SlideShare a Scribd company logo
Project Delivery Strategy
(Design-Build) Case Study
Company Name: Home Of Dissertations
Website: https://www.dissertationhomework.com/
Contact Number: +44-7842798340
Connect Now
Project Management Delivery Team
Strategy
Factors determining strategy used.
 Investor/sponsor experience, qualification and
capability
 Scope of the project.
 Organization and project objectives.
 Client attitude towards the market and project.
 Nature of project.
 Market conditions.
Strategy.
 Develop and construct.
 Design and build.
 Design and manage
 Package deal.
Delivery Team and Function
Team Member include.
 Contractor
 Prepares the proposals and brief.
 Prepare schedule and cost structure.
 Designer
 Project Manager
 Suppliers.
 Investor/client
 Consultants.
Phase and Procurement Route
(Newham council; housing social care and a community hub)
Phases.
 Hughes (1991) divided the project delivery into 7 stages.
1. Inception stage.
2. Feasibility.
3. Scheme design.
4. Detail design stage.
5. Contract stage
6. Construction stage.
7. Commissioning.
Procurement route
Type; There are three type main used, Namely:
1. Traditional/design-bid-build.
2. Design and build.
3. Design/develop and construct.
The constructor is identified at the beginning of the project.
Enables:
 Partnering – improves communication and work towards
same objectives.
 Facilitates integrated project delivery system. incentivizes
collaboration and team risk-sharing.
 Commissioning particularly at the beginning of the
project.
 Close relation with contracting and acquisition officials.
Reference.
 Berkun, S., & Berkun, S. (2008). Making things happen: Mastering project
management. Beijing: O'Reilly
 Hughes, W. (1991). "Modelling the construction process using plans of
work." Paper to Construction Project modelling and Productivity,
Dubrovnik, pp 81-86.
 Newton, R. (2013). The project management book. England : Pearson
 Ojo, S.O. and Ikpo,J. (2013). Determining the Performance of
Procurement Methods against Selection Criteria using Outranking –
Satisfying Methodology. Journal of Engineering, Project, and Production
Management, 3(2), pp.74-84.
 Young, T. L. (2013). Successful project management. Philadelphia, PA :
Kogan Page Limited,
Contact us now
Website: https://www.dissertationhomework.com/
Contact Number: +44-7842798340
Connect Now

More Related Content

Similar to Project Delivery Strategy (Design-Build) Case Study.pptx

Intro to Project Management .pptx
Intro to Project Management .pptxIntro to Project Management .pptx
Intro to Project Management .pptx
Parmeshwar Biradar
 
Front end planning
Front end planningFront end planning
Front end planning
Spice Shuvo
 
Lecture Presentation on Project Proposal
Lecture Presentation on Project ProposalLecture Presentation on Project Proposal
Lecture Presentation on Project Proposal
Jo Balucanag - Bitonio
 
Exploration of risks and risk management in construction project delivery
Exploration of risks and risk management in construction project deliveryExploration of risks and risk management in construction project delivery
Exploration of risks and risk management in construction project delivery
MECandPMV
 
Ibm projectmgmt-1
Ibm  projectmgmt-1Ibm  projectmgmt-1
Ibm projectmgmt-1
Prithwiraj Saha
 
Design & planning (v. 2017-2018 eng)
Design & planning (v. 2017-2018 eng)Design & planning (v. 2017-2018 eng)
Design & planning (v. 2017-2018 eng)
Frieda Brioschi
 
ACE Team 2 - WK6 - IPD Presentation
ACE Team 2 - WK6 - IPD PresentationACE Team 2 - WK6 - IPD Presentation
ACE Team 2 - WK6 - IPD Presentation
Ausrine Rakauskaite
 
PM Survival Guide to Proposal Management
PM Survival Guide to Proposal ManagementPM Survival Guide to Proposal Management
PM Survival Guide to Proposal Management
Lohfeld Consulting Group
 
Project management-CH 4
Project management-CH 4Project management-CH 4
Project management-CH 4
Hamad Al-oqayli
 
Project management
Project managementProject management
Project management
Hamad Al-oqayli
 
