SlideShare a Scribd company logo
Production
Planning
Labor and
Machine
Hours
Committing
Process to ERP
System
Design receiving from FM (3Di
& Panel)
Nesting – Nest design files for
cutting production
File processing – Process design
files for 3Di production
Ticket checking
Order desk – Accepting sales
orders
Panel Sails
3Di Sails
Labor and Machine Hours Committing Process to ERP
System
Downloading the file processed or nested design package from
the server.
Ticket checking
Uploading the ticket checked design file into the production
server.
Downloading the edited BOM that was sent by the ticket checking
team.
Updating the D365 BOM according to the edited BOM.
Demand forecasting
Capacity planning
Production scheduling
Resource allocation
Monitoring and control
Demand forecasting: Forecasting
the demand for the product or
service is an essential step in
production planning. This involves
analyzing historical sales data,
market trends, and customer
behavior to predict future demand.
Capacity planning: Once the
demand is forecasted, the
production capacity required to
meet the demand needs to be
determined. Capacity planning
involves assessing the availability of
resources such as labor, machinery,
and materials to determine how
much can be produced.
Production scheduling: Once the
capacity is determined, the next
step is to develop a production
schedule. This involves determining
the order in which products will be
produced, the quantity to be
produced, and the time required to
produce each product.
Resource allocation: Resources
such as labor, machinery, and
materials need to be allocated to
ensure that the production
schedule is met.
Monitoring and control: Finally, the
production process needs to be
monitored and controlled to ensure
that the plan is being executed as
intended. This involves tracking
progress against the production
schedule, identifying and
addressing issues that arise, and
making adjustments to the plan as
necessary.
Capacity Planning
MACHINE HOURS LABOR HOURS RAW MATERIAL
Machine Hours
3D Department
Cutting Department
North Cloth Department
Printing Department
3D
Department
There are the four fixed non moving machines.
Pregger
Tapehead
Mold
Gantry
Cutting
Department
Types of
Plotters
Blade(5) Laser(5)
Cutting Operation Hours Calculation Report
• Assume plotter machine operate hours for one plotter per day is 22
hrs.
• There are 5 blade plotters and 5 laser plotters.
• Plotter machines operates for 7 days.
• Total machine hours from Blade plotter per day is 22*5*7=770hrs.
• Total machine hours from Laser plotter per day is 22*5*7=770hrs.
• We create cutting report once a week based on the total machine
hours and delivery date.
Production Planning.pptx

More Related Content

Similar to Production Planning.pptx

Unit 2
Unit 2Unit 2
Unit 2
dinesh babu
 
PROCESS PLANNING 1.pptx
PROCESS PLANNING 1.pptxPROCESS PLANNING 1.pptx
PROCESS PLANNING 1.pptx
murugarajan001
 
4.Process Planning and Line Balancing.pptx
4.Process Planning and Line Balancing.pptx4.Process Planning and Line Balancing.pptx
4.Process Planning and Line Balancing.pptx
virshit
 
Production Planning & Control Book
Production Planning & Control BookProduction Planning & Control Book
Production Planning & Control Book
Learn With GeekAlign
 
Syed mohamed ak
Syed mohamed akSyed mohamed ak
Syed mohamed ak
Syed Mohamed
 
Production planning and control
Production planning and controlProduction planning and control
Production planning and control
Ratnadeepsinh Jadeja
 
COMPUTER AIDED PROCESS PLANNING
COMPUTER AIDED PROCESS PLANNINGCOMPUTER AIDED PROCESS PLANNING
COMPUTER AIDED PROCESS PLANNING
jntuhcej
 
Computer – Aided process planning (CAPP)
Computer – Aided process planning (CAPP)Computer – Aided process planning (CAPP)
Computer – Aided process planning (CAPP)
jntuhcej
 
Software Solution for Production Planning and Scheduling
Software Solution for Production Planning and SchedulingSoftware Solution for Production Planning and Scheduling
Software Solution for Production Planning and Scheduling
IRJET Journal
 
Production Planning & Control
Production Planning & ControlProduction Planning & Control
Production Planning & Control
KunalJagtap5
 
PPC and functions of PPC.pptx
PPC and functions of PPC.pptxPPC and functions of PPC.pptx
PPC and functions of PPC.pptx
IbrahimFakkad
 
Introduction to Production Planning & Control & Manufacturing.pptx
Introduction to Production Planning & Control & Manufacturing.pptxIntroduction to Production Planning & Control & Manufacturing.pptx
Introduction to Production Planning & Control & Manufacturing.pptx
Tarek Erin
 
Production planning & control
Production planning & controlProduction planning & control
Production planning & control
Brijesh Kandu
 
