Download free for 30 days
Sign in
Upload
Language (EN)
Support
Business
Mobile
Social Media
Marketing
Technology
Art & Photos
Career
Design
Education
Presentations & Public Speaking
Government & Nonprofit
Healthcare
Internet
Law
Leadership & Management
Automotive
Engineering
Software
Recruiting & HR
Retail
Sales
Services
Science
Small Business & Entrepreneurship
Food
Environment
Economy & Finance
Data & Analytics
Investor Relations
Sports
Spiritual
News & Politics
Travel
Self Improvement
Real Estate
Entertainment & Humor
Health & Medicine
Devices & Hardware
Lifestyle
Change Language
Language
English
Español
Português
Français
Deutsche
Cancel
Save
Submit search
EN
Uploaded by
DinaAllam10
PPT, PDF
134 views
Procurement Principles : Project Procurement
Procurement Principles : Project Procurement
Business
◦
Read more
0
Save
Share
Embed
Embed presentation
Download
Download to read offline
1
/ 30
2
/ 30
Most read
3
/ 30
4
/ 30
5
/ 30
6
/ 30
7
/ 30
8
/ 30
9
/ 30
10
/ 30
11
/ 30
12
/ 30
13
/ 30
Most read
14
/ 30
15
/ 30
16
/ 30
17
/ 30
18
/ 30
19
/ 30
20
/ 30
21
/ 30
22
/ 30
23
/ 30
24
/ 30
25
/ 30
26
/ 30
27
/ 30
28
/ 30
29
/ 30
30
/ 30
More Related Content
PPTX
Risk Areas in Public Procurement (1).pptx
by
HakimuNsubuga2
PPTX
Real world sourcing - Taking on a New Category
by
BravoSolution
PDF
Project Risk Management
by
Biju Nair
PDF
APM Practitioner Qualification revision cards
by
Jacobs Engineering
PPT
100322 Procurement for Planning Managers
by
Dr Gordon Murray
PDF
Managing procurement to improve front line services
by
Association of Colleges
PDF
Managing procurement to improve front line services
by
Association of Colleges
PDF
Riskallocationmodel
by
Martin Ellis
Risk Areas in Public Procurement (1).pptx
by
HakimuNsubuga2
Real world sourcing - Taking on a New Category
by
BravoSolution
Project Risk Management
by
Biju Nair
APM Practitioner Qualification revision cards
by
Jacobs Engineering
100322 Procurement for Planning Managers
by
Dr Gordon Murray
Managing procurement to improve front line services
by
Association of Colleges
Managing procurement to improve front line services
by
Association of Colleges
Riskallocationmodel
by
Martin Ellis
Similar to Procurement Principles : Project Procurement
PPTX
DEPT OF PSCM ppt PUS 213 L5 DEPT OF PSCM ppt PUS 213 L4.understanding procure...
by
paxtonwills02
PDF
Section 01 Procurement Fundamentals
by
Avik Munshi
PPT
Risk management and opprtuinty _pp10.ppt
by
DrAtefRagab2
PDF
Risk management concepts and learning
by
Vanita Ahuja
PPTX
2. Risk Management Analysis and Register.pptx
by
robmente
PPTX
2. Project Risk Assessment and the Risk MAtrix
by
MusyokiMusyoka1
PPTX
PMO Manual v2.0 June-18.pptx
by
Ashfaq Ahmad
PDF
Project Risk Management
by
Russell Taylor BEng CEng FAPM FIET
PPT
Project Planning and control in Software Engineering
by
RaghavendraPrasad179187
PPTX
Alan Watt - APM Assurance SIG Conference 2018
by
Association for Project Management
PPTX
APM Edinburgh risk management january 2017 final
by
Association for Project Management
PPTX
Lecture 6 Managing risk.pptx
by
MehediHasan636262
PPT
Spm
by
Suresh Kumar
PPT
Risk management
by
tumetr1
PDF
Risky Business
by
3gamma
PPTX
CAPM Muzette Charles Chapter11-13
by
Muzette Charles, PMP
PPT
bpm-risk-analysis
by
Holly E. Rogers
PPT
Strategic procurement for councillors
by
Dr Gordon Murray
PDF
What is a Company? Where Can I Make An Impact? כנס IIA ישראל 4.1.18
by
Inna Golderbiter
PDF
Understanding and Managing Risk in Complex Supply Chain Projects
by
Derek Hill
DEPT OF PSCM ppt PUS 213 L5 DEPT OF PSCM ppt PUS 213 L4.understanding procure...
