SlideShare a Scribd company logo
OAS Energy GmbH
OAS Energy GmbH
Fischhof 3/6, A – 1010 Wien
Tel.: +43 193080 3130
Fax.: +43 193080 3135 FR_01_OP_QMS_008_00
Date:2015 / 04 / 22
Attention to: Radomir Kanuk
Reference List
Project: Construction of the new unit Nr. 3 for Almirante Álvaro Alberto Nuclear Power Plant in Angra,
Brasil
Position: Expeditor
The job description:
- Monitoring progress of the project.
- Inspection activities during the production of components.
- Identifying potential risk in the production chain and delivery dates.
- Organizing „Technical Meeting“.
- Weekly report of the production chain form customer OAS Energy.
- Final inspection of manufactured components and final documentations.
Entrusted companies:
- Lisega SE: Gerhard-Liesegang-Stasse 1, 27404 Zeven, Germany, www.lisega.de ,
- GERB SCHWINGUNGSISOLIERUNGEN GmbH: 13407 Berlin, Germany,
www.gerb.com.
- MPS Gradior s.r.o.: Křižíkova 2989/68a, Královo pole, 612 00 Brno, www.mps-
gradior.cz.
- DITEC DICHTUNGSTECHNIK GnbH: 97318 Kitzingen, Germany, www.ditec-kt.de.
- TECTUBI RACCORD S.p.A: Podenzano, Piacenza, Italy, www.tectubiraccordi.com.
Mr. Kaňuk was able to address the entrusted tasks independently and with a great precision
so that the company was always able to rely on him. Among the characteristics that I would
like to highlight was an excellent ability to organize time, loyalty, creativity, systematic
approach and expertise. He proved to be a vaild team-player but at the same time, when
needed, he was able to work independently. He was especially keen on improving his
knowledge and skills and implementing them in the daily practice.
Based on his outstanding results, performance and undeniable potential, I can recommend
Mr.Kaňuk from both professional and persoal point of view.
Alexandre de Souza Barbosa
Expediting manager
Tel: +43 1 93080 3131
Mobile +44 741 846 5081
alexandre.barbosa@oas.com
www.oas.com

More Related Content

Similar to Reference _List_OAS

STINGS online mine tailings monitoring solution
STINGS online mine tailings monitoring solutionSTINGS online mine tailings monitoring solution
STINGS online mine tailings monitoring solution
DMT GROUP
 
Germany_New Business Opportunities in German Maritime and Offshore Market_Sem...
Germany_New Business Opportunities in German Maritime and Offshore Market_Sem...Germany_New Business Opportunities in German Maritime and Offshore Market_Sem...
Germany_New Business Opportunities in German Maritime and Offshore Market_Sem...
Business Finland
 
Smm hamburg 2014 olaf
Smm hamburg 2014 olafSmm hamburg 2014 olaf
Smm hamburg 2014 olaf
Thor Ivar Gikling
 
031171 Orient Weavers457866544552144.pdf
031171 Orient Weavers457866544552144.pdf031171 Orient Weavers457866544552144.pdf
031171 Orient Weavers457866544552144.pdf
ssuserdefb02
 
Cv
CvCv
Tools and methods for pre-installation seabed surveys
Tools and methods for pre-installation seabed surveysTools and methods for pre-installation seabed surveys
Tools and methods for pre-installation seabed surveys
Torben Haagh
 
Presentation blp
Presentation blpPresentation blp
Presentation blp
Roland Barow
 
Ivan van zyl edited 2016 MARCH
Ivan van zyl edited 2016 MARCHIvan van zyl edited 2016 MARCH
Ivan van zyl edited 2016 MARCHivan van zyl
 
Offshore Wind Power SUBSTATIONS 2013
Offshore Wind Power SUBSTATIONS 2013Offshore Wind Power SUBSTATIONS 2013
Offshore Wind Power SUBSTATIONS 2013
Torben Haagh
 
Ecdis PLATINUM Certificate 122896 - Oleksiy Osipov
Ecdis PLATINUM Certificate 122896 - Oleksiy OsipovEcdis PLATINUM Certificate 122896 - Oleksiy Osipov
Ecdis PLATINUM Certificate 122896 - Oleksiy OsipovAleksey Osipov
 
resume Kogan D 20151028
resume Kogan D 20151028resume Kogan D 20151028
resume Kogan D 20151028Dmitry Kogan
 
MaiVanBinh_CV
MaiVanBinh_CVMaiVanBinh_CV
MaiVanBinh_CVBINH MAI
 
Mhimdi.sameh. cv
Mhimdi.sameh. cvMhimdi.sameh. cv
Mhimdi.sameh. cv
Sameh Mhimdi, PMP, PMI-RMP
 
Germany_shipbuilding activities 2016
Germany_shipbuilding activities 2016Germany_shipbuilding activities 2016
Germany_shipbuilding activities 2016
Business Finland
 
BDE SC3.3 Workshop - BDE Pilot case for Wind Turbine condition monitoring re...
 BDE SC3.3 Workshop - BDE Pilot case for Wind Turbine condition monitoring re... BDE SC3.3 Workshop - BDE Pilot case for Wind Turbine condition monitoring re...
BDE SC3.3 Workshop - BDE Pilot case for Wind Turbine condition monitoring re...
BigData_Europe
 
Moccia cv
Moccia cvMoccia cv

Similar to Reference _List_OAS (20)

STINGS online mine tailings monitoring solution
STINGS online mine tailings monitoring solutionSTINGS online mine tailings monitoring solution
STINGS online mine tailings monitoring solution
 
Germany_New Business Opportunities in German Maritime and Offshore Market_Sem...
Germany_New Business Opportunities in German Maritime and Offshore Market_Sem...Germany_New Business Opportunities in German Maritime and Offshore Market_Sem...
Germany_New Business Opportunities in German Maritime and Offshore Market_Sem...
 
Smm hamburg 2014 olaf
Smm hamburg 2014 olafSmm hamburg 2014 olaf
Smm hamburg 2014 olaf
 
Lawrence CV på English 2
Lawrence CV på English 2Lawrence CV på English 2
Lawrence CV på English 2
 
031171 Orient Weavers457866544552144.pdf
031171 Orient Weavers457866544552144.pdf031171 Orient Weavers457866544552144.pdf
031171 Orient Weavers457866544552144.pdf
 
Cv
CvCv
Cv
 
Tools and methods for pre-installation seabed surveys
Tools and methods for pre-installation seabed surveysTools and methods for pre-installation seabed surveys
Tools and methods for pre-installation seabed surveys
 
Presentation blp
Presentation blpPresentation blp
Presentation blp
 
Ivan van zyl edited 2016 MARCH
Ivan van zyl edited 2016 MARCHIvan van zyl edited 2016 MARCH
Ivan van zyl edited 2016 MARCH
 
Offshore Wind Power SUBSTATIONS 2013
Offshore Wind Power SUBSTATIONS 2013Offshore Wind Power SUBSTATIONS 2013
Offshore Wind Power SUBSTATIONS 2013
 
Ecdis PLATINUM Certificate 122896 - Oleksiy Osipov
Ecdis PLATINUM Certificate 122896 - Oleksiy OsipovEcdis PLATINUM Certificate 122896 - Oleksiy Osipov
Ecdis PLATINUM Certificate 122896 - Oleksiy Osipov
 
resume Kogan D 20151028
resume Kogan D 20151028resume Kogan D 20151028
resume Kogan D 20151028
 
CV Giovanni FRISO-Nov2015
CV Giovanni FRISO-Nov2015CV Giovanni FRISO-Nov2015
CV Giovanni FRISO-Nov2015
 
MaiVanBinh_CV
MaiVanBinh_CVMaiVanBinh_CV
MaiVanBinh_CV
 
Mhimdi.sameh. cv
Mhimdi.sameh. cvMhimdi.sameh. cv
Mhimdi.sameh. cv
 
Germany_shipbuilding activities 2016
Germany_shipbuilding activities 2016Germany_shipbuilding activities 2016
Germany_shipbuilding activities 2016
 
MAHMOUD CV
MAHMOUD CVMAHMOUD CV
MAHMOUD CV
 
GMcnicol CV
GMcnicol CVGMcnicol CV
GMcnicol CV
 
BDE SC3.3 Workshop - BDE Pilot case for Wind Turbine condition monitoring re...
 BDE SC3.3 Workshop - BDE Pilot case for Wind Turbine condition monitoring re... BDE SC3.3 Workshop - BDE Pilot case for Wind Turbine condition monitoring re...
BDE SC3.3 Workshop - BDE Pilot case for Wind Turbine condition monitoring re...
 
Moccia cv
Moccia cvMoccia cv
Moccia cv
 

Reference _List_OAS

  • 1. OAS Energy GmbH OAS Energy GmbH Fischhof 3/6, A – 1010 Wien Tel.: +43 193080 3130 Fax.: +43 193080 3135 FR_01_OP_QMS_008_00 Date:2015 / 04 / 22 Attention to: Radomir Kanuk Reference List Project: Construction of the new unit Nr. 3 for Almirante Álvaro Alberto Nuclear Power Plant in Angra, Brasil Position: Expeditor The job description: - Monitoring progress of the project. - Inspection activities during the production of components. - Identifying potential risk in the production chain and delivery dates. - Organizing „Technical Meeting“. - Weekly report of the production chain form customer OAS Energy. - Final inspection of manufactured components and final documentations. Entrusted companies: - Lisega SE: Gerhard-Liesegang-Stasse 1, 27404 Zeven, Germany, www.lisega.de , - GERB SCHWINGUNGSISOLIERUNGEN GmbH: 13407 Berlin, Germany, www.gerb.com. - MPS Gradior s.r.o.: Křižíkova 2989/68a, Královo pole, 612 00 Brno, www.mps- gradior.cz. - DITEC DICHTUNGSTECHNIK GnbH: 97318 Kitzingen, Germany, www.ditec-kt.de. - TECTUBI RACCORD S.p.A: Podenzano, Piacenza, Italy, www.tectubiraccordi.com. Mr. Kaňuk was able to address the entrusted tasks independently and with a great precision so that the company was always able to rely on him. Among the characteristics that I would like to highlight was an excellent ability to organize time, loyalty, creativity, systematic approach and expertise. He proved to be a vaild team-player but at the same time, when needed, he was able to work independently. He was especially keen on improving his knowledge and skills and implementing them in the daily practice. Based on his outstanding results, performance and undeniable potential, I can recommend Mr.Kaňuk from both professional and persoal point of view. Alexandre de Souza Barbosa Expediting manager Tel: +43 1 93080 3131 Mobile +44 741 846 5081 alexandre.barbosa@oas.com www.oas.com