RATIONALE AND
OVERVIEW
CAPACITY BUILDING FOR THE SELECTED FIELD
PERSONNEL ON THE UPGRADED LAWIN SMART
Forest Management Bureau
RATIONALE
SMART 6.x
• Response Tracking Tool
SMART 3.x
• 2015-2016
• Improves Data Collection
and Analysis
• 7 B+WISER Sites
• Google Drive for data
collection
SMART 4.x
• 2016-2019
• Introduction of SMART
Connect for Data
consolidation.
• Dashboard
• Image Resizing
RATIONALE
▪ Data analysis requires additional
features and queries
▪ Usage growth and increase in data
uploads
▪ Frequent server downtime
▪ Incompatibility of cybertracker to
newer smartphone versions
OBJECTIVES
Improve the implementation of the
Lawin Forest and Biodiversity
Protection System
Improve the following:
⮚ Data Recording
⮚ Data Transmission
⮚ Data Analysis and Reporting
⮚ Data Storing or Server Capability
OBJECTIVES
1. Capacitate the participants on the proper
installation, setup, and navigation of the
SMART 7.5.6 Software;
1. Capacitate the participants on data
recording using SMART Mobile and data
management using the SMART 7.5.6; and,
1. Provide an avenue for the participants to
share their experiences and challenges in
the implementation of the Lawin System
SCHEDULE OF ACTIVITIES
Date Cluster Venue
April 17-19, 2024 Cluster I (Regions I, II, CAR) Baguio
May 8-10, 2024
Cluster II (Regions III, V, NCR,
CALABARZON, MIMAROPA)
Tagaytay
May 15-17, 2024 Cluster III (Regions VI, VII, VIII) Cebu
May 29-31, 2024 Cluster IV (Regions XI, XIII) Davao
June 5-7, 2024 Cluster V (Regions IX, X, XII) Cagayan De Oro
PROGRAM OF ACTIVITIES
Time Activity Responsible Person
Day 1
08:00am – 12:00nn
Arrival and Registration of
Participants
01:00pm – 01:15pm Opening Program FRCD-FPS
01:15pm – 01:30pm Rationale and Overview
For. Evie Bernardino-
Pagayona
01:30pm – 02:45pm
Introduction to the SMART 7.5.6 and
SMART Mobile
Ms. Arel Ramos
02:45pm – 03:00pm Health Break
03:00pm – 5:00pm
Hands-on Installation, Set-up and
Migration of Data
For. Mark Adrian Abad
Presentation of Changes in the Data
Model
For. Sarah Jean Espulgar
PROGRAM OF ACTIVITIES
Time Activity Responsible Person
Day 2
08:30am – 9:00am
Creation and Updating of Mobile Package
in the SMART Mobile
Engr. Paul Brian Lachica
09:00am – 10:00am
Field work: Data Recording/Gathering
using SMART Mobile
Participants, FMB, USAID
10:00am – 12:00nn Data Management Engr. Paul Brian Lachica
12:00nn – 01:00pm Lunch Break
01:00pm – 01:30pm Updating of FCA Plans
For. Evie Bernardino-
Pagayona
01:30pm – 04:00pm Workshop: Updating of FCA Plans Participants
04:00pm – 05:00pm
Presentation of Outputs (Consolidated by
Region)
Regional Data Manager
PROGRAM OF ACTIVITIES
Time Activity Responsible Person
Day 3
08:00am – 09:00am Continuation of Presentation
Regional Data
Managers
09:00am – 11:00nn Agreements and Forward Planning
For. Sarah Jean Q.
Espulgar
11:00am – 12:00nn Closing Program FRCD - FPS
12:00nn – 01:00pm Lunch Break
PM Homebound
EXPECTED OUTPUTS
1. Obtained knowledge on the changes in the
SMART 7.5.6 and SMART Mobile as compared
to the current SMART and Cybertracker;
2. Be able to properly install, set-up, and
navigate the SMART 7.5.6 Software and
SMART Mobile; and,
3. Updated the FCA Plans; and,
4. Be able to share experiences and challenges
in the implementation of the Lawin System.
THANK YOU
VERY MUCH!
Email: fmb@denr.gov.ph
@denrfmbofficial

Rationale and Overview 05.08-10.24.pptx Rationale and Overview

  • 1.