by
paxtonwills02
Section 01 Procurement Fundamentals
by
Avik Munshi
Risk management and opprtuinty _pp10.ppt
by
DrAtefRagab2
Risk management concepts and learning
by
Vanita Ahuja
2. Risk Management Analysis and Register.pptx
by
robmente
2. Project Risk Assessment and the Risk MAtrix
by
MusyokiMusyoka1
PMO Manual v2.0 June-18.pptx
by
Ashfaq Ahmad
Project Risk Management
by
Russell Taylor BEng CEng FAPM FIET
Project Planning and control in Software Engineering
by
RaghavendraPrasad179187
Alan Watt - APM Assurance SIG Conference 2018
by
Association for Project Management
APM Edinburgh risk management january 2017 final
by
Association for Project Management
Lecture 6 Managing risk.pptx
by
MehediHasan636262
Spm
by
Suresh Kumar
Risk management
by
tumetr1
Risky Business
by
3gamma
CAPM Muzette Charles Chapter11-13
by
Muzette Charles, PMP
bpm-risk-analysis
by
Holly E. Rogers
Strategic procurement for councillors
by
Dr Gordon Murray
What is a Company? Where Can I Make An Impact? כנס IIA ישראל 4.1.18
by
Inna Golderbiter
Understanding and Managing Risk in Complex Supply Chain Projects
by
Derek Hill
More from DinaAllam10
PPT
Procurement Principles : Key areas in Negotiation
by
DinaAllam10
PPTX
Service Operations Management Framing service operations
by
DinaAllam10
PPTX
Service Operations Management; The world of service
by
DinaAllam10
PPTX
Retail Management: The Strategic Approach
by
DinaAllam10
PPT
Logistics management: Sourcing and procurement
by
DinaAllam10
PPTX
Building And Sustaining Relationships In Retailing
by
DinaAllam10
PPT
Logistics future challenges and opportunities
by
DinaAllam10
PPTX
Foundations of Business: Stakeholders Groups
by
DinaAllam10
PPTX
Lean Six Sigma Process Improvement Tools and Techniques: Design of Experiments
by
DinaAllam10
PPTX
Selling Today: Developing Personal Selling Philosophy
by
DinaAllam10
PPTX
Evolution of Selling Models that Complement the Marketing Concept
by
DinaAllam10
PPTX
Lean Six Sigma: Process Improvement Tools and Techniques
by
DinaAllam10
PPTX
Managing Operations ; Management Global Ed
by
DinaAllam10
PPTX
managerial accounting and financial accounting
by
DinaAllam10
PPTX
Reviewed FBCE_Ch13.Union Management Issues
by
DinaAllam10
PPTX
Compare and contrast theories of motivation
by
DinaAllam10
PPTX
personal finances and financial planning.
by
DinaAllam10
PPTX
Understanding and Managing Individual Behavior
by
DinaAllam10
PPTX
foundational philosophies of capitalism and socialism
by
DinaAllam10
PPTX
Reviewed FBCE_Ch14.Marketing Providing Value
by
DinaAllam10
Procurement Principles : Key areas in Negotiation
by
DinaAllam10
Service Operations Management Framing service operations
by
DinaAllam10
Service Operations Management; The world of service
by
DinaAllam10
Retail Management: The Strategic Approach
by
DinaAllam10
Logistics management: Sourcing and procurement
by
DinaAllam10
Building And Sustaining Relationships In Retailing
by
DinaAllam10
Logistics future challenges and opportunities
by
DinaAllam10
Foundations of Business: Stakeholders Groups
by
DinaAllam10
Lean Six Sigma Process Improvement Tools and Techniques: Design of Experiments
by
DinaAllam10
Selling Today: Developing Personal Selling Philosophy
by
DinaAllam10
Evolution of Selling Models that Complement the Marketing Concept
by
DinaAllam10
Lean Six Sigma: Process Improvement Tools and Techniques
by
DinaAllam10
Managing Operations ; Management Global Ed
by
DinaAllam10
managerial accounting and financial accounting
by
DinaAllam10
Reviewed FBCE_Ch13.Union Management Issues
by
DinaAllam10
Compare and contrast theories of motivation
by
DinaAllam10
personal finances and financial planning.
