Mobile No: 09966533422 (INDIA)
Mobile No:+971-562804323(U.A.E)
E-mail: rajan90.singh@gmail.com
RAJAN KUMAR SINGH, ROUSTABOUT/MOTORMAN
CAREER OBJECTIVE
To achieve a challenging and rewarding career where in my knowledge, potential and problem solving skills
would be of a great value and offers professional growth while being resourceful for the esteemed
organization.
EDUCATIONAL QUALIFICATION
B.E Marine Engineering (2008-2012)
Institute : Praveenya Institute Of Marine Engineering And Maritime Studies
University : Andhra University. Visakhapatnam, INDIA.
Intermediate - Maths Physics Chemistry (2006-2008)
Board : Board of Intermediate Education, Andhra Pradesh.
CERTIFICATION OF PROFICIENCY
S.No Certificates Certificate No Date of Issue
1 EFA (Elementary First Aid) 0080020192012 11/01/2012
2 FPFF (Fire Prevention& Fire
Fighting)
0010030212012 14/01/2012
3 PST (Proficiency in Survival
Techniques)
0070020162012 18/01/2012
4 PSSR (Personnel Safety & social
Responsibility)
0100020192012 21/01/2012
Course completed in TRAINING SHIP RAHAMAN (TS RAHAMAN), Approved by “DG
SHIPPING”.
RAJAN KUMAR SINGH, ROUSTABOUT Page 1 of 4
Pre Sea Training
Praveenya Institute Of Marine Engineering (2008-2012) B.E Marine Engineering And
Maritime Studies, Approved By “Dg Shipping” And AICTE, Affiliated To Andhra University. An
ISO 9001-2000 Certified Institution.
Mobile No: 09966533422 (INDIA)
Mobile No:+971-562804323(U.A.E)
E-mail: rajan90.singh@gmail.com
Oil Field Engineering
FIELD PIPING ENGINEERING: Familiarization of Piping Engineer’s role addressing
following areas:
• Piping Systems &
Components
• Procurement • Pre-commissioning &
Mechanical
Completion
• Pipe Supports • Fabrication & Erection • Commissioning
• Piping Drawing
(PFD,GA,P&ID, ISOMETRIC)
• Welding & Non Destructive
Examinations
• Handover
• ASME Codes &
Standards
• Punch listing & Hydro test • Quality Health Safety
& Environment
SUMMARY OF WORK EXPERIENCE
About 1 year Experience as a Piping Trainee Engineer
Company/ Client Position Duration
HINDUSTAN PETROLUM
COMPANY LIMITED,INDIA
NATIONAL PETROLUM
CONSTRUCTION COMPANY,ABU
DHABI
Trainee Engineer
ENTRY LEVEL(HELPER)
AUG 2012
To
AUG 2014
OCT 2014
TO
MAY 2015
Professional Summary
• Fabrication and erection of Rack piping, Unit piping and Underground piping, including different
diameters of piping systems.
• Familiar in Review of GAD'S with P& ID.
• Review Iso-Metrics and Piping support drawing.
• Planning of day to day activities & execution.
• Scheduling man power resource requirement.
• Material verification as per drawings.
• Arrange manpower, tool & tackles and other resources required for the Piping fabrication and
erection.
RAJAN KUMAR SINGH, ROUSTABOUT Page 2 of 4
Mobile No: 09966533422 (INDIA)
Mobile No:+971-562804323(U.A.E)
E-mail: rajan90.singh@gmail.com
• Selection and Issue of required materials as per the Drawing and codes.
• Responsible for materials follow-up for continuous supply and smooth fabrication as well as erection.
• Awareness of standards codes and practices.
• Familiar with quality and safety standards.
• Isometric & Mechanical Clearance.
• Attend Progress Review & Safety Meetings.
• Preparation of Daily Fabrication & Erection Progress Report (DPR)
• Monitoring the Piping activities on day to day basis and prepare Progress measurement sheet (PMS)
INDUSTRIAL TRAINING/VISIT
• Participated in Training Program in HINDUSTHAN SHIPYARD, Visakhapatnam.
(28,NOV 2011 TO 09,DEC 2011)
• Visited Naval Science and Technological laboratory (NSTL), Visakhapatnam
• Visited Visakhapatnam Port Trust.
Personnel Details
Date of Birth : 22nd
August 1990
Gender : Male.
Marital Status : Single.
Nationality : Indian.
Languages Known : Telugu, Hindi, English.
Hobbies : Playing Football.
Passport No. : K3769846
Place of Issue : Visakhapatnam
Date of Exp. : 22/05/2022
INDOS No. : O9EL4459
Date of Issue : 26/10/2009
Issued country : INDIA
I do hereby declare that the particulars of information and facts stated above are true, correct and complete to
the best of my knowledge and belief.
RAJAN KUMAR SINGH, ROUSTABOUT Page 3 of 4
Mobile No: 09966533422 (INDIA)
Mobile No:+971-562804323(U.A.E)
E-mail: rajan90.singh@gmail.com
Declaration
Place : AJMAN,DUBAI(U.A.E)
Date : Rajan Kumar Singh
RAJAN KUMAR SINGH, ROUSTABOUT Page 4 of 4

Rajan kumar singh-cv-roustabout

  • 1.
