ANURAG KESARWANI
Mobile: 9920019167 ~ Tel. (Res): 02227665175
Address: A-5, New Gulmohar CHS, Sector 16A, Vashi, Navi Mumbai-400703.
E-Mail: kesarwanianurag90@gmail.com
CAREER OBJECTIVE
To work in a challenging and responsible position where I can apply and improve my knowledge
and skills to contribute to a dynamic and growth-oriented organization.
DETAILS OF WORK EXPERIENCE
Organization : DAS Offshore Engineering Private Ltd.
Designation : Production Coordinator (Junior Engineer)
Duration of Job : May 2015- May 2016.
KEY RESPONSIBILITIES:
ď‚· Scheduling and Coordinating flow of work between departments of Fabrication plant to
expedite production.
ď‚· Reviewing master production schedule and revising according to work order
specifications, established priorities and availability of workers, parts, materials,
machines and equipments.
ď‚· Conferring with department supervisors to determine progress of work and to provide
information on changes in processing methods received from engineering department.
ď‚· Compiling report concerning progress of work and downtime due to failures of machines
and equipments to apprise production planning personnel of production delays.
ď‚· Maintaining inventory of materials and equipments needed to complete the production
thereby reducing time consumption.
PROJECTS UNDERTAKEN
ď‚· PIPELINE REPLACEMENT PROJECT-4 (PRP-4)
Description: Top side modification of 63 oil platforms consisting of Fabrication of Piping,
Structure, Clamps, Supports and Deck Extensions. Installation and Demolition of New piping
networks and old piping networks respectively present in the Bombay High Region for Swiber
Offshore India Private Ltd.
Duration: May 2015-May 2016.
ď‚· PIPELINE REPLACEMENT PROJECT-3 (PRP-3)
Description: Completion of Balance work of 18 Oil Platforms consisting of Fabrication of
Pipeline networks, Insulation & Strengthening of Decks for Leighton India Private Ltd.
Duration: Feb 2016 to May 2016.
ACADEMIC CREDENTIALS
Sr
No.
QUALIFICATION COURSE BOARD/UNIVERSITY MONTH
YEAR
PERCENTAGE
1. B.E. Mechanical
Engineering
Mumbai University May/2013 66.05%
2. Higher Secondary - Maharashtra State Board Feb/2008 71.33%
3. Secondary School - Maharashtra State Board March/2006 80.13%
CERTIFICATIONS
ASNT NDT LEVEL 2 CERTIFICATION IN THE FOLLOWING DISCIPLINES:
1. Ultrasonic Testing
2. Liquid Penetrant Testing
3. Magnetic Particle Testing
4. Radiographic Testing
PROJECT DETAILS UNDERGRADUATE
Balmer Lawrie-Van Leer Limited, Turbhe, Navi Mumbai
Project : Improving Production planning and making On Time Delivery
Duration : 9 months
Technology used : Microsoft Dynamics AXAPTA.
Project Description: The project aimed at improving production planning and making on time
deliveries to its clients with the help of an ERP (Enterprise Resource Planning) software wiz.
Microsoft Dynamics AXAPTA. By combining ERP with purpose built industry capabilities, this
software provides fast and perfect solution in no time. This helped in maximizing business
opportunities that could be adapted to meet specific needs today and can be easily changed as the
business grows. Microsoft Dynamics was integrated with various other programs such as
Microsoft word Excel, Microsoft SQL Server. By making use of this software not only time was
saved but making on time deliveries was also made easy and optimized.
EXTRA CURRICULAR ACTIVITIES
ď‚· Active member of college organization
ď‚· Participated in various technical events
ď‚· Event head in Tech ZEPHYRTM 2012
ď‚· Sponsorship Manager in Tech ZEPHYRTM 2009
PERSONAL DETAILS
ď‚· Date of birth : 30 July 1990
ď‚· Gender : Male
ď‚· Marital Status : Single
ď‚· Nationality : Indian
ď‚· Languages known : English, Hindi, Marathi
ď‚· Hobbies : Jogging, Swimming, Travelling, Internet Surfing, Sports
DECLARATION
I hereby declare that the above mentioned information is true to the best of my knowledge.
