fiziks
Institute for NET/JRF, GATE, IIT-JAM, JEST, TIFR and GRE in PHYSICAL SCIENCES
Website: www.physicsbyfiziks.com
Email: fiziks.physics@gmail.com 1
Head office
fiziks, H.No. 23, G.F, Jia Sarai,
Near IIT, Hauz Khas, New Delhi-16
Phone: 011-26865455/+91-9871145498
Branch office
Anand Institute of Mathematics,
28-B/6, Jia Sarai, Near IIT
Hauz Khas, New Delhi-16
QUANTUM MECHANICS FORMULA SHEET
Contents
1. Wave Particle Duality
1.1 De Broglie Wavelength
1.2 Heisenberg’s Uncertainty Principle
1.3 Group velocity and Phase velocity
1.4 Experimental evidence of wave particle duality
1.4.1 Wave nature of particle (Davisson-German experiment)
1.4.2 Particle nature of wave (Compton and Photoelectric Effect)
2. Mathematical Tools for Quantum Mechanics
2.1 Dimension and Basis of a Vector Space
2.2 Operators
2.3 Postulates of Quantum Mechanics
2.4 Commutator
2.5 Eigen value problem in Quantum Mechanics
2.6 Time evaluation of the expectation of A
2.7 Uncertainty relation related to operator
2.8 Change in basis in quantum mechanics
2.9 Expectation value and uncertainty principle
3. Schrödinger wave equation and Potential problems
3.1 Schrödinger wave equation
3.2 Property of bound state
3.3 Current density
3.4 The free particle in one dimension
3.5 The Step Potential
3.7 Potential Barrier
3.7.1 Tunnel Effect
fiziks
Institute for NET/JRF, GATE, IIT-JAM, JEST, TIFR and GRE in PHYSICAL SCIENCES
Website: www.physicsbyfiziks.com
Email: fiziks.physics@gmail.com 2
Head office
fiziks, H.No. 23, G.F, Jia Sarai,
Near IIT, Hauz Khas, New Delhi-16
Phone: 011-26865455/+91-9871145498
Branch office
Anand Institute of Mathematics,
28-B/6, Jia Sarai, Near IIT
Hauz Khas, New Delhi-16
3.8 The Infinite Square Well Potential
3.7.1 Symmetric Potential
3.9 Finite Square Well Potential
3.10 One dimensional Harmonic Oscillator
4. Angular Momentum Problem
4.1 Angular Momentum
4.1.1 Eigen Values and Eigen Function
4.1.2 Ladder Operator
4.2 Spin Angular Momentum
4.2.1 Stern Gerlach experiment
4.2.2 Spin Algebra
4.2.3 Pauli Spin Matrices
4.3 Total Angular Momentum
5. Two Dimensional Problems in Quantum Mechanics
5.1 Free Particle
5.2 Square Well Potential
5.3 Harmonic oscillator
6. Three Dimensional Problems in Quantum Mechanics
6.1 Free Particle
6.2 Particle in Rectangular Box
6.2.1 Particle in Cubical Box
6.3 Harmonic Oscillator
6.3.1 An Anistropic Oscillator
6.3.2 The Isotropic Oscillator
6.4 Potential in Spherical Coordinate (Central Potential)
6.4.1 Hydrogen Atom Problem
fiziks
Institute for NET/JRF, GATE, IIT-JAM, JEST, TIFR and GRE in PHYSICAL SCIENCES
Website: www.physicsbyfiziks.com
Email: fiziks.physics@gmail.com 3
Head office
fiziks, H.No. 23, G.F, Jia Sarai,
Near IIT, Hauz Khas, New Delhi-16
Phone: 011-26865455/+91-9871145498
Branch office
Anand Institute of Mathematics,
28-B/6, Jia Sarai, Near IIT
Hauz Khas, New Delhi-16
7. Perturbation Theory
7.1 Time Independent Perturbation Theory
7.1.1 Non-degenerate Theory
7.1.2 Degenerate Theory
7.2 Time Dependent Perturbation Theory
8. Variational Method
9. The Wentzel-Kramer-Brillouin (WKB) method
9.1 The WKB Method
9.1.1 Quantization of the Energy Level of Bound state
9.1.2 Transmission probability from WKB
10. Identical Particles
10.1 Exchange Operator
10.2 Particle with Integral Spins
10.3 Particle with Half-integral Spins
11. Scattering in Quantum Mechanics
11.1 Born Approximation
11.2 Partial Wave Analysis
12. Relativistic Quantum Mechanics
12.1 Klein Gordon equation
12.2 Dirac Equation
fiziks
Institute for NET/JRF, GATE, IIT-JAM, JEST, TIFR and GRE in PHYSICAL SCIENCES
Website: www.physicsbyfiziks.com
Email: fiziks.physics@gmail.com 4
Head office
fiziks, H.No. 23, G.F, Jia Sarai,
Near IIT, Hauz Khas, New Delhi-16
Phone: 011-26865455/+91-9871145498
Branch office
Anand Institute of Mathematics,
28-B/6, Jia Sarai, Near IIT
Hauz Khas, New Delhi-16
1.Wave Particle Duality
1.1 De Broglie Wavelengths
The wavelength of the wave associated with a particle is given by the de Broglie relation
mv
h
p
h
 where h is Plank’s constant
For relativistic case, the mass becomes
2
2
0
1
c
v
m
m

 where m0 is rest mass and v is
velocity of body.
1.2 Heisenberg’s Uncertainty Principle
“It is impossible to determine two canonical variables simultaneously for microscopic
particle”. If q and qp are two canonical variable then
2

 qpq
where ∆q is the error in measurement of q and ∆pq is error in measurement of pq and h is
Planck’s constant ( / 2 )h  .
Important uncertainty relations

2

 xPx (x is position and xp is momentum in x direction )

2

 tE ( E is energy and t is time).

2

 L (L is angular momentum, θ is angle measured)
fiziks
Institute for NET/JRF, GATE, IIT-JAM, JEST, TIFR and GRE in PHYSICAL SCIENCES
Website: www.physicsbyfiziks.com
Email: fiziks.physics@gmail.com 5
Head office
fiziks, H.No. 23, G.F, Jia Sarai,
Near IIT, Hauz Khas, New Delhi-16
Phone: 011-26865455/+91-9871145498
Branch office
Anand Institute of Mathematics,
28-B/6, Jia Sarai, Near IIT
Hauz Khas, New Delhi-16
1.3 Group Velocity and Phase Velocity
According to de Broglie, matter waves are associated with every moving body. These
matter waves moves in a group of different waves having slightly different wavelengths.
The formation of group is due to superposition of individual wave.
Let If  tx,1 and  tx,2 are two waves of slightly different wavelength and frequency.
      tdxdkkAtkxA   sin,sin 21
21    tkx
tddk
A 







 sin
22
cos2
The velocity of individual wave is known as Phase
velocity which is given as
k
vp

 . The velocity of
amplitude is given by group velocity vg i.e.
dk
d
vg


The relationship between group and phase velocity is given by



d
dv
vv
dk
dv
kv
dk
d
v
p
pg
p
pg  ;
Due to superposition of different wave of slightly different wavelength resultant wave
moves like a wave packet with velocity equal to group velocity.
1.4 Experimental evidence of wave particle duality
1.4.1 Wave nature of particle (Davisson-German experiment)
Electron strikes the crystals surface at an
angle . The detector, symmetrically located
from the source measure the number of
electrons scattered at angle θ where θ is the
angle between incident and scattered electron
beam.
The Maxima condition is given by
p
h
dnor
dn












where
2
cos2
sin2



S D
gv
phv
t
fiziks
Institute for NET/JRF, GATE, IIT-JAM, JEST, TIFR and GRE in PHYSICAL SCIENCES
Website: www.physicsbyfiziks.com
Email: fiziks.physics@gmail.com 6
Head office
fiziks, H.No. 23, G.F, Jia Sarai,
Near IIT, Hauz Khas, New Delhi-16
Phone: 011-26865455/+91-9871145498
Branch office
Anand Institute of Mathematics,
28-B/6, Jia Sarai, Near IIT
Hauz Khas, New Delhi-16
1.4.2 Particle nature of wave (Compton and Photoelectric Effect)
Compton Effect
The Compton Effect is the result of scattering of a photon by an electron. Energy and
momentum are conserved in such an event and as a result the scattered photon has less
energy (longer wavelength) then the incident photon.
If λ is incoming wavelength and λ' is scattered
wavelength and  is the angle made by
scattered wave to the incident wave then
  cos1' 
cm
h
o
where
cm
h
o
known as c which is Compton wavelength ( c = 2.426 x 10-12
m) and mo is
rest mass of electron.
Photoelectric effect
When a metal is irradiated with light, electron may get emitted. Kinetic energy k of
electron leaving when irradiated with a light of frequency o  , where o is threshold
frequency. Kinetic energy is given by
max 0k h h  
Stopping potential sV is potential required to stop electron which contain maximum
kinetic energy maxk .
0seV h h   , which is known as Einstein equation
photonincident
photonscattered
ElectronTarget ElectronScattered


fiziks
Institute for NET/JRF, GATE, IIT-JAM, JEST, TIFR and GRE in PHYSICAL SCIENCES
Website: www.physicsbyfiziks.com
Email: fiziks.physics@gmail.com 7
Head office
fiziks, H.No. 23, G.F, Jia Sarai,
Near IIT, Hauz Khas, New Delhi-16
Phone: 011-26865455/+91-9871145498
Branch office
Anand Institute of Mathematics,
28-B/6, Jia Sarai, Near IIT
Hauz Khas, New Delhi-16
2. Mathematical Tools for Quantum Mechanics
2.1 Dimension and Basis of a Vector Space
A set of N vectors N ,........, 21 is said to be linearly independent if and only if the
solution of equation 

N
i
iia
1
0 is 1 2 Na = a = ..... a =0
N dimensional vector space can be represent as 

N
i
iia
1
0 where i = 1, 2, 3 … are
linearly independent function or vector.
Scalar Product: Scalar product of two functions is represented as , , which is
defined as  dx*
. If the integral diverges scalar product is not defined.
Square Integrable: If the integration or scalar product  
2
, dx    is finite then the
integration is known as square integrable.
Dirac Notation: Any state vector  can be represented as  which is termed as ket
and conjugate of  i.e. * is represented by  which is termed as bra.
The scalar product of  and ψ in Dirac Notation is represented by   (bra-ket). The
value of   is given by integral     rdtrtr 3*
,,  in three dimensions.
Properties of kets, bras and brakets:
 




*
**
aa
Orthogonality relation: If  and  are two ket and the value of bracket 0
then  ,  is orthogonal.
Orthonormality relation: If  and  are two ket and the value of bracket 0
and 1 1 then  and  are orthonormal.
Schwarz inequality:  
2
fiziks
Institute for NET/JRF, GATE, IIT-JAM, JEST, TIFR and GRE in PHYSICAL SCIENCES
Website: www.physicsbyfiziks.com
Email: fiziks.physics@gmail.com 8
Head office
fiziks, H.No. 23, G.F, Jia Sarai,
Near IIT, Hauz Khas, New Delhi-16
Phone: 011-26865455/+91-9871145498
Branch office
Anand Institute of Mathematics,
28-B/6, Jia Sarai, Near IIT
Hauz Khas, New Delhi-16
2.2 Operators
An operator A is mathematical rule that when applied to a ket  transforms it into
another ket  i.e.
A    
Different type of operator
Identity operator I  
Parity operator    rr  
For even parity    rr   , for odd parity    rr  
Momentum operator xP i
x



 


Energy operator H i
t






Laplacian operator 2
2
2
2
2
2
2
zyx 










Position operator    rxrX  
Linear operator
For 2211  aa  if an operator Aˆ applied on  results in 1 1 2 2a A a A 
then operator Aˆ is said to be linear operator.
fiziks
Institute for NET/JRF, GATE, IIT-JAM, JEST, TIFR and GRE in PHYSICAL SCIENCES
Website: www.physicsbyfiziks.com
Email: fiziks.physics@gmail.com 9
Head office
fiziks, H.No. 23, G.F, Jia Sarai,
Near IIT, Hauz Khas, New Delhi-16
Phone: 011-26865455/+91-9871145498
Branch office
Anand Institute of Mathematics,
28-B/6, Jia Sarai, Near IIT
Hauz Khas, New Delhi-16
2.3 Postulates of Quantum Mechanics
Postulate 1: State of system
The state of any physical system is specified at each time t by a state vector  t which
contains all the information about the system. The state vector is also referred as wave
function. The wave function must be: Single valued, Continuous, Differentiable, Square
integrable (i.e. wave function have to converse at infinity).
Postulate 2: To every physically measurable quantity called as observable dynamical
variable. For every observable there corresponds a linear Hermitian operatorAˆ . The
Eigen vector of Aˆ let say n  form complete basis. Completeness relation is given
by
1
n n
n
I 


 
Eigen value: The only possible result of measurement of a physical quantity na is one of
the Eigen values of the corresponding observable.
Postulate 3: (Probabilistic outcome): When the physical quantity A is measured on a
system in the normalized state  the probability P(an) of obtaining the Eigen value an of
corresponding observable A is  
2
1
ng
i
n
i
n
a
P a

 


 

where gn is degeneracy of state and
nu is the Normalised Eigen vector of Aˆ associated with Eigen value an.
Postulate 4: Immediately after measurement.
If the measurement of physical quantity A on the system in the state  gives the result
an (an is Eigen value associated with Eigen vector na ), Then the state of the system
immediately after the measurement is the normalized projection


n
n
P
P
where Pn is
projection operator defined by n n  .
fiziks
Institute for NET/JRF, GATE, IIT-JAM, JEST, TIFR and GRE in PHYSICAL SCIENCES
Website: www.physicsbyfiziks.com
Email: fiziks.physics@gmail.com 10
Head office
fiziks, H.No. 23, G.F, Jia Sarai,
Near IIT, Hauz Khas, New Delhi-16
Phone: 011-26865455/+91-9871145498
Branch office
Anand Institute of Mathematics,
28-B/6, Jia Sarai, Near IIT
Hauz Khas, New Delhi-16
Projection operator Pˆ : An operator Pˆ is said to be a projector, or projection operator, if
it is Hermitian and equal to its own square i.e. PP ˆˆ 2

The projection operator is represented by n n
n
 
Postulate 5: The time evolution of the state vector  t is governed by Schrodinger
equation:      ttHt
dt
d
i   , where H(t) is the observable associated with total
energy of system and popularly known as Hamiltonian of system. Some other operator
related to quantum mechanics:
2.4 Commutator
If A and B are two operator then their commutator is defined as  A,B AB-BA
Properties of commutators
         
       
     
† † †
, , ; , , ,
, , , ; , ,
, , , , , 0 (Popularly known as Jacobi identity).
C C
C C B C
C C C
             
             
                  
 , 0f    
If X is position and xP is conjugate momentum then
 1
,n n
xX P nX i
     and  1
, n n
x xX P nP i
  
If b is scalar and A is any operator then  , 0b 
If [A, B] = 0 then it is said that A and B commutes to each other ie AB BA .
If two Hermition operators A andB , commute ie , 0       and if A has non
degenerate Eigen value, then each Eigen vector of Aˆ is also an Eigen vector ofB .
We can also construct the common orthonormal basis that will be joint Eigen state of
A and B .
The anti commutator is defined as  ,     
fiziks
Institute for NET/JRF, GATE, IIT-JAM, JEST, TIFR and GRE in PHYSICAL SCIENCES
Website: www.physicsbyfiziks.com
Email: fiziks.physics@gmail.com 11
Head office
fiziks, H.No. 23, G.F, Jia Sarai,
Near IIT, Hauz Khas, New Delhi-16
Phone: 011-26865455/+91-9871145498
Branch office
Anand Institute of Mathematics,
28-B/6, Jia Sarai, Near IIT
Hauz Khas, New Delhi-16
2.5 Eigen value problem in Quantum Mechanics
Eigen value problem in quantum mechanics is defined as
n n na  
where an is Eigen value and n is Eigen vector.
 In quantum mechanics operator associated with observable is Hermitian, so its Eigen
values are real and Eigen vector corresponding to different Eigen values are
orthogonal.
 The Eigen state (Eigen vector) of Hamilton operator defines a complete set of
mutually orthonormal basis state. This basis will be unique if Eigen value are non
degenerate and not unique if there are degeneracy.
Completeness relation: the orthonormnal realtion and completeness relation is given by
I
n
nnmnmn  

1
, 
where I is unity operator.
2.6 Time evaluation of the expectation of A (Ehrenfest theorem)
 
1 A
A,H
d
A
dt i t

 

where  ,A H is commutation between operator A and
Hamiltonian H operator .Time evaluation of expectation of A gives rise to Ehrenfest
theorem .
1d
R P
dt m
 ,  ,
d
P V R t
dt
  
where R is position, P is momentum and  ,V R t is potential operator.
2.7 Uncertainty relation related to operator
If Aˆ and Bˆ are two operator related to observable A and B then
 Bˆ,Aˆ
2
1
BˆAˆ 
where
2
2
AˆAˆAˆ  and
2
2
BˆBˆAˆ  .
fiziks
Institute for NET/JRF, GATE, IIT-JAM, JEST, TIFR and GRE in PHYSICAL SCIENCES
Website: www.physicsbyfiziks.com
Email: fiziks.physics@gmail.com 12
Head office
fiziks, H.No. 23, G.F, Jia Sarai,
Near IIT, Hauz Khas, New Delhi-16
Phone: 011-26865455/+91-9871145498
Branch office
Anand Institute of Mathematics,
28-B/6, Jia Sarai, Near IIT
Hauz Khas, New Delhi-16
2.8 Change in basis in quantum mechanics
If  k are wave function is position representation and  k are wave function in
momentum representation, one can change position to momentum basis via Fourier
transformation.
   
