KATRINA A. LASCO
113 Dona Nieves St. Brgy. San Isidro
Angono, Rizal, Philippines 1930 ● Mobile: (+63) 917 259 4726 ● katrina.lasco@gmail.com
Progressive architect with comprehensive experience in architectural design, documentation and
construction, client management, project management, leadership, team coordination and problem-
solving. Proven ability in the design and preparation of detailed architectural drawings and
construction detailing of commercial-office buildings, institutional, hospitality, residential buildings
(Low and High Rise Buildings) and mixed-used development. Highly experienced in leveraging
technical expertise in BIM, ArhiCAD, project efficiencies, photoshop, and Artlantis to develop
presentations, renderings, coordinations and 3D illustration. Talented in the design of exceptionally
built environments that deliver client expectations and integrate well with their contexts.
Core Competencies  Master Planning and Design
 Design and Conceptualization
 Architectural Design,
Documentation and Detailing
 Target Project Efficiency
 Technical Problem and
Resolution
 Visioning
 Mixed-Used Development
 High Rise Development
 Safety and Security
 Management and
Supervisions
 Coordination, RFI, RFA and
SRF
 Team Management
 Project and Client
Management
 Clash Dectection (BIM)
Education 2007 University of Santo Tomas, Manila, Philippines
Bachelor of Science in Architecture
Professional Organization 2010 Registered Architect, Philippine Board of Architecture
Professional Regulation Commission
Registration # 0024432
Skills
 Computer-aided drafting and
design (CADD)
 Building Information Modeling
(BIM)
 ArchiCAD (3D Modeling and
Rendering)
 Interior Design
 Artlantis
 Photoshop
 Computer literate – Windows
and Mac OS X based
software environment
 Knowledge in Estimate
 Knowledge in MEP
Professional Experience Architecture and Design
Jan. 2013 – Feb. 2015
AIDEA Philippines, Inc., Makati City, Phils.
(formerly RMJM Philippines)
Project Architect
Oversee all aspects of managing and executing the design and
development of the projects. Strategized and innovate project
development in accordance with client specification and project
schedule. Managed staff development for project timely
submissions
 Design and conceptualize the project plans and façade that
meet the client expectations
 Successfully coordinate projects with the client, project manager
and engineering consultants.
 Manage project efficiencies, code compliance and development
summaries.
 Led the integration of the project and timely submission.
 Successfully created a documentation and organization system
for the team, resulting in a more efficient and productive output.
Projects Included:
 BGC Boutique Office Building, BGC, Taguig City
 Solinea Phase 2 – Tower 3, Cebu City
Assistant Studio BIM Manager
Assists studio BIM manager in the auditing of projects using Solibri
Checker, educate BIM architects in proper modeling using
ArchiCAD and office standards and ensure all projects as a clash
free model. Attends meeting and training regarding the advance
information of BIM and its uses, softwares and new office
procedures and development.
Sept. 2010 – Mar. 2012
AIDEA Philippines, Inc., Makati City, Phils.
(formerly RMJM Philippines)
Assistant Project Architect
Manages a full range of architectural services, BIM and 3D
modeling and rendering, including client and consultant
coordination, design documentation and construction detailing using
ArchiCAD as the principal production medium.
 Contribute in designing and conceptualizing the project plans
and façade that meets the client expectations.
 Innovated technologies and material finishes that has been used
as part of standardization for the ALVEO projects.
 Proactively resolving issues independently resulting for my
superiors to focus on more important tasks instead of
micromanaging the team
Projects Included:
 Abreeza Place Phase 1 – Tower 1 & 2, Davao City
 Abreeza Place Master Planning, Davao City
 Abreeza Residences, Davao City
 Solinea Master Planning, Cebu City
 Park Terraces Phase 1 – Tower 1, Makati City
Nov. 2007 – Aug. 2010 Plaraj Design, Quezon City, Philippines
Design Associate
 Provide innovation for the company in developing design in
software such as AutoCAD and also suggest improvements on
planning and façade conceptualization to increase the appeal of
the building.
 Manages a full range of architectural services, including client
and consultant coordination, design documentation, contract
administration and construction detailing using AutoCAD as the
principal production medium.
 Provide cost estimate as initial reference of the projects.
 Ensures that the safety and design standards are followed in all
the projects.
