Designing the next generation in containerised cranes has
many challenges. On one hand the crane capacity has to
increase and at the same time all components have to be easy
to assembly and remain within the limits required for
containerised transport. For the main winches the solution was
found in a 40ft frame which provided it’s own supporting
structure and two detachable winch drums. Each drum, when
spooled with steel wire weighed as much as a container itself
and had therefore be transported seperately.
Maximum line pull 60 metric ton at 8th
layer
Wire speed 0-50 m
/min nominal line pull
50-70 m
/min reduced line pull
Spooling capacity 2100 m
Drums construction High Strength steel with Lebus shells
Power Hydraulic multi-motor system
Transmission Planetary gearbox with external pinion
The winches were designed in The Netherlands under
supervision of Lloyd’s Register, fabrication was executed in
Germany, commissioning and testing again in The
Netherlands

More Related Content

Viewers also liked

Plattformpolice VorsorgePlan
Plattformpolice VorsorgePlanPlattformpolice VorsorgePlan
Plattformpolice VorsorgePlanmgraf101
 
Clase de religion 1primera parte
Clase de religion 1primera parteClase de religion 1primera parte
Clase de religion 1primera parteiangeles3120
 
Elaich module 2 exercise 2.8.b - Study of the hygrometric behavior of buildin...
Elaich module 2 exercise 2.8.b - Study of the hygrometric behavior of buildin...Elaich module 2 exercise 2.8.b - Study of the hygrometric behavior of buildin...
Elaich module 2 exercise 2.8.b - Study of the hygrometric behavior of buildin...elaich
 
Goodwins Analysis
Goodwins AnalysisGoodwins Analysis
Goodwins Analysisrobinmcobin
 
Workshop 04
Workshop 04Workshop 04
Workshop 04republic
 
Elaich module 1 topic 1.2 - Why should we preserve cultural heritage?
Elaich module 1 topic 1.2 - Why should we preserve cultural heritage?Elaich module 1 topic 1.2 - Why should we preserve cultural heritage?
Elaich module 1 topic 1.2 - Why should we preserve cultural heritage?elaich
 
Elaich module 1 topic 1.3 - How should we preserve cultural heritage?
Elaich module 1 topic 1.3 - How should we preserve cultural heritage?Elaich module 1 topic 1.3 - How should we preserve cultural heritage?
Elaich module 1 topic 1.3 - How should we preserve cultural heritage?elaich
 
Tópicos de atuação profissional unip
Tópicos de atuação profissional unipTópicos de atuação profissional unip
Tópicos de atuação profissional unipArte de Lorena
 

Viewers also liked (13)

Award Kundenzufriedenheit.pdf
Award Kundenzufriedenheit.pdfAward Kundenzufriedenheit.pdf
Award Kundenzufriedenheit.pdf
 
Capital Market Mini Boot Camp
Capital Market Mini Boot CampCapital Market Mini Boot Camp
Capital Market Mini Boot Camp
 
Planos digitalizados
Planos digitalizadosPlanos digitalizados
Planos digitalizados
 
Woon com
Woon comWoon com
Woon com
 
Plattformpolice VorsorgePlan
Plattformpolice VorsorgePlanPlattformpolice VorsorgePlan
Plattformpolice VorsorgePlan
 
Clase de religion 1primera parte
Clase de religion 1primera parteClase de religion 1primera parte
Clase de religion 1primera parte
 
Elaich module 2 exercise 2.8.b - Study of the hygrometric behavior of buildin...
Elaich module 2 exercise 2.8.b - Study of the hygrometric behavior of buildin...Elaich module 2 exercise 2.8.b - Study of the hygrometric behavior of buildin...
Elaich module 2 exercise 2.8.b - Study of the hygrometric behavior of buildin...
 
Goodwins Analysis
Goodwins AnalysisGoodwins Analysis
Goodwins Analysis
 
Workshop 04
Workshop 04Workshop 04
Workshop 04
 
Elaich module 1 topic 1.2 - Why should we preserve cultural heritage?
Elaich module 1 topic 1.2 - Why should we preserve cultural heritage?Elaich module 1 topic 1.2 - Why should we preserve cultural heritage?
Elaich module 1 topic 1.2 - Why should we preserve cultural heritage?
 
Elaich module 1 topic 1.3 - How should we preserve cultural heritage?
Elaich module 1 topic 1.3 - How should we preserve cultural heritage?Elaich module 1 topic 1.3 - How should we preserve cultural heritage?
Elaich module 1 topic 1.3 - How should we preserve cultural heritage?
 
