EPSCC Project
Safety Moment
Safety Moment
Discipline
Unit Rate
/hr
UoM TOTAL INSTALLED REMAINING
PIPERACK STRUCTURAL CONCRETE 60.00 M3 15,558.00 9,010 6,548
EQUIPMENT + STRUCTURAL CONCRETE 60.00 M3 29,019.00 4,366 24,653
MISC. FOUNDATION STRUCTURES 60.00 M3 3,948.00 3,948
CONCRETE TANKS 60.00 M3 1486 1,486
CONCRETE WALL (PRECAST) 32.00 M3 4988 4,988
UG CONCRETE 60.00 M3 14,361 14,361
PAVING 10.00 M3 25,791 25,791
TOTAL CONCRETE 95,151.00 13,376.00 81,775.00
PIPERACK STRUCTURAL STEEL 80.00 TONS 8,121.00 2,179 6,246
EQUIPMENT + EQPT STRUCTURAL STEEL 80.00 TONS 3,402.00 3,402
MISC. STEEL 80.00 TONS 900 900
TOTAL STEEL 12,423.00 2,179.00 10,548.00
UG-NON METALLIC PIPE 7.99 Joints 8,618.00 8,618
UG-METALLIC PIPE 1.60 Joints 2,287.00 2,287
AG MET PIPE 1.60 WDI 203,772 203,772
AG NON-MET PIPE 7.99 Joints 8,053 8,053
HYDROTEST PACKS 120.00 ea 1,200 1,200
REINSTATEMENT 50.00 ea 1,200 1,200
MECHANICAL EQUIPMENT 692.00 EA 552 552
TANKS 255.00 TONS 3,008 3,008
BUILDINGS_CEMENTERS 145.10 M2 6,213 62,13
BUILDINGS_REMAINIMG 123.84 M2 13,362 13,362
INSULATION 14.70 M2 45,424 45,424
PAINTING 3.15 M2 138,020 138,020
CABLE TRAY 5.96 LM 57,647 57,647
ELECTRICAL CABLE 0.78 LM 899,283 899,283
E,I&T TERMINATIONS 3.65 EA 189,780 189,780
HEAT TRACING 1.10 LM 239,561 239,561
INSTRUMENT/TELECOMCABLE 0.78 LM 1,025,311 1,025,311
INSTRUMENTS 4.57 EA 45,000 45,000
INSTRUMENT LOOPS 12.00 EA 7,806 7,806
project schedule workshop rebaseline.pptx
project schedule workshop rebaseline.pptx
project schedule workshop rebaseline.pptx
project schedule workshop rebaseline.pptx
project schedule workshop rebaseline.pptx
project schedule workshop rebaseline.pptx
project schedule workshop rebaseline.pptx
project schedule workshop rebaseline.pptx
project schedule workshop rebaseline.pptx

project schedule workshop rebaseline.pptx

  • 1.
  • 2.
  • 3.
    Discipline Unit Rate /hr UoM TOTALINSTALLED REMAINING PIPERACK STRUCTURAL CONCRETE 60.00 M3 15,558.00 9,010 6,548 EQUIPMENT + STRUCTURAL CONCRETE 60.00 M3 29,019.00 4,366 24,653 MISC. FOUNDATION STRUCTURES 60.00 M3 3,948.00 3,948 CONCRETE TANKS 60.00 M3 1486 1,486 CONCRETE WALL (PRECAST) 32.00 M3 4988 4,988 UG CONCRETE 60.00 M3 14,361 14,361 PAVING 10.00 M3 25,791 25,791 TOTAL CONCRETE 95,151.00 13,376.00 81,775.00 PIPERACK STRUCTURAL STEEL 80.00 TONS 8,121.00 2,179 6,246 EQUIPMENT + EQPT STRUCTURAL STEEL 80.00 TONS 3,402.00 3,402 MISC. STEEL 80.00 TONS 900 900 TOTAL STEEL 12,423.00 2,179.00 10,548.00 UG-NON METALLIC PIPE 7.99 Joints 8,618.00 8,618 UG-METALLIC PIPE 1.60 Joints 2,287.00 2,287 AG MET PIPE 1.60 WDI 203,772 203,772 AG NON-MET PIPE 7.99 Joints 8,053 8,053 HYDROTEST PACKS 120.00 ea 1,200 1,200 REINSTATEMENT 50.00 ea 1,200 1,200 MECHANICAL EQUIPMENT 692.00 EA 552 552 TANKS 255.00 TONS 3,008 3,008 BUILDINGS_CEMENTERS 145.10 M2 6,213 62,13 BUILDINGS_REMAINIMG 123.84 M2 13,362 13,362 INSULATION 14.70 M2 45,424 45,424 PAINTING 3.15 M2 138,020 138,020 CABLE TRAY 5.96 LM 57,647 57,647 ELECTRICAL CABLE 0.78 LM 899,283 899,283 E,I&T TERMINATIONS 3.65 EA 189,780 189,780 HEAT TRACING 1.10 LM 239,561 239,561 INSTRUMENT/TELECOMCABLE 0.78 LM 1,025,311 1,025,311 INSTRUMENTS 4.57 EA 45,000 45,000 INSTRUMENT LOOPS 12.00 EA 7,806 7,806