Operations, in most organizations, provide the largest losses and can be proven statistically. One can identify these losses as partial or total functional failure causes and thus put a plan in place to eliminate them.
Reliability and Maintenance in production ManagementNazneen sheikh
This ppt may help you to get a clear picture about reliability and maintenance in Production Management.
Feedback is a must!!!1
Regards.
Nazneen Sheikh
Having experience as a Maintenance Manager and Maintenance Consultant I wrote this article. The one Maintenance Manager that inspired me the most was Rick Mullen, former Engineering and Maintenance Manager at Anheuser Busch, who by far the #1 Maintenance Manager I ever met.
What does a "Day in the Life of a Proactive Maintenance Planner" look like. This article was writen based on my experience at Alcoa Mt Holly (Certified as World Class Maintenance).
Having worked with companies all over the world I decided to write this article based on my experience as a Maintenance Advisor and a Maintenance Leader.
How to know if your maintenance planning and scheduling is not effectiveRicky Smith CMRP, CMRT
Many times companies have Maintenance Planning and Scheduling however it is not effective as they like it to be. This article helps anyone who is struggling the Planning and Scheduling with a few ideas.
If you have questions email me at rsmith@worldclassmaintenance.org
Ever wondered what a "Day in the Life of a Proactive Maintenance Supervisor". Checkout this article and see how it matching where you are. If you have questions send Ricky an email to rsmith@worldclassmaintenance.org
A proactive maintenance technician is a highly trained professional who is an expert in his or her skills area, has knowledge of other skills areas, including safety and production, and has a desire to learn more. This professional knows and can
implement a failure-modes driven maintenance strategy for any piece of equipment.
A proactive maintenance technician uses knowledge and experience to ensure the maintenance process is optimized by making constructive recommendations to
management concerning improvement areas.
To ensure success, a proactive maintenance technician is proactive in everything he or she does. This person constantly reviews information to ensure procedures are accurate and issues are resolved quickly and does what is required to ensure the work is repeatable. Such a professional leads by example and takes responsibility for training new employees on how to be a proactive and effective maintenance technician.
Reliability and Maintenance in production ManagementNazneen sheikh
This ppt may help you to get a clear picture about reliability and maintenance in Production Management.
Feedback is a must!!!1
Regards.
Nazneen Sheikh
Having experience as a Maintenance Manager and Maintenance Consultant I wrote this article. The one Maintenance Manager that inspired me the most was Rick Mullen, former Engineering and Maintenance Manager at Anheuser Busch, who by far the #1 Maintenance Manager I ever met.
What does a "Day in the Life of a Proactive Maintenance Planner" look like. This article was writen based on my experience at Alcoa Mt Holly (Certified as World Class Maintenance).
Having worked with companies all over the world I decided to write this article based on my experience as a Maintenance Advisor and a Maintenance Leader.
How to know if your maintenance planning and scheduling is not effectiveRicky Smith CMRP, CMRT
Many times companies have Maintenance Planning and Scheduling however it is not effective as they like it to be. This article helps anyone who is struggling the Planning and Scheduling with a few ideas.
If you have questions email me at rsmith@worldclassmaintenance.org
Ever wondered what a "Day in the Life of a Proactive Maintenance Supervisor". Checkout this article and see how it matching where you are. If you have questions send Ricky an email to rsmith@worldclassmaintenance.org
A proactive maintenance technician is a highly trained professional who is an expert in his or her skills area, has knowledge of other skills areas, including safety and production, and has a desire to learn more. This professional knows and can
implement a failure-modes driven maintenance strategy for any piece of equipment.
A proactive maintenance technician uses knowledge and experience to ensure the maintenance process is optimized by making constructive recommendations to
management concerning improvement areas.
To ensure success, a proactive maintenance technician is proactive in everything he or she does. This person constantly reviews information to ensure procedures are accurate and issues are resolved quickly and does what is required to ensure the work is repeatable. Such a professional leads by example and takes responsibility for training new employees on how to be a proactive and effective maintenance technician.
The objective of the Parts Checkout process to ensure the right part is in stock when required by Maintenance / Operations to provide Production with Reliable Assets.
> Parts / Material Checkout Guiding Principles:
•All parts/material used for an asset will be charge to the asset via a Work Order
•No blanket work orders – blanket work orders lead to lack of failure information due to failure threads of like parts/material
•Overnight ordering of parts is an exception and not the general rule
•The Materials Management Process will be managed with Leading and Lagging KPIs
... and so much more
Best Maintenance Lubrication Practices are essential to
optimal life for ball and rolling element bearings.
There are four factors that are important when
lubricating bearings:
1. What type of lubrication?
2. How much lubrication?
3. How frequently should lubrication be applied?
4. How should the lubrication be applied to ensure
contamination control?
... and so much more covered on this document
Maintenance Planning and Scheduling is critical to success of any Maintenance Organization resulting in a significant increase in Wrench-time (Hands on Tool Time). Planning and Scheduling are two distinct functions which are dependent on each other.
Top 7 Reasons why Maintenance Work Orders are Closed Out AccuratelyRicky Smith CMRP, CMRT
Closing out work orders accurately is critical for leadership to make the “right decisions at the right time with accurate data” and it can only occur if work orders are “Closed with the Right Information/Data”.