    Mobile No: 09966533422(INDIA) Mobile No:+971-562804323(U.A.E) E-mail: rajan90.singh@gmail.com RAJAN KUMAR SINGH, ROUSTABOUT/MOTORMAN CAREER OBJECTIVE To achieve a challenging and rewarding career where in my knowledge, potential and problem solving skills would be of a great value and offers professional growth while being resourceful for the esteemed organization. EDUCATIONAL QUALIFICATION B.E Marine Engineering (2008-2012) Institute : Praveenya Institute Of Marine Engineering And Maritime Studies University : Andhra University. Visakhapatnam, INDIA. Intermediate - Maths Physics Chemistry (2006-2008) Board : Board of Intermediate Education, Andhra Pradesh. CERTIFICATION OF PROFICIENCY S.No Certificates Certificate No Date of Issue 1 EFA (Elementary First Aid) 0080020192012 11/01/2012 2 FPFF (Fire Prevention& Fire Fighting) 0010030212012 14/01/2012 3 PST (Proficiency in Survival Techniques) 0070020162012 18/01/2012 4 PSSR (Personnel Safety & social Responsibility) 0100020192012 21/01/2012 Course completed in TRAINING SHIP RAHAMAN (TS RAHAMAN), Approved by “DG SHIPPING”. RAJAN KUMAR SINGH, ROUSTABOUT Page 1 of 4 Pre Sea Training Praveenya Institute Of Marine Engineering (2008-2012) B.E Marine Engineering And Maritime Studies, Approved By “Dg Shipping” And AICTE, Affiliated To Andhra University. An ISO 9001-2000 Certified Institution.
  • 2.
    Mobile No: 09966533422(INDIA) Mobile No:+971-562804323(U.A.E) E-mail: rajan90.singh@gmail.com Oil Field Engineering FIELD PIPING ENGINEERING: Familiarization of Piping Engineer’s role addressing following areas: • Piping Systems & Components • Procurement • Pre-commissioning & Mechanical Completion • Pipe Supports • Fabrication & Erection • Commissioning • Piping Drawing (PFD,GA,P&ID, ISOMETRIC) • Welding & Non Destructive Examinations • Handover • ASME Codes & Standards • Punch listing & Hydro test • Quality Health Safety & Environment SUMMARY OF WORK EXPERIENCE About 1 year Experience as a Piping Trainee Engineer Company/ Client Position Duration HINDUSTAN PETROLUM COMPANY LIMITED,INDIA NATIONAL PETROLUM CONSTRUCTION COMPANY,ABU DHABI Trainee Engineer ENTRY LEVEL(HELPER) AUG 2012 To AUG 2014 OCT 2014 TO MAY 2015 Professional Summary • Fabrication and erection of Rack piping, Unit piping and Underground piping, including different diameters of piping systems. • Familiar in Review of GAD'S with P& ID. • Review Iso-Metrics and Piping support drawing. • Planning of day to day activities & execution. • Scheduling man power resource requirement. • Material verification as per drawings. • Arrange manpower, tool & tackles and other resources required for the Piping fabrication and erection. RAJAN KUMAR SINGH, ROUSTABOUT Page 2 of 4
  • 3.
    Mobile No: 09966533422(INDIA) Mobile No:+971-562804323(U.A.E) E-mail: rajan90.singh@gmail.com • Selection and Issue of required materials as per the Drawing and codes. • Responsible for materials follow-up for continuous supply and smooth fabrication as well as erection. • Awareness of standards codes and practices. • Familiar with quality and safety standards. • Isometric & Mechanical Clearance. • Attend Progress Review & Safety Meetings. • Preparation of Daily Fabrication & Erection Progress Report (DPR) • Monitoring the Piping activities on day to day basis and prepare Progress measurement sheet (PMS) INDUSTRIAL TRAINING/VISIT • Participated in Training Program in HINDUSTHAN SHIPYARD, Visakhapatnam. (28,NOV 2011 TO 09,DEC 2011) • Visited Naval Science and Technological laboratory (NSTL), Visakhapatnam • Visited Visakhapatnam Port Trust. Personnel Details Date of Birth : 22nd August 1990 Gender : Male. Marital Status : Single. Nationality : Indian. Languages Known : Telugu, Hindi, English. Hobbies : Playing Football. Passport No. : K3769846 Place of Issue : Visakhapatnam Date of Exp. : 22/05/2022 INDOS No. : O9EL4459 Date of Issue : 26/10/2009 Issued country : INDIA I do hereby declare that the particulars of information and facts stated above are true, correct and complete to the best of my knowledge and belief. RAJAN KUMAR SINGH, ROUSTABOUT Page 3 of 4
  • 4.
    Mobile No: 09966533422(INDIA) Mobile No:+971-562804323(U.A.E) E-mail: rajan90.singh@gmail.com Declaration Place : AJMAN,DUBAI(U.A.E) Date : Rajan Kumar Singh RAJAN KUMAR SINGH, ROUSTABOUT Page 4 of 4