by
DinaAllam10
Understanding and Managing Individual Behavior
by
DinaAllam10
foundational philosophies of capitalism and socialism
by
DinaAllam10
Reviewed FBCE_Ch14.Marketing Providing Value
by
DinaAllam10
Recently uploaded
PDF
Buy TikTok Seller Account in 2025_ What the Term Really ....pdf
by
zgaptxdary3819la63qg
PDF
Inspirational Icon to Watch in 2025.
by
insightssuccess2
PDF
Buy Verified Cash App Accounts in 2026 – High-Limit Verified Accounts.pdf
by
PVAISBACK.COM--Digital Marketing Self-Employed Consultant
PDF
10 Best Ways to Buy Verified Wise Accounts in the US, UK, & All Countries Sup...
by
PVAISBACK.COM--Digital Marketing Self-Employed Consultant
PDF
5 Easy Ways to Understand Buying Old Gmail Accounts Smartly in 2026.pdf
by
Buy Verified PayPal Accounts
PDF
3 Sites To Buy Verified Binance Accounts (Personal & Business.pdf
by
arv2w53nigw38om2mr5l
PDF
Buy Old Gmail Accounts for All Countries Supported.pdf
by
PVAISBACK.COM--Digital Marketing Self-Employed Consultant
PDF
1767784681592.pdf Richard Smith's five statements of his pension
by
Henry Tapper
PDF
Governor Presentation of OMV shabwa Draft2.pdf
by
Mahmoodahmedsaeedabd
PDF
Proposal Success with Color Team Reviews
by
iQuasar LLC
PDF
IPR Top Public Relations Insights of 2025
by
Olivia Kresic
PDF
AML-CFT-CPF-Guidelines-for-Foreign-Exchange-Bureaus-2025-1.pdf
by
Kweku Zurek
PDF
How to Buy Old GitHub Accounts Securely (11).pdf
by
Buy Old GitHub Account in USA with Lifetime Support
PDF
Reflections for the new year, on the economy, Europe and uncertainty
by
Andrea Mennillo
PDF
Where and Why Can I Buy Old Gmail Accounts.pdf
by
https://propvaservice.com/product/buy-old-gmail-accounts/
PDF
How to Buy Gmail Accounts With Instant Delivery from usaallit.pdf
by
usaallit.com
PDF
Ghana Card now compulsory for every bank transaction - Here are the new stric...
by
Kweku Zurek
PDF
Introduction to 4 Place for Buying Old Gmail Accounts.pdf
by
https://topsellerit.com/product/buy-verified-paypal-accounts/
PDF
Fruit Production Farming and Exporting Business Plan in Bahir Dar Town, Amhar...
by
Reyan Business Consultancy
DOCX
Buy Gmail Accounts_ Step-by-Step Guide for 2025
by
buy old gmail accounts
Buy TikTok Seller Account in 2025_ What the Term Really ....pdf
by
zgaptxdary3819la63qg
Inspirational Icon to Watch in 2025.