Projects Included:
 Medicard Interior Fit-Out, Las Pinas, Metro Manila
 5 Units Bungalow Townhouse, Fairview, Quezon City
 Medicard Interior Fit-Out, Ortigas, Pasig City
 Venetian Hotel Expansion, SBMA
 Prepares architectural and structural detailing for both
architectural and construction drawings
 Prepare Contract Documents
 Interior Design and Detailing
 Coron Hilltop View Resort, Coron, Palawan
 Wellness Center and Dining Complex, Bataan
 2-Storey Residence, Cainta, Rizal
 Crown Royale Hotel Expansion and Roof Top Renovation,
Bataan
 Guest Casita, Ayala Heights, Katipunan, Quezon City
 Health and Wellness Center, Medicard, Makati City
 Prepares architectural detailing for both architectural and
construction drawings
 Prepares Construction drawings and Contract Documents
 Sandy Chan Residence (Outsourced project from LVL Partners)
 1-Bedroom Interior Fit-Out, One Serendra, Tagiug City
 2-Bedroom Interior Fit-Out, One Serendra, Taguig City
 2-Storey Residential Renovation, Bicutan, Metro Manila
 2-Storey Duplex Residence, Tagaytay
 Fresenius Kabi Interior Fit-Out, Makati City
 4-Storey Hotel, Subic
 Vetaf’s Superstore Expansion and Façade Renovation, Bataan
 Prepares architectural detailing for both architectural and
construction drawings
 Prepares Construction drawings and Contract Documents
International External Projects
Feb. 2009 – Dec. 2010
QPAL Builders Corporation
New York, 10461
Assistant Project Architect
Manages a full range of construction shop drawings particularly on
roof and wall detailing using AutoCAD as the principal production
medium.
Projects Included
 Rehabilitation of Five Stations: Pelham Line in the Borough of
the Bronx
 Lehman College Science Facility, The City University of New
York
 Con Edison: Control Building Extension, Westchester, New York
 DDC-DEP Remsen Avenue Yard Reconstruction, Remsen
Avenue, Brooklyn, New York
 Metropolitan High School, Metropolitan Avenue, Queens, New
York
 Gotham Veterinary Center, Columbus Avenue, New York
 PS / IS 263M, Sherman Avenue, New York
 Queen West Stage 2, Queens, New York
Languages  English
 Filipino
Trainings and Activities  Solibri Model Checker Basic Product Training, Manila, April 14,
2013
 Participate in GDL Training, Manila
 Participate in Affinity Trelligence
References Arch. Ed Trias Project Architect
AIDEA Philippines Inc.
Makati City Philippines
(632) 758 8888
e.trias@aidea.com.ph
Arch. Primitivo L. Rodriguez
Jr.
Principal Director
PLARAJ Design
Quezon City Philippines
+63 919 214 2534 / (02) 951 1228
jrodriguez@plarajdesign.net
Mr. Percival Cunanan Principal Director
QPAL Builders Corporation
1310 Puritan Avenue
Bronx, New York, 10461
001-347-698-2348
percivalcunanan@yahoo.com

Resume_Katrina Lasco_2015

  • 1.
    KATRINA A. LASCO 113Dona Nieves St. Brgy. San Isidro Angono, Rizal, Philippines 1930 ● Mobile: (+63) 917 259 4726 ● katrina.lasco@gmail.com Progressive architect with comprehensive experience in architectural design, documentation and construction, client management, project management, leadership, team coordination and problem- solving. Proven ability in the design and preparation of detailed architectural drawings and construction detailing of commercial-office buildings, institutional, hospitality, residential buildings (Low and High Rise Buildings) and mixed-used development. Highly experienced in leveraging technical expertise in BIM, ArhiCAD, project efficiencies, photoshop, and Artlantis to develop presentations, renderings, coordinations and 3D illustration. Talented in the design of exceptionally built environments that deliver client expectations and integrate well with their contexts. Core Competencies  Master Planning and Design  Design and Conceptualization  Architectural Design, Documentation and Detailing  Target Project Efficiency  Technical Problem and Resolution  Visioning  Mixed-Used Development  High Rise Development  Safety and Security  Management and Supervisions  Coordination, RFI, RFA and SRF  Team Management  Project and Client Management  Clash Dectection (BIM) Education 2007 University of Santo Tomas, Manila, Philippines Bachelor of Science in Architecture Professional Organization 2010 Registered Architect, Philippine Board of Architecture Professional Regulation Commission Registration # 0024432 Skills  Computer-aided drafting and design (CADD)  Building Information Modeling (BIM)  ArchiCAD (3D Modeling and Rendering)  Interior Design  Artlantis  Photoshop  Computer literate – Windows and Mac OS X based software environment  Knowledge in Estimate  Knowledge in MEP Professional Experience Architecture and Design Jan. 2013 – Feb. 2015 AIDEA Philippines, Inc., Makati City, Phils. (formerly RMJM Philippines) Project Architect Oversee all aspects of managing and executing the design and development of the projects. Strategized and innovate project development in accordance with client specification and project schedule. Managed staff development for project timely submissions  Design and conceptualize the project plans and façade that
  • 2.