MBA UNIT 2.pptx
MBA UNIT 2.pptxMBA UNIT 2.pptx
MBA UNIT 2.pptx
selam49
 
pre-design phase
pre-design phasepre-design phase
pre-design phase
DaintyLorenBarrameda
 
Project mangment
Project mangmentProject mangment
Project mangment
Hemant Srivastava
 
Industrial.projects.Student.Level
Industrial.projects.Student.LevelIndustrial.projects.Student.Level
Industrial.projects.Student.Level
Dino Almirall
 
Design methods for developing services
Design methods for developing servicesDesign methods for developing services
Design methods for developing services
Colaborativismo
 
2. Organization of the Architect‘s office.pptx
2. Organization of the Architect‘s office.pptx2. Organization of the Architect‘s office.pptx
2. Organization of the Architect‘s office.pptx
MussemaAbdurazak
 
Project management
Project managementProject management
Project management
Benjamin Tan
 
know more about Multimedia Design and digital marketing services with- speak...
know more about  Multimedia Design and digital marketing services with- speak...know more about  Multimedia Design and digital marketing services with- speak...
know more about Multimedia Design and digital marketing services with- speak...
speakerhead-com
 
COVERTITLE PAGE Table of ContentsI. Integrated Projec
COVERTITLE PAGE Table of ContentsI. Integrated ProjecCOVERTITLE PAGE Table of ContentsI. Integrated Projec
COVERTITLE PAGE Table of ContentsI. Integrated Projec
CruzIbarra161
 
Pile Chapter 5 Design Process Ym
Pile Chapter 5   Design Process   YmPile Chapter 5   Design Process   Ym
Pile Chapter 5 Design Process Ym
Galala University
 

Similar to Project Delivery Strategy (Design-Build) Case Study.pptx (20)

Intro to Project Management .pptx
Intro to Project Management .pptxIntro to Project Management .pptx
Intro to Project Management .pptx
 
Front end planning
Front end planningFront end planning
Front end planning
 
Lecture Presentation on Project Proposal
Lecture Presentation on Project ProposalLecture Presentation on Project Proposal
Lecture Presentation on Project Proposal
 
Exploration of risks and risk management in construction project delivery
Exploration of risks and risk management in construction project deliveryExploration of risks and risk management in construction project delivery
Exploration of risks and risk management in construction project delivery
 
Ibm projectmgmt-1
Ibm  projectmgmt-1Ibm  projectmgmt-1
Ibm projectmgmt-1
 
Design & planning (v. 2017-2018 eng)
Design & planning (v. 2017-2018 eng)Design & planning (v. 2017-2018 eng)
Design & planning (v. 2017-2018 eng)
 
ACE Team 2 - WK6 - IPD Presentation
ACE Team 2 - WK6 - IPD PresentationACE Team 2 - WK6 - IPD Presentation
ACE Team 2 - WK6 - IPD Presentation
 
PM Survival Guide to Proposal Management
PM Survival Guide to Proposal ManagementPM Survival Guide to Proposal Management
PM Survival Guide to Proposal Management
 
Project management-CH 4
Project management-CH 4Project management-CH 4
Project management-CH 4
 
Project management
Project managementProject management
Project management
 
MBA UNIT 2.pptx
MBA UNIT 2.pptxMBA UNIT 2.pptx
MBA UNIT 2.pptx
 
pre-design phase
pre-design phasepre-design phase
pre-design phase
 
Project mangment
Project mangmentProject mangment
Project mangment
 
Industrial.projects.Student.Level
Industrial.projects.Student.LevelIndustrial.projects.Student.Level
Industrial.projects.Student.Level
 
Design methods for developing services
Design methods for developing servicesDesign methods for developing services
Design methods for developing services
 
2. Organization of the Architect‘s office.pptx
2. Organization of the Architect‘s office.pptx2. Organization of the Architect‘s office.pptx
2. Organization of the Architect‘s office.pptx
 
Project management
Project managementProject management
Project management
 
know more about Multimedia Design and digital marketing services with- speak...
know more about  Multimedia Design and digital marketing services with- speak...know more about  Multimedia Design and digital marketing services with- speak...
know more about Multimedia Design and digital marketing services with- speak...
 
