How to design an Oracle database system to minimize planned interruptions? That depends on the requirements, goals, SLAs etc. The presentation will follow top-down approach. First we will describe major types of planned maintenance, prioritize those and then based on the system availability requirements find the best cost-effective technics to address those. A bit of planning, strategy and of course modern database and OS technics including latest Oracle 12c features.
2. 2
WHO IS KIRILL
LOIFMAN
ā¢ Using Oracle since 1996
ā¢ Oracle DBA experience on Unix
AIX, OpenVMS, Tru64, HP-UX,
Linux
ā¢ Senior DB Architect at adidas
ā¢ OCP DBA 9i,10g,11g,12c,ā¦
ā¢ Blogger, speaker & a father
ā¢ Contacts
Blog: dadbm.com
Twitter: @loifmkir
Google.com/+dadbm
Facebook, LinkedIn, Xing ā¦
3. 3
AGENDA
ā¢ Downtime and system availability basics
ā¢ Reduce planned downtime approach
ā¢ Jump into technology
- System configurations
- Online maintenance technics
- Oracle 12c features
- Best practices
4. 4
ELEMENTS OF SYSTEM AVAILABILITY
ā¢ Downtime
- How much time you can tolerate your system being unavailable
- 99.9% availability ~ 8 hours and 45 minutes of down time per year
- Includes unexpected as well as planned down time *
ā¢ High availability (HA)
- Eliminating single points of failure through redundancy
- Examples: redundant HW, SAN/ASM, RAC databases
ā¢ Disaster recovery (DR)
- Recovering from failure
- Examples: Extended clusters, standby databases
ā¢ Maximum Availability Architecture (MAA)
- Big Bang approach - HA & DR combination
5. Footer 5
AVAILABILITY TARGET VS COST
ā¢ How many 9s do you need?
Sharp decrease in
downtime for each
additional 9 in the
availability target.
ā¢ What will it cost?
The higher the percentage
of overall availability the
greater the cost.
Availability Target Downtime Per Year (Approx.)
95 % 19 days
98 % 7.3 days
99.7 % 26 hours
99.99 % 52 minutes
99.999 % 5 minutes
6. 6
LEVELS OF SYSTEM AVAILABILITY
ā¢ Level 0: Out-of-the-box (no specific high-availability elements)
ā¢ Level 1: Storage-level protection (database instance with protected storage)
ā¢ Level 2: CFC or/and Standby
(Cold Failover Cluster or/and Standby DB
at the same physical location)
ā¢ Level 3: Recovery via redundant
components
(Hot Failover with multi-node RAC
at the same physical location)
ā¢ Level 4: Active and passive recovery
(2 site concept, MAA, RAC, Data Guard,
Storage mirroring, Flashback DB,ā¦)
Note: Level combinations possible; * percentages shown are for illustrative purposes only.
8. 14/03/2012Footer 8
INFRA TO MINIMIZE PLANNED DOWNTIME
Oracle Big Bang -> Exa, Multitenant, Maximum Availability Architecture
9. 9
CAUSES OF DOWNTIME ā PLANNED VS UNPLANNED
ā¢ a) donāt touch a running system
-> sometime you have to
-> for how long will it run?
ā¢ b) categorize, plan, minimize
How to Minimize?
10. Footer 10
ā¢ Categorize and prioritize Maintenance Activities
ā¢ Plan properly utilizing efficient service and change management processes
ā¢ Minimize duration of every maintenance occurrence with:
- proper system design (Infra) for every availability target
- best practices, new technics, automation
MINIMIZE PLANNED DOWNTIME
Maintenance Category Examples
Application Maintenance Application upgrade, code changes, etc.
Schema maintenance Objects/Segment maintenance, etc.
Database maintenance DB files/tablespace changes, backup, etc.
