7*&(',%(/%61''*/,%8,-,*%-/2%%
9*$,%:'-+,#+*$%#/%;/0('4-,#(/%<#,*'-+=%%
>1,"('?%6-'@-%9-$#@#!

         !
         !                    !




                                                               !                                 !
               !"#$%&'()*+,%"-$%.**/%01/2*2%3#,"%$1&&(',%0'(4%,"*%51'(&*-/%6(44#$$#(/%
               %
Empower Autonomous Learning through Information Competencies




        Carla Basili
Date: February 2011
EMPATIC Partners

BASILI Carla          (BC)
CISEK Sabina          (CS)
DAVIES Rob            (DR)
KATSIRIKOU Anthi      (KA)
PROCHNICKA Maria      (PM)
REGGIANI Lisa         (RL)
ROCCHI Maurizio       (RM)
ROWLATT Mary          (RMa)
SKIADAS Christos      (SC)
VINCIGUERRA Filippo   (VF)
YILMAZ Bulent         (YB)




                              1/77
EXECUTIVE SUMMARY

The present report constitutes the delivery D1.1 of the Work Package 1: Desk research of the
EMPATIC project.
The core objectives of the EMPATIC project are to:
- draw together and valorise the results of previous Information Literacy initiatives and
projects across the school, university, adult and vocational learning sectors;
- use this evidence to influence policy makers’ perceptions and actions to support a marked
increase in piloting and mainstreaming of Information Literacy;
- have a significant impact on validating new learning paradigms and strategic thinking on
curriculum reform.
Within the work plan of EMPATIC, the Work Package 1 is aimed to:
1. Arrive at a practical definition of Information Literacy and an assessment of current thinking
on its role in learner performance and learning outcomes at each level of education, taking into
account the findings of LLP projects and other European initiatives.
2. Assess to what extent Information Literacy efforts are being employed within mainstream
education.
3. Identify best practices in schools, higher education, adult and vocational educational bodies
in formal and non-formal settings.
In view of the above, in its Section 1, the deliverable presents the state of the art in the area
of information literacy, which reflects the most significant global challenges and developments
in this domain. The section starts with a concise presentation of the role information literacy
plays within respect to lifelong learning. Then it provides a concise overview of definitions of
information learning suggested by a number of international and national bodies as well as
leading researchers. The section does not aim to present a critical analysis of the views on
information literacy but to illustrate how rich is this concept and how the various points of view
complement each other. Special attention is paid to the definitions suggested by bodies from
the library sector which address the information literacy issue as being of great relevance to
the changing role of the libraries in the information age. Finally, this section offers a summary
of frameworks addressing information literacy, including those suggested by the Association of
College and Research Libraries (ACRL), the Australian and New Zealand Information Literacy
Framework (ANZIIL), and the UK Standing Committee of National and University Libraries
(SCONUL).
Section 2 provides data on the projects in the information literacy domain supported by the
European Union, these activities cover the period 1994–2010 and include 79 projects. This
work can be seen as a logical continuation of the efforts of EnIL (European network on
Information Literacy) to collect and inform the professional community on the European
initiatives in this area. The section outlines attributes which had been studied and identified for
every single project and are used for initial analysis of the situation in Europe. These attributes
include identification attributes (name of the initiative, acronym, URL, Leader institution,
contacts); country of the coordinator if a multinational initiative; typology of the leading
institution; classification of the kind of initiative; source of funding, main focus, target
community, starting date and a description.
Even the initial analysis provided in the deliverable identifies some essential specific features of
the current situation in the EU support of information literacy initiatives. Information literacy
projects are still mainly supported through national initiatives; the specialised funding
programmes address them rather as an exception. This might mean that a serious debate on




EMPATIC WP1/D1.1                                                                     Page 2 of 77
the priorities of some of the funding programmes in the EU is needed to position better the
work in the information literacy domain;
Furthermore, the large part of the initiatives are centred around the concept of IL as a skill and
are library-originated in kind.
The IL policy dimension is quite neglected and therefore the cases have been selected – where
possible – in the area of policy initiatives and recommendations.
A further criterion adopted for data collection is to maximise the number of countries
considered.


Finally, Section 3 of the report synthesizes the point of view taken by the Empatic project.
Since as Section 1 showed there are multiple and not always converging points of view, this
section is needed to illustrate and justify the EMPATIC framework of analysis. A distinguished
feature of the Empatic approach is that it identifies three dimensions of Information Literacy,
each one supported by a number of argumentations, and complementing each other:
Information Literacy as a discipline of study; as a social objective; and as a cognitive
acquisition of individuals. This theoretical background sets the scene for the subsequent work
on the policy recommendations which Empatic aims to deliver.




EMPATIC WP1/D1.1                                                                   Page 3 of 77
Table of Contents
EXECUTIVE SUMMARY ................................................................................................ 2!


SECTION 1: STATE OF THE ART IN INFORMATION LITERACY ..................................... 5!

1.1. INFORMATION LITERACY AND LIFELONG LEARNING ......................................................... 5!
1.2. INFORMATION LITERACY DEFINITIONS .......................................................................... 9!
  1.2.1 INFORMATION LITERACY: INTERNATIONAL AND RESEARCH DEFINITIONS ................................... 9!
  1.2.2 INFORMATION LITERACY: LIBRARY DEFINITIONS ............................................................. 12!
  1.2.3 INFORMATION LITERACY: MAPPING WITH COUPLED CONCEPTS ............................................. 14!
  1.2.4 INFORMATION LITERACY AND CRITICAL THINKING .......................................................... 17!
1.3. INFORMATION LITERACY IN EDUCATION ...................................................................... 20!
  1.3.1 INFORMATION LITERACY IN HIGHER EDUCATION: RELEVANT DEVELOPMENTS ............................ 20!
  1.3.2 INFORMATION LITERACY IN SCHOOLS: RELEVANT DEVELOPMENTS ........................................ 23!
  1.3.3 IL AMONG THE SKILLS FOR JOB ................................................................................ 25!
  1.3.4 IL IN LIFELONG LEARNING: RELEVANT DEVELOPMENTS ..................................................... 27!


SECTION 2: BEST PRACTICES IDENTIFICATION ....................................................... 29!

2.1 METHODOLOGY ....................................................................................................... 29!
2.2 LIST OF INITIAL 87 POTENTIAL INITIATIVES FOR GOOD PRACTICE SELECTION ....................... 32!
2.3 DATA CLUSTERING AND ANALYSIS ............................................................................... 46!
2.4 IL INSTITUTIONAL BODIES AND NETWORKS ................................................................. 51!


SECTION3: THE EMPATIC FRAMEWORK OF ANALYSIS .............................................. 53!

3.1 THREE PERSPECTIVES OF ANALYSIS ............................................................................. 53!
  3.1.1 INFORMATION LITERACY AS A DISCIPLINE OF STUDY ........................................................ 55!
  3.1.2 INFORMATION LITERACY AS SOCIAL OBJECTIVE .............................................................. 61!
  3.1.3 INFORMATION LITERACY AS COGNITIVE ACQUISITION OF INDIVIDUALS ................................... 64!
3.2. CONSEQUENCES OF THE PROPOSED FRAMEWORK ............................................................ 65!


SECTION 4: SELECTED BIBLIOGRAPHY ..................................................................... 67!

REFERENCES ................................................................................................................ 71!
LIST OF FIGURES .......................................................................................................... 74!
LIST OF GRAPHS ........................................................................................................... 74!
LIST OF TABLES ............................................................................................................ 74!
LIST OF ABBREVIATIONS ................................................................................................ 75!




EMPATIC WP1/D1.1                                                                                           Page 4 of 77
SECTION 1: STATE OF THE ART IN INFORMATION LITERACY


1.1. Information Literacy and Lifelong Learning

Since the beginning of the development of information literacy as a global phenomenon, the
Information Literacy definition – released by ALA in 1989 and credited as the earliest and most
enduring definitions of information literacy – underlines a strong association between
Information Literacy (IL) and Learning, particularly with respect to the dimension of
autonomous learning through learning how to learn. In fact, in the ALA 1989 definition,
a learning-how-to-learn perspective is explicitly proposed, as follows:

            To be information literate, a person must be able to recognize when information is needed and
            have the ability to locate, evaluate, and use effectively the needed information. Producing such a
            citizenry will require that schools and colleges appreciate and integrate the concept of information
            literacy into their learning programs and that they play a leadership role in equipping individuals
            and institutions to take advantage of the opportunities inherent within the information society.
            Ultimately, information literate people are those who have learned how to learn. They know how
            to learn because they know how knowledge is organized, how to find information, and how to use
            information in such a way that others can learn from them. They are people prepared for lifelong
            learning, because they can always find the information needed for any task or decision at hand.1

As to the connection between IL and Lifelong Learning (LLL), a number of influential positions
and statements explicitly recognise their reciprocal interdependence.
The above mentioned ALA Report underlines that:

            What is called for is not a new information studies curriculum but, rather, a restructuring of the
            learning process. Textbooks, workbooks, and lectures must yield to a learning process based on
            the information resources available for learning and problem solving throughout people's
            lifetimes--to learning experiences that build a lifelong habit of library use. Such a learning process
            would actively involve students in the process of:

            -   knowing when they have a need for information
            -   identifying information needed to address a given problem or issue
            -   finding needed information and evaluating the information
            -   organizing the information
            -   using the information effectively to address the problem or issue at hand.

            Such a restructuring of the learning process will not only enhance the critical thinking skills of
            students but will also empower them for lifelong learning and the effective performance of
            professional and civic responsibilities2.

Similar point of view is expressed and expanded in a number of subsequent studies. For
example Andretta (Andretta, 2004) suggests to promote IL “as a vehicle of enhancing critical


1
  AMERICAN LIBRARY ASSOCIATION PRESIDENTIAL COMMITTEE ON INFORMATION LITERACY. Final
report 10 January 1989. Available on http://www.ala.org/ala/mgrps/divs/acrl/publications/whitepapers/presidential.cfm
2
    ibid.




EMPATIC WP1/D1.1                                                                                              Page 5 of 77
enquiry and self-directed learning as a foundational element of broader focus on lifelong
learning”3
In its report “Australian and New Zealand information literacy framework: principles, standards
and practice. 2nd ed, ANZIIL – the Australian and New Zealand Institute for Information
Literacy – states that

        Information literacy can be seen as a subset of independent learning, that in turn is a subset of
        lifelong learning

and illustrates the concept through the following figure:




                                                 Independent
                 Information                                                              Lifelong
                                                   Learning
                   Literacy                                                               Learning




                      Fig. 1. Information literacy in the context of lifelong learning.
     Source: BUNDI, A., ed., 2004. Australian and New Zealand information literacy framework:
    principles, standards and practice. 2nd ed. Adelaide: Australian and New Zealand Institute for
                                         Information Literacy.


The same ANZIIL Framework further underlines a strong connection between IL and LLL, citing
the work of (Candy et al., 1994):
     In 1994, Candy, Crebert and O’Leary’s report Developing lifelong learners through undergraduate
     education connected information literacy with lifelong learning. Its profile of the lifelong learner
     included the following information literacy qualities or characteristics:
     • knowledge of major current resources available in at least one field of study
     • ability to frame researchable questions in at least one field of study
     • ability to locate, evaluate, manage and use information in a range of contexts
     • ability to retrieve information using a variety of media
     • ability to decode information in a variety of forms: written, statistical, graphs, charts, diagrams
     and tables
     • critical evaluation of information
According to (Orr et al., 2001), IL




3
 ANDRETTA, S. (2005) Information Literacy: A Practitioners’ Guide. Oxford: Chandos Publishing, as cited in
CRAWFORD, J. (2006) The Culture of Evaluation in Library and Information Services, Chandos Publishing.




EMPATIC WP1/D1.1                                                                                      Page 6 of 77
is a vital component of lifelong learning. By ensuring that individuals have the opportunity to
      develop the intellectual abilities of reasoning and critical thinking, and by helping them construct a
      framework for learning how to learn”4.

The Information Literacy meeting of experts held in Prague on 2003 based its discussion on a
number of white papers, each focused on a different IL aspect. Among them was the white
paper by P.C. Candy, focused on illustrating the strong association between Information
Literacy and Lifelong Learning:

       “information literacy and lifelong learning are inextricably intertwined.5”

In turn, the educational goal of lifelong learning has been acknowledged as one of the main
driving forces behind the development of information literacy as a global phenomenon (Bruce,
1999)6


A significant international position by the National Forum on Information Literacy (NFIL) of
UNESCO and the International Federation of Library Associations and Institutions (IFLA) is THE
ALEXANDRIA PROCLAMATION. The full text of the proclamation is available at
www.ifla.org/III/wsis/BeaconInfSoc.html, while selected parts of it are given in fig. 2.




4
  ORR, D, APPLETON, M & WALLIN, M. (2001) Information literacy and flexible delivery: creating a conceptual
framework and model, Journal of Academic Librarianship, vol. 27, no. 6, pp. 457-463
5
 CANDY, P.C. (2002) Information literacy and lifelong learning, White paper prepared for UNESCO, the US National
Commission on Libraries and Information Science, and the National Forum on Information Literacy, for use at the
Information Literacy, meetings of Experts. Prague: The Czech Republic, pp. 1-17. Available:
http://www.nclis.gov/libinter/infolitconf&meet/papers/candy-paper.pdf
6
 BRUCE, C. (1999) Information literacy; an international review of programs and research. Auckland ’99 Lianza
conference, 9-12 November 1999, pp.1-9. Available: http://www2.auckland.ac.nz/lbr/conf99/bruce.htm




EMPATIC WP1/D1.1                                                                                        Page 7 of 77
BEACONS OF THE INFORMATION SOCIETY
      THE ALEXANDRIA PROCLAMATION ON INFORMATION LITERACY AND LIFELONG
      LEARNING
      [...] the participants in the High-Level Colloquium on Information Literacy and Lifelong Learning
      held at the Bibliotheca Alexandrina on 6-9 November 2005 proclaim that Information Literacy and
      lifelong learning are the beacons of the Information Society, illuminating the courses to
      development, prosperity and freedom.
      Information Literacy lies at the core of lifelong learning. It empowers people in all walks of life to
      seek, evaluate, use and create information effectively to achieve their personal, social,
      occupational and educational goals. It is a basic human right in a digital world and promotes social
      inclusion of all nations.
      Information Literacy
      - comprises the competencies to recognise information needs and to locate, evaluate, apply and
            create information within cultural and social contexts;
      - is crucial to the competitive advantage of individuals, enterprises (especially small and
            medium enterprises), regions and nations;
      - provides the key to effective access, use and creation of content to support economic
            development, education, health and human services, and all other aspects of contemporary
            societies, and thereby provides the vital foundation for fulfilling the goals of the Millennium
            Declaration and the World Summit on the Information Society; and
      - extends beyond current technologies to encompass learning, critical thinking and
            interpretative skills across professional boundaries and empowers individuals and
            communities.
      Within the context of the developing Information Society, we urge governments and
      intergovernmental organisations to pursue policies and programmes to promote Information
      Literacy and lifelong learning. In particular, we ask them to support
      - [...] inclusion of Information Literacy into initial and continuing education for key
            economic sectors and government policy making and administration, and into the practice of
            advisors to the business, industry and agriculture sectors;
      - [...]
      - recognition of lifelong learning and Information Literacy as key elements for the development
            of generic capabilities which must be required for the accreditation of all education and
            training programmes.
      We affirm that vigorous investment in Information Literacy and lifelong learning strategies creates
      public value and is essential to the development of the Information Society.

      Adopted in Alexandria, Egypt at the Bibliotheca Alexandrina on 9 November 20057

                   Fig. 2- Excerpts from the Alxandria Proclamation on IL and LLL


Furthermore, Information literacy standards for student learning, produced by the ALA in
1998, links information literacy, independent learning, and social responsibility8.
The above statements and positions are only a few voices among many others pointing out
how IL creates the foundation for lifelong learning.


7
 GARNER, S.D. (2005) High level colloquium on information literacy and lifelong learning. Bibliotheca Alexandrina,
Alexandria, Egypt November 6-9, 2005. Report of the meeting. Available: http://archive.ifla.org/III/wsis/High-Level-
Colloquium.pdf
8
 American Library Association (1998) Information literacy standards for student learning: standards and indicators,
Available: http://www.ala.org/ala/aasl/aaslproftools/informationpower/InformationLiteracyStandards_final.pdf




EMPATIC WP1/D1.1                                                                                        Page 8 of 77
The Empatic project not only recognises this link but aims to contribute to a better
understanding of the European experiences and to foster future developments in this spirit.



1.2. Information Literacy definitions

Information literacy is widely recognised as covering a pivotal role in the contemporary society
since it “should be a basic human right in a digital world”, as declared in a thematic debate held
on April 2005 by UNESCO. The thematic debate originated by the acknowledgement of an
explicit link between Information Literacy and the UNESCO’s Information for All programme, as
declared on the thematic debate website:

     The specific purpose of the thematic debate was to consult with researchers and other experts in
     the field of information literacy, both within UNESCO and within our constituent stakeholders, to
     identify the particular contribution that the Information for All Programme can make in helping to
     ensure all peoples have the opportunity to become information literate9.

This is a voice among many that acknowledges Information Literacy as strategic competence
in the Information Society, nevertheless there is still no universal consensus about its
definition.
Seminal reviewing works are:
DOYLE C. (1994). Information literacy in an information society: A concept for the information
age. Syracuse, NY: ERIC Clearinghouse on Information and Technology.
BEHRENS, S.J. (1994) A conceptual analysis and historical overview of information literacy,
College & Research Libraries, 55(4), 309-322
BAWDEN, D. (2001) Information and Digital Literacies: A Review of Concepts. Journal of
Documentation, 57(2), 218-259.
MUTCH, A. (1997) Information literacy: an exploration. International journal of information
management, 1997, 17 (5) pp.377-86.


1.2.1 Information Literacy: international and research definitions
A number of definitions of the IL concept follow. These were suggested by various influential
bodies, mostly international and some national ones, as well as by leading experts in the IL
field. Our aim here is not to provide a detailed analysis of the differences, but to give the
readers a feeling of the different perceptions of IL recurring in the specialised literature.

UNESCO
The UNESCO-sponsored Meeting of Experts on Information Literacy, held in Prague on
September 2003 and organised by the US National Commission on Library and Information
Sciences and the National Forum on Information Literacy, propose the following Information
Literacy definition:

     Information Literacy encompasses knowledge of one's information concerns and needs, and the
     ability to identify, locate, evaluate, organize and effectively create, use and communicate



9
   UNESCO (2005), Thematic debate on information literacy: final report, 20 April 2005. Available:
http://portal.unesco.org/ci/en/ev.php-URL_ID=18775&URL_DO=DO_TOPIC&URL_SECTION=201.html>




EMPATIC WP1/D1.1                                                                                   Page 9 of 77
information to address issues or problems at hand; it is a prerequisite for participating effectively
        in the Information Society, and is part of the basic human right of life long learning10.

National forum on IL (US)
Patricia Senn Breivik– already chairman of the US National Forum on Information Literacy – in
order to better underline the connection between IL and LLL, promotes a very effective picture
of IL as an umbrella including ‘computer literacy’, ‘library literacy’, ‘media literacy’, ‘network
literacy’, ‘visual literacy’, and a blank one (meant to refer to other literacies), with the words
‘critical thinking skills’ covering the whole umbrella11.




                               Fig. 3. Information literacy and critical thinking.
                                           Source: Senn Breivik (2001)



Australian and New Zealand Institute for Information Literacy (ANZIIL)
ANZIIL proposes the following definition:


        Information literate people
        • recognise a need for information
        • determine the extent of information needed
        • access information efficiently
        • critically evaluate information and its sources
        • classify, store, manipulate and redraft information collected or generated
        • incorporate selected information into their knowledge base

10
     portal.unesco.org/.../ev.php-URL_ID=19634&URL_DO=DO_TOPIC&URL_ SECTION=201.html
11
  SENN BREVIK, P. (2001) Information literacy and lifelong learning: The magical partnership. Proceedings of the
1st International Lifelong Learning Conference, Central Queensland University, Rockhampton, Queensland, Australia,
pp. 1-6.




EMPATIC WP1/D1.1                                                                                       Page 10 of 77
• use information effectively to learn, create new knowledge, solve problems and make decisions
         • understand economic, legal, social, political and cultural issues in the use of
         information
         • access and use information ethically and legally
         • use information and knowledge for participative citizenship and social responsibility
         • experience information literacy as part of independent learning and lifelong learning. (ANZIIL,
         2004)

Joint Information Systems Committee, UK
In the UK, the Joint Information Systems Committee sustains the concept of i-Skills:

         You may not have heard the term ‘i-skills’ up to now, but probably terms such as information
         skills, e-literacy, information literacy, knowledge management and research skills are more
         familiar. This guide uses the term i-skills to encompass all of these.

         i-Skills are defined as: the ability to identify, assess, retrieve, evaluate, adapt, organise and
         communicate information within an iterative context of review and reflection12.

Information Literacy as a Liberal Art
A research point of view about IL conception comes from the work of Shapiro and Hughes, in
their proposal of IL as a new liberal art13, as follows:

         Information and computer literacy, in the conventional sense, are functionally valuable technical
         skills. But information literacy should in fact be conceived more broadly as a new liberal art that
         extends from knowing how to use computers and access information to critical reflection on the
         nature of information itself, its technical infrastructure, and its social, cultural and even
         philosophical context and impact - as essential to the mental framework of the educated
         information-age citizen as the trivium of basic liberal arts (grammar, logic and rhetoric) was to the
         educated person in medieval society.

More specifically, Shapiro and Hughes propose that an IL curriculum should be based on a
“critical conception of a more humanistic sort” and the proposed curriculum includes the
following seven dimensions:

         Tool literacy, or the ability to understand and use the practical and conceptual tools of current
         information technology, including software, hardware and multimedia, that are relevant to
         education and the areas of work and professional life that the individual expects to inhabit. This
         can be taken to include the basics of computer and network applications as well as fundamental
         concepts of algorithms, data structures, and network topologies and protocols.

         Resource literacy, or the ability to understand the form, format, location and access methods of
         information resources, especially daily expanding networked information resources. This is
         practically identical with librarians' conceptions of information literacy, and includes concepts of
         the classification and organization of such resources.

         Social-structural literacy, or knowing that and how information is socially situated and produced.
         This means knowing about how information fits into the life of groups; about the institutions and
         social networks - such as the universities, libraries, researcher communities, corporations,
         government agencies, community groups - that create and organize information and knowledge;

12
     Available: www.jisc.ac.uk/media/documents/publications/improvingiskills_rtf.rtf
13
   HUGHES, S., & SHAPIRO, J. (1996) Information Literacy as a Liberal Art. Educom Review, 31(2). Available:
http://net.educause.edu/apps/er/review/reviewarticles/31231.html




EMPATIC WP1/D1.1                                                                                        Page 11 of 77
and the social processes through which it is generated - such as the trajectory of publication of
         scholarly articles (peer review, etc.), the relationship between a Listserv and a shared interest
         group, or the audience served by a specialized library or Web site.



         Research literacy, or the ability to understand and use the IT-based tools relevant to the work of
         today's researcher and scholar. For those in graduate education, this would include discipline-
         related computer software for quantitative analysis, qualitative analysis and simulation, as well as
         an understanding of the conceptual and analytical limitations of such software.

         Publishing literacy, or the ability to format and publish research and ideas electronically, in
         textual and multimedia forms (including via World Wide Web, electronic mail and distribution
         lists, and CD-ROMs), to introduce them into the electronic public realm and the electronic
         community of scholars. Writing is always shaped by its tools and its audience. Computer tools and
         network audiences represent genuine changes in writing itself.

         Emerging technology literacy, or the ability to ongoingly adapt to, understand, evaluate and
         make use of the continually emerging innovations in information technology so as not to be a
         prisoner of prior tools and resources, and to make intelligent decisions about the adoption of new
         ones. Clearly this includes understanding of the human, organizational and social context of
         technologies as well as criteria for their evaluation.

         Critical literacy, or the ability to evaluate critically the intellectual, human and social strengths
         and weaknesses, potentials and limits, benefits and costs of information technologies. This would
         need to include a historical perspective (e.g. the connection between algorithmic thinking,
         formalization in mathematics, and the development of Western science and rationality and their
         limits); a philosophical perspective (current debates in the philosophy of technology, the critique
         of instrumental reason, the possibility and nature of artificial intelligence); a sociopolitical
         perspective (e.g. the impact of information technology on work, public policy issues in the
         development of a global information infrastructure); and a cultural perspective (e.g. current
         discussions of the virtual body and of the definition of human being as an information-processing
         machine) (Shapiro- Hughes, 1996).

Information Literacy as Information Behaviour in the Information Society
A further broader, not merely technical, perspective is suggested by Webber and Johnston14:

         Information literacy is the adoption of appropriate information behaviour to identify, through
         whatever channel or medium, information well fitted to information needs, leading to wise and
         ethical use of information in society. (Webber and Johnston, 2003)


1.2.2 Information Literacy: library definitions
The library sector is following particularly closely the developments in the IL field and plays a
special role in the promotion and wider adoption of the concept. Below some key definitions
suggested by international and national library associations are presented as they are
described by the CILIP CSG Information Literacy Group15




14
  Webber, S. and Johnston, B. (2003) Information literacy in the United Kingdom: a critical review. In: Basili, C. (Ed)
Information Literacy in Europe. Rome: Italian National Research Council. 258-283.
15
     Available: http://www.informationliteracy.org.uk/Information_literacy_definitions/Definitions.aspx




EMPATIC WP1/D1.1                                                                                        Page 12 of 77
ALA , 1989

The most widely recognized and used definition of IL comes from the Final Report of the
Presidential Committee on Information Literacy, where is declared that:

         To be information literate, a person must be able to recognize when information is needed and
         have the ability to locate, evaluate, and use effectively the needed information.

CILIP
CILIP – the UK Chartered Institute of Library and Information Professionals – in 2003 defined
IL as:

         “Information literacy is knowing when and why you need information, where to find it, and how
         to evaluate, use and communicate it in an ethical manner. This definition implies several skills.
         We believe that the skills (or competencies) that are required to be information literate require an
         understanding of:

         -    a need for information
         -    the resources available
         -    how to find information
         -    the need to evaluate results
         -    how to work with or exploit results
         -    ethics and responsibility of use
         -    how to communicate or share your findings
         -    how to manage your findings.” (CILIP, 200316

SCONUL
SCONUL (Society of College, National and University Libraries) has a view of IL as a set of
seven competency dimensions, built upon basic library and IT skills that constitute the
foundation for them. SCONUL supplies a visual representation of this conception (see figure
4)17.




16
     Available: http://www.cilip.org.uk/get-involved/advocacy/learning/information-literacy/Pages/definition.aspx
17
     Available: http://www.sconul.ac.uk/groups/information_literacy/seven_pillars.html




EMPATIC WP1/D1.1                                                                                        Page 13 of 77
Fig. 4 - The SCONUL proposal



The definitions of IL from the library sector – evolving from the original focus on Library
Instruction - are strongly connected to the operative use of information and usually do not
address the larger context of learning. However some of them provide a useful finer
granularity view on the specific types of skills which constitute the IL as perceived nowadays.


1.2.3 Information Literacy: mapping with coupled concepts
In the specialised literature a number of concepts contiguous to IL are sustained, namely
media literacy, digital or computer or ICT literacy.
Those concepts are often used interchangeably or with largely overlapping meaning, therefore
the task of identifying universal accepted definitions for them is not easy.
Nevertheless, the Partnership for 21st Century Skills (P21) – a national US organization that
advocates for 21st century readiness for every student – developed a Framework for 21st




EMPATIC WP1/D1.1                                                               Page 14 of 77
Century Learning18 that can be of use in both positioning IL among the strategic competencies
for 21st learners, and for better understanding the distinction between different kinds of
literacy.
The Framework is aimed at helping help students master the multi-dimensional abilities
required of them in the 21st century.
The key elements of 21st century learning are represented in the graphic in fig.5 below.




                  Fig. 5 - 21st Century Skills. Source: Parnership for 21st century skills



The graphic represents both 21st century skills student outcomes (as represented by the
arches of the rainbow) and 21st century skills support systems (as represented by the pools at
the bottom), namely the systems that must be aligned to produce 21st century outcomes for
today’s students.
While the graphic represents each element distinctly for descriptive purposes, the Partnership
views all the components as fully interconnected in the process of 21st century teaching and
learning.
The elements described below are the critical systems necessary to ensure 21st century
readiness for every student. Twenty-first century standards, assessments, curriculum,
instruction, professional development and learning environments must be aligned to produce a
support system that produces 21st century outcomes for today’s students19.

18
     Available: http://www.p21.org/index.php
19
     Source: http://www.p21.org/index.php?option=com_content&task=view&id=254&Itemid=119




EMPATIC WP1/D1.1                                                                           Page 15 of 77
The skills, knowledge and expertise students should master to succeed in work and life in the
21st century (Twenty-First Century Student Outcomes) are grouped into four classes, as listed
below.




1. Core Subjects and 21st Century Themes
2. Learning and Innovation Skills
       Creativity and Innovation
       Critical Thinking and Problem Solving
       Communication and Collaboration
3. Information, Media and Technology Skills
       Information Literacy
       Media Literacy
       ICT Literacy
4. Life and Career Skills
                            Fig. 6 21st century skills - source: P21


Focussing on class number 3 “Information, Media and Technology Skills” in fig.6, it is evident
the positioning of IL among the strategic skills and its distinction from other contiguous
literacies. In fact, looking into more detail into the descriptions of each literacy can help in
understanding their differentiation.




Information Literacy
Access and Evaluate Information
       Access information efficiently (time) and effectively (sources)
       Evaluate information critically and competently


Use and Manage Information
       Use information accurately and creatively for the issue or problem at hand
       Manage the flow of information from a wide variety of sources
       Apply a fundamental understanding of the ethical/legal issues surrounding the
       access and use of information


        Fig. 7 - Information Literacy within 21st Century Skills (Source P21 framework)




EMPATIC WP1/D1.1                                                                Page 16 of 77
Media Literacy
Analyze Media
       Understand both how and why media messages are constructed, and for what
       purposes
       Examine how individuals interpret messages differently, how values and points
       of view are included or excluded, and how media can influence beliefs and
       behaviours
       Apply a fundamental understanding of the ethical/legal issues surrounding the
       access and use of media
Create Media Products
       Understand and utilize the most appropriate media creation tools,
       characteristics and conventions
       Understand and effectively utilize the most appropriate expressions and
       interpretations in diverse, multi-cultural environments
           Fig. 8 - Media Literacy within 21st Century Skills (Source P21 framework)


ICT Literacy
Apply Technology Effectively
       Use technology as a tool to research, organize, evaluate and communicate
       information
       Use digital technologies (computers, PDAs, media players, GPS, etc.),
       communication/networking tools and social networks appropriately to access,
       manage, integrate, evaluate and create information to successfully function in
       a knowledge economy
       Apply a fundamental understanding of the ethical/legal issues surrounding the
       access and use of information technologies
       Fig. 9 - ICT or digital Literacy within 21st Century Skills (Source P21 framework)


Besides the usefulness in setting the scene for IL as strategic skill and for its differentiation
from other (and equally strategic) literacies, the P21 framework has been selected since
among the P21 partners is the American Association of School Librarians, responsible for the
release in 2007 of the "Standards for the 21st Century Learner", a document where is given a
very effective description of IL as intrinsically connected to critical thinking.


1.2.4 Information Literacy and Critical Thinking
The strong connection between IL and Critical Thinking is well described in the "Standards for
the 21st Century Learner" developed by AASL that identifies the following four classes of skills:




EMPATIC WP1/D1.1                                                                 Page 17 of 77
1. Inquire, think critically, and gain knowledge.
2. Draw conclusions, make informed decisions, apply knowledge to new situations, and create
new knowledge.
3. Share knowledge and participate ethically and productively as members of our democratic
society.
4. Pursue personal and aesthetic growth.
                 Fig. 10 - Standards for the 21st Century Learner, AASL, 2007


Each class is described with further details and the first group of strategic skills “Inquire, think
critically, and gain knowledge” is specified as follows.


1.     Inquire, think critically, and gain knowledge.


1.1 Skills
1.1.1 Follow an inquiry- based process in seeking knowledge in curricular subjects, and make
the real-world connection for using this process in own life.
1.1.2 Use prior and background knowledge as context for new learning.
1.1.3 Develop and refine a range of questions to frame the search for new understanding.
1.1.4 Find, evaluate, and select appropriate sources to answer questions.
1.1.5 Evaluate information found in selected sources on the basis of accuracy, validity,
appropriateness for needs, importance, and social and cultural context.
1.1.6 Read, view, and listen for information presented in any format (e.g., textual, visual,
media, digital) in order to make inferences and gather meaning.
1.1.7 Make sense of information gathered from diverse sources by identifying misconceptions,
main and supporting ideas, conflicting information, and point of view or bias.
1.1.8 Demonstrate mastery of technology tools for accessing information and pursuing inquiry.
1.1.9 Collaborate with others to broaden and deepen understanding.-
         Fig. 11- Class1 skills - - Standards for the 21st Century Learner, AASL, 2007




EMPATIC WP1/D1.1                                                                    Page 18 of 77
1.     Inquire, think critically, and gain knowledge.


1.2 Dispositions in Action
1.2.1 Display initiative and engagement by posing questions and investigating the answers
beyond the collection of superficial facts.
1.2.2 Demonstrate confidence and self-direction by making independent choices in the
selection of resources and information.
1.2.3 Demonstrate creativity by using multiple resources and formats.
1.2.4 Maintain a critical stance by questioning the validity and accuracy of all information.
1.2.5 Demonstrate adaptability by changing the inquiry focus, questions, resources, or
strategies when necessary to achieve success.
1.2.6 Display emotional resilience by persisting in information searching despite challenges.
1.2.7 Display persistence by continuing to pursue information to gain a broad perspective.
 Fig. 12 - Class1 Dispositions in Action - Standards for the 21st Century Learner, AASL, 2007




1.     Inquire, think critically, and gain knowledge.


1.3 Responsibilities
1.3.1 Respect copyright/ intellectual property rights of creators and producers.
1.3.2 Seek divergent perspectives during information gathering and assessment.
1.3.3 Follow ethical and legal guidelines in gathering and using information.
1.3.4 Contribute to the exchange of ideas within the learning community.
1.3.5 Use information technology responsibly.
1.4 Self-Assessment Strategies
1.4.1 Monitor own information-seeking processes for effectiveness and progress, and adapt as
necessary.
1.4.2 Use interaction with and feedback from teachers and peers to guide own inquiry process.
1.4.3 Monitor gathered information, and assess for gaps or weaknesses.
1.4.4 Seek appropriate help when it is needed.
     Fig. 13 -- Class1-Responsibilities - Standards for the 21st Century Learner, AASL, 2007


The set of shaded sub-skills in figs. 10÷13 provides for IL a description of a finer granularity
with respect to the IL definitions most commonly cited in literature (see §1.2 in this section)
and further underlines how strongly IL and critical thinking are intrinsically interrelated.




EMPATIC WP1/D1.1                                                                   Page 19 of 77
1.3. Information Literacy in Education

A recent publication analyses and discusses how IL is a multidimensional phenomenon crossing
the borders of both Information and Education policies20.

         The cross-borders view of Information Literacy – between Information and Education policies –
         widens the concept of Information Literacy, traditionally limited to the Information policy scope.