COVERTITLE PAGE Table of ContentsI. Integrated Projec
COVERTITLE PAGE Table of ContentsI. Integrated ProjecCOVERTITLE PAGE Table of ContentsI. Integrated Projec
COVERTITLE PAGE Table of ContentsI. Integrated Projec
 
Pile Chapter 5 Design Process Ym
Pile Chapter 5   Design Process   YmPile Chapter 5   Design Process   Ym
Pile Chapter 5 Design Process Ym
 

More from Home of Dissertations

Independence and Reflection_ the ingredients for successful Learners_ -_ Chap...
Independence and Reflection_ the ingredients for successful Learners_ -_ Chap...Independence and Reflection_ the ingredients for successful Learners_ -_ Chap...
Independence and Reflection_ the ingredients for successful Learners_ -_ Chap...
Home of Dissertations
 
TORTURE AND COUNTER-TERRORISM IN INTERNATIONAL LAW.pptx
TORTURE AND COUNTER-TERRORISM IN INTERNATIONAL LAW.pptxTORTURE AND COUNTER-TERRORISM IN INTERNATIONAL LAW.pptx
TORTURE AND COUNTER-TERRORISM IN INTERNATIONAL LAW.pptx
Home of Dissertations
 
STAKEHOLDER ANALYSIS OF COMPANY OPORTO AND ITS RELATIONSHIP
STAKEHOLDER ANALYSIS OF COMPANY OPORTO AND ITS RELATIONSHIPSTAKEHOLDER ANALYSIS OF COMPANY OPORTO AND ITS RELATIONSHIP
STAKEHOLDER ANALYSIS OF COMPANY OPORTO AND ITS RELATIONSHIP
Home of Dissertations
 
What the National Health Services offers you
What the National Health Services offers youWhat the National Health Services offers you
What the National Health Services offers you
Home of Dissertations
 
The Signification of Epidemiology: A Medicine Branch
The Signification of Epidemiology: A Medicine BranchThe Signification of Epidemiology: A Medicine Branch
The Signification of Epidemiology: A Medicine Branch
Home of Dissertations
 
Etihad Airways (CASE STUDY).pptx
Etihad Airways (CASE STUDY).pptxEtihad Airways (CASE STUDY).pptx
Etihad Airways (CASE STUDY).pptx
Home of Dissertations
 
CUSTOMER SERVICE EXCELLENCE (CASE STUDY).pptx
CUSTOMER SERVICE EXCELLENCE (CASE STUDY).pptxCUSTOMER SERVICE EXCELLENCE (CASE STUDY).pptx
CUSTOMER SERVICE EXCELLENCE (CASE STUDY).pptx
Home of Dissertations
 
Consumer engagement Starbuck (Case Study).pptx
Consumer engagement Starbuck (Case Study).pptxConsumer engagement Starbuck (Case Study).pptx
Consumer engagement Starbuck (Case Study).pptx
Home of Dissertations
 
SELF Reflection Occupational Therapist for rehabilitation of Coronary Heart D...
SELF Reflection Occupational Therapist for rehabilitation of Coronary Heart D...SELF Reflection Occupational Therapist for rehabilitation of Coronary Heart D...
SELF Reflection Occupational Therapist for rehabilitation of Coronary Heart D...
Home of Dissertations
 
An Overview of Customer Based Brand Equity(CBBE) Model (Case Study).pptx
An Overview of Customer Based Brand Equity(CBBE) Model (Case Study).pptxAn Overview of Customer Based Brand Equity(CBBE) Model (Case Study).pptx
An Overview of Customer Based Brand Equity(CBBE) Model (Case Study).pptx
Home of Dissertations
 
BUSINESS PLAN.pptx
BUSINESS PLAN.pptxBUSINESS PLAN.pptx
BUSINESS PLAN.pptx
Home of Dissertations
 
Global Management (Case Study).pptx
Global Management (Case Study).pptxGlobal Management (Case Study).pptx
Global Management (Case Study).pptx
Home of Dissertations
 
Knife Crime (Case Study).pptx
Knife Crime (Case Study).pptxKnife Crime (Case Study).pptx
Knife Crime (Case Study).pptx
Home of Dissertations
 
