Production Diary- Day 3
Date- 22/11/16
Location- Art room,MansheadSchool,Dunstable
Scene(s) filmed- Titlesequence
Thiswas our final dayof production;we managedtofinishfilmingeverythingwe neededforthe title
sequence byusingthe drawingsprovidedbyCaraour illustratoraswell asa camera andtripod
providedbyChris.We filmedall footageinjustunderanhour sowe filmedfairlyquickly.
Evaluation
Overall, the groupwere all satisfiedwiththe qualityof workproducedandanyshotsthat were not
completelyuptoourstandardswere agreedtobe editedbymiles.We all contributedintothe
filmingof the shotstomake sure everythingwassuitableforthe title sequence.Whenreviewing
footage we all agreedeverythingwasuptoa goodstandard.

Production diary day 3

  • 1.
    Production Diary- Day3 Date- 22/11/16 Location- Art room,MansheadSchool,Dunstable Scene(s) filmed- Titlesequence Thiswas our final dayof production;we managedtofinishfilmingeverythingwe neededforthe title sequence byusingthe drawingsprovidedbyCaraour illustratoraswell asa camera andtripod providedbyChris.We filmedall footageinjustunderanhour sowe filmedfairlyquickly. Evaluation Overall, the groupwere all satisfiedwiththe qualityof workproducedandanyshotsthat were not completelyuptoourstandardswere agreedtobe editedbymiles.We all contributedintothe filmingof the shotstomake sure everythingwassuitableforthe title sequence.Whenreviewing footage we all agreedeverythingwasuptoa goodstandard.