REVIVAL OF MALAM JABBA TOURIST/ SKI RESORT
SECTOR: TOURISM & SPORTS
FEASIBILE LOCATION: Malam Jabba, Swat, Khyber Pakhtunkhwa.
TO PROVIDE HILL STATION STAYING / SKI FACILITIES AND VIEWING OF
NATURAL SCENIC BEAUTY
INTRODUCTION
Malam Jabba (also Maalam Jabba) is a Hill Station in the Karakoram mountain range nearly
40 km from Saidu Sharif in Swat Valley, Khyber Pakhtunkhwa, Pakistan. It is 314 km from
Islamabad and 51 km from Saidu Sharif Airport.
Malam Jabba is home to the only ski resort in Pakistan. It is one of the Top 10 most adventurous
ski resorts in the world. The resort of Malam Jabba is around 9000 feet above the sea level and
it’s at 5-hours’ drive from capital city Islamabad.
THE PROJECT:
The project envisages restoration and revival of the resort both for beginners and professional
skiers. Chairlift and hotel at the resort is planned and will be offered to the investors. The hotel
project can be operated throughout the year as this is the frequently visited destination by the
tourist in all seasons.
Facilities to be provided includes construction of 5 Star hotel with minimum of 70 plus rooms
with 30-40 rooms of 3 Star facilities, Installation of chairlift meeting International standards, Ski
equipment’s, installation of Bob Sledge, first aid, safety facilities and medical emergency
backup, Restaurant / tea with tuck shop at top of the hill and Parking facility.
EISTIMATED INVESMENT:
Total Investment:
Construction Cost = Rs 900 Million
Equipment Cost = Rs 700 million
Land Lease Amount for 30 years @ Rs: 4 Million per year (first two years will be free Lease,
lease payment of 4 million will start from third year with annual increase of 5% up to 10th year.
10% annually increase of lease amount from 11th to 20th year and `15% annually increase of
lease amount from 21st to 30th year.
Total Investment = Rs 1800 Million
RETURN OF EQUITY:
Total Revenues: = Rs 384 million
(@ 800 visitors per day during Eight months season average revenue of Rs.2000 per person for
240 business days)
Operating Costs:
Salaries (including Mgt, Admin & Support Staff) = Rs 10, 00,000 Per Month
Utilities, Depreciation & Misc. = Rs 6, 00,000 per Month
Total = Rs 16, 00,000
Say, Rs 1, 92, 00,000 per Year
Total Annual Operating = Rs 19.2 Million
Total Income: = Rs 384 million
Income Taxes @ 35%: = Rs 134.4 million
Income after Tax: = Rs 249.6 million
Estimated Ratios:
Return on Investment: = 21.33 %
Payback Period: = Approx. 4.7 Years
PROPOSE MODEOF FINANCING: Public Private Partnership on Bot Basis
INFRASTRUCTURE AVALABLE:
All the basic facilities are available on site such as water, road network, electricity, and
telephone.

More Related Content

What's hot

Banasura Hill Resort Wayanad
Banasura Hill Resort WayanadBanasura Hill Resort Wayanad
Banasura Hill Resort Wayanad
Banasura Hill Resort
 
Banasura Hill Resort: Heaven Made of Earth
Banasura Hill Resort: Heaven Made of Earth Banasura Hill Resort: Heaven Made of Earth
Banasura Hill Resort: Heaven Made of Earth
Banasura Hill Resort
 
Bangalore building-byelaws- 2003
Bangalore building-byelaws- 2003Bangalore building-byelaws- 2003
Bangalore building-byelaws- 2003
Rishii2i
 
Motel design - Case Study
Motel design - Case StudyMotel design - Case Study
Motel design - Case Study
LipikaPandey
 
Report on Hotel
Report on HotelReport on Hotel
Report on Hotel
Preetam89
 
resort complex casestudy
resort complex casestudyresort complex casestudy
resort complex casestudy
Ar. Sahid Akhtar
 
architecture and transportation
architecture and transportationarchitecture and transportation
architecture and transportation
Sheena Llare
 