Instance maintenance Instance parameters, SGA changes
DB software maintenance DB/GRID patching/upgrade/migration
OS Maintenance OS Patching / Upgrade
Hardware maintenance Server HW extension; Server/HBA Firmware patching *
Where to startā¦
11. 11
MINIMIZE PLANNED DOWNTIME
Plan maintenance & Improve service, change management
Example:
Level1 = every month
Level2/3 = every quarter
Level 4 = 1-2 a year
Plan Global:
HW, OS, DB, App,ā¦
12. 14/03/2012Footer 12
MINIMIZE PLANNED DOWNTIME
Maintenance Category Level 1
(Single/1DC)
Level 2
(CFC/1DC)
Level 3
(RAC/1DC)
Level 4
(RAC/DG/2DC)
Application Maintenance
Schema maintenance
Database maintenance
Instance maintenance
DB software maintenance
OS Maintenance
Hardware maintenance
ā¢ Improve what already exists
ā¢ Introduce extra complexity only if required
ā¢ Introduce extra budget only if required
ā¢ Start out-of-the box, from green to red
Minimize duration of maintenance
13. 13
MINIMIZE PLANNED DOWNTIME
ā¢ Single box (Level 1->4)
- Online System Reconfiguration
- Online Linux Patching
- Online database patching and patching best practices
- Online database parameter changes
- Online database file move/compression (12c+)
- Online partition move/compression (12c+)
- Online Table Redefinition including 12c enhancements
- Online Statistics Gathering during Bulk-Loads (12+)
- Online Application Upgrades with Edition-Based Redefinition
- Online / Active Database Duplication (11g+) and 12c enhancements
ā¦
ā¢ High Availability Solutions (Level 2,3,4)
- Cold Failover Cluster ā CFC (Oracle RAC 1 Node)
- Hot Failover Custer (Oracle RAC/VM)
- Disaster Recovery Configuration (RAC+Oracle Data Guard)
- Virtualization
New technics & Best practices
14. 14/03/2012Footer 14
ā¢ Several different indexes on the same set of columns
- Unique and non-unique
- Partitioned and not-partitioned
- Locally and Globally Partitioned
- Indexes with differ partitioning type (range or hash)
ā¢ Only one of the indexes visible at a time.
ā¢ If OPTIMIZER_USE_INVISIBLE_INDEXES=TRUE, optimizer uses the invisible
index.
create index i1 on T1 (emp_id) invisible;
create index i2 on T1 (emp_id) reverse;
APPLICATION MAINTENANCE
Indexes on the Same Set of Columns (new in 12c)
15. ā¢ Invisible columns are user-specified hidden columns
SQL> CREATE TABLE mytab (col1 VARCHAR2(10), col2 NUMBER INVISIBLE);
ā¢ Hidden columns do not affect existing applications that access the table.
ā¢ A hidden column can be accessed only by referring to its name explicitly
SQL> INSERT INTO mytab (col1, col2) values ('A',1);
ā¢ Can be made visible later
SQL> SET COLINVISIBLE ON
SQL> DESC mytab
SQL> ALTER TABLE mytab MODIFY (col2 VISIBLE);
Invisible table columns (new in 12c)
15
APPLICATION MAINTENANCE
16. 16
ā¢ Provides high availability during upgrades of
the database tier of applications
ā¢ Used by the application vendor / developers
ā¢ How it works
ā¢ Applied to Editionable object types
ā¢ Data changes made to new tables/columns
ā¢ Code changes are installed in the privacy
of a new edition
ā¢ Application cutover (Switch or Hot Rollover)
ā¢ Useful for massive stored SQL,PL/SQL changes
APPLICATION MAINTENANCE
Edition-Based Redefinition (11gR2+)
17. 17
ā¢ Move / split / merge partitions and subpartitions ONLINE
ā¢ Compress partitions and subpartitions ONLINE
ā¢ DML allowed, not DDL / Global and Local indexes maintained
ā¢ Used by ILM to move / compress table partitions on ADO policies
ā¢ SQL examples:
ALTER TABLE orders MOVE PARTITION ord_p1
TABLESPACE lowtbs UPDATE INDEXES ONLINE;
ALTER TABLE orders MOVE PARTITION ord_p1
ROW STORE COMPRESS UPDATE INDEXES ONLINE;
DB SCHEMA MAINTENANCE
Online partition move/compression (new in 12c)
18. 18
ā¢ Following enhancements introduced in Oracle 12c:
- Support for redefinition of multiple partitions in a single redefinition session.