         Such a wider perspective is required due to a number of influential factors arising from the full
         establishment of the so-called Information Society, such as the mass access to information, the
         uncontrolled production process of large amounts of information, the constraints imposed on
         Higher Education by the market and by a new kind of demand from the labour market (Basili,
         2008)21.

Already in 1975, the Unesco NATIS Programme released a set of guidelines for National
Information Policies, aimed at developing national information infrastructures, where users are
considered the fulcrum of the whole infrastructure.
     An adequate system to provide access to information should include the following features:
     •     potential users would be regarded as part of the system. Their education would assist them to
           diagnose their problems and be such that they would not fear revealing their ignorance when seeking
           assistance.
     •     The educational system would recognise, as Johnson said, that: “Knowledge is of two kinds. We
           know a subject ourselves, or we know where we can find information upon it”22.
The last point cited from (Urquhart, 1975) can be used as an effective synthesis of the need to
integrate IL into the whole educational system, namely from schools to university, but the
whole set of NATIS indications includes also the generic user of information, namely adults and
workers. These needs are even more pressing today and a number of developments have
occurred since 1975 in each educational area. Among them, the most meaningful are set out
in the following paragraphs.


1.3.1 Information Literacy in Higher Education: relevant developments
Information Literacy as a graduate attribute
The ALA 1989 definition has had a great impact on the Higher Education sector.




20
  Information Literacy at the crossroad of Education and Information Policies in Europe, Carla BASILI (ed.),
Consiglio Nazionale delle Ricerche, Rome, 2008, 301 pp.
21
  Basili, C., 2008, Information and education policies in Europe: key factors influencing information literacy
academic policies in Europe . In: Information Literacy at the crossroad of Education and Information Policies in
Europe, pp. 18-32
22
   Urquhart, D.J. (1975). Developing a National Information Policy. A NATIS guideline. Unesco, 24 pp: The issue of
user education is at the top of the list of priorities for “Developing the Information Plan”:
1.      improving the education of potential users;
2.      the training of librarians and information officers;
3.      improving access to existing services;
4.      improving and expanding existing services;
5.      creating new services.




EMPATIC WP1/D1.1                                                                                      Page 20 of 77
In the USA the already mentioned ACRL IL standards for Higher Education23 were defined in
1999 by the Association of College and Research Libraries (ACRL) and translated into: Finnish,
French, German, Greek, Italian, Spanish, Chinese, Japanese, and Iranian.
In Australia, the Australian and New Zealand Institute for Information Literacy released the
second edition of the Australian and New Zealand Information Literacy Framework24 in 2004.
The educational philosophy underpinning the Australian IL standards strongly promotes the
idea that IL should be tightly integrated into teaching and learning activities. The standards
suggest that all academic curricula be reformed in line with its recommendations as a matter
of university-wide policy.
A major policy parameter in the assessment exercise of Australian universities is the set of
graduate attributes that each university must declare in its mission statement. According to
(Barrie, 2004):

         … generic graduate attributes in Australia have come to be accepted as the skills, knowledge and
         abilities of university graduates, beyond disciplinary content knowledge, which are applicable to a
         range of contexts. It is intended that university students acquire these qualities as one of the
         outcomes of successfully completing any undergraduate degree at university.

This statement has been widely acknowledged and IL has been included among the set of
graduate attributes, so that, already in 2004, 53.8% of Australian Universities had included IL
among the graduate attributes declared in their mission statement.
One example among many others is the University of Sydney, which in 2002 started a project
for revising its graduate attributes policy, according to a multidimensional classification of
attributes.

         The revised policy specifies two levels of attributes. There are three overarching graduate
         attributes – Scholarship, Lifelong Learning, and Global Citizenship – which reflect the research
         intensive nature of the University, its scholarly values in relation to research-led teaching, and the
         place of its graduates in a global society.

         These overarching attributes represent combinations of five clusters of more specific attributes,
         which can be interpreted or contextualised differently in different disciplinary domains. These are
         in turn supported by generic foundation skills and abilities underpinned by basic competencies.
         (Barrie, 2004)




23
  Association of College and Research Libraries, Information Literacy Competency Standards for Higher Education,
Jan 2000 Available: http://www.ala.org/acrl/ilcomstan.cfm
24
     http://www.anziil.org/resources/Infolit2ndedition.pdf




EMPATIC WP1/D1.1                                                                                         Page 21 of 77
Fig. 14. Graphical representation of graduate attributes and their functional aims (Barrie,
                                               2004).


Furthermore, Barrie refers to the definition by the HE Council of 1992, from which most of the
definitions for “graduate attributes” derive:

         These are skills, personal attributes and values, which should be acquired by all graduates
         regardless of their discipline or field of study. In other words, they should represent the central
         achievements of higher education as a process. (HEC, 1992, p. 20)

As to the European context, the commitment to skill development of graduate attributes has
been adopted by the European Union policies on Higher Education under the name of “learning
outcomes” and officially recommended in 2005 at the meeting in Bergen of the Ministers of the
Bologna Process signatory states. The Bergen Communiqué, in fact, officially adopted the
“Standards and Guidelines for Quality Assurance in the European Higher Education Area”. The
Guidelines - produced by the European Network for Quality Assurance in Higher Education
(ENQA)25 – recognise the fundamental role of the learning attributes approach in achieving
transparency and comparability of competencies within the European Higher Education Area.
The Empatic vision of IL integration into the HE system - which is strictly connected to the
scope of the European network on Information Literacy26 launched in 2001 - is oriented
towards a policy inspired by the Bologna process for Higher Education in Europe.
The Bologna process, aimed at establishing a European Higher Education Area, operates along
a number of action lines. In the reasoning about the institutionalisation of IL within the Higher
Education context, of particular interest are the “Bologna” activities of curriculum design and
harmonisation, together with the introduction of the concept of learning outcomes.
The first series of activities are now being carried out through the “Tuning Educational
Structures in Europe” project, which is aimed at;


•      "Tune" educational structures in Europe, and thereby aid the development of the European
       Higher Education Area;


25
 ENQA (2005) Report on Standards and Guidelines for Quality Assurance in the European Higher Education Area,
Helsinki, ENQA.
26
     http://www.ceris.cnr.it/Basili/EnIL/index.html




EMPATIC WP1/D1.1                                                                                       Page 22 of 77
•      Open up a debate on the nature and importance of subject-specific and general
       competences, involving all stakeholders, including academics, graduates and employers;
•      Identify and exchange information on common subject-based reference points, curricula
       content, learning outcomes and methods of teaching, learning and assessment;
•      Improve European co-operation and collaboration in the development of the quality,
       effectiveness and transparency of European higher education by examining ECTS credits
       and other suitable devices to enhance progress.


Among the Tuning project activities, it is useful to recall the analysis – for each course of study
and disciplinary sector –of the differences existing among the curricula of the universities in
Europe, in order to make more comparable (and therefore transferable) curricula of the same
subject area.
The concept of learning outcomes is strictly related to the quality assessment procedures of
universities, which are asked to demonstrate the efficient achievement of these, particularly in
response to calls for accountability27. It is a concept quite new in Europe, while elsewhere, for
example in Australia and the USA, is among the well-established criteria for universities to
obtain government funds. In fact, in Australia and the USA, the learning outcomes are
explicitly declared into the mission of the single university and constitute the set of
competencies that graduates are expected to acquire. They must be measurable in order to
give evidence of the successful completion of a cycle of study. It is worth to note that in most
Australian universities, IL is included among the learning outcomes (or graduate attributes as
they are also known in the USA)28.


EMPATIC suggestion is to include IL among the learning outcomes, specifically among the
generic competencies defined by the Tuning project.



1.3.2 Information Literacy in Schools: relevant developments
The rationale behind the need of diffusion IL in schools is well summarised by Plotnick:

         Educational reform and restructuring make information literacy skills a necessity as students seek
         to construct their own knowledge and create their own understandings.
         - Educators are selecting various forms of resource-based learning (authentic learning, problem-
              based learning and work-based learning) to help students focus on the process and to help
              students learn from the content. Information literacy skills are necessary components of each.
         - The process approach to education is requiring new forms of student assessment. Students
              demonstrate their skills, assess their own learning, and evaluate the processes by which this
              learning has been achieved by preparing portfolios, learning. (Plotnick, 199929)

The first formal initiative pointing out the need of Educating students to information date back
to 1988, when the American Association of School Librarians (AASL) published “Information
Power: Guidelines for school library Media Programs” in collaboration with the Association for



27
     BARRIE, S.C. (2005) Rethinking Generic Graduate Attributes, HERDSA News, Draft, 5 March 2005
28
     www.caul.edu.au/surveys/info-literacy2004.doc
29
     PLOTNICK, E. Information Literacy. ERIC- digest. ED427777




EMPATIC WP1/D1.1                                                                                       Page 23 of 77
Educational Communications and Technology (AECT)30. This publication, along with its follow-
up published in 1998, is widely recognised as providing an extremely helpful road map to
                                                        .
guide educators into the next century The guidelines, in fact, provide standards for
information literacy learning, as well as indicators for each standard. These standards create
goals for all educators.
Subsequent results by AASL are the following families of standards:

Information Literacy Standards for Student Learning, 199831
Standards for the 21st Century Learner, 200732


Outside the library community, the Big6 model is largely known and used approach to teaching
IL. From the Big6 website33:

         Developed by educators Mike Eisenberg and Bob Berkowitz, the Big6 is the most widely-known
         and widely-used approach to teaching information and technology skills in the world. The Big6 is
         an information and technology literacy model and curriculum, implemented in thousands of
         schools – K through higher education. Some people call the Big6 an information problem-solving
         strategy because with the Big6, students are able to handle any problem, assignment, decision or
         task. Here are the six stages we call the Big6. Two sub-stages are part of each main category in the
         Big6 model:

         1. Task Definition
         1.1 Define the information problem
         1.2 Identify information needed
         2. Information Seeking Strategies
         2.1 Determine all possible sources
         2.2 Select the best sources
         3. Location and Access
         3.1 Locate sources (intellectually and physically)
         3.2 Find information within sources
         4. Use of Information
         4.1 Engage (e.g., read, hear, view, touch)
         4.2 Extract relevant information
         5. Synthesis
         5.1 Organize from multiple sources
         5.2 Present the information
         6. Evaluation
         6.1 Judge the product (effectiveness)
         6.2 Judge the process (efficiency)



30
  AASL and Association for Educational Communications and Technology, Information Power: Guidelines for School
Library Media Programs (Chicago: ALA, 1988)
31
  American Association of School Librarians and the Association for Educational Communications and Technology,
Information Literacy Standards for Student Learning, 1998 Available: http://www.alastore.ala.org/detail.aspx?ID=203
32
  Already mentioned in § 1.3.4 of this Report Available:
http://www.ala.org/ala/mgrps/divs/aasl/guidelinesandstandards/learningstandards/AASL_LearningStandards.pdf
33
     http://www.big6.com/




EMPATIC WP1/D1.1                                                                                        Page 24 of 77
Specifically devoted to IL in schools are the books by Eisenberg and Berkowitz:
Eisenberg, M. B.- Berkowitz, R. E. (1999). Teaching information & technology skills: The Big6
in elementary schools. Worthington, Ohio: Linworth Publishing.
Eisenberg, M. B.- Berkowitz, R. E. (2000). Teaching information & technology skills: The Big6
in secondary schools. Worthington, Ohio: Linworth Publishing.



1.3.3 IL among the skills for Job
A major starting point for the discussion of IL in the workplace is that of the “intelligent
organisation” illustrated by Choo in 1995 as follows:
The intelligent organization is able to mobilize the different kinds of knowledge that exist in the organization in order to
enhance performance. It pursues goals in a changing environment by adapting behaviour according to knowledge about
itself and the world it thrives in. The intelligent organization is therefore a learning organization that is skilled at
creating, acquiring, organizing, and sharing knowledge, and at applying this knowledge to design its behaviour.
Organizational learning depends critically upon information management -- the capacity to harness the organization's
information resources and information capabilities to energize organizational growth. Information management is a
cycle of processes that support the organization's learning activities: identifying information needs, acquiring
information, organizing and storing information, developing information products and services, distributing
information, and using information. 34
From the above definition it is evident how much the role of information in the intelligent
organisation is strategic and, consequently, how much necessary is the ability to dominate the
universe of information located both inside and outside the organisation.
Kirton and Barham provide a review of IL in the workplace, focussing on the need for IL
awareness within organisations35.

       With the exponential increase in information, its management and use have become an important
       issue in the workplace, yet knowledge management or information literacy is not adequately
       addressed by most organisations or professions (Abell 2000; Candy 1998; O'Sullivan 2002;
       Winterman, Skelton and Abell 2003). A report by TFPL Ltd (1991) however did find that chief
       executives valued knowledge management second only to globalisation as essential for their
       organisations. Lloyd (2003) states that in the

       ...knowledge economy, the ability of the individual to become information literate and to engage
       effectively the operations skills of information literacy are attributes in which organisations
       should invest, in terms of both recruitment and training.

       A report by KPMG Consulting (2000) found that companies risked wasting their investment in the
       technology used to manage information if they did not tackle the 'human' aspect, which has been
       identified as an essential focus in knowledge management (Abell 2000). Employees continued to
       have problems with information overload, information anxiety, disinformation or misinformation,
       insufficient time, inadequate technological skills to share knowledge, to have difficulty locating
       information and were frequently 'reinventing the wheel'. While information is highly valued within
       most organisations (Candy 1998), many members of the workforce are unable to deal effectively

34
  CHOO, C.W. Information Management for the Intelligent Organization: Roles and Implications for the Information
Professions. In: Proceedings of the Digital Libraries Conference, March 27-28, 1995, Singapore. Available:
http://choo.fis.utoronto.ca/fis/respub/dlc95.html - CHOO, C. W. (1995). Information Management for the Intelligent
Organization: The Art of Scanning the Environment. Medford, NJ: Information Today.
35
  KIRTON, J.- BARHAM, L. (2005) Information Literacy in the Workplace. The Australian Library Journal, 54(4)
p.365-376




EMPATIC WP1/D1.1                                                                                        Page 25 of 77
with it in their everyday work (De Ruiter 2002; O'Sullivan 2002; Rader 2002; Winterman, Skelton
         and Abell 2003).

In their review of the specialised literature, Kirton and Barham also cites the work from Cheuk
to underline that:

         [....] Cheuk's UNESCO White Paper (2002) provides examples of the lack of information literacy
         skills in the workplace and how this affects the productivity of employees, suggests practices to
         improve performance and discusses the barriers to promoting information literacy in the workplace
         and how to overcome these, as well as the relationship between knowledge management and
         information literacy.

Even the term “Information Literacy” is not used in the workplace where

         Synonyms such as 'working smarter', 'information skills', 'information resources training',
         'information discovery', and 'information management' have been used. (Kirton-Bahram, 2005)

Surprisingly, the analysis by Kirton and Bahram does not include the concept of
“environmental scanning”, namely representing the need for a company to compete within a
market context which must be known to the company.


Moreover, a major point arising from the Kirton- Bahram analysis is the character of
complexity that IL assumes into the context of the knowledge (or intelligent) organisation:

         Winterman, Skelton and Abell (2003) also identified barriers to the development of such programs
         in the workplace. They found that the scope and content of the concept was not well defined or
         detailed, with the degree of agreement as to exactly what skills were relevant and which levels of
         these were needed varying widely between organisations.

         [....]

         Bawden and Robinson (2002) found that information literacy must be contextualised, relevantly
         illustrated, and presented in ways reflecting the needs of the range of learners found in the
         individual workplace.



A meaningful initiative for IL in vocational education is the SCANS report, produced by the
Secretary's Commission on Achieving Necessary Skills (SCANS) – a commission appointed in
1990 by the Secretary of Labour of the US Department of Labour, to determine the skills our
young people need to succeed in the world of work.
The commission's fundamental purpose was to encourage a high-performance economy
characterized by high-skill, high-wage employment. Although the commission completed its
work in 1992, its findings and recommendations continue to be a valuable source of
information for individuals and organizations involved in education and workforce
development..36
Table 1 below illustrates the set of skills for job identified by the SCAN commission.




36
     http://wdr.doleta.gov/SCANS/




EMPATIC WP1/D1.1                                                                                      Page 26 of 77
SCANS Competencies
      Resources                        Allocates Time
                                       Allocates Money
                                       Allocates Material and Facility Resources
                                       Allocates Human Resources


      Information                      Acquires and Evaluates Information
                                       Organizes and Maintains Information
                                       Interprets and Communicates Information
                                       Uses Computers to Process Information


      Interpersonal                    Participates as a Member of a Team
                                       Teaches Others
                                       Serves Clients/Customers
                                       Exercises Leadership
                                       Negotiates to Arrive at a Decision
                                       Works with Cultural Diversity


      Systems                          Understands Systems
                                       Monitors and Corrects Performance
                                       Improves and Designs Systems


      Technology                       Selects Technology
                                       Applies Technology to Task
                                       Maintains and Troubleshoots Technology
                  Tab. 1 - Skills and Tasks for Jobs: A SCANS Report for America 200037


The SCANS Report is of particular interest for the goals of the EMPATIC project , since it
constitutes a gateway between school learning and workplace efficiency. Therefore, the SCANS
Report will be object of further analysis by WP-4 of EMPATIC.


1.3.4 IL in Lifelong Learning: relevant developments
In § 1.1 of this section the connection between IL and LLL has been already pointed out.
Nevertheless, here it is important to recall that in 2006 the European Union recommends that
Member States develop the provision of key competencies and use the ‘Key Competences
for Lifelong Learning — A European Reference Framework’, that defines the set of key
competences described in fig.15 below.




37
     What Work Requires of Schools: A SCANS Report for America 2000, U.S. Department of Labour, June 1991




EMPATIC WP1/D1.1                                                                                Page 27 of 77
Key Competences
Competences are defined here as a combination of knowledge, skills and attitudes appropriate
to the context. Key competences are those which all individuals need for personal fulfilment
and development, active citizenship, social inclusion and employment.
The Reference Framework sets out eight key competences:
1) Communication in the mother tongue;
2) Communication in foreign languages;
3) Mathematical competence and basic competences in science and technology;
4) Digital competence;
5) Learning to learn;
6) Social and civic competences;
7) Sense of initiative and entrepreneurship; and
8) Cultural awareness and expression.
The key competences are all considered equally important, because each of them can
contribute to a successful life in a knowledge society. Many of the competences overlap and
interlock: aspects essential to one domain will support competence in another. Competence in
the fundamental basic skills of language, literacy, numeracy and in information and
communication technologies (ICT) is an essential foundation for learning, and learning to learn
supports all learning activities. There are a number of themes that are applied throughout the
Reference Framework: critical thinking, creativity, initiative, problem solving, risk assessment,
decision taking, and constructive management of feelings play a role in all eight key
competences38.
     Fig. 15 - Key Competences for Lifelong Learning — A European Reference Framework


Compared with the set of competencies in fig.15, IL includes those shown in bold, in such
confirming how deeply related are IL and LLL, de facto, even if not explicitly declared.




38
     (30.12.2006 EN Official Journal of the European Union L                394/13)   Available:   http://eur-
lex.europa.eu/LexUriServ/LexUriServ.do?uri=OJ:L:2006:394:0010:0018:en:PDF




EMPATIC WP1/D1.1                                                                          Page 28 of 77
SECTION 2: BEST PRACTICES IDENTIFICATION

The earlier and most diffused IL initiatives are those developed in the US since 1989 and in the
Australian and new Zealand (ANZ) area since 1999. Both in US and ANZ, in fact, a widespread
recognition of the IL importance gave rise to national policies aimed at setting coherent and
enabling contexts for IL developments.
On the contrary, Europe has not yet matured the awareness of the role that IL can assume,
independently – even if in synergy – from other literacies, such as computer literacy or digital
literacy or media literacy.
As a consequence of being a neglected policy issue, European IL initiatives have been
developed in a fragmented and episodic manner (Basili, 2003)39. This recognition was the
rationale behind the launch in 2003 of the European network on Information Literacy (EnIL),
aimed at both setting a common research agenda among IL researchers in Europe and
diffusion a Culture of Information in Europe40.
A more detailed comparison of the European situation with respect to US and ANZ will be part
of the Empatic final report, aimed at streaming the IL issue within the attention of policy
makers.
In view of the above, his section of the report is aimed at pursuing both the following tasks:
-      providing a first systematically gathered information about how the EU funding activities
       have been addressed IL;
-      collecting a set of best practices to be further analysed by the next phases of the Empatic
       project.


2.1 Methodology

The process of collecting data on IL initiatives have taken into account the nature of the
Empatic project as an action transversal to all the four areas of the EU Lifelong Learning
programme (Erasmus, Comenius, Grundtvig, Leonardo) segmented by educational level
(university, school, adult and vocational). Therefore, a first step has been to analyse the
databases of EU funded projects, and more specifically, the following sources:
ADAM (Advanced Data Archive and Management System) - Leonardo da Vinci Projects and
Products Portal
http://www.adam-europe.eu/adam/homepageView.htm


ISOC - SOCRATES Projects Database (until 2004 )
http://www.isoc.siu.no/isocii.nsf

CORDIS - Community Research and Development Information Service
http://cordis.europa.eu/

These were the natural source of information, but the project also gathered information on
other projects funded in a range of programmes such as FP3-FP7, ESF, etc. .

39
  Basili, C. (ed.). (2003). Information literacy in Europe. A first insight into the state of the art of information literacy
in the European Union. Roma: Consiglio Nazionale delle Ricerche
40
     http://www.ceris.cnr.it/Basili/EnIL/index.html




EMPATIC WP1/D1.1                                                                                         Page 29 of 77
The national initiatives have been derived mainly from:
The European Observatory on IL Policies and Research
http://www.ceris.cnr.it/Basili/EnIL/gateway/gatewayhome.htm
a source produced by the CNR-Ceris within the research activities of the European network on
Information Literacy.
The EnIL Observatory covers a set of European countries41, and therefore the Empatic list of
best practices concentrates on the 10 countries there represented: Austria, Denmark, Estonia,
Finland, Germany, Italy, Latvia, Lithuania, Poland, and Spain. UK initiatives have been chosen
based on their meaningfulness, while the Turkish and Polish initiatives have been identified,
respectively, by Jagu and TDK Empatic partners.
Besides these intrinsic project constraints, a set of representation criteria were identified in the
Empatic’s desk research work package. The guiding logic was to represent each initiative
through a set of attributes which will be functional to the next steps, and – more specifically –
to the activities concerning the analysis of best practices and the formulation of policy
recommendations.


The representation criteria identified are listed and described in the figure below.




41
 The European Observatory on IL Policies and Research
Available: http://www.ceris.cnr.it/Basili/EnIL/gatewayhome.htm




EMPATIC WP1/D1.1                                                                    Page 30 of 77
Identification attributes:               name of the initiative, acronym, URL, Leader
                                         institution, contacts;
Country:                                 the one of the coordinator if a multinational
                                         initiative;
Leader institution                       Government/Parliament, Ministry, National
typology:                                Authority/Committee, Local Authority/Committee,
                                         University, Department, Research Institution,
                                         Professional Body,
                                         International organisation, NGO
Kind of initiative:                      policy, position & recommendations, strategy,
                                         R&D project, survey,
                                         resource(s)/tool(s) for learners/teachers/users,
                                         curriculum,
                                         promotion/support/awareness/debate/culture
EU frame:                                COMENIUS, ERASMUS, GRUNDTVIG, LEONARDO,
                                         MINERVA, Transversal,
                                         FP3, FP4, FP7 / FP6,
                                         European Structural Funds,
                                         National, EU, International.
Context or main focus:                   Information Literacy,
                                         Media Literacy,
                                         Digital Literacy,
                                         Information/Digital Literacy, Information/Media
                                         Literacy, Digital/Media Literacy,
                                         Science Literacy,
                                         Statistical Literacy
Target community:                        Schools, HE, Adults, VET,
                                         mixed (the target community can be larger with
                                         respect to the LLL frame (COMENIUS, ERASMUS,
                                         GRUNDTVIG, LEONARDO);
Start date :                             this field is not always available, but it is meaningful
                                         in order to understand how timely the leader
                                         institution realised the importance of IL.
                      Fig. 16- representation format of IL best-practices




.




EMPATIC WP1/D1.1                                                                  Page 31 of 77
2.2 List of initial 87 potential initiatives for good practice selection

      Below are listed the 87 initiatives identified, from which 20 will be selected as good practice cases for deeper analysis in the next phases of
      Empatic
Initiative short Initiative full name             Author /                        Contact(s)                    Country   Launch    End      Initiative     Target
    name or                                   Coordinator name                                                             year     year       frame      Sector(s) /
   acronym                                                                                                                                                Segment(s)
ALCE             ALCE Animation for          Fundación Tomillo     capto@tomillo.es - Luis RUIZ DEL ÁRBOL T      Spain     1998     1999     COMENIUS       Schools
                 reading and                 Capto - Centro de     +34.915.61.16.03 F +34 915 63 97 84
                 comprehension at            Actividades
                 school                      Pedagógicas, Spain
Alfin-EEES       Alfin-EEES - Skills and     Universidad de        María Pinto Molina Tel.: 34 958 243 933       Spain    2006     ongoing    National        HE
                 competencies in             Granada. Facultad     Fax: 34 958 243 490
                 information                 Biblioteconomía y
                 management for              Documentación,
                 learning to learn within    Spain
                 European Higher
                 Education


CHILIAS          Children in Libraries:      Stuttgart City Library, Ingrid BUSSMANN Tel:+49-711-               Germany    1996     1998        FP4         Schools
                 improving multimedia        Germany                 2165710/5730 Fax:+49-711-2165701
                 virtual library access
                 and information skills
CIL              CIL: basic IL tutorial of   CIB - Inter Library   Alina Renditiso                               Italy              Latest    National       users
                 the CIB- Inter Library      Centre, University    Department of Education Sciences - Library                      ed 2009
                 Centre, University          Libraries System of   Tel. 051 20 98540
                 Libraries System of         Alma Mater
                 Bologna University          Studiorum, Bologna
                                             University
Initiative short Initiative full name           Author /                           Contact(s)                    Country     Launch    End      Initiative      Target
    name or                                 Coordinator name                                                                  year     year       frame       Sector(s) /
   acronym                                                                                                                                                    Segment(s)
Compulsory       Compulsory schooling Ministry of Public           Ministero della Pubblica Istruzione - Viale     Italy      2007    ongoing    National       Schools
schooling        obligation until the age Education, Italy         Trastevere, 76/A 00153 Rome Italy - Tel.:
obligation until of 16 years: the new                              06 5849.1
the age of 16    key competences -
years: the new Synthesis of the Italian
key competences Minister of Public
                 Education's speech
                 (Original in Italian)
DEDICATE         Distance Education        Chalmers University     Nancy FJÄLLBRANT Tel:+46-31-7723754           Sweden       1997     1998        FP4           VET
                 Information Courses       of Technology,          Fax:+46-31-168494
                 through Networks          Sweden
DELCIS           Distance Education for    Vilnius University,     audra.glosiene@kv.vu.lt                       Lithuania    2000     2002     LEONARDO         VET
                 Librarians; Creating an   Department of
                 Information-Competent     Communication,
                 Society                   Lithuania
Diliweb          Diliweb - The shortest    The University of Le    Pierre-Yves Cachard pierre-                    France      2000    ongoing International       HE
                 way to the Net            Havre                   yves.cachard@univ-lehavre.fr
The DOTEINE      The DOTEINE research Library & Information        Miguel Ángel Marzal García-Quismondo           Spain       2003    ongoing    National         HE
research group   group                Science Department -         (Director) - Professor at the Library &
                                      Carlos III University        Information Science Department of the
                                      of Madrid                    Carlos III University of Madrid - Tel.: 91-
                                                                   6249219 91-8561251
The DOTEINE      Documentation and         Library & Information   Miguel Ángel Marzal García-Quismondo           Spain       2003     2006      National         HE
project          information               Science Department -    (Director) - Professor at the Library &
                 technologies for          Carlos III University   Information Science Department of the
                 education:                of Madrid               Carlos III University of Madrid - Tel.: 91-
                 instruments for                                   6249219        91-8561251
                 information literacy
                 and the organization of
                 educational resources




    EMPATIC WP1/D1.1                                                                                                                                Page 33 of 77
Initiative short Initiative full name           Author /                          Contact(s)                   Country        Launch    End    Initiative      Target
    name or                                 Coordinator name                                                                   year     year     frame       Sector(s) /
   acronym                                                                                                                                                   Segment(s)
E-learning and    E-learning and           Department of          Luciano Galliani (course director) Tel.         Italy        2004     2005    National        VET
Integrated        Integrated Education     Education Sciences     049/8278956
Education                                  Faculty of Education   Alessandra Dal Corso (organizational
                                           Sciences, University   secretary) Tel. 049/8278964
                                           of Padua
E-meryt           E-meryt - programme      LUTW - the Lodz Third emeryt@eduplatforma.pl; Error!                  Poland        2009     2009      ESF          Adults
                  for social integration   Age University        Hyperlink reference not valid.
                  and e-inclusion of
                  people 50+
EDUCATE           End-user courses in   University of             Patrick KELLY Tel:+353-61-333644              Ireland        1994     1997      FP3            HE
                  information access    Limerick, Ireland         Fax:+353-61-338044
                  through communication
                  technology
Educational       Educational Psychology Library of the Faculty Michaela Zemanek (Head)                         Austria        2005     2005    National         HE
Psychology        proseminars:           of Psychology -        Tel.: +43(1) 4277-16830
proseminars:      Information Literacy   Vienna                 Fax: +43(1) 4277-16839
Information
Literacy
EEE-European      EEE-European methods Zespó! Szkol nr 24      s.bryla@wsisz.edu.pl; person: Ewa                 Poland        2004    2005    COMENIUS        Schools
methods of e-     of e-teaching and e- im. prof. S. Bryly, ul. Gutowska
teaching and e-   learning             Ks. Janusza 45/4
learning                               Warszawa
ENTITLE           Europe’s New libraries   MDR Partners           www.entitlelll.eu                           international    2008     2009   Transversal    common
                  Together In
                  Transversal Learning
                  Environments
EU Media Trainer EU Media Trainer          Bürgermedienzentrum benno@muenster.de                               Germany         2003     2005   LEONARDO         VET
                                           Bennohaus, Germany
EU-Trainer for    EU-Trainer for ICT- and Bürgerhaus              Benedikt Althoff Tel.: ++49 (0)251 609673    Germany         2008    ongoing LEONARDO         VET
ICT- and Media    Media competencies      Bennohaus -             Fax: ++49 (0)251 6096777 -
competencies                              Arbeitskreis Ostviertel benalthoff@bennohaus.info
                                          e.V., Germany




    EMPATIC WP1/D1.1                                                                                                                               Page 34 of 77
Initiative short Initiative full name             Author /                           Contact(s)             Country    Launch    End       Initiative       Target
    name or                                   Coordinator name                                                          year     year        frame        Sector(s) /
   acronym                                                                                                                                                Segment(s)
The Evaluation     The Evaluation of the   Ba"aran, M.                                                       Turkey     2005    2005        National         VET
of the             Information Literacy of
Information        the Candidate Teachers
Literacy of the    in Primary Schools
Candidate
Teachers in
Primary Schools
FORM-IT            Form - it "Take part in Austrian Institute for Marie Céline LOIBL Tel:+43-1/523610529     Austria    2006     2008      FP7 / FP6         VET
                   research"               Applied Ecology,       Fax:+43-1-5235843
                                           Austria
From               II. National School       Özel Üsküdar                                                    Turkey     2009    2009        National         VET
Information        Librarians' Conference:   American High
Literacy to Life   From Information          School, #stanbul
Long Learning      Literacy to Life Long     School Librarians'
II. National       Learning                  Group, Türkish
School                                       Librarians' Association
Librarians'
Conference:
Global             A Global Imperative - The New Media                 t 512 445-4200 f 512 445-4205;      International 2004    2005     International    common
Imperative         The Report of the 21st Consortium                   www.nmc.org
                   Century Literary
                   Summit
The Google         The Google Generation JISC - Joint        ma-publishing@ucl.ac.uk                         United     2007     2007       National         VET
Generation                               Information Systems                                                Kingdom
                                         Committee; BL -
                                         British Library
Handbook for    Handbook for                 Cardiff University        morgannj@cardiff.ac.uk                United     2005    ongoing     National         VET
Information     Information Literacy                                                                        Kingdom
Literacy        Teaching (HILT)
Teaching (HILT)




    EMPATIC WP1/D1.1                                                                                                                           Page 35 of 77
Initiative short Initiative full name            Author /                            Contact(s)               Country   Launch   End    Initiative     Target
    name or                                  Coordinator name                                                            year    year     frame      Sector(s) /
   acronym                                                                                                                                           Segment(s)
HERON - Adults      HERON - Adults          The Institute of Adult   http://www.emil-network.eu/res/          Greece     2005    2008                  Adults
Training on basic   Training on basic       Life Long Learning       documents/resource/HERON%20-%20Adults%
knowledge and       knowledge and skills in (IDEKE), which
                                                                     20Training%20on%20Basic%
skills in New       New Technologies        belongs to the
Technologies                                General Secretariat of   20Knowledge%20and%20Skills%20in%
                                            Life Long Learning       20New%20Technologies.pdf
                                            (GGDVM).