If metrics and Key Performance Indicators are so important where are people pulling the data from without their work orders having the right data on them when they are closed into that dark hole called the CMMS or EAM.
Without good data you are lost and probably are making decisions based on passion and not facts.
Very few organizations pay attention to hydraulic leaks and how they can impact production capacity, asset reliability, and reactivity when a mitigation strategy is in place.
This Tool Box Talk may help you take that next step.
Most companies spend a lot of money training their maintenance personnel to troubleshoot a hydraulic system.
If we focused on preventing system failure then we could spend less time and money on troubleshooting a hydraulic system. We normally except hydraulic system failure rather than deciding not to except hydraulic failure as the norm. Let’s spend the time and money to eliminate hydraulic failure rather than preparing for failure.
Preventive Maintenance - Actions performed on a time- or machine-run-based schedule that detect, preclude, or mitigate degradation of a component or system with the aim of sustaining or extending its useful life through controlling degradation to an acceptable level. (Definition Source: SMRP Best Practices)
Maintenance Skills Training for industry is a hot subject right now. In many areas of the country, companies are competing for skilled maintenance personnel.
“A Deloitte study found that the skills gap may leave an estimated 2.4 million positions unfilled between 2018 and 2028, with a potential economic impact of $2.5 trillion”
The skill level of the maintenance personnel in most companies is well below what industry would say is acceptable. In the past, I have been involved with the assessment of the skill level for hundreds of maintenance personnel in the U.S. and Canada and found 80% of the people assessed scored less than 50% of where they need to be in the basic technical skills to perform their jobs. The literacy level of maintenance personnel is also a problem. In some areas of the United States we find that up to 40% of maintenance personnel in a plant are reading below the eighth grade level. After performing the Gunning FOG index, we find the reading level for mechanical maintenance personnel should be the twelfth year level and electrical maintenance personnel the fourteenth year level (associate degree).
Much has been written about lean manufacturing and the lean enterprise—enough that nearly all readers are familiar with the concepts as well as the phrases themselves. But what about lean maintenance?
Is it merely a subset of lean manufacturing? Is it a natural fall-in-behind spinoff result of adopting lean manufacturing practices?
Much to the chagrin of many manufacturing companies, whose attempts at implementing lean practices have failed ignominiously, lean maintenance is neither a subset nor a spinoff of lean manufacturing. It is instead a prerequisite for success as a lean manufacturer. This article will explain why.
Every wondered what the life of a Proactive Maintenance Technician looks like. This article was written based on my experience as a Proactive Maintenance Technician.
How does anyone Optimize their current CMMS? What is the path forward to success with our CMMS. John Day, former Engineering / Maintenance Manager for Alcoa Mt Holly is quoted in this presentation.
Preventive Maintenance Best Practices plus PM Optimization Workshop BrochureRicky Smith CMRP, CMRT
Join Ricky Smith for his Preventive Maintenance Best Practices plus PM Optimization Workshop, October 19-21 "Live" and "Virtual" (via internet). Check out the attached brochure.
The objective of the Parts Checkout process to ensure the right part is in stock when required by Maintenance / Operations to provide Production with Reliable Assets.
> Parts / Material Checkout Guiding Principles:
•All parts/material used for an asset will be charge to the asset via a Work Order
•No blanket work orders – blanket work orders lead to lack of failure information due to failure threads of like parts/material
•Overnight ordering of parts is an exception and not the general rule
•The Materials Management Process will be managed with Leading and Lagging KPIs
... and so much more
Best Maintenance Lubrication Practices are essential to
optimal life for ball and rolling element bearings.
There are four factors that are important when
lubricating bearings:
1. What type of lubrication?
2. How much lubrication?
3. How frequently should lubrication be applied?
4. How should the lubrication be applied to ensure
contamination control?
... and so much more covered on this document
Maintenance Planning and Scheduling is critical to success of any Maintenance Organization resulting in a significant increase in Wrench-time (Hands on Tool Time). Planning and Scheduling are two distinct functions which are dependent on each other.
Top 7 Reasons why Maintenance Work Orders are Closed Out AccuratelyRicky Smith CMRP, CMRT
Closing out work orders accurately is critical for leadership to make the “right decisions at the right time with accurate data” and it can only occur if work orders are “Closed with the Right Information/Data”.
If metrics and Key Performance Indicators are so important where are people pulling the data from without their work orders having the right data on them when they are closed into that dark hole called the CMMS or EAM.
Without good data you are lost and probably are making decisions based on passion and not facts.
Very few organizations pay attention to hydraulic leaks and how they can impact production capacity, asset reliability, and reactivity when a mitigation strategy is in place.
This Tool Box Talk may help you take that next step.
Most companies spend a lot of money training their maintenance personnel to troubleshoot a hydraulic system.
If we focused on preventing system failure then we could spend less time and money on troubleshooting a hydraulic system. We normally except hydraulic system failure rather than deciding not to except hydraulic failure as the norm. Let’s spend the time and money to eliminate hydraulic failure rather than preparing for failure.
Preventive Maintenance - Actions performed on a time- