RAVIRANJAN 
TEL:(M0BILE)+91-8960608173,E-mail:raviranjan.sa@gmail.com 
To contribute my technical knowledge in a position with growing and dynamic firm which will 
help me to explore myself fully and realize potential. Willing to work as a key player in 
challenging and creative environment. 
EXECUTIVE SUMMARY 
 Work has been completed as an Engineer with POWER MECH PROJECT LTD. at the site of 
NTPC( National Thermal Power Cooperation, Barh ,Bihar ), 2x660MW # Unit IV WITHOUT DRUM (SUPER 
CRITICAL BOILER) 
 Working as an Engineer with DURH CONSTRUCTIONS .LTD.at the site of U.P RUVNL (Anpara, U.P) 
500MW #Unit VI WITH DRUM. 
 Responsibilities of Site: - Planning, Erection and checking of structure and pressure parts. 
 Carrying out monthly billing of sub contractors. 
 An effective communicator with strong analytical, logical, problem solving abilities. 
EDUCATION 
. 
2010 B.Tech. (Mechanical) from G.H.I.TM PURI ,65% 
2003 Class XII (J.E.C.B) from S.P COLLEGE DUMKA, JHARKHAND -5O% 
2000 Class X(B.E.C.B) from HIGH SCHOOL GODDA -59% 
CAREER HIGHLIGHTS 
CURRENT EMPLOYER; 
From AUGUST 2011. DURH CONSTRUCTIONS PVT.Ltd. Client- M/s B & R 
 As an ENGINEER 
*EXECUTION : - I have completed........... 
1) Structure pre-assembly and Erection (MATERIAL 
OF BHEL) 
2) Pre-assembly and Erection of CEILING GIRDERS 
3) Pre-assembly and Erection of M.S SILENCER (MATERIAL OF BHEL) 
4) ERECTION OF PRESSUSRE PARTS (MATERIAL OF ALSTOM) 
*PLANNING: - 
1. setting targets for the day and month 
2. preparing DPR & MPR 
3. Planning & allocation. 
4. Managing material requirement as per planning. 
5. Maintaining documentation record like inspection protocols. 
1
6. Inspection of structure members welding of columns, beams and 
bracing and duct module as per ASME and client requirement. 
7. Involved in checking of alignment and verticality of columns, bolting, 
welding at different position during erection and after erection of 
structure members and Duct Module with dampers and gates. 
*BILLING: 
1. Subcontractor billing. 
TECHNICAL EXPOSURE 
1.Good Working with Auto-CAD 2007 
2.PRIMAVERA(P6) 
3.SM.PROJECTS. 
AREAS OF INTEREST 
 Planning 
 Billing 
 Erection 
 Managing of the resources 
PERSONAL VITAE 
Date of Birth : 02 JUNE 1985 
Place of Birth : GODDA 
Gender : Male 
Nationality : Indian 
Marital Status : Unmarried 
Language known : English, Hindi, 
Address : S/O:-UPENDRA PRASAD SHA. 
AT-SHANTI NAGER GANGTA GODDA 
P.O+DIST-GODDA 
JHARKHAND-814133 
Tel. (Res.) : 08960608173 
Current Location : STATE: - U.P, dist:-SONEBHADRA, 
Total Experience : TWO YEAR 
Hobbies : Listening Music & Reading newspaper. 
Declaration: 
I hereby declare that the information furnished above is true to the best of my knowledge. 
2
Place: ANPARA Signature 
Date: RAVIRANJAN 
3

resume (1)

  • 1.
    RAVIRANJAN TEL:(M0BILE)+91-8960608173,E-mail:raviranjan.sa@gmail.com Tocontribute my technical knowledge in a position with growing and dynamic firm which will help me to explore myself fully and realize potential. Willing to work as a key player in challenging and creative environment. EXECUTIVE SUMMARY  Work has been completed as an Engineer with POWER MECH PROJECT LTD. at the site of NTPC( National Thermal Power Cooperation, Barh ,Bihar ), 2x660MW # Unit IV WITHOUT DRUM (SUPER CRITICAL BOILER)  Working as an Engineer with DURH CONSTRUCTIONS .LTD.at the site of U.P RUVNL (Anpara, U.P) 500MW #Unit VI WITH DRUM.  Responsibilities of Site: - Planning, Erection and checking of structure and pressure parts.  Carrying out monthly billing of sub contractors.  An effective communicator with strong analytical, logical, problem solving abilities. EDUCATION . 2010 B.Tech. (Mechanical) from G.H.I.TM PURI ,65% 2003 Class XII (J.E.C.B) from S.P COLLEGE DUMKA, JHARKHAND -5O% 2000 Class X(B.E.C.B) from HIGH SCHOOL GODDA -59% CAREER HIGHLIGHTS CURRENT EMPLOYER; From AUGUST 2011. DURH CONSTRUCTIONS PVT.Ltd. Client- M/s B & R  As an ENGINEER *EXECUTION : - I have completed........... 1) Structure pre-assembly and Erection (MATERIAL OF BHEL) 2) Pre-assembly and Erection of CEILING GIRDERS 3) Pre-assembly and Erection of M.S SILENCER (MATERIAL OF BHEL) 4) ERECTION OF PRESSUSRE PARTS (MATERIAL OF ALSTOM) *PLANNING: - 1. setting targets for the day and month 2. preparing DPR & MPR 3. Planning & allocation. 4. Managing material requirement as per planning. 5. Maintaining documentation record like inspection protocols. 1
  • 2.
    6. Inspection ofstructure members welding of columns, beams and bracing and duct module as per ASME and client requirement. 7. Involved in checking of alignment and verticality of columns, bolting, welding at different position during erection and after erection of structure members and Duct Module with dampers and gates. *BILLING: 1. Subcontractor billing. TECHNICAL EXPOSURE 1.Good Working with Auto-CAD 2007 2.PRIMAVERA(P6) 3.SM.PROJECTS. AREAS OF INTEREST  Planning  Billing  Erection  Managing of the resources PERSONAL VITAE Date of Birth : 02 JUNE 1985 Place of Birth : GODDA Gender : Male Nationality : Indian Marital Status : Unmarried Language known : English, Hindi, Address : S/O:-UPENDRA PRASAD SHA. AT-SHANTI NAGER GANGTA GODDA P.O+DIST-GODDA JHARKHAND-814133 Tel. (Res.) : 08960608173 Current Location : STATE: - U.P, dist:-SONEBHADRA, Total Experience : TWO YEAR Hobbies : Listening Music & Reading newspaper. Declaration: I hereby declare that the information furnished above is true to the best of my knowledge. 2
  • 3.
    Place: ANPARA Signature Date: RAVIRANJAN 3