by
insightssuccess2
Buy Verified Cash App Accounts in 2026 – High-Limit Verified Accounts.pdf
by
PVAISBACK.COM--Digital Marketing Self-Employed Consultant
10 Best Ways to Buy Verified Wise Accounts in the US, UK, & All Countries Sup...
by
PVAISBACK.COM--Digital Marketing Self-Employed Consultant
5 Easy Ways to Understand Buying Old Gmail Accounts Smartly in 2026.pdf
by
Buy Verified PayPal Accounts
3 Sites To Buy Verified Binance Accounts (Personal & Business.pdf
by
arv2w53nigw38om2mr5l
Buy Old Gmail Accounts for All Countries Supported.pdf
by
PVAISBACK.COM--Digital Marketing Self-Employed Consultant
1767784681592.pdf Richard Smith's five statements of his pension
by
Henry Tapper
Governor Presentation of OMV shabwa Draft2.pdf
by
Mahmoodahmedsaeedabd
Proposal Success with Color Team Reviews
by
iQuasar LLC
IPR Top Public Relations Insights of 2025
by
Olivia Kresic
AML-CFT-CPF-Guidelines-for-Foreign-Exchange-Bureaus-2025-1.pdf
by
Kweku Zurek
How to Buy Old GitHub Accounts Securely (11).pdf
by
Buy Old GitHub Account in USA with Lifetime Support
Reflections for the new year, on the economy, Europe and uncertainty
by
Andrea Mennillo
Where and Why Can I Buy Old Gmail Accounts.pdf
by
https://propvaservice.com/product/buy-old-gmail-accounts/
How to Buy Gmail Accounts With Instant Delivery from usaallit.pdf
by
usaallit.com
Ghana Card now compulsory for every bank transaction - Here are the new stric...
by
Kweku Zurek
Introduction to 4 Place for Buying Old Gmail Accounts.pdf
by
https://topsellerit.com/product/buy-verified-paypal-accounts/
Fruit Production Farming and Exporting Business Plan in Bahir Dar Town, Amhar...
by
Reyan Business Consultancy
Buy Gmail Accounts_ Step-by-Step Guide for 2025
by
buy old gmail accounts
Procurement Principles : Project Procurement
1.
Slide 11.1 Baily et
al., Procurement, Principles and Management, 11e © Pearson Education Limited 2015 Part 3 Applications Chapter 11 Project procurement
2.
Slide 11.2 Baily et
al., Procurement, Principles and Management, 11e © Pearson Education Limited 2015 Objectives of this chapter • To outline the key features of projects • To understand how procurement adds value in project management • To examine various success factors and how these impact on the procurement activity • To examine the issues of project planning • To appreciate the importance of procurement within project control • To consider the various types of contract for major projects such as Wembley football stadium and the Terminal 5 Building at Heathrow Airport • To appreciate the issues involved in subcontracting • To outline network analysis • To provide an overview of risk management and its benefits
3.
Slide 11.3 Baily et
al., Procurement, Principles and Management, 11e © Pearson Education Limited 2015 A project is a set of activities which: • Has a defined start point • Has a defined end state • Pursues a defined goal • Uses a defined set of resources. Introduction to projects
4.
Slide 11.4 Baily et
al., Procurement, Principles and Management, 11e © Pearson Education Limited 2015 • An objective – definable end result, output or product. • Complexity – large number of different tasks. • Uniqueness – projects are usually ‘one-offs’. • Uncertainty – projects are planned before they are executed, hence they carry an element of risk. • Temporary nature – defined beginning and end. • Life cycle – resources needs change during the life of the project. Introduction to projects (Continued)
5.
Slide 11.5 Baily et
al., Procurement, Principles and Management, 11e © Pearson Education Limited 2015 Figure 11.1 Earned value
6.
Slide 11.6 Baily et
al., Procurement, Principles and Management, 11e © Pearson Education Limited 2015 The completion of the £757 million Wembley stadium project faced many delays after claims by main contractor Multiplex that client Wembley National Stadium Ltd (WNSL) had not begun some of the works required to achieve practical completion. The delays by WNSL meant that Multiplex was unable to sign off the works for approval and reach practical completion. Wembley Stadium firmly rejected Multiplex’s statement and refuted any claims made against them. WNSL appeared to blame Multiplex 100 per cent for the delays. Multiplex strongly disputed the claims and replied that design changes from the client were partly to blame. Multiplex believed that the changes justified an extension of time. Mini case study – Wembley Stadium
7.
Slide 11.7 Baily et
al., Procurement, Principles and Management, 11e © Pearson Education Limited 2015 Figure 11.2 Subcontracting
8.
Slide 11.8 Baily et
al., Procurement, Principles and Management, 11e © Pearson Education Limited 2015 Figure 11.3 Arrow diagram for project X
9.
Slide 11.9 Baily et
al., Procurement, Principles and Management, 11e © Pearson Education Limited 2015 Figure 11.4 Bar charts for project X
10.