Proyecto final de ingenieria de riego por gravedad
Proyecto final de ingenieria de riego por gravedadProyecto final de ingenieria de riego por gravedad
Proyecto final de ingenieria de riego por gravedad
 
Tópicos de atuação profissional unip
Tópicos de atuação profissional unipTópicos de atuação profissional unip
Tópicos de atuação profissional unip
 

Similar to Containerised Double Drum Winches

Mo utilizado en la fabricación de gruas
Mo utilizado en la fabricación de gruasMo utilizado en la fabricación de gruas
Mo utilizado en la fabricación de gruasDaniel García
 
Millau via duct presentation full analysis
Millau via duct presentation full analysisMillau via duct presentation full analysis
Millau via duct presentation full analysisMohammad Ali
 
Millau Bridge (Operations Management)
Millau Bridge (Operations Management)Millau Bridge (Operations Management)
Millau Bridge (Operations Management)Rohan Negi
 
Copy of 563050-TSHD 650-ES (SPEC-DAM - 3479100 - 1 - A) - 1.PPTX
Copy of 563050-TSHD 650-ES (SPEC-DAM - 3479100 - 1 - A) - 1.PPTXCopy of 563050-TSHD 650-ES (SPEC-DAM - 3479100 - 1 - A) - 1.PPTX
Copy of 563050-TSHD 650-ES (SPEC-DAM - 3479100 - 1 - A) - 1.PPTXMrbThinh
 
Crane & Hoist Market Applications & Innovations
Crane & Hoist Market Applications & InnovationsCrane & Hoist Market Applications & Innovations
Crane & Hoist Market Applications & InnovationsAltra Industrial Motion
 
California Orthotropic-October-2005 & Millau Normandie France Mangus LinkedIn
California Orthotropic-October-2005 & Millau Normandie France Mangus LinkedInCalifornia Orthotropic-October-2005 & Millau Normandie France Mangus LinkedIn
California Orthotropic-October-2005 & Millau Normandie France Mangus LinkedInAlfred Mangus
 
Catalogue--Veca(2015.10.23)
Catalogue--Veca(2015.10.23)Catalogue--Veca(2015.10.23)
Catalogue--Veca(2015.10.23)Veca Zhu
 
Portfolio - Theodoros Dragonas - Mechanical Design Engineer
Portfolio - Theodoros Dragonas - Mechanical Design EngineerPortfolio - Theodoros Dragonas - Mechanical Design Engineer
Portfolio - Theodoros Dragonas - Mechanical Design EngineerTheodoros Dragonas
 
Design of An Immersed Tube Tunnel
Design of An Immersed Tube TunnelDesign of An Immersed Tube Tunnel
Design of An Immersed Tube Tunnelneilirish
 
Presentation on construction of cable stay bridge - a modern technique for su...
Presentation on construction of cable stay bridge - a modern technique for su...Presentation on construction of cable stay bridge - a modern technique for su...
Presentation on construction of cable stay bridge - a modern technique for su...Rajesh Prasad
 
Cranes and Heavy Equipments - Adgeco Group
Cranes and Heavy Equipments - Adgeco GroupCranes and Heavy Equipments - Adgeco Group
Cranes and Heavy Equipments - Adgeco GroupMohamed Dekkak
 

Similar to Containerised Double Drum Winches (20)

Millau viaduct
Millau viaductMillau viaduct
Millau viaduct
 
Mo utilizado en la fabricación de gruas
Mo utilizado en la fabricación de gruasMo utilizado en la fabricación de gruas
Mo utilizado en la fabricación de gruas
 
Millau via duct presentation full analysis
Millau via duct presentation full analysisMillau via duct presentation full analysis
Millau via duct presentation full analysis
 
Photoshow Breakbulk Antwerp 2008 Part 2
Photoshow Breakbulk Antwerp 2008 Part 2Photoshow Breakbulk Antwerp 2008 Part 2
Photoshow Breakbulk Antwerp 2008 Part 2
 
Millau Bridge (Operations Management)
Millau Bridge (Operations Management)Millau Bridge (Operations Management)
Millau Bridge (Operations Management)
 