HÜBO                Hacettepe Üniversity    Hacettepe University - http://www.bby.hacettepe.edu.tr/           Turkey     2010            National     common
                    Information Literacy    Department of         eng/yandaleng.asp
                    Program                 Information
                                            Management -
                                            Education Faculty
I Curriculum -      I Curriculum - The       Foundation for        katerina@iacm.forth.gr                     Greece     2002    2004    MINERVA      common
The Knowledge       Knowledge and            Research and
and Information     Information Skills       Technology - Hellas -
Skills needed for   needed for living in the Institute of Applied
living in the       Digital Age              and Computational
Digital Age                                  Mathematics (IACM),
                                             Greece
ICT as a tool to    ICT as a tool to       Fullness-of-Life     biuro@apz.org.pl; tel. +48 12 294-81-35,      Poland     2008    2010   GRUNDTVIG      Adults
activate seniors    activate seniors       Academy Association, tel./fax +48 12 294-81-36
education           education and their    Poland, Krakow
                    personal development -
                    exchanging
                    experiences, ideas and
                    good practices
ILIPG               Innovative Library      #stanbul Technical       http://www.library.itu.edu.tr/           Turkey     2007    2009    National     common
                    Initiatives Promotion   University - Library     ilipg/pt03_uyeler.html
                    Group                   and Documentation
                                            Branch




    EMPATIC WP1/D1.1                                                                                                                        Page 36 of 77
Initiative short Initiative full name             Author /                           Contact(s)                    Country     Launch    End       Initiative       Target
    name or                                   Coordinator name                                                                  year     year        frame        Sector(s) /
   acronym                                                                                                                                                        Segment(s)
Improvement of      Improvement of the       Raziye Demiralay;      raziyedemiralay@gmail.com;                      Turkey      2008    ongoing     National        Schools
the information     information literacy for $irin Karadeniz        sirin.karadeniz@bahcesehir.edu.tr
literacy for Life   Life Long Learning in
Long Learning in    Primary School
Primary School
Information For Information For All          UNESCO                 b.radoykov@unesco.org;                        International 2000    ongoing International      common
All Programme - Programme - IFAP                                    mc.botte@unesco.org
IFAP
Information         Information Literacy     Aberdeen Business      international@rgu.ac.uk                         United              ongoing     National          HE
Literacy                                     School - Robert                                                       Kingdom
                                             Gordon University
Information         Information Literacy     Serkan KOÇ; Özgün       ozgun.kosaner@deu.edu.tr                       Turkey      2005    ongoing     National          HE
Literacy and        and Active Education:    Ko"aner
Active              A Practice Model
Education: A
Practice Model
Information         Information literacy     Kaunas University of   Gene Duobiniene (Director)                     Lithuania    1999     2003     International       HE
literacy courses    courses at the Library   Technology. The        tel. 300650, tel./fax. +370-37-323590
                    of the Kaunas            Library                Vanda Dovydaityte (Deputy director)
                    University of                                   tel. +370-37-300651
                    Technology
Information         Information Literacy     University of Helsinki, Kaisa Sinikara - Director of Library and       Finland     2004     2006       National          HE
Literacy            Curriculum Project       Finland                 Information Services Development,
Curriculum          2004-2006                                        University of Helsinki - P.O. Box 33 - FI-
Project 2004-                                                        00014
2006
Information         Information Literacy-    University of        http://www.lib.uom.gr/index.php?lang=utf-         Greece      1999    ongoing     National          HE
Literacy-           Educational Seminars     Macedonia -Library & 8
Educational                                  Information Center
Seminars




    EMPATIC WP1/D1.1                                                                                                                                   Page 37 of 77
Initiative short Initiative full name              Author /                         Contact(s)                Country     Launch    End       Initiative       Target
    name or                                    Coordinator name                                                            year     year        frame        Sector(s) /
   acronym                                                                                                                                                   Segment(s)
Information     Information Literacy          NUI Galway, Trinity   Isolde Harpur, Trinity College Library     Ireland             ongoing     National          HE
Literacy module module                        College Dublin and    Dublin
                                              University College
                                              Cork
Information        Information Literacy for Evgenidis Foundation- lib@eugenfound.edu.gr                        Greece                          National         VET
Literacy for       Teachers                 Library
Teachers
Information        Information literacy       Staffordshire         3800@staffs.ac.uk                          United              ongoing     National          HE
Literacy Project   project                    University                                                      Kingdom
Information        Information literacy      Glasgow Caledonian     J.Crawford@gcal.ac.uk;                     United      2004     2008       National        Schools
literacy skills    skills - the link between University (GCU)       christine.irving@gcal.ac.uk               Kingdom
                   secondary and tertiary
                   education
Informatyka+       Informatyka+: the          Wy%sza Szko!a         Project's office – Wy%sza Szko!a           Poland      2008     2012       National        Schools
                   interregional              Informatyki (The      Informatyki, Lewartowskiego St. / 17 0-
                   programme for the          Academy of            169 Warsaw / Poland
                   development of the         Informatics) in
                   secondary school           Warsaw
                   students' qualifications
                   in Information
                   Communication
                   Technology
ISIC 2008          Information Seeking in Vilnius University.       Dr. Erika Jani&nien' (contact person)     Lithuania    2008     2008     International       HE
                   Context (ISIC) 2008    Faculty of                tel. +370 5 2366119
                                          Communication.
                                          Department of
                                          Information and
                                          Communication
Learning by      Learning by doing: ICT Szkola Podstawowa   sp31_dabrowa@poczta.onet.pl, person:               Poland      2005     2006     COMENIUS          Schools
doing: ICT since since early years      Nr 31, Aleja        Miroslaw Pyplacz
early years                             Zwyci(stwa, Dabrowa
                                        Gornicza-Zabkowice




     EMPATIC WP1/D1.1                                                                                                                             Page 38 of 77
Initiative short Initiative full name          Author /                          Contact(s)                  Country     Launch    End      Initiative     Target
    name or                                Coordinator name                                                               year     year       frame      Sector(s) /
   acronym                                                                                                                                               Segment(s)
Learning Objects Learning Objects Web     Aalborg University     Niels Jørgen Blaabjerg, Tel.: 9635 7304     Denmark      2006    ongoing    National        HE
Web                                       Library - Aalborg      njb@aub.aau.dk
Library -        Library - community      Lithuanian Regional    Antanas Alvikas (Director)                  Lithuania    2003     2004        EU           VET
community        public information       Research Institute,    Drs. Jurga Bu)ait' (Project manager)
public           centre                   Kaunas                 Edita Naujokaityt' (Project manager)
information
centre
MA in            MA in Information        University of Sheffield s.webber@sheffield.ac.uk                    United     2010     ongoing    National        HE
Information      Literacy                                                                                    Kingdom
Literacy
Medienpass       (Media portfolio:        Technische             antje.neuhoff@tu-dresden.de                 Germany      2006    ongoing LEONARDO          VET
                 blended learning         Universität Dresden,
                 course on media          Lehrzentrum
                 literacy for language    Sprachen und
                 teachers)                Kulturen, Germany
Mile             Mile - Model for         Aalborg University     njb@aub.auc.dk                              Denmark      1999     2001      National        HE
                 information literacy     Library, Denmark
                 education
The multimedia   Project: the multimedia Federal Ministry for    Prof. Mag. Werner Schöggl (Project co-       Austria             ongoing    National      Schools
school library   school library          Education, the Arts     ordination)
                                         and Culture (BMUKK)     Service centre for school libraries - AHS
                                         Vienna                  Vienna
                                                                 Tel. 43-1/ 523 62 22 - 93278
                                                                 Fax 43-1/523 62 22 99 93 210
Net              Net Communication for    Faculty of Education   Prof. Francesco Susi (Dean)                   Italy      2006               National        HE
Communication    Learning                 Sciences               Tel.: 06 49229323
for Learning     Course for students of   "Roma Tre"             Fax: 06 4463722
                 Pedagogical Sciences     University, Rome
                 (Master's Degree)




       EMPATIC WP1/D1.1                                                                                                                         Page 39 of 77
Initiative short Initiative full name         Author /                            Contact(s)                    Country    Launch    End      Initiative     Target
    name or                               Coordinator name                                                                  year     year       frame      Sector(s) /
   acronym                                                                                                                                                 Segment(s)
"ORION"           Reference Services,    Library of A.T.E.I. of   library@lib.teithe.gr                          Greece             ongoing    National       VET
Information       "ORION" Information    Thessaloniki
Literacy Tutorial Literacy Tutorial
Reference
Services,
Project IL I /   Information Literacy  The Library of the         Oliver Kohl-Frey - Tel.:++49 - (0)7531 -      Germany     2003     2005      National        HE
Projekt IK I     Project I (IL I) /    University of              88 - 2835 - Fax: ++49 - (0)7531 - 88 -
                 Projekt               Konstanz, Germany          3082
                 Informationskompetenz
                 I
Project          Joint Project on        The Library of the       Bernd Schmid-Ruhe Tel:                        Germany     2005     2007      National        HE
Information      Comparative Research University of               ++49/(0)7531/88-2804 - Fax:
Literacy II      in Information Literacy Konstanz, Germany        ++49/(0)7531/88-3082
                 for advanced students
                 and staff members
PUZZLE           Increasing and          Chambre de               Cchretien-petiot@ccip.fr - Tel.: 33 1 55 65    France     2001     2004     GRUNDTVIG       VET
                 supporting the          Commerce et              67 90 - Fax: 33 1 55 65 66 94
                 individual demand for   d'Industrie de Paris
                 education in the
                 Information Society
Recommendation Recommendation of         European    Parliament   Tel.: (32-2) 281 61 11 - Fax: (32-2) 281      European    2006                 EU          Schools
of the European the European             & Council   of the       69 34                                          Union
Parliament and Parliament and of the     European    Union,
of the Council of Council of 18          European    Union
18 December       December 2006 on key
2006 on key       competences for
competences for lifelong learning
lifelong learning




     EMPATIC WP1/D1.1                                                                                                                             Page 40 of 77
Initiative short Initiative full name              Author /                           Contact(s)                  Country   Launch    End      Initiative     Target
    name or                                    Coordinator name                                                              year     year       frame      Sector(s) /
   acronym                                                                                                                                                  Segment(s)
Recommendation Recommendation for       University of Helsinki, Anne Lehto tel (09) 191 23958                     Finland    2004               National        HE
for universities universities for       Finland
for including    including information
information      literacy competency in
literacy         the new degree
competency in    structures
the new degree
structures
Regional Public Regional Public Library Hacettepe University i                                                    Turkey     2002 ongoing       National       VET
Library Seminars Seminars               Prof. Dr. Bülent
                                        Yılmaz
Retrieving and     Accéder à l'information    Institut Universitaire   anne.piponnier@aquitaine.iufm.fr Tel.      France     2000     2003     COMENIUS        VET
accessing          scientifique et            de Formation des         +33.5.56.12.67.68 Fax: +33 5 56 12 67 99
scientific and     technique (=Retrieving     Maitres d'Aquitaine
technical          and accessing scientific   "Academie de
information        and technical              Bordeaux"
                   information)
SAPRISTI!          SAPRISTI! – Access        Doc’Insa Lyon             Monique Joly monique.joly@insa-lyon.fr     France     1996    ongoing    National        HE
                   paths and tracks to
                   search for scientific and
                   technical information
                   on the Internet
School-            School-documentalist       Department of            Prof. Donatella Lombello                    Italy     2005     2006      National       VET
documentalist      teacher training (AY       Education Sciences       (course director)
teacher training   2005-2006): distance       Faculty of Education
                   course                     Sciences, University
                                              of Padua
The School on      The School on the Net      Faculty of Education     Ornella Martini                             Italy     2005    ongoing    National       VET
the Net                                       Sciences                 Tel.: 06 49229247
                                              "Roma Tre"               Fax: 06 491627
                                              University, Rome




    EMPATIC WP1/D1.1                                                                                                                               Page 41 of 77
Initiative short Initiative full name              Author /                           Contact(s)                  Country    Launch    End       Initiative     Target
    name or                                    Coordinator name                                                               year     year        frame      Sector(s) /
   acronym                                                                                                                                                    Segment(s)
Searching for       Searching for and       “E. Fermi” Technical      Prof. Roberto Cadonici (coordinator)          Italy     2000    ongoing     National      Schools
and processing      processing information High School for            Tel. 39-573-452638
information - A     - A high school project Surveyors - Pistoia
high school
project
SEEKS - Adult       SEEKS - Adult             MANCHESTER              b.jones-2@umist.ac.uk - Telephone +00 44     United     2001     2003      MINERVA         VET
Information         Information Seeking       METROPOLITAN            161 275 7255 - Fax +00 44 161 200 3505      Kingdom
Seeking             Strategies in the         UNIVERSITY, UK
Strategies in the   Information Society
Information
Society
Sieciaki.pl         Sieciaki.pl – get to      Fundacja Dzieci      marcin.solodki@fdn.pl,                          Poland     2005      ---     National        Schools
                    know the safe side of     Niczyje (Nobody's    katarzyna.zygmunt@fdn.pl.
                    the internet              Children Foundation)
SLAM                SLAM - School Libraries PEDAGOGISK SENTER Per FAGERLAND tel.: +47 52811445 fax:                Norway     1999     2000      MINERVA         VET
                    as Multimedia Centres - KARMØY KOMMUNE +47 52855327 -
                                            - SKOLE- OG       per.fagerland@karmoyped.no
                                            KULTURETATEN,
                                            Norway
Statistical         International Statistical International           reija.helenius@stat.fi                     International 1994   ongoing International    common
Literacy            Literacy Project          Statistical Institute
A Study on          A Study on Equipping      Serap Kurbano*lu;       serap@hacettepe.edu.tr                       Turkey     2001     2002       National      Schools
Equipping           Students with             Buket Akkoyunlu         buket@hacettepe.edu.tr
Students with       Information Literacy
Information         Skills
Literacy Skills
Study and          Study and information University of Ioannina library@uoi.gr                                     Greece                         National        HE
information skills skills                - Central Library
SWIM                SWIM - Streaming     Aalborg University           Maj Rosenstand                              Denmark     2001     2003       National        HE
                    Webbased Information Library - Aalborg            Tel.: 9635 9349
                    Modules                                           Niels Jørgen Blåbjerg
                                                                      Tel.: 9635 7304




     EMPATIC WP1/D1.1                                                                                                                                Page 42 of 77
Initiative short Initiative full name            Author /                          Contact(s)                 Country       Launch    End     Initiative       Target
    name or                                  Coordinator name                                                                year     year      frame        Sector(s) /
   acronym                                                                                                                                                   Segment(s)
SWIM tutorial       SWIM - information      Aalborg University      Maj Rosenstand                           Denmark         2001     2003     National          HE
                    search strategy         Library - Aalborg       Tel.: 9635 9349
                                                                    Niels Jørgen Blåbjerg
                                                                    Tel.: 9635 7304
Szkolenia - to si( Database of training     PARP - the Polish     biuro@parp.gov.pl; www.parp.gov.pl;          Poland        2010     2011       ESF            VET
op!aca             offers                   Agency for Enterprise phone +48 22 432 80 80, +48 22 432 71
                                            Development           25
Television News     Television News on      KULTURRING IN           Armin HOTTMANN Email                     Germany         1999     2002    COMENIUS         Schools
on Europe -         Europe - Project on     BERLIN E.V. -           LuArmHott@gmx.de T +49.30.513.97.49 F
Project on media    media education for     Kulturring Institute,   +49 30 513 97 55
education for       compulsory schools in   Germany
compulsory          Europe
schools in
Europe
UNESCO          Information and Media UNESCO                        aw.khan@unesco.org                      International            ongoing International    common
Information and Literacy
Media Literacy
UNESCO              The 2003 International UNESCO                   aw.khan@unesco.org                      International 2003        2003   International    common
International       Conference of
Conference          Information Literacy
Information         Experts - Prague
Literacy
UNESCO              The 2005 High-Level     UNESCO, NFIL, IFLA      aw.khan@unesco.org                      International 2005        2005   International    common
International       International
Colloquium          Colloquium on
Information         Information Literacy
Literacy and        and Lifelong Learning
Lifelong Learning




    EMPATIC WP1/D1.1                                                                                                                              Page 43 of 77
Initiative short Initiative full name           Author /                         Contact(s)    Country    Launch    End       Initiative       Target
    name or                                 Coordinator name                                               year     year        frame        Sector(s) /
   acronym                                                                                                                                   Segment(s)
UNESCO           Teacher-Training        UNESCO                  aw.khan@unesco.org           International 2008   ongoing International        VET
Teacher-Training Curricula for Media and
Curricula for    Information Literacy
Media and
Information
Literacy
UNESCO           Training of Information UNESCO                  aw.khan@unesco.org           International 2002    2009     International      VET
Training of      Professionals
Information
Professionals
UNESCO           Training-the-Trainers in UNESCO                 aw.khan@unesco.org           International 2007    2009     International      VET
Training-the-    Information Literacy
Trainers in
Information
Literacy
UNESCO            Training of Media        UNESCO                aw.khan@unesco.org           International 2002   ongoing International        VET
Training of Media Professionals
Professionals
University of    User's Training           Library and           info@library.tuc.gr            Greece             ongoing     National          HE
Crete: User's                              Information Center of
Training                                   the Technical
                                           University of Crete
University of    Training & Information Library & Information mbal@lib.uth.gr                   Greece             ongoing     National         VET
Thessaly:        Support                Center - University of
Training &                              Thessaly
Information
Support
Using the         Using the Internet for   Department of         Ari Haasio                     Finland            ongoing     National       common
Internet for Non- Non-work Information     Information Studies
work Information Seeking                   Tampere University
Seeking




    EMPATIC WP1/D1.1                                                                                                              Page 44 of 77
Initiative short Initiative full name           Author /                          Contact(s)                  Country   Launch    End      Initiative     Target
    name or                                 Coordinator name                                                             year     year       frame      Sector(s) /
   acronym                                                                                                                                              Segment(s)
Value of data     The value of data: to    ISTAT                 ilvaloredeidati@istat.it                      Italy     2002    ongoing    National      Schools
                  know more, to decide
                  better
VERITY            Virtual and Electronic   University of         Jo AITKINS Tel:+44-191-5153915                United    1998     2000        FP4         Schools
                  Resources for            Sunderland, UK        Fax:+44-191-5152904                          Kingdom
                  Information skills
                  Training
Web-Seal          Web Searching,           University of Tampere Eero Sormunen tel. +358-03-3551 6972         Finland    2006     2009      National        HE
                  Information Literacy     - Department of       (office) tel. +358-50-362 8781 (mobile)
                  and Learning (Web-       Information Studies,
                  SeaL)                    Finland
wkluczamy.PL      wkluczamy.PL ("self e- Association "Silesian   stowarzyszenie@galeriaidei.pl; tel. +48 32   Poland     2009    ongoing   Regional       Adults
                  inclusion"), the        Gallery of Ideas"      276 42 20; tel. gsm +48 604 476 069;
                  initiative to "upgrade"                        www.galeriaidei.pl
                  50+ Silesians in the
                  information society
The working       The working group      Federal Ministry for    Werner Schöggl (co-ordinator)                Austria                       National      Schools
group "The        "The multimedia school Education, the Arts     Service centre for school libraries - AHS
multimedia        library"               and Culture (BMUKK)     Vienna
school library"                          Vienna                  Tel. 43-1/ 523 62 22 - 93278
                                                                 FAX 43-1/523 62 22 99 93 210




    EMPATIC WP1/D1.1                                                                                                                           Page 45 of 77
2.3 Data clustering and analysis

A first analysis based on those single attributes give rises to the following results (see graphs 1
to 8).



          ESF                               2



          EU                                2



     FP7 / FP6                1



          FP4                                             3



          FP3                 1



    MINERVA                                               3



  LEONARDO                                                              4



 GRUNDTVIG                                  2



   COMENIUS                                                                           5


                 0        1             2             3             4             5                 6




                       Graph. 1 - IL initiatives by EU funding Programme




EMPATIC WP1/D1.1                                                                          Page 46 of 77
Graph. 2 - IL initiatives by institution




EMPATIC WP1/D1.1                                              Page 47 of 77
Graph. 3- IL initiatives by Country




EMPATIC WP1/D1.1                                         Page 48 of 77
Graph. 4 - IL initiatives by initiative-type


Low number of curriculum project while this area needs to be addressed better since there are
no common views; training in the situation of lack of curricula might not be efficient




                           Graph. 5 - IL initiatives by literacy area


The granularity of literacies still needs to be understood better; it seems a bit worrying that
the area is fragmented and not approached in a holistic way




EMPATIC WP1/D1.1                                                                 Page 49 of 77
Graph. 6 - IL initiatives by year of launch




                   Graph. 7 - IL initiatives by Country and year of launch



EMPATIC WP1/D1.1                                                             Page 50 of 77
Graph. 8 - IL initiatives by target community


2.4 IL Institutional Bodies and Networks

Specific mention is due to Institutions and on European network focussed on IL.

National Forum on Information Literacy (United States)
http://infolit.org
Established in 1989 under the auspices of the American Library Association’s (ALA) Presidential
Committee on Information Literacy, the National Forum on Information Literacy’s mission was
to promote information literacy. After operating as a volunteer organization for the last 20
years, the National Forum on Information incorporated as a 501c3 non-profit organization,
based in Massachusetts, in 2009. Engaging collaborative partnerships with community based
organizations servicing the diverse needs of middle and low income populations in the U.S. is
at the heart of how we view our mission moving forward (source: the Institutional website).

Australian and New Zealand Institute for Information Literacy (ANZIIL)
http://www.anziil.org/
ANZIIL was established in 2000 with the mission to support organisations, institutions and
individuals in the promotion of information literacy and, in particular, the embedding of
information literacy within the total educational process. The ways in which ANZIIL can achieve
this mission is by the identification, facilitation, fostering and support of best practice in
information literacy education through professional development, promotion, marketing and
advocacy, and research.
ANZIIL's activities and initiatives will primarily target vocational and higher education. It is
intended that the Institute will collaborate with a range of national and international
organisations, forums and groups to complement their existing information literacy aims,
objectives and initiatives. In particular, ANZIIL will work closely with CAUL, the Council of New




EMPATIC WP1/D1.1                                                                   Page 51 of 77
Zealand University Librarians (CONZUL), Australian Library and Information Association
(ALIA), NWGTLS (National Working Group for TAFE Library Services) and Library and
Information Association of New Zealand Aotearoa (LIANZA) (source: the Institutional website).

European Network on Information Literacy (EnIL)
http://www.ceris.cnr.it/Basili/EnIL/index.html
EnIL (European network on Information Literacy) is a research initiative of the Institute for
Studies on Scientific Research and Documentation (Isrds), within the Italian National Research
Council, started in 2001. The idea of opening a European discourse on Information Literacy
stems from the evident absence of a "European voice" in the IL debate, where USA initiatives
appear to dominate.
Among the EnIL aims are the establishment of an aggregation and discussion place among
European IL experts (the EnIL network); the definition within the network on a common
research agenda; the development of a system for the assessment and certification of
information skills of the Higher Education students in Europe; the experimentation of a
European Information Driving License (EiDL), analogous to the European Computer Driving
License (EcDL)through a number of EiDL pilot projects in different countries.
The philosophy underlying the EnIL programme is based on common strategies, exchange of
results, and production of comparable data.
Common, sharable and comparable results, in fact, will give a Europe-wide methodological
value to all the EnIL actions. Furthermore, operating as a network, EnIL will empower the
promotion of its goals (source: the Institutional website).

International Alliance for Information Literacy (IAIL)
http://infolit.org/international-alliance-2/
Upon a recommendation from the Prague Conference of Information Literacy Experts held
September 20-23, 2003, the following organizations are committing to creating an
International Alliance for Information Literacy. The evolving purpose for the Alliance is to
facilitate the sharing of information and expertise on information literacy across regions and
nations of the world. The ultimate goal of the Alliance is to facilitate people’s participating
effectively in the Information Society, as part of the basic human right of life long learning.
The Alliance will consist of organizations that act as nodes around the world. Member
organizations will generally be regional or national organizations that are broadly based,
including representation from the economic development, education, health, human services,
librarianship, public policy, and information and communications technology sectors.
Founding Members of IAIL:
Australian and New Zealand Institute for Information Literacy (ANZIIL)
European Network on Information Literacy(Europe)
National Forum on Information Literacy (United States)
NORDINFOlit (Scandinavia)
SCONUL Advisory Committee on Information Literacy (United Kingdom)




EMPATIC WP1/D1.1                                                                 Page 52 of 77
SECTION3: THE EMPATIC FRAMEWORK OF ANALYSIS


3.1 Three perspectives of analysis

The universe of discourse on Information Literacy (IL) can be stratified into different
layers. The proposed stratification can be of use both for a theoretical systematisation of
the issue and for identifying a sequence of measures aimed at an effective propagation of
a Culture of Information.
The proposal presents a mathematical-like approach, which starts proposing the
definitions of some basic concepts and then proceeds with 10 propositions or theses, each
supported by a number of argumentations.
The proposed theses are generated by the following perspectives of analysis of the
Information Literacy phenomenon, and accordingly grouped:
      a)      DISCIPLINARY PERSPECTIVE: analysis of Information Literacy as Culture of
      information and as a form of study of information;
      b)      SOCIAL/POLITICAL        PERSPECTIVE:     analysis    of      Information   Literacy    as   an
      educational policy goal;
      c)     COGNITIVE PERSPECTIVE: analysis of Information Literacy as a form of personal
      competence.
As a consequence of the proposed theses, the following foci of the Information Literacy
discourse are identified:
            •    Information Literacy rationale (theses 1,2,3);
            •    Policy awareness (theses 4,5,6);
            •    Planning and implementation (theses 7,8,9);
            •    Individual development (thesis 10).


Against this background, it can be explored how the distinction between different
stratifications – by trying to give an order to the reasoning about the issues concerning
literacy in information – can facilitate the identification of a set of variables to be taken
into account in defining a coherent strategy towards making Information Literacy
legitimate within the European Higher Education context.


Nearly twenty years after the historical ALA report42, the configuration of discourse about the
IL phenomenon appears focused around the following key issues: the promoter community of
the IL problem is the librarian one; in the Library and Information Science (LIS) field a large
consent about IL importance do exists, but a universally accepted definition of the concept is
still lacking; outside the LIS community a very scarce awareness of the question and of the
distinction between the concepts of “Information” and “Informatics” persists and prevails; a
great number of tools of self-teaching has been developed, in the form of tutorials, mostly by
initiative of libraries; a great amount of specialised literature about IL is available, however it’s




42
  ALA Presidential Committee on IL, Final Report on IL, 1989. Available:
http://www.infolit.org/documents/89Report.htm



EMPATIC WP1/D1.1                                                                                    Page 53 of 77
needed an agreement about concrete actions, agents and ways for an effective embodiment of
the IL objective. The IL territory has been ironically defined as "the IL land of confusion"43.


In view of the above, we strongly believe that coherent pragmatic decisions can derive from
coherent theoretical premises. Therefore, with such intent, we want to propose here several
theses, which, supported by adequate argumentations, could be useful in differentiating
among discussion levels that, despite their differences, in the literature appears to be
undifferentiated.
In fact, our conviction is that the lack of a separation between different “stratifications” of
reasoning represents one of the main causes of confusion about IL discourse and,
consequently, that this obscures the way towards concrete and coordinated policy measures.
“Information Literacy” is a complex phenomenon, which can be analysed from several
perspectives; here we have chosen to analyse it from the following points of view (see fig.17):
1. disciplinary, as a form of study of information (Culture of Information);
2. social/educational, as a form of literacy (Information Literacy);
3. cognitive, as a form of individual competency (information skills or i-skills).



                                                    Culture of Information


                                     Information                             Information
                                           skills                            literacy
                                                             IL
                                                          universe
                                                         of discourse

                              Socio-political                                Cognitive
                                 perspective                                 perspective

                                                        Disciplinary
                                                        perspective




                     Fig. 17 - Perspectives of analysis of the Information Literacy discourse



Reasoning about IL definitions

43
     http://lorenzen.blogspot.com/




EMPATIC WP1/D1.1                                                                           Page 54 of 77
The complexity of the IL concept exceeds the literal meaning of the expression, nevertheless,
the practice of going back to the literal meaning of the term "literacy" can be of use. As
resulting from the etymological and philological analysis of the English term “literacy”, this
refers to a status, a condition, and in English there is not a verb analogous to the Italian
“alfabetizzare”, with a similar meaning of “making people to become literate”44. For the
purposes of this paper it’s fundamental to distinguish two meanings of the term literacy: the
status (to be literate) and the process (to make someone becoming literate).


DEFINITION. Information Literacy (as process): educational process, of political derivation,
that aims at spreading in a population a minimum level of competencies for the retrieval,
evaluation and exploitation of information from a variety of sources.
DEFINITION. Information Literacy (as status): social objective of educational policy; state or
condition, result of a process; to have acquired the competence to retrieve, evaluate and use
information from a variety of sources.


The distinction between the process and its result is essential for the purposes of this paper. In
fact, the reasoning on the result articulates around variables like:
       •    expected competency level;
       •    aims of learning;
       •    assessment procedures;


while reasoning about the process articulates around other variables, like:
       •    planning of actions,
       •    target communities;
       •    curriculum design;
       •    course configuration;
       •    teaching methods.


The theses described in the following paragraphs are strictly connected with the definitions
here provided: some of them represent a justification of the proposed definitions, particularly
for terms in italic, while others are consequences of them. Other theses provide the rationale
of our reasoning and thus are described as first in the next section.


3.1.1 Information Literacy as a discipline of study

Thesis 1: The culture of information falls within the disciplinary field of documentation-
information science
Firstly, we want to place in a definite disciplinary field the knowledge transferred during the
process of IL. This perspective of analysis regards IL as a form of study of information, as a branch
of knowledge and therefore as a subject of study, which we will call “Culture of Information”.
We refer to the seminal work of Fritz Machlup and Una Mansfield8 for a deepening and a
comparison between nine disciplinary fields, whose study object, principle or secondary, is
information:


44
     In fact, the English verb “to alphabetize” means “to put in alphabetical order”.




EMPATIC WP1/D1.1                                                                        Page 55 of 77
“cognitive sciences, computer and information science, artificial intelligence, linguistics, library
           and information sciences, cybernetics, information theory, mathematical system theory and
           general system theory”.45

In the same work the authors explain the debate about the suitability of the connotation as
“science” for some disciplines, an issue outside the scope of this paper.
Nevertheless, it is worth to underline the existence of cultural differences in the study of information,
even in the limits of the LIS (Library and Information Sciences) field.
The common theoretical matrix of the various documentary disciplines – Archival Science,
Library Science, Bibliography, Documentation or Information Science46 – is undeniable.
However, those elements, which at a theoretical level represent a partial difference, in the
purposes of the single disciplines constitute a relevant distinction.


By accepting such significant common matrix, the Culture of Information inherits methodologies
and tools from Bibliography, Library Science, Documentation, Scientific Research Methodologies
and Computer Science.47 However, from Documentation three fundamental elements are
additionally and specifically inherited:
           -     the ability of mapping heterogeneous sources,
           -     a critical sense and evaluation ability,
           -     and – most important – the typology of results.
In fact, by limiting the comparison between Documentation and Library Science in other
papers we have underlined that:

           “In comparison with the result of the reference service, which points out and refers to information
           sources, the result of the documentation service is a synthetic processing of various sources; it is
           the answer and not just a medium to achieve it.”48

As to the comparison between Library Instruction and Information Literacy, the first one is limited to
sources and services provided by the library and it is addressed to library users, while the
second one relates to every form of explicit, codified and recorded information, and it is
addressed to everyone who needs information for study or practical purposes.
As a disciplinary field, IL can therefore be considered as a branch of the Information Science,
as this one affects much more IL aims.
The relation between Culture of Information and Information Science or Documentation can be better
described through an analogy with the relation between Computer Literacy and Computer
Science; reasoning about this analogy on the one hand is useful to put an accent on the
distinction between the concepts of Information Literacy and Computer Literacy, on the other
hand to better understand the disciplinary placement of IL.
The disciplinary matrix of Computer Literacy is Computer Science, as well as that one of IL is
Information Science.


45
     MACHLUP, F. , MANSFIELD, U. (1983) The study of information. Interdisciplinary messages, Wiley & Sons.
46
  Hereafter the terms Documentation and Information Science will refer to the same discipline, since the former – in
use until 1969 - is the older name of the latter.
47
     the list is merely in alphabetical order, without any attribution of relevance as to the influence on IL of the various disciplines.
48
  BASILI, Carla. L’assetto disciplinare della Documentazione. Alcune riflessioni, "AIDA Informazioni", 18(2000), n.
3/4, p.30-35




EMPATIC WP1/D1.1                                                                                                                        Page 56 of 77
Therefore we could point out a derivation relation between matrices and branches as follows:


                                   branch X : matrix X = branch Y : matrix Y
which in the analysed case appears as follows:


            Information Literacy : Information Science = Computer Literacy : Computer Science


A first consequence of this relation is that in both couples the matrix is a discipline, which
forms the professionals of that subject (respectively documentalist and the so called
computer specialists), while the branch is a discipline, which forms the user, respectively of
information and of computers. This can be synthetically represented as:


       Information Science : Information Professional = Computer Science : Computer Professional
               Information Literacy : Information User = Computer Literacy : Computer User


A second consequence relates to the inheritance of basic characteristics from the matrix: the
branch inherits the main characteristics of the matrix from which it derives. Should we place
the different concepts in a thesaurus, the relation between terms could be represented as
follows:
        Information Science Computer Science
        NT Information Literacy NT Computer Literacy
And vice versa:
        Information Literacy Computer Literacy
        BT Information Science BT Computer Science
Therefore - we want to stress again - Culture of Information is aimed at educating the
information user, and it is distinguished from the education of the information professional.



Thesis 2: The Culture of information is a knowledge independent from every application
domain
The definition of “discipline” provided by Machlup and Mansfield, that we entirely report:

       “Disciplines (sciences, academic areas of research and teaching) are orderly arrangements
      (metaphorically called bodies) of coherent thoughts, formulated as propositions, about things
      (sense-objects or thought-objects) deemed worthy of being known (i.e., being believed with some
      degree of confidence) and being passed on. (Machlup-Mansfield, p.3)”

is enough clear and simple for the scope of our reasoning.
In addition, most scientific disciplines present a theoretical and an applicative component.
This is affirmed by Borko in relation to Documentation, at the moment of the epochal transition
from “Documentation” to “Information Science” in 196849.


49
 This change of denomination is considered as officially ratified in 1969 with the new denomination of the American
Documentation Institute, which became American Society for Information Science.




EMPATIC WP1/D1.1                                                                                  Page 57 of 77
“Information Science [ ... ] is concerned with that body of knowledge relating to the origination,
          collection, organisation, storage, retrieval, interpretation, transmission, transformation, and
          utilisation of information. It has both a pure science component, which enquires into the subject
          without regard to its application, and an applied science component, which develops services and
          products. (Borko,196850)”



Ancient philosophers already made a distinction between !"#$%&µ& (epistéme) – science or
scientific cognition - and '()*& (téchne) – art, skill or ability, instrumental, context and
practical knowledge.
Aristotle’s position, in particular, has been understood by modern science as basis of the
distinction between theory (possession of knowledge) and practice (the field of craft,
profession)51.
Because of its derivation from Documentation (compare Thesis 1), the Culture of Information
inherits the same components.
The theoretical component is based on a set of general principles, logical constructions and
standardised methodologies, inheritance of the Information Science52, which represent the
theoretical basis for structuring, representing and organising information. Objects of study,
just citing some of them, are: architecture of a system for information retrieval, structure of
an apparatus for indexing, methodologies of evaluation of sources, criteria for analysis of
sources, techniques for production of dossiers. Besides these we find general principles and
context knowledge such as: concept of bibliographic control, processing of the documentary
chain, information life cycle, and ethical use of information. Such theoretical foundation is
completely independent from its applicative context, which permits to place the Culture of
Information among the other disciplines of study. The theoretical component, in other words,
constitutes the property of transversality of the Culture of Information with respect to
subject (or vertical) disciplines like Astrophysics, Geology, Medicine, and so on (see Thesis 3
below).
On the other hand, only the applicative component of the Culture of Information can – but
not necessarily must – be intended as functional for a specific domain or field of study. It
comprises the study of services and information resources of interest for a specific subject
field.
The applied component can be integrated into various vertical disciplines (compare Thesis 3
below), through the indication of specific sources and description of particular reference
systems, also with support of the library staff.
Another important distinction is between the concepts of education and training. In previous
papers we already underlined the need of establishing a Culture of Information53, that means
to infuse values as to the importance of information and its ethical use, while training is mainly
concerned with instructions for using tools and information resources.
The specialised literature distinguishes different kinds of knowledge:

50
  BORKO, Harold (1968) Information science: What is it? Journal of the American Society for Information Science,
19, 3-5.
51
  PARRY, Richard, "Episteme and Techne", The Stanford Encyclopedia of Philosophy (Summer 2003 Edition), Edward
N. Zalta (ed.), Available: http://plato.stanford.edu/archives/sum2003/entries/episteme-techne
52
     This set of general principles constitute the theoretical foundation of Information Science as a scientific discipline
53
 BASILI, C. (2000), “Information literacy”: un concetto solo statunitense? (Information literacy: a issue only in the
USA?). “AIDAinformazioni”, 19 (2001), n. 2




EMPATIC WP1/D1.1                                                                                             Page 58 of 77
•   know-why: is the knowledge of general principles and laws, which govern nature,
         human mind and society;
     •   Know-what: is the knowledge of facts (contiguous, as regards its meaning, to that
         which is commonly defined “information”)
     •   Know-how: refers to the skill and competence in doing something.
With a view to such distinction and considering the large proliferation of courses and IL
tutorials, most of which is designed for auto-instruction, we want to stress that IL is mainly
"knowledge", not only "ability". This view is supported by Shapiro’s and Hughes’s concept, who
include IL among the liberal arts, as already mentioned (see § 1.2.1 in Section 1 of this report)
"Information and computer literacy, in the conventional sense, are functionally valuable
technical skills. But information literacy should in fact be conceived more broadly as a new
liberal art that extends from knowing how to use computers and access information to critical
reflection on the nature of information itself, its technical infrastructure, and its social, cultural
and even philosophical context and impact - as essential to the mental framework of the
educated information-age citizen as the trivium of basic liberal arts (grammar, logic and
rhetoric) was to the educated person in medieval society." 54

Thesis 3: The Culture of information is a kind of transversal knowledge
In the specialised literature often recurs the distinction between subject disciplines and cross-
curricular disciplines, where the former– which we call here “vertical” – are focused to a
particular field of study and research, while the latter – which we call “horizontal” – have
methodological character, independent from a specific scientific sector.
The Culture of information, as Informatics and Second Language, is transversal to every
intellectual activity, and thus it can be introduced in any course of study. In fact, it can be
counted among the methodologies of scientific research and it has been defined as the basis
for “learning how to learn”.