    meet the clientexpectations  Successfully coordinate projects with the client, project manager and engineering consultants.  Manage project efficiencies, code compliance and development summaries.  Led the integration of the project and timely submission.  Successfully created a documentation and organization system for the team, resulting in a more efficient and productive output. Projects Included:  BGC Boutique Office Building, BGC, Taguig City  Solinea Phase 2 – Tower 3, Cebu City Assistant Studio BIM Manager Assists studio BIM manager in the auditing of projects using Solibri Checker, educate BIM architects in proper modeling using ArchiCAD and office standards and ensure all projects as a clash free model. Attends meeting and training regarding the advance information of BIM and its uses, softwares and new office procedures and development. Sept. 2010 – Mar. 2012 AIDEA Philippines, Inc., Makati City, Phils. (formerly RMJM Philippines) Assistant Project Architect Manages a full range of architectural services, BIM and 3D modeling and rendering, including client and consultant coordination, design documentation and construction detailing using ArchiCAD as the principal production medium.  Contribute in designing and conceptualizing the project plans and façade that meets the client expectations.  Innovated technologies and material finishes that has been used as part of standardization for the ALVEO projects.  Proactively resolving issues independently resulting for my superiors to focus on more important tasks instead of micromanaging the team Projects Included:  Abreeza Place Phase 1 – Tower 1 & 2, Davao City  Abreeza Place Master Planning, Davao City  Abreeza Residences, Davao City  Solinea Master Planning, Cebu City  Park Terraces Phase 1 – Tower 1, Makati City Nov. 2007 – Aug. 2010 Plaraj Design, Quezon City, Philippines Design Associate  Provide innovation for the company in developing design in software such as AutoCAD and also suggest improvements on planning and façade conceptualization to increase the appeal of the building.  Manages a full range of architectural services, including client and consultant coordination, design documentation, contract administration and construction detailing using AutoCAD as the principal production medium.
  • 3.
     Provide costestimate as initial reference of the projects.  Ensures that the safety and design standards are followed in all the projects. Projects Included:  Medicard Interior Fit-Out, Las Pinas, Metro Manila  5 Units Bungalow Townhouse, Fairview, Quezon City  Medicard Interior Fit-Out, Ortigas, Pasig City  Venetian Hotel Expansion, SBMA  Prepares architectural and structural detailing for both architectural and construction drawings  Prepare Contract Documents  Interior Design and Detailing  Coron Hilltop View Resort, Coron, Palawan  Wellness Center and Dining Complex, Bataan  2-Storey Residence, Cainta, Rizal  Crown Royale Hotel Expansion and Roof Top Renovation, Bataan  Guest Casita, Ayala Heights, Katipunan, Quezon City  Health and Wellness Center, Medicard, Makati City  Prepares architectural detailing for both architectural and construction drawings  Prepares Construction drawings and Contract Documents  Sandy Chan Residence (Outsourced project from LVL Partners)  1-Bedroom Interior Fit-Out, One Serendra, Tagiug City  2-Bedroom Interior Fit-Out, One Serendra, Taguig City  2-Storey Residential Renovation, Bicutan, Metro Manila  2-Storey Duplex Residence, Tagaytay  Fresenius Kabi Interior Fit-Out, Makati City  4-Storey Hotel, Subic  Vetaf’s Superstore Expansion and Façade Renovation, Bataan  Prepares architectural detailing for both architectural and construction drawings  Prepares Construction drawings and Contract Documents International External Projects Feb. 2009 – Dec. 2010 QPAL Builders Corporation New York, 10461 Assistant Project Architect Manages a full range of construction shop drawings particularly on roof and wall detailing using AutoCAD as the principal production medium. Projects Included  Rehabilitation of Five Stations: Pelham Line in the Borough of the Bronx  Lehman College Science Facility, The City University of New York  Con Edison: Control Building Extension, Westchester, New York  DDC-DEP Remsen Avenue Yard Reconstruction, Remsen Avenue, Brooklyn, New York  Metropolitan High School, Metropolitan Avenue, Queens, New York
  • 4.
     Gotham VeterinaryCenter, Columbus Avenue, New York  PS / IS 263M, Sherman Avenue, New York  Queen West Stage 2, Queens, New York Languages  English  Filipino Trainings and Activities  Solibri Model Checker Basic Product Training, Manila, April 14, 2013  Participate in GDL Training, Manila  Participate in Affinity Trelligence References Arch. Ed Trias Project Architect AIDEA Philippines Inc. Makati City Philippines (632) 758 8888 e.trias@aidea.com.ph Arch. Primitivo L. Rodriguez Jr. Principal Director PLARAJ Design Quezon City Philippines +63 919 214 2534 / (02) 951 1228 jrodriguez@plarajdesign.net Mr. Percival Cunanan Principal Director QPAL Builders Corporation 1310 Puritan Avenue Bronx, New York, 10461 001-347-698-2348 percivalcunanan@yahoo.com