456.pdf
456.pdf456.pdf
456.pdf
 
Copy of 563050-TSHD 650-ES (SPEC-DAM - 3479100 - 1 - A) - 1.PPTX
Copy of 563050-TSHD 650-ES (SPEC-DAM - 3479100 - 1 - A) - 1.PPTXCopy of 563050-TSHD 650-ES (SPEC-DAM - 3479100 - 1 - A) - 1.PPTX
Copy of 563050-TSHD 650-ES (SPEC-DAM - 3479100 - 1 - A) - 1.PPTX
 
Crane & Hoist Market Applications & Innovations
Crane & Hoist Market Applications & InnovationsCrane & Hoist Market Applications & Innovations
Crane & Hoist Market Applications & Innovations
 
California Orthotropic-October-2005 & Millau Normandie France Mangus LinkedIn
California Orthotropic-October-2005 & Millau Normandie France Mangus LinkedInCalifornia Orthotropic-October-2005 & Millau Normandie France Mangus LinkedIn
California Orthotropic-October-2005 & Millau Normandie France Mangus LinkedIn
 
Catalogue--Veca(2015.10.23)
Catalogue--Veca(2015.10.23)Catalogue--Veca(2015.10.23)
Catalogue--Veca(2015.10.23)
 
The Railway Challenges of the New Silk Road
The Railway Challenges of the New Silk RoadThe Railway Challenges of the New Silk Road
The Railway Challenges of the New Silk Road
 
Portfolio - Theodoros Dragonas - Mechanical Design Engineer
Portfolio - Theodoros Dragonas - Mechanical Design EngineerPortfolio - Theodoros Dragonas - Mechanical Design Engineer
Portfolio - Theodoros Dragonas - Mechanical Design Engineer
 
Puente izable
Puente izablePuente izable
Puente izable
 
Equipment Handling Fact sheet
Equipment Handling Fact sheetEquipment Handling Fact sheet
Equipment Handling Fact sheet
 
Design of An Immersed Tube Tunnel
Design of An Immersed Tube TunnelDesign of An Immersed Tube Tunnel
Design of An Immersed Tube Tunnel
 
the millau viaduct
the millau viaductthe millau viaduct
the millau viaduct
 
Presentation on construction of cable stay bridge - a modern technique for su...
Presentation on construction of cable stay bridge - a modern technique for su...Presentation on construction of cable stay bridge - a modern technique for su...
Presentation on construction of cable stay bridge - a modern technique for su...
 
WY-Segments
WY-SegmentsWY-Segments
WY-Segments
 
Wagenborg times 3
Wagenborg times 3Wagenborg times 3
Wagenborg times 3
 
Cranes and Heavy Equipments - Adgeco Group
Cranes and Heavy Equipments - Adgeco GroupCranes and Heavy Equipments - Adgeco Group
Cranes and Heavy Equipments - Adgeco Group
 

More from Ivo Van Donselaar

More from Ivo Van Donselaar (6)

Modular Ringer Crane Bogies
Modular Ringer Crane BogiesModular Ringer Crane Bogies
Modular Ringer Crane Bogies
 
23m Heave Compensated Sweep Bar
23m Heave Compensated Sweep Bar23m Heave Compensated Sweep Bar
23m Heave Compensated Sweep Bar
 
440 Ton Twin Gantry
440 Ton Twin Gantry440 Ton Twin Gantry
440 Ton Twin Gantry
 
Containerised Winch System
Containerised Winch SystemContainerised Winch System
Containerised Winch System
 
Plet Installation Module
Plet Installation ModulePlet Installation Module
Plet Installation Module
 
Hoisting And Luffing Winches
Hoisting And Luffing WinchesHoisting And Luffing Winches
Hoisting And Luffing Winches
 

Containerised Double Drum Winches

  • 1. Containerised Double Drum Winches Ivo van Donselaar Feb 2012 Page 1 of 1 Designing the next generation in containerised cranes has many challenges. On one hand the crane capacity has to increase and at the same time all components have to be easy to assembly and remain within the limits required for containerised transport. For the main winches the solution was found in a 40ft frame which provided it’s own supporting structure and two detachable winch drums. Each drum, when spooled with steel wire weighed as much as a container itself and had therefore be transported seperately. Maximum line pull 60 metric ton at 8th layer Wire speed 0-50 m /min nominal line pull 50-70 m /min reduced line pull Spooling capacity 2100 m Drums construction High Strength steel with Lebus shells Power Hydraulic multi-motor system Transmission Planetary gearbox with external pinion The winches were designed in The Netherlands under supervision of Lloyd’s Register, fabrication was executed in Germany, commissioning and testing again in The Netherlands