   
1
2
1
2
ikx
ikx
x k e dk
k x e dx
 

 










2.9 Expectation value and uncertainty principle
The expectation value A of A in direction of  is given by
A
A
 
 
 or
A n na P  where nP is probability to getting Eigen value an in state  .
fiziks
Institute for NET/JRF, GATE, IIT-JAM, JEST, TIFR and GRE in PHYSICAL SCIENCES
Website: www.physicsbyfiziks.com
Email: fiziks.physics@gmail.com 13
Head office
fiziks, H.No. 23, G.F, Jia Sarai,
Near IIT, Hauz Khas, New Delhi-16
Phone: 011-26865455/+91-9871145498
Branch office
Anand Institute of Mathematics,
28-B/6, Jia Sarai, Near IIT
Hauz Khas, New Delhi-16
3. Schrödinger Wave Equation and Potential Problems
3.1 Schrödinger Wave Equation
Hamiltonian of the system is given by
2
2
P
H V
m
 
Time dependent Schrödinger wave equation is given by
t
iH




 
Time independent Schrödinger wave equation is given by  EH 
where H is Hamiltonian of system.
It is given that total energy E and potential energy of system is V.
3.2 Property of bound state
Bound state
If E > V and there is two classical turning point in which particle is classically trapped
then system is called bound state.
Property of Bound state
The energy Eigen value is discrete and in one dimensional system it is non degenerate.
The wave function  xn of one dimensional bound state system has n nodes if n = 0
corresponds to ground state and (n – 1) node if n = 1 corresponds to ground state.
Unbound states
If E > V and either there is one classical turning point or no turning point the energy
value is continuous. If there is one turning point the energy eigen value is non-
degenerate. If there is no turning point the energy eigen value is degenerate. The particle
is said to be unbounded.
If E < V then particle is said to be unbounded and wave function will decay at ± ∞. There
is finite probability to find particle in the region.
fiziks
Institute for NET/JRF, GATE, IIT-JAM, JEST, TIFR and GRE in PHYSICAL SCIENCES
Website: www.physicsbyfiziks.com
Email: fiziks.physics@gmail.com 14
Head office
fiziks, H.No. 23, G.F, Jia Sarai,
Near IIT, Hauz Khas, New Delhi-16
Phone: 011-26865455/+91-9871145498
Branch office
Anand Institute of Mathematics,
28-B/6, Jia Sarai, Near IIT
Hauz Khas, New Delhi-16
3.3 Current density
If wave function in one Dimension is  x then current density is given by












xxim
Jx
*
*
2





which satisfies the continually equation 0


J
t

Where   *
 in general J v
2
J v where v is velocity of particle?
If Ji, Jr, Jt are incident, reflected and transmitted current density then reflection coefficient
R and transmission coefficient T is given by
r
i
J
R
J
 and t
i
J
T
J

3.4 The free particle in one dimension
Hψ = Eψ  xE
dx
d
m


 2
22
2

  ikxikx
AeeAx 
 
Energy eigen value E
m
k
2
22

 where 2
2

mE
k  the eigen values are doubly degenerate
3.5 The Step Potential
The potential step is defined as
 






0
00
xV
x
xV
o
Case I: E > Vo
0
0
22
11
2
1




xBeAe
xBeAe
xikxik
xikxik


Hence, a particle is coming from left so D = 0.
R = reflection coefficient =
incident
reflected
J
J
=
2
1 2
1 2
k k
R
k k
 
  
 
xo
oV
fiziks
Institute for NET/JRF, GATE, IIT-JAM, JEST, TIFR and GRE in PHYSICAL SCIENCES
Website: www.physicsbyfiziks.com
Email: fiziks.physics@gmail.com 15
Head office
fiziks, H.No. 23, G.F, Jia Sarai,
Near IIT, Hauz Khas, New Delhi-16
Phone: 011-26865455/+91-9871145498
Branch office
Anand Institute of Mathematics,
28-B/6, Jia Sarai, Near IIT
Hauz Khas, New Delhi-16
T = transmitted coefficient =
incident
dtransmitte
J
J
=
 
1 2
2
1 2
4k k
T
k k


where
 
2221
22

oVEm
k
mE
k


Case II: E < Vo
21
2
011

mE
kxBeAe xikxik
I  

 
22
2
02

EVm
kxce oxk
II

 

1r
t
J
R
J
  and 0t
i
J
T
J
 
For case even there is Transmission coefficient is zero there is finite probability to find
the particle in x > 0 .
3.7 Potential Barrier
Potential barrier is shown in figure.
Potential barrier is given by  









ax
axV
x
xV
0
0
00
0
Case I: E > Vo
   
   
    0
0
0
1
22
11
33
22
11



xEexx
axDeCexx
xBeAexx
xik
xikxik
xikxik



Where 21
2

mE
k 
 
22
2

oVEm
k


Transmission coefficient
 
 
1
2
1sin
14
1
1









 T
a
Energy
o x
oV
fiziks
Institute for NET/JRF, GATE, IIT-JAM, JEST, TIFR and GRE in PHYSICAL SCIENCES
Website: www.physicsbyfiziks.com
Email: fiziks.physics@gmail.com 16
Head office
fiziks, H.No. 23, G.F, Jia Sarai,
Near IIT, Hauz Khas, New Delhi-16
Phone: 011-26865455/+91-9871145498
Branch office
Anand Institute of Mathematics,
28-B/6, Jia Sarai, Near IIT
Hauz Khas, New Delhi-16
Reflection coefficient
 
 
1
2
1sin
14
1











R Where 2
2
,

o
o
mV
a
V
E
 
Case II: E < Vo
3.7.1 Tunnel Effect
1 1
2 2
1
0
0
0
ik x ik x
I
k x k x
II
ik x
III
Ae Be x
Ce Be x a
Fe x





  
   
 
 
 21
sin 1
4 1
R h  
 
and
 
 21
1 sin 1
4 1
T h   
 
Where
o
o
V
EmV
a  ,
2
2


For E << Vo
 
2
22
1
16 
EVma
oo
o
e
V
E
V
E
T









Approximate transmission probability ak
eT 22
 where
 
22
2

EVm
k o 

3.8 The Infinite Square Well Potential
The infinite square well potential is defined as as shown in the figure
 









ax
ax
x
xV 00
0
Since V(x) is infinite in the region 0x  and x a so the wave function corresponding
to the particle will be zero.
The particle is confined only within region 0 ≤ x ≤ a.
Time independent wave Schrödinger wave equation is given by

 xV
o a x

ao
oV
fiziks
Institute for NET/JRF, GATE, IIT-JAM, JEST, TIFR and GRE in PHYSICAL SCIENCES
Website: www.physicsbyfiziks.com
Email: fiziks.physics@gmail.com 17
Head office
fiziks, H.No. 23, G.F, Jia Sarai,
Near IIT, Hauz Khas, New Delhi-16
Phone: 011-26865455/+91-9871145498
Branch office
Anand Institute of Mathematics,
28-B/6, Jia Sarai, Near IIT
Hauz Khas, New Delhi-16


E
dx
d
m
 2
22
2

sin cosA kx B kx  
B = 0 since wave function must be vanished at boundary ie 0x  so sinA kx 
Energy eigen value for bound state can be find by ka n where 1,2,3...n 
The Normalized wave function is for th
n state is given by
 
2
sinn
n x
x
a a

 
Which is energy Eigen value correspondence to th
n
2
222
2ma
n
En

 where n = 1, 2, 3 .....
othonormality relation is given by
0
sin sin i.e.
2
0
1
2
a
mn
m x n x a
dx
L L
m n
a
m
 

 
 

If x is position operator xP Px is momentum operator and  n x is wave function of
particle in nth
state in one dimensional potential box then  
2
sinn
n x
x
a a

  then
   
   
   
   
*
2 2
2 * 2
2 2
*
2 2 2 2
2 *
2 2
2
2 2
0
2
n n
n n
x n n
x n n
a
x x x x
a a
x x x x
n
P x i x
x
n
P x x
m x a
 
 

 

 








 
  

  


  






 
fiziks
Institute for NET/JRF, GATE, IIT-JAM, JEST, TIFR and GRE in PHYSICAL SCIENCES
Website: www.physicsbyfiziks.com
Email: fiziks.physics@gmail.com 18
Head office
fiziks, H.No. 23, G.F, Jia Sarai,
Near IIT, Hauz Khas, New Delhi-16
Phone: 011-26865455/+91-9871145498
Branch office
Anand Institute of Mathematics,
28-B/6, Jia Sarai, Near IIT
Hauz Khas, New Delhi-16
The uncertainty product is given by 22
2
1
12
1


n
nPxx  
The wave function and the probability density function of particle of mass m in one
dimensional potential box is given by
3.8.1 Symmetric Potential
The infinite symmetric well potential is given by
 
22
0
22
a
x
a
a
xor
a
xxV


Schrondinger wave function is given by
 
)(0
2
cos
2
sin
)(0
2
cos
2
sin
0,
2
2
cossin
22
;
2 2
22
ii
ka
B
ka
A
i
ka
B
ka
Aso
x
a
xat
mE
kwherekxBkxA
a
x
a
E
dx
d
m











Hence parity ( ) commute with Hamiltonian ( )H then parity must conserve
So wave function have to be either symmetric or anti symmetric
2
a

2
a
a
 xV
m
En
2
1
22
1


12 42 EEn 
13 93 EEn 
a
x
a

 sin
2
1 
a
x
a


2
sin
2
2 
a
x
a


3
sin
2
3 
2
1
2
2
2
3
fiziks
Institute for NET/JRF, GATE, IIT-JAM, JEST, TIFR and GRE in PHYSICAL SCIENCES
Website: www.physicsbyfiziks.com
Email: fiziks.physics@gmail.com 19
Head office
fiziks, H.No. 23, G.F, Jia Sarai,
Near IIT, Hauz Khas, New Delhi-16
Phone: 011-26865455/+91-9871145498
Branch office
Anand Institute of Mathematics,
28-B/6, Jia Sarai, Near IIT
Hauz Khas, New Delhi-16
For even parity
cosB kx  and Bound state energy is given by 0
2
cos 
ka
,....5,3,10
2
 n
a
n
k
ka 
Wave function for even parity is given as
a
xn
a

cos
2
For odd parity
Ψ (x) = A sin kx and Bound state energy is given by
sin 0
2
ka
 , 0
2
ka n
k
a

  2,4,6,........n 
For odd parity Wave function is given as
a
xn
a

sin
2
The energy eigen value is given by ,......3,2,1
2 2
222
 n
ma
n
En

First three wave function is given by
 
 
 
a
x
a
x
a
x
a
x
a
x
a
x






3
cos
2
2
sin
2
cos
2
3
2
1



where
a
2
is normalization constant.
2
22
2ma

2
a
2
a
 2
22
2
9
ma

2
22
2
4
ma

2
a

2
a
2
a

2
a
 x3
 x2
 x1
fiziks
Institute for NET/JRF, GATE, IIT-JAM, JEST, TIFR and GRE in PHYSICAL SCIENCES
Website: www.physicsbyfiziks.com
Email: fiziks.physics@gmail.com 20
Head office
fiziks, H.No. 23, G.F, Jia Sarai,
Near IIT, Hauz Khas, New Delhi-16
Phone: 011-26865455/+91-9871145498
Branch office
Anand Institute of Mathematics,
28-B/6, Jia Sarai, Near IIT
Hauz Khas, New Delhi-16
3.9 Finite Square Well Potential
For the Bound state E < Vo
Again parity will commute to Hamiltonian
So wave function is either symmetric or
Anti symmetric
For even parity
 
 
 
2
22
cos
2
a
xAex
a
x
a
kxCx
a
xAex
x
III
II
x
I








wave function must be continuous and differentiable at boundaries so using boundary
condition at
2
a
 one will get
2
tan
ka
k
tan   where
2
a
 
2
ka
 
For odd parity
 
 
 
2
22
sin
2
2
1
a
xAex
a
x
a
kxDx
a
xAex
x
III
x








using boundary condition one can get
cot    where
 
2
2

EVm o 
 2
2

mE
k 
and 2
2
22
2
amV
n o
 which is equation of circle.
The Bound state energy will be found by solving equation
 tann for even
2
a

2
a x
oV
 xV
fiziks
Institute for NET/JRF, GATE, IIT-JAM, JEST, TIFR and GRE in PHYSICAL SCIENCES
Website: www.physicsbyfiziks.com
Email: fiziks.physics@gmail.com 21
Head office
fiziks, H.No. 23, G.F, Jia Sarai,
Near IIT, Hauz Khas, New Delhi-16
Phone: 011-26865455/+91-9871145498
Branch office
Anand Institute of Mathematics,
28-B/6, Jia Sarai, Near IIT
Hauz Khas, New Delhi-16
 cotn for odd
2
22
2


amV
n o

one can solve it by graphical method.
The intersection point of = tan   (solid curve) and
2
2 2
2
2
omV a
  

(circle) give
Eigen value for even state and intersection point at = - cot   (dotted curve) and
2
2 2
2
2
omV a
  

(circle) give Eigen value for odd state.
The table below shows the number of bound state for various range of 2
0V a where Voa2
is strength of potential.
Voa2
Even eigen function Odd eigen function No. of Bound
states
m2
22
 1 0 1
m
aV
m 2
4
2
22
2
0
22
 

1 1 2
m
aV
m 2
9
2
22
2
0
22
 

2 1 3
m
aV
m 2
16
2
9 22
2
0
22
 

2 2 4
n
 tann
o
2
 
2
3 2 
fiziks
Institute for NET/JRF, GATE, IIT-JAM, JEST, TIFR and GRE in PHYSICAL SCIENCES
Website: www.physicsbyfiziks.com
Email: fiziks.physics@gmail.com 22
Head office
fiziks, H.No. 23, G.F, Jia Sarai,
Near IIT, Hauz Khas, New Delhi-16
Phone: 011-26865455/+91-9871145498
Branch office
Anand Institute of Mathematics,
28-B/6, Jia Sarai, Near IIT
Hauz Khas, New Delhi-16
The three bound Eigen function for the square well
3.10 One dimensional Harmonic Oscillator
One dimensional Harmonic oscillator is given by
   xxmxV 22
2
1

The schrodinger equation is given by


Exm
dx
d
m

 22
2
22
2
1
2

It is given that x
m


  and

E
k
2

The wave function of Harmonic oscillator is given by.
    2
2/14/1 2
!2
1


















 eH
n
m
nnn

and energy eigen value is given by
nE = (n+1/2)  ; n = 0, 1, 2, 3, ....
The wave function of Harmonic oscillator is shown
0H ( ) = 1 , 1H ( ) = 2  , 2
2H ( ) = 4 -2 
It n and m wave function of Harmonic oscillator then    


 mnnm dxxx 
x
2
a

2
a
 x2
x
2
a
2
a

 x1
x
 x3
1n
2
0

E
 xV
0n
2n
2
3
1

E
2
5
2

E
fiziks
Institute for NET/JRF, GATE, IIT-JAM, JEST, TIFR and GRE in PHYSICAL SCIENCES
Website: www.physicsbyfiziks.com
Email: fiziks.physics@gmail.com 23
Head office
fiziks, H.No. 23, G.F, Jia Sarai,
Near IIT, Hauz Khas, New Delhi-16
Phone: 011-26865455/+91-9871145498
Branch office
Anand Institute of Mathematics,
28-B/6, Jia Sarai, Near IIT
Hauz Khas, New Delhi-16
Number operator
The Hamiltonian of Harmonic operator is given by 22
2
2
1
2
Xm
m
P
H x

Consider dimensioned operator as HPX ˆ,ˆ,ˆ where
X
m
X ˆ


 ˆ
x xP m P  HH ˆ so  22 ˆˆ
2
1ˆ XPH x  .
Consider lowering operator  xiPXa  ˆ
2
1
and raising † 1 ˆ
2
xa X iP   
 2/1ˆ  NH
where †
N a a and  1/ 2H N    N is known as number operator
n is eigen function of N with eigen value n.
N n n n and
1
2
H n N n
 
  
 

nnnH 






2
1
where n = 0, 1, 2, 3,………
Commutation of a and †
a : †
[a, a ] = 1, †
[a , a] = -1 and [N, a] = -a , † †
[N a ] = a
Action of a and †
a operator on n
11
001



nnna
abutnnna
Expectation value of 22
,,, XX PPXX in stationary states
   
  







mnPn
m
X
PX
m
i
aa
Paa
m
X
X
X
X












2
1
,12
2
0,0
2
,
2
22
2
;0,
2
1 
 





 XX PXnfornPX
fiziks
Institute for NET/JRF, GATE, IIT-JAM, JEST, TIFR and GRE in PHYSICAL SCIENCES
Website: www.physicsbyfiziks.com
Email: fiziks.physics@gmail.com 24
Head office
fiziks, H.No. 23, G.F, Jia Sarai,
Near IIT, Hauz Khas, New Delhi-16
Phone: 011-26865455/+91-9871145498
Branch office
Anand Institute of Mathematics,
28-B/6, Jia Sarai, Near IIT
Hauz Khas, New Delhi-16
4. Angular Momentum Problem
Angular momentum in Quantum mechanics is given kLjLiLL zyx
ˆˆˆ 
Where xyzzxYyzX YPXPLXPZPLZPYPL  ;;
and
x
iPX