Primary Medical Care and Reduction in Addiction Severity.pptx
Primary Medical Care and Reduction in Addiction Severity.pptxPrimary Medical Care and Reduction in Addiction Severity.pptx
Primary Medical Care and Reduction in Addiction Severity.pptx
Home of Dissertations
 
Health promotion and wellbeing (CASE STUDY).pptx
Health promotion and wellbeing (CASE STUDY).pptxHealth promotion and wellbeing (CASE STUDY).pptx
Health promotion and wellbeing (CASE STUDY).pptx
Home of Dissertations
 
Three Of The Most Important HR Issues (Case Study).pptx
Three Of The Most Important HR Issues (Case Study).pptxThree Of The Most Important HR Issues (Case Study).pptx
Three Of The Most Important HR Issues (Case Study).pptx
Home of Dissertations
 
The process of performance management (CASE STUDY).pptx
The process of performance management (CASE STUDY).pptxThe process of performance management (CASE STUDY).pptx
The process of performance management (CASE STUDY).pptx
Home of Dissertations
 
Occupational Therapist (Case Study).pptx
Occupational Therapist (Case Study).pptxOccupational Therapist (Case Study).pptx
Occupational Therapist (Case Study).pptx
Home of Dissertations
 
Multi Agency (Case Study).pptx
Multi Agency (Case Study).pptxMulti Agency (Case Study).pptx
Multi Agency (Case Study).pptx
Home of Dissertations
 
Financial Accounting ( Case Study).pptx
Financial Accounting ( Case Study).pptxFinancial Accounting ( Case Study).pptx
Financial Accounting ( Case Study).pptx
Home of Dissertations
 

More from Home of Dissertations (20)

Independence and Reflection_ the ingredients for successful Learners_ -_ Chap...
Independence and Reflection_ the ingredients for successful Learners_ -_ Chap...Independence and Reflection_ the ingredients for successful Learners_ -_ Chap...
Independence and Reflection_ the ingredients for successful Learners_ -_ Chap...
 
TORTURE AND COUNTER-TERRORISM IN INTERNATIONAL LAW.pptx
TORTURE AND COUNTER-TERRORISM IN INTERNATIONAL LAW.pptxTORTURE AND COUNTER-TERRORISM IN INTERNATIONAL LAW.pptx
TORTURE AND COUNTER-TERRORISM IN INTERNATIONAL LAW.pptx
 
STAKEHOLDER ANALYSIS OF COMPANY OPORTO AND ITS RELATIONSHIP
STAKEHOLDER ANALYSIS OF COMPANY OPORTO AND ITS RELATIONSHIPSTAKEHOLDER ANALYSIS OF COMPANY OPORTO AND ITS RELATIONSHIP
STAKEHOLDER ANALYSIS OF COMPANY OPORTO AND ITS RELATIONSHIP
 
What the National Health Services offers you
What the National Health Services offers youWhat the National Health Services offers you
What the National Health Services offers you
 
The Signification of Epidemiology: A Medicine Branch
The Signification of Epidemiology: A Medicine BranchThe Signification of Epidemiology: A Medicine Branch
The Signification of Epidemiology: A Medicine Branch
 
Etihad Airways (CASE STUDY).pptx
Etihad Airways (CASE STUDY).pptxEtihad Airways (CASE STUDY).pptx
Etihad Airways (CASE STUDY).pptx
 
CUSTOMER SERVICE EXCELLENCE (CASE STUDY).pptx
CUSTOMER SERVICE EXCELLENCE (CASE STUDY).pptxCUSTOMER SERVICE EXCELLENCE (CASE STUDY).pptx
CUSTOMER SERVICE EXCELLENCE (CASE STUDY).pptx
 
Consumer engagement Starbuck (Case Study).pptx
Consumer engagement Starbuck (Case Study).pptxConsumer engagement Starbuck (Case Study).pptx
Consumer engagement Starbuck (Case Study).pptx
 
SELF Reflection Occupational Therapist for rehabilitation of Coronary Heart D...
SELF Reflection Occupational Therapist for rehabilitation of Coronary Heart D...SELF Reflection Occupational Therapist for rehabilitation of Coronary Heart D...
SELF Reflection Occupational Therapist for rehabilitation of Coronary Heart D...
 