Furthermore, the competencies acquired (information skills) are defined in the
European Education Thesaurus as included in the Basic Education17, as follows:




54
   SHAPIRO, Jeremy J. and HUGHES, Shelley K. (1996) Information Literacy as a Liberal Art: Enlightenment
proposals     for    a    new       curriculum.     «Educom      review». 31 (2),   31-35.     Available:
http://www.educause.edu/pub/er/review/reviewArticles/31231.html)




EMPATIC WP1/D1.1                                                                         Page 59 of 77
basic education
             MT (10) content of education
             da: grunduddannelse
             de: Grundbildung
             el : +,-./0 1/2,.314-1
             es: educación básica
             fi : perusopetus
             fr : éducation de base
             it : educazione di base
             nl : fundamenteel onderwijs
             pt : Educação de base
             sv: grundutbildning
             SN instruction in subjects of elementary education,
             social skills and community responsibilities
             UF fundamental education
             NT1 computer literacy
             NT1 information skills
             RT basic training
             RT content of education
             RT minimum competencies




Thesis 4: The Culture of information is distinct from the Informatics culture
In 1983 F.W. Horton pointed out the distinction between Information Literacy and Computer
Literacy – affirming that:

       “Computer literacy has to do with increasing our understanding of what the machine can and
      cannot do. There are two major components of computer literacy: hardware and software.

      … Information literacy, then, as opposed to computer literacy, means rising the level of awareness
      of individuals and enterprises to the knowledge explosion, and how machine-aided handling
      systems can help identify, access and obtain data, documents and literature needed for problem-
      solving and decision-making. [Horton, 1983]55”

As a matter of facts, today all the secondary information and an increasing part of the primary
is available in electronic format. Correspondently, a great variety of search software exists and
therefore its functionality as computer application has to be understood and studied.

55
  HORTON, Forrest Woody Jr. (1983), Information literacy vs. computer literacy. “Bulletin of the American Society
for Information Science”, Vol. 9, No. 4, April 1983




EMPATIC WP1/D1.1                                                                                    Page 60 of 77
Nevertheless, the large part of the study should concern the general logic of the internal
design of this class of packages, and its strong relation with the underlying information
architecture.


3.1.2 Information Literacy as social objective

Thesis 5: Information Literacy is a requisite of the Information Society
The reasons supporting this thesis can be found in the introduction of nearby all articles
dealing with the issue of Information Literacy, therefore we will just cite the most recurring
slogans related to well-known problems and needs of the current Information Society:
   •    information overload;
   •    information smog;
   •    learn how to learn;
   •    active citizenship;
   •    information divide.
The only remark we want to underline is a kind of graduality in the different purposes of
Information Literacy. In the literature it seems to exist a large consent about the close relation
between Information Literacy and processes like problem-solving and decision-making.
However, these purposes can be conceived as one end of a spectrum, where the opposite end
is the enlargement of individual knowledge.
With Fig.18 we try to provide a graphic representation of this concept.




        Activity                            Goal                           Context

                                         Decision-making
          Decision                                                        Lifelong learning
                                         problem-solving



       Investigation -                                                  Scientific research/
                                          Dossier/report
        interpretation                                                 vocational education



                                    Enlargement of individual
           Study                                                         Formal Education
                                           knowledge




                   Fig. 18 - Aims and contexts of Information Literacy exploitation




EMPATIC WP1/D1.1                                                                      Page 61 of 77
Thesis 6: Information Literacy is an objective of educational policy
In previous paragraphs we defined information literacy as an educational policy goal. In the
following ones we will give a number of argumentations supporting this thesis. Firstly, the
original meaning of term “literacy” – i. e. “to be able to read and write” – historically
originates as political objective aiming at solving the question of illiteracy.
Furthermore, Zurkowsky56 himself, to whom – as already remembered - the coin of the
expression “information literate” has been attributed, characterizes it as an intervention of
political matrix. This cannot be recognized in the sentence intensively cited in the literature
as follows:

         “People trained in the application of information resources to their work can be called information literates.
         They have learned techniques and skills for using the wide range of information tools as well as primary
         sources in molding information solutions to their problems [Zurkowski, 1974]“.

but rather in the abstract of his paper found in the Eric database57:

          “The relations of the National Program for Library and Information Services to information
         literacy and the information industry are discussed. Private sector information resources are
         identified in several categories. The traditional relations of libraries and with the information
         industry are described, and examples are given of situations where traditional roles of libraries and
         private sector information activities are in transition. It is suggested that the top priority of the
         National Commission on Libraries and Information Science should be directed toward establishing
         a major national program to achieve universal information literacy by 1984. (PF)”



In fact, in the abstract – as we can see – is clearly mentioned Zurkowsky’s hope that a
national program would be started, aiming at achieving universal information literacy within a
decade.

Thesis 7: Information Literacy implies a massive operation
The definition of information literacy proposed in section 2. implies the concept of “target
population” of the Information Literacy process.
As we understood this expression and according to the character of Zurkowsky’s paper, target
population is every citizen who is in condition of information illiteracy.
However, it is necessary to consider those cases where the educational objective is pursued for
a limited universe in comparison with that of a whole nation: a region, a province, a
municipality, a university, a school. The case of studying population of universities is of
particular interest to our analysis.
The IL process, anyway, implies the idea of a mass-operation, according to its policy
connotation (see theses 6). This aspect can be easily recognised even in the denomination of
international initiatives like the UNESCO “Information for all Programme”.

Thesis 8: Information Literacy refers to a minimum amount of competencies
The concept of literacy has been extended from its original meaning, i. e. “ability to read and
write”, to that of competencies of general character, dispensed to individuals which are


56
 ZURKOWSKI, Paul (1974), The information service environment: Relationships and priorities. Washington, DC :
National Commission on Libraries and Information Science. Government Printing Office, 1974 (Report ED 100391).
57
     ED100391: The Information Service Environment: Relationships and Priorities. Related Paper No. 5.




EMPATIC WP1/D1.1                                                                                          Page 62 of 77
completely or nearly completely incompetent in that matter58. This is opposite, we underline
this concept, to the professional training of information specialists (see Thesis 1).
We can consider three levels of competence:
                Basic
                Advanced
                Specialised
In fact, besides the literal meaning of the term “literacy” - which calls for an educational
strategy informed to a “minimum common denominator” - it could be useful to consider also
both advanced and specialised levels of competence, particularly in the Higher Education
context.


Our vision of the three levels of IL competency is outlined below.
Basic IL competencies:
       •   Fundamental concepts: value of information, a general picture of the information
           universe
       •   Basic theoretical level: information mapping, Information Retrieval basics, minimum set
           of evaluation criteria
Advanced IL competencies:
       •   Basic IL competencies
       •   Analysis of information sources
       •   The logic of the Information Retrieval process
       •   Semantic representation of documents (basic concepts)
       •   Scientific writing


Specialised IL competencies:
       •   Advanced IL competencies
       •   Disciplinary information mapping
       •   Specific search tools
       •   Disciplinary writing
The distinction among different levels of IL competency is relevant for the discussion about
two main points: the configuration of IL relative to the curriculum and the attribution of the
charge of teaching.

Thesis 9: Information Literacy requires changes in the education system
To date, the teaching dimension of IL has been developed mostly by autonomous initiative of
libraries worldwide, in the common format of tutorials and self-instruction courses (see
PRIMO)59.
Nevertheless, IL – as a requisite of the Information Society (see thesis 5) – cannot be
developed in episodic and fragmented forms, but rather through coherent policy measures
concerning modifications in the education system.

58
  We intend, for example, the processes of diffuse Second language and Computer Literacies launched in the primary
school in the last decades.
59
     http://www.ala.org/ala/acrlbucket/is/iscommittees/webpages/emergingtech/site/index.cfm




EMPATIC WP1/D1.1                                                                                 Page 63 of 77
This topic represents a key issue for an effective implementation of the IL process, as it
comprises a conversion of policy goals into operational terms.
Implementing such transformation means to identify (and agree upon) one of the alternative
paths of modification of the education system.
The general concept of Education Policy as it is defined into the TESE – Thesaurus for
Education Systems in Europe – 2006 Edition60:


Education policy
MT (04)
UF educational policy

NT    access to education
NT    accreditation
NT    democratisation of education
NT    duration of compulsory education
NT    duration of studies
NT    duration of the academic year
NT    duration of the school year
NT    forecasting
NT    free education
NT    language policy
NT    planning
NT    priority area
NT    promotion of mobility
NT    reform
NT    school closure
NT    setting up a school

RT education
RT educational authority


can help in outline the issue. We underlined those terms which are (to different
extents) of interest for an IL policy.


3.1.3 Information Literacy as cognitive acquisition of individuals

Thesis 10: Information competencies (or i-skills) must be certificated
Acquired information competencies constitute the learner dimension of Information Literacy.
The cognitive perspective is the most analysed in the literature and a number of standards has
been developed for different classes of learners. Of particular interest for the scope of this
paper are the ACRL Competency Standards for Higher Education61 .
It is meaningful to distinguish between two main classes of learners:
•      those still within the cycles of formal education (pupils in primary education, students in
       secondary and higher or tertiary education);
•      those already outside the formal education system, i.e. in the lifelong learning context.

60
  http://www.eurydice.org/portal/page/portal/Eurydice/TESEHome        It is meaningful to note that on April 2008 the
descriptor “Information Literacy” is absent from the Tese thesaurus, while it is present in the Eric Thesaurus since
1992.
61
     http://www.ala.org/ala/acrl/acrlstandards/informationliteracycompetency.cfm




EMPATIC WP1/D1.1                                                                                    Page 64 of 77
Information competencies achieved within the formal Education fall within the standard
evaluation procedures, like any other competence dispensed there. In previous sections the
connotation of the Culture of information as an autonomous discipline has been already
discussed (compare theses 1-3).


Out of the formal education cycles, and therefore in the lifelong learning context, it is
necessary to define and develop methodologies for standard certification. In this direction
could be the setting-up of an Information Driving License – perhaps at European level (EiDL62),
analogous to the European Computer Driving License (EcDL). The EiDL could be calibrated on a
minimum level of competency (the basic level – see thesis 8) in order to be suitable for both a
massive operation (see theses 7) and generalised needs, independent from a specific
application field (see thesis 2).


3.2. Consequences of the proposed framework

The theses illustrated in the previous sections can be, in turn, assumed as statements to be
taken into account in outlining how IL could be institutionalised in Europe, with particular focus
on Higher Education institutions.
A first step should be that of promoting among academics and policy makers the awareness of
both the need of IL (see thesis 5) and the distinction between IL and Computer Literacy (thesis
4). Alongside, the idea of replicating – mutatis mutandis – an institutional configuration path
similar to that of Computer Literacy can be suggested. Both disciplines, in fact, are transversal
and useful to every course of study (see thesis 3).
A second step could be to insert IL among the learning outcomes of European universities and,
particularly, among the so-called “generic instrumental competencies” (theses 11 and 3). A
viable solution could be to integrate the ACRL Competency Standards for Higher Education into
the Tuning project63 activities64.
A strong assumption underlying the previous steps is to recognise the Culture of Information
as a discipline in its own right (thesis 1), to be conceived mainly as "knowledge" then as mere
"ability" (thesis 2), independent from any subject discipline (thesis 2), except for its applicative
component (thesis 1), which can be related to the specialised IL competency level (thesis 10).
The second edition of the ANZIL framework65, includes the following table, adapted from the
work of Bruce66, illustrating IL program components::




 BASILI, C. (ed.) Information literacy in Europe. A first insight into the state of the art of information literacy in the
62

European Union. Consiglio Nazionale delle Ricerche, Roma, 2003, 315 pp., p. 9
63
     http://tuning.unideusto.org/tuningeu/
64
  It is important to underline that the Tuning project is a university-led project. It presents the motivated and generous
work of 128 academics from 105 University departments across the length and breadth of Europe
(http://tuning.unideusto.org/tuningeu/: final report of Tuning phase 1)
65
  BUNDY, A. (ed.) (2004) Australian and New Zealand Information Literacy Framework. Principles, standards and
practice. Second edition, Australian and New Zealand Institute for Information Literacy, Adelaide.
66
  BRUCE, C. (2002) Information literacy as a catalyst for educational change: a background paper. White paper
prepared for UNESCO, the US National Commission on Libraries and Information Science, and the National Forum on
Information Literacy for use at the Meeting of Information Literacy Experts, Prague The Czech Republic 2002
Available: http://www.nclis.gov/libinter/infolitconf&meet/papers/bruce-fullpaper.pdf




EMPATIC WP1/D1.1                                                                                          Page 65 of 77
Generic          Extra curricular classes and/or self paced packages
      Parallel         Extra curricular classes and/or self paced packages
                       that complement the curriculum
      Integrated       Classes and packages that are part of the curriculum
      Embedded         Curriculum design where students have ongoing
                       interaction and reflection with information
                       Table.1 Information literacy program components


We would like to use this classification for reasoning about a range of disciplinary
configurations of the discipline “Culture of Information” with respect to the academic
curriculum. This implies a reformulation of the Anzil table above as follows:


      Generic          Extra curricular, not credit-bearing
      Parallel         Extra curricular discipline, credit-bearing, optional
      Integrated       A discipline inserted into the curriculum, credit-
                       bearing, mandatory
      Embedded         Part of subject disciplines
                            Tab. 2 - disciplinary configurations of IL


According to table 2, the responsibility of teaching could be attributed to librarians for the
basic level competencies (what in the table is “generic”) and to academic staff from the LIS
Faculties for the other configurations. The embedded configuration - corresponding, in our
vision, to what we defined as “specialised competency level” - should be imparted by
academics of the “host” subject discipline.
As concluding remarks, according to the research perspective of the European network on
Information Literacy (EnIL), the discussion has been mainly focused to the Higher Education
context, even if a large part of the concepts expressed are of general interest.
Some of the consequences derived from the proposed framework of analysis are in contrast to
the positions dominating the specialised literature. It is hoped that just this contrast could be
of some help in the debate around Information Literacy in Europe.




EMPATIC WP1/D1.1                                                                   Page 66 of 77
SECTION 4: SELECTED BIBLIOGRAPHY

  1. AACC (American Association of Community Colleges).(2008). Position Statement on
     Information Literacy.
     http://www.aacc.nche.edu/About/Positions/Pages/ps05052008.aspx
  2. ACRL (2006). Information Literacy Standards for Science and Technology (No.
     Document ID: 108186): American Library Association
     http://www.ala.org/ala/mgrps/divs/acrl/standards/infolitscitech.cfm
  3. American Association of School Librarians. (2006). Information Power: Building
     Partnerships for Learning: Learning and Teaching Principles of School Library Media
     Programs.
  4. Andretta, S. (ed.). (2007). Change and Challenge. Information literacy for the 21st
     Century. Adelaide: Auslib Press
  5. Armstrong, C., et al. (2005). Defining information literacy for the UK. Library and
     Information Update, 4(1).
  6. Association of College & Research Librarie (ACRL). (2000). Information Literacy
     Competency Standards for Higher Education. Chicago, IL: ACRL
     http://www.acrl.org/ala/mgrps/divs/acrl/standards/standards.pdf
  7. Australian and New Zealand Institute for Information Literacy (2004). Australian and
     New Zealand Information Literacy Framework- 2nd Edition.
  8. Barnard, L., et al. (2009). Measuring self-regulation in online and blended learning
     environments. The Internet and Higher Education, 12, 1-6
  9. Basili, C. (2004). Le Réseau européen pour la culture de l’information (EnIL): vers une
     approche commune dans l’Union européenne pour promouvoir l’usage de l’information.
     In: Sylvie Chevillotte (Ed.), 3èmes Rencontres FORMIST, June 12th 2003. La formation
     à la maîtrise de l'information à l'heure européenne: problèmes et perspectives (pp. 37-
     54). Villeurbanne: Presses de l'Enssib
  10. Basili, C. (2007). Theorems of Information Literacy. In: Proceedings of the Conference
      “The Information Literacy Landscape”, Belgrade, Serbia, 5th-7th October 2007
  11. Basili, C. (ed.). (2003). Information literacy in Europe. A first insight into the state of
      the art of information literacy in the European Union. Roma: Consiglio Nazionale delle
      Ricerche
  12. Basili, C. (ed.). (2008). Infomation Literacy at the crossroad of Education and
      Information Policies in Europe. Roma: Consiglio Nazionale delle Ricerche
  13. Basili, C. (ed.). (2009).The Observatory on Information Literacy Policies and Research
      in Europe. Roma: Consiglio Nazionale delle Ricerche
  14. Brown, C., & Krumholz, L. (2002). Integrating information literacy into the science
      curriculum. College and Research Libraries, 63(2), 111-124
      http://www.ala.org/ala/mgrps/divs/acrl/publications/crljournal/2002/mar/brown.pdf
  15. Bruce, C. S. (1997). Seven faces of information literacy. Adelaide: AULSIB Press
                                                                      st
  16. Campbell, S. (2004). Defining Information Literacy in the 21 century. IFLA
  17. Candy, P. (2002). Lifelong Learning and Information Literacy.




EMPATIC WP1/D1.1                                                                     Page 67 of 77
18. Case, D. (2002). Looking for Information: A Survey of Research on Information
      Seeking, Needs and Behavior. New York: Academic Press
  19. Catts, R., & Lau, J. (2008), Towards Information Literacy Indicators. Paris: Unesco
  20. Corrall, S. (2008). Information literacy strategy development in higher education: An
      exploratory study. International Journal of Information Management, 28, 26-37
  21. Eisenberg , M. (2008). Information Literacy: Essential Skills for the Information Age.
      DESIDOC Journal of Library & Information Technology, 28(2), 39-47
  22. Eisenberg, M. (2007). Teaching Information Literacy: Context, Context, Context. In: S.
      Curzon & L. Lampert (Eds.), Proven strategies for building a successful information
      literacy program. Neal-Schuman
  23. Eisenberg, M., et al. (2004). Information Literacy: Essential Skills for the Information
      Age. 2nd. Edition. Libraries Unlimited
  24. Endrizzi, L. (2006). Les Dossiers d'actualité: Information literacy. Lettre VST, 17. INRP
      (Institut National de Recherche Pédagogique). Veille scientifique et technologique
      http://www.inrp.fr/vst/LettreVST/english/17-april-2006_en.php
  25. Hancock, V. E. (2004). Information Literacy for Lifelong Learning.
  26. Head, A.J. & Eisenberg, M.B. (December 1, 2009). Lessons Learned: How College
      Students Seek Information in the Digital Age. Project Information Literacy First Year
      Report with Student Survey Findings. University of Washington's Information School
      http://projectinfolit.org/pdfs/PIL_Fall2009_finalv_YR1_12_2009v2.pdf
  27. Head, A.J. & Eisenberg, M.B. (February 4, 2009). Finding Context: What Today's
      College Student Say about Conducting Research in the Digital Age. Project Information
      Literacy Progress Report. University of Washington's Information School
      http://projectinfolit.org/progress/
  28. Head, A.J. (2007). Beyond Google: How Do Students Conduct Academic Research? First
      Monday, 12(7)
      http://www.uic.edu/htbin/cgiwrap/bin/ojs/index.php/fm/article/view/1998/1873
  29. Head, A.J. (2008). Information Literacy from the Trenches: How Do Humanities and
      Social Science Majors Conduct Academic Research? College and Research Libraries,
      69(4)
  30. Information Literacy Test (ILT), from Madison Assessment. (2009).
      http://www.madisonassessment.com/assessment-testing/information-literacy-test/
  31. Kapitzke, C. (2003). Information Literacy: A Positivist Epistemology and a Politics of
      Outformation. Educational Theory, 53, 37-53
  32. Kelly, O., et al. (2009). Don’t dilly dally on the way: Driving towards digital information
      literacy capability. In: Same places, different spaces. Proceedings ascilite Auckland
      2009. http://www.ascilite.org.au/conferences/auckland09/procs/kelly-o.pdf
  33. Kuhlthau, C. (1999). Literacy and Learning for the Information Age. In: Stripling, B.
      (ed.) Learning and Libraries in an Information Age: Principles and Practices. Libraries
      Unlimited; Teacher Ideas Press: Eaglewood, Colorado, 1999, p. 3-21 [Principles and
      practices series]
  34. Kurbanoglu, S.S., Akkoyunlu, B. & Umay, A. (2006). Developing the information
      literacy self-efficacy scale. Journal of Documentation, 62(6), 730-743




EMPATIC WP1/D1.1                                                                   Page 68 of 77
35. Lau, J. (2006), Guidelines on Information Literacy for Lifelong learning.
      http://www.ifla.org/VII/s42/pub/IL-Guidelines2006.pdf
  36. Liu, H., Chuang, H. & Huang, J. (2008). The correlation among web-based learners’
      self-efficacy, learning strategies and outcomes. In: K. McFerrin et al. (Eds.),
      Proceedings of Society for Information Technology and Teacher Education International
      Conference 2008 (pp. 3030-3034). Chesapeake, VA: AACE
  37. Lupton, M. (2008). Information literacy and learning. Adelaide: Auslib Press
  38. Maybee, C. (2006). Undergraduate perceptions of information use: The basis for
      creating usercentered student information literacy instruction. The Journal of Academic
      Librarianship, 32(1), 79-85
  39. McGuiness, C. (2006). What faculty think – exploring the barriers to information literacy
      development in undergraduate education. The Journal of Academic Librarianship, 32(6),
      573-82
  40. Mednick, M. (2002). Information Literacy: The New Challenge. California: City of
      Publication
  41. Moore, P. (2002). An Analysis of Information Literacy Education Worldwide. White
      paper prepared for UNESCO, the U.S. National Commission on Libraries and.
      Information Science, and the National Forum on Information Literacy, for use at the
      Information Literacy Meeting of Experts, Prague, The Czech Republic
  42. MSCHE (Middle States Commission on Higher Education). (2003). Developing Research
      and Communication Skills. Guidelines for Information Literacy in the Curriculum.
      MSCHE http://www.msche.org/publications/Developing-Skills080111151714.pdf
  43. New Jersey Institute of Technology (NJIT). (2009). Institute Information Literacy Plan.
      Newark, NJ: New Jersey Institute of Technology. http://library.njit.edu/docs/njit-info-
      lit-plan-caa-approved-05-20-2009.pdf
  44. Project SAILS (Standardized Assessment of Information Literacy Skills).(2001-2006).
      Kent State University and the Association of Research Libraries
      https://www.projectsails.org/sails/aboutSAILS.php?page=aboutSAILS
  45. Rader, H. (2002). Information Literacy 1973-2002: A Selected Literature Review.
      Library Trends, 51(2), 242-259.
  46. Reed, M., Kinder, D., & Cecile, F. (2007). Collaboration between librarians and teaching
      faculty to teach information literacy at One Ontario University: experiences and
      outcomes. Journal of Information Literacy, 1(3)
      http://digitalcommons.ryerson.ca/cgi/viewcontent.cgi?article=1011&context=library_pu
      bs
  47. Scharf, D. (2009). Are we teaching our students to be information literate? Newark, NJ:
      New Jersey Institute of Technology. University Lecture Series. Sept 24, 2009.
      Powerpoint.
  48. Scharf, D., Elliot, N., & Huey, H. (2006). NJIT Assessment Scales: Information Literacy.
      http://library.njit.edu/docs/NJIT-ILRubric.pdf
  49. Scharf, D., et al. (2007). Direct Assessment of Information Literacy Using Writing
      Portfolios. Journal of Academic Librarianship, 34, 462-477
  50. SCONUL Advisory Committee on Information Literacy (1999). Information skills in
      higher education: a SCONUL Position Paper. The Society of College,National and




EMPATIC WP1/D1.1                                                                  Page 69 of 77
University Libraries
     http://www.sconul.ac.uk/groups/information_literacy/papers/Seven_pillars2.pdf
  51. Sharma, S., et al. (2007). Self-regulated learning and e-learning. In: H. Österle, J.
      Schelp & R. Winter (Eds.), Proceedings of the Fifteenth European Conference on
      Information Systems (pp. 383-394). St. Gallen: University of St. Gallen
  52. Small, R. V., Zakaria, N. & El-Figuigui, H. (2004). Motivational aspects of information
      literacy skills instruction in community college libraries. College & Research Libraries,
      65(2), 96-121.
  53. Suskie, L. (2006). Five Dimensions of Good Assessment. Middle States Commission on
      Higher Education. http://library.njit.edu/researchhelpdesk/infolit/docs/suskie-msche-
      assessmentsummary-2006.pdf
  54. The Bay Area Community Colleges Information Competency Assessment Project (2004).
      http://www.topsy.org/ICAP/ICAProject.html
  55. Thornton, S. (2008). Pedagogy, Politics and Information Literacy. Politics, 28(1), 50-56
  56. Unesco, Ifla, & Nfil. (2005). The Alexandria proclamation on Information Literacy and
      Lifelong Learning. http://www.ifla.org/III/wsis/BeaconInfSoc.html
  57. Virkus, S. (2003). Information literacy in Europe: a literature review. Information
      Research, 8(4), paper no. 159 http://informationr.net/ir/8-4/paper159.html
  58. Warner, D. A. (2008). An Illustration in Process: Recommended Sequence for
      Bibliographic and Information Literacy for an Interdisciplinary Program in the Sciences:
      The Integrated Sciences and Math Major. A Disciplinary Blueprint for the Assessment of
      Information Literacy. Westport, CT: Libraries Unlimited
      http://library.njit.edu/researchhelpdesk/infolit/docs/warner-chapter4-2008.pdf
  59. Wilson, T.D. (1981). Unisist Guidelines for Developing and Implementing a National
      Plan for Training and Education in Information Use, preliminary version. Paris: Unesco
  60. Winkworth, F.V. (1977). User education in schools: a survey of the literature on
      education for library and information use in schools. London: The British Library.
      Research and Development Departments (BLRDD 5391 HC)
  61. Zurkowsky, P. (1974). The information service environment: Relationships and
      priorities. Washington, DC: National Commission on Libraries and Information Science.
      Government Printing Office (ED 100391- Eric Clearinghouse)
     http://library.njit.edu/researchhelpdesk/infolit/docs/scharf-universitylecture-
  24sept09.pdf
  62. Tsai, M. J. (2009). The model of strategic e-learning: Understanding and evaluating
      student elearning from metacognitive perspectives. Educational Technology & Society,
      12(1), 34-48 http://www.ifets.info/journals/12_1/4.pdf
  63. Head, A.J., & Eisenberg, M.B. (July 13, 2010). Assigning Inquiry: How Handouts for
      Research Assignments Guide Today's College Students. Project Information Literacy
      Progress Report.University of Washington's Information School
      http://projectinfolit.org/pdfs/PIL_Handout_Study_finalvJuly_2010.pdf
  64. Head, A.J., & Eisenberg, M.B. (2010). How Today's College Students Use Wikipedia for
      Course-Related Research. First Monday, 15(3)
      http://www.uic.edu/htbin/cgiwrap/bin/ojs/index.php/fm/article/view/2830/2476
  65. Information Seeking Skills Test, from James Madison University's general education
      program. (2010). http://www.jmu.edu/gened/info_lit_general.shtml#isst




EMPATIC WP1/D1.1                                                                   Page 70 of 77
66. Kiliç-Çakmak, E. (2010). Learning strategies and motivational factors predicting
        information literacy self-efficacy of e-learners. Australasian Journal of Educational
        Technology, 26(2), 192-208
    67. Miller, M.H. (March 16, 2010). Students Use Wikipedia Early and Often Study Shows.
        Chronicle of Higher Education http://chronicle.com/blogPost/Students-Use-Wikipedia-
        Early/21850/
    68. Pinto, M. (2010). Design of the IL-HUMASS survey on information literacy in higher
        education: A self-assessment approach. Journal of Information Science, 36(1), 86-103
    69. Truong, K. (July 27, 2010). Research Assignment Handouts Give Students Meager
        Guidance. Chronicle of Higher Education http://chronicle.com/article/Research-
        Assignment-Handouts/123702/?sid=at&utm_source=at&utm_medium=en
    70. Weiner, S. & Jackman, L.W. (2010). Information literacy beyond the library: The
        national forum on information literacy. College & Undergraduate Libraries, 17(1), 114-
        120
    71. Weiner, S. (2010). Information literacy: A Call to Action, College and Research Library
        News, 71(7) http://crln.acrl.org/content/71/7
    72. Weiner, S. (2010). Information Literacy: A Neglected Core Competency. Educause
        Quarterly, 33(1)
        http://www.educause.edu/EDUCAUSE+Quarterly/EDUCAUSEQuarterlyMagazineVolum/I
        nformationLiteracyANeglectedC/199382




REFERENCES

American Library Association (ALA). (1998). Information literacy standards for student learning: standards and
indicators http://www.ala.org/ala/aasl/aaslproftools/informationpower/InformationLiteracyStandards_final.pdf

American Library Association Presidential Committee on Information Literacy (January 10, 1989). Final report.
http://www.ala.org/ala/mgrps/divs/acrl/publications/whitepapers/presidential.cfm

Andretta, S. (2005). Information Literacy: A Practitioners’ Guide. Oxford: Chandos Publishing, as cited in Crawford, J.
(2006). The Culture of Evaluation in Library and Information Services. Chandos Publishing

Association of College & Research Libraries (ACRL). (January 2000). Information Literacy Competency Standards for
Higher Education. Chicago, IL: ACRL http://www.acrl.org/ala/mgrps/divs/acrl/standards/standards.pdf

Australia & New Zealand Institute for Information Literacy (ANZIIL)
http://www.anziil.org/resources/Infolit2ndedition.pdf


Barrie, S.C. (2005). Rethinking Generic Graduate Attributes. HERDSA News [Draft, March 5, 2005]

Basili, C. (2000). L’assetto disciplinare della Documentazione. Alcune riflessioni. AIDAinformazioni, 18(3/4), 30-35

Basili, C. (2001). “Information literacy”: un concetto solo statunitense? (Information literacy: a issue only in the
USA?). AIDAinformazioni, 19(2)




EMPATIC WP1/D1.1                                                                                      Page 71 of 77
Basili, C. (2008). Information and education policies in Europe: key factors influencing information literacy academic
policies in Europe. In: Carla Basili (ed.), Information Literacy at the crossroad of Education and Information Policies
in Europe (pp. 18-32). Roma: Consiglio Nazionale delle Ricerche

Basili, C. (ed.). (2003). Information literacy in Europe. A first insight into the state of the art of information literacy in
the European Union. Roma: Consiglio Nazionale delle Ricerche

Basili, C. (ed.). (2003). Information literacy in Europe. A first insight into the state of the art of information literacy in
the European Union (p. 9). Roma: Consiglio Nazionale delle Ricerche

Basili, C. (ed.). (2008). Information Literacy at the crossroad of Education and Information Policies in Europe. Roma:
Consiglio Nazionale delle Ricerche

Bawden, D. (2001) Information and Digital Literacies: A Review of Concepts. Journal of Documentation, 57(2), 218-
259

Behrens, S.J. (1994). A conceptual analysis and historical overview of information literacy. College & Research
Libraries, 55(4), 309-322

Borko, H. (1968). Information science: What is it? Journal of the American Society for Information Science, 19, 3-5

Bruce, C. (2002). Information literacy as a catalyst for educational change: a background paper. White paper prepared
for UNESCO, the US National Commission on Libraries and Information Science, and the National Forum on
Information Literacy for use at the Meeting of Information Literacy Experts, Prague The Czech Republic 2002
http://www.nclis.gov/libinter

Bruce, C.S. (2000). Information literacy programs and research: an international review. Australian Library Journal,
49(3), 209-218

Bundy, A. (ed.). (2004). Australian and New Zealand Information Literacy Framework. Principles, standards and
practice. Second Edition. Adelaide: Australian and New Zealand Institute for Information Literacy

Candy, P. (2002). Lifelong Learning and Information Literacy. White paper prepared for UNESCO, the US National
Commission on Libraries and Information Science, and the National Forum on Information Literacy, for use at the
Information     Literacy,     meetings    of    Experts.    Prague:   The    Czech     Republic  (pp.    1-17).
http://www.nclis.gov/libinter/infolitconf&meet/papers/candy-paper.pdf

Choo, C.W. (1995). Information Management for the Intelligent Organization: The Art of Scanning the Environment.
Medford, NJ: Information Today

Choo, C.W. (1995). Information Management for the Intelligent Organization: Roles and Implications for the
Information Professions. In: Proceedings of the Digital Libraries Conference, March 27-28, 1995, Singapore
http://choo.fis.utoronto.ca/fis/respub/dlc95.html

Doyle, C. (1994). Information literacy in an information society: A concept for the information age. Syracuse, NY:
ERIC Clearinghouse on Information and Technology

European Association for Quality Assurance in Higher Education (ENQA). (2005). Report on Standards and
Guidelines for Quality Assurance in the European Higher Education Area. Helsinki, ENQA

Garner, S.D. (2005). High level colloquium on information literacy and lifelong learning. Bibliotheca Alexandrina,
Alexandria, Egypt November 6-9, 2005. Report of the meeting http://archive.ifla.org/III/wsis/High-Level-
Colloquium.pdf




EMPATIC WP1/D1.1                                                                                           Page 72 of 77
Horton, F.W. Jr. (1983). Information literacy vs. computer literacy. Bulletin of the American Society for Information
Science, 9(4)

Hughes, S.K., & Shapiro, J.J. (1996). Information Literacy as a Liberal Art. Enlightenment proposals for a new
curriculum. Educom Review, 31(2), 31-35 http://net.educause.edu/apps/er/review/reviewarticles/31231.html

Kirton, J., & Barham, L. (2005). Information Literacy in the Workplace. The Australian Library Journal, 54(4), 365-
376

Machlup, F., & Mansfield, U. (1983). The study of information. Interdisciplinary messages. Wiley & Sons

Mutch, A. (1997). Information literacy: an exploration. International journal of information management, 17(5), 377-86

Orr, D., Appleton, M., & Wallin, M. (2001). Information literacy and flexible delivery: creating a conceptual
framework and model. Journal of Academic Librarianship, 27(6), 457-463

Parry, R. (2003). “Episteme and Techne”. In: Edward N. Zalta (ed.), The Stanford Encyclopedia of Philosophy.
Summer 2003 Edition http://plato.stanford.edu/archives/sum2003/entries/episteme-techne

Senn Brevik, P. (2001). Information literacy and lifelong learning: The magical partnership. In: Proceedings of the 1st
International Lifelong Learning Conference. Central Queensland University, Rockhampton, Queensland, Australia (pp.
1-6).