CONSIDERATION FOR BUILDING A RESORT IN SIKKIM
CONSIDERATION FOR BUILDING A RESORT IN SIKKIMCONSIDERATION FOR BUILDING A RESORT IN SIKKIM
CONSIDERATION FOR BUILDING A RESORT IN SIKKIM
BISHAL KHANAL
 
Case study on Resort
Case study on ResortCase study on Resort
Case study on Resort
Imtiaz Ahmad
 
" ITC GRAND CHOLA CHENNAI" By Preeti Gusain
" ITC GRAND CHOLA  CHENNAI"  By Preeti Gusain" ITC GRAND CHOLA  CHENNAI"  By Preeti Gusain
" ITC GRAND CHOLA CHENNAI" By Preeti Gusainpoojagusain
 
18ARC71_SustainableSite_AV_PDF.pdf
18ARC71_SustainableSite_AV_PDF.pdf18ARC71_SustainableSite_AV_PDF.pdf
18ARC71_SustainableSite_AV_PDF.pdf
AkashV75
 
Tbs terminal, Malaysia
Tbs terminal, MalaysiaTbs terminal, Malaysia
Tbs terminal, Malaysia
Palak Khandelwal
 
ARCHINT: Hotel Design 1.0
ARCHINT: Hotel Design 1.0ARCHINT: Hotel Design 1.0
ARCHINT: Hotel Design 1.0
ArchiEducPH
 
shoba city mall case study shopping mall shobha city mall thrissur kerala
shoba city mall case study shopping mall shobha city mall thrissur keralashoba city mall case study shopping mall shobha city mall thrissur kerala
shoba city mall case study shopping mall shobha city mall thrissur kerala
Shabana Kotta
 
Vancouver Centre Case Study
Vancouver Centre Case StudyVancouver Centre Case Study
Vancouver Centre Case StudyJon Vehlow
 
Motel
MotelMotel
Motel
yomask Kv
 

What's hot (20)

Banasura Hill Resort Wayanad
Banasura Hill Resort WayanadBanasura Hill Resort Wayanad
Banasura Hill Resort Wayanad
 
Banasura Hill Resort: Heaven Made of Earth
Banasura Hill Resort: Heaven Made of Earth Banasura Hill Resort: Heaven Made of Earth
Banasura Hill Resort: Heaven Made of Earth
 
Bangalore building-byelaws- 2003
Bangalore building-byelaws- 2003Bangalore building-byelaws- 2003
Bangalore building-byelaws- 2003
 
Motel design - Case Study
Motel design - Case StudyMotel design - Case Study
Motel design - Case Study
 
Report on Hotel
Report on HotelReport on Hotel
Report on Hotel
 
resort complex casestudy
resort complex casestudyresort complex casestudy
resort complex casestudy
 
Resort
ResortResort
Resort
 
Banquet Hall
Banquet HallBanquet Hall
Banquet Hall
 
architecture and transportation
architecture and transportationarchitecture and transportation
architecture and transportation
 
CONSIDERATION FOR BUILDING A RESORT IN SIKKIM
CONSIDERATION FOR BUILDING A RESORT IN SIKKIMCONSIDERATION FOR BUILDING A RESORT IN SIKKIM
CONSIDERATION FOR BUILDING A RESORT IN SIKKIM
 
Case study on Resort
Case study on ResortCase study on Resort
Case study on Resort
 
" ITC GRAND CHOLA CHENNAI" By Preeti Gusain
" ITC GRAND CHOLA  CHENNAI"  By Preeti Gusain" ITC GRAND CHOLA  CHENNAI"  By Preeti Gusain
" ITC GRAND CHOLA CHENNAI" By Preeti Gusain
 
18ARC71_SustainableSite_AV_PDF.pdf
18ARC71_SustainableSite_AV_PDF.pdf18ARC71_SustainableSite_AV_PDF.pdf
18ARC71_SustainableSite_AV_PDF.pdf
 
Tbs terminal, Malaysia
Tbs terminal, MalaysiaTbs terminal, Malaysia
Tbs terminal, Malaysia
 
Architectural programming
Architectural programmingArchitectural programming
Architectural programming
 