PMC_CHAPTER 3_ PPC.pptx
PMC_CHAPTER 3_ PPC.pptxPMC_CHAPTER 3_ PPC.pptx
PMC_CHAPTER 3_ PPC.pptx
yeshuniju2007
 
Process planning approaches
Process planning approaches Process planning approaches
Process planning approaches
chethan kumar
 
Production planning and Control, Sale's forecasting
Production planning and Control, Sale's forecastingProduction planning and Control, Sale's forecasting
Production planning and Control, Sale's forecasting
TabassumShaikh36
 
New text document
New text documentNew text document
New text documentsalunkhev15
 
MFG 240 - Manufacturing DesignFinal ProjectScope of Project.docx
MFG 240 - Manufacturing DesignFinal ProjectScope of Project.docxMFG 240 - Manufacturing DesignFinal ProjectScope of Project.docx
MFG 240 - Manufacturing DesignFinal ProjectScope of Project.docx
ARIV4
 
Material requirement planning (mrp)
Material requirement planning (mrp)Material requirement planning (mrp)
Material requirement planning (mrp)
Somashekar S.M
 

Similar to Production Planning.pptx (20)

Unit 2
Unit 2Unit 2
Unit 2
 
PROCESS PLANNING 1.pptx
PROCESS PLANNING 1.pptxPROCESS PLANNING 1.pptx
PROCESS PLANNING 1.pptx
 
4.Process Planning and Line Balancing.pptx
4.Process Planning and Line Balancing.pptx4.Process Planning and Line Balancing.pptx
4.Process Planning and Line Balancing.pptx
 
UNIT VI-3.pptx
UNIT VI-3.pptxUNIT VI-3.pptx
UNIT VI-3.pptx
 
Production Planning & Control Book
Production Planning & Control BookProduction Planning & Control Book
Production Planning & Control Book
 
Syed mohamed ak
Syed mohamed akSyed mohamed ak
Syed mohamed ak
 
Production planning and control
Production planning and controlProduction planning and control
Production planning and control
 
COMPUTER AIDED PROCESS PLANNING
COMPUTER AIDED PROCESS PLANNINGCOMPUTER AIDED PROCESS PLANNING
COMPUTER AIDED PROCESS PLANNING
 
Computer – Aided process planning (CAPP)
Computer – Aided process planning (CAPP)Computer – Aided process planning (CAPP)
Computer – Aided process planning (CAPP)
 
Software Solution for Production Planning and Scheduling
Software Solution for Production Planning and SchedulingSoftware Solution for Production Planning and Scheduling
Software Solution for Production Planning and Scheduling
 
Production Planning & Control
Production Planning & ControlProduction Planning & Control
Production Planning & Control
 
PPC and functions of PPC.pptx
PPC and functions of PPC.pptxPPC and functions of PPC.pptx
PPC and functions of PPC.pptx
 
Introduction to Production Planning & Control & Manufacturing.pptx
Introduction to Production Planning & Control & Manufacturing.pptxIntroduction to Production Planning & Control & Manufacturing.pptx
Introduction to Production Planning & Control & Manufacturing.pptx
 
Production planning & control
Production planning & controlProduction planning & control
Production planning & control
 
PMC_CHAPTER 3_ PPC.pptx
PMC_CHAPTER 3_ PPC.pptxPMC_CHAPTER 3_ PPC.pptx
PMC_CHAPTER 3_ PPC.pptx
 
Process planning approaches
Process planning approaches Process planning approaches
Process planning approaches
 
Production planning and Control, Sale's forecasting
Production planning and Control, Sale's forecastingProduction planning and Control, Sale's forecasting
Production planning and Control, Sale's forecasting
 
New text document
New text documentNew text document
New text document
 
MFG 240 - Manufacturing DesignFinal ProjectScope of Project.docx
MFG 240 - Manufacturing DesignFinal ProjectScope of Project.docxMFG 240 - Manufacturing DesignFinal ProjectScope of Project.docx
MFG 240 - Manufacturing DesignFinal ProjectScope of Project.docx
 
Material requirement planning (mrp)
Material requirement planning (mrp)Material requirement planning (mrp)
Material requirement planning (mrp)
 

Recently uploaded

ikea_woodgreen_petscharity_cat-alogue_digital.pdf
ikea_woodgreen_petscharity_cat-alogue_digital.pdfikea_woodgreen_petscharity_cat-alogue_digital.pdf
ikea_woodgreen_petscharity_cat-alogue_digital.pdf
agatadrynko
 
The key differences between the MDR and IVDR in the EU
The key differences between the MDR and IVDR in the EUThe key differences between the MDR and IVDR in the EU
The key differences between the MDR and IVDR in the EU
Allensmith572606
 
LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024
Lital Barkan
 
The Influence of Marketing Strategy and Market Competition on Business Perfor...
The Influence of Marketing Strategy and Market Competition on Business Perfor...The Influence of Marketing Strategy and Market Competition on Business Perfor...
The Influence of Marketing Strategy and Market Competition on Business Perfor...
Adam Smith
 
-- June 2024 is National Volunteer Month --
-- June 2024 is National Volunteer Month ---- June 2024 is National Volunteer Month --
-- June 2024 is National Volunteer Month --
NZSG
 
Putting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptxPutting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptx
Cynthia Clay
 
Buy Verified PayPal Account | Buy Google 5 Star Reviews
Buy Verified PayPal Account | Buy Google 5 Star ReviewsBuy Verified PayPal Account | Buy Google 5 Star Reviews
Buy Verified PayPal Account | Buy Google 5 Star Reviews
usawebmarket
 
VAT Registration Outlined In UAE: Benefits and Requirements
VAT Registration Outlined In UAE: Benefits and RequirementsVAT Registration Outlined In UAE: Benefits and Requirements
VAT Registration Outlined In UAE: Benefits and Requirements
uae taxgpt
 
Bài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc
Bài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.docBài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc
Bài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc
daothibichhang1
 
Premium MEAN Stack Development Solutions for Modern Businesses
Premium MEAN Stack Development Solutions for Modern BusinessesPremium MEAN Stack Development Solutions for Modern Businesses
Premium MEAN Stack Development Solutions for Modern Businesses
SynapseIndia
 
Authentically Social Presented by Corey Perlman
Authentically Social Presented by Corey PerlmanAuthentically Social Presented by Corey Perlman
Authentically Social Presented by Corey Perlman
Corey Perlman, Social Media Speaker and Consultant
 
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
taqyed
 
What is the TDS Return Filing Due Date for FY 2024-25.pdf
What is the TDS Return Filing Due Date for FY 2024-25.pdfWhat is the TDS Return Filing Due Date for FY 2024-25.pdf
What is the TDS Return Filing Due Date for FY 2024-25.pdf
seoforlegalpillers
 
Digital Transformation and IT Strategy Toolkit and Templates
Digital Transformation and IT Strategy Toolkit and TemplatesDigital Transformation and IT Strategy Toolkit and Templates
Digital Transformation and IT Strategy Toolkit and Templates
Aurelien Domont, MBA
 
Sustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & EconomySustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & Economy
Operational Excellence Consulting
 
Business Valuation Principles for Entrepreneurs
Business Valuation Principles for EntrepreneursBusiness Valuation Principles for Entrepreneurs
Business Valuation Principles for Entrepreneurs
Ben Wann
 
The Parable of the Pipeline a book every new businessman or business student ...
The Parable of the Pipeline a book every new businessman or business student ...The Parable of the Pipeline a book every new businessman or business student ...
The Parable of the Pipeline a book every new businessman or business student ...
awaisafdar
 
Exploring Patterns of Connection with Social Dreaming
Exploring Patterns of Connection with Social DreamingExploring Patterns of Connection with Social Dreaming
Exploring Patterns of Connection with Social Dreaming
Nicola Wreford-Howard
 
20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf
tjcomstrang
 
Set off and carry forward of losses and assessment of individuals.pptx
Set off and carry forward of losses and assessment of individuals.pptxSet off and carry forward of losses and assessment of individuals.pptx
Set off and carry forward of losses and assessment of individuals.pptx
HARSHITHV26
 

Recently uploaded (20)

ikea_woodgreen_petscharity_cat-alogue_digital.pdf
ikea_woodgreen_petscharity_cat-alogue_digital.pdfikea_woodgreen_petscharity_cat-alogue_digital.pdf
ikea_woodgreen_petscharity_cat-alogue_digital.pdf
 
The key differences between the MDR and IVDR in the EU
The key differences between the MDR and IVDR in the EUThe key differences between the MDR and IVDR in the EU
The key differences between the MDR and IVDR in the EU
 
LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024
 
The Influence of Marketing Strategy and Market Competition on Business Perfor...
The Influence of Marketing Strategy and Market Competition on Business Perfor...The Influence of Marketing Strategy and Market Competition on Business Perfor...
The Influence of Marketing Strategy and Market Competition on Business Perfor...
 