  ,
y
iPY


  ,
z
ipZ


 
Commutation relation
,x y zL L i L     , ,y z xL L i L      , ,z x yL L i L 
2 2 2 2
X Y ZL L L L   and 2
, 0XL L    , 2
, 0YL L    , 2
, 0ZL L   
4.1.1 Eigen Values and Eigen Function







































iL
iL
SiniL
Z
Y
X
cotsincos
cotcos
Eigen function of ZL is 

im
e
2
1
.
and Eigen value of ZL m  where m = 0, ± 1, ± 2...
L2
operator is given by 

















 2
2
2
22
sin
1
sin
sin
1



L
Eigen value of 2
L is 2
( 1)l l   where l = 0, 1, 2, ...l
Eigen function of 2
L is  m
lP where  m
lP  is associated Legendre function
L2
commute with Lz so both can have common set of Eigen function.
 , ( )m m im
l lY P e 
   is common set of Eigen function which is known as spherical
harmonics .
The normalized spherical harmonics are given by
fiziks
Institute for NET/JRF, GATE, IIT-JAM, JEST, TIFR and GRE in PHYSICAL SCIENCES
Website: www.physicsbyfiziks.com
Email: fiziks.physics@gmail.com 25
Head office
fiziks, H.No. 23, G.F, Jia Sarai,
Near IIT, Hauz Khas, New Delhi-16
Phone: 011-26865455/+91-9871145498
Branch office
Anand Institute of Mathematics,
28-B/6, Jia Sarai, Near IIT
Hauz Khas, New Delhi-16
 
   
 
 
2 1 !
( , ) 1 cos
4 !
mm m im
l l
l l m
Y P e
l m

  

 
 

l m l  
 


4
1
,0
0 Y
  


 i
eY sin
8
3
,1
1  ,  0
1
3
, cos
4
Y   

 ,  1
1
3
, sin
8
i
Y e 
  

 

      ,1, 22 m
l
m
l YllYL  l = 0, 1, 2, ……. And
    ,, m
l
m
lZ YmYL  m = -l ,(-l +1) ..0,….. (l – 1)( l ) there is 2 1l 
Degeneracy of 2
L is 2 1l  .
Orthogonality Relation    
2
' '
0 0
, , sinm m
l l ll mmd Y Y d
 
         
4.1.2 Ladder Operator
Let X YL L iL   and X YL L iL  
Let us assume ml, is ket associated with 2
L and ZL operator.
 
22
, 1 ,L l m l l l m  0,1,2,.......l 
,, , ...0,...zL l m m l m m l l  
Action of L+ and L- on ml, basis
   , 1 1 , 1L l m l l m m l m     
   , 1 1 , 1L l m l l m m l m     
Expectation value of XL and YL in direction of ml,
0xL  , 0yL   
2
2 2 2
1
2
X YL L l l m     

 
2
2
1
2
X YL L l l m      

fiziks
Institute for NET/JRF, GATE, IIT-JAM, JEST, TIFR and GRE in PHYSICAL SCIENCES
Website: www.physicsbyfiziks.com
Email: fiziks.physics@gmail.com 26
Head office
fiziks, H.No. 23, G.F, Jia Sarai,
Near IIT, Hauz Khas, New Delhi-16
Phone: 011-26865455/+91-9871145498
Branch office
Anand Institute of Mathematics,
28-B/6, Jia Sarai, Near IIT
Hauz Khas, New Delhi-16
4.2 Spin Angular Momentum
4.2.1 Stern Gerlach experiment
When silver beam is passed to the inhomogeneous Magnetic field, two sharp trace found
on the screen which provides the experimental evidence of spin.
4.2.2 Spin Algebra
ˆˆ ˆX Y ZS S i S j S k   , 2 2 2 2
X Y ZS S S S  
2
, 0XS S    , 2
, 0YS S   
2
, 0ZS S    and
 ,X Y ZS S iS  ,Y Z XS S iS  ,Z X YS S iS
 2 2
, 1 ,s sS s m s s s m   , ,z s sS s m m s m  where ss m s   
X YS S iS   and X YS S iS  
   , 1 1 , 1s s s sS s m s s m m s m     
4.2.3 Pauli Spin Matrices
For Spin
1
2
Pauli matrix
1
2
s  ,
1 1
,
2 2
sm   
Pauli Matrix is defined as
  e.anticommutMatrixSpinPauli;0
10
01
0
0
01
10
222
kj
I
i
i
jkkj
zyx
zyx



























1 if is an even permutation of , ,
1 if is an odd permutation of , ,
0 if any two indices among , , are equal
jkl
jkl x y z
jkl x y z
j k l


  


zzyyxx SSS 
2
,
2
,
2


   , 1 1 , 1s s s sS s m s s m m s m     
fiziks
Institute for NET/JRF, GATE, IIT-JAM, JEST, TIFR and GRE in PHYSICAL SCIENCES
Website: www.physicsbyfiziks.com
Email: fiziks.physics@gmail.com 27
Head office
fiziks, H.No. 23, G.F, Jia Sarai,
Near IIT, Hauz Khas, New Delhi-16
Phone: 011-26865455/+91-9871145498
Branch office
Anand Institute of Mathematics,
28-B/6, Jia Sarai, Near IIT
Hauz Khas, New Delhi-16












 







10
01
20
0
201
10
2

zyx S
i
i
SS












 
01
00
00
10
 SS







10
01
4
3 2
2 
S
For spin ½ the quantum number m takes only two values
2
1
sm and
2
1
 . So that two
states are
2
1
,
2
1
and
2
1
,
2
1
, smS
2
1
,
2
1
4
3
2
1
,
2
1 2
2 
S ,
2
1
,
2
1
4
3
2
1
,
2
1 2
2


S
2
1
,
2
1
2
1
2
1
,
2
1
zS ,
2
1
,
2
1
2
1
2
1
,
2
1
 zS
0
2
1
,
2
1
S ,
2
1
,
2
1
2
1
,
2
1
S
2
1
,
2
1
2
1
,
2
1
 S , 0
2
1
,
2
1
S
4.3 Total Angular Momentum
Total angular momentum J = L + S , kJjJiJJ zyx
ˆˆˆ 
jmj, is the Eigen ket at J2
and Jz and x yJ J iJ   x yJ J iJ  
  jj mjjjmjJ ,1, 22
 , jjjz mjmmjJ ,, 
    1,11,  jjjj mjmmjjmjJ
    1,11,  jjjj mjmmjjmjJ
J L S l s j l s     
jmjSLJ jzzz  and l s jm m m 
fiziks
Institute for NET/JRF, GATE, IIT-JAM, JEST, TIFR and GRE in PHYSICAL SCIENCES
Website: www.physicsbyfiziks.com
Email: fiziks.physics@gmail.com 28
Head office
fiziks, H.No. 23, G.F, Jia Sarai,
Near IIT, Hauz Khas, New Delhi-16
Phone: 011-26865455/+91-9871145498
Branch office
Anand Institute of Mathematics,
28-B/6, Jia Sarai, Near IIT
Hauz Khas, New Delhi-16
5. Two Dimensional Problems in Quantum Mechanics
5.1 Free Particle
Hψ = Eψ


E
yxm











 2
2
2
22
2

x and y are independent variable. Thus
 
 
1
,
2
1
2
yx
ik yik x
n
i k r
x y e e
e






 
Energy Eigen value   2
2
22
2
22
k
m
kk
m
yx


As total orientation of k

which preserve its magnitude is infinite. So energy of free
particle is infinitely degenerate.
5.2 Square Well Potential
  0V x x a   and 0 y a 
otherewise
2 2 2
2 2
2
H E
m x y
 

  
    
  

The solution of Schrödinger wave equation is given by Wave function
, 2
4
sin sinx y
yx
n n
n yn x
a aa


  
        
Correspondence to energy eigen value








 2
2
2
222
,
2 a
n
a
n
m
E yx
nynx

1,2,3...xn  and 1,2,3...yn 
fiziks
Institute for NET/JRF, GATE, IIT-JAM, JEST, TIFR and GRE in PHYSICAL SCIENCES
Website: www.physicsbyfiziks.com
Email: fiziks.physics@gmail.com 29
Head office
fiziks, H.No. 23, G.F, Jia Sarai,
Near IIT, Hauz Khas, New Delhi-16
Phone: 011-26865455/+91-9871145498
Branch office
Anand Institute of Mathematics,
28-B/6, Jia Sarai, Near IIT
Hauz Khas, New Delhi-16
Energy of state (nx, ny) Degeneracy
Ground state 2
22
2
2
ma

(1, 1) Non degenerate
First state 2
22
2
5
ma

(1, 2), (2,1) 2
Second state 2
22
2
8
ma

(2, 2) Non-degenerate
5.3 Harmonic oscillator
Two dimensional isotropic Harmonic oscillators is given by
 
22
2 2 21
2 2 2
yx
pp
H m x y
m m
   
 1x yn n x yE n n     where 0,1,2,3...xn  0,1,2,3...yn 
 1nE n   
degeneracy of the nth
state is given by (n + 1) where n = nx + ny.
fiziks
Institute for NET/JRF, GATE, IIT-JAM, JEST, TIFR and GRE in PHYSICAL SCIENCES
Website: www.physicsbyfiziks.com
Email: fiziks.physics@gmail.com 30
Head office
fiziks, H.No. 23, G.F, Jia Sarai,
Near IIT, Hauz Khas, New Delhi-16
Phone: 011-26865455/+91-9871145498
Branch office
Anand Institute of Mathematics,
28-B/6, Jia Sarai, Near IIT
Hauz Khas, New Delhi-16
6. Three Dimensional Problems in Quantum Mechanics
6.1 Free Particle
 EH 


E
zyxm














 2
2
2
2
2
22
2

Hence x, y, z are independent variable. Using separation of variable one can find the
 
 
zikyikxik
k
zyn
eeezyx 2/3
2
1
,,

   
3/2 .
2 ik r
e



Energy Eigen value   2
2
222
2
22
k
m
kkk
m
zyx


As total orientation of k which preserve its magnitude is infinite, the energy of free
particle is infinitely degenerate.
6.2 Particle in Rectangular Box
Spinless particle of mass m confined in a rectangular box of sides Lx, Ly, Lz
 , , 0 ,xV x y z x L   0 ,yy L  0 ,zz L 
=  other wise .
The Schrodinger wave equation for three dimensional box is given by


E
zyxm
H 













 2
2
2
2
2
22
2

Solution of the Schrödinger is given by Eigen function x y zn n n and energy eigen value
is x y zn n nE is given by





















z
z
y
y
x
x
zyx
nnn
L
zn
L
yn
L
xn
LLLzyx

 sinsinsin
8








 2
2
2
2
2
222
2 z
z
y
y
x
x
nnn
L
n
L
n
L
n
m
E zyx

fiziks
Institute for NET/JRF, GATE, IIT-JAM, JEST, TIFR and GRE in PHYSICAL SCIENCES
Website: www.physicsbyfiziks.com
Email: fiziks.physics@gmail.com 31
Head office
fiziks, H.No. 23, G.F, Jia Sarai,
Near IIT, Hauz Khas, New Delhi-16
Phone: 011-26865455/+91-9871145498
Branch office
Anand Institute of Mathematics,
28-B/6, Jia Sarai, Near IIT
Hauz Khas, New Delhi-16
6.2.1 Particle in Cubical Box
For the simple case of cubic box of side a, the
i.e. Lx = Ly = Lz = a



















a
zn
a
yn
a
xn
a
zyx
nnn zyx

 sinsinsin
8
3
 222
2
22
2
zyxnnn nnn
ma
E zyx


1,2,3...xn  1,2,3...yn  1,2,3...zn 
Energy of state (nx, ny, nz) Degeneracy
E of ground state 2
22
2
3
ma


(1, 1, 1) Non degenerate
E of first excited state 2
22
2
6
ma


(2, 1, 1) (1, 2, 1) (1, 1, 2 3
E of 2nd
excited state 2
22
2
9
ma


(2, 2, 1) (2, 1, 2) (1, 2, 2) 3
6.3 Harmonic Oscillator
6.3.1 An Anistropic Oscillator
  222222
2
1
2
1
2
1
,, ZmYmXmZYXV ZYX  
zzyyxxnnn nnnE zyx
  


















2
1
2
1
2
1
where
0,1,2,3...xn  0,1,2,3...yn  0,1,2,3...xn 
6.3.2 The Isotropic Oscillator
x y z     
3
2x y zn n n x y zE n n n 
 
    
 
 where x y zn n n n   0,1,2,3...n 
Degeneracy is given by =   21
2
1
 nn
fiziks
Institute for NET/JRF, GATE, IIT-JAM, JEST, TIFR and GRE in PHYSICAL SCIENCES
Website: www.physicsbyfiziks.com
Email: fiziks.physics@gmail.com 32
Head office
fiziks, H.No. 23, G.F, Jia Sarai,
Near IIT, Hauz Khas, New Delhi-16
Phone: 011-26865455/+91-9871145498
Branch office
Anand Institute of Mathematics,
28-B/6, Jia Sarai, Near IIT
Hauz Khas, New Delhi-16
6.4 Potential in Spherical Coordinate (Central Potential)
Hamiltonion in spherical polar co-ordinate
 
2 2
2
2 2 2 2 2
1 1 1
sin
2 sin sin
r V r E
m r rr r r
  
  
   
        
        
         

 
2 2
2
2 2
1
2 2
L
r V r
m r rr mr
 

    
        

L2
is operator for orbital angular momentum square.
So  ,m
lY   are the common Eigen state of and L2
because [H, L2
] = 0 in central force
problem and    2 2
, 1 ( , )m m
l lL Y l l Y     
So   ,,r can be separated as    ,m
lf r Y  
   
      
2 22
2 2
12
0
2 2
d f r l lf
f r V r E f r
m r rdr mr
  
      
  

To solve these equations    
r
ru
rf 
So one can get
    0
2
1
2 2
2
2
22








 uE
mr
ll
rV
dr
ud
m

Where
 
2
2
2
1
mr
ll 
is centrifugal potential and    
2
2
2
1
mr
ll
rV

 is effective potential
The energy Eigen function in case of central potential is written as
     
 
 , , , ,m m
l l
u r
r f r Y Y
r
       
The normalization condition is
 
2
, , 1r d    
 
 
2 2
22
0 0 0
, sin 1m
l
u r
r dr Y d d
r
 
    

  
 
2
0
1u r dr

 or  
2 2
0
1R r r dr


fiziks
Institute for NET/JRF, GATE, IIT-JAM, JEST, TIFR and GRE in PHYSICAL SCIENCES
Website: www.physicsbyfiziks.com
Email: fiziks.physics@gmail.com 33
Head office
fiziks, H.No. 23, G.F, Jia Sarai,
Near IIT, Hauz Khas, New Delhi-16
Phone: 011-26865455/+91-9871145498
Branch office
Anand Institute of Mathematics,
28-B/6, Jia Sarai, Near IIT
Hauz Khas, New Delhi-16
6.4.1 Hydrogen Atom Problem
Hydrogen atom is two body central force problem with central potential is given by
 
2
04
e
V r
r
 

Time-independent Schrondinger equation on centre of mass reference frame is given by
     
2 2
2 2
, ,
2 2
R r V r R r E R r
m
 

 
      
  
    
where R is position of c.m and r is distance between proton and electron.
 R,r   R  r
The Schronginger equation is given by


h2
2M
1
 R 
R
2
 R 








 
h2
2
1
 r
R
2
 rV r 








 E
Separating R and r part
   RER
M
R  2
2
2

     rrVrr 

 2
2
2

Total energy R rE = E + E
ER is Energy of centre of mass and Er is Energy of reduce mass µ
 
 
3/ 2
1
2
ik R
R e


  2 2
2
R
k
E
M


i.eCentre of mass moves with constant momentum so it is free particle.
Solution of radial part


h2
2
d2
u r 
dr2 
l l 1 h2
2r2 
e2
4 0 r





u r  E r 
For Hydrogen atom em
fiziks
Institute for NET/JRF, GATE, IIT-JAM, JEST, TIFR and GRE in PHYSICAL SCIENCES
Website: www.physicsbyfiziks.com
Email: fiziks.physics@gmail.com 34
Head office
fiziks, H.No. 23, G.F, Jia Sarai,
Near IIT, Hauz Khas, New Delhi-16
Phone: 011-26865455/+91-9871145498
Branch office
Anand Institute of Mathematics,
28-B/6, Jia Sarai, Near IIT
Hauz Khas, New Delhi-16
The energy eigen value is given by nE =
 
4
2 2 2
02 4
em e
n

 
eV
n2
6.13
 1,2,3...n 
And radius of th
n orbit is given by
2 2
0
2
4
n
n
r
m e
 


1,2,3...n  where me is mass of
electron and e is electronic charge.
n is known as participle quantum number which varies as 1, 2,...n l n   For the
given value of n the orbital quantum numbern can have value between 0 and 1n  (i.e. l
= 0, 1, 2, 3, ….. n – 1) and for given value of l the Azimuthal quantum number m varies
from – l to l known as magnetic quantum mechanics .
Degeneracy of Hydrogen atom without spin = 2
n and if spin is included the degeneracy
is given by
1
2
0
2 2 1 2
n
n
l
g l n