An Overview of Customer Based Brand Equity(CBBE) Model (Case Study).pptx
An Overview of Customer Based Brand Equity(CBBE) Model (Case Study).pptxAn Overview of Customer Based Brand Equity(CBBE) Model (Case Study).pptx
An Overview of Customer Based Brand Equity(CBBE) Model (Case Study).pptx
 
BUSINESS PLAN.pptx
BUSINESS PLAN.pptxBUSINESS PLAN.pptx
BUSINESS PLAN.pptx
 
Global Management (Case Study).pptx
Global Management (Case Study).pptxGlobal Management (Case Study).pptx
Global Management (Case Study).pptx
 
Knife Crime (Case Study).pptx
Knife Crime (Case Study).pptxKnife Crime (Case Study).pptx
Knife Crime (Case Study).pptx
 
Primary Medical Care and Reduction in Addiction Severity.pptx
Primary Medical Care and Reduction in Addiction Severity.pptxPrimary Medical Care and Reduction in Addiction Severity.pptx
Primary Medical Care and Reduction in Addiction Severity.pptx
 
Health promotion and wellbeing (CASE STUDY).pptx
Health promotion and wellbeing (CASE STUDY).pptxHealth promotion and wellbeing (CASE STUDY).pptx
Health promotion and wellbeing (CASE STUDY).pptx
 
Three Of The Most Important HR Issues (Case Study).pptx
Three Of The Most Important HR Issues (Case Study).pptxThree Of The Most Important HR Issues (Case Study).pptx
Three Of The Most Important HR Issues (Case Study).pptx
 
The process of performance management (CASE STUDY).pptx
The process of performance management (CASE STUDY).pptxThe process of performance management (CASE STUDY).pptx
The process of performance management (CASE STUDY).pptx
 
Occupational Therapist (Case Study).pptx
Occupational Therapist (Case Study).pptxOccupational Therapist (Case Study).pptx
Occupational Therapist (Case Study).pptx
 
Multi Agency (Case Study).pptx
Multi Agency (Case Study).pptxMulti Agency (Case Study).pptx
Multi Agency (Case Study).pptx
 
Financial Accounting ( Case Study).pptx
Financial Accounting ( Case Study).pptxFinancial Accounting ( Case Study).pptx
Financial Accounting ( Case Study).pptx
 

Recently uploaded

ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...
ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...
ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...
PECB
 
Exploiting Artificial Intelligence for Empowering Researchers and Faculty, In...
Exploiting Artificial Intelligence for Empowering Researchers and Faculty, In...Exploiting Artificial Intelligence for Empowering Researchers and Faculty, In...
Exploiting Artificial Intelligence for Empowering Researchers and Faculty, In...
Dr. Vinod Kumar Kanvaria
 
বাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdf
বাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdfবাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdf
বাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdf
eBook.com.bd (প্রয়োজনীয় বাংলা বই)
 
MARY JANE WILSON, A “BOA MÃE” .
MARY JANE WILSON, A “BOA MÃE”           .MARY JANE WILSON, A “BOA MÃE”           .
MARY JANE WILSON, A “BOA MÃE” .
Colégio Santa Teresinha
 
Azure Interview Questions and Answers PDF By ScholarHat
Azure Interview Questions and Answers PDF By ScholarHatAzure Interview Questions and Answers PDF By ScholarHat
Azure Interview Questions and Answers PDF By ScholarHat
Scholarhat
 
Digital Artifact 1 - 10VCD Environments Unit
Digital Artifact 1 - 10VCD Environments UnitDigital Artifact 1 - 10VCD Environments Unit
Digital Artifact 1 - 10VCD Environments Unit
chanes7
 
Digital Artefact 1 - Tiny Home Environmental Design
Digital Artefact 1 - Tiny Home Environmental DesignDigital Artefact 1 - Tiny Home Environmental Design
Digital Artefact 1 - Tiny Home Environmental Design
amberjdewit93
 