-- June 2024 is National Volunteer Month --
-- June 2024 is National Volunteer Month ---- June 2024 is National Volunteer Month --
-- June 2024 is National Volunteer Month --
 
Putting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptxPutting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptx
 
Buy Verified PayPal Account | Buy Google 5 Star Reviews
Buy Verified PayPal Account | Buy Google 5 Star ReviewsBuy Verified PayPal Account | Buy Google 5 Star Reviews
Buy Verified PayPal Account | Buy Google 5 Star Reviews
 
VAT Registration Outlined In UAE: Benefits and Requirements
VAT Registration Outlined In UAE: Benefits and RequirementsVAT Registration Outlined In UAE: Benefits and Requirements
VAT Registration Outlined In UAE: Benefits and Requirements
 
Bài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc
Bài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.docBài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc
Bài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc
 
Premium MEAN Stack Development Solutions for Modern Businesses
Premium MEAN Stack Development Solutions for Modern BusinessesPremium MEAN Stack Development Solutions for Modern Businesses
Premium MEAN Stack Development Solutions for Modern Businesses
 
Authentically Social Presented by Corey Perlman
Authentically Social Presented by Corey PerlmanAuthentically Social Presented by Corey Perlman
Authentically Social Presented by Corey Perlman
 
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
 
What is the TDS Return Filing Due Date for FY 2024-25.pdf
What is the TDS Return Filing Due Date for FY 2024-25.pdfWhat is the TDS Return Filing Due Date for FY 2024-25.pdf
What is the TDS Return Filing Due Date for FY 2024-25.pdf
 
Digital Transformation and IT Strategy Toolkit and Templates
Digital Transformation and IT Strategy Toolkit and TemplatesDigital Transformation and IT Strategy Toolkit and Templates
Digital Transformation and IT Strategy Toolkit and Templates
 
Sustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & EconomySustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & Economy
 
Business Valuation Principles for Entrepreneurs
Business Valuation Principles for EntrepreneursBusiness Valuation Principles for Entrepreneurs
Business Valuation Principles for Entrepreneurs
 
The Parable of the Pipeline a book every new businessman or business student ...
The Parable of the Pipeline a book every new businessman or business student ...The Parable of the Pipeline a book every new businessman or business student ...
The Parable of the Pipeline a book every new businessman or business student ...
 
Exploring Patterns of Connection with Social Dreaming
Exploring Patterns of Connection with Social DreamingExploring Patterns of Connection with Social Dreaming
Exploring Patterns of Connection with Social Dreaming
 
20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf
 
Set off and carry forward of losses and assessment of individuals.pptx
Set off and carry forward of losses and assessment of individuals.pptxSet off and carry forward of losses and assessment of individuals.pptx
Set off and carry forward of losses and assessment of individuals.pptx
 

Production Planning.pptx

  • 2. Labor and Machine Hours Committing Process to ERP System Design receiving from FM (3Di & Panel) Nesting – Nest design files for cutting production File processing – Process design files for 3Di production Ticket checking Order desk – Accepting sales orders Panel Sails 3Di Sails
  • 3. Labor and Machine Hours Committing Process to ERP System Downloading the file processed or nested design package from the server. Ticket checking Uploading the ticket checked design file into the production server. Downloading the edited BOM that was sent by the ticket checking team. Updating the D365 BOM according to the edited BOM.
  • 4.
  • 5. Demand forecasting Capacity planning Production scheduling Resource allocation Monitoring and control
  • 6. Demand forecasting: Forecasting the demand for the product or service is an essential step in production planning. This involves analyzing historical sales data, market trends, and customer behavior to predict future demand. Capacity planning: Once the demand is forecasted, the production capacity required to meet the demand needs to be determined. Capacity planning involves assessing the availability of resources such as labor, machinery, and materials to determine how much can be produced. Production scheduling: Once the capacity is determined, the next step is to develop a production schedule. This involves determining the order in which products will be produced, the quantity to be produced, and the time required to produce each product. Resource allocation: Resources such as labor, machinery, and materials need to be allocated to ensure that the production schedule is met. Monitoring and control: Finally, the production process needs to be monitored and controlled to ensure that the plan is being executed as intended. This involves tracking progress against the production schedule, identifying and addressing issues that arise, and making adjustments to the plan as necessary.
  • 7. Capacity Planning MACHINE HOURS LABOR HOURS RAW MATERIAL
  • 8. Machine Hours 3D Department Cutting Department North Cloth Department Printing Department
  • 9. 3D Department There are the four fixed non moving machines. Pregger Tapehead Mold Gantry
  • 10.
  • 12. Cutting Operation Hours Calculation Report
  • 13. • Assume plotter machine operate hours for one plotter per day is 22 hrs. • There are 5 blade plotters and 5 laser plotters. • Plotter machines operates for 7 days. • Total machine hours from Blade plotter per day is 22*5*7=770hrs. • Total machine hours from Laser plotter per day is 22*5*7=770hrs. • We create cutting report once a week based on the total machine hours and delivery date.