BASF-YPC invested 1 billion euros to build two new production facilities for super absorbent polymers in Nanjing, China and Camacari, Brazil. WorleyParsons was chosen to provide engineering, procurement, and construction management services for the facilities based on their experience in China and Brazil and ability to provide over 550 technical specialists. To maximize cost savings, BASF-BYC decided the two facilities would utilize cloned designs and technologies.