Slide 11.10 Baily et
al., Procurement, Principles and Management, 11e © Pearson Education Limited 2015 Internal/external drivers of key risks Financial Risks Financial Risks Operational Risks Operational Risks Strategic Risks Strategic Risks Hazard Risks Hazard Risks Interest rates Exchange rates Credit Regulations Culture Liquidity and cash flow Accounting contracts Recruitment Supply Chain Information systems Competition Customer changes Industry changes Customer demand Contracts Natural events Suppliers environment Research & development Intellectual capital Employees Properties Products/services Internal Risks External Risks Table 11.1 Examples of internal and external drivers of key risks
11.
Slide 11.11 Baily et
al., Procurement, Principles and Management, 11e © Pearson Education Limited 2015 The risk management process Organisation’s Strategic Objectives Risk Reporting (threats/opportunities) Monitoring Residual Risk Reporting Risk Treatment Decision Risk Assessment Risk Analysis Risk Identification Risk Description Risk Estimation Risk Evaluation Monitoring Formal Audit
12.
Slide 11.12 Baily et
al., Procurement, Principles and Management, 11e © Pearson Education Limited 2015 Risk description table 1 Name of risk 2 Scope of risk Qualitative description of the events, their size, type, number and dependencies 3 Nature of risk e.g. strategic, operational, financial, knowledge or compliance 4 Stakeholders Stakeholders and their expectations 5 Quantification of risk Significance & probability
13.
Slide 11.13 Baily et
al., Procurement, Principles and Management, 11e © Pearson Education Limited 2015 Risk description table (Continued) 6 Risk tolerance/appetite Loss potential and financial impact of risk Value at risk Probability and size of potential losses/gains Objective(s) for control of the risk and desired level of performance 7 Risk treatment and control mechanisms Primary means by which the risk is currently managed Levels of confidence in existing control Identification of protocols for monitoring and review
14.
Slide 11.14 Baily et
al., Procurement, Principles and Management, 11e © Pearson Education Limited 2015 Risk description table (Continued) 8 Potential action for improvement Recommendations to reduce risk 9 Strategy and policy developments Identification of function responsible for developing strategy and policy.
15.
Slide 11.15 Baily et
al., Procurement, Principles and Management, 11e © Pearson Education Limited 2015 Risk estimation – Consequences Both threats and opportunities High Financial impact on the organisation is likely to exceed £x Significant impact on the organisation’s strategy or operational activities Significant stakeholder concerns. Medium Financial impact on the organisation likely to be between £x and £y Moderate impact on the organisation’s strategy or operational activities Moderate stakeholder concern.
16.
Slide 11.16 Baily et
al., Procurement, Principles and Management, 11e © Pearson Education Limited 2015 Risk estimation – Consequences (Continued) Both threats and opportunities Low Financial impact on the organisation likely to be less than £y Low impact on the organisation’s strategy or operational activities Low stakeholder concern.
17.
Slide 11.17 Baily et
al., Procurement, Principles and Management, 11e © Pearson Education Limited 2015 Probability of occurrence – threats Estimation Description Indicators High (probable) Likely to occur each year or more than 25% chance of occurrence. Potential of it occurring several times within the time period (for example – 10 years) Has occurred recently. Table 11.3 Risk estimation
18.
Slide 11.18 Baily et
al., Procurement, Principles and Management, 11e © Pearson Education Limited 2015 Probability of occurrence – threats (Continued) Estimation Description Indicators Medium (possible) Likely to occur in a ten year time period or less than 25% chance of occurrence Could occur more than once within the time period (e.g. 10 years) Could be difficult to control due to some external influences Is there a history of occurrence? Table 11.3 Risk estimation (Continued)
19.
Slide 11.19 Baily et
al., Procurement, Principles and Management, 11e © Pearson Education Limited 2015 Probability of occurrence – threats (Continued) Estimation Description Indicators Low (remote) Not likely to occur in a ten year time period or less than 2% chance of occurrence. Has not occurred Unlikely to occur Table 11.3 Risk estimation (Continued)
20.
Slide 11.20 Baily et
al., Procurement, Principles and Management, 11e © Pearson Education Limited 2015 Probability of occurrence – opportunities Estimation Description Indicators High (probable) Favourable outcome is likely to be achieved in one year or better than 75% chance of occurrence Clear opportunity which can be relied on with reasonable certainty, to be achieved in the short term. Table 11.3 Risk estimation (Continued)
21.