- New procedure REDEF_TABLE allows a one-step operation to redefine a table or partition
- Improved performance of sync_interim_table and resilence of finish_redef_table
- Support for tables with VPD policies
- New parameter dml_lock_timeout to handle pending DML in FINISH_REDEF_TABLE procedure
ā¢ SQL> EXEC DBMS_REDEFINITION.START_REDEF_TABLE ( uname => 'hr',-
orig_table => 't1', int_table => 'int_t1',-
options_flag => DBMS_REDEFINITION.CONS_USE_PK,-
copy_vpd_opt => DBMS_REDEFINITION.CONS_VPD_AUTO)
EXEC DBMS_REDEFINITION.FINISH_REDEF_TABLE (uname => 'hr',-
orig_table => 't1', int_table => 'int_t1'-
dml_lock_timeout => 100)
DB SCHEMA MAINTENANCE
Online Table Redefinition 12c enhancements
19. 19
ā¢ Following operations do not block end user DML statements
DROP INDEX ONLINE (except cluster index, index on queue table)
DROP CONSTRAINT ONLINE (except CASCADEd and referencing constraints)
ALTER INDEX UNUSABLE ONLINE (except index on temporary table)
SET COLUMN UNUSED ONLINE (except columns with DEFERRABLE constraint)
ALTER INDEX [VISIBLE | INVISIBLE]
DB SCHEMA MAINTENANCE
Enhanced Online DDL Capabilities (new in 12c)
20. 20
ā¢ Database automatically gathers table statistics during the following types of
bulk loads:
ā CREATE TABLE ... AS SELECT
- INSERT INTO ... SELECT into an empty table by using a direct path insert.
ā¢ Statistics are available immediately after load.
ā¢ No additional table scan is required to gather statistics.
ā¢ All internal maintenance operations that use CTAS (MV refresh) benefit
ā¢ Index statistics or histograms are not gathered -> manual gather_table_stats
DB SCHEMA MAINTENANCE
Online Statistics Gathering during Bulk-Loads (new in 12c)
21. 21
ā¢ Greater application separation for DB consolidation environments
-> added DBA complexity though
ā¢ Faster database provisioning
- Pluggable PDB creation from PDB$SEED
- Clone PDB into the same or another CDB (still not officially ONLINE -> wait for 12cR2)
- Plug an unplugged PDB into the same or another CDB (even to higher version)
- Plug non-CDB in as PDB (DBMS_PDB, Full Transportable, TTS/TDB)
ā¢ More patching / upgrade options
- Patch / Upgrade all PDBs in a CDB at once
- Plug PDB into the CDB container with higher version
- Note: More PDBs -> longer patching / upgrade time
DATABASE MAINTENANCE
Oracle 12c Multitenant Architecture
22. 22
ā¢ Move data file online to different location , disk or storage system
ā¢ Progress in V$SESSION_LONGOPS (One row per file; blocks moved so far)
ā¢ SQL Examples:
ALTER DATABASE MOVE datafile 5 TO '+DiskGroup3' REUSE;
ALTER DATABASE MOVE datafile '/disk1/myexample01.dbf'
TO '/disk2/myexample01.dbf' KEEP ;
DATABASE MAINTENANCE
Online database file move (new in12c)
Compatible Not compatible
Queries, DML and DDL operations
Block media recovery
Tablespace made READ ONLY or READ WRITE
Data file RESIZE (extension)
Online backup, Flashback Database*
Data file OFFLINE
Media recovery
Data file RESIZE (shrink) operation
FLASHBACK DATABASE operation
23. ā¢ Default use of backup sets for active duplication (Pull method instead of Push)
ā¢ Choice of compression, section size, and encryption
ā¢ Option to end duplication with DB in mounted state (Move DB to ASM; Upgrading DB)
ā¢ Duplication of pluggable databases including all or individual PDBs