The European network for Information Literacy (EnIL)
http://www.ceris.cnr.it/Basili/EnIL/index.html


The European Observatory on IL Policies and Research
http://www.ceris.cnr.it/Basili/EnIL/gateway/gatewayhome.htm
The European Parliament and the Council of the European Union. (2006). Recommendation of 18 December 2006 on
key competences for lifelong learning. (30.12.2006 EN Official Journal of the European Union L 394/13) http://eur-
lex.europa.eu/LexUriServ/LexUriServ.do?uri=OJ:L:2006:394:0010:0018:en:PDF

U.S. Department of Labour. (June 1991). What Work Requires of Schools: A SCANS Report for America 2000.

UNESCO.         (April     20,    2005).   Thematic debate on  information literacy: final                        report.
http://portal.unesco.org/ci/en/ev.php-URL_ID=18775&URL_DO=DO_TOPIC&URL_SECTION=201.html

Urquhart, D.J. (1975). Developing a National Information Policy. A NATIS guideline. UNESCO, 24 pp: The issue of
user education is at the top of the list of priorities for “Developing the Information Plan”

Webber, S., & Johnston, B. (2003). Information literacy in the United Kingdom: a critical review. In: Carla Basili (ed.),
Information literacy in Europe. A first insight into the state of the art of information literacy in the European Union
(pp. 258-283). Roma: Consiglio Nazionale delle Ricerche

Zurkowsky, P. (1974). The information service environment: Relationships and priorities. Washington, DC: National
Commission on Libraries and Information Science. Government Printing Office (ED 100391- Eric Clearinghouse)




EMPATIC WP1/D1.1                                                                                       Page 73 of 77
LIST OF FIGURES

Fig. 1. Information literacy in the context of lifelong learning.............................................. 6
Fig. 2- Excerpts from the Alxandria Proclamation on IL and LLL .......................................... 8
Fig. 3. Information literacy and critical thinking. ............................................................. 10
Fig. 4 - The SCONUL proposal ...................................................................................... 14
Fig. 5 - 21st Century Skills. Source: Parnership for 21st century skills ............................... 15
Fig. 6 21st century skills - source: P21 .......................................................................... 16
Fig. 7 - Information Literacy within 21st Century Skills (Source P21 framework) ................. 16
Fig. 8 - Media Literacy within 21st Century Skills (Source P21 framework) ......................... 17
Fig. 9 - ICT or digital Literacy within 21st Century Skills (Source P21 framework) ............... 17
Fig. 10 - Standards for the 21st Century Learner, AASL, 2007 .......................................... 18
Fig. 11- Class1 skills - - Standards for the 21st Century Learner, AASL, 2007 ..................... 18
Fig. 12 - Class1 Dispositions in Action - Standards for the 21st Century Learner, AASL, 2007 19
Fig. 13 -- Class1-Responsibilities - Standards for the 21st Century Learner, AASL, 2007 ...... 19
Fig. 14. Graphical representation of graduate attributes and their functional aims (Barrie,
2004). ...................................................................................................................... 22
Fig. 15 - Key Competences for Lifelong Learning — A European Reference Framework ......... 28
Fig. 16- representation format of IL best-practices ......................................................... 31
Fig. 17 - Perspectives of analysis of the Information Literacy discourse .............................. 54
Fig. 18 - Aims and contexts of Information Literacy exploitation....................................... 61



LIST OF GRAPHS

Graph. 1 - IL initiatives by EU funding Programme .......................................................... 46
Graph. 2 - IL initiatives by institution ............................................................................ 47
Graph. 3- IL initiatives by Country ................................................................................ 48
Graph. 4 - IL initiatives by initiative-type ....................................................................... 49
Graph. 5 - IL initiatives by literacy area ......................................................................... 49
Graph. 6 - IL initiatives by year of launch ...................................................................... 50
Graph. 7 - IL initiatives by Country and year of launch .................................................... 50
Graph. 8 - IL initiatives by target community ................................................................. 51



LIST OF TABLES

Tab. 1 - Skills and Tasks for Jobs: A SCANS Report for America 2000 ................................ 27
Tab. 2 - disciplinary configurations of IL ........................................................................ 66




EMPATIC WP1/D1.1                                                                                             Page 74 of 77
LIST OF ABBREVIATIONS

AASL       American Association of School Librarians

ACRL       Association of College and Research Libraries

ADAM       Advanced Data Archive and Management System

ALA        American Library Association

ANZIIL     Australian and New Zealand Institute for Information Literacy

CAUL       Council of Australian University Librarians

CILIP      Chartered Institute of Library and Information Professionals

EnIL       EnIL – the European network on Information Literacy

ENQA       European Network for Quality Assurance

ESF        European structural funds

EU         The European Union

FP         Framework Programme

HE         higher education

IFLA       International Federation for Library Automation

IL         Information literacy

JISC       Joint Information Systems Committee

LLL        Lifelong learning

NFIL       National Forum on Information Literacy

SCONUL     Society of College, National and University Libraries

UNESCO     United Nations Educational, Scientific and Cultural Organisation

VET        vocational education and training




EMPATIC WP1/D1.1                                                              Page 75 of 77
http://empat-ic.eu/eng/
                Project funded by the European Commission
                   under the Lifelong Learning Programme




 This publication reflects the views only of the author, and the Commission cannot be
held responsible for any use which may be made of the information contained therein.