Slide 11.21 Baily et
al., Procurement, Principles and Management, 11e © Pearson Education Limited 2015 Probability of occurrence – opportunities (Continued) Estimation Description Indicators Medium (possible) Reasonable prospects of favourable results in one year of 25% to 75% chance of occurrence Opportunities which may be achievable but which require careful management Table 11.3 Risk estimation (Continued)
22.
Slide 11.22 Baily et
al., Procurement, Principles and Management, 11e © Pearson Education Limited 2015 Probability of occurrence – opportunities (Continued) Estimation Description Indicators Low (remote) Some chance of favourable outcome in the medium term or less than 25% chance of occurrence. Possible opportunity which has yet to be fully investigated by management Table 11.3 Risk estimation (Continued)
23.
Slide 11.23 Baily et
al., Procurement, Principles and Management, 11e © Pearson Education Limited 2015 Risk identification techniques Examples Brainstorming Questionnaires Industry benchmarking Scenario analysis Risk assessment workshops Incident investigation Auditing and inspection HAZOP (Hazard & operability studies)
24.
Slide 11.24 Baily et
al., Procurement, Principles and Management, 11e © Pearson Education Limited 2015 Risk analysis methods and techniques Examples Market survey and test marketing Research and development Business impact analysis SWOT analysis (Strengths, Weaknesses, Opportunities, Threats) Event tree analysis Business continuity planning Real option modelling PESTLE (Political Economic Social Technical Legal Environment) Threat analysis Fault tree analysis FMEA (Failure Mode & Effect analysis)
25.
Slide 11.25 Baily et
al., Procurement, Principles and Management, 11e © Pearson Education Limited 2015 Incorporating risk considerations Incorporating risk considerations into what have historically been highly cost-focused analyses requires a shift in thinking and organisational behaviour. While procurement teams remain focused on price reduction, waste reduction and supplier performance measures – rather than engaging fully with the ever more important issue of supply chain risk – opportunities for total cost reduction are ignored and the prospect of serious supply failure is increasing.
26.
Slide 11.26 Baily et
al., Procurement, Principles and Management, 11e © Pearson Education Limited 2015 Best practice risk management Risk identification Your business probably already has a risk register and the procurement and quality teams, in particular, should have a proactive approach to identifying where supply chain risks lie. Reworking the risk register is a multi functional process, which needs the collaboration and experience of colleagues throughout the business in quality, planning, forecasting, operations, logistics.
27.
Slide 11.27 Baily et
al., Procurement, Principles and Management, 11e © Pearson Education Limited 2015 Best practice risk management (Continued) Risk valuation and prioritisation It s not just a matter of prioritising the risks according to potential impact and likelihood. The key step is to calculate a credible financial value for the risks, where value = cost of failure x likelihood (probability) of the event occurring. Once the risks are valued, they are easy to rank and prioritise. Make sure that you appreciate the true cost of failure. Procurement/supply chain management should think in terms of cost, but also the value to the business should be measured in lost profitability.
28.
Slide 11.28 Baily et
al., Procurement, Principles and Management, 11e © Pearson Education Limited 2015 Best practice risk management (Continued) Establish contingencies and controls Risk management is the process of taking actions to reduce the likelihood and/or impact of the event. For each important risk, control measures should be identified and given to a risk owner. And the impact of each control measure can be forecast and valued. This vital step will help you allocate the correct resources to address the most important risks. And measurable actions can be added to personal objectives, individuals can be held accountable and rewarded.
29.
Slide 11.29 Baily et
al., Procurement, Principles and Management, 11e © Pearson Education Limited 2015 Best practice risk management (Continued) Measurement and monitoring Once you have identified and valued the risks and produced the action plan, the final step is to monitor and measure progress. By monitoring reviewing and enhancing managing potential supply chain problems becomes an ongoing and sustainable process.
30.
Slide 11.30 Baily et
al., Procurement, Principles and Management, 11e © Pearson Education Limited 2015 Best Practice Risk Management Risk management benefits It is a source of competitive advantages, enabling companies to pursue rewarding strategies, with confidence that they are able to manage the attendant risks. It enables you to involve individuals and departments and reward them according to the impact their actions have on supply chain risk.
Download