Hindi varnamala | hindi alphabet PPT.pdf
Hindi varnamala | hindi alphabet PPT.pdfHindi varnamala | hindi alphabet PPT.pdf
Hindi varnamala | hindi alphabet PPT.pdf
Dr. Mulla Adam Ali
 
How to Build a Module in Odoo 17 Using the Scaffold Method
How to Build a Module in Odoo 17 Using the Scaffold MethodHow to Build a Module in Odoo 17 Using the Scaffold Method
How to Build a Module in Odoo 17 Using the Scaffold Method
Celine George
 
Film vocab for eal 3 students: Australia the movie
Film vocab for eal 3 students: Australia the movieFilm vocab for eal 3 students: Australia the movie
Film vocab for eal 3 students: Australia the movie
Nicholas Montgomery
 
Your Skill Boost Masterclass: Strategies for Effective Upskilling
Your Skill Boost Masterclass: Strategies for Effective UpskillingYour Skill Boost Masterclass: Strategies for Effective Upskilling
Your Skill Boost Masterclass: Strategies for Effective Upskilling
Excellence Foundation for South Sudan
 
The Diamonds of 2023-2024 in the IGRA collection
The Diamonds of 2023-2024 in the IGRA collectionThe Diamonds of 2023-2024 in the IGRA collection
The Diamonds of 2023-2024 in the IGRA collection
Israel Genealogy Research Association
 
Cognitive Development Adolescence Psychology
Cognitive Development Adolescence PsychologyCognitive Development Adolescence Psychology
Cognitive Development Adolescence Psychology
paigestewart1632
 
Liberal Approach to the Study of Indian Politics.pdf
Liberal Approach to the Study of Indian Politics.pdfLiberal Approach to the Study of Indian Politics.pdf
Liberal Approach to the Study of Indian Politics.pdf
WaniBasim
 
Smart-Money for SMC traders good time and ICT
Smart-Money for SMC traders good time and ICTSmart-Money for SMC traders good time and ICT
Smart-Money for SMC traders good time and ICT
simonomuemu
 
Pengantar Penggunaan Flutter - Dart programming language1.pptx
Pengantar Penggunaan Flutter - Dart programming language1.pptxPengantar Penggunaan Flutter - Dart programming language1.pptx
Pengantar Penggunaan Flutter - Dart programming language1.pptx
Fajar Baskoro
 
Chapter 4 - Islamic Financial Institutions in Malaysia.pptx
Chapter 4 - Islamic Financial Institutions in Malaysia.pptxChapter 4 - Islamic Financial Institutions in Malaysia.pptx
Chapter 4 - Islamic Financial Institutions in Malaysia.pptx
Mohd Adib Abd Muin, Senior Lecturer at Universiti Utara Malaysia
 
Advanced Java[Extra Concepts, Not Difficult].docx
Advanced Java[Extra Concepts, Not Difficult].docxAdvanced Java[Extra Concepts, Not Difficult].docx
Advanced Java[Extra Concepts, Not Difficult].docx
adhitya5119
 
LAND USE LAND COVER AND NDVI OF MIRZAPUR DISTRICT, UP
LAND USE LAND COVER AND NDVI OF MIRZAPUR DISTRICT, UPLAND USE LAND COVER AND NDVI OF MIRZAPUR DISTRICT, UP
LAND USE LAND COVER AND NDVI OF MIRZAPUR DISTRICT, UP
RAHUL
 
South African Journal of Science: Writing with integrity workshop (2024)
South African Journal of Science: Writing with integrity workshop (2024)South African Journal of Science: Writing with integrity workshop (2024)
South African Journal of Science: Writing with integrity workshop (2024)
Academy of Science of South Africa
 

Recently uploaded (20)

ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...
ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...
ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...
 
Exploiting Artificial Intelligence for Empowering Researchers and Faculty, In...
Exploiting Artificial Intelligence for Empowering Researchers and Faculty, In...Exploiting Artificial Intelligence for Empowering Researchers and Faculty, In...
Exploiting Artificial Intelligence for Empowering Researchers and Faculty, In...
 
বাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdf
বাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdfবাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdf
বাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdf
 
MARY JANE WILSON, A “BOA MÃE” .
MARY JANE WILSON, A “BOA MÃE”           .MARY JANE WILSON, A “BOA MÃE”           .
MARY JANE WILSON, A “BOA MÃE” .
 
Azure Interview Questions and Answers PDF By ScholarHat
Azure Interview Questions and Answers PDF By ScholarHatAzure Interview Questions and Answers PDF By ScholarHat
Azure Interview Questions and Answers PDF By ScholarHat
 
Digital Artifact 1 - 10VCD Environments Unit
Digital Artifact 1 - 10VCD Environments UnitDigital Artifact 1 - 10VCD Environments Unit
Digital Artifact 1 - 10VCD Environments Unit
 
Digital Artefact 1 - Tiny Home Environmental Design
Digital Artefact 1 - Tiny Home Environmental DesignDigital Artefact 1 - Tiny Home Environmental Design
Digital Artefact 1 - Tiny Home Environmental Design
 
Hindi varnamala | hindi alphabet PPT.pdf
Hindi varnamala | hindi alphabet PPT.pdfHindi varnamala | hindi alphabet PPT.pdf
Hindi varnamala | hindi alphabet PPT.pdf
 
How to Build a Module in Odoo 17 Using the Scaffold Method
How to Build a Module in Odoo 17 Using the Scaffold MethodHow to Build a Module in Odoo 17 Using the Scaffold Method
How to Build a Module in Odoo 17 Using the Scaffold Method
 
Film vocab for eal 3 students: Australia the movie
Film vocab for eal 3 students: Australia the movieFilm vocab for eal 3 students: Australia the movie
Film vocab for eal 3 students: Australia the movie
 
Your Skill Boost Masterclass: Strategies for Effective Upskilling
Your Skill Boost Masterclass: Strategies for Effective UpskillingYour Skill Boost Masterclass: Strategies for Effective Upskilling
Your Skill Boost Masterclass: Strategies for Effective Upskilling
 
The Diamonds of 2023-2024 in the IGRA collection
The Diamonds of 2023-2024 in the IGRA collectionThe Diamonds of 2023-2024 in the IGRA collection
The Diamonds of 2023-2024 in the IGRA collection
 
Cognitive Development Adolescence Psychology
Cognitive Development Adolescence PsychologyCognitive Development Adolescence Psychology
Cognitive Development Adolescence Psychology
 
Liberal Approach to the Study of Indian Politics.pdf
Liberal Approach to the Study of Indian Politics.pdfLiberal Approach to the Study of Indian Politics.pdf
Liberal Approach to the Study of Indian Politics.pdf
 
Smart-Money for SMC traders good time and ICT
Smart-Money for SMC traders good time and ICTSmart-Money for SMC traders good time and ICT
Smart-Money for SMC traders good time and ICT
 
Pengantar Penggunaan Flutter - Dart programming language1.pptx
Pengantar Penggunaan Flutter - Dart programming language1.pptxPengantar Penggunaan Flutter - Dart programming language1.pptx
Pengantar Penggunaan Flutter - Dart programming language1.pptx
 
Chapter 4 - Islamic Financial Institutions in Malaysia.pptx
Chapter 4 - Islamic Financial Institutions in Malaysia.pptxChapter 4 - Islamic Financial Institutions in Malaysia.pptx
Chapter 4 - Islamic Financial Institutions in Malaysia.pptx
 
Advanced Java[Extra Concepts, Not Difficult].docx
Advanced Java[Extra Concepts, Not Difficult].docxAdvanced Java[Extra Concepts, Not Difficult].docx
Advanced Java[Extra Concepts, Not Difficult].docx
 
LAND USE LAND COVER AND NDVI OF MIRZAPUR DISTRICT, UP
LAND USE LAND COVER AND NDVI OF MIRZAPUR DISTRICT, UPLAND USE LAND COVER AND NDVI OF MIRZAPUR DISTRICT, UP
LAND USE LAND COVER AND NDVI OF MIRZAPUR DISTRICT, UP
 
South African Journal of Science: Writing with integrity workshop (2024)
South African Journal of Science: Writing with integrity workshop (2024)South African Journal of Science: Writing with integrity workshop (2024)
South African Journal of Science: Writing with integrity workshop (2024)
 