ā¢ Example
RMAN> DUPLICATE DATABASE TO cdb2 PLUGGABLE DATABASE pdb1, pdb3;
RMAN> DUPLICATE TARGET DATABASE TO orcl2 FROM ACTIVE DATABASE
[USING BACKUPSET]
[SECTION SIZE ā¦]
[USING COMPRESSED BACKUPSET]
[NOOPEN] ā¦; 23
DATABASE MAINTENANCE
Active Database Duplication 12c Enhancements
24. 24
HARDWARE MAINTENANCE TECHNICS
ā¢ Online grow and shrink of shared memory and database cache
- Reserve enough memory (sga_max_size /memory_max_size)
- Linux Huge Pages (pros & cons)
ā¢ Online addition/extension or removal of disks (SAN,ASM/LVM)
ā¢ Online addition or removal of clustered nodes (Oracle RAC/GRID)
ā¢ Online addition or removal of RAM/CPUs
- Oracle SPARC M-Series & Oracle Solaris (Dynamic Reconfiguration & System Domains)
- Hitachi Compute Blade logical partitioning (LPAR) & RHL/Windows
ā¢ Oracle 12c Database Smart Flash Cache Enhancements
Online System Reconfiguration
25. 25
HARDWARE MAINTENANCE TECHNICS
ā¢ Multiple flash drives in the flash cache (up to 16 devices in 12c)
ā¢ Specify flash devices at instance startup:
db_flash_cache_file = /dev/raw/sda, /dev/raw/sdb
db_flash_cache_size = 32G, 64G
ā¢ Dynamic enable/disable for flash cache devices:
db_flash_cache_size = 0, 64G
db_flash_cache_size = 32G, 64G
ā¢ HW example: HP Blade BL460c + HP IO Accelerator Flash Card 1,2T
Oracle 12c Database Smart Flash Cache Enhancements
26. 26
OS MAINTENANCE TECHNICS
ā¢ Enabled by Oracle Ksplice technology (founded in 2008; at Oracle since 2011)
ā¢ Types of patches
- Security updates and other critical fixes
- Kernel Diagnostic patches
- Userspace patching: glibc & OpenSSL (new from last OOW)
ā¢ Online patching does not replace regular one (use it between OS version upgrades)
ā¢ Prerequisites
- Oracle Enterprise Linux 5.x+ with OU or RH compatible Kernels
- Oracle Linux Premier Support
- Get ULN access and Ksplice access key
Online Oracle Linux (OEL) Patching
27. 27
OS MAINTENANCE TECHNICS
Ksplice technologyKernel
updates
Target systems
Zero downtime
kernel updates
Uptrack Client
a) ONLINE
Ksplice
Channel
b) OFFLINE
Local YUM
repository
ULN
Channel
How it works
28. ā¢ ONLINE: Individual Servers can register with Oracleās Ksplice server directly
- Each system must be connected to Internet
- Each system will check for new updates ~every 4 hours
- Oracle provides an interactive Web portal to monitor usersā systems
- Updates can be auto-installed if desired
ā¢ OFFLINE: Ksplice repository
- All internal servers configured to use local Ksplice Repository
+ Better control for a large environment; less patch data downloaded from Internet
- Cron job updates local patch mirror once per day
- Patching triggered manually with yum
- Useable with: Spacewalk Server or EM12c (automatic patch deployment)
28
OS MAINTENANCE TECHNICS
Two Ways to Consume Ksplice
29. 29
OS MAINTENANCE TECHNICS
ā¢ Create a local YUM Mirror and register the Ksplice Channel(s)
- http://docs.oracle.com/cd/E37670_01/E37355/html/ol_offlncl_ksplice.html
- Subscribe each machine in yum.repos.d to your local YUM Ksplice channel
[ol6_x86_64_ksplice]
name=Ksplice for $releasever - $basearch
baseurl=http://local_yum_server/yum/OracleLinux/OL6/ksplice/$basearch/
gpgkey=file:///etc/pki/rpm-gpg/RPM-GPG-KEY
gpgcheck=1
enabled=1
ā¢ Install Ksplice āUptrack-offlineā RPM onto target machines.