Place:
Date:
Name & Signature

Resume Anurag Updated work exp

  • 1.
    ANURAG KESARWANI Mobile: 9920019167~ Tel. (Res): 02227665175 Address: A-5, New Gulmohar CHS, Sector 16A, Vashi, Navi Mumbai-400703. E-Mail: kesarwanianurag90@gmail.com CAREER OBJECTIVE To work in a challenging and responsible position where I can apply and improve my knowledge and skills to contribute to a dynamic and growth-oriented organization. DETAILS OF WORK EXPERIENCE Organization : DAS Offshore Engineering Private Ltd. Designation : Production Coordinator (Junior Engineer) Duration of Job : May 2015- May 2016. KEY RESPONSIBILITIES: ď‚· Scheduling and Coordinating flow of work between departments of Fabrication plant to expedite production. ď‚· Reviewing master production schedule and revising according to work order specifications, established priorities and availability of workers, parts, materials, machines and equipments. ď‚· Conferring with department supervisors to determine progress of work and to provide information on changes in processing methods received from engineering department. ď‚· Compiling report concerning progress of work and downtime due to failures of machines and equipments to apprise production planning personnel of production delays. ď‚· Maintaining inventory of materials and equipments needed to complete the production thereby reducing time consumption.
  • 2.
    PROJECTS UNDERTAKEN ď‚· PIPELINEREPLACEMENT PROJECT-4 (PRP-4) Description: Top side modification of 63 oil platforms consisting of Fabrication of Piping, Structure, Clamps, Supports and Deck Extensions. Installation and Demolition of New piping networks and old piping networks respectively present in the Bombay High Region for Swiber Offshore India Private Ltd. Duration: May 2015-May 2016. ď‚· PIPELINE REPLACEMENT PROJECT-3 (PRP-3) Description: Completion of Balance work of 18 Oil Platforms consisting of Fabrication of Pipeline networks, Insulation & Strengthening of Decks for Leighton India Private Ltd. Duration: Feb 2016 to May 2016. ACADEMIC CREDENTIALS Sr No. QUALIFICATION COURSE BOARD/UNIVERSITY MONTH YEAR PERCENTAGE 1. B.E. Mechanical Engineering Mumbai University May/2013 66.05% 2. Higher Secondary - Maharashtra State Board Feb/2008 71.33% 3. Secondary School - Maharashtra State Board March/2006 80.13% CERTIFICATIONS ASNT NDT LEVEL 2 CERTIFICATION IN THE FOLLOWING DISCIPLINES: 1. Ultrasonic Testing 2. Liquid Penetrant Testing 3. Magnetic Particle Testing 4. Radiographic Testing
  • 3.
    PROJECT DETAILS UNDERGRADUATE BalmerLawrie-Van Leer Limited, Turbhe, Navi Mumbai Project : Improving Production planning and making On Time Delivery Duration : 9 months Technology used : Microsoft Dynamics AXAPTA. Project Description: The project aimed at improving production planning and making on time deliveries to its clients with the help of an ERP (Enterprise Resource Planning) software wiz. Microsoft Dynamics AXAPTA. By combining ERP with purpose built industry capabilities, this software provides fast and perfect solution in no time. This helped in maximizing business opportunities that could be adapted to meet specific needs today and can be easily changed as the business grows. Microsoft Dynamics was integrated with various other programs such as Microsoft word Excel, Microsoft SQL Server. By making use of this software not only time was saved but making on time deliveries was also made easy and optimized. EXTRA CURRICULAR ACTIVITIES ď‚· Active member of college organization ď‚· Participated in various technical events ď‚· Event head in Tech ZEPHYRTM 2012 ď‚· Sponsorship Manager in Tech ZEPHYRTM 2009 PERSONAL DETAILS ď‚· Date of birth : 30 July 1990 ď‚· Gender : Male ď‚· Marital Status : Single ď‚· Nationality : Indian ď‚· Languages known : English, Hindi, Marathi ď‚· Hobbies : Jogging, Swimming, Travelling, Internet Surfing, Sports DECLARATION I hereby declare that the above mentioned information is true to the best of my knowledge. Place: Date: Name & Signature