Project Delivery Strategy (Design-Build) Case Study.pptx

  • 1. Project Delivery Strategy (Design-Build) Case Study Company Name: Home Of Dissertations Website: https://www.dissertationhomework.com/ Contact Number: +44-7842798340 Connect Now
  • 2. Project Management Delivery Team Strategy Factors determining strategy used.  Investor/sponsor experience, qualification and capability  Scope of the project.  Organization and project objectives.  Client attitude towards the market and project.  Nature of project.  Market conditions. Strategy.  Develop and construct.  Design and build.  Design and manage  Package deal. Delivery Team and Function Team Member include.  Contractor  Prepares the proposals and brief.  Prepare schedule and cost structure.  Designer  Project Manager  Suppliers.  Investor/client  Consultants.
  • 3. Phase and Procurement Route (Newham council; housing social care and a community hub) Phases.  Hughes (1991) divided the project delivery into 7 stages. 1. Inception stage. 2. Feasibility. 3. Scheme design. 4. Detail design stage. 5. Contract stage 6. Construction stage. 7. Commissioning. Procurement route Type; There are three type main used, Namely: 1. Traditional/design-bid-build. 2. Design and build. 3. Design/develop and construct. The constructor is identified at the beginning of the project. Enables:  Partnering – improves communication and work towards same objectives.  Facilitates integrated project delivery system. incentivizes collaboration and team risk-sharing.  Commissioning particularly at the beginning of the project.  Close relation with contracting and acquisition officials.
  • 4. Reference.  Berkun, S., & Berkun, S. (2008). Making things happen: Mastering project management. Beijing: O'Reilly  Hughes, W. (1991). "Modelling the construction process using plans of work." Paper to Construction Project modelling and Productivity, Dubrovnik, pp 81-86.  Newton, R. (2013). The project management book. England : Pearson  Ojo, S.O. and Ikpo,J. (2013). Determining the Performance of Procurement Methods against Selection Criteria using Outranking – Satisfying Methodology. Journal of Engineering, Project, and Production Management, 3(2), pp.74-84.  Young, T. L. (2013). Successful project management. Philadelphia, PA : Kogan Page Limited,
  • 5. Contact us now Website: https://www.dissertationhomework.com/ Contact Number: +44-7842798340 Connect Now

Editor's Notes

  1. Project Delivery is a contractual agreement between the project sponsor/investors, contractors and the management normally it is used to in design and construct of the project (Young, 2013). There are a number of strategy of deliverance including traditional method and a design build. A single entity provides both the design and construction of the project (Must meet the both the design and performance requirement specified). Design and Build is primarily based on the interest of the client and emphasize on the client value of his/her money (Newton, 2013). Delivery team member representation mainly depends on the project budget, professional and support staff resources. The conditions between the contractor and designer serve to; minimize project cost, follow schedule and scope of work (Newton, 2013).
  2. The design and build approach brings the whole process under a single directly controlled by the client for greater effectiveness, integration and better constructability (Young, 2013).Development of a effective delivery strategy significantly affects the project (Berkun & Berkun, 2008). The strategies adopted is largely determined by investor’s involvement. A design and build is an collaborative form with seven delivery stage (Ojo and Ikpo, 2013). The procurement technique and route influence the partnering between the design consultant and main constructor also collaborating with the investors, fostering better communication. In this form, integrated project delivery system in assimilated into the project (Newton, 2013). Three procurement route are mainly used, namely; Traditional/Design-bid-build, Design and Build and design and construct. Each varying with the method used to procure or rather the line of communication between the project participants. Traditional (Design-bid-Build): It’s a single-stage where the consultant team develop the project schematics fully, penalties imposed on lateness makes it time-conscious. On the other hand, the contractor have no or limited responsibility. Design and Build: the main contractor designs and construct the project beforehand. In this form, a single point of references is used enhancing responsibilities for the project deliverance. However, its applicable mostly for small projects where emphasize of the design is not made. Develop and construct; similar to design and build but the design is completed before the contractor is appointed. A lot of opportunities are neglected or miss though.