# yum install uptrack-offline
ā¢ Perform kernel patching with your Local YUM Ksplice Repository
# yum install uptrack-updates-`uname ār`
Ksplice Off-Line with Intranet Connection
30. 30
DB SOFTWARE MAINTENANCE
Patching Best Practices (Single One-Off, CPU, PSU, Bundle Patch)
ā¢ Patch at least every 6 months, before DB creation, before upgrade, ā¦
ā¢ Test and automate patching (functional, load, performance testing)
ā¢ Avoid combining untested patch combinations
ā¢ Review patch issues on MOS after 4 weeks of the patch release
ā¢ Do prerequisite checks in advance (opatch or MOS Patch Conflict Checker)
ā¢ 98% of patches can be installed in a highly available manner
- Online patch (11g+; few interim one-off patches ) online
- RAC rolling patching (9i+; some interim, all PSUs) almost online (<1min)
- Data Guard Standby First (11gR2+; some interim, all PSU and Bundle) almost online (<2min)
- Out of Place patching (all patches from 11.2.0.2+) < 3-5min
31. 31
ā¢ Apply several patches during the same downtime
ā¢ Unzip patches in the same patch location
ā¢ Patching examples
# opatch napply āskip_subset āskip_duplicate
# opatchauto apply [-nonrolling] [-silent] [-local]
ā¢ 12.1) datapatch takes care of applying the post SQL (DB part)
# datapatch [-verbose] [-apply / -rollback <patch_id>] [-force]
ā¢ 12.1.0.2) No need for catbundle.sql with PSU, BP installs
dba_registry_sqlpatch instead of dba_registry_history
datapatch -rollbackall
DB SOFTWARE MAINTENANCE
Optimizing Patch Application
32. 32
ā¢ Available only for small amount interim one-off patches and bug fixes
ā¢ Applied and removed on a running instance
ā¢ Additional memory consumption and process start time penalty
ā¢ Rollback and replace them with āregularā ones during next downtime
ā¢ Oracle 12c -> no improvements found
ā¢ Use OPatch utility (which uses oradebug to install/uninstall the patch)
opatch apply online
DB SOFTWARE MAINTENANCE
Online database patching
33. 14/03/2012Footer 33
ā¢ Possible in RAC, RAC One Node configurations
ā¢ Similar in CFC configurations with local Oracle binaries
ā¢ Note: JavaVM part of PSU (OJVM PSU) is not Rolling installable (from Nov 2014)
DB SOFTWARE MAINTENANCE
RAC Rolling Patching (some interim, all PSUs)
34. 34
ā¢ Available for all patches from 11.2.0.2+ / supported by SAP
ā¢ Minimize downtime during patching of NON-RAC databases
ā¢ In-Place vs Out-of-Place patching
-
- Apply required patch set to the cloned database home using Opatch
- Switch the database services to the cloned database home
- Complete the post installation tasks for the patch set applied
ā¢
DB SOFTWARE MAINTENANCE
Out of place patching
11gR2 regular In-Place 12c Out-of-Place
Shutdown DB / Listener Clone existing ORACLE_HOME online
Binary part: opatch apply Patch cloned binaries: opatch apply
Logs check / fixes /conflict resolution patches Logs check / fixes / conflict resolution patches
Possible rollback of binaries Possible rollback of binaries (or not required)
DB Startup DB Restart in the new cloned ORACLE_HOME
DB part: SQL>@catbundle.sql psu apply DB part: ./datapatch -verbose
35. 35
# ONLINE clone (as root) of $ORACLE_HOME_O (dbhome_1) to $ORACLE_HOME_C (dbhome_2)
mkdir $ORACLE_HOME_C
chown oracle:oinstall $ORACLE_HOME_C
cd $ORACLE_HOME_O
tar cvfp - . --exclude=*.log --exclude=*.trc | ( cd $ORACLE_HOME_C; tar xvf - )
# Clone the installation with OUI (Perl script can be used instead)
./runInstaller -clone -silent -noconfig -defaultHomeName ORACLE_BASE=$ORACLE_BASE
ORACLE_HOME=$ORACLE_HOME_C oracle_install_OSDBA=dba oracle_install_OSOPER=oper
# Run root.sh (as root) from the cloned ORACLE_HOME
/oracle/product/12.1.0/dbhome_2/root.sh
# Patch the cloned ORACLE_HOME with PSU 12.1.0.2.5
export ORACLE_HOME=$ORACLE_HOME_C
cd /oracle/stage/12.1.0.2.5-21359755
$ORACLE_HOME/OPatch/opatch apply
DB SOFTWARE MAINTENANCE
Out of place patching ā PSU example
36. 36
# Switch database services to the cloned ORACLE_HOME
# Update new ORACLE_HOME in the /etc/oratab and in any .profile files
# Restart DB and listener from the cloned ORACLE_HOME
export ORACLE_HOME=$ORACLE_HOME_O
lsnrctl stop
sql> shutdown immediate
export ORACLE_HOME=$ORACLE_HOME_C # or better . oraenv
lsnrctl start
sql> startup
# Complete the Patch post installation steps
./datapatch āverbose
# Cleanup the old ORACLE_HOME
export ORACLE_HOME=$ORACLE_HOME_O
$ORACLE_HOME/oui/bin/detachHome.sh
rm -rf $ORACLE_HOME
DB SOFTWARE MAINTENANCE
Out of place patching ā PSU example
38. 38
ā¢ DBUA interface improved
ā¢ New SQL Automation FixUp Scripts
- Fixing issues before and after upgrade
- preupgrd.sql -> detailed recommendations
ā¢ Parallel Upgrade
- Default feature
- Saving upgrade duration between 20% and 40%
- Upgrade drived by PERL driver catctl.pl, that executes the upgrade scripts
- Parallel threads: default = 4; maximum = 8
ā¢ DB needs to be in STARTUP UPGRADE mode
$ORACLE_HOME/perl/bin/perl catctl.pl ān 3 catupgrd.sql
DB SOFTWARE MAINTENANCE
Database upgrade
12.1.0.1 -> 12.1.0.2 upgrade:
- NON-CDB
- noarchivelog
- JVM & Text components only
- disable and truncate audit
- gather DB and dictionary stats
- 8 parallel threads
- HP BL 12 cores box
Duration ~ 15 min
39. 14/03/2012Footer 39
DB SOFTWARE MAINTENANCE
DataPump Full Transportable (new in 12c)
(Optional)
a)
b)
Transport Options:
-11.2.0.3+ -> 12c CDB as PDB
-11.2.0.3+ -> 12c NON-CDB
-PDB into another PDB
-PDB into a 12c NON-CDB
c) for large DBs:
+ RMAN incremental
backups
(Doc IDs: 1576755.1
2005729.1)
40. 40
SUMMARY
ā¢ Classify company applications based on the availability requirements
ā¢ Build DB Infra based on availability targets / levels (more complexity only if required)
ā¢ Categorize and plan maintenance activities
ā¢ Utilize efficient service and change management processes
ā¢ Minimize duration of every maintenance using best practices and new technics
ā¢ Focus on maintenance categories that cover most availability levels ( from green to red)
ā¢ Do end-to-end application failover testing
ā¢ Standardizie, automate and document maitenance activities
ā¢ Itās a continiuose processā¦