  
For hydrogen like atom
2
2
6.13
n
z
En  where z is atomic number of Hydrogen like atom.
Normalized wave function for Hydrogen atom i.e. Rnl (r) where n is principle quantum
number and l is orbital quantum.
n l E(eV) Rnl
1 0 2
-13.6z
0
3/ 2
/
0
2 zr az
e
a
 
 
 
2 0 2
- 3.4 z
0
3/ 2
/ 2
0 0
2
2
zr az zr
e
a a
   
   
   
2 0 2
- 3.4 z
0
3/ 2
/ 20
0 0
1
24
zr az zr
e
a a
   
   
   
fiziks
Institute for NET/JRF, GATE, IIT-JAM, JEST, TIFR and GRE in PHYSICAL SCIENCES
Website: www.physicsbyfiziks.com
Email: fiziks.physics@gmail.com 35
Head office
fiziks, H.No. 23, G.F, Jia Sarai,
Near IIT, Hauz Khas, New Delhi-16
Phone: 011-26865455/+91-9871145498
Branch office
Anand Institute of Mathematics,
28-B/6, Jia Sarai, Near IIT
Hauz Khas, New Delhi-16
The radial wave function for hydrogen atom is Laguerre polynomials and angular part of
the wave function is associated Legendre polynomials .
For the nth
state there is n – l – 1 node
If Rnl is represented by ln, then
 2
0
1
3 1
2
nl r nl n l l a   
 
 2 2 2 2
0
1
5 1 3 1
2
nl r nl n n l l a    
 
1
2
0
1
nl r nl
n a


 
2
3 2
0
2
2 1
nl r nl
n l a



 rR10
0/arr
 rR20
0/arr
21R
0/ar
fiziks
Institute for NET/JRF, GATE, IIT-JAM, JEST, TIFR and GRE in PHYSICAL SCIENCES
Website: www.physicsbyfiziks.com
Email: fiziks.physics@gmail.com 36
Head office
fiziks, H.No. 23, G.F, Jia Sarai,
Near IIT, Hauz Khas, New Delhi-16
Phone: 011-26865455/+91-9871145498
Branch office
Anand Institute of Mathematics,
28-B/6, Jia Sarai, Near IIT
Hauz Khas, New Delhi-16
7. Perturbation Theory
7.1 Time Independent Perturbation Theory
7.1.1 Non-degenerate Theory
For approximation methods of stationary states
o PH H H 
Where H Hamiltonian can be divided into two parts in that oH can be solved exactly
known as unperturbed Hamiltonian and pH is perturbation in the system eigen value
of oH is non degenerate
It is known n
o
nno EH   and 1  pH W where 1 
Now  o n n nH W E    where n is eigen function corresponds to eigen value nE
for the Hamiltonian H
Using Taylor expansion
........2210
 nnnn EEEE  and .........221
 nnnn 
First order Energy correction 1
nE is given by  1
n n nE W 
And energy correction up to order in  is given by 1
n n n nE E W   
First order Eigen function correction  1
0 0
m n
n m
m n n m
W
E E
 
 




And wave function up to order correction in  0 0
m n
n n m
m n n m
W
E E
 
   

 


Second order energy correction  
   
2
2
0 0
m n
n
m n n m
W
E
E E
 




Energy correction up to order of 2
    
2
2
0 0 0
m n
n n n
m n n m
W
E E W
E E
 
   

  


fiziks
Institute for NET/JRF, GATE, IIT-JAM, JEST, TIFR and GRE in PHYSICAL SCIENCES
Website: www.physicsbyfiziks.com
Email: fiziks.physics@gmail.com 37
Head office
fiziks, H.No. 23, G.F, Jia Sarai,
Near IIT, Hauz Khas, New Delhi-16
Phone: 011-26865455/+91-9871145498
Branch office
Anand Institute of Mathematics,
28-B/6, Jia Sarai, Near IIT
Hauz Khas, New Delhi-16
7.1.2 Degenerate Theory
( )n o p n n nH H H E    
 0
nE is f fold degenerate  fEH nnno ,.....3,2,10
  
To determine the Eigen values to first-order and Eigen state to zeroth order for an f-fold
degenerate level one can proceed as follows
First for each f-fold degenerate level, determine f x f matrix of the perturbation pHˆ



















ff
f
f
ppfpf
ppp
ppp
p
HHH
HHH
HHH
H
.........
.
.
.........
.........
ˆ
21
22221
11211
where p n p nH H   
then diagonalised pH and find Eigen value and Eigen vector of diagonalized pH which
are nE and n respectively.
 10
 nnn EEE  and 

f
nn q
1
 
7.2 Time Dependent Perturbation Theory
The transition probability corresponding to a transition from an initial unperturbed
state i to perturbed f is obtained as
   
1
'
0
'fiiw t
if f i
i
P t V t e dt   
Where
f i
fi
E E
w



and
 f o f i o i
fi
H H
w
   


fiziks
Institute for NET/JRF, GATE, IIT-JAM, JEST, TIFR and GRE in PHYSICAL SCIENCES
Website: www.physicsbyfiziks.com
Email: fiziks.physics@gmail.com 38
Head office
fiziks, H.No. 23, G.F, Jia Sarai,
Near IIT, Hauz Khas, New Delhi-16
Phone: 011-26865455/+91-9871145498
Branch office
Anand Institute of Mathematics,
28-B/6, Jia Sarai, Near IIT
Hauz Khas, New Delhi-16
8. Variational Method
Variational method is based on energy optimization and parameter variation on the basis
of choosing trial wave function.
1. On the basis of physical intuition guess the trial wave function. Say
 noo  ,.....,, 321 where 321 ,,  are parameter.
2. Find  
   
   nn
nn
n
H
E



,.....,,,.....,,
,.....,,,.....,,
,.....,,
32103210
32103210
3210 
3. Find   0,.....,, 321 


n
i
oE


Find the value of   ,.....,, 321 so that it minimize E0.
4. Substitute the value of   ,.....,, 321 in   ,.....,, 3210E one get minimum value
of E0 for given trial wave function.
5. One can find the upper level of 1 on the basis that it must be orthogonal to 0 i.e.
1 0 0  
Once 1 can be selected the 2, 3, 4 step can be repeated to find energy the first Eigen
state.
fiziks
Institute for NET/JRF, GATE, IIT-JAM, JEST, TIFR and GRE in PHYSICAL SCIENCES
Website: www.physicsbyfiziks.com
Email: fiziks.physics@gmail.com 39
Head office
fiziks, H.No. 23, G.F, Jia Sarai,
Near IIT, Hauz Khas, New Delhi-16
Phone: 011-26865455/+91-9871145498
Branch office
Anand Institute of Mathematics,
28-B/6, Jia Sarai, Near IIT
Hauz Khas, New Delhi-16
9. The Wentzel-Kramer-Brillouin (WKB) method
WKB method is approximation method popularly derived from semi classical theory
For the case 1
d
dx

where ( )
2 ( ( )
x
m E V x
 


If potential is given as V(x) then and there is three region
WKB wave function in the first region i.e 1x x
 
 
1
1 1
exp ' '
x
I
x
c
P x dx
P x

 
  
  

WKB wave function in region II: i.e 1 2x x x 
 
 
 
 
' "
2 2
exp ' exp ' 'II
x
c ci i
P x dx P x dx
P x P x

  
       
  
WKB wave function in region III: i.e 2x x
 
 
2
3 1
exp ' '
x
III
x
c
P x dx
P x

 
  
  

9.1.1 Quantization of the Energy Level of Bound state
Case I: When both the boundary is smooth
1
( ) ( )
2
p x dx n   where 0,1,2...n 
  
2
1
1
2 2
2
x
n
x
m E V x dx n
 
   
 
  where 0, 1, 2,......n  and 1x and 2x are turning
point
Case II: When one the boundary is smooth and other is rigid
2
1
3
( ) ( )
4
x
x
p x dx n    where 0,1,2...n 
  
2
1
3
2
4
x
n
x
m E V x dx n 
 
   
 
  where 0, 1, 2,......n  and 1x and 2x are turning
points
 xV
I II III
fiziks
Institute for NET/JRF, GATE, IIT-JAM, JEST, TIFR and GRE in PHYSICAL SCIENCES
Website: www.physicsbyfiziks.com
Email: fiziks.physics@gmail.com 40
Head office
fiziks, H.No. 23, G.F, Jia Sarai,
Near IIT, Hauz Khas, New Delhi-16
Phone: 011-26865455/+91-9871145498
Branch office
Anand Institute of Mathematics,
28-B/6, Jia Sarai, Near IIT
Hauz Khas, New Delhi-16
Case III: When both boundary of potential is rigid
2
1
( ) ( 1)
x
x
p x dx n    where 0,1,2...n 
    
2
1
2 1
x
n
x
m E V x dx n     where 0, 1, 2,......n  and 1x and 2x are turning
points .
9.1.2 Transmission probability from WKB
T is defined as transmission probability through potential barrier V is given by
exp 2T   where   
2
1
1
2
x
n
x
m E V x dx  
and 1x and 2x are turning points.
fiziks
Institute for NET/JRF, GATE, IIT-JAM, JEST, TIFR and GRE in PHYSICAL SCIENCES
Website: www.physicsbyfiziks.com
Email: fiziks.physics@gmail.com 41
Head office
fiziks, H.No. 23, G.F, Jia Sarai,
Near IIT, Hauz Khas, New Delhi-16
Phone: 011-26865455/+91-9871145498
Branch office
Anand Institute of Mathematics,
28-B/6, Jia Sarai, Near IIT
Hauz Khas, New Delhi-16
10. Identical Particles
Identical particle in classical mechanics are distinguishable but identical particle in
quantum mechanics are Indistinguishable.
Total wave function of particles are either totally symmetric or totally anti-symmetric.
11.1 Exchange Operator
Exchange operator ijP as an operator as that when acting on an N-particle wave
function 1 2 3( .... ... ... )i j N       interchanges i and j.
i.e 1 2 3 1 2 3( .... ... ... ) ( .... ... ... )ij i j N j i NP              
 sign is for symmetric wave function s and  sign for anti symmetric wave
function a .
11.2 Particle with Integral Spins
Particle with integral spins or boson has symmetric states.
     1 2 1 2 2 1
1
, ,
2
s           
For three identical particle:
 
     
     








123213312
132231321
321
,,,,,,
,,,,,,
6
1


 s
For boson total wave function(space and spin) is symmetric i.e if space part is symmetric
spin part will also symmetric and if space part is ant symmetric space part will also also
anti symmetric.
11.3 Particle with Half-integral Spins
Particle with half-odd-integral spins or fermions have anti-symmetric.
For two identical particle:
      122121 ,,
2
1
 a
For three identical particle:
fiziks
Institute for NET/JRF, GATE, IIT-JAM, JEST, TIFR and GRE in PHYSICAL SCIENCES
Website: www.physicsbyfiziks.com
Email: fiziks.physics@gmail.com 42
Head office
fiziks, H.No. 23, G.F, Jia Sarai,
Near IIT, Hauz Khas, New Delhi-16
Phone: 011-26865455/+91-9871145498
Branch office
Anand Institute of Mathematics,
28-B/6, Jia Sarai, Near IIT
Hauz Khas, New Delhi-16
 
     
     
1 2 3 1 3 2 2 3 1
1 2 3
2 1 3 3 1 2 3 2 1
, , , , , ,1
, , , , , ,6
a
           
   
           
  
  
    
For fermions total wave function(space and spin) is anti symmetric .ie if space part is
symmetric spin part will anti symmetric and if space part is ant symmetric space part will
also symmetric.
11. Scattering in Quantum Mechanics
Incident wave is given by   .oik r
inc r Ae 

. If particle is scattered with angle θ which is
angle between incident and scattered wave vector ok

and k

Scattered wave is given by
   
.
,
ik r
sc
e
r Af
r
  
 
, where  ,f is called scattering amplitude wave function.
 is superposition of incident and scattered wave   






r
e
feA
rik
rik
o
o
 ,
differential scattering cross section is given by  
2
,
o
d k
f
d k

 

where  is solid angle
For elastic collision  
2
,
d
f
d

 

If potential is given by V and reduce mass of system is µ then

k
ok
     
2 22 ' 3
2
, ' ' '
4
ikrd
f e V r r d r
d
 
  


 
 
fiziks
Institute for NET/JRF, GATE, IIT-JAM, JEST, TIFR and GRE in PHYSICAL SCIENCES
Website: www.physicsbyfiziks.com
Email: fiziks.physics@gmail.com 43
Head office
fiziks, H.No. 23, G.F, Jia Sarai,
Near IIT, Hauz Khas, New Delhi-16
Phone: 011-26865455/+91-9871145498
Branch office
Anand Institute of Mathematics,
28-B/6, Jia Sarai, Near IIT
Hauz Khas, New Delhi-16
11.1 Born Approximation
Born approximation is valid for weak potential V(r)
     2
0
2
, ' ' sin ' 'f r V r qr dr
q

 

  
Where 2 sin
2
oq k k k

  
 
for and for ok k
 
   
2
2
4 2
0
4
' ' sin ' '
d
r V r qr dr
d q
  

 
11.2 Partial Wave Analysis
Partial wave analysis for elastic scattering
For spherically symmetric potential one can assume that the incident plane wave is in z-
direction hence    exp cosinc r ikr  . So it can be expressed in term of a superposition of
angular momentum Eigen state, each with definite angular momentum number l
     cos
0
2 cosik r ikr l
l l
l
e e i l l J kr p




   , where Jl is Bessel’s polynomial function and Pl
is Legendre polynomial.
         
0
, 2 1 cos
ikr
l
l l
l
e
r i l J kr P f
r
   


  
     
1
2 1 sin cosli
l lf l e P
k

   
Total cross section is given by
  2
2
0 0
4
2 1 sinl l
l l
l
k

  
 
 
   
Where σl is called the partial cross section corresponding to the scattering of particles in
various angular momentum states and l is phase shift .
fiziks
Institute for NET/JRF, GATE, IIT-JAM, JEST, TIFR and GRE in PHYSICAL SCIENCES
Website: www.physicsbyfiziks.com
Email: fiziks.physics@gmail.com 44
Head office
fiziks, H.No. 23, G.F, Jia Sarai,
Near IIT, Hauz Khas, New Delhi-16
Phone: 011-26865455/+91-9871145498
Branch office
Anand Institute of Mathematics,
28-B/6, Jia Sarai, Near IIT
Hauz Khas, New Delhi-16
12. Relativistic Quantum Mechanics
12.1 Klein Gordon equation
The non-relativistic equation for the energy of a free particle is
2
2
p
E
m
 and
2
2
p
E
m
  
2
2
p
i
m t



 

 where
p i   is the momentum operator ( being the del operator).
The Schrödinger equation suffers from not being relativistic ally covariant, meaning it
does not take into account Einstein's special relativity .It is natural to try to use the
identity from special relativity describing the energy: 2 2 2 4
p c m c E  Then, just
inserting the quantum mechanical operators for momentum and energy yields the
equation 2 2 2 2 4
c m c i
t



   

 
This, however, is a cumbersome expression to work with because the differential operator
cannot be evaluated while under the square root sign.
which simplifies to
2
2 2 2 2 4
2
c m c
t



    


Rearranging terms yields
2 2 2
2
2 2 2
1 m c
E
c t
 
 

  
 
Since all reference to imaginary numbers has been eliminated from this equation, it can
be applied to fields that are real valued as well as those that have complex values.
Using the inverse of the Murkowski metric we ge
2 2
2
0
m c
     

where
2
( ) 0  
fiziks
Institute for NET/JRF, GATE, IIT-JAM, JEST, TIFR and GRE in PHYSICAL SCIENCES
Website: www.physicsbyfiziks.com
Email: fiziks.physics@gmail.com 45
Head office
fiziks, H.No. 23, G.F, Jia Sarai,
Near IIT, Hauz Khas, New Delhi-16
Phone: 011-26865455/+91-9871145498
Branch office
Anand Institute of Mathematics,
28-B/6, Jia Sarai, Near IIT
Hauz Khas, New Delhi-16
In covariant notation. This is often abbreviated as 2
( ) 0   where
mc
 

and
2
2
2 2
1
c t

 

This operator is called the d’Alembert operator . Today this form is interpreted as the
relativistic field for a scalar (i.e. spin -0) particle. Furthermore, any solution to the Dirac
equation (for a spin-one-half particle) is automatically a solution to the Klein–Gordon
equation, though not all solutions of the Klein–Gordon equation are solutions of the Dirac
equation.
The Klein–Gordon equation for a free particle and dispersion relation
Klein –Gordon relation for free particle is given by
2
2
2 2
1
E
c t

 

  

with the same solution as in the non-relativistic case:
dispersion relation from free wave equation ( , ) exp ( . )r t i k r t   which can be
obtained by putting the value of in
2
2
2 2
1
E
c t

 

  

equation we will get
dispersion relation which is given by
2 2 2
2
2 2
m c
k
k

  

.
12.2 Dirac Equation
searches for an alternative relativistic equation starting from the generic form describing
evolution of wave function:



H
t
i ˆ
If one keeps first order derivative of time, then to preserve Lorentz invariance, the space
coordinate derivatives must be of the first order as well. Having all energy-related
operators (E, p, m) of the same first order:
t
iE


ˆ and
z
ip
y
ip
x
ip zyx








 ˆ,ˆ,ˆ
fiziks
Institute for NET/JRF, GATE, IIT-JAM, JEST, TIFR and GRE in PHYSICAL SCIENCES
Website: www.physicsbyfiziks.com
Email: fiziks.physics@gmail.com 46
Head office
fiziks, H.No. 23, G.F, Jia Sarai,
Near IIT, Hauz Khas, New Delhi-16
Phone: 011-26865455/+91-9871145498
Branch office
Anand Institute of Mathematics,
28-B/6, Jia Sarai, Near IIT
Hauz Khas, New Delhi-16
  mpppE zyx  ˆˆˆˆ
321
By acting with left-and right-hand operators twice, we get
  2
1 2 3 1 2 3
ˆ ˆ ˆ ˆ ˆ ˆ ˆx y z x y zE p p p m p p p m               
which must be compatible with the Klein-Gordon equation
  22222
ˆˆˆˆ mpppE zyx
This implies that
,0 ijji  for ji 
0 ii 
12
i
12

Therefore, parameters α and β cannot be numbers. However, it may and does work if they
are matrices, the lowest order being 4×4. Therefore, ψ must be 4-component vectors.
Popular representations are







0
0
i
i
i


 and 







10
01

where i are 2  2 Pauli matrices:












 







10
01
0
0
01
10
321 
i
i
The equation is usually written using γµ-matrices, where i i  for
The equation is usually written using γµ-matrices, where i i  for 1,2,3i  and
0  (just multiply the above equation with matrix β and move all terms on one side of
the equation):
0











m
x
i

 where 







0
0
i
i
i


 and 







10
01
0
Find solution for particles at rest, i.e. p=0:
fiziks
Institute for NET/JRF, GATE, IIT-JAM, JEST, TIFR and GRE in PHYSICAL SCIENCES
Website: www.physicsbyfiziks.com
Email: fiziks.physics@gmail.com 47
Head office
fiziks, H.No. 23, G.F, Jia Sarai,
Near IIT, Hauz Khas, New Delhi-16
Phone: 011-26865455/+91-9871145498
Branch office
Anand Institute of Mathematics,
28-B/6, Jia Sarai, Near IIT
Hauz Khas, New Delhi-16
0
4
3
2
1
0 



























 m
t
i
























B
A
B
A
m
t
i
10
01
It has two positive energy solutions that correspond to two spin states of spin-½
electrons:






