Modular stands can be configured in many ways to suit different space and budget needs. They are flexible, reconfigurable and reusable, allowing the stand design to be adapted over time. The document provides examples of modular stand designs ranging from under 9m2 to over 30m2. The designs showcase different shapes, features and layouts that are possible using modular components like walls, counters, lighting and graphics. They can be reconfigured by purchasing the base design and adding or moving components as needed. This allows the stand to look new each time while maximizing the return on investment.