    RATIONALE AND OVERVIEW CAPACITY BUILDINGFOR THE SELECTED FIELD PERSONNEL ON THE UPGRADED LAWIN SMART Forest Management Bureau
  • 2.
    RATIONALE SMART 6.x • ResponseTracking Tool SMART 3.x • 2015-2016 • Improves Data Collection and Analysis • 7 B+WISER Sites • Google Drive for data collection SMART 4.x • 2016-2019 • Introduction of SMART Connect for Data consolidation. • Dashboard • Image Resizing
  • 3.
    RATIONALE ▪ Data analysisrequires additional features and queries ▪ Usage growth and increase in data uploads ▪ Frequent server downtime ▪ Incompatibility of cybertracker to newer smartphone versions
  • 4.
    OBJECTIVES Improve the implementationof the Lawin Forest and Biodiversity Protection System Improve the following: ⮚ Data Recording ⮚ Data Transmission ⮚ Data Analysis and Reporting ⮚ Data Storing or Server Capability
  • 5.
    OBJECTIVES 1. Capacitate theparticipants on the proper installation, setup, and navigation of the SMART 7.5.6 Software; 1. Capacitate the participants on data recording using SMART Mobile and data management using the SMART 7.5.6; and, 1. Provide an avenue for the participants to share their experiences and challenges in the implementation of the Lawin System
  • 6.
    SCHEDULE OF ACTIVITIES DateCluster Venue April 17-19, 2024 Cluster I (Regions I, II, CAR) Baguio May 8-10, 2024 Cluster II (Regions III, V, NCR, CALABARZON, MIMAROPA) Tagaytay May 15-17, 2024 Cluster III (Regions VI, VII, VIII) Cebu May 29-31, 2024 Cluster IV (Regions XI, XIII) Davao June 5-7, 2024 Cluster V (Regions IX, X, XII) Cagayan De Oro
  • 7.
    PROGRAM OF ACTIVITIES TimeActivity Responsible Person Day 1 08:00am – 12:00nn Arrival and Registration of Participants 01:00pm – 01:15pm Opening Program FRCD-FPS 01:15pm – 01:30pm Rationale and Overview For. Evie Bernardino- Pagayona 01:30pm – 02:45pm Introduction to the SMART 7.5.6 and SMART Mobile Ms. Arel Ramos 02:45pm – 03:00pm Health Break 03:00pm – 5:00pm Hands-on Installation, Set-up and Migration of Data For. Mark Adrian Abad Presentation of Changes in the Data Model For. Sarah Jean Espulgar
  • 8.
    PROGRAM OF ACTIVITIES TimeActivity Responsible Person Day 2 08:30am – 9:00am Creation and Updating of Mobile Package in the SMART Mobile Engr. Paul Brian Lachica 09:00am – 10:00am Field work: Data Recording/Gathering using SMART Mobile Participants, FMB, USAID 10:00am – 12:00nn Data Management Engr. Paul Brian Lachica 12:00nn – 01:00pm Lunch Break 01:00pm – 01:30pm Updating of FCA Plans For. Evie Bernardino- Pagayona 01:30pm – 04:00pm Workshop: Updating of FCA Plans Participants 04:00pm – 05:00pm Presentation of Outputs (Consolidated by Region) Regional Data Manager
  • 9.
    PROGRAM OF ACTIVITIES TimeActivity Responsible Person Day 3 08:00am – 09:00am Continuation of Presentation Regional Data Managers 09:00am – 11:00nn Agreements and Forward Planning For. Sarah Jean Q. Espulgar 11:00am – 12:00nn Closing Program FRCD - FPS 12:00nn – 01:00pm Lunch Break PM Homebound
  • 10.
    EXPECTED OUTPUTS 1. Obtainedknowledge on the changes in the SMART 7.5.6 and SMART Mobile as compared to the current SMART and Cybertracker; 2. Be able to properly install, set-up, and navigate the SMART 7.5.6 Software and SMART Mobile; and, 3. Updated the FCA Plans; and, 4. Be able to share experiences and challenges in the implementation of the Lawin System.
  • 11.
    THANK YOU VERY MUCH! Email:fmb@denr.gov.ph @denrfmbofficial