                                                                                        1

Report on Current State and Best Practices in Information Literacy

  • 1.
    ! ! ! ! ! ! ! ! ! ! ! ! 7*&(',%(/%61''*/,%8,-,*%-/2%% 9*$,%:'-+,#+*$%#/%;/0('4-,#(/%<#,*'-+=%% >1,"('?%6-'@-%9-$#@#! ! ! ! ! ! !"#$%&'()*+,%"-$%.**/%01/2*2%3#,"%$1&&(',%0'(4%,"*%51'(&*-/%6(44#$$#(/% %
  • 2.
    Empower Autonomous Learningthrough Information Competencies Carla Basili Date: February 2011
  • 3.
    EMPATIC Partners BASILI Carla (BC) CISEK Sabina (CS) DAVIES Rob (DR) KATSIRIKOU Anthi (KA) PROCHNICKA Maria (PM) REGGIANI Lisa (RL) ROCCHI Maurizio (RM) ROWLATT Mary (RMa) SKIADAS Christos (SC) VINCIGUERRA Filippo (VF) YILMAZ Bulent (YB) 1/77
  • 4.
    EXECUTIVE SUMMARY The presentreport constitutes the delivery D1.1 of the Work Package 1: Desk research of the EMPATIC project. The core objectives of the EMPATIC project are to: - draw together and valorise the results of previous Information Literacy initiatives and projects across the school, university, adult and vocational learning sectors; - use this evidence to influence policy makers’ perceptions and actions to support a marked increase in piloting and mainstreaming of Information Literacy; - have a significant impact on validating new learning paradigms and strategic thinking on curriculum reform. Within the work plan of EMPATIC, the Work Package 1 is aimed to: 1. Arrive at a practical definition of Information Literacy and an assessment of current thinking on its role in learner performance and learning outcomes at each level of education, taking into account the findings of LLP projects and other European initiatives. 2. Assess to what extent Information Literacy efforts are being employed within mainstream education. 3. Identify best practices in schools, higher education, adult and vocational educational bodies in formal and non-formal settings. In view of the above, in its Section 1, the deliverable presents the state of the art in the area of information literacy, which reflects the most significant global challenges and developments in this domain. The section starts with a concise presentation of the role information literacy plays within respect to lifelong learning. Then it provides a concise overview of definitions of information learning suggested by a number of international and national bodies as well as leading researchers. The section does not aim to present a critical analysis of the views on information literacy but to illustrate how rich is this concept and how the various points of view complement each other. Special attention is paid to the definitions suggested by bodies from the library sector which address the information literacy issue as being of great relevance to the changing role of the libraries in the information age. Finally, this section offers a summary of frameworks addressing information literacy, including those suggested by the Association of College and Research Libraries (ACRL), the Australian and New Zealand Information Literacy Framework (ANZIIL), and the UK Standing Committee of National and University Libraries (SCONUL). Section 2 provides data on the projects in the information literacy domain supported by the European Union, these activities cover the period 1994–2010 and include 79 projects. This work can be seen as a logical continuation of the efforts of EnIL (European network on Information Literacy) to collect and inform the professional community on the European initiatives in this area. The section outlines attributes which had been studied and identified for every single project and are used for initial analysis of the situation in Europe. These attributes include identification attributes (name of the initiative, acronym, URL, Leader institution, contacts); country of the coordinator if a multinational initiative; typology of the leading institution; classification of the kind of initiative; source of funding, main focus, target community, starting date and a description. Even the initial analysis provided in the deliverable identifies some essential specific features of the current situation in the EU support of information literacy initiatives. Information literacy projects are still mainly supported through national initiatives; the specialised funding programmes address them rather as an exception. This might mean that a serious debate on EMPATIC WP1/D1.1 Page 2 of 77
  • 5.
    the priorities ofsome of the funding programmes in the EU is needed to position better the work in the information literacy domain; Furthermore, the large part of the initiatives are centred around the concept of IL as a skill and are library-originated in kind. The IL policy dimension is quite neglected and therefore the cases have been selected – where possible – in the area of policy initiatives and recommendations. A further criterion adopted for data collection is to maximise the number of countries considered. Finally, Section 3 of the report synthesizes the point of view taken by the Empatic project. Since as Section 1 showed there are multiple and not always converging points of view, this section is needed to illustrate and justify the EMPATIC framework of analysis. A distinguished feature of the Empatic approach is that it identifies three dimensions of Information Literacy, each one supported by a number of argumentations, and complementing each other: Information Literacy as a discipline of study; as a social objective; and as a cognitive acquisition of individuals. This theoretical background sets the scene for the subsequent work on the policy recommendations which Empatic aims to deliver. EMPATIC WP1/D1.1 Page 3 of 77
  • 6.
    Table of Contents EXECUTIVESUMMARY ................................................................................................ 2! SECTION 1: STATE OF THE ART IN INFORMATION LITERACY ..................................... 5! 1.1. INFORMATION LITERACY AND LIFELONG LEARNING ......................................................... 5! 1.2. INFORMATION LITERACY DEFINITIONS .......................................................................... 9! 1.2.1 INFORMATION LITERACY: INTERNATIONAL AND RESEARCH DEFINITIONS ................................... 9! 1.2.2 INFORMATION LITERACY: LIBRARY DEFINITIONS ............................................................. 12! 1.2.3 INFORMATION LITERACY: MAPPING WITH COUPLED CONCEPTS ............................................. 14! 1.2.4 INFORMATION LITERACY AND CRITICAL THINKING .......................................................... 17! 1.3. INFORMATION LITERACY IN EDUCATION ...................................................................... 20! 1.3.1 INFORMATION LITERACY IN HIGHER EDUCATION: RELEVANT DEVELOPMENTS ............................ 20! 1.3.2 INFORMATION LITERACY IN SCHOOLS: RELEVANT DEVELOPMENTS ........................................ 23! 1.3.3 IL AMONG THE SKILLS FOR JOB ................................................................................ 25! 1.3.4 IL IN LIFELONG LEARNING: RELEVANT DEVELOPMENTS ..................................................... 27! SECTION 2: BEST PRACTICES IDENTIFICATION ....................................................... 29! 2.1 METHODOLOGY ....................................................................................................... 29! 2.2 LIST OF INITIAL 87 POTENTIAL INITIATIVES FOR GOOD PRACTICE SELECTION ....................... 32! 2.3 DATA CLUSTERING AND ANALYSIS ............................................................................... 46! 2.4 IL INSTITUTIONAL BODIES AND NETWORKS ................................................................. 51! SECTION3: THE EMPATIC FRAMEWORK OF ANALYSIS .............................................. 53! 3.1 THREE PERSPECTIVES OF ANALYSIS ............................................................................. 53! 3.1.1 INFORMATION LITERACY AS A DISCIPLINE OF STUDY ........................................................ 55! 3.1.2 INFORMATION LITERACY AS SOCIAL OBJECTIVE .............................................................. 61! 3.1.3 INFORMATION LITERACY AS COGNITIVE ACQUISITION OF INDIVIDUALS ................................... 64! 3.2. CONSEQUENCES OF THE PROPOSED FRAMEWORK ............................................................ 65! SECTION 4: SELECTED BIBLIOGRAPHY ..................................................................... 67! REFERENCES ................................................................................................................ 71! LIST OF FIGURES .......................................................................................................... 74! LIST OF GRAPHS ........................................................................................................... 74! LIST OF TABLES ............................................................................................................ 74! LIST OF ABBREVIATIONS ................................................................................................ 75! EMPATIC WP1/D1.1 Page 4 of 77
  • 7.
    SECTION 1: STATEOF THE ART IN INFORMATION LITERACY 1.1. Information Literacy and Lifelong Learning Since the beginning of the development of information literacy as a global phenomenon, the Information Literacy definition – released by ALA in 1989 and credited as the earliest and most enduring definitions of information literacy – underlines a strong association between Information Literacy (IL) and Learning, particularly with respect to the dimension of autonomous learning through learning how to learn. In fact, in the ALA 1989 definition, a learning-how-to-learn perspective is explicitly proposed, as follows: To be information literate, a person must be able to recognize when information is needed and have the ability to locate, evaluate, and use effectively the needed information. Producing such a citizenry will require that schools and colleges appreciate and integrate the concept of information literacy into their learning programs and that they play a leadership role in equipping individuals and institutions to take advantage of the opportunities inherent within the information society. Ultimately, information literate people are those who have learned how to learn. They know how to learn because they know how knowledge is organized, how to find information, and how to use information in such a way that others can learn from them. They are people prepared for lifelong learning, because they can always find the information needed for any task or decision at hand.1 As to the connection between IL and Lifelong Learning (LLL), a number of influential positions and statements explicitly recognise their reciprocal interdependence. The above mentioned ALA Report underlines that: What is called for is not a new information studies curriculum but, rather, a restructuring of the learning process. Textbooks, workbooks, and lectures must yield to a learning process based on the information resources available for learning and problem solving throughout people's lifetimes--to learning experiences that build a lifelong habit of library use. Such a learning process would actively involve students in the process of: - knowing when they have a need for information - identifying information needed to address a given problem or issue - finding needed information and evaluating the information - organizing the information - using the information effectively to address the problem or issue at hand. Such a restructuring of the learning process will not only enhance the critical thinking skills of students but will also empower them for lifelong learning and the effective performance of professional and civic responsibilities2. Similar point of view is expressed and expanded in a number of subsequent studies. For example Andretta (Andretta, 2004) suggests to promote IL “as a vehicle of enhancing critical 1 AMERICAN LIBRARY ASSOCIATION PRESIDENTIAL COMMITTEE ON INFORMATION LITERACY. Final report 10 January 1989. Available on http://www.ala.org/ala/mgrps/divs/acrl/publications/whitepapers/presidential.cfm 2 ibid. EMPATIC WP1/D1.1 Page 5 of 77
  • 8.
    enquiry and self-directedlearning as a foundational element of broader focus on lifelong learning”3 In its report “Australian and New Zealand information literacy framework: principles, standards and practice. 2nd ed, ANZIIL – the Australian and New Zealand Institute for Information Literacy – states that Information literacy can be seen as a subset of independent learning, that in turn is a subset of lifelong learning and illustrates the concept through the following figure: Independent Information Lifelong Learning Literacy Learning Fig. 1. Information literacy in the context of lifelong learning. Source: BUNDI, A., ed., 2004. Australian and New Zealand information literacy framework: principles, standards and practice. 2nd ed. Adelaide: Australian and New Zealand Institute for Information Literacy. The same ANZIIL Framework further underlines a strong connection between IL and LLL, citing the work of (Candy et al., 1994): In 1994, Candy, Crebert and O’Leary’s report Developing lifelong learners through undergraduate education connected information literacy with lifelong learning. Its profile of the lifelong learner included the following information literacy qualities or characteristics: • knowledge of major current resources available in at least one field of study • ability to frame researchable questions in at least one field of study • ability to locate, evaluate, manage and use information in a range of contexts • ability to retrieve information using a variety of media • ability to decode information in a variety of forms: written, statistical, graphs, charts, diagrams and tables • critical evaluation of information According to (Orr et al., 2001), IL 3 ANDRETTA, S. (2005) Information Literacy: A Practitioners’ Guide. Oxford: Chandos Publishing, as cited in CRAWFORD, J. (2006) The Culture of Evaluation in Library and Information Services, Chandos Publishing. EMPATIC WP1/D1.1 Page 6 of 77
  • 9.
    is a vitalcomponent of lifelong learning. By ensuring that individuals have the opportunity to develop the intellectual abilities of reasoning and critical thinking, and by helping them construct a framework for learning how to learn”4. The Information Literacy meeting of experts held in Prague on 2003 based its discussion on a number of white papers, each focused on a different IL aspect. Among them was the white paper by P.C. Candy, focused on illustrating the strong association between Information Literacy and Lifelong Learning: “information literacy and lifelong learning are inextricably intertwined.5” In turn, the educational goal of lifelong learning has been acknowledged as one of the main driving forces behind the development of information literacy as a global phenomenon (Bruce, 1999)6 A significant international position by the National Forum on Information Literacy (NFIL) of UNESCO and the International Federation of Library Associations and Institutions (IFLA) is THE ALEXANDRIA PROCLAMATION. The full text of the proclamation is available at www.ifla.org/III/wsis/BeaconInfSoc.html, while selected parts of it are given in fig. 2. 4 ORR, D, APPLETON, M & WALLIN, M. (2001) Information literacy and flexible delivery: creating a conceptual framework and model, Journal of Academic Librarianship, vol. 27, no. 6, pp. 457-463 5 CANDY, P.C. (2002) Information literacy and lifelong learning, White paper prepared for UNESCO, the US National Commission on Libraries and Information Science, and the National Forum on Information Literacy, for use at the Information Literacy, meetings of Experts. Prague: The Czech Republic, pp. 1-17. Available: http://www.nclis.gov/libinter/infolitconf&meet/papers/candy-paper.pdf 6 BRUCE, C. (1999) Information literacy; an international review of programs and research. Auckland ’99 Lianza conference, 9-12 November 1999, pp.1-9. Available: http://www2.auckland.ac.nz/lbr/conf99/bruce.htm EMPATIC WP1/D1.1 Page 7 of 77
  • 10.
    BEACONS OF THEINFORMATION SOCIETY THE ALEXANDRIA PROCLAMATION ON INFORMATION LITERACY AND LIFELONG LEARNING [...] the participants in the High-Level Colloquium on Information Literacy and Lifelong Learning held at the Bibliotheca Alexandrina on 6-9 November 2005 proclaim that Information Literacy and lifelong learning are the beacons of the Information Society, illuminating the courses to development, prosperity and freedom. Information Literacy lies at the core of lifelong learning. It empowers people in all walks of life to seek, evaluate, use and create information effectively to achieve their personal, social, occupational and educational goals. It is a basic human right in a digital world and promotes social inclusion of all nations. Information Literacy - comprises the competencies to recognise information needs and to locate, evaluate, apply and create information within cultural and social contexts; - is crucial to the competitive advantage of individuals, enterprises (especially small and medium enterprises), regions and nations; - provides the key to effective access, use and creation of content to support economic development, education, health and human services, and all other aspects of contemporary societies, and thereby provides the vital foundation for fulfilling the goals of the Millennium Declaration and the World Summit on the Information Society; and - extends beyond current technologies to encompass learning, critical thinking and interpretative skills across professional boundaries and empowers individuals and communities. Within the context of the developing Information Society, we urge governments and intergovernmental organisations to pursue policies and programmes to promote Information Literacy and lifelong learning. In particular, we ask them to support - [...] inclusion of Information Literacy into initial and continuing education for key economic sectors and government policy making and administration, and into the practice of advisors to the business, industry and agriculture sectors; - [...] - recognition of lifelong learning and Information Literacy as key elements for the development of generic capabilities which must be required for the accreditation of all education and training programmes. We affirm that vigorous investment in Information Literacy and lifelong learning strategies creates public value and is essential to the development of the Information Society. Adopted in Alexandria, Egypt at the Bibliotheca Alexandrina on 9 November 20057 Fig. 2- Excerpts from the Alxandria Proclamation on IL and LLL Furthermore, Information literacy standards for student learning, produced by the ALA in 1998, links information literacy, independent learning, and social responsibility8. The above statements and positions are only a few voices among many others pointing out how IL creates the foundation for lifelong learning. 7 GARNER, S.D. (2005) High level colloquium on information literacy and lifelong learning. Bibliotheca Alexandrina, Alexandria, Egypt November 6-9, 2005. Report of the meeting. Available: http://archive.ifla.org/III/wsis/High-Level- Colloquium.pdf 8 American Library Association (1998) Information literacy standards for student learning: standards and indicators, Available: http://www.ala.org/ala/aasl/aaslproftools/informationpower/InformationLiteracyStandards_final.pdf EMPATIC WP1/D1.1 Page 8 of 77
  • 11.
    The Empatic projectnot only recognises this link but aims to contribute to a better understanding of the European experiences and to foster future developments in this spirit. 1.2. Information Literacy definitions Information literacy is widely recognised as covering a pivotal role in the contemporary society since it “should be a basic human right in a digital world”, as declared in a thematic debate held on April 2005 by UNESCO. The thematic debate originated by the acknowledgement of an explicit link between Information Literacy and the UNESCO’s Information for All programme, as declared on the thematic debate website: The specific purpose of the thematic debate was to consult with researchers and other experts in the field of information literacy, both within UNESCO and within our constituent stakeholders, to identify the particular contribution that the Information for All Programme can make in helping to ensure all peoples have the opportunity to become information literate9. This is a voice among many that acknowledges Information Literacy as strategic competence in the Information Society, nevertheless there is still no universal consensus about its definition. Seminal reviewing works are: DOYLE C. (1994). Information literacy in an information society: A concept for the information age. Syracuse, NY: ERIC Clearinghouse on Information and Technology. BEHRENS, S.J. (1994) A conceptual analysis and historical overview of information literacy, College & Research Libraries, 55(4), 309-322 BAWDEN, D. (2001) Information and Digital Literacies: A Review of Concepts. Journal of Documentation, 57(2), 218-259. MUTCH, A. (1997) Information literacy: an exploration. International journal of information management, 1997, 17 (5) pp.377-86. 1.2.1 Information Literacy: international and research definitions A number of definitions of the IL concept follow. These were suggested by various influential bodies, mostly international and some national ones, as well as by leading experts in the IL field. Our aim here is not to provide a detailed analysis of the differences, but to give the readers a feeling of the different perceptions of IL recurring in the specialised literature. UNESCO The UNESCO-sponsored Meeting of Experts on Information Literacy, held in Prague on September 2003 and organised by the US National Commission on Library and Information Sciences and the National Forum on Information Literacy, propose the following Information Literacy definition: Information Literacy encompasses knowledge of one's information concerns and needs, and the ability to identify, locate, evaluate, organize and effectively create, use and communicate 9 UNESCO (2005), Thematic debate on information literacy: final report, 20 April 2005. Available: http://portal.unesco.org/ci/en/ev.php-URL_ID=18775&URL_DO=DO_TOPIC&URL_SECTION=201.html> EMPATIC WP1/D1.1 Page 9 of 77
  • 12.
    information to addressissues or problems at hand; it is a prerequisite for participating effectively in the Information Society, and is part of the basic human right of life long learning10. National forum on IL (US) Patricia Senn Breivik– already chairman of the US National Forum on Information Literacy – in order to better underline the connection between IL and LLL, promotes a very effective picture of IL as an umbrella including ‘computer literacy’, ‘library literacy’, ‘media literacy’, ‘network literacy’, ‘visual literacy’, and a blank one (meant to refer to other literacies), with the words ‘critical thinking skills’ covering the whole umbrella11. Fig. 3. Information literacy and critical thinking. Source: Senn Breivik (2001) Australian and New Zealand Institute for Information Literacy (ANZIIL) ANZIIL proposes the following definition: Information literate people • recognise a need for information • determine the extent of information needed • access information efficiently • critically evaluate information and its sources • classify, store, manipulate and redraft information collected or generated • incorporate selected information into their knowledge base 10 portal.unesco.org/.../ev.php-URL_ID=19634&URL_DO=DO_TOPIC&URL_ SECTION=201.html 11 SENN BREVIK, P. (2001) Information literacy and lifelong learning: The magical partnership. Proceedings of the 1st International Lifelong Learning Conference, Central Queensland University, Rockhampton, Queensland, Australia, pp. 1-6. EMPATIC WP1/D1.1 Page 10 of 77
  • 13.
    • use informationeffectively to learn, create new knowledge, solve problems and make decisions • understand economic, legal, social, political and cultural issues in the use of information • access and use information ethically and legally • use information and knowledge for participative citizenship and social responsibility • experience information literacy as part of independent learning and lifelong learning. (ANZIIL, 2004) Joint Information Systems Committee, UK In the UK, the Joint Information Systems Committee sustains the concept of i-Skills: You may not have heard the term ‘i-skills’ up to now, but probably terms such as information skills, e-literacy, information literacy, knowledge management and research skills are more familiar. This guide uses the term i-skills to encompass all of these. i-Skills are defined as: the ability to identify, assess, retrieve, evaluate, adapt, organise and communicate information within an iterative context of review and reflection12. Information Literacy as a Liberal Art A research point of view about IL conception comes from the work of Shapiro and Hughes, in their proposal of IL as a new liberal art13, as follows: Information and computer literacy, in the conventional sense, are functionally valuable technical skills. But information literacy should in fact be conceived more broadly as a new liberal art that extends from knowing how to use computers and access information to critical reflection on the nature of information itself, its technical infrastructure, and its social, cultural and even philosophical context and impact - as essential to the mental framework of the educated information-age citizen as the trivium of basic liberal arts (grammar, logic and rhetoric) was to the educated person in medieval society. More specifically, Shapiro and Hughes propose that an IL curriculum should be based on a “critical conception of a more humanistic sort” and the proposed curriculum includes the following seven dimensions: Tool literacy, or the ability to understand and use the practical and conceptual tools of current information technology, including software, hardware and multimedia, that are relevant to education and the areas of work and professional life that the individual expects to inhabit. This can be taken to include the basics of computer and network applications as well as fundamental concepts of algorithms, data structures, and network topologies and protocols. Resource literacy, or the ability to understand the form, format, location and access methods of information resources, especially daily expanding networked information resources. This is practically identical with librarians' conceptions of information literacy, and includes concepts of the classification and organization of such resources. Social-structural literacy, or knowing that and how information is socially situated and produced. This means knowing about how information fits into the life of groups; about the institutions and social networks - such as the universities, libraries, researcher communities, corporations, government agencies, community groups - that create and organize information and knowledge; 12 Available: www.jisc.ac.uk/media/documents/publications/improvingiskills_rtf.rtf 13 HUGHES, S., & SHAPIRO, J. (1996) Information Literacy as a Liberal Art. Educom Review, 31(2). Available: http://net.educause.edu/apps/er/review/reviewarticles/31231.html EMPATIC WP1/D1.1 Page 11 of 77
  • 14.
    and the socialprocesses through which it is generated - such as the trajectory of publication of scholarly articles (peer review, etc.), the relationship between a Listserv and a shared interest group, or the audience served by a specialized library or Web site. Research literacy, or the ability to understand and use the IT-based tools relevant to the work of today's researcher and scholar. For those in graduate education, this would include discipline- related computer software for quantitative analysis, qualitative analysis and simulation, as well as an understanding of the conceptual and analytical limitations of such software. Publishing literacy, or the ability to format and publish research and ideas electronically, in textual and multimedia forms (including via World Wide Web, electronic mail and distribution lists, and CD-ROMs), to introduce them into the electronic public realm and the electronic community of scholars. Writing is always shaped by its tools and its audience. Computer tools and network audiences represent genuine changes in writing itself. Emerging technology literacy, or the ability to ongoingly adapt to, understand, evaluate and make use of the continually emerging innovations in information technology so as not to be a prisoner of prior tools and resources, and to make intelligent decisions about the adoption of new ones. Clearly this includes understanding of the human, organizational and social context of technologies as well as criteria for their evaluation. Critical literacy, or the ability to evaluate critically the intellectual, human and social strengths and weaknesses, potentials and limits, benefits and costs of information technologies. This would need to include a historical perspective (e.g. the connection between algorithmic thinking, formalization in mathematics, and the development of Western science and rationality and their limits); a philosophical perspective (current debates in the philosophy of technology, the critique of instrumental reason, the possibility and nature of artificial intelligence); a sociopolitical perspective (e.g. the impact of information technology on work, public policy issues in the development of a global information infrastructure); and a cultural perspective (e.g. current discussions of the virtual body and of the definition of human being as an information-processing machine) (Shapiro- Hughes, 1996). Information Literacy as Information Behaviour in the Information Society A further broader, not merely technical, perspective is suggested by Webber and Johnston14: Information literacy is the adoption of appropriate information behaviour to identify, through whatever channel or medium, information well fitted to information needs, leading to wise and ethical use of information in society. (Webber and Johnston, 2003) 1.2.2 Information Literacy: library definitions The library sector is following particularly closely the developments in the IL field and plays a special role in the promotion and wider adoption of the concept. Below some key definitions suggested by international and national library associations are presented as they are described by the CILIP CSG Information Literacy Group15 14 Webber, S. and Johnston, B. (2003) Information literacy in the United Kingdom: a critical review. In: Basili, C. (Ed) Information Literacy in Europe. Rome: Italian National Research Council. 258-283. 15 Available: http://www.informationliteracy.org.uk/Information_literacy_definitions/Definitions.aspx EMPATIC WP1/D1.1 Page 12 of 77
  • 15.
    ALA , 1989 Themost widely recognized and used definition of IL comes from the Final Report of the Presidential Committee on Information Literacy, where is declared that: To be information literate, a person must be able to recognize when information is needed and have the ability to locate, evaluate, and use effectively the needed information. CILIP CILIP – the UK Chartered Institute of Library and Information Professionals – in 2003 defined IL as: “Information literacy is knowing when and why you need information, where to find it, and how to evaluate, use and communicate it in an ethical manner. This definition implies several skills. We believe that the skills (or competencies) that are required to be information literate require an understanding of: - a need for information - the resources available - how to find information - the need to evaluate results - how to work with or exploit results - ethics and responsibility of use - how to communicate or share your findings - how to manage your findings.” (CILIP, 200316 SCONUL SCONUL (Society of College, National and University Libraries) has a view of IL as a set of seven competency dimensions, built upon basic library and IT skills that constitute the foundation for them. SCONUL supplies a visual representation of this conception (see figure 4)17. 16 Available: http://www.cilip.org.uk/get-involved/advocacy/learning/information-literacy/Pages/definition.aspx 17 Available: http://www.sconul.ac.uk/groups/information_literacy/seven_pillars.html EMPATIC WP1/D1.1 Page 13 of 77
  • 16.
    Fig. 4 -The SCONUL proposal The definitions of IL from the library sector – evolving from the original focus on Library Instruction - are strongly connected to the operative use of information and usually do not address the larger context of learning. However some of them provide a useful finer granularity view on the specific types of skills which constitute the IL as perceived nowadays. 1.2.3 Information Literacy: mapping with coupled concepts In the specialised literature a number of concepts contiguous to IL are sustained, namely media literacy, digital or computer or ICT literacy. Those concepts are often used interchangeably or with largely overlapping meaning, therefore the task of identifying universal accepted definitions for them is not easy. Nevertheless, the Partnership for 21st Century Skills (P21) – a national US organization that advocates for 21st century readiness for every student – developed a Framework for 21st EMPATIC WP1/D1.1 Page 14 of 77
  • 17.
    Century Learning18 thatcan be of use in both positioning IL among the strategic competencies for 21st learners, and for better understanding the distinction between different kinds of literacy. The Framework is aimed at helping help students master the multi-dimensional abilities required of them in the 21st century. The key elements of 21st century learning are represented in the graphic in fig.5 below. Fig. 5 - 21st Century Skills. Source: Parnership for 21st century skills The graphic represents both 21st century skills student outcomes (as represented by the arches of the rainbow) and 21st century skills support systems (as represented by the pools at the bottom), namely the systems that must be aligned to produce 21st century outcomes for today’s students. While the graphic represents each element distinctly for descriptive purposes, the Partnership views all the components as fully interconnected in the process of 21st century teaching and learning. The elements described below are the critical systems necessary to ensure 21st century readiness for every student. Twenty-first century standards, assessments, curriculum, instruction, professional development and learning environments must be aligned to produce a support system that produces 21st century outcomes for today’s students19. 18 Available: http://www.p21.org/index.php 19 Source: http://www.p21.org/index.php?option=com_content&task=view&id=254&Itemid=119 EMPATIC WP1/D1.1 Page 15 of 77
  • 18.
    The skills, knowledgeand expertise students should master to succeed in work and life in the 21st century (Twenty-First Century Student Outcomes) are grouped into four classes, as listed below. 1. Core Subjects and 21st Century Themes 2. Learning and Innovation Skills Creativity and Innovation Critical Thinking and Problem Solving Communication and Collaboration 3. Information, Media and Technology Skills Information Literacy Media Literacy ICT Literacy 4. Life and Career Skills Fig. 6 21st century skills - source: P21 Focussing on class number 3 “Information, Media and Technology Skills” in fig.6, it is evident the positioning of IL among the strategic skills and its distinction from other contiguous literacies. In fact, looking into more detail into the descriptions of each literacy can help in understanding their differentiation. Information Literacy Access and Evaluate Information Access information efficiently (time) and effectively (sources) Evaluate information critically and competently Use and Manage Information Use information accurately and creatively for the issue or problem at hand Manage the flow of information from a wide variety of sources Apply a fundamental understanding of the ethical/legal issues surrounding the access and use of information Fig. 7 - Information Literacy within 21st Century Skills (Source P21 framework) EMPATIC WP1/D1.1 Page 16 of 77
  • 19.
    Media Literacy Analyze Media Understand both how and why media messages are constructed, and for what purposes Examine how individuals interpret messages differently, how values and points of view are included or excluded, and how media can influence beliefs and behaviours Apply a fundamental understanding of the ethical/legal issues surrounding the access and use of media Create Media Products Understand and utilize the most appropriate media creation tools, characteristics and conventions Understand and effectively utilize the most appropriate expressions and interpretations in diverse, multi-cultural environments Fig. 8 - Media Literacy within 21st Century Skills (Source P21 framework) ICT Literacy Apply Technology Effectively Use technology as a tool to research, organize, evaluate and communicate information Use digital technologies (computers, PDAs, media players, GPS, etc.), communication/networking tools and social networks appropriately to access, manage, integrate, evaluate and create information to successfully function in a knowledge economy Apply a fundamental understanding of the ethical/legal issues surrounding the access and use of information technologies Fig. 9 - ICT or digital Literacy within 21st Century Skills (Source P21 framework) Besides the usefulness in setting the scene for IL as strategic skill and for its differentiation from other (and equally strategic) literacies, the P21 framework has been selected since among the P21 partners is the American Association of School Librarians, responsible for the release in 2007 of the "Standards for the 21st Century Learner", a document where is given a very effective description of IL as intrinsically connected to critical thinking. 1.2.4 Information Literacy and Critical Thinking The strong connection between IL and Critical Thinking is well described in the "Standards for the 21st Century Learner" developed by AASL that identifies the following four classes of skills: EMPATIC WP1/D1.1 Page 17 of 77
  • 20.
    1. Inquire, thinkcritically, and gain knowledge. 2. Draw conclusions, make informed decisions, apply knowledge to new situations, and create new knowledge. 3. Share knowledge and participate ethically and productively as members of our democratic society. 4. Pursue personal and aesthetic growth. Fig. 10 - Standards for the 21st Century Learner, AASL, 2007 Each class is described with further details and the first group of strategic skills “Inquire, think critically, and gain knowledge” is specified as follows. 1. Inquire, think critically, and gain knowledge. 1.1 Skills 1.1.1 Follow an inquiry- based process in seeking knowledge in curricular subjects, and make the real-world connection for using this process in own life. 1.1.2 Use prior and background knowledge as context for new learning. 1.1.3 Develop and refine a range of questions to frame the search for new understanding. 1.1.4 Find, evaluate, and select appropriate sources to answer questions. 1.1.5 Evaluate information found in selected sources on the basis of accuracy, validity, appropriateness for needs, importance, and social and cultural context. 1.1.6 Read, view, and listen for information presented in any format (e.g., textual, visual, media, digital) in order to make inferences and gather meaning. 1.1.7 Make sense of information gathered from diverse sources by identifying misconceptions, main and supporting ideas, conflicting information, and point of view or bias. 1.1.8 Demonstrate mastery of technology tools for accessing information and pursuing inquiry. 1.1.9 Collaborate with others to broaden and deepen understanding.- Fig. 11- Class1 skills - - Standards for the 21st Century Learner, AASL, 2007 EMPATIC WP1/D1.1 Page 18 of 77
  • 21.
    1. Inquire, think critically, and gain knowledge. 1.2 Dispositions in Action 1.2.1 Display initiative and engagement by posing questions and investigating the answers beyond the collection of superficial facts. 1.2.2 Demonstrate confidence and self-direction by making independent choices in the selection of resources and information. 1.2.3 Demonstrate creativity by using multiple resources and formats. 1.2.4 Maintain a critical stance by questioning the validity and accuracy of all information. 1.2.5 Demonstrate adaptability by changing the inquiry focus, questions, resources, or strategies when necessary to achieve success. 1.2.6 Display emotional resilience by persisting in information searching despite challenges. 1.2.7 Display persistence by continuing to pursue information to gain a broad perspective. Fig. 12 - Class1 Dispositions in Action - Standards for the 21st Century Learner, AASL, 2007 1. Inquire, think critically, and gain knowledge. 1.3 Responsibilities 1.3.1 Respect copyright/ intellectual property rights of creators and producers. 1.3.2 Seek divergent perspectives during information gathering and assessment. 1.3.3 Follow ethical and legal guidelines in gathering and using information. 1.3.4 Contribute to the exchange of ideas within the learning community. 1.3.5 Use information technology responsibly. 1.4 Self-Assessment Strategies 1.4.1 Monitor own information-seeking processes for effectiveness and progress, and adapt as necessary. 1.4.2 Use interaction with and feedback from teachers and peers to guide own inquiry process. 1.4.3 Monitor gathered information, and assess for gaps or weaknesses. 1.4.4 Seek appropriate help when it is needed. Fig. 13 -- Class1-Responsibilities - Standards for the 21st Century Learner, AASL, 2007 The set of shaded sub-skills in figs. 10÷13 provides for IL a description of a finer granularity with respect to the IL definitions most commonly cited in literature (see §1.2 in this section) and further underlines how strongly IL and critical thinking are intrinsically interrelated. EMPATIC WP1/D1.1 Page 19 of 77
  • 22.
    1.3. Information Literacyin Education A recent publication analyses and discusses how IL is a multidimensional phenomenon crossing the borders of both Information and Education policies20. The cross-borders view of Information Literacy – between Information and Education policies – widens the concept of Information Literacy, traditionally limited to the Information policy scope. Such a wider perspective is required due to a number of influential factors arising from the full establishment of the so-called Information Society, such as the mass access to information, the uncontrolled production process of large amounts of information, the constraints imposed on Higher Education by the market and by a new kind of demand from the labour market (Basili, 2008)21. Already in 1975, the Unesco NATIS Programme released a set of guidelines for National Information Policies, aimed at developing national information infrastructures, where users are considered the fulcrum of the whole infrastructure. An adequate system to provide access to information should include the following features: • potential users would be regarded as part of the system. Their education would assist them to diagnose their problems and be such that they would not fear revealing their ignorance when seeking assistance. • The educational system would recognise, as Johnson said, that: “Knowledge is of two kinds. We know a subject ourselves, or we know where we can find information upon it”22. The last point cited from (Urquhart, 1975) can be used as an effective synthesis of the need to integrate IL into the whole educational system, namely from schools to university, but the whole set of NATIS indications includes also the generic user of information, namely adults and workers. These needs are even more pressing today and a number of developments have occurred since 1975 in each educational area. Among them, the most meaningful are set out in the following paragraphs. 1.3.1 Information Literacy in Higher Education: relevant developments Information Literacy as a graduate attribute The ALA 1989 definition has had a great impact on the Higher Education sector. 20 Information Literacy at the crossroad of Education and Information Policies in Europe, Carla BASILI (ed.), Consiglio Nazionale delle Ricerche, Rome, 2008, 301 pp. 21 Basili, C., 2008, Information and education policies in Europe: key factors influencing information literacy academic policies in Europe . In: Information Literacy at the crossroad of Education and Information Policies in Europe, pp. 18-32 22 Urquhart, D.J. (1975). Developing a National Information Policy. A NATIS guideline. Unesco, 24 pp: The issue of user education is at the top of the list of priorities for “Developing the Information Plan”: 1. improving the education of potential users; 2. the training of librarians and information officers; 3. improving access to existing services; 4. improving and expanding existing services; 5. creating new services. EMPATIC WP1/D1.1 Page 20 of 77
  • 23.
    In the USAthe already mentioned ACRL IL standards for Higher Education23 were defined in 1999 by the Association of College and Research Libraries (ACRL) and translated into: Finnish, French, German, Greek, Italian, Spanish, Chinese, Japanese, and Iranian. In Australia, the Australian and New Zealand Institute for Information Literacy released the second edition of the Australian and New Zealand Information Literacy Framework24 in 2004. The educational philosophy underpinning the Australian IL standards strongly promotes the idea that IL should be tightly integrated into teaching and learning activities. The standards suggest that all academic curricula be reformed in line with its recommendations as a matter of university-wide policy. A major policy parameter in the assessment exercise of Australian universities is the set of graduate attributes that each university must declare in its mission statement. According to (Barrie, 2004): … generic graduate attributes in Australia have come to be accepted as the skills, knowledge and abilities of university graduates, beyond disciplinary content knowledge, which are applicable to a range of contexts. It is intended that university students acquire these qualities as one of the outcomes of successfully completing any undergraduate degree at university. This statement has been widely acknowledged and IL has been included among the set of graduate attributes, so that, already in 2004, 53.8% of Australian Universities had included IL among the graduate attributes declared in their mission statement. One example among many others is the University of Sydney, which in 2002 started a project for revising its graduate attributes policy, according to a multidimensional classification of attributes. The revised policy specifies two levels of attributes. There are three overarching graduate attributes – Scholarship, Lifelong Learning, and Global Citizenship – which reflect the research intensive nature of the University, its scholarly values in relation to research-led teaching, and the place of its graduates in a global society. These overarching attributes represent combinations of five clusters of more specific attributes, which can be interpreted or contextualised differently in different disciplinary domains. These are in turn supported by generic foundation skills and abilities underpinned by basic competencies. (Barrie, 2004) 23 Association of College and Research Libraries, Information Literacy Competency Standards for Higher Education, Jan 2000 Available: http://www.ala.org/acrl/ilcomstan.cfm 24 http://www.anziil.org/resources/Infolit2ndedition.pdf EMPATIC WP1/D1.1 Page 21 of 77
  • 24.
    Fig. 14. Graphicalrepresentation of graduate attributes and their functional aims (Barrie, 2004). Furthermore, Barrie refers to the definition by the HE Council of 1992, from which most of the definitions for “graduate attributes” derive: These are skills, personal attributes and values, which should be acquired by all graduates regardless of their discipline or field of study. In other words, they should represent the central achievements of higher education as a process. (HEC, 1992, p. 20) As to the European context, the commitment to skill development of graduate attributes has been adopted by the European Union policies on Higher Education under the name of “learning outcomes” and officially recommended in 2005 at the meeting in Bergen of the Ministers of the Bologna Process signatory states. The Bergen Communiqué, in fact, officially adopted the “Standards and Guidelines for Quality Assurance in the European Higher Education Area”. The Guidelines - produced by the European Network for Quality Assurance in Higher Education (ENQA)25 – recognise the fundamental role of the learning attributes approach in achieving transparency and comparability of competencies within the European Higher Education Area. The Empatic vision of IL integration into the HE system - which is strictly connected to the scope of the European network on Information Literacy26 launched in 2001 - is oriented towards a policy inspired by the Bologna process for Higher Education in Europe. The Bologna process, aimed at establishing a European Higher Education Area, operates along a number of action lines. In the reasoning about the institutionalisation of IL within the Higher Education context, of particular interest are the “Bologna” activities of curriculum design and harmonisation, together with the introduction of the concept of learning outcomes. The first series of activities are now being carried out through the “Tuning Educational Structures in Europe” project, which is aimed at; • "Tune" educational structures in Europe, and thereby aid the development of the European Higher Education Area; 25 ENQA (2005) Report on Standards and Guidelines for Quality Assurance in the European Higher Education Area, Helsinki, ENQA. 26 http://www.ceris.cnr.it/Basili/EnIL/index.html EMPATIC WP1/D1.1 Page 22 of 77
  • 25.
    Open up a debate on the nature and importance of subject-specific and general competences, involving all stakeholders, including academics, graduates and employers; • Identify and exchange information on common subject-based reference points, curricula content, learning outcomes and methods of teaching, learning and assessment; • Improve European co-operation and collaboration in the development of the quality, effectiveness and transparency of European higher education by examining ECTS credits and other suitable devices to enhance progress. Among the Tuning project activities, it is useful to recall the analysis – for each course of study and disciplinary sector –of the differences existing among the curricula of the universities in Europe, in order to make more comparable (and therefore transferable) curricula of the same subject area. The concept of learning outcomes is strictly related to the quality assessment procedures of universities, which are asked to demonstrate the efficient achievement of these, particularly in response to calls for accountability27. It is a concept quite new in Europe, while elsewhere, for example in Australia and the USA, is among the well-established criteria for universities to obtain government funds. In fact, in Australia and the USA, the learning outcomes are explicitly declared into the mission of the single university and constitute the set of competencies that graduates are expected to acquire. They must be measurable in order to give evidence of the successful completion of a cycle of study. It is worth to note that in most Australian universities, IL is included among the learning outcomes (or graduate attributes as they are also known in the USA)28. EMPATIC suggestion is to include IL among the learning outcomes, specifically among the generic competencies defined by the Tuning project. 1.3.2 Information Literacy in Schools: relevant developments The rationale behind the need of diffusion IL in schools is well summarised by Plotnick: Educational reform and restructuring make information literacy skills a necessity as students seek to construct their own knowledge and create their own understandings. - Educators are selecting various forms of resource-based learning (authentic learning, problem- based learning and work-based learning) to help students focus on the process and to help students learn from the content. Information literacy skills are necessary components of each. - The process approach to education is requiring new forms of student assessment. Students demonstrate their skills, assess their own learning, and evaluate the processes by which this learning has been achieved by preparing portfolios, learning. (Plotnick, 199929) The first formal initiative pointing out the need of Educating students to information date back to 1988, when the American Association of School Librarians (AASL) published “Information Power: Guidelines for school library Media Programs” in collaboration with the Association for 27 BARRIE, S.C. (2005) Rethinking Generic Graduate Attributes, HERDSA News, Draft, 5 March 2005 28 www.caul.edu.au/surveys/info-literacy2004.doc 29 PLOTNICK, E. Information Literacy. ERIC- digest. ED427777 EMPATIC WP1/D1.1 Page 23 of 77
  • 26.