 
0
1imt
A e and 





 
1
0imt
A e
and two symmetrical negative-energy solutions






 
0
1imt
B e and 





 
1
0imt
B e

Quantum formula sheet

  • 1.
    fiziks Institute for NET/JRF,GATE, IIT-JAM, JEST, TIFR and GRE in PHYSICAL SCIENCES Website: www.physicsbyfiziks.com Email: fiziks.physics@gmail.com 1 Head office fiziks, H.No. 23, G.F, Jia Sarai, Near IIT, Hauz Khas, New Delhi-16 Phone: 011-26865455/+91-9871145498 Branch office Anand Institute of Mathematics, 28-B/6, Jia Sarai, Near IIT Hauz Khas, New Delhi-16 QUANTUM MECHANICS FORMULA SHEET Contents 1. Wave Particle Duality 1.1 De Broglie Wavelength 1.2 Heisenberg’s Uncertainty Principle 1.3 Group velocity and Phase velocity 1.4 Experimental evidence of wave particle duality 1.4.1 Wave nature of particle (Davisson-German experiment) 1.4.2 Particle nature of wave (Compton and Photoelectric Effect) 2. Mathematical Tools for Quantum Mechanics 2.1 Dimension and Basis of a Vector Space 2.2 Operators 2.3 Postulates of Quantum Mechanics 2.4 Commutator 2.5 Eigen value problem in Quantum Mechanics 2.6 Time evaluation of the expectation of A 2.7 Uncertainty relation related to operator 2.8 Change in basis in quantum mechanics 2.9 Expectation value and uncertainty principle 3. Schrödinger wave equation and Potential problems 3.1 Schrödinger wave equation 3.2 Property of bound state 3.3 Current density 3.4 The free particle in one dimension 3.5 The Step Potential 3.7 Potential Barrier 3.7.1 Tunnel Effect
  • 2.
    fiziks Institute for NET/JRF,GATE, IIT-JAM, JEST, TIFR and GRE in PHYSICAL SCIENCES Website: www.physicsbyfiziks.com Email: fiziks.physics@gmail.com 2 Head office fiziks, H.No. 23, G.F, Jia Sarai, Near IIT, Hauz Khas, New Delhi-16 Phone: 011-26865455/+91-9871145498 Branch office Anand Institute of Mathematics, 28-B/6, Jia Sarai, Near IIT Hauz Khas, New Delhi-16 3.8 The Infinite Square Well Potential 3.7.1 Symmetric Potential 3.9 Finite Square Well Potential 3.10 One dimensional Harmonic Oscillator 4. Angular Momentum Problem 4.1 Angular Momentum 4.1.1 Eigen Values and Eigen Function 4.1.2 Ladder Operator 4.2 Spin Angular Momentum 4.2.1 Stern Gerlach experiment 4.2.2 Spin Algebra 4.2.3 Pauli Spin Matrices 4.3 Total Angular Momentum 5. Two Dimensional Problems in Quantum Mechanics 5.1 Free Particle 5.2 Square Well Potential 5.3 Harmonic oscillator 6. Three Dimensional Problems in Quantum Mechanics 6.1 Free Particle 6.2 Particle in Rectangular Box 6.2.1 Particle in Cubical Box 6.3 Harmonic Oscillator 6.3.1 An Anistropic Oscillator 6.3.2 The Isotropic Oscillator 6.4 Potential in Spherical Coordinate (Central Potential) 6.4.1 Hydrogen Atom Problem
  • 3.
    fiziks Institute for NET/JRF,GATE, IIT-JAM, JEST, TIFR and GRE in PHYSICAL SCIENCES Website: www.physicsbyfiziks.com Email: fiziks.physics@gmail.com 3 Head office fiziks, H.No. 23, G.F, Jia Sarai, Near IIT, Hauz Khas, New Delhi-16 Phone: 011-26865455/+91-9871145498 Branch office Anand Institute of Mathematics, 28-B/6, Jia Sarai, Near IIT Hauz Khas, New Delhi-16 7. Perturbation Theory 7.1 Time Independent Perturbation Theory 7.1.1 Non-degenerate Theory 7.1.2 Degenerate Theory 7.2 Time Dependent Perturbation Theory 8. Variational Method 9. The Wentzel-Kramer-Brillouin (WKB) method 9.1 The WKB Method 9.1.1 Quantization of the Energy Level of Bound state 9.1.2 Transmission probability from WKB 10. Identical Particles 10.1 Exchange Operator 10.2 Particle with Integral Spins 10.3 Particle with Half-integral Spins 11. Scattering in Quantum Mechanics 11.1 Born Approximation 11.2 Partial Wave Analysis 12. Relativistic Quantum Mechanics 12.1 Klein Gordon equation 12.2 Dirac Equation
  • 4.
    fiziks Institute for NET/JRF,GATE, IIT-JAM, JEST, TIFR and GRE in PHYSICAL SCIENCES Website: www.physicsbyfiziks.com Email: fiziks.physics@gmail.com 4 Head office fiziks, H.No. 23, G.F, Jia Sarai, Near IIT, Hauz Khas, New Delhi-16 Phone: 011-26865455/+91-9871145498 Branch office Anand Institute of Mathematics, 28-B/6, Jia Sarai, Near IIT Hauz Khas, New Delhi-16 1.Wave Particle Duality 1.1 De Broglie Wavelengths The wavelength of the wave associated with a particle is given by the de Broglie relation mv h p h  where h is Plank’s constant For relativistic case, the mass becomes 2 2 0 1 c v m m   where m0 is rest mass and v is velocity of body. 1.2 Heisenberg’s Uncertainty Principle “It is impossible to determine two canonical variables simultaneously for microscopic particle”. If q and qp are two canonical variable then 2   qpq where ∆q is the error in measurement of q and ∆pq is error in measurement of pq and h is Planck’s constant ( / 2 )h  . Important uncertainty relations  2   xPx (x is position and xp is momentum in x direction )  2   tE ( E is energy and t is time).  2   L (L is angular momentum, θ is angle measured)
  • 5.
    fiziks Institute for NET/JRF,GATE, IIT-JAM, JEST, TIFR and GRE in PHYSICAL SCIENCES Website: www.physicsbyfiziks.com Email: fiziks.physics@gmail.com 5 Head office fiziks, H.No. 23, G.F, Jia Sarai, Near IIT, Hauz Khas, New Delhi-16 Phone: 011-26865455/+91-9871145498 Branch office Anand Institute of Mathematics, 28-B/6, Jia Sarai, Near IIT Hauz Khas, New Delhi-16 1.3 Group Velocity and Phase Velocity According to de Broglie, matter waves are associated with every moving body. These matter waves moves in a group of different waves having slightly different wavelengths. The formation of group is due to superposition of individual wave. Let If  tx,1 and  tx,2 are two waves of slightly different wavelength and frequency.       tdxdkkAtkxA   sin,sin 21 21    tkx tddk A          sin 22 cos2 The velocity of individual wave is known as Phase velocity which is given as k vp   . The velocity of amplitude is given by group velocity vg i.e. dk d vg   The relationship between group and phase velocity is given by    d dv vv dk dv kv dk d v p pg p pg  ; Due to superposition of different wave of slightly different wavelength resultant wave moves like a wave packet with velocity equal to group velocity. 1.4 Experimental evidence of wave particle duality 1.4.1 Wave nature of particle (Davisson-German experiment) Electron strikes the crystals surface at an angle . The detector, symmetrically located from the source measure the number of electrons scattered at angle θ where θ is the angle between incident and scattered electron beam. The Maxima condition is given by p h dnor dn             where 2 cos2 sin2    S D gv phv t
  • 6.
    fiziks Institute for NET/JRF,GATE, IIT-JAM, JEST, TIFR and GRE in PHYSICAL SCIENCES Website: www.physicsbyfiziks.com Email: fiziks.physics@gmail.com 6 Head office fiziks, H.No. 23, G.F, Jia Sarai, Near IIT, Hauz Khas, New Delhi-16 Phone: 011-26865455/+91-9871145498 Branch office Anand Institute of Mathematics, 28-B/6, Jia Sarai, Near IIT Hauz Khas, New Delhi-16 1.4.2 Particle nature of wave (Compton and Photoelectric Effect) Compton Effect The Compton Effect is the result of scattering of a photon by an electron. Energy and momentum are conserved in such an event and as a result the scattered photon has less energy (longer wavelength) then the incident photon. If λ is incoming wavelength and λ' is scattered wavelength and  is the angle made by scattered wave to the incident wave then   cos1'  cm h o where cm h o known as c which is Compton wavelength ( c = 2.426 x 10-12 m) and mo is rest mass of electron. Photoelectric effect When a metal is irradiated with light, electron may get emitted. Kinetic energy k of electron leaving when irradiated with a light of frequency o  , where o is threshold frequency. Kinetic energy is given by max 0k h h   Stopping potential sV is potential required to stop electron which contain maximum kinetic energy maxk . 0seV h h   , which is known as Einstein equation photonincident photonscattered ElectronTarget ElectronScattered  
  • 7.
    fiziks Institute for NET/JRF,GATE, IIT-JAM, JEST, TIFR and GRE in PHYSICAL SCIENCES Website: www.physicsbyfiziks.com Email: fiziks.physics@gmail.com 7 Head office fiziks, H.No. 23, G.F, Jia Sarai, Near IIT, Hauz Khas, New Delhi-16 Phone: 011-26865455/+91-9871145498 Branch office Anand Institute of Mathematics, 28-B/6, Jia Sarai, Near IIT Hauz Khas, New Delhi-16 2. Mathematical Tools for Quantum Mechanics 2.1 Dimension and Basis of a Vector Space A set of N vectors N ,........, 21 is said to be linearly independent if and only if the solution of equation   N i iia 1 0 is 1 2 Na = a = ..... a =0 N dimensional vector space can be represent as   N i iia 1 0 where i = 1, 2, 3 … are linearly independent function or vector. Scalar Product: Scalar product of two functions is represented as , , which is defined as  dx* . If the integral diverges scalar product is not defined. Square Integrable: If the integration or scalar product   2 , dx    is finite then the integration is known as square integrable. Dirac Notation: Any state vector  can be represented as  which is termed as ket and conjugate of  i.e. * is represented by  which is termed as bra. The scalar product of  and ψ in Dirac Notation is represented by   (bra-ket). The value of   is given by integral     rdtrtr 3* ,,  in three dimensions. Properties of kets, bras and brakets:       * ** aa Orthogonality relation: If  and  are two ket and the value of bracket 0 then  ,  is orthogonal. Orthonormality relation: If  and  are two ket and the value of bracket 0 and 1 1 then  and  are orthonormal. Schwarz inequality:   2
  • 8.
    fiziks Institute for NET/JRF,GATE, IIT-JAM, JEST, TIFR and GRE in PHYSICAL SCIENCES Website: www.physicsbyfiziks.com Email: fiziks.physics@gmail.com 8 Head office fiziks, H.No. 23, G.F, Jia Sarai, Near IIT, Hauz Khas, New Delhi-16 Phone: 011-26865455/+91-9871145498 Branch office Anand Institute of Mathematics, 28-B/6, Jia Sarai, Near IIT Hauz Khas, New Delhi-16 2.2 Operators An operator A is mathematical rule that when applied to a ket  transforms it into another ket  i.e. A     Different type of operator Identity operator I   Parity operator    rr   For even parity    rr   , for odd parity    rr   Momentum operator xP i x        Energy operator H i t       Laplacian operator 2 2 2 2 2 2 2 zyx            Position operator    rxrX   Linear operator For 2211  aa  if an operator Aˆ applied on  results in 1 1 2 2a A a A  then operator Aˆ is said to be linear operator.
  • 9.
    fiziks Institute for NET/JRF,GATE, IIT-JAM, JEST, TIFR and GRE in PHYSICAL SCIENCES Website: www.physicsbyfiziks.com Email: fiziks.physics@gmail.com 9 Head office fiziks, H.No. 23, G.F, Jia Sarai, Near IIT, Hauz Khas, New Delhi-16 Phone: 011-26865455/+91-9871145498 Branch office Anand Institute of Mathematics, 28-B/6, Jia Sarai, Near IIT Hauz Khas, New Delhi-16 2.3 Postulates of Quantum Mechanics Postulate 1: State of system The state of any physical system is specified at each time t by a state vector  t which contains all the information about the system. The state vector is also referred as wave function. The wave function must be: Single valued, Continuous, Differentiable, Square integrable (i.e. wave function have to converse at infinity). Postulate 2: To every physically measurable quantity called as observable dynamical variable. For every observable there corresponds a linear Hermitian operatorAˆ . The Eigen vector of Aˆ let say n  form complete basis. Completeness relation is given by 1 n n n I      Eigen value: The only possible result of measurement of a physical quantity na is one of the Eigen values of the corresponding observable. Postulate 3: (Probabilistic outcome): When the physical quantity A is measured on a system in the normalized state  the probability P(an) of obtaining the Eigen value an of corresponding observable A is   2 1 ng i n i n a P a         where gn is degeneracy of state and nu is the Normalised Eigen vector of Aˆ associated with Eigen value an. Postulate 4: Immediately after measurement. If the measurement of physical quantity A on the system in the state  gives the result an (an is Eigen value associated with Eigen vector na ), Then the state of the system immediately after the measurement is the normalized projection   n n P P where Pn is projection operator defined by n n  .
  • 10.
    fiziks Institute for NET/JRF,GATE, IIT-JAM, JEST, TIFR and GRE in PHYSICAL SCIENCES Website: www.physicsbyfiziks.com Email: fiziks.physics@gmail.com 10 Head office fiziks, H.No. 23, G.F, Jia Sarai, Near IIT, Hauz Khas, New Delhi-16 Phone: 011-26865455/+91-9871145498 Branch office Anand Institute of Mathematics, 28-B/6, Jia Sarai, Near IIT Hauz Khas, New Delhi-16 Projection operator Pˆ : An operator Pˆ is said to be a projector, or projection operator, if it is Hermitian and equal to its own square i.e. PP ˆˆ 2  The projection operator is represented by n n n   Postulate 5: The time evolution of the state vector  t is governed by Schrodinger equation:      ttHt dt d i   , where H(t) is the observable associated with total energy of system and popularly known as Hamiltonian of system. Some other operator related to quantum mechanics: 2.4 Commutator If A and B are two operator then their commutator is defined as  A,B AB-BA Properties of commutators                         † † † , , ; , , , , , , ; , , , , , , , 0 (Popularly known as Jacobi identity). C C C C B C C C C                                                 , 0f     If X is position and xP is conjugate momentum then  1 ,n n xX P nX i      and  1 , n n x xX P nP i    If b is scalar and A is any operator then  , 0b  If [A, B] = 0 then it is said that A and B commutes to each other ie AB BA . If two Hermition operators A andB , commute ie , 0       and if A has non degenerate Eigen value, then each Eigen vector of Aˆ is also an Eigen vector ofB . We can also construct the common orthonormal basis that will be joint Eigen state of A and B . The anti commutator is defined as  ,     
  • 11.
    fiziks Institute for NET/JRF,GATE, IIT-JAM, JEST, TIFR and GRE in PHYSICAL SCIENCES Website: www.physicsbyfiziks.com Email: fiziks.physics@gmail.com 11 Head office fiziks, H.No. 23, G.F, Jia Sarai, Near IIT, Hauz Khas, New Delhi-16 Phone: 011-26865455/+91-9871145498 Branch office Anand Institute of Mathematics, 28-B/6, Jia Sarai, Near IIT Hauz Khas, New Delhi-16 2.5 Eigen value problem in Quantum Mechanics Eigen value problem in quantum mechanics is defined as n n na   where an is Eigen value and n is Eigen vector.  In quantum mechanics operator associated with observable is Hermitian, so its Eigen values are real and Eigen vector corresponding to different Eigen values are orthogonal.  The Eigen state (Eigen vector) of Hamilton operator defines a complete set of mutually orthonormal basis state. This basis will be unique if Eigen value are non degenerate and not unique if there are degeneracy. Completeness relation: the orthonormnal realtion and completeness relation is given by I n nnmnmn    1 ,  where I is unity operator. 2.6 Time evaluation of the expectation of A (Ehrenfest theorem)   1 A A,H d A dt i t     where  ,A H is commutation between operator A and Hamiltonian H operator .Time evaluation of expectation of A gives rise to Ehrenfest theorem . 1d R P dt m  ,  , d P V R t dt    where R is position, P is momentum and  ,V R t is potential operator. 2.7 Uncertainty relation related to operator If Aˆ and Bˆ are two operator related to observable A and B then  Bˆ,Aˆ 2 1 BˆAˆ  where 2 2 AˆAˆAˆ  and 2 2 BˆBˆAˆ  .
  • 12.
    fiziks Institute for NET/JRF,GATE, IIT-JAM, JEST, TIFR and GRE in PHYSICAL SCIENCES Website: www.physicsbyfiziks.com Email: fiziks.physics@gmail.com 12 Head office fiziks, H.No. 23, G.F, Jia Sarai, Near IIT, Hauz Khas, New Delhi-16 Phone: 011-26865455/+91-9871145498 Branch office Anand Institute of Mathematics, 28-B/6, Jia Sarai, Near IIT Hauz Khas, New Delhi-16 2.8 Change in basis in quantum mechanics If  k are wave function is position representation and  k are wave function in momentum representation, one can change position to momentum basis via Fourier transformation.         1 2 1 2 ikx ikx x k e dk k x e dx                2.9 Expectation value and uncertainty principle The expectation value A of A in direction of  is given by A A      or A n na P  where nP is probability to getting Eigen value an in state  .
  • 13.
    fiziks Institute for NET/JRF,GATE, IIT-JAM, JEST, TIFR and GRE in PHYSICAL SCIENCES Website: www.physicsbyfiziks.com Email: fiziks.physics@gmail.com 13 Head office fiziks, H.No. 23, G.F, Jia Sarai, Near IIT, Hauz Khas, New Delhi-16 Phone: 011-26865455/+91-9871145498 Branch office Anand Institute of Mathematics, 28-B/6, Jia Sarai, Near IIT Hauz Khas, New Delhi-16 3. Schrödinger Wave Equation and Potential Problems 3.1 Schrödinger Wave Equation Hamiltonian of the system is given by 2 2 P H V m   Time dependent Schrödinger wave equation is given by t iH       Time independent Schrödinger wave equation is given by  EH  where H is Hamiltonian of system. It is given that total energy E and potential energy of system is V. 3.2 Property of bound state Bound state If E > V and there is two classical turning point in which particle is classically trapped then system is called bound state. Property of Bound state The energy Eigen value is discrete and in one dimensional system it is non degenerate. The wave function  xn of one dimensional bound state system has n nodes if n = 0 corresponds to ground state and (n – 1) node if n = 1 corresponds to ground state. Unbound states If E > V and either there is one classical turning point or no turning point the energy value is continuous. If there is one turning point the energy eigen value is non- degenerate. If there is no turning point the energy eigen value is degenerate. The particle is said to be unbounded. If E < V then particle is said to be unbounded and wave function will decay at ± ∞. There is finite probability to find particle in the region.
  • 14.
    fiziks Institute for NET/JRF,GATE, IIT-JAM, JEST, TIFR and GRE in PHYSICAL SCIENCES Website: www.physicsbyfiziks.com Email: fiziks.physics@gmail.com 14 Head office fiziks, H.No. 23, G.F, Jia Sarai, Near IIT, Hauz Khas, New Delhi-16 Phone: 011-26865455/+91-9871145498 Branch office Anand Institute of Mathematics, 28-B/6, Jia Sarai, Near IIT Hauz Khas, New Delhi-16 3.3 Current density If wave function in one Dimension is  x then current density is given by             xxim Jx * * 2      which satisfies the continually equation 0   J t  Where   *  in general J v 2 J v where v is velocity of particle? If Ji, Jr, Jt are incident, reflected and transmitted current density then reflection coefficient R and transmission coefficient T is given by r i J R J  and t i J T J  3.4 The free particle in one dimension Hψ = Eψ  xE dx d m    2 22 2    ikxikx AeeAx    Energy eigen value E m k 2 22   where 2 2  mE k  the eigen values are doubly degenerate 3.5 The Step Potential The potential step is defined as         0 00 xV x xV o Case I: E > Vo 0 0 22 11 2 1     xBeAe xBeAe xikxik xikxik   Hence, a particle is coming from left so D = 0. R = reflection coefficient = incident reflected J J = 2 1 2 1 2 k k R k k        xo oV
  • 15.
