamic pile testing - Independent Geoscience Pty Ltd
High strain dynamic pile testing - Independent Geoscience Pty LtdHigh strain dynamic pile testing - Independent Geoscience Pty Ltd
High strain dynamic pile testing - Independent Geoscience Pty Ltd
Independent Geoscience
 

Similar to Roller Replacement Project (20)

Episode 38 : Bin and Hopper Design
Episode 38 :  Bin and Hopper DesignEpisode 38 :  Bin and Hopper Design
Episode 38 : Bin and Hopper Design
 
Flexible Gravity conveyor
Flexible Gravity conveyorFlexible Gravity conveyor
Flexible Gravity conveyor
 
How to unlock productivity savings in mining operations part 1
How to unlock productivity savings in mining operations part 1How to unlock productivity savings in mining operations part 1
How to unlock productivity savings in mining operations part 1
 
TDAS 615 Tubing Design pitfalls 2005.ppt
TDAS 615 Tubing Design pitfalls 2005.pptTDAS 615 Tubing Design pitfalls 2005.ppt
TDAS 615 Tubing Design pitfalls 2005.ppt
 
Storage and Dispensing Platforms - DENIOS US
Storage and Dispensing Platforms - DENIOS USStorage and Dispensing Platforms - DENIOS US
Storage and Dispensing Platforms - DENIOS US
 
Personal Dock Bbuilding 101
Personal Dock Bbuilding 101Personal Dock Bbuilding 101
Personal Dock Bbuilding 101
 
Us Flood E Brochure
Us Flood E BrochureUs Flood E Brochure
Us Flood E Brochure
 
IRJET- Design and Finite Element Analysis of Fabricated Panama Chock with 225...
IRJET- Design and Finite Element Analysis of Fabricated Panama Chock with 225...IRJET- Design and Finite Element Analysis of Fabricated Panama Chock with 225...
IRJET- Design and Finite Element Analysis of Fabricated Panama Chock with 225...
 
15 june 7 structural_modeling_2016_distribution_klymshyn
15 june 7 structural_modeling_2016_distribution_klymshyn15 june 7 structural_modeling_2016_distribution_klymshyn
15 june 7 structural_modeling_2016_distribution_klymshyn
 
Crossrail-C336-Paddington-New-Yard
Crossrail-C336-Paddington-New-YardCrossrail-C336-Paddington-New-Yard
Crossrail-C336-Paddington-New-Yard
 
Rotacaster Manual Materials Handling Solution Spotlights
Rotacaster Manual Materials Handling Solution SpotlightsRotacaster Manual Materials Handling Solution Spotlights
Rotacaster Manual Materials Handling Solution Spotlights
 
dragline-operation.ppt
dragline-operation.pptdragline-operation.ppt
dragline-operation.ppt
 
dragline-operation.ppt
dragline-operation.pptdragline-operation.ppt
dragline-operation.ppt
 
IRJET- A Study on Corrugated Bulkheads for Bulk Carriers
IRJET- A Study on Corrugated Bulkheads for Bulk CarriersIRJET- A Study on Corrugated Bulkheads for Bulk Carriers
IRJET- A Study on Corrugated Bulkheads for Bulk Carriers
 
A Review Paper on Analysis and Design of Precast Box Culvert Bridge
A Review Paper on Analysis and Design of Precast Box Culvert BridgeA Review Paper on Analysis and Design of Precast Box Culvert Bridge
A Review Paper on Analysis and Design of Precast Box Culvert Bridge
 
Thesis Poster Presentation
Thesis Poster PresentationThesis Poster Presentation
Thesis Poster Presentation
 
Angebot wsb englisch teil 2 2012
Angebot wsb englisch teil 2  2012Angebot wsb englisch teil 2  2012
Angebot wsb englisch teil 2 2012
 
Thesis Powerpoint
Thesis PowerpointThesis Powerpoint
Thesis Powerpoint
 
High strain dynamic pile testing - Independent Geoscience Pty Ltd
High strain dynamic pile testing - Independent Geoscience Pty LtdHigh strain dynamic pile testing - Independent Geoscience Pty Ltd
High strain dynamic pile testing - Independent Geoscience Pty Ltd
 
WY-Segments
WY-SegmentsWY-Segments
WY-Segments
 

Roller Replacement Project

  • 1. Project Name: Roller Replacement Current Problem(s): Boxes (4X1’s,in particular) arecatchingon the roller and tippingdue to the largegap between the rollers. Suggested Solutions(s): By getting rollers with a much smaller gap,the boxes will havenothing to catch on, preventing them from topplingover. This will allowDevin to keep his attention on his machineinstead of manning the conveyor belt. Itwill also preventthe boxes from fallingdown and blockingthe flow throughout the conveyor set up. Suggested Products & Quotes:  Conveyor #11F10EG15B15 - $1,300 (Ashland Conveyor)  Model: RS14G-18-1.5-30 - $1,503 (SJF Material Handling)  Roller Conveyors - $1,422 (IngallsConveyors)  Gravity Conveyor - $1342 (FloStor Engineering) Highlighted is not recommended, but still an option *Does not includeshipping Savings/Results: Accordingto data compiled by Chris,the intern last summer, the casepacker is responsiblefor approximately 22%of machine downtime. With new rollers,thatdowntime can reasonably cutby 2%, consideringthatone of the issues Devin has is turning the machine off to forcibly remove an incorrectly oriented box from the box queue. I only estimate a 2% elimination becausethe topplingoccurs primarily with 4X1’s,and keeping the boxes upright does not correct the issueof the boxes being improperly turned. ROI Calculation: Estimatinga 2600 hour work year and usingChris’ calculationsof 26%of total worktime being occupied with maintenance issues, 2600 hours X .26 X .02 X $200/hr = $2,704/yr Estimated Cost: $1600 ROI: 1600/2,704 = 7 months (approximately)