    Educational Communications andTechnology (AECT)30. This publication, along with its follow- up published in 1998, is widely recognised as providing an extremely helpful road map to . guide educators into the next century The guidelines, in fact, provide standards for information literacy learning, as well as indicators for each standard. These standards create goals for all educators. Subsequent results by AASL are the following families of standards: Information Literacy Standards for Student Learning, 199831 Standards for the 21st Century Learner, 200732 Outside the library community, the Big6 model is largely known and used approach to teaching IL. From the Big6 website33: Developed by educators Mike Eisenberg and Bob Berkowitz, the Big6 is the most widely-known and widely-used approach to teaching information and technology skills in the world. The Big6 is an information and technology literacy model and curriculum, implemented in thousands of schools – K through higher education. Some people call the Big6 an information problem-solving strategy because with the Big6, students are able to handle any problem, assignment, decision or task. Here are the six stages we call the Big6. Two sub-stages are part of each main category in the Big6 model: 1. Task Definition 1.1 Define the information problem 1.2 Identify information needed 2. Information Seeking Strategies 2.1 Determine all possible sources 2.2 Select the best sources 3. Location and Access 3.1 Locate sources (intellectually and physically) 3.2 Find information within sources 4. Use of Information 4.1 Engage (e.g., read, hear, view, touch) 4.2 Extract relevant information 5. Synthesis 5.1 Organize from multiple sources 5.2 Present the information 6. Evaluation 6.1 Judge the product (effectiveness) 6.2 Judge the process (efficiency) 30 AASL and Association for Educational Communications and Technology, Information Power: Guidelines for School Library Media Programs (Chicago: ALA, 1988) 31 American Association of School Librarians and the Association for Educational Communications and Technology, Information Literacy Standards for Student Learning, 1998 Available: http://www.alastore.ala.org/detail.aspx?ID=203 32 Already mentioned in § 1.3.4 of this Report Available: http://www.ala.org/ala/mgrps/divs/aasl/guidelinesandstandards/learningstandards/AASL_LearningStandards.pdf 33 http://www.big6.com/ EMPATIC WP1/D1.1 Page 24 of 77
  • 27.
    Specifically devoted toIL in schools are the books by Eisenberg and Berkowitz: Eisenberg, M. B.- Berkowitz, R. E. (1999). Teaching information & technology skills: The Big6 in elementary schools. Worthington, Ohio: Linworth Publishing. Eisenberg, M. B.- Berkowitz, R. E. (2000). Teaching information & technology skills: The Big6 in secondary schools. Worthington, Ohio: Linworth Publishing. 1.3.3 IL among the skills for Job A major starting point for the discussion of IL in the workplace is that of the “intelligent organisation” illustrated by Choo in 1995 as follows: The intelligent organization is able to mobilize the different kinds of knowledge that exist in the organization in order to enhance performance. It pursues goals in a changing environment by adapting behaviour according to knowledge about itself and the world it thrives in. The intelligent organization is therefore a learning organization that is skilled at creating, acquiring, organizing, and sharing knowledge, and at applying this knowledge to design its behaviour. Organizational learning depends critically upon information management -- the capacity to harness the organization's information resources and information capabilities to energize organizational growth. Information management is a cycle of processes that support the organization's learning activities: identifying information needs, acquiring information, organizing and storing information, developing information products and services, distributing information, and using information. 34 From the above definition it is evident how much the role of information in the intelligent organisation is strategic and, consequently, how much necessary is the ability to dominate the universe of information located both inside and outside the organisation. Kirton and Barham provide a review of IL in the workplace, focussing on the need for IL awareness within organisations35. With the exponential increase in information, its management and use have become an important issue in the workplace, yet knowledge management or information literacy is not adequately addressed by most organisations or professions (Abell 2000; Candy 1998; O'Sullivan 2002; Winterman, Skelton and Abell 2003). A report by TFPL Ltd (1991) however did find that chief executives valued knowledge management second only to globalisation as essential for their organisations. Lloyd (2003) states that in the ...knowledge economy, the ability of the individual to become information literate and to engage effectively the operations skills of information literacy are attributes in which organisations should invest, in terms of both recruitment and training. A report by KPMG Consulting (2000) found that companies risked wasting their investment in the technology used to manage information if they did not tackle the 'human' aspect, which has been identified as an essential focus in knowledge management (Abell 2000). Employees continued to have problems with information overload, information anxiety, disinformation or misinformation, insufficient time, inadequate technological skills to share knowledge, to have difficulty locating information and were frequently 'reinventing the wheel'. While information is highly valued within most organisations (Candy 1998), many members of the workforce are unable to deal effectively 34 CHOO, C.W. Information Management for the Intelligent Organization: Roles and Implications for the Information Professions. In: Proceedings of the Digital Libraries Conference, March 27-28, 1995, Singapore. Available: http://choo.fis.utoronto.ca/fis/respub/dlc95.html - CHOO, C. W. (1995). Information Management for the Intelligent Organization: The Art of Scanning the Environment. Medford, NJ: Information Today. 35 KIRTON, J.- BARHAM, L. (2005) Information Literacy in the Workplace. The Australian Library Journal, 54(4) p.365-376 EMPATIC WP1/D1.1 Page 25 of 77
  • 28.
    with it intheir everyday work (De Ruiter 2002; O'Sullivan 2002; Rader 2002; Winterman, Skelton and Abell 2003). In their review of the specialised literature, Kirton and Barham also cites the work from Cheuk to underline that: [....] Cheuk's UNESCO White Paper (2002) provides examples of the lack of information literacy skills in the workplace and how this affects the productivity of employees, suggests practices to improve performance and discusses the barriers to promoting information literacy in the workplace and how to overcome these, as well as the relationship between knowledge management and information literacy. Even the term “Information Literacy” is not used in the workplace where Synonyms such as 'working smarter', 'information skills', 'information resources training', 'information discovery', and 'information management' have been used. (Kirton-Bahram, 2005) Surprisingly, the analysis by Kirton and Bahram does not include the concept of “environmental scanning”, namely representing the need for a company to compete within a market context which must be known to the company. Moreover, a major point arising from the Kirton- Bahram analysis is the character of complexity that IL assumes into the context of the knowledge (or intelligent) organisation: Winterman, Skelton and Abell (2003) also identified barriers to the development of such programs in the workplace. They found that the scope and content of the concept was not well defined or detailed, with the degree of agreement as to exactly what skills were relevant and which levels of these were needed varying widely between organisations. [....] Bawden and Robinson (2002) found that information literacy must be contextualised, relevantly illustrated, and presented in ways reflecting the needs of the range of learners found in the individual workplace. A meaningful initiative for IL in vocational education is the SCANS report, produced by the Secretary's Commission on Achieving Necessary Skills (SCANS) – a commission appointed in 1990 by the Secretary of Labour of the US Department of Labour, to determine the skills our young people need to succeed in the world of work. The commission's fundamental purpose was to encourage a high-performance economy characterized by high-skill, high-wage employment. Although the commission completed its work in 1992, its findings and recommendations continue to be a valuable source of information for individuals and organizations involved in education and workforce development..36 Table 1 below illustrates the set of skills for job identified by the SCAN commission. 36 http://wdr.doleta.gov/SCANS/ EMPATIC WP1/D1.1 Page 26 of 77
  • 29.
    SCANS Competencies Resources Allocates Time Allocates Money Allocates Material and Facility Resources Allocates Human Resources Information Acquires and Evaluates Information Organizes and Maintains Information Interprets and Communicates Information Uses Computers to Process Information Interpersonal Participates as a Member of a Team Teaches Others Serves Clients/Customers Exercises Leadership Negotiates to Arrive at a Decision Works with Cultural Diversity Systems Understands Systems Monitors and Corrects Performance Improves and Designs Systems Technology Selects Technology Applies Technology to Task Maintains and Troubleshoots Technology Tab. 1 - Skills and Tasks for Jobs: A SCANS Report for America 200037 The SCANS Report is of particular interest for the goals of the EMPATIC project , since it constitutes a gateway between school learning and workplace efficiency. Therefore, the SCANS Report will be object of further analysis by WP-4 of EMPATIC. 1.3.4 IL in Lifelong Learning: relevant developments In § 1.1 of this section the connection between IL and LLL has been already pointed out. Nevertheless, here it is important to recall that in 2006 the European Union recommends that Member States develop the provision of key competencies and use the ‘Key Competences for Lifelong Learning — A European Reference Framework’, that defines the set of key competences described in fig.15 below. 37 What Work Requires of Schools: A SCANS Report for America 2000, U.S. Department of Labour, June 1991 EMPATIC WP1/D1.1 Page 27 of 77
  • 30.
    Key Competences Competences aredefined here as a combination of knowledge, skills and attitudes appropriate to the context. Key competences are those which all individuals need for personal fulfilment and development, active citizenship, social inclusion and employment. The Reference Framework sets out eight key competences: 1) Communication in the mother tongue; 2) Communication in foreign languages; 3) Mathematical competence and basic competences in science and technology; 4) Digital competence; 5) Learning to learn; 6) Social and civic competences; 7) Sense of initiative and entrepreneurship; and 8) Cultural awareness and expression. The key competences are all considered equally important, because each of them can contribute to a successful life in a knowledge society. Many of the competences overlap and interlock: aspects essential to one domain will support competence in another. Competence in the fundamental basic skills of language, literacy, numeracy and in information and communication technologies (ICT) is an essential foundation for learning, and learning to learn supports all learning activities. There are a number of themes that are applied throughout the Reference Framework: critical thinking, creativity, initiative, problem solving, risk assessment, decision taking, and constructive management of feelings play a role in all eight key competences38. Fig. 15 - Key Competences for Lifelong Learning — A European Reference Framework Compared with the set of competencies in fig.15, IL includes those shown in bold, in such confirming how deeply related are IL and LLL, de facto, even if not explicitly declared. 38 (30.12.2006 EN Official Journal of the European Union L 394/13) Available: http://eur- lex.europa.eu/LexUriServ/LexUriServ.do?uri=OJ:L:2006:394:0010:0018:en:PDF EMPATIC WP1/D1.1 Page 28 of 77
  • 31.
    SECTION 2: BESTPRACTICES IDENTIFICATION The earlier and most diffused IL initiatives are those developed in the US since 1989 and in the Australian and new Zealand (ANZ) area since 1999. Both in US and ANZ, in fact, a widespread recognition of the IL importance gave rise to national policies aimed at setting coherent and enabling contexts for IL developments. On the contrary, Europe has not yet matured the awareness of the role that IL can assume, independently – even if in synergy – from other literacies, such as computer literacy or digital literacy or media literacy. As a consequence of being a neglected policy issue, European IL initiatives have been developed in a fragmented and episodic manner (Basili, 2003)39. This recognition was the rationale behind the launch in 2003 of the European network on Information Literacy (EnIL), aimed at both setting a common research agenda among IL researchers in Europe and diffusion a Culture of Information in Europe40. A more detailed comparison of the European situation with respect to US and ANZ will be part of the Empatic final report, aimed at streaming the IL issue within the attention of policy makers. In view of the above, his section of the report is aimed at pursuing both the following tasks: - providing a first systematically gathered information about how the EU funding activities have been addressed IL; - collecting a set of best practices to be further analysed by the next phases of the Empatic project. 2.1 Methodology The process of collecting data on IL initiatives have taken into account the nature of the Empatic project as an action transversal to all the four areas of the EU Lifelong Learning programme (Erasmus, Comenius, Grundtvig, Leonardo) segmented by educational level (university, school, adult and vocational). Therefore, a first step has been to analyse the databases of EU funded projects, and more specifically, the following sources: ADAM (Advanced Data Archive and Management System) - Leonardo da Vinci Projects and Products Portal http://www.adam-europe.eu/adam/homepageView.htm ISOC - SOCRATES Projects Database (until 2004 ) http://www.isoc.siu.no/isocii.nsf CORDIS - Community Research and Development Information Service http://cordis.europa.eu/ These were the natural source of information, but the project also gathered information on other projects funded in a range of programmes such as FP3-FP7, ESF, etc. . 39 Basili, C. (ed.). (2003). Information literacy in Europe. A first insight into the state of the art of information literacy in the European Union. Roma: Consiglio Nazionale delle Ricerche 40 http://www.ceris.cnr.it/Basili/EnIL/index.html EMPATIC WP1/D1.1 Page 29 of 77
  • 32.
    The national initiativeshave been derived mainly from: The European Observatory on IL Policies and Research http://www.ceris.cnr.it/Basili/EnIL/gateway/gatewayhome.htm a source produced by the CNR-Ceris within the research activities of the European network on Information Literacy. The EnIL Observatory covers a set of European countries41, and therefore the Empatic list of best practices concentrates on the 10 countries there represented: Austria, Denmark, Estonia, Finland, Germany, Italy, Latvia, Lithuania, Poland, and Spain. UK initiatives have been chosen based on their meaningfulness, while the Turkish and Polish initiatives have been identified, respectively, by Jagu and TDK Empatic partners. Besides these intrinsic project constraints, a set of representation criteria were identified in the Empatic’s desk research work package. The guiding logic was to represent each initiative through a set of attributes which will be functional to the next steps, and – more specifically – to the activities concerning the analysis of best practices and the formulation of policy recommendations. The representation criteria identified are listed and described in the figure below. 41 The European Observatory on IL Policies and Research Available: http://www.ceris.cnr.it/Basili/EnIL/gatewayhome.htm EMPATIC WP1/D1.1 Page 30 of 77
  • 33.
    Identification attributes: name of the initiative, acronym, URL, Leader institution, contacts; Country: the one of the coordinator if a multinational initiative; Leader institution Government/Parliament, Ministry, National typology: Authority/Committee, Local Authority/Committee, University, Department, Research Institution, Professional Body, International organisation, NGO Kind of initiative: policy, position & recommendations, strategy, R&D project, survey, resource(s)/tool(s) for learners/teachers/users, curriculum, promotion/support/awareness/debate/culture EU frame: COMENIUS, ERASMUS, GRUNDTVIG, LEONARDO, MINERVA, Transversal, FP3, FP4, FP7 / FP6, European Structural Funds, National, EU, International. Context or main focus: Information Literacy, Media Literacy, Digital Literacy, Information/Digital Literacy, Information/Media Literacy, Digital/Media Literacy, Science Literacy, Statistical Literacy Target community: Schools, HE, Adults, VET, mixed (the target community can be larger with respect to the LLL frame (COMENIUS, ERASMUS, GRUNDTVIG, LEONARDO); Start date : this field is not always available, but it is meaningful in order to understand how timely the leader institution realised the importance of IL. Fig. 16- representation format of IL best-practices . EMPATIC WP1/D1.1 Page 31 of 77
  • 34.
    2.2 List ofinitial 87 potential initiatives for good practice selection Below are listed the 87 initiatives identified, from which 20 will be selected as good practice cases for deeper analysis in the next phases of Empatic Initiative short Initiative full name Author / Contact(s) Country Launch End Initiative Target name or Coordinator name year year frame Sector(s) / acronym Segment(s) ALCE ALCE Animation for Fundación Tomillo capto@tomillo.es - Luis RUIZ DEL ÁRBOL T Spain 1998 1999 COMENIUS Schools reading and Capto - Centro de +34.915.61.16.03 F +34 915 63 97 84 comprehension at Actividades school Pedagógicas, Spain Alfin-EEES Alfin-EEES - Skills and Universidad de María Pinto Molina Tel.: 34 958 243 933 Spain 2006 ongoing National HE competencies in Granada. Facultad Fax: 34 958 243 490 information Biblioteconomía y management for Documentación, learning to learn within Spain European Higher Education CHILIAS Children in Libraries: Stuttgart City Library, Ingrid BUSSMANN Tel:+49-711- Germany 1996 1998 FP4 Schools improving multimedia Germany 2165710/5730 Fax:+49-711-2165701 virtual library access and information skills CIL CIL: basic IL tutorial of CIB - Inter Library Alina Renditiso Italy Latest National users the CIB- Inter Library Centre, University Department of Education Sciences - Library ed 2009 Centre, University Libraries System of Tel. 051 20 98540 Libraries System of Alma Mater Bologna University Studiorum, Bologna University
  • 35.
    Initiative short Initiativefull name Author / Contact(s) Country Launch End Initiative Target name or Coordinator name year year frame Sector(s) / acronym Segment(s) Compulsory Compulsory schooling Ministry of Public Ministero della Pubblica Istruzione - Viale Italy 2007 ongoing National Schools schooling obligation until the age Education, Italy Trastevere, 76/A 00153 Rome Italy - Tel.: obligation until of 16 years: the new 06 5849.1 the age of 16 key competences - years: the new Synthesis of the Italian key competences Minister of Public Education's speech (Original in Italian) DEDICATE Distance Education Chalmers University Nancy FJÄLLBRANT Tel:+46-31-7723754 Sweden 1997 1998 FP4 VET Information Courses of Technology, Fax:+46-31-168494 through Networks Sweden DELCIS Distance Education for Vilnius University, audra.glosiene@kv.vu.lt Lithuania 2000 2002 LEONARDO VET Librarians; Creating an Department of Information-Competent Communication, Society Lithuania Diliweb Diliweb - The shortest The University of Le Pierre-Yves Cachard pierre- France 2000 ongoing International HE way to the Net Havre yves.cachard@univ-lehavre.fr The DOTEINE The DOTEINE research Library & Information Miguel Ángel Marzal García-Quismondo Spain 2003 ongoing National HE research group group Science Department - (Director) - Professor at the Library & Carlos III University Information Science Department of the of Madrid Carlos III University of Madrid - Tel.: 91- 6249219 91-8561251 The DOTEINE Documentation and Library & Information Miguel Ángel Marzal García-Quismondo Spain 2003 2006 National HE project information Science Department - (Director) - Professor at the Library & technologies for Carlos III University Information Science Department of the education: of Madrid Carlos III University of Madrid - Tel.: 91- instruments for 6249219 91-8561251 information literacy and the organization of educational resources EMPATIC WP1/D1.1 Page 33 of 77
  • 36.
    Initiative short Initiativefull name Author / Contact(s) Country Launch End Initiative Target name or Coordinator name year year frame Sector(s) / acronym Segment(s) E-learning and E-learning and Department of Luciano Galliani (course director) Tel. Italy 2004 2005 National VET Integrated Integrated Education Education Sciences 049/8278956 Education Faculty of Education Alessandra Dal Corso (organizational Sciences, University secretary) Tel. 049/8278964 of Padua E-meryt E-meryt - programme LUTW - the Lodz Third emeryt@eduplatforma.pl; Error! Poland 2009 2009 ESF Adults for social integration Age University Hyperlink reference not valid. and e-inclusion of people 50+ EDUCATE End-user courses in University of Patrick KELLY Tel:+353-61-333644 Ireland 1994 1997 FP3 HE information access Limerick, Ireland Fax:+353-61-338044 through communication technology Educational Educational Psychology Library of the Faculty Michaela Zemanek (Head) Austria 2005 2005 National HE Psychology proseminars: of Psychology - Tel.: +43(1) 4277-16830 proseminars: Information Literacy Vienna Fax: +43(1) 4277-16839 Information Literacy EEE-European EEE-European methods Zespó! Szkol nr 24 s.bryla@wsisz.edu.pl; person: Ewa Poland 2004 2005 COMENIUS Schools methods of e- of e-teaching and e- im. prof. S. Bryly, ul. Gutowska teaching and e- learning Ks. Janusza 45/4 learning Warszawa ENTITLE Europe’s New libraries MDR Partners www.entitlelll.eu international 2008 2009 Transversal common Together In Transversal Learning Environments EU Media Trainer EU Media Trainer Bürgermedienzentrum benno@muenster.de Germany 2003 2005 LEONARDO VET Bennohaus, Germany EU-Trainer for EU-Trainer for ICT- and Bürgerhaus Benedikt Althoff Tel.: ++49 (0)251 609673 Germany 2008 ongoing LEONARDO VET ICT- and Media Media competencies Bennohaus - Fax: ++49 (0)251 6096777 - competencies Arbeitskreis Ostviertel benalthoff@bennohaus.info e.V., Germany EMPATIC WP1/D1.1 Page 34 of 77
  • 37.
    Initiative short Initiativefull name Author / Contact(s) Country Launch End Initiative Target name or Coordinator name year year frame Sector(s) / acronym Segment(s) The Evaluation The Evaluation of the Ba"aran, M. Turkey 2005 2005 National VET of the Information Literacy of Information the Candidate Teachers Literacy of the in Primary Schools Candidate Teachers in Primary Schools FORM-IT Form - it "Take part in Austrian Institute for Marie Céline LOIBL Tel:+43-1/523610529 Austria 2006 2008 FP7 / FP6 VET research" Applied Ecology, Fax:+43-1-5235843 Austria From II. National School Özel Üsküdar Turkey 2009 2009 National VET Information Librarians' Conference: American High Literacy to Life From Information School, #stanbul Long Learning Literacy to Life Long School Librarians' II. National Learning Group, Türkish School Librarians' Association Librarians' Conference: Global A Global Imperative - The New Media t 512 445-4200 f 512 445-4205; International 2004 2005 International common Imperative The Report of the 21st Consortium www.nmc.org Century Literary Summit The Google The Google Generation JISC - Joint ma-publishing@ucl.ac.uk United 2007 2007 National VET Generation Information Systems Kingdom Committee; BL - British Library Handbook for Handbook for Cardiff University morgannj@cardiff.ac.uk United 2005 ongoing National VET Information Information Literacy Kingdom Literacy Teaching (HILT) Teaching (HILT) EMPATIC WP1/D1.1 Page 35 of 77
  • 38.
    Initiative short Initiativefull name Author / Contact(s) Country Launch End Initiative Target name or Coordinator name year year frame Sector(s) / acronym Segment(s) HERON - Adults HERON - Adults The Institute of Adult http://www.emil-network.eu/res/ Greece 2005 2008 Adults Training on basic Training on basic Life Long Learning documents/resource/HERON%20-%20Adults% knowledge and knowledge and skills in (IDEKE), which 20Training%20on%20Basic% skills in New New Technologies belongs to the Technologies General Secretariat of 20Knowledge%20and%20Skills%20in% Life Long Learning 20New%20Technologies.pdf (GGDVM). HÜBO Hacettepe Üniversity Hacettepe University - http://www.bby.hacettepe.edu.tr/ Turkey 2010 National common Information Literacy Department of eng/yandaleng.asp Program Information Management - Education Faculty I Curriculum - I Curriculum - The Foundation for katerina@iacm.forth.gr Greece 2002 2004 MINERVA common The Knowledge Knowledge and Research and and Information Information Skills Technology - Hellas - Skills needed for needed for living in the Institute of Applied living in the Digital Age and Computational Digital Age Mathematics (IACM), Greece ICT as a tool to ICT as a tool to Fullness-of-Life biuro@apz.org.pl; tel. +48 12 294-81-35, Poland 2008 2010 GRUNDTVIG Adults activate seniors activate seniors Academy Association, tel./fax +48 12 294-81-36 education education and their Poland, Krakow personal development - exchanging experiences, ideas and good practices ILIPG Innovative Library #stanbul Technical http://www.library.itu.edu.tr/ Turkey 2007 2009 National common Initiatives Promotion University - Library ilipg/pt03_uyeler.html Group and Documentation Branch EMPATIC WP1/D1.1 Page 36 of 77
  • 39.
    Initiative short Initiativefull name Author / Contact(s) Country Launch End Initiative Target name or Coordinator name year year frame Sector(s) / acronym Segment(s) Improvement of Improvement of the Raziye Demiralay; raziyedemiralay@gmail.com; Turkey 2008 ongoing National Schools the information information literacy for $irin Karadeniz sirin.karadeniz@bahcesehir.edu.tr literacy for Life Life Long Learning in Long Learning in Primary School Primary School Information For Information For All UNESCO b.radoykov@unesco.org; International 2000 ongoing International common All Programme - Programme - IFAP mc.botte@unesco.org IFAP Information Information Literacy Aberdeen Business international@rgu.ac.uk United ongoing National HE Literacy School - Robert Kingdom Gordon University Information Information Literacy Serkan KOÇ; Özgün ozgun.kosaner@deu.edu.tr Turkey 2005 ongoing National HE Literacy and and Active Education: Ko"aner Active A Practice Model Education: A Practice Model Information Information literacy Kaunas University of Gene Duobiniene (Director) Lithuania 1999 2003 International HE literacy courses courses at the Library Technology. The tel. 300650, tel./fax. +370-37-323590 of the Kaunas Library Vanda Dovydaityte (Deputy director) University of tel. +370-37-300651 Technology Information Information Literacy University of Helsinki, Kaisa Sinikara - Director of Library and Finland 2004 2006 National HE Literacy Curriculum Project Finland Information Services Development, Curriculum 2004-2006 University of Helsinki - P.O. Box 33 - FI- Project 2004- 00014 2006 Information Information Literacy- University of http://www.lib.uom.gr/index.php?lang=utf- Greece 1999 ongoing National HE Literacy- Educational Seminars Macedonia -Library & 8 Educational Information Center Seminars EMPATIC WP1/D1.1 Page 37 of 77
  • 40.
    Initiative short Initiativefull name Author / Contact(s) Country Launch End Initiative Target name or Coordinator name year year frame Sector(s) / acronym Segment(s) Information Information Literacy NUI Galway, Trinity Isolde Harpur, Trinity College Library Ireland ongoing National HE Literacy module module College Dublin and Dublin University College Cork Information Information Literacy for Evgenidis Foundation- lib@eugenfound.edu.gr Greece National VET Literacy for Teachers Library Teachers Information Information literacy Staffordshire 3800@staffs.ac.uk United ongoing National HE Literacy Project project University Kingdom Information Information literacy Glasgow Caledonian J.Crawford@gcal.ac.uk; United 2004 2008 National Schools literacy skills skills - the link between University (GCU) christine.irving@gcal.ac.uk Kingdom secondary and tertiary education Informatyka+ Informatyka+: the Wy%sza Szko!a Project's office – Wy%sza Szko!a Poland 2008 2012 National Schools interregional Informatyki (The Informatyki, Lewartowskiego St. / 17 0- programme for the Academy of 169 Warsaw / Poland development of the Informatics) in secondary school Warsaw students' qualifications in Information Communication Technology ISIC 2008 Information Seeking in Vilnius University. Dr. Erika Jani&nien' (contact person) Lithuania 2008 2008 International HE Context (ISIC) 2008 Faculty of tel. +370 5 2366119 Communication. Department of Information and Communication Learning by Learning by doing: ICT Szkola Podstawowa sp31_dabrowa@poczta.onet.pl, person: Poland 2005 2006 COMENIUS Schools doing: ICT since since early years Nr 31, Aleja Miroslaw Pyplacz early years Zwyci(stwa, Dabrowa Gornicza-Zabkowice EMPATIC WP1/D1.1 Page 38 of 77
  • 41.
    Initiative short Initiativefull name Author / Contact(s) Country Launch End Initiative Target name or Coordinator name year year frame Sector(s) / acronym Segment(s) Learning Objects Learning Objects Web Aalborg University Niels Jørgen Blaabjerg, Tel.: 9635 7304 Denmark 2006 ongoing National HE Web Library - Aalborg njb@aub.aau.dk Library - Library - community Lithuanian Regional Antanas Alvikas (Director) Lithuania 2003 2004 EU VET community public information Research Institute, Drs. Jurga Bu)ait' (Project manager) public centre Kaunas Edita Naujokaityt' (Project manager) information centre MA in MA in Information University of Sheffield s.webber@sheffield.ac.uk United 2010 ongoing National HE Information Literacy Kingdom Literacy Medienpass (Media portfolio: Technische antje.neuhoff@tu-dresden.de Germany 2006 ongoing LEONARDO VET blended learning Universität Dresden, course on media Lehrzentrum literacy for language Sprachen und teachers) Kulturen, Germany Mile Mile - Model for Aalborg University njb@aub.auc.dk Denmark 1999 2001 National HE information literacy Library, Denmark education The multimedia Project: the multimedia Federal Ministry for Prof. Mag. Werner Schöggl (Project co- Austria ongoing National Schools school library school library Education, the Arts ordination) and Culture (BMUKK) Service centre for school libraries - AHS Vienna Vienna Tel. 43-1/ 523 62 22 - 93278 Fax 43-1/523 62 22 99 93 210 Net Net Communication for Faculty of Education Prof. Francesco Susi (Dean) Italy 2006 National HE Communication Learning Sciences Tel.: 06 49229323 for Learning Course for students of "Roma Tre" Fax: 06 4463722 Pedagogical Sciences University, Rome (Master's Degree) EMPATIC WP1/D1.1 Page 39 of 77
  • 42.
    Initiative short Initiativefull name Author / Contact(s) Country Launch End Initiative Target name or Coordinator name year year frame Sector(s) / acronym Segment(s) "ORION" Reference Services, Library of A.T.E.I. of library@lib.teithe.gr Greece ongoing National VET Information "ORION" Information Thessaloniki Literacy Tutorial Literacy Tutorial Reference Services, Project IL I / Information Literacy The Library of the Oliver Kohl-Frey - Tel.:++49 - (0)7531 - Germany 2003 2005 National HE Projekt IK I Project I (IL I) / University of 88 - 2835 - Fax: ++49 - (0)7531 - 88 - Projekt Konstanz, Germany 3082 Informationskompetenz I Project Joint Project on The Library of the Bernd Schmid-Ruhe Tel: Germany 2005 2007 National HE Information Comparative Research University of ++49/(0)7531/88-2804 - Fax: Literacy II in Information Literacy Konstanz, Germany ++49/(0)7531/88-3082 for advanced students and staff members PUZZLE Increasing and Chambre de Cchretien-petiot@ccip.fr - Tel.: 33 1 55 65 France 2001 2004 GRUNDTVIG VET supporting the Commerce et 67 90 - Fax: 33 1 55 65 66 94 individual demand for d'Industrie de Paris education in the Information Society Recommendation Recommendation of European Parliament Tel.: (32-2) 281 61 11 - Fax: (32-2) 281 European 2006 EU Schools of the European the European & Council of the 69 34 Union Parliament and Parliament and of the European Union, of the Council of Council of 18 European Union 18 December December 2006 on key 2006 on key competences for competences for lifelong learning lifelong learning EMPATIC WP1/D1.1 Page 40 of 77
  • 43.
    Initiative short Initiativefull name Author / Contact(s) Country Launch End Initiative Target name or Coordinator name year year frame Sector(s) / acronym Segment(s) Recommendation Recommendation for University of Helsinki, Anne Lehto tel (09) 191 23958 Finland 2004 National HE for universities universities for Finland for including including information information literacy competency in literacy the new degree competency in structures the new degree structures Regional Public Regional Public Library Hacettepe University i Turkey 2002 ongoing National VET Library Seminars Seminars Prof. Dr. Bülent Yılmaz Retrieving and Accéder à l'information Institut Universitaire anne.piponnier@aquitaine.iufm.fr Tel. France 2000 2003 COMENIUS VET accessing scientifique et de Formation des +33.5.56.12.67.68 Fax: +33 5 56 12 67 99 scientific and technique (=Retrieving Maitres d'Aquitaine technical and accessing scientific "Academie de information and technical Bordeaux" information) SAPRISTI! SAPRISTI! – Access Doc’Insa Lyon Monique Joly monique.joly@insa-lyon.fr France 1996 ongoing National HE paths and tracks to search for scientific and technical information on the Internet School- School-documentalist Department of Prof. Donatella Lombello Italy 2005 2006 National VET documentalist teacher training (AY Education Sciences (course director) teacher training 2005-2006): distance Faculty of Education course Sciences, University of Padua The School on The School on the Net Faculty of Education Ornella Martini Italy 2005 ongoing National VET the Net Sciences Tel.: 06 49229247 "Roma Tre" Fax: 06 491627 University, Rome EMPATIC WP1/D1.1 Page 41 of 77
  • 44.
    Initiative short Initiativefull name Author / Contact(s) Country Launch End Initiative Target name or Coordinator name year year frame Sector(s) / acronym Segment(s) Searching for Searching for and “E. Fermi” Technical Prof. Roberto Cadonici (coordinator) Italy 2000 ongoing National Schools and processing processing information High School for Tel. 39-573-452638 information - A - A high school project Surveyors - Pistoia high school project SEEKS - Adult SEEKS - Adult MANCHESTER b.jones-2@umist.ac.uk - Telephone +00 44 United 2001 2003 MINERVA VET Information Information Seeking METROPOLITAN 161 275 7255 - Fax +00 44 161 200 3505 Kingdom Seeking Strategies in the UNIVERSITY, UK Strategies in the Information Society Information Society Sieciaki.pl Sieciaki.pl – get to Fundacja Dzieci marcin.solodki@fdn.pl, Poland 2005 --- National Schools know the safe side of Niczyje (Nobody's katarzyna.zygmunt@fdn.pl. the internet Children Foundation) SLAM SLAM - School Libraries PEDAGOGISK SENTER Per FAGERLAND tel.: +47 52811445 fax: Norway 1999 2000 MINERVA VET as Multimedia Centres - KARMØY KOMMUNE +47 52855327 - - SKOLE- OG per.fagerland@karmoyped.no KULTURETATEN, Norway Statistical International Statistical International reija.helenius@stat.fi International 1994 ongoing International common Literacy Literacy Project Statistical Institute A Study on A Study on Equipping Serap Kurbano*lu; serap@hacettepe.edu.tr Turkey 2001 2002 National Schools Equipping Students with Buket Akkoyunlu buket@hacettepe.edu.tr Students with Information Literacy Information Skills Literacy Skills Study and Study and information University of Ioannina library@uoi.gr Greece National HE information skills skills - Central Library SWIM SWIM - Streaming Aalborg University Maj Rosenstand Denmark 2001 2003 National HE Webbased Information Library - Aalborg Tel.: 9635 9349 Modules Niels Jørgen Blåbjerg Tel.: 9635 7304 EMPATIC WP1/D1.1 Page 42 of 77
  • 45.
    Initiative short Initiativefull name Author / Contact(s) Country Launch End Initiative Target name or Coordinator name year year frame Sector(s) / acronym Segment(s) SWIM tutorial SWIM - information Aalborg University Maj Rosenstand Denmark 2001 2003 National HE search strategy Library - Aalborg Tel.: 9635 9349 Niels Jørgen Blåbjerg Tel.: 9635 7304 Szkolenia - to si( Database of training PARP - the Polish biuro@parp.gov.pl; www.parp.gov.pl; Poland 2010 2011 ESF VET op!aca offers Agency for Enterprise phone +48 22 432 80 80, +48 22 432 71 Development 25 Television News Television News on KULTURRING IN Armin HOTTMANN Email Germany 1999 2002 COMENIUS Schools on Europe - Europe - Project on BERLIN E.V. - LuArmHott@gmx.de T +49.30.513.97.49 F Project on media media education for Kulturring Institute, +49 30 513 97 55 education for compulsory schools in Germany compulsory Europe schools in Europe UNESCO Information and Media UNESCO aw.khan@unesco.org International ongoing International common Information and Literacy Media Literacy UNESCO The 2003 International UNESCO aw.khan@unesco.org International 2003 2003 International common International Conference of Conference Information Literacy Information Experts - Prague Literacy UNESCO The 2005 High-Level UNESCO, NFIL, IFLA aw.khan@unesco.org International 2005 2005 International common International International Colloquium Colloquium on Information Information Literacy Literacy and and Lifelong Learning Lifelong Learning EMPATIC WP1/D1.1 Page 43 of 77
  • 46.
    Initiative short Initiativefull name Author / Contact(s) Country Launch End Initiative Target name or Coordinator name year year frame Sector(s) / acronym Segment(s) UNESCO Teacher-Training UNESCO aw.khan@unesco.org International 2008 ongoing International VET Teacher-Training Curricula for Media and Curricula for Information Literacy Media and Information Literacy UNESCO Training of Information UNESCO aw.khan@unesco.org International 2002 2009 International VET Training of Professionals Information Professionals UNESCO Training-the-Trainers in UNESCO aw.khan@unesco.org International 2007 2009 International VET Training-the- Information Literacy Trainers in Information Literacy UNESCO Training of Media UNESCO aw.khan@unesco.org International 2002 ongoing International VET Training of Media Professionals Professionals University of User's Training Library and info@library.tuc.gr Greece ongoing National HE Crete: User's Information Center of Training the Technical University of Crete University of Training & Information Library & Information mbal@lib.uth.gr Greece ongoing National VET Thessaly: Support Center - University of Training & Thessaly Information Support Using the Using the Internet for Department of Ari Haasio Finland ongoing National common Internet for Non- Non-work Information Information Studies work Information Seeking Tampere University Seeking EMPATIC WP1/D1.1 Page 44 of 77
  • 47.
    Initiative short Initiativefull name Author / Contact(s) Country Launch End Initiative Target name or Coordinator name year year frame Sector(s) / acronym Segment(s) Value of data The value of data: to ISTAT ilvaloredeidati@istat.it Italy 2002 ongoing National Schools know more, to decide better VERITY Virtual and Electronic University of Jo AITKINS Tel:+44-191-5153915 United 1998 2000 FP4 Schools Resources for Sunderland, UK Fax:+44-191-5152904 Kingdom Information skills Training Web-Seal Web Searching, University of Tampere Eero Sormunen tel. +358-03-3551 6972 Finland 2006 2009 National HE Information Literacy - Department of (office) tel. +358-50-362 8781 (mobile) and Learning (Web- Information Studies, SeaL) Finland wkluczamy.PL wkluczamy.PL ("self e- Association "Silesian stowarzyszenie@galeriaidei.pl; tel. +48 32 Poland 2009 ongoing Regional Adults inclusion"), the Gallery of Ideas" 276 42 20; tel. gsm +48 604 476 069; initiative to "upgrade" www.galeriaidei.pl 50+ Silesians in the information society The working The working group Federal Ministry for Werner Schöggl (co-ordinator) Austria National Schools group "The "The multimedia school Education, the Arts Service centre for school libraries - AHS multimedia library" and Culture (BMUKK) Vienna school library" Vienna Tel. 43-1/ 523 62 22 - 93278 FAX 43-1/523 62 22 99 93 210 EMPATIC WP1/D1.1 Page 45 of 77
  • 48.
    2.3 Data clusteringand analysis A first analysis based on those single attributes give rises to the following results (see graphs 1 to 8). ESF 2 EU 2 FP7 / FP6 1 FP4 3 FP3 1 MINERVA 3 LEONARDO 4 GRUNDTVIG 2 COMENIUS 5 0 1 2 3 4 5 6 Graph. 1 - IL initiatives by EU funding Programme EMPATIC WP1/D1.1 Page 46 of 77
  • 49.
    Graph. 2 -IL initiatives by institution EMPATIC WP1/D1.1 Page 47 of 77
  • 50.
    Graph. 3- ILinitiatives by Country EMPATIC WP1/D1.1 Page 48 of 77
  • 51.
    Graph. 4 -IL initiatives by initiative-type Low number of curriculum project while this area needs to be addressed better since there are no common views; training in the situation of lack of curricula might not be efficient Graph. 5 - IL initiatives by literacy area The granularity of literacies still needs to be understood better; it seems a bit worrying that the area is fragmented and not approached in a holistic way EMPATIC WP1/D1.1 Page 49 of 77
  • 52.
    Graph. 6 -IL initiatives by year of launch Graph. 7 - IL initiatives by Country and year of launch EMPATIC WP1/D1.1 Page 50 of 77
  • 53.
    Graph. 8 -IL initiatives by target community 2.4 IL Institutional Bodies and Networks Specific mention is due to Institutions and on European network focussed on IL. National Forum on Information Literacy (United States) http://infolit.org Established in 1989 under the auspices of the American Library Association’s (ALA) Presidential Committee on Information Literacy, the National Forum on Information Literacy’s mission was to promote information literacy. After operating as a volunteer organization for the last 20 years, the National Forum on Information incorporated as a 501c3 non-profit organization, based in Massachusetts, in 2009. Engaging collaborative partnerships with community based organizations servicing the diverse needs of middle and low income populations in the U.S. is at the heart of how we view our mission moving forward (source: the Institutional website). Australian and New Zealand Institute for Information Literacy (ANZIIL) http://www.anziil.org/ ANZIIL was established in 2000 with the mission to support organisations, institutions and individuals in the promotion of information literacy and, in particular, the embedding of information literacy within the total educational process. The ways in which ANZIIL can achieve this mission is by the identification, facilitation, fostering and support of best practice in information literacy education through professional development, promotion, marketing and advocacy, and research. ANZIIL's activities and initiatives will primarily target vocational and higher education. It is intended that the Institute will collaborate with a range of national and international organisations, forums and groups to complement their existing information literacy aims, objectives and initiatives. In particular, ANZIIL will work closely with CAUL, the Council of New EMPATIC WP1/D1.1 Page 51 of 77
  • 54.
    Zealand University Librarians(CONZUL), Australian Library and Information Association (ALIA), NWGTLS (National Working Group for TAFE Library Services) and Library and Information Association of New Zealand Aotearoa (LIANZA) (source: the Institutional website). European Network on Information Literacy (EnIL) http://www.ceris.cnr.it/Basili/EnIL/index.html EnIL (European network on Information Literacy) is a research initiative of the Institute for Studies on Scientific Research and Documentation (Isrds), within the Italian National Research Council, started in 2001. The idea of opening a European discourse on Information Literacy stems from the evident absence of a "European voice" in the IL debate, where USA initiatives appear to dominate. Among the EnIL aims are the establishment of an aggregation and discussion place among European IL experts (the EnIL network); the definition within the network on a common research agenda; the development of a system for the assessment and certification of information skills of the Higher Education students in Europe; the experimentation of a European Information Driving License (EiDL), analogous to the European Computer Driving License (EcDL)through a number of EiDL pilot projects in different countries. The philosophy underlying the EnIL programme is based on common strategies, exchange of results, and production of comparable data. Common, sharable and comparable results, in fact, will give a Europe-wide methodological value to all the EnIL actions. Furthermore, operating as a network, EnIL will empower the promotion of its goals (source: the Institutional website). International Alliance for Information Literacy (IAIL) http://infolit.org/international-alliance-2/ Upon a recommendation from the Prague Conference of Information Literacy Experts held September 20-23, 2003, the following organizations are committing to creating an International Alliance for Information Literacy. The evolving purpose for the Alliance is to facilitate the sharing of information and expertise on information literacy across regions and nations of the world. The ultimate goal of the Alliance is to facilitate people’s participating effectively in the Information Society, as part of the basic human right of life long learning. The Alliance will consist of organizations that act as nodes around the world. Member organizations will generally be regional or national organizations that are broadly based, including representation from the economic development, education, health, human services, librarianship, public policy, and information and communications technology sectors. Founding Members of IAIL: Australian and New Zealand Institute for Information Literacy (ANZIIL) European Network on Information Literacy(Europe) National Forum on Information Literacy (United States) NORDINFOlit (Scandinavia) SCONUL Advisory Committee on Information Literacy (United Kingdom) EMPATIC WP1/D1.1 Page 52 of 77
  • 55.
    SECTION3: THE EMPATICFRAMEWORK OF ANALYSIS 3.1 Three perspectives of analysis The universe of discourse on Information Literacy (IL) can be stratified into different layers. The proposed stratification can be of use both for a theoretical systematisation of the issue and for identifying a sequence of measures aimed at an effective propagation of a Culture of Information. The proposal presents a mathematical-like approach, which starts proposing the definitions of some basic concepts and then proceeds with 10 propositions or theses, each supported by a number of argumentations. The proposed theses are generated by the following perspectives of analysis of the Information Literacy phenomenon, and accordingly grouped: a) DISCIPLINARY PERSPECTIVE: analysis of Information Literacy as Culture of information and as a form of study of information; b) SOCIAL/POLITICAL PERSPECTIVE: analysis of Information Literacy as an educational policy goal; c) COGNITIVE PERSPECTIVE: analysis of Information Literacy as a form of personal competence. As a consequence of the proposed theses, the following foci of the Information Literacy discourse are identified: • Information Literacy rationale (theses 1,2,3); • Policy awareness (theses 4,5,6); • Planning and implementation (theses 7,8,9); • Individual development (thesis 10). Against this background, it can be explored how the distinction between different stratifications – by trying to give an order to the reasoning about the issues concerning literacy in information – can facilitate the identification of a set of variables to be taken into account in defining a coherent strategy towards making Information Literacy legitimate within the European Higher Education context. Nearly twenty years after the historical ALA report42, the configuration of discourse about the IL phenomenon appears focused around the following key issues: the promoter community of the IL problem is the librarian one; in the Library and Information Science (LIS) field a large consent about IL importance do exists, but a universally accepted definition of the concept is still lacking; outside the LIS community a very scarce awareness of the question and of the distinction between the concepts of “Information” and “Informatics” persists and prevails; a great number of tools of self-teaching has been developed, in the form of tutorials, mostly by initiative of libraries; a great amount of specialised literature about IL is available, however it’s 42 ALA Presidential Committee on IL, Final Report on IL, 1989. Available: http://www.infolit.org/documents/89Report.htm EMPATIC WP1/D1.1 Page 53 of 77
  • 56.
    needed an agreementabout concrete actions, agents and ways for an effective embodiment of the IL objective. The IL territory has been ironically defined as "the IL land of confusion"43. In view of the above, we strongly believe that coherent pragmatic decisions can derive from coherent theoretical premises. Therefore, with such intent, we want to propose here several theses, which, supported by adequate argumentations, could be useful in differentiating among discussion levels that, despite their differences, in the literature appears to be undifferentiated. In fact, our conviction is that the lack of a separation between different “stratifications” of reasoning represents one of the main causes of confusion about IL discourse and, consequently, that this obscures the way towards concrete and coordinated policy measures. “Information Literacy” is a complex phenomenon, which can be analysed from several perspectives; here we have chosen to analyse it from the following points of view (see fig.17): 1. disciplinary, as a form of study of information (Culture of Information); 2. social/educational, as a form of literacy (Information Literacy); 3. cognitive, as a form of individual competency (information skills or i-skills). Culture of Information Information Information skills literacy IL universe of discourse Socio-political Cognitive perspective perspective Disciplinary perspective Fig. 17 - Perspectives of analysis of the Information Literacy discourse Reasoning about IL definitions 43 http://lorenzen.blogspot.com/ EMPATIC WP1/D1.1 Page 54 of 77
  • 57.
    The complexity ofthe IL concept exceeds the literal meaning of the expression, nevertheless, the practice of going back to the literal meaning of the term "literacy" can be of use. As resulting from the etymological and philological analysis of the English term “literacy”, this refers to a status, a condition, and in English there is not a verb analogous to the Italian “alfabetizzare”, with a similar meaning of “making people to become literate”44. For the purposes of this paper it’s fundamental to distinguish two meanings of the term literacy: the status (to be literate) and the process (to make someone becoming literate). DEFINITION. Information Literacy (as process): educational process, of political derivation, that aims at spreading in a population a minimum level of competencies for the retrieval, evaluation and exploitation of information from a variety of sources. DEFINITION. Information Literacy (as status): social objective of educational policy; state or condition, result of a process; to have acquired the competence to retrieve, evaluate and use information from a variety of sources. The distinction between the process and its result is essential for the purposes of this paper. In fact, the reasoning on the result articulates around variables like: • expected competency level; • aims of learning; • assessment procedures; while reasoning about the process articulates around other variables, like: • planning of actions, • target communities; • curriculum design; • course configuration; • teaching methods. The theses described in the following paragraphs are strictly connected with the definitions here provided: some of them represent a justification of the proposed definitions, particularly for terms in italic, while others are consequences of them. Other theses provide the rationale of our reasoning and thus are described as first in the next section. 3.1.1 Information Literacy as a discipline of study Thesis 1: The culture of information falls within the disciplinary field of documentation- information science Firstly, we want to place in a definite disciplinary field the knowledge transferred during the process of IL. This perspective of analysis regards IL as a form of study of information, as a branch of knowledge and therefore as a subject of study, which we will call “Culture of Information”. We refer to the seminal work of Fritz Machlup and Una Mansfield8 for a deepening and a comparison between nine disciplinary fields, whose study object, principle or secondary, is information: 44 In fact, the English verb “to alphabetize” means “to put in alphabetical order”. EMPATIC WP1/D1.1 Page 55 of 77
  • 58.