    fiziks Institute for NET/JRF,GATE, IIT-JAM, JEST, TIFR and GRE in PHYSICAL SCIENCES Website: www.physicsbyfiziks.com Email: fiziks.physics@gmail.com 15 Head office fiziks, H.No. 23, G.F, Jia Sarai, Near IIT, Hauz Khas, New Delhi-16 Phone: 011-26865455/+91-9871145498 Branch office Anand Institute of Mathematics, 28-B/6, Jia Sarai, Near IIT Hauz Khas, New Delhi-16 T = transmitted coefficient = incident dtransmitte J J =   1 2 2 1 2 4k k T k k   where   2221 22  oVEm k mE k   Case II: E < Vo 21 2 011  mE kxBeAe xikxik I      22 2 02  EVm kxce oxk II     1r t J R J   and 0t i J T J   For case even there is Transmission coefficient is zero there is finite probability to find the particle in x > 0 . 3.7 Potential Barrier Potential barrier is shown in figure. Potential barrier is given by            ax axV x xV 0 0 00 0 Case I: E > Vo             0 0 0 1 22 11 33 22 11    xEexx axDeCexx xBeAexx xik xikxik xikxik    Where 21 2  mE k    22 2  oVEm k   Transmission coefficient     1 2 1sin 14 1 1           T a Energy o x oV
  • 16.
    fiziks Institute for NET/JRF,GATE, IIT-JAM, JEST, TIFR and GRE in PHYSICAL SCIENCES Website: www.physicsbyfiziks.com Email: fiziks.physics@gmail.com 16 Head office fiziks, H.No. 23, G.F, Jia Sarai, Near IIT, Hauz Khas, New Delhi-16 Phone: 011-26865455/+91-9871145498 Branch office Anand Institute of Mathematics, 28-B/6, Jia Sarai, Near IIT Hauz Khas, New Delhi-16 Reflection coefficient     1 2 1sin 14 1            R Where 2 2 ,  o o mV a V E   Case II: E < Vo 3.7.1 Tunnel Effect 1 1 2 2 1 0 0 0 ik x ik x I k x k x II ik x III Ae Be x Ce Be x a Fe x                  21 sin 1 4 1 R h     and    21 1 sin 1 4 1 T h      Where o o V EmV a  , 2 2   For E << Vo   2 22 1 16  EVma oo o e V E V E T          Approximate transmission probability ak eT 22  where   22 2  EVm k o   3.8 The Infinite Square Well Potential The infinite square well potential is defined as as shown in the figure            ax ax x xV 00 0 Since V(x) is infinite in the region 0x  and x a so the wave function corresponding to the particle will be zero. The particle is confined only within region 0 ≤ x ≤ a. Time independent wave Schrödinger wave equation is given by   xV o a x  ao oV
  • 17.
    fiziks Institute for NET/JRF,GATE, IIT-JAM, JEST, TIFR and GRE in PHYSICAL SCIENCES Website: www.physicsbyfiziks.com Email: fiziks.physics@gmail.com 17 Head office fiziks, H.No. 23, G.F, Jia Sarai, Near IIT, Hauz Khas, New Delhi-16 Phone: 011-26865455/+91-9871145498 Branch office Anand Institute of Mathematics, 28-B/6, Jia Sarai, Near IIT Hauz Khas, New Delhi-16   E dx d m  2 22 2  sin cosA kx B kx   B = 0 since wave function must be vanished at boundary ie 0x  so sinA kx  Energy eigen value for bound state can be find by ka n where 1,2,3...n  The Normalized wave function is for th n state is given by   2 sinn n x x a a    Which is energy Eigen value correspondence to th n 2 222 2ma n En   where n = 1, 2, 3 ..... othonormality relation is given by 0 sin sin i.e. 2 0 1 2 a mn m x n x a dx L L m n a m         If x is position operator xP Px is momentum operator and  n x is wave function of particle in nth state in one dimensional potential box then   2 sinn n x x a a    then                 * 2 2 2 * 2 2 2 * 2 2 2 2 2 * 2 2 2 2 2 0 2 n n n n x n n x n n a x x x x a a x x x x n P x i x x n P x x m x a                                        
  • 18.
    fiziks Institute for NET/JRF,GATE, IIT-JAM, JEST, TIFR and GRE in PHYSICAL SCIENCES Website: www.physicsbyfiziks.com Email: fiziks.physics@gmail.com 18 Head office fiziks, H.No. 23, G.F, Jia Sarai, Near IIT, Hauz Khas, New Delhi-16 Phone: 011-26865455/+91-9871145498 Branch office Anand Institute of Mathematics, 28-B/6, Jia Sarai, Near IIT Hauz Khas, New Delhi-16 The uncertainty product is given by 22 2 1 12 1   n nPxx   The wave function and the probability density function of particle of mass m in one dimensional potential box is given by 3.8.1 Symmetric Potential The infinite symmetric well potential is given by   22 0 22 a x a a xor a xxV   Schrondinger wave function is given by   )(0 2 cos 2 sin )(0 2 cos 2 sin 0, 2 2 cossin 22 ; 2 2 22 ii ka B ka A i ka B ka Aso x a xat mE kwherekxBkxA a x a E dx d m            Hence parity ( ) commute with Hamiltonian ( )H then parity must conserve So wave function have to be either symmetric or anti symmetric 2 a  2 a a  xV m En 2 1 22 1   12 42 EEn  13 93 EEn  a x a   sin 2 1  a x a   2 sin 2 2  a x a   3 sin 2 3  2 1 2 2 2 3
  • 19.
    fiziks Institute for NET/JRF,GATE, IIT-JAM, JEST, TIFR and GRE in PHYSICAL SCIENCES Website: www.physicsbyfiziks.com Email: fiziks.physics@gmail.com 19 Head office fiziks, H.No. 23, G.F, Jia Sarai, Near IIT, Hauz Khas, New Delhi-16 Phone: 011-26865455/+91-9871145498 Branch office Anand Institute of Mathematics, 28-B/6, Jia Sarai, Near IIT Hauz Khas, New Delhi-16 For even parity cosB kx  and Bound state energy is given by 0 2 cos  ka ,....5,3,10 2  n a n k ka  Wave function for even parity is given as a xn a  cos 2 For odd parity Ψ (x) = A sin kx and Bound state energy is given by sin 0 2 ka  , 0 2 ka n k a    2,4,6,........n  For odd parity Wave function is given as a xn a  sin 2 The energy eigen value is given by ,......3,2,1 2 2 222  n ma n En  First three wave function is given by       a x a x a x a x a x a x       3 cos 2 2 sin 2 cos 2 3 2 1    where a 2 is normalization constant. 2 22 2ma  2 a 2 a  2 22 2 9 ma  2 22 2 4 ma  2 a  2 a 2 a  2 a  x3  x2  x1
  • 20.
    fiziks Institute for NET/JRF,GATE, IIT-JAM, JEST, TIFR and GRE in PHYSICAL SCIENCES Website: www.physicsbyfiziks.com Email: fiziks.physics@gmail.com 20 Head office fiziks, H.No. 23, G.F, Jia Sarai, Near IIT, Hauz Khas, New Delhi-16 Phone: 011-26865455/+91-9871145498 Branch office Anand Institute of Mathematics, 28-B/6, Jia Sarai, Near IIT Hauz Khas, New Delhi-16 3.9 Finite Square Well Potential For the Bound state E < Vo Again parity will commute to Hamiltonian So wave function is either symmetric or Anti symmetric For even parity       2 22 cos 2 a xAex a x a kxCx a xAex x III II x I         wave function must be continuous and differentiable at boundaries so using boundary condition at 2 a  one will get 2 tan ka k tan   where 2 a   2 ka   For odd parity       2 22 sin 2 2 1 a xAex a x a kxDx a xAex x III x         using boundary condition one can get cot    where   2 2  EVm o   2 2  mE k  and 2 2 22 2 amV n o  which is equation of circle. The Bound state energy will be found by solving equation  tann for even 2 a  2 a x oV  xV
  • 21.
    fiziks Institute for NET/JRF,GATE, IIT-JAM, JEST, TIFR and GRE in PHYSICAL SCIENCES Website: www.physicsbyfiziks.com Email: fiziks.physics@gmail.com 21 Head office fiziks, H.No. 23, G.F, Jia Sarai, Near IIT, Hauz Khas, New Delhi-16 Phone: 011-26865455/+91-9871145498 Branch office Anand Institute of Mathematics, 28-B/6, Jia Sarai, Near IIT Hauz Khas, New Delhi-16  cotn for odd 2 22 2   amV n o  one can solve it by graphical method. The intersection point of = tan   (solid curve) and 2 2 2 2 2 omV a     (circle) give Eigen value for even state and intersection point at = - cot   (dotted curve) and 2 2 2 2 2 omV a     (circle) give Eigen value for odd state. The table below shows the number of bound state for various range of 2 0V a where Voa2 is strength of potential. Voa2 Even eigen function Odd eigen function No. of Bound states m2 22  1 0 1 m aV m 2 4 2 22 2 0 22    1 1 2 m aV m 2 9 2 22 2 0 22    2 1 3 m aV m 2 16 2 9 22 2 0 22    2 2 4 n  tann o 2   2 3 2 
  • 22.
    fiziks Institute for NET/JRF,GATE, IIT-JAM, JEST, TIFR and GRE in PHYSICAL SCIENCES Website: www.physicsbyfiziks.com Email: fiziks.physics@gmail.com 22 Head office fiziks, H.No. 23, G.F, Jia Sarai, Near IIT, Hauz Khas, New Delhi-16 Phone: 011-26865455/+91-9871145498 Branch office Anand Institute of Mathematics, 28-B/6, Jia Sarai, Near IIT Hauz Khas, New Delhi-16 The three bound Eigen function for the square well 3.10 One dimensional Harmonic Oscillator One dimensional Harmonic oscillator is given by    xxmxV 22 2 1  The schrodinger equation is given by   Exm dx d m   22 2 22 2 1 2  It is given that x m     and  E k 2  The wave function of Harmonic oscillator is given by.     2 2/14/1 2 !2 1                    eH n m nnn  and energy eigen value is given by nE = (n+1/2)  ; n = 0, 1, 2, 3, .... The wave function of Harmonic oscillator is shown 0H ( ) = 1 , 1H ( ) = 2  , 2 2H ( ) = 4 -2  It n and m wave function of Harmonic oscillator then        mnnm dxxx  x 2 a  2 a  x2 x 2 a 2 a   x1 x  x3 1n 2 0  E  xV 0n 2n 2 3 1  E 2 5 2  E
  • 23.
    fiziks Institute for NET/JRF,GATE, IIT-JAM, JEST, TIFR and GRE in PHYSICAL SCIENCES Website: www.physicsbyfiziks.com Email: fiziks.physics@gmail.com 23 Head office fiziks, H.No. 23, G.F, Jia Sarai, Near IIT, Hauz Khas, New Delhi-16 Phone: 011-26865455/+91-9871145498 Branch office Anand Institute of Mathematics, 28-B/6, Jia Sarai, Near IIT Hauz Khas, New Delhi-16 Number operator The Hamiltonian of Harmonic operator is given by 22 2 2 1 2 Xm m P H x  Consider dimensioned operator as HPX ˆ,ˆ,ˆ where X m X ˆ    ˆ x xP m P  HH ˆ so  22 ˆˆ 2 1ˆ XPH x  . Consider lowering operator  xiPXa  ˆ 2 1 and raising † 1 ˆ 2 xa X iP     2/1ˆ  NH where † N a a and  1/ 2H N    N is known as number operator n is eigen function of N with eigen value n. N n n n and 1 2 H n N n         nnnH        2 1 where n = 0, 1, 2, 3,……… Commutation of a and † a : † [a, a ] = 1, † [a , a] = -1 and [N, a] = -a , † † [N a ] = a Action of a and † a operator on n 11 001    nnna abutnnna Expectation value of 22 ,,, XX PPXX in stationary states               mnPn m X PX m i aa Paa m X X X X             2 1 ,12 2 0,0 2 , 2 22 2 ;0, 2 1          XX PXnfornPX
  • 24.
    fiziks Institute for NET/JRF,GATE, IIT-JAM, JEST, TIFR and GRE in PHYSICAL SCIENCES Website: www.physicsbyfiziks.com Email: fiziks.physics@gmail.com 24 Head office fiziks, H.No. 23, G.F, Jia Sarai, Near IIT, Hauz Khas, New Delhi-16 Phone: 011-26865455/+91-9871145498 Branch office Anand Institute of Mathematics, 28-B/6, Jia Sarai, Near IIT Hauz Khas, New Delhi-16 4. Angular Momentum Problem Angular momentum in Quantum mechanics is given kLjLiLL zyx ˆˆˆ  Where xyzzxYyzX YPXPLXPZPLZPYPL  ;; and x iPX     , y iPY     , z ipZ     Commutation relation ,x y zL L i L     , ,y z xL L i L      , ,z x yL L i L  2 2 2 2 X Y ZL L L L   and 2 , 0XL L    , 2 , 0YL L    , 2 , 0ZL L    4.1.1 Eigen Values and Eigen Function                                        iL iL SiniL Z Y X cotsincos cotcos Eigen function of ZL is   im e 2 1 . and Eigen value of ZL m  where m = 0, ± 1, ± 2... L2 operator is given by                    2 2 2 22 sin 1 sin sin 1    L Eigen value of 2 L is 2 ( 1)l l   where l = 0, 1, 2, ...l Eigen function of 2 L is  m lP where  m lP  is associated Legendre function L2 commute with Lz so both can have common set of Eigen function.  , ( )m m im l lY P e     is common set of Eigen function which is known as spherical harmonics . The normalized spherical harmonics are given by
  • 25.
    fiziks Institute for NET/JRF,GATE, IIT-JAM, JEST, TIFR and GRE in PHYSICAL SCIENCES Website: www.physicsbyfiziks.com Email: fiziks.physics@gmail.com 25 Head office fiziks, H.No. 23, G.F, Jia Sarai, Near IIT, Hauz Khas, New Delhi-16 Phone: 011-26865455/+91-9871145498 Branch office Anand Institute of Mathematics, 28-B/6, Jia Sarai, Near IIT Hauz Khas, New Delhi-16           2 1 ! ( , ) 1 cos 4 ! mm m im l l l l m Y P e l m           l m l       4 1 ,0 0 Y       i eY sin 8 3 ,1 1  ,  0 1 3 , cos 4 Y      ,  1 1 3 , sin 8 i Y e               ,1, 22 m l m l YllYL  l = 0, 1, 2, ……. And     ,, m l m lZ YmYL  m = -l ,(-l +1) ..0,….. (l – 1)( l ) there is 2 1l  Degeneracy of 2 L is 2 1l  . Orthogonality Relation     2 ' ' 0 0 , , sinm m l l ll mmd Y Y d             4.1.2 Ladder Operator Let X YL L iL   and X YL L iL   Let us assume ml, is ket associated with 2 L and ZL operator.   22 , 1 ,L l m l l l m  0,1,2,.......l  ,, , ...0,...zL l m m l m m l l   Action of L+ and L- on ml, basis    , 1 1 , 1L l m l l m m l m         , 1 1 , 1L l m l l m m l m      Expectation value of XL and YL in direction of ml, 0xL  , 0yL    2 2 2 2 1 2 X YL L l l m         2 2 1 2 X YL L l l m       
  • 26.
    fiziks Institute for NET/JRF,GATE, IIT-JAM, JEST, TIFR and GRE in PHYSICAL SCIENCES Website: www.physicsbyfiziks.com Email: fiziks.physics@gmail.com 26 Head office fiziks, H.No. 23, G.F, Jia Sarai, Near IIT, Hauz Khas, New Delhi-16 Phone: 011-26865455/+91-9871145498 Branch office Anand Institute of Mathematics, 28-B/6, Jia Sarai, Near IIT Hauz Khas, New Delhi-16 4.2 Spin Angular Momentum 4.2.1 Stern Gerlach experiment When silver beam is passed to the inhomogeneous Magnetic field, two sharp trace found on the screen which provides the experimental evidence of spin. 4.2.2 Spin Algebra ˆˆ ˆX Y ZS S i S j S k   , 2 2 2 2 X Y ZS S S S   2 , 0XS S    , 2 , 0YS S    2 , 0ZS S    and  ,X Y ZS S iS  ,Y Z XS S iS  ,Z X YS S iS  2 2 , 1 ,s sS s m s s s m   , ,z s sS s m m s m  where ss m s    X YS S iS   and X YS S iS      , 1 1 , 1s s s sS s m s s m m s m      4.2.3 Pauli Spin Matrices For Spin 1 2 Pauli matrix 1 2 s  , 1 1 , 2 2 sm    Pauli Matrix is defined as   e.anticommutMatrixSpinPauli;0 10 01 0 0 01 10 222 kj I i i jkkj zyx zyx                            1 if is an even permutation of , , 1 if is an odd permutation of , , 0 if any two indices among , , are equal jkl jkl x y z jkl x y z j k l        zzyyxx SSS  2 , 2 , 2      , 1 1 , 1s s s sS s m s s m m s m     
  • 27.
    fiziks Institute for NET/JRF,GATE, IIT-JAM, JEST, TIFR and GRE in PHYSICAL SCIENCES Website: www.physicsbyfiziks.com Email: fiziks.physics@gmail.com 27 Head office fiziks, H.No. 23, G.F, Jia Sarai, Near IIT, Hauz Khas, New Delhi-16 Phone: 011-26865455/+91-9871145498 Branch office Anand Institute of Mathematics, 28-B/6, Jia Sarai, Near IIT Hauz Khas, New Delhi-16                      10 01 20 0 201 10 2  zyx S i i SS               01 00 00 10  SS        10 01 4 3 2 2  S For spin ½ the quantum number m takes only two values 2 1 sm and 2 1  . So that two states are 2 1 , 2 1 and 2 1 , 2 1 , smS 2 1 , 2 1 4 3 2 1 , 2 1 2 2  S , 2 1 , 2 1 4 3 2 1 , 2 1 2 2   S 2 1 , 2 1 2 1 2 1 , 2 1 zS , 2 1 , 2 1 2 1 2 1 , 2 1  zS 0 2 1 , 2 1 S , 2 1 , 2 1 2 1 , 2 1 S 2 1 , 2 1 2 1 , 2 1  S , 0 2 1 , 2 1 S 4.3 Total Angular Momentum Total angular momentum J = L + S , kJjJiJJ zyx ˆˆˆ  jmj, is the Eigen ket at J2 and Jz and x yJ J iJ   x yJ J iJ     jj mjjjmjJ ,1, 22  , jjjz mjmmjJ ,,      1,11,  jjjj mjmmjjmjJ     1,11,  jjjj mjmmjjmjJ J L S l s j l s      jmjSLJ jzzz  and l s jm m m 
  • 28.
    fiziks Institute for NET/JRF,GATE, IIT-JAM, JEST, TIFR and GRE in PHYSICAL SCIENCES Website: www.physicsbyfiziks.com Email: fiziks.physics@gmail.com 28 Head office fiziks, H.No. 23, G.F, Jia Sarai, Near IIT, Hauz Khas, New Delhi-16 Phone: 011-26865455/+91-9871145498 Branch office Anand Institute of Mathematics, 28-B/6, Jia Sarai, Near IIT Hauz Khas, New Delhi-16 5. Two Dimensional Problems in Quantum Mechanics 5.1 Free Particle Hψ = Eψ   E yxm             2 2 2 22 2  x and y are independent variable. Thus     1 , 2 1 2 yx ik yik x n i k r x y e e e         Energy Eigen value   2 2 22 2 22 k m kk m yx   As total orientation of k  which preserve its magnitude is infinite. So energy of free particle is infinitely degenerate. 5.2 Square Well Potential   0V x x a   and 0 y a  otherewise 2 2 2 2 2 2 H E m x y                The solution of Schrödinger wave equation is given by Wave function , 2 4 sin sinx y yx n n n yn x a aa               Correspondence to energy eigen value          2 2 2 222 , 2 a n a n m E yx nynx  1,2,3...xn  and 1,2,3...yn 
  • 29.
    fiziks Institute for NET/JRF,GATE, IIT-JAM, JEST, TIFR and GRE in PHYSICAL SCIENCES Website: www.physicsbyfiziks.com Email: fiziks.physics@gmail.com 29 Head office fiziks, H.No. 23, G.F, Jia Sarai, Near IIT, Hauz Khas, New Delhi-16 Phone: 011-26865455/+91-9871145498 Branch office Anand Institute of Mathematics, 28-B/6, Jia Sarai, Near IIT Hauz Khas, New Delhi-16 Energy of state (nx, ny) Degeneracy Ground state 2 22 2 2 ma  (1, 1) Non degenerate First state 2 22 2 5 ma  (1, 2), (2,1) 2 Second state 2 22 2 8 ma  (2, 2) Non-degenerate 5.3 Harmonic oscillator Two dimensional isotropic Harmonic oscillators is given by   22 2 2 21 2 2 2 yx pp H m x y m m      1x yn n x yE n n     where 0,1,2,3...xn  0,1,2,3...yn   1nE n    degeneracy of the nth state is given by (n + 1) where n = nx + ny.
  • 30.
    fiziks Institute for NET/JRF,GATE, IIT-JAM, JEST, TIFR and GRE in PHYSICAL SCIENCES Website: www.physicsbyfiziks.com Email: fiziks.physics@gmail.com 30 Head office fiziks, H.No. 23, G.F, Jia Sarai, Near IIT, Hauz Khas, New Delhi-16 Phone: 011-26865455/+91-9871145498 Branch office Anand Institute of Mathematics, 28-B/6, Jia Sarai, Near IIT Hauz Khas, New Delhi-16 6. Three Dimensional Problems in Quantum Mechanics 6.1 Free Particle  EH    E zyxm                2 2 2 2 2 22 2  Hence x, y, z are independent variable. Using separation of variable one can find the     zikyikxik k zyn eeezyx 2/3 2 1 ,,      3/2 . 2 ik r e    Energy Eigen value   2 2 222 2 22 k m kkk m zyx   As total orientation of k which preserve its magnitude is infinite, the energy of free particle is infinitely degenerate. 6.2 Particle in Rectangular Box Spinless particle of mass m confined in a rectangular box of sides Lx, Ly, Lz  , , 0 ,xV x y z x L   0 ,yy L  0 ,zz L  =  other wise . The Schrodinger wave equation for three dimensional box is given by   E zyxm H                2 2 2 2 2 22 2  Solution of the Schrödinger is given by Eigen function x y zn n n and energy eigen value is x y zn n nE is given by                      z z y y x x zyx nnn L zn L yn L xn LLLzyx   sinsinsin 8          2 2 2 2 2 222 2 z z y y x x nnn L n L n L n m E zyx 
  • 31.
    fiziks Institute for NET/JRF,GATE, IIT-JAM, JEST, TIFR and GRE in PHYSICAL SCIENCES Website: www.physicsbyfiziks.com Email: fiziks.physics@gmail.com 31 Head office fiziks, H.No. 23, G.F, Jia Sarai, Near IIT, Hauz Khas, New Delhi-16 Phone: 011-26865455/+91-9871145498 Branch office Anand Institute of Mathematics, 28-B/6, Jia Sarai, Near IIT Hauz Khas, New Delhi-16 6.2.1 Particle in Cubical Box For the simple case of cubic box of side a, the i.e. Lx = Ly = Lz = a                    a zn a yn a xn a zyx nnn zyx   sinsinsin 8 3  222 2 22 2 zyxnnn nnn ma E zyx   1,2,3...xn  1,2,3...yn  1,2,3...zn  Energy of state (nx, ny, nz) Degeneracy E of ground state 2 22 2 3 ma   (1, 1, 1) Non degenerate E of first excited state 2 22 2 6 ma   (2, 1, 1) (1, 2, 1) (1, 1, 2 3 E of 2nd excited state 2 22 2 9 ma   (2, 2, 1) (2, 1, 2) (1, 2, 2) 3 6.3 Harmonic Oscillator 6.3.1 An Anistropic Oscillator   222222 2 1 2 1 2 1 ,, ZmYmXmZYXV ZYX   zzyyxxnnn nnnE zyx                      2 1 2 1 2 1 where 0,1,2,3...xn  0,1,2,3...yn  0,1,2,3...xn  6.3.2 The Isotropic Oscillator x y z      3 2x y zn n n x y zE n n n            where x y zn n n n   0,1,2,3...n  Degeneracy is given by =   21 2 1  nn
  • 32.
    fiziks Institute for NET/JRF,GATE, IIT-JAM, JEST, TIFR and GRE in PHYSICAL SCIENCES Website: www.physicsbyfiziks.com Email: fiziks.physics@gmail.com 32 Head office fiziks, H.No. 23, G.F, Jia Sarai, Near IIT, Hauz Khas, New Delhi-16 Phone: 011-26865455/+91-9871145498 Branch office Anand Institute of Mathematics, 28-B/6, Jia Sarai, Near IIT Hauz Khas, New Delhi-16 6.4 Potential in Spherical Coordinate (Central Potential) Hamiltonion in spherical polar co-ordinate   2 2 2 2 2 2 2 2 1 1 1 sin 2 sin sin r V r E m r rr r r                                          2 2 2 2 2 1 2 2 L r V r m r rr mr                   L2 is operator for orbital angular momentum square. So  ,m lY   are the common Eigen state of and L2 because [H, L2 ] = 0 in central force problem and    2 2 , 1 ( , )m m l lL Y l l Y      So   ,,r can be separated as    ,m lf r Y              2 22 2 2 12 0 2 2 d f r l lf f r V r E f r m r rdr mr               To solve these equations     r ru rf  So one can get     0 2 1 2 2 2 2 22          uE mr ll rV dr ud m  Where   2 2 2 1 mr ll  is centrifugal potential and     2 2 2 1 mr ll rV   is effective potential The energy Eigen function in case of central potential is written as          , , , ,m m l l u r r f r Y Y r         The normalization condition is   2 , , 1r d         2 2 22 0 0 0 , sin 1m l u r r dr Y d d r              2 0 1u r dr   or   2 2 0 1R r r dr  
  • 33.
    fiziks Institute for NET/JRF,GATE, IIT-JAM, JEST, TIFR and GRE in PHYSICAL SCIENCES Website: www.physicsbyfiziks.com Email: fiziks.physics@gmail.com 33 Head office fiziks, H.No. 23, G.F, Jia Sarai, Near IIT, Hauz Khas, New Delhi-16 Phone: 011-26865455/+91-9871145498 Branch office Anand Institute of Mathematics, 28-B/6, Jia Sarai, Near IIT Hauz Khas, New Delhi-16 6.4.1 Hydrogen Atom Problem Hydrogen atom is two body central force problem with central potential is given by   2 04 e V r r    Time-independent Schrondinger equation on centre of mass reference frame is given by       2 2 2 2 , , 2 2 R r V r R r E R r m                     where R is position of c.m and r is distance between proton and electron.  R,r   R  r The Schronginger equation is given by   h2 2M 1  R  R 2  R            h2 2 1  r R 2  rV r           E Separating R and r part    RER M R  2 2 2       rrVrr    2 2 2  Total energy R rE = E + E ER is Energy of centre of mass and Er is Energy of reduce mass µ     3/ 2 1 2 ik R R e     2 2 2 R k E M   i.eCentre of mass moves with constant momentum so it is free particle. Solution of radial part   h2 2 d2 u r  dr2  l l 1 h2 2r2  e2 4 0 r      u r  E r  For Hydrogen atom em
  • 34.
    fiziks Institute for NET/JRF,GATE, IIT-JAM, JEST, TIFR and GRE in PHYSICAL SCIENCES Website: www.physicsbyfiziks.com Email: fiziks.physics@gmail.com 34 Head office fiziks, H.No. 23, G.F, Jia Sarai, Near IIT, Hauz Khas, New Delhi-16 Phone: 011-26865455/+91-9871145498 Branch office Anand Institute of Mathematics, 28-B/6, Jia Sarai, Near IIT Hauz Khas, New Delhi-16 The energy eigen value is given by nE =   4 2 2 2 02 4 em e n    eV n2 6.13  1,2,3...n  And radius of th n orbit is given by 2 2 0 2 4 n n r m e     1,2,3...n  where me is mass of electron and e is electronic charge. n is known as participle quantum number which varies as 1, 2,...n l n   For the given value of n the orbital quantum numbern can have value between 0 and 1n  (i.e. l = 0, 1, 2, 3, ….. n – 1) and for given value of l the Azimuthal quantum number m varies from – l to l known as magnetic quantum mechanics . Degeneracy of Hydrogen atom without spin = 2 n and if spin is included the degeneracy is given by 1 2 0 2 2 1 2 n n l g l n      For hydrogen like atom 2 2 6.13 n z En  where z is atomic number of Hydrogen like atom. Normalized wave function for Hydrogen atom i.e. Rnl (r) where n is principle quantum number and l is orbital quantum. n l E(eV) Rnl 1 0 2 -13.6z 0 3/ 2 / 0 2 zr az e a       2 0 2 - 3.4 z 0 3/ 2 / 2 0 0 2 2 zr az zr e a a             2 0 2 - 3.4 z 0 3/ 2 / 20 0 0 1 24 zr az zr e a a            
  • 35.
    fiziks Institute for NET/JRF,GATE, IIT-JAM, JEST, TIFR and GRE in PHYSICAL SCIENCES Website: www.physicsbyfiziks.com Email: fiziks.physics@gmail.com 35 Head office fiziks, H.No. 23, G.F, Jia Sarai, Near IIT, Hauz Khas, New Delhi-16 Phone: 011-26865455/+91-9871145498 Branch office Anand Institute of Mathematics, 28-B/6, Jia Sarai, Near IIT Hauz Khas, New Delhi-16 The radial wave function for hydrogen atom is Laguerre polynomials and angular part of the wave function is associated Legendre polynomials . For the nth state there is n – l – 1 node If Rnl is represented by ln, then  2 0 1 3 1 2 nl r nl n l l a       2 2 2 2 0 1 5 1 3 1 2 nl r nl n n l l a       1 2 0 1 nl r nl n a     2 3 2 0 2 2 1 nl r nl n l a     rR10 0/arr  rR20 0/arr 21R 0/ar
  • 36.
    fiziks Institute for NET/JRF,GATE, IIT-JAM, JEST, TIFR and GRE in PHYSICAL SCIENCES Website: www.physicsbyfiziks.com Email: fiziks.physics@gmail.com 36 Head office fiziks, H.No. 23, G.F, Jia Sarai, Near IIT, Hauz Khas, New Delhi-16 Phone: 011-26865455/+91-9871145498 Branch office Anand Institute of Mathematics, 28-B/6, Jia Sarai, Near IIT Hauz Khas, New Delhi-16 7. Perturbation Theory 7.1 Time Independent Perturbation Theory 7.1.1 Non-degenerate Theory For approximation methods of stationary states o PH H H  Where H Hamiltonian can be divided into two parts in that oH can be solved exactly known as unperturbed Hamiltonian and pH is perturbation in the system eigen value of oH is non degenerate It is known n o nno EH   and 1  pH W where 1  Now  o n n nH W E    where n is eigen function corresponds to eigen value nE for the Hamiltonian H Using Taylor expansion ........2210  nnnn EEEE  and .........221  nnnn  First order Energy correction 1 nE is given by  1 n n nE W  And energy correction up to order in  is given by 1 n n n nE E W    First order Eigen function correction  1 0 0 m n n m m n n m W E E         And wave function up to order correction in  0 0 m n n n m m n n m W E E            Second order energy correction       2 2 0 0 m n n m n n m W E E E       Energy correction up to order of 2      2 2 0 0 0 m n n n n m n n m W E E W E E            
  • 37.
    fiziks Institute for NET/JRF,GATE, IIT-JAM, JEST, TIFR and GRE in PHYSICAL SCIENCES Website: www.physicsbyfiziks.com Email: fiziks.physics@gmail.com 37 Head office fiziks, H.No. 23, G.F, Jia Sarai, Near IIT, Hauz Khas, New Delhi-16 Phone: 011-26865455/+91-9871145498 Branch office Anand Institute of Mathematics, 28-B/6, Jia Sarai, Near IIT Hauz Khas, New Delhi-16 7.1.2 Degenerate Theory ( )n o p n n nH H H E      0 nE is f fold degenerate  fEH nnno ,.....3,2,10    To determine the Eigen values to first-order and Eigen state to zeroth order for an f-fold degenerate level one can proceed as follows First for each f-fold degenerate level, determine f x f matrix of the perturbation pHˆ                    ff f f ppfpf ppp ppp p HHH HHH HHH H ......... . . ......... ......... ˆ 21 22221 11211 where p n p nH H    then diagonalised pH and find Eigen value and Eigen vector of diagonalized pH which are nE and n respectively.  10  nnn EEE  and   f nn q 1   7.2 Time Dependent Perturbation Theory The transition probability corresponding to a transition from an initial unperturbed state i to perturbed f is obtained as     1 ' 0 'fiiw t if f i i P t V t e dt    Where f i fi E E w    and  f o f i o i fi H H w      
  • 38.
    fiziks Institute for NET/JRF,GATE, IIT-JAM, JEST, TIFR and GRE in PHYSICAL SCIENCES Website: www.physicsbyfiziks.com Email: fiziks.physics@gmail.com 38 Head office fiziks, H.No. 23, G.F, Jia Sarai, Near IIT, Hauz Khas, New Delhi-16 Phone: 011-26865455/+91-9871145498 Branch office Anand Institute of Mathematics, 28-B/6, Jia Sarai, Near IIT Hauz Khas, New Delhi-16 8. Variational Method Variational method is based on energy optimization and parameter variation on the basis of choosing trial wave function. 1. On the basis of physical intuition guess the trial wave function. Say  noo  ,.....,, 321 where 321 ,,  are parameter. 2. Find          nn nn n H E    ,.....,,,.....,, ,.....,,,.....,, ,.....,, 32103210 32103210 3210  3. Find   0,.....,, 321    n i oE   Find the value of   ,.....,, 321 so that it minimize E0. 4. Substitute the value of   ,.....,, 321 in   ,.....,, 3210E one get minimum value of E0 for given trial wave function. 5. One can find the upper level of 1 on the basis that it must be orthogonal to 0 i.e. 1 0 0   Once 1 can be selected the 2, 3, 4 step can be repeated to find energy the first Eigen state.
  • 39.
    fiziks Institute for NET/JRF,GATE, IIT-JAM, JEST, TIFR and GRE in PHYSICAL SCIENCES Website: www.physicsbyfiziks.com Email: fiziks.physics@gmail.com 39 Head office fiziks, H.No. 23, G.F, Jia Sarai, Near IIT, Hauz Khas, New Delhi-16 Phone: 011-26865455/+91-9871145498 Branch office Anand Institute of Mathematics, 28-B/6, Jia Sarai, Near IIT Hauz Khas, New Delhi-16 9. The Wentzel-Kramer-Brillouin (WKB) method WKB method is approximation method popularly derived from semi classical theory For the case 1 d dx  where ( ) 2 ( ( ) x m E V x     If potential is given as V(x) then and there is three region WKB wave function in the first region i.e 1x x     1 1 1 exp ' ' x I x c P x dx P x           WKB wave function in region II: i.e 1 2x x x          ' " 2 2 exp ' exp ' 'II x c ci i P x dx P x dx P x P x                WKB wave function in region III: i.e 2x x     2 3 1 exp ' ' x III x c P x dx P x           9.1.1 Quantization of the Energy Level of Bound state Case I: When both the boundary is smooth 1 ( ) ( ) 2 p x dx n   where 0,1,2...n     2 1 1 2 2 2 x n x m E V x dx n           where 0, 1, 2,......n  and 1x and 2x are turning point Case II: When one the boundary is smooth and other is rigid 2 1 3 ( ) ( ) 4 x x p x dx n    where 0,1,2...n     2 1 3 2 4 x n x m E V x dx n            where 0, 1, 2,......n  and 1x and 2x are turning points  xV I II III
  • 40.
    fiziks Institute for NET/JRF,GATE, IIT-JAM, JEST, TIFR and GRE in PHYSICAL SCIENCES Website: www.physicsbyfiziks.com Email: fiziks.physics@gmail.com 40 Head office fiziks, H.No. 23, G.F, Jia Sarai, Near IIT, Hauz Khas, New Delhi-16 Phone: 011-26865455/+91-9871145498 Branch office Anand Institute of Mathematics, 28-B/6, Jia Sarai, Near IIT Hauz Khas, New Delhi-16 Case III: When both boundary of potential is rigid 2 1 ( ) ( 1) x x p x dx n    where 0,1,2...n       2 1 2 1 x n x m E V x dx n     where 0, 1, 2,......n  and 1x and 2x are turning points . 9.1.2 Transmission probability from WKB T is defined as transmission probability through potential barrier V is given by exp 2T   where    2 1 1 2 x n x m E V x dx   and 1x and 2x are turning points.
  • 41.
    fiziks Institute for NET/JRF,GATE, IIT-JAM, JEST, TIFR and GRE in PHYSICAL SCIENCES Website: www.physicsbyfiziks.com Email: fiziks.physics@gmail.com 41 Head office fiziks, H.No. 23, G.F, Jia Sarai, Near IIT, Hauz Khas, New Delhi-16 Phone: 011-26865455/+91-9871145498 Branch office Anand Institute of Mathematics, 28-B/6, Jia Sarai, Near IIT Hauz Khas, New Delhi-16 10. Identical Particles Identical particle in classical mechanics are distinguishable but identical particle in quantum mechanics are Indistinguishable. Total wave function of particles are either totally symmetric or totally anti-symmetric. 11.1 Exchange Operator Exchange operator ijP as an operator as that when acting on an N-particle wave function 1 2 3( .... ... ... )i j N       interchanges i and j. i.e 1 2 3 1 2 3( .... ... ... ) ( .... ... ... )ij i j N j i NP                sign is for symmetric wave function s and  sign for anti symmetric wave function a . 11.2 Particle with Integral Spins Particle with integral spins or boson has symmetric states.      1 2 1 2 2 1 1 , , 2 s            For three identical particle:                       123213312 132231321 321 ,,,,,, ,,,,,, 6 1    s For boson total wave function(space and spin) is symmetric i.e if space part is symmetric spin part will also symmetric and if space part is ant symmetric space part will also also anti symmetric. 11.3 Particle with Half-integral Spins Particle with half-odd-integral spins or fermions have anti-symmetric. For two identical particle:       122121 ,, 2 1  a For three identical particle:
  • 42.
    fiziks Institute for NET/JRF,GATE, IIT-JAM, JEST, TIFR and GRE in PHYSICAL SCIENCES Website: www.physicsbyfiziks.com Email: fiziks.physics@gmail.com 42 Head office fiziks, H.No. 23, G.F, Jia Sarai, Near IIT, Hauz Khas, New Delhi-16 Phone: 011-26865455/+91-9871145498 Branch office Anand Institute of Mathematics, 28-B/6, Jia Sarai, Near IIT Hauz Khas, New Delhi-16               1 2 3 1 3 2 2 3 1 1 2 3 2 1 3 3 1 2 3 2 1 , , , , , ,1 , , , , , ,6 a                                        For fermions total wave function(space and spin) is anti symmetric .ie if space part is symmetric spin part will anti symmetric and if space part is ant symmetric space part will also symmetric. 11. Scattering in Quantum Mechanics Incident wave is given by   .oik r inc r Ae   . If particle is scattered with angle θ which is angle between incident and scattered wave vector ok  and k  Scattered wave is given by     . , ik r sc e r Af r      , where  ,f is called scattering amplitude wave function.  is superposition of incident and scattered wave          r e feA rik rik o o  , differential scattering cross section is given by   2 , o d k f d k     where  is solid angle For elastic collision   2 , d f d     If potential is given by V and reduce mass of system is µ then  k ok       2 22 ' 3 2 , ' ' ' 4 ikrd f e V r r d r d           
  • 43.
    fiziks Institute for NET/JRF,GATE, IIT-JAM, JEST, TIFR and GRE in PHYSICAL SCIENCES Website: www.physicsbyfiziks.com Email: fiziks.physics@gmail.com 43 Head office fiziks, H.No. 23, G.F, Jia Sarai, Near IIT, Hauz Khas, New Delhi-16 Phone: 011-26865455/+91-9871145498 Branch office Anand Institute of Mathematics, 28-B/6, Jia Sarai, Near IIT Hauz Khas, New Delhi-16 11.1 Born Approximation Born approximation is valid for weak potential V(r)      2 0 2 , ' ' sin ' 'f r V r qr dr q        Where 2 sin 2 oq k k k       for and for ok k       2 2 4 2 0 4 ' ' sin ' ' d r V r qr dr d q       11.2 Partial Wave Analysis Partial wave analysis for elastic scattering For spherically symmetric potential one can assume that the incident plane wave is in z- direction hence    exp cosinc r ikr  . So it can be expressed in term of a superposition of angular momentum Eigen state, each with definite angular momentum number l      cos 0 2 cosik r ikr l l l l e e i l l J kr p        , where Jl is Bessel’s polynomial function and Pl is Legendre polynomial.           0 , 2 1 cos ikr l l l l e r i l J kr P f r                1 2 1 sin cosli l lf l e P k      Total cross section is given by   2 2 0 0 4 2 1 sinl l l l l k             Where σl is called the partial cross section corresponding to the scattering of particles in various angular momentum states and l is phase shift .
  • 44.
    fiziks Institute for NET/JRF,GATE, IIT-JAM, JEST, TIFR and GRE in PHYSICAL SCIENCES Website: www.physicsbyfiziks.com Email: fiziks.physics@gmail.com 44 Head office fiziks, H.No. 23, G.F, Jia Sarai, Near IIT, Hauz Khas, New Delhi-16 Phone: 011-26865455/+91-9871145498 Branch office Anand Institute of Mathematics, 28-B/6, Jia Sarai, Near IIT Hauz Khas, New Delhi-16 12. Relativistic Quantum Mechanics 12.1 Klein Gordon equation The non-relativistic equation for the energy of a free particle is 2 2 p E m  and 2 2 p E m    2 2 p i m t        where p i   is the momentum operator ( being the del operator). The Schrödinger equation suffers from not being relativistic ally covariant, meaning it does not take into account Einstein's special relativity .It is natural to try to use the identity from special relativity describing the energy: 2 2 2 4 p c m c E  Then, just inserting the quantum mechanical operators for momentum and energy yields the equation 2 2 2 2 4 c m c i t           This, however, is a cumbersome expression to work with because the differential operator cannot be evaluated while under the square root sign. which simplifies to 2 2 2 2 2 4 2 c m c t           Rearranging terms yields 2 2 2 2 2 2 2 1 m c E c t           Since all reference to imaginary numbers has been eliminated from this equation, it can be applied to fields that are real valued as well as those that have complex values. Using the inverse of the Murkowski metric we ge 2 2 2 0 m c        where 2 ( ) 0  
  • 45.
    fiziks Institute for NET/JRF,GATE, IIT-JAM, JEST, TIFR and GRE in PHYSICAL SCIENCES Website: www.physicsbyfiziks.com Email: fiziks.physics@gmail.com 45 Head office fiziks, H.No. 23, G.F, Jia Sarai, Near IIT, Hauz Khas, New Delhi-16 Phone: 011-26865455/+91-9871145498 Branch office Anand Institute of Mathematics, 28-B/6, Jia Sarai, Near IIT Hauz Khas, New Delhi-16 In covariant notation. This is often abbreviated as 2 ( ) 0   where mc    and 2 2 2 2 1 c t     This operator is called the d’Alembert operator . Today this form is interpreted as the relativistic field for a scalar (i.e. spin -0) particle. Furthermore, any solution to the Dirac equation (for a spin-one-half particle) is automatically a solution to the Klein–Gordon equation, though not all solutions of the Klein–Gordon equation are solutions of the Dirac equation. The Klein–Gordon equation for a free particle and dispersion relation Klein –Gordon relation for free particle is given by 2 2 2 2 1 E c t         with the same solution as in the non-relativistic case: dispersion relation from free wave equation ( , ) exp ( . )r t i k r t   which can be obtained by putting the value of in 2 2 2 2 1 E c t         equation we will get dispersion relation which is given by 2 2 2 2 2 2 m c k k      . 12.2 Dirac Equation searches for an alternative relativistic equation starting from the generic form describing evolution of wave function:    H t i ˆ If one keeps first order derivative of time, then to preserve Lorentz invariance, the space coordinate derivatives must be of the first order as well. Having all energy-related operators (E, p, m) of the same first order: t iE   ˆ and z ip y ip x ip zyx          ˆ,ˆ,ˆ
  • 46.
    fiziks Institute for NET/JRF,GATE, IIT-JAM, JEST, TIFR and GRE in PHYSICAL SCIENCES Website: www.physicsbyfiziks.com Email: fiziks.physics@gmail.com 46 Head office fiziks, H.No. 23, G.F, Jia Sarai, Near IIT, Hauz Khas, New Delhi-16 Phone: 011-26865455/+91-9871145498 Branch office Anand Institute of Mathematics, 28-B/6, Jia Sarai, Near IIT Hauz Khas, New Delhi-16   mpppE zyx  ˆˆˆˆ 321 By acting with left-and right-hand operators twice, we get   2 1 2 3 1 2 3 ˆ ˆ ˆ ˆ ˆ ˆ ˆx y z x y zE p p p m p p p m                which must be compatible with the Klein-Gordon equation   22222 ˆˆˆˆ mpppE zyx This implies that ,0 ijji  for ji  0 ii  12 i 12  Therefore, parameters α and β cannot be numbers. However, it may and does work if they are matrices, the lowest order being 4×4. Therefore, ψ must be 4-component vectors. Popular representations are        0 0 i i i    and         10 01  where i are 2  2 Pauli matrices:                      10 01 0 0 01 10 321  i i The equation is usually written using γµ-matrices, where i i  for The equation is usually written using γµ-matrices, where i i  for 1,2,3i  and 0  (just multiply the above equation with matrix β and move all terms on one side of the equation): 0            m x i   where         0 0 i i i    and         10 01 0 Find solution for particles at rest, i.e. p=0:
  • 47.
    fiziks Institute for NET/JRF,GATE, IIT-JAM, JEST, TIFR and GRE in PHYSICAL SCIENCES Website: www.physicsbyfiziks.com Email: fiziks.physics@gmail.com 47 Head office fiziks, H.No. 23, G.F, Jia Sarai, Near IIT, Hauz Khas, New Delhi-16 Phone: 011-26865455/+91-9871145498 Branch office Anand Institute of Mathematics, 28-B/6, Jia Sarai, Near IIT Hauz Khas, New Delhi-16 0 4 3 2 1 0                              m t i                         B A B A m t i 10 01 It has two positive energy solutions that correspond to two spin states of spin-½ electrons:         0 1imt A e and         1 0imt A e and two symmetrical negative-energy solutions         0 1imt B e and         1 0imt B e