ARCHINT: Hotel Design 1.0
ARCHINT: Hotel Design 1.0ARCHINT: Hotel Design 1.0
ARCHINT: Hotel Design 1.0
 
Egypt Village
Egypt VillageEgypt Village
Egypt Village
 
shoba city mall case study shopping mall shobha city mall thrissur kerala
shoba city mall case study shopping mall shobha city mall thrissur keralashoba city mall case study shopping mall shobha city mall thrissur kerala
shoba city mall case study shopping mall shobha city mall thrissur kerala
 
Vancouver Centre Case Study
Vancouver Centre Case StudyVancouver Centre Case Study
Vancouver Centre Case Study
 
Motel
MotelMotel
Motel
 

Viewers also liked

Pc i festival traditional events 2014-15 50m
Pc i festival traditional events 2014-15 50mPc i festival traditional events 2014-15 50m
Pc i festival traditional events 2014-15 50m
hayat alishah
 
Seahenge
SeahengeSeahenge
Mala dfr.mak
Mala dfr.makMala dfr.mak
Mala dfr.mak
hayat alishah
 
To rs for consultancy environment firm tourism projects new
To rs for consultancy environment firm tourism projects newTo rs for consultancy environment firm tourism projects new
To rs for consultancy environment firm tourism projects newhayat alishah
 
Information
InformationInformation
Information
hayat alishah
 
Informatoin 2 chapter 6 international tourism markets
Informatoin 2 chapter 6 international tourism marketsInformatoin 2 chapter 6 international tourism markets
Informatoin 2 chapter 6 international tourism markets
hayat alishah
 
Proforma monitoring p&d 25 2-2015
Proforma monitoring p&d 25 2-2015Proforma monitoring p&d 25 2-2015
Proforma monitoring p&d 25 2-2015
hayat alishah
 

Viewers also liked (11)

Ric report
Ric reportRic report
Ric report
 
Pc i festival traditional events 2014-15 50m
Pc i festival traditional events 2014-15 50mPc i festival traditional events 2014-15 50m
Pc i festival traditional events 2014-15 50m
 
Seahenge
SeahengeSeahenge
Seahenge
 
Mala dfr.mak
Mala dfr.makMala dfr.mak
Mala dfr.mak
 
Hochdorf
HochdorfHochdorf
Hochdorf
 
To rs for consultancy environment firm tourism projects new
To rs for consultancy environment firm tourism projects newTo rs for consultancy environment firm tourism projects new
To rs for consultancy environment firm tourism projects new
 
Chapter 2has
Chapter 2hasChapter 2has
Chapter 2has
 
Information
InformationInformation
Information
 
Informatoin 2 chapter 6 international tourism markets
Informatoin 2 chapter 6 international tourism marketsInformatoin 2 chapter 6 international tourism markets
Informatoin 2 chapter 6 international tourism markets
 
Proforma monitoring p&d 25 2-2015
Proforma monitoring p&d 25 2-2015Proforma monitoring p&d 25 2-2015
Proforma monitoring p&d 25 2-2015
 
Odometer
OdometerOdometer
Odometer
 

Similar to Project revival of malam jabba resort

Project resort galiyat
Project resort galiyatProject resort galiyat
Project resort galiyat
hayat alishah
 
Silverwood: Plots in Neemrana, NH-8 with Bank Loan
Silverwood: Plots in Neemrana, NH-8 with Bank LoanSilverwood: Plots in Neemrana, NH-8 with Bank Loan
Silverwood: Plots in Neemrana, NH-8 with Bank Loan
Deepak Prakash
 
Prolonging Life Cycle of Tourism Area/ Malam Jabba Swat.
Prolonging Life Cycle of Tourism Area/ Malam Jabba Swat.Prolonging Life Cycle of Tourism Area/ Malam Jabba Swat.
Prolonging Life Cycle of Tourism Area/ Malam Jabba Swat.
Mohammad Imlaq
 
Corporate Presentation Aquarius
Corporate Presentation AquariusCorporate Presentation Aquarius
Corporate Presentation Aquarius
Amar Yadav
 
Sspl business plan as
Sspl business plan  asSspl business plan  as
Sspl business plan as
swatisunsource
 