    “cognitive sciences, computerand information science, artificial intelligence, linguistics, library and information sciences, cybernetics, information theory, mathematical system theory and general system theory”.45 In the same work the authors explain the debate about the suitability of the connotation as “science” for some disciplines, an issue outside the scope of this paper. Nevertheless, it is worth to underline the existence of cultural differences in the study of information, even in the limits of the LIS (Library and Information Sciences) field. The common theoretical matrix of the various documentary disciplines – Archival Science, Library Science, Bibliography, Documentation or Information Science46 – is undeniable. However, those elements, which at a theoretical level represent a partial difference, in the purposes of the single disciplines constitute a relevant distinction. By accepting such significant common matrix, the Culture of Information inherits methodologies and tools from Bibliography, Library Science, Documentation, Scientific Research Methodologies and Computer Science.47 However, from Documentation three fundamental elements are additionally and specifically inherited: - the ability of mapping heterogeneous sources, - a critical sense and evaluation ability, - and – most important – the typology of results. In fact, by limiting the comparison between Documentation and Library Science in other papers we have underlined that: “In comparison with the result of the reference service, which points out and refers to information sources, the result of the documentation service is a synthetic processing of various sources; it is the answer and not just a medium to achieve it.”48 As to the comparison between Library Instruction and Information Literacy, the first one is limited to sources and services provided by the library and it is addressed to library users, while the second one relates to every form of explicit, codified and recorded information, and it is addressed to everyone who needs information for study or practical purposes. As a disciplinary field, IL can therefore be considered as a branch of the Information Science, as this one affects much more IL aims. The relation between Culture of Information and Information Science or Documentation can be better described through an analogy with the relation between Computer Literacy and Computer Science; reasoning about this analogy on the one hand is useful to put an accent on the distinction between the concepts of Information Literacy and Computer Literacy, on the other hand to better understand the disciplinary placement of IL. The disciplinary matrix of Computer Literacy is Computer Science, as well as that one of IL is Information Science. 45 MACHLUP, F. , MANSFIELD, U. (1983) The study of information. Interdisciplinary messages, Wiley & Sons. 46 Hereafter the terms Documentation and Information Science will refer to the same discipline, since the former – in use until 1969 - is the older name of the latter. 47 the list is merely in alphabetical order, without any attribution of relevance as to the influence on IL of the various disciplines. 48 BASILI, Carla. L’assetto disciplinare della Documentazione. Alcune riflessioni, "AIDA Informazioni", 18(2000), n. 3/4, p.30-35 EMPATIC WP1/D1.1 Page 56 of 77
  • 59.
    Therefore we couldpoint out a derivation relation between matrices and branches as follows: branch X : matrix X = branch Y : matrix Y which in the analysed case appears as follows: Information Literacy : Information Science = Computer Literacy : Computer Science A first consequence of this relation is that in both couples the matrix is a discipline, which forms the professionals of that subject (respectively documentalist and the so called computer specialists), while the branch is a discipline, which forms the user, respectively of information and of computers. This can be synthetically represented as: Information Science : Information Professional = Computer Science : Computer Professional Information Literacy : Information User = Computer Literacy : Computer User A second consequence relates to the inheritance of basic characteristics from the matrix: the branch inherits the main characteristics of the matrix from which it derives. Should we place the different concepts in a thesaurus, the relation between terms could be represented as follows: Information Science Computer Science NT Information Literacy NT Computer Literacy And vice versa: Information Literacy Computer Literacy BT Information Science BT Computer Science Therefore - we want to stress again - Culture of Information is aimed at educating the information user, and it is distinguished from the education of the information professional. Thesis 2: The Culture of information is a knowledge independent from every application domain The definition of “discipline” provided by Machlup and Mansfield, that we entirely report: “Disciplines (sciences, academic areas of research and teaching) are orderly arrangements (metaphorically called bodies) of coherent thoughts, formulated as propositions, about things (sense-objects or thought-objects) deemed worthy of being known (i.e., being believed with some degree of confidence) and being passed on. (Machlup-Mansfield, p.3)” is enough clear and simple for the scope of our reasoning. In addition, most scientific disciplines present a theoretical and an applicative component. This is affirmed by Borko in relation to Documentation, at the moment of the epochal transition from “Documentation” to “Information Science” in 196849. 49 This change of denomination is considered as officially ratified in 1969 with the new denomination of the American Documentation Institute, which became American Society for Information Science. EMPATIC WP1/D1.1 Page 57 of 77
  • 60.
    “Information Science [... ] is concerned with that body of knowledge relating to the origination, collection, organisation, storage, retrieval, interpretation, transmission, transformation, and utilisation of information. It has both a pure science component, which enquires into the subject without regard to its application, and an applied science component, which develops services and products. (Borko,196850)” Ancient philosophers already made a distinction between !"#$%&µ& (epistéme) – science or scientific cognition - and '()*& (téchne) – art, skill or ability, instrumental, context and practical knowledge. Aristotle’s position, in particular, has been understood by modern science as basis of the distinction between theory (possession of knowledge) and practice (the field of craft, profession)51. Because of its derivation from Documentation (compare Thesis 1), the Culture of Information inherits the same components. The theoretical component is based on a set of general principles, logical constructions and standardised methodologies, inheritance of the Information Science52, which represent the theoretical basis for structuring, representing and organising information. Objects of study, just citing some of them, are: architecture of a system for information retrieval, structure of an apparatus for indexing, methodologies of evaluation of sources, criteria for analysis of sources, techniques for production of dossiers. Besides these we find general principles and context knowledge such as: concept of bibliographic control, processing of the documentary chain, information life cycle, and ethical use of information. Such theoretical foundation is completely independent from its applicative context, which permits to place the Culture of Information among the other disciplines of study. The theoretical component, in other words, constitutes the property of transversality of the Culture of Information with respect to subject (or vertical) disciplines like Astrophysics, Geology, Medicine, and so on (see Thesis 3 below). On the other hand, only the applicative component of the Culture of Information can – but not necessarily must – be intended as functional for a specific domain or field of study. It comprises the study of services and information resources of interest for a specific subject field. The applied component can be integrated into various vertical disciplines (compare Thesis 3 below), through the indication of specific sources and description of particular reference systems, also with support of the library staff. Another important distinction is between the concepts of education and training. In previous papers we already underlined the need of establishing a Culture of Information53, that means to infuse values as to the importance of information and its ethical use, while training is mainly concerned with instructions for using tools and information resources. The specialised literature distinguishes different kinds of knowledge: 50 BORKO, Harold (1968) Information science: What is it? Journal of the American Society for Information Science, 19, 3-5. 51 PARRY, Richard, "Episteme and Techne", The Stanford Encyclopedia of Philosophy (Summer 2003 Edition), Edward N. Zalta (ed.), Available: http://plato.stanford.edu/archives/sum2003/entries/episteme-techne 52 This set of general principles constitute the theoretical foundation of Information Science as a scientific discipline 53 BASILI, C. (2000), “Information literacy”: un concetto solo statunitense? (Information literacy: a issue only in the USA?). “AIDAinformazioni”, 19 (2001), n. 2 EMPATIC WP1/D1.1 Page 58 of 77
  • 61.
    know-why: is the knowledge of general principles and laws, which govern nature, human mind and society; • Know-what: is the knowledge of facts (contiguous, as regards its meaning, to that which is commonly defined “information”) • Know-how: refers to the skill and competence in doing something. With a view to such distinction and considering the large proliferation of courses and IL tutorials, most of which is designed for auto-instruction, we want to stress that IL is mainly "knowledge", not only "ability". This view is supported by Shapiro’s and Hughes’s concept, who include IL among the liberal arts, as already mentioned (see § 1.2.1 in Section 1 of this report) "Information and computer literacy, in the conventional sense, are functionally valuable technical skills. But information literacy should in fact be conceived more broadly as a new liberal art that extends from knowing how to use computers and access information to critical reflection on the nature of information itself, its technical infrastructure, and its social, cultural and even philosophical context and impact - as essential to the mental framework of the educated information-age citizen as the trivium of basic liberal arts (grammar, logic and rhetoric) was to the educated person in medieval society." 54 Thesis 3: The Culture of information is a kind of transversal knowledge In the specialised literature often recurs the distinction between subject disciplines and cross- curricular disciplines, where the former– which we call here “vertical” – are focused to a particular field of study and research, while the latter – which we call “horizontal” – have methodological character, independent from a specific scientific sector. The Culture of information, as Informatics and Second Language, is transversal to every intellectual activity, and thus it can be introduced in any course of study. In fact, it can be counted among the methodologies of scientific research and it has been defined as the basis for “learning how to learn”. Furthermore, the competencies acquired (information skills) are defined in the European Education Thesaurus as included in the Basic Education17, as follows: 54 SHAPIRO, Jeremy J. and HUGHES, Shelley K. (1996) Information Literacy as a Liberal Art: Enlightenment proposals for a new curriculum. «Educom review». 31 (2), 31-35. Available: http://www.educause.edu/pub/er/review/reviewArticles/31231.html) EMPATIC WP1/D1.1 Page 59 of 77
  • 62.
    basic education MT (10) content of education da: grunduddannelse de: Grundbildung el : +,-./0 1/2,.314-1 es: educación básica fi : perusopetus fr : éducation de base it : educazione di base nl : fundamenteel onderwijs pt : Educação de base sv: grundutbildning SN instruction in subjects of elementary education, social skills and community responsibilities UF fundamental education NT1 computer literacy NT1 information skills RT basic training RT content of education RT minimum competencies Thesis 4: The Culture of information is distinct from the Informatics culture In 1983 F.W. Horton pointed out the distinction between Information Literacy and Computer Literacy – affirming that: “Computer literacy has to do with increasing our understanding of what the machine can and cannot do. There are two major components of computer literacy: hardware and software. … Information literacy, then, as opposed to computer literacy, means rising the level of awareness of individuals and enterprises to the knowledge explosion, and how machine-aided handling systems can help identify, access and obtain data, documents and literature needed for problem- solving and decision-making. [Horton, 1983]55” As a matter of facts, today all the secondary information and an increasing part of the primary is available in electronic format. Correspondently, a great variety of search software exists and therefore its functionality as computer application has to be understood and studied. 55 HORTON, Forrest Woody Jr. (1983), Information literacy vs. computer literacy. “Bulletin of the American Society for Information Science”, Vol. 9, No. 4, April 1983 EMPATIC WP1/D1.1 Page 60 of 77
  • 63.
    Nevertheless, the largepart of the study should concern the general logic of the internal design of this class of packages, and its strong relation with the underlying information architecture. 3.1.2 Information Literacy as social objective Thesis 5: Information Literacy is a requisite of the Information Society The reasons supporting this thesis can be found in the introduction of nearby all articles dealing with the issue of Information Literacy, therefore we will just cite the most recurring slogans related to well-known problems and needs of the current Information Society: • information overload; • information smog; • learn how to learn; • active citizenship; • information divide. The only remark we want to underline is a kind of graduality in the different purposes of Information Literacy. In the literature it seems to exist a large consent about the close relation between Information Literacy and processes like problem-solving and decision-making. However, these purposes can be conceived as one end of a spectrum, where the opposite end is the enlargement of individual knowledge. With Fig.18 we try to provide a graphic representation of this concept. Activity Goal Context Decision-making Decision Lifelong learning problem-solving Investigation - Scientific research/ Dossier/report interpretation vocational education Enlargement of individual Study Formal Education knowledge Fig. 18 - Aims and contexts of Information Literacy exploitation EMPATIC WP1/D1.1 Page 61 of 77
  • 64.
    Thesis 6: InformationLiteracy is an objective of educational policy In previous paragraphs we defined information literacy as an educational policy goal. In the following ones we will give a number of argumentations supporting this thesis. Firstly, the original meaning of term “literacy” – i. e. “to be able to read and write” – historically originates as political objective aiming at solving the question of illiteracy. Furthermore, Zurkowsky56 himself, to whom – as already remembered - the coin of the expression “information literate” has been attributed, characterizes it as an intervention of political matrix. This cannot be recognized in the sentence intensively cited in the literature as follows: “People trained in the application of information resources to their work can be called information literates. They have learned techniques and skills for using the wide range of information tools as well as primary sources in molding information solutions to their problems [Zurkowski, 1974]“. but rather in the abstract of his paper found in the Eric database57: “The relations of the National Program for Library and Information Services to information literacy and the information industry are discussed. Private sector information resources are identified in several categories. The traditional relations of libraries and with the information industry are described, and examples are given of situations where traditional roles of libraries and private sector information activities are in transition. It is suggested that the top priority of the National Commission on Libraries and Information Science should be directed toward establishing a major national program to achieve universal information literacy by 1984. (PF)” In fact, in the abstract – as we can see – is clearly mentioned Zurkowsky’s hope that a national program would be started, aiming at achieving universal information literacy within a decade. Thesis 7: Information Literacy implies a massive operation The definition of information literacy proposed in section 2. implies the concept of “target population” of the Information Literacy process. As we understood this expression and according to the character of Zurkowsky’s paper, target population is every citizen who is in condition of information illiteracy. However, it is necessary to consider those cases where the educational objective is pursued for a limited universe in comparison with that of a whole nation: a region, a province, a municipality, a university, a school. The case of studying population of universities is of particular interest to our analysis. The IL process, anyway, implies the idea of a mass-operation, according to its policy connotation (see theses 6). This aspect can be easily recognised even in the denomination of international initiatives like the UNESCO “Information for all Programme”. Thesis 8: Information Literacy refers to a minimum amount of competencies The concept of literacy has been extended from its original meaning, i. e. “ability to read and write”, to that of competencies of general character, dispensed to individuals which are 56 ZURKOWSKI, Paul (1974), The information service environment: Relationships and priorities. Washington, DC : National Commission on Libraries and Information Science. Government Printing Office, 1974 (Report ED 100391). 57 ED100391: The Information Service Environment: Relationships and Priorities. Related Paper No. 5. EMPATIC WP1/D1.1 Page 62 of 77
  • 65.
    completely or nearlycompletely incompetent in that matter58. This is opposite, we underline this concept, to the professional training of information specialists (see Thesis 1). We can consider three levels of competence: Basic Advanced Specialised In fact, besides the literal meaning of the term “literacy” - which calls for an educational strategy informed to a “minimum common denominator” - it could be useful to consider also both advanced and specialised levels of competence, particularly in the Higher Education context. Our vision of the three levels of IL competency is outlined below. Basic IL competencies: • Fundamental concepts: value of information, a general picture of the information universe • Basic theoretical level: information mapping, Information Retrieval basics, minimum set of evaluation criteria Advanced IL competencies: • Basic IL competencies • Analysis of information sources • The logic of the Information Retrieval process • Semantic representation of documents (basic concepts) • Scientific writing Specialised IL competencies: • Advanced IL competencies • Disciplinary information mapping • Specific search tools • Disciplinary writing The distinction among different levels of IL competency is relevant for the discussion about two main points: the configuration of IL relative to the curriculum and the attribution of the charge of teaching. Thesis 9: Information Literacy requires changes in the education system To date, the teaching dimension of IL has been developed mostly by autonomous initiative of libraries worldwide, in the common format of tutorials and self-instruction courses (see PRIMO)59. Nevertheless, IL – as a requisite of the Information Society (see thesis 5) – cannot be developed in episodic and fragmented forms, but rather through coherent policy measures concerning modifications in the education system. 58 We intend, for example, the processes of diffuse Second language and Computer Literacies launched in the primary school in the last decades. 59 http://www.ala.org/ala/acrlbucket/is/iscommittees/webpages/emergingtech/site/index.cfm EMPATIC WP1/D1.1 Page 63 of 77
  • 66.
    This topic representsa key issue for an effective implementation of the IL process, as it comprises a conversion of policy goals into operational terms. Implementing such transformation means to identify (and agree upon) one of the alternative paths of modification of the education system. The general concept of Education Policy as it is defined into the TESE – Thesaurus for Education Systems in Europe – 2006 Edition60: Education policy MT (04) UF educational policy NT access to education NT accreditation NT democratisation of education NT duration of compulsory education NT duration of studies NT duration of the academic year NT duration of the school year NT forecasting NT free education NT language policy NT planning NT priority area NT promotion of mobility NT reform NT school closure NT setting up a school RT education RT educational authority can help in outline the issue. We underlined those terms which are (to different extents) of interest for an IL policy. 3.1.3 Information Literacy as cognitive acquisition of individuals Thesis 10: Information competencies (or i-skills) must be certificated Acquired information competencies constitute the learner dimension of Information Literacy. The cognitive perspective is the most analysed in the literature and a number of standards has been developed for different classes of learners. Of particular interest for the scope of this paper are the ACRL Competency Standards for Higher Education61 . It is meaningful to distinguish between two main classes of learners: • those still within the cycles of formal education (pupils in primary education, students in secondary and higher or tertiary education); • those already outside the formal education system, i.e. in the lifelong learning context. 60 http://www.eurydice.org/portal/page/portal/Eurydice/TESEHome It is meaningful to note that on April 2008 the descriptor “Information Literacy” is absent from the Tese thesaurus, while it is present in the Eric Thesaurus since 1992. 61 http://www.ala.org/ala/acrl/acrlstandards/informationliteracycompetency.cfm EMPATIC WP1/D1.1 Page 64 of 77
  • 67.
    Information competencies achievedwithin the formal Education fall within the standard evaluation procedures, like any other competence dispensed there. In previous sections the connotation of the Culture of information as an autonomous discipline has been already discussed (compare theses 1-3). Out of the formal education cycles, and therefore in the lifelong learning context, it is necessary to define and develop methodologies for standard certification. In this direction could be the setting-up of an Information Driving License – perhaps at European level (EiDL62), analogous to the European Computer Driving License (EcDL). The EiDL could be calibrated on a minimum level of competency (the basic level – see thesis 8) in order to be suitable for both a massive operation (see theses 7) and generalised needs, independent from a specific application field (see thesis 2). 3.2. Consequences of the proposed framework The theses illustrated in the previous sections can be, in turn, assumed as statements to be taken into account in outlining how IL could be institutionalised in Europe, with particular focus on Higher Education institutions. A first step should be that of promoting among academics and policy makers the awareness of both the need of IL (see thesis 5) and the distinction between IL and Computer Literacy (thesis 4). Alongside, the idea of replicating – mutatis mutandis – an institutional configuration path similar to that of Computer Literacy can be suggested. Both disciplines, in fact, are transversal and useful to every course of study (see thesis 3). A second step could be to insert IL among the learning outcomes of European universities and, particularly, among the so-called “generic instrumental competencies” (theses 11 and 3). A viable solution could be to integrate the ACRL Competency Standards for Higher Education into the Tuning project63 activities64. A strong assumption underlying the previous steps is to recognise the Culture of Information as a discipline in its own right (thesis 1), to be conceived mainly as "knowledge" then as mere "ability" (thesis 2), independent from any subject discipline (thesis 2), except for its applicative component (thesis 1), which can be related to the specialised IL competency level (thesis 10). The second edition of the ANZIL framework65, includes the following table, adapted from the work of Bruce66, illustrating IL program components:: BASILI, C. (ed.) Information literacy in Europe. A first insight into the state of the art of information literacy in the 62 European Union. Consiglio Nazionale delle Ricerche, Roma, 2003, 315 pp., p. 9 63 http://tuning.unideusto.org/tuningeu/ 64 It is important to underline that the Tuning project is a university-led project. It presents the motivated and generous work of 128 academics from 105 University departments across the length and breadth of Europe (http://tuning.unideusto.org/tuningeu/: final report of Tuning phase 1) 65 BUNDY, A. (ed.) (2004) Australian and New Zealand Information Literacy Framework. Principles, standards and practice. Second edition, Australian and New Zealand Institute for Information Literacy, Adelaide. 66 BRUCE, C. (2002) Information literacy as a catalyst for educational change: a background paper. White paper prepared for UNESCO, the US National Commission on Libraries and Information Science, and the National Forum on Information Literacy for use at the Meeting of Information Literacy Experts, Prague The Czech Republic 2002 Available: http://www.nclis.gov/libinter/infolitconf&meet/papers/bruce-fullpaper.pdf EMPATIC WP1/D1.1 Page 65 of 77
  • 68.
    Generic Extra curricular classes and/or self paced packages Parallel Extra curricular classes and/or self paced packages that complement the curriculum Integrated Classes and packages that are part of the curriculum Embedded Curriculum design where students have ongoing interaction and reflection with information Table.1 Information literacy program components We would like to use this classification for reasoning about a range of disciplinary configurations of the discipline “Culture of Information” with respect to the academic curriculum. This implies a reformulation of the Anzil table above as follows: Generic Extra curricular, not credit-bearing Parallel Extra curricular discipline, credit-bearing, optional Integrated A discipline inserted into the curriculum, credit- bearing, mandatory Embedded Part of subject disciplines Tab. 2 - disciplinary configurations of IL According to table 2, the responsibility of teaching could be attributed to librarians for the basic level competencies (what in the table is “generic”) and to academic staff from the LIS Faculties for the other configurations. The embedded configuration - corresponding, in our vision, to what we defined as “specialised competency level” - should be imparted by academics of the “host” subject discipline. As concluding remarks, according to the research perspective of the European network on Information Literacy (EnIL), the discussion has been mainly focused to the Higher Education context, even if a large part of the concepts expressed are of general interest. Some of the consequences derived from the proposed framework of analysis are in contrast to the positions dominating the specialised literature. It is hoped that just this contrast could be of some help in the debate around Information Literacy in Europe. EMPATIC WP1/D1.1 Page 66 of 77
  • 69.
    SECTION 4: SELECTEDBIBLIOGRAPHY 1. AACC (American Association of Community Colleges).(2008). Position Statement on Information Literacy. http://www.aacc.nche.edu/About/Positions/Pages/ps05052008.aspx 2. ACRL (2006). Information Literacy Standards for Science and Technology (No. Document ID: 108186): American Library Association http://www.ala.org/ala/mgrps/divs/acrl/standards/infolitscitech.cfm 3. American Association of School Librarians. (2006). Information Power: Building Partnerships for Learning: Learning and Teaching Principles of School Library Media Programs. 4. Andretta, S. (ed.). (2007). Change and Challenge. Information literacy for the 21st Century. Adelaide: Auslib Press 5. Armstrong, C., et al. (2005). Defining information literacy for the UK. Library and Information Update, 4(1). 6. Association of College & Research Librarie (ACRL). (2000). Information Literacy Competency Standards for Higher Education. Chicago, IL: ACRL http://www.acrl.org/ala/mgrps/divs/acrl/standards/standards.pdf 7. Australian and New Zealand Institute for Information Literacy (2004). Australian and New Zealand Information Literacy Framework- 2nd Edition. 8. Barnard, L., et al. (2009). Measuring self-regulation in online and blended learning environments. The Internet and Higher Education, 12, 1-6 9. Basili, C. (2004). Le Réseau européen pour la culture de l’information (EnIL): vers une approche commune dans l’Union européenne pour promouvoir l’usage de l’information. In: Sylvie Chevillotte (Ed.), 3èmes Rencontres FORMIST, June 12th 2003. La formation à la maîtrise de l'information à l'heure européenne: problèmes et perspectives (pp. 37- 54). Villeurbanne: Presses de l'Enssib 10. Basili, C. (2007). Theorems of Information Literacy. In: Proceedings of the Conference “The Information Literacy Landscape”, Belgrade, Serbia, 5th-7th October 2007 11. Basili, C. (ed.). (2003). Information literacy in Europe. A first insight into the state of the art of information literacy in the European Union. Roma: Consiglio Nazionale delle Ricerche 12. Basili, C. (ed.). (2008). Infomation Literacy at the crossroad of Education and Information Policies in Europe. Roma: Consiglio Nazionale delle Ricerche 13. Basili, C. (ed.). (2009).The Observatory on Information Literacy Policies and Research in Europe. Roma: Consiglio Nazionale delle Ricerche 14. Brown, C., & Krumholz, L. (2002). Integrating information literacy into the science curriculum. College and Research Libraries, 63(2), 111-124 http://www.ala.org/ala/mgrps/divs/acrl/publications/crljournal/2002/mar/brown.pdf 15. Bruce, C. S. (1997). Seven faces of information literacy. Adelaide: AULSIB Press st 16. Campbell, S. (2004). Defining Information Literacy in the 21 century. IFLA 17. Candy, P. (2002). Lifelong Learning and Information Literacy. EMPATIC WP1/D1.1 Page 67 of 77
  • 70.
    18. Case, D.(2002). Looking for Information: A Survey of Research on Information Seeking, Needs and Behavior. New York: Academic Press 19. Catts, R., & Lau, J. (2008), Towards Information Literacy Indicators. Paris: Unesco 20. Corrall, S. (2008). Information literacy strategy development in higher education: An exploratory study. International Journal of Information Management, 28, 26-37 21. Eisenberg , M. (2008). Information Literacy: Essential Skills for the Information Age. DESIDOC Journal of Library & Information Technology, 28(2), 39-47 22. Eisenberg, M. (2007). Teaching Information Literacy: Context, Context, Context. In: S. Curzon & L. Lampert (Eds.), Proven strategies for building a successful information literacy program. Neal-Schuman 23. Eisenberg, M., et al. (2004). Information Literacy: Essential Skills for the Information Age. 2nd. Edition. Libraries Unlimited 24. Endrizzi, L. (2006). Les Dossiers d'actualité: Information literacy. Lettre VST, 17. INRP (Institut National de Recherche Pédagogique). Veille scientifique et technologique http://www.inrp.fr/vst/LettreVST/english/17-april-2006_en.php 25. Hancock, V. E. (2004). Information Literacy for Lifelong Learning. 26. Head, A.J. & Eisenberg, M.B. (December 1, 2009). Lessons Learned: How College Students Seek Information in the Digital Age. Project Information Literacy First Year Report with Student Survey Findings. University of Washington's Information School http://projectinfolit.org/pdfs/PIL_Fall2009_finalv_YR1_12_2009v2.pdf 27. Head, A.J. & Eisenberg, M.B. (February 4, 2009). Finding Context: What Today's College Student Say about Conducting Research in the Digital Age. Project Information Literacy Progress Report. University of Washington's Information School http://projectinfolit.org/progress/ 28. Head, A.J. (2007). Beyond Google: How Do Students Conduct Academic Research? First Monday, 12(7) http://www.uic.edu/htbin/cgiwrap/bin/ojs/index.php/fm/article/view/1998/1873 29. Head, A.J. (2008). Information Literacy from the Trenches: How Do Humanities and Social Science Majors Conduct Academic Research? College and Research Libraries, 69(4) 30. Information Literacy Test (ILT), from Madison Assessment. (2009). http://www.madisonassessment.com/assessment-testing/information-literacy-test/ 31. Kapitzke, C. (2003). Information Literacy: A Positivist Epistemology and a Politics of Outformation. Educational Theory, 53, 37-53 32. Kelly, O., et al. (2009). Don’t dilly dally on the way: Driving towards digital information literacy capability. In: Same places, different spaces. Proceedings ascilite Auckland 2009. http://www.ascilite.org.au/conferences/auckland09/procs/kelly-o.pdf 33. Kuhlthau, C. (1999). Literacy and Learning for the Information Age. In: Stripling, B. (ed.) Learning and Libraries in an Information Age: Principles and Practices. Libraries Unlimited; Teacher Ideas Press: Eaglewood, Colorado, 1999, p. 3-21 [Principles and practices series] 34. Kurbanoglu, S.S., Akkoyunlu, B. & Umay, A. (2006). Developing the information literacy self-efficacy scale. Journal of Documentation, 62(6), 730-743 EMPATIC WP1/D1.1 Page 68 of 77
  • 71.
    35. Lau, J.(2006), Guidelines on Information Literacy for Lifelong learning. http://www.ifla.org/VII/s42/pub/IL-Guidelines2006.pdf 36. Liu, H., Chuang, H. & Huang, J. (2008). The correlation among web-based learners’ self-efficacy, learning strategies and outcomes. In: K. McFerrin et al. (Eds.), Proceedings of Society for Information Technology and Teacher Education International Conference 2008 (pp. 3030-3034). Chesapeake, VA: AACE 37. Lupton, M. (2008). Information literacy and learning. Adelaide: Auslib Press 38. Maybee, C. (2006). Undergraduate perceptions of information use: The basis for creating usercentered student information literacy instruction. The Journal of Academic Librarianship, 32(1), 79-85 39. McGuiness, C. (2006). What faculty think – exploring the barriers to information literacy development in undergraduate education. The Journal of Academic Librarianship, 32(6), 573-82 40. Mednick, M. (2002). Information Literacy: The New Challenge. California: City of Publication 41. Moore, P. (2002). An Analysis of Information Literacy Education Worldwide. White paper prepared for UNESCO, the U.S. National Commission on Libraries and. Information Science, and the National Forum on Information Literacy, for use at the Information Literacy Meeting of Experts, Prague, The Czech Republic 42. MSCHE (Middle States Commission on Higher Education). (2003). Developing Research and Communication Skills. Guidelines for Information Literacy in the Curriculum. MSCHE http://www.msche.org/publications/Developing-Skills080111151714.pdf 43. New Jersey Institute of Technology (NJIT). (2009). Institute Information Literacy Plan. Newark, NJ: New Jersey Institute of Technology. http://library.njit.edu/docs/njit-info- lit-plan-caa-approved-05-20-2009.pdf 44. Project SAILS (Standardized Assessment of Information Literacy Skills).(2001-2006). Kent State University and the Association of Research Libraries https://www.projectsails.org/sails/aboutSAILS.php?page=aboutSAILS 45. Rader, H. (2002). Information Literacy 1973-2002: A Selected Literature Review. Library Trends, 51(2), 242-259. 46. Reed, M., Kinder, D., & Cecile, F. (2007). Collaboration between librarians and teaching faculty to teach information literacy at One Ontario University: experiences and outcomes. Journal of Information Literacy, 1(3) http://digitalcommons.ryerson.ca/cgi/viewcontent.cgi?article=1011&context=library_pu bs 47. Scharf, D. (2009). Are we teaching our students to be information literate? Newark, NJ: New Jersey Institute of Technology. University Lecture Series. Sept 24, 2009. Powerpoint. 48. Scharf, D., Elliot, N., & Huey, H. (2006). NJIT Assessment Scales: Information Literacy. http://library.njit.edu/docs/NJIT-ILRubric.pdf 49. Scharf, D., et al. (2007). Direct Assessment of Information Literacy Using Writing Portfolios. Journal of Academic Librarianship, 34, 462-477 50. SCONUL Advisory Committee on Information Literacy (1999). Information skills in higher education: a SCONUL Position Paper. The Society of College,National and EMPATIC WP1/D1.1 Page 69 of 77
  • 72.
    University Libraries http://www.sconul.ac.uk/groups/information_literacy/papers/Seven_pillars2.pdf 51. Sharma, S., et al. (2007). Self-regulated learning and e-learning. In: H. Österle, J. Schelp & R. Winter (Eds.), Proceedings of the Fifteenth European Conference on Information Systems (pp. 383-394). St. Gallen: University of St. Gallen 52. Small, R. V., Zakaria, N. & El-Figuigui, H. (2004). Motivational aspects of information literacy skills instruction in community college libraries. College & Research Libraries, 65(2), 96-121. 53. Suskie, L. (2006). Five Dimensions of Good Assessment. Middle States Commission on Higher Education. http://library.njit.edu/researchhelpdesk/infolit/docs/suskie-msche- assessmentsummary-2006.pdf 54. The Bay Area Community Colleges Information Competency Assessment Project (2004). http://www.topsy.org/ICAP/ICAProject.html 55. Thornton, S. (2008). Pedagogy, Politics and Information Literacy. Politics, 28(1), 50-56 56. Unesco, Ifla, & Nfil. (2005). The Alexandria proclamation on Information Literacy and Lifelong Learning. http://www.ifla.org/III/wsis/BeaconInfSoc.html 57. Virkus, S. (2003). Information literacy in Europe: a literature review. Information Research, 8(4), paper no. 159 http://informationr.net/ir/8-4/paper159.html 58. Warner, D. A. (2008). An Illustration in Process: Recommended Sequence for Bibliographic and Information Literacy for an Interdisciplinary Program in the Sciences: The Integrated Sciences and Math Major. A Disciplinary Blueprint for the Assessment of Information Literacy. Westport, CT: Libraries Unlimited http://library.njit.edu/researchhelpdesk/infolit/docs/warner-chapter4-2008.pdf 59. Wilson, T.D. (1981). Unisist Guidelines for Developing and Implementing a National Plan for Training and Education in Information Use, preliminary version. Paris: Unesco 60. Winkworth, F.V. (1977). User education in schools: a survey of the literature on education for library and information use in schools. London: The British Library. Research and Development Departments (BLRDD 5391 HC) 61. Zurkowsky, P. (1974). The information service environment: Relationships and priorities. Washington, DC: National Commission on Libraries and Information Science. Government Printing Office (ED 100391- Eric Clearinghouse) http://library.njit.edu/researchhelpdesk/infolit/docs/scharf-universitylecture- 24sept09.pdf 62. Tsai, M. J. (2009). The model of strategic e-learning: Understanding and evaluating student elearning from metacognitive perspectives. Educational Technology & Society, 12(1), 34-48 http://www.ifets.info/journals/12_1/4.pdf 63. Head, A.J., & Eisenberg, M.B. (July 13, 2010). Assigning Inquiry: How Handouts for Research Assignments Guide Today's College Students. Project Information Literacy Progress Report.University of Washington's Information School http://projectinfolit.org/pdfs/PIL_Handout_Study_finalvJuly_2010.pdf 64. Head, A.J., & Eisenberg, M.B. (2010). How Today's College Students Use Wikipedia for Course-Related Research. First Monday, 15(3) http://www.uic.edu/htbin/cgiwrap/bin/ojs/index.php/fm/article/view/2830/2476 65. Information Seeking Skills Test, from James Madison University's general education program. (2010). http://www.jmu.edu/gened/info_lit_general.shtml#isst EMPATIC WP1/D1.1 Page 70 of 77
  • 73.
    66. Kiliç-Çakmak, E.(2010). Learning strategies and motivational factors predicting information literacy self-efficacy of e-learners. Australasian Journal of Educational Technology, 26(2), 192-208 67. Miller, M.H. (March 16, 2010). Students Use Wikipedia Early and Often Study Shows. Chronicle of Higher Education http://chronicle.com/blogPost/Students-Use-Wikipedia- Early/21850/ 68. Pinto, M. (2010). Design of the IL-HUMASS survey on information literacy in higher education: A self-assessment approach. Journal of Information Science, 36(1), 86-103 69. Truong, K. (July 27, 2010). Research Assignment Handouts Give Students Meager Guidance. Chronicle of Higher Education http://chronicle.com/article/Research- Assignment-Handouts/123702/?sid=at&utm_source=at&utm_medium=en 70. Weiner, S. & Jackman, L.W. (2010). Information literacy beyond the library: The national forum on information literacy. College & Undergraduate Libraries, 17(1), 114- 120 71. Weiner, S. (2010). Information literacy: A Call to Action, College and Research Library News, 71(7) http://crln.acrl.org/content/71/7 72. Weiner, S. (2010). Information Literacy: A Neglected Core Competency. Educause Quarterly, 33(1) http://www.educause.edu/EDUCAUSE+Quarterly/EDUCAUSEQuarterlyMagazineVolum/I nformationLiteracyANeglectedC/199382 REFERENCES American Library Association (ALA). (1998). Information literacy standards for student learning: standards and indicators http://www.ala.org/ala/aasl/aaslproftools/informationpower/InformationLiteracyStandards_final.pdf American Library Association Presidential Committee on Information Literacy (January 10, 1989). Final report. http://www.ala.org/ala/mgrps/divs/acrl/publications/whitepapers/presidential.cfm Andretta, S. (2005). Information Literacy: A Practitioners’ Guide. Oxford: Chandos Publishing, as cited in Crawford, J. (2006). The Culture of Evaluation in Library and Information Services. Chandos Publishing Association of College & Research Libraries (ACRL). (January 2000). Information Literacy Competency Standards for Higher Education. Chicago, IL: ACRL http://www.acrl.org/ala/mgrps/divs/acrl/standards/standards.pdf Australia & New Zealand Institute for Information Literacy (ANZIIL) http://www.anziil.org/resources/Infolit2ndedition.pdf Barrie, S.C. (2005). Rethinking Generic Graduate Attributes. HERDSA News [Draft, March 5, 2005] Basili, C. (2000). L’assetto disciplinare della Documentazione. Alcune riflessioni. AIDAinformazioni, 18(3/4), 30-35 Basili, C. (2001). “Information literacy”: un concetto solo statunitense? (Information literacy: a issue only in the USA?). AIDAinformazioni, 19(2) EMPATIC WP1/D1.1 Page 71 of 77
  • 74.
    Basili, C. (2008).Information and education policies in Europe: key factors influencing information literacy academic policies in Europe. In: Carla Basili (ed.), Information Literacy at the crossroad of Education and Information Policies in Europe (pp. 18-32). Roma: Consiglio Nazionale delle Ricerche Basili, C. (ed.). (2003). Information literacy in Europe. A first insight into the state of the art of information literacy in the European Union. Roma: Consiglio Nazionale delle Ricerche Basili, C. (ed.). (2003). Information literacy in Europe. A first insight into the state of the art of information literacy in the European Union (p. 9). Roma: Consiglio Nazionale delle Ricerche Basili, C. (ed.). (2008). Information Literacy at the crossroad of Education and Information Policies in Europe. Roma: Consiglio Nazionale delle Ricerche Bawden, D. (2001) Information and Digital Literacies: A Review of Concepts. Journal of Documentation, 57(2), 218- 259 Behrens, S.J. (1994). A conceptual analysis and historical overview of information literacy. College & Research Libraries, 55(4), 309-322 Borko, H. (1968). Information science: What is it? Journal of the American Society for Information Science, 19, 3-5 Bruce, C. (2002). Information literacy as a catalyst for educational change: a background paper. White paper prepared for UNESCO, the US National Commission on Libraries and Information Science, and the National Forum on Information Literacy for use at the Meeting of Information Literacy Experts, Prague The Czech Republic 2002 http://www.nclis.gov/libinter Bruce, C.S. (2000). Information literacy programs and research: an international review. Australian Library Journal, 49(3), 209-218 Bundy, A. (ed.). (2004). Australian and New Zealand Information Literacy Framework. Principles, standards and practice. Second Edition. Adelaide: Australian and New Zealand Institute for Information Literacy Candy, P. (2002). Lifelong Learning and Information Literacy. White paper prepared for UNESCO, the US National Commission on Libraries and Information Science, and the National Forum on Information Literacy, for use at the Information Literacy, meetings of Experts. Prague: The Czech Republic (pp. 1-17). http://www.nclis.gov/libinter/infolitconf&meet/papers/candy-paper.pdf Choo, C.W. (1995). Information Management for the Intelligent Organization: The Art of Scanning the Environment. Medford, NJ: Information Today Choo, C.W. (1995). Information Management for the Intelligent Organization: Roles and Implications for the Information Professions. In: Proceedings of the Digital Libraries Conference, March 27-28, 1995, Singapore http://choo.fis.utoronto.ca/fis/respub/dlc95.html Doyle, C. (1994). Information literacy in an information society: A concept for the information age. Syracuse, NY: ERIC Clearinghouse on Information and Technology European Association for Quality Assurance in Higher Education (ENQA). (2005). Report on Standards and Guidelines for Quality Assurance in the European Higher Education Area. Helsinki, ENQA Garner, S.D. (2005). High level colloquium on information literacy and lifelong learning. Bibliotheca Alexandrina, Alexandria, Egypt November 6-9, 2005. Report of the meeting http://archive.ifla.org/III/wsis/High-Level- Colloquium.pdf EMPATIC WP1/D1.1 Page 72 of 77
  • 75.
    Horton, F.W. Jr.(1983). Information literacy vs. computer literacy. Bulletin of the American Society for Information Science, 9(4) Hughes, S.K., & Shapiro, J.J. (1996). Information Literacy as a Liberal Art. Enlightenment proposals for a new curriculum. Educom Review, 31(2), 31-35 http://net.educause.edu/apps/er/review/reviewarticles/31231.html Kirton, J., & Barham, L. (2005). Information Literacy in the Workplace. The Australian Library Journal, 54(4), 365- 376 Machlup, F., & Mansfield, U. (1983). The study of information. Interdisciplinary messages. Wiley & Sons Mutch, A. (1997). Information literacy: an exploration. International journal of information management, 17(5), 377-86 Orr, D., Appleton, M., & Wallin, M. (2001). Information literacy and flexible delivery: creating a conceptual framework and model. Journal of Academic Librarianship, 27(6), 457-463 Parry, R. (2003). “Episteme and Techne”. In: Edward N. Zalta (ed.), The Stanford Encyclopedia of Philosophy. Summer 2003 Edition http://plato.stanford.edu/archives/sum2003/entries/episteme-techne Senn Brevik, P. (2001). Information literacy and lifelong learning: The magical partnership. In: Proceedings of the 1st International Lifelong Learning Conference. Central Queensland University, Rockhampton, Queensland, Australia (pp. 1-6). The European network for Information Literacy (EnIL) http://www.ceris.cnr.it/Basili/EnIL/index.html The European Observatory on IL Policies and Research http://www.ceris.cnr.it/Basili/EnIL/gateway/gatewayhome.htm The European Parliament and the Council of the European Union. (2006). Recommendation of 18 December 2006 on key competences for lifelong learning. (30.12.2006 EN Official Journal of the European Union L 394/13) http://eur- lex.europa.eu/LexUriServ/LexUriServ.do?uri=OJ:L:2006:394:0010:0018:en:PDF U.S. Department of Labour. (June 1991). What Work Requires of Schools: A SCANS Report for America 2000. UNESCO. (April 20, 2005). Thematic debate on information literacy: final report. http://portal.unesco.org/ci/en/ev.php-URL_ID=18775&URL_DO=DO_TOPIC&URL_SECTION=201.html Urquhart, D.J. (1975). Developing a National Information Policy. A NATIS guideline. UNESCO, 24 pp: The issue of user education is at the top of the list of priorities for “Developing the Information Plan” Webber, S., & Johnston, B. (2003). Information literacy in the United Kingdom: a critical review. In: Carla Basili (ed.), Information literacy in Europe. A first insight into the state of the art of information literacy in the European Union (pp. 258-283). Roma: Consiglio Nazionale delle Ricerche Zurkowsky, P. (1974). The information service environment: Relationships and priorities. Washington, DC: National Commission on Libraries and Information Science. Government Printing Office (ED 100391- Eric Clearinghouse) EMPATIC WP1/D1.1 Page 73 of 77
  • 76.
    LIST OF FIGURES Fig.1. Information literacy in the context of lifelong learning.............................................. 6 Fig. 2- Excerpts from the Alxandria Proclamation on IL and LLL .......................................... 8 Fig. 3. Information literacy and critical thinking. ............................................................. 10 Fig. 4 - The SCONUL proposal ...................................................................................... 14 Fig. 5 - 21st Century Skills. Source: Parnership for 21st century skills ............................... 15 Fig. 6 21st century skills - source: P21 .......................................................................... 16 Fig. 7 - Information Literacy within 21st Century Skills (Source P21 framework) ................. 16 Fig. 8 - Media Literacy within 21st Century Skills (Source P21 framework) ......................... 17 Fig. 9 - ICT or digital Literacy within 21st Century Skills (Source P21 framework) ............... 17 Fig. 10 - Standards for the 21st Century Learner, AASL, 2007 .......................................... 18 Fig. 11- Class1 skills - - Standards for the 21st Century Learner, AASL, 2007 ..................... 18 Fig. 12 - Class1 Dispositions in Action - Standards for the 21st Century Learner, AASL, 2007 19 Fig. 13 -- Class1-Responsibilities - Standards for the 21st Century Learner, AASL, 2007 ...... 19 Fig. 14. Graphical representation of graduate attributes and their functional aims (Barrie, 2004). ...................................................................................................................... 22 Fig. 15 - Key Competences for Lifelong Learning — A European Reference Framework ......... 28 Fig. 16- representation format of IL best-practices ......................................................... 31 Fig. 17 - Perspectives of analysis of the Information Literacy discourse .............................. 54 Fig. 18 - Aims and contexts of Information Literacy exploitation....................................... 61 LIST OF GRAPHS Graph. 1 - IL initiatives by EU funding Programme .......................................................... 46 Graph. 2 - IL initiatives by institution ............................................................................ 47 Graph. 3- IL initiatives by Country ................................................................................ 48 Graph. 4 - IL initiatives by initiative-type ....................................................................... 49 Graph. 5 - IL initiatives by literacy area ......................................................................... 49 Graph. 6 - IL initiatives by year of launch ...................................................................... 50 Graph. 7 - IL initiatives by Country and year of launch .................................................... 50 Graph. 8 - IL initiatives by target community ................................................................. 51 LIST OF TABLES Tab. 1 - Skills and Tasks for Jobs: A SCANS Report for America 2000 ................................ 27 Tab. 2 - disciplinary configurations of IL ........................................................................ 66 EMPATIC WP1/D1.1 Page 74 of 77
  • 77.
    LIST OF ABBREVIATIONS AASL American Association of School Librarians ACRL Association of College and Research Libraries ADAM Advanced Data Archive and Management System ALA American Library Association ANZIIL Australian and New Zealand Institute for Information Literacy CAUL Council of Australian University Librarians CILIP Chartered Institute of Library and Information Professionals EnIL EnIL – the European network on Information Literacy ENQA European Network for Quality Assurance ESF European structural funds EU The European Union FP Framework Programme HE higher education IFLA International Federation for Library Automation IL Information literacy JISC Joint Information Systems Committee LLL Lifelong learning NFIL National Forum on Information Literacy SCONUL Society of College, National and University Libraries UNESCO United Nations Educational, Scientific and Cultural Organisation VET vocational education and training EMPATIC WP1/D1.1 Page 75 of 77
  • 78.
    http://empat-ic.eu/eng/ Project funded by the European Commission under the Lifelong Learning Programme This publication reflects the views only of the author, and the Commission cannot be held responsible for any use which may be made of the information contained therein. 1