Presentation on Parking area in sector v, Kolkata
Presentation on Parking area in sector v, KolkataPresentation on Parking area in sector v, Kolkata
Presentation on Parking area in sector v, Kolkata
Unitedworld School Of Business
 
Circus_Residence_Brochure_July_29th_2015
Circus_Residence_Brochure_July_29th_2015Circus_Residence_Brochure_July_29th_2015
Circus_Residence_Brochure_July_29th_2015SAINBAYAR Beejin
 
RMP Jaipur
RMP JaipurRMP Jaipur
RMP Jaipur
rmpjaipur
 
ELITE 10 - INVESTMENT PROPOSAL
ELITE 10 - INVESTMENT PROPOSALELITE 10 - INVESTMENT PROPOSAL
ELITE 10 - INVESTMENT PROPOSALQaiser Ijaz Tiwana
 
SPARKLES (CLEANING&GRILL)
SPARKLES (CLEANING&GRILL)SPARKLES (CLEANING&GRILL)
SPARKLES (CLEANING&GRILL)Christian Ibe
 
Piston ring kuldeep agrawal
Piston ring  kuldeep agrawalPiston ring  kuldeep agrawal
Piston ring kuldeep agrawal
ANIKET KULKARNI
 

Similar to Project revival of malam jabba resort (13)

Project profile new
Project profile newProject profile new
Project profile new
 
Project resort galiyat
Project resort galiyatProject resort galiyat
Project resort galiyat
 
Irs 22.2.2015
Irs 22.2.2015Irs 22.2.2015
Irs 22.2.2015
 
Silverwood: Plots in Neemrana, NH-8 with Bank Loan
Silverwood: Plots in Neemrana, NH-8 with Bank LoanSilverwood: Plots in Neemrana, NH-8 with Bank Loan
Silverwood: Plots in Neemrana, NH-8 with Bank Loan
 
Prolonging Life Cycle of Tourism Area/ Malam Jabba Swat.
Prolonging Life Cycle of Tourism Area/ Malam Jabba Swat.Prolonging Life Cycle of Tourism Area/ Malam Jabba Swat.
Prolonging Life Cycle of Tourism Area/ Malam Jabba Swat.
 
Corporate Presentation Aquarius
Corporate Presentation AquariusCorporate Presentation Aquarius
Corporate Presentation Aquarius
 
Sspl business plan as
Sspl business plan  asSspl business plan  as
Sspl business plan as
 
Presentation on Parking area in sector v, Kolkata
Presentation on Parking area in sector v, KolkataPresentation on Parking area in sector v, Kolkata
Presentation on Parking area in sector v, Kolkata
 
Circus_Residence_Brochure_July_29th_2015
Circus_Residence_Brochure_July_29th_2015Circus_Residence_Brochure_July_29th_2015
Circus_Residence_Brochure_July_29th_2015
 
RMP Jaipur
RMP JaipurRMP Jaipur
RMP Jaipur
 
ELITE 10 - INVESTMENT PROPOSAL
ELITE 10 - INVESTMENT PROPOSALELITE 10 - INVESTMENT PROPOSAL
ELITE 10 - INVESTMENT PROPOSAL
 
SPARKLES (CLEANING&GRILL)
SPARKLES (CLEANING&GRILL)SPARKLES (CLEANING&GRILL)
SPARKLES (CLEANING&GRILL)
 
Piston ring kuldeep agrawal
Piston ring  kuldeep agrawalPiston ring  kuldeep agrawal
Piston ring kuldeep agrawal
 

More from hayat alishah

Tourism policy
Tourism policyTourism policy
Tourism policy
hayat alishah
 
Tourism policy 2015
Tourism policy 2015Tourism policy 2015
Tourism policy 2015
hayat alishah
 
1633505747100 tourism-police-regulations-(gazette)
1633505747100 tourism-police-regulations-(gazette)1633505747100 tourism-police-regulations-(gazette)
1633505747100 tourism-police-regulations-(gazette)
hayat alishah
 
1627547779798 gazetted-copy-of-tourism-act-2019
1627547779798 gazetted-copy-of-tourism-act-20191627547779798 gazetted-copy-of-tourism-act-2019
1627547779798 gazetted-copy-of-tourism-act-2019
hayat alishah
 
Uniform specs updated copy
Uniform specs updated   copyUniform specs updated   copy
Uniform specs updated copy
hayat alishah
 
Tourism wing sdu
Tourism wing sduTourism wing sdu
Tourism wing sdu
hayat alishah
 
Aip tourism
Aip tourismAip tourism
Aip tourism
hayat alishah
 
Aip dev
Aip devAip dev
Aip dev
hayat alishah
 
Progress report
Progress reportProgress report
Progress report
hayat alishah
 
Stacy updated presentation cs nov 2021
Stacy updated presentation cs nov 2021Stacy updated presentation cs nov 2021
Stacy updated presentation cs nov 2021
hayat alishah
 
Psdp plus progress report updated
Psdp plus progress report updatedPsdp plus progress report updated
Psdp plus progress report updated
hayat alishah
 
Stacy updated presentation cs nov 2021
Stacy updated presentation cs nov 2021Stacy updated presentation cs nov 2021
Stacy updated presentation cs nov 2021
hayat alishah
 
White paper safety_and_security_in_yucat
White paper safety_and_security_in_yucatWhite paper safety_and_security_in_yucat
White paper safety_and_security_in_yucat
hayat alishah
 
dg arc imran hayat kpcta gm pia planetarium original and options mergedreport
dg arc imran hayat kpcta gm pia planetarium original and options mergedreportdg arc imran hayat kpcta gm pia planetarium original and options mergedreport
dg arc imran hayat kpcta gm pia planetarium original and options mergedreport
hayat alishah
 
Member list
Member listMember list
Member list
hayat alishah
 
Final projects tourism department
Final projects tourism departmentFinal projects tourism department
Final projects tourism department
hayat alishah
 
Proposals15march2021
Proposals15march2021Proposals15march2021
Proposals15march2021
hayat alishah
 
Tourismfinal16proposalsbyabad 170315081525
Tourismfinal16proposalsbyabad 170315081525Tourismfinal16proposalsbyabad 170315081525
Tourismfinal16proposalsbyabad 170315081525
hayat alishah
 
Document 26
Document 26Document 26
Document 26
hayat alishah
 
1975 ahmed-mataloona-pashto proverbs.pdf
1975 ahmed-mataloona-pashto proverbs.pdf1975 ahmed-mataloona-pashto proverbs.pdf
1975 ahmed-mataloona-pashto proverbs.pdf
hayat alishah
 

More from hayat alishah (20)

Tourism policy
Tourism policyTourism policy
Tourism policy
 
Tourism policy 2015
Tourism policy 2015Tourism policy 2015
Tourism policy 2015
 
1633505747100 tourism-police-regulations-(gazette)
1633505747100 tourism-police-regulations-(gazette)1633505747100 tourism-police-regulations-(gazette)
1633505747100 tourism-police-regulations-(gazette)
 
1627547779798 gazetted-copy-of-tourism-act-2019
1627547779798 gazetted-copy-of-tourism-act-20191627547779798 gazetted-copy-of-tourism-act-2019
1627547779798 gazetted-copy-of-tourism-act-2019
 
Uniform specs updated copy
Uniform specs updated   copyUniform specs updated   copy
Uniform specs updated copy
 
Tourism wing sdu
Tourism wing sduTourism wing sdu
Tourism wing sdu
 
Aip tourism
Aip tourismAip tourism
Aip tourism
 
Aip dev
Aip devAip dev
Aip dev
 
Progress report
Progress reportProgress report
Progress report
 
Stacy updated presentation cs nov 2021
Stacy updated presentation cs nov 2021Stacy updated presentation cs nov 2021
Stacy updated presentation cs nov 2021
 
Psdp plus progress report updated
Psdp plus progress report updatedPsdp plus progress report updated
Psdp plus progress report updated
 
Stacy updated presentation cs nov 2021
Stacy updated presentation cs nov 2021Stacy updated presentation cs nov 2021
Stacy updated presentation cs nov 2021
 
White paper safety_and_security_in_yucat
White paper safety_and_security_in_yucatWhite paper safety_and_security_in_yucat
White paper safety_and_security_in_yucat
 
dg arc imran hayat kpcta gm pia planetarium original and options mergedreport
dg arc imran hayat kpcta gm pia planetarium original and options mergedreportdg arc imran hayat kpcta gm pia planetarium original and options mergedreport
dg arc imran hayat kpcta gm pia planetarium original and options mergedreport
 
Member list
Member listMember list
Member list
 
Final projects tourism department
Final projects tourism departmentFinal projects tourism department
Final projects tourism department
 
Proposals15march2021
Proposals15march2021Proposals15march2021
Proposals15march2021
 
Tourismfinal16proposalsbyabad 170315081525
Tourismfinal16proposalsbyabad 170315081525Tourismfinal16proposalsbyabad 170315081525
Tourismfinal16proposalsbyabad 170315081525
 
Document 26
Document 26Document 26
Document 26
 
1975 ahmed-mataloona-pashto proverbs.pdf
1975 ahmed-mataloona-pashto proverbs.pdf1975 ahmed-mataloona-pashto proverbs.pdf
1975 ahmed-mataloona-pashto proverbs.pdf
 

Project revival of malam jabba resort

  • 1. REVIVAL OF MALAM JABBA TOURIST/ SKI RESORT SECTOR: TOURISM & SPORTS FEASIBILE LOCATION: Malam Jabba, Swat, Khyber Pakhtunkhwa.
  • 2. TO PROVIDE HILL STATION STAYING / SKI FACILITIES AND VIEWING OF NATURAL SCENIC BEAUTY INTRODUCTION Malam Jabba (also Maalam Jabba) is a Hill Station in the Karakoram mountain range nearly 40 km from Saidu Sharif in Swat Valley, Khyber Pakhtunkhwa, Pakistan. It is 314 km from Islamabad and 51 km from Saidu Sharif Airport. Malam Jabba is home to the only ski resort in Pakistan. It is one of the Top 10 most adventurous ski resorts in the world. The resort of Malam Jabba is around 9000 feet above the sea level and it’s at 5-hours’ drive from capital city Islamabad.
  • 3. THE PROJECT: The project envisages restoration and revival of the resort both for beginners and professional skiers. Chairlift and hotel at the resort is planned and will be offered to the investors. The hotel project can be operated throughout the year as this is the frequently visited destination by the tourist in all seasons. Facilities to be provided includes construction of 5 Star hotel with minimum of 70 plus rooms with 30-40 rooms of 3 Star facilities, Installation of chairlift meeting International standards, Ski equipment’s, installation of Bob Sledge, first aid, safety facilities and medical emergency backup, Restaurant / tea with tuck shop at top of the hill and Parking facility. EISTIMATED INVESMENT: Total Investment: Construction Cost = Rs 900 Million Equipment Cost = Rs 700 million Land Lease Amount for 30 years @ Rs: 4 Million per year (first two years will be free Lease, lease payment of 4 million will start from third year with annual increase of 5% up to 10th year. 10% annually increase of lease amount from 11th to 20th year and `15% annually increase of lease amount from 21st to 30th year. Total Investment = Rs 1800 Million RETURN OF EQUITY: Total Revenues: = Rs 384 million (@ 800 visitors per day during Eight months season average revenue of Rs.2000 per person for 240 business days) Operating Costs: Salaries (including Mgt, Admin & Support Staff) = Rs 10, 00,000 Per Month Utilities, Depreciation & Misc. = Rs 6, 00,000 per Month Total = Rs 16, 00,000 Say, Rs 1, 92, 00,000 per Year Total Annual Operating = Rs 19.2 Million Total Income: = Rs 384 million Income Taxes @ 35%: = Rs 134.4 million Income after Tax: = Rs 249.6 million Estimated Ratios: Return on Investment: = 21.33 % Payback Period: = Approx. 4.7 Years PROPOSE MODEOF FINANCING: Public Private Partnership on Bot Basis INFRASTRUCTURE AVALABLE: All the basic facilities are available on site such as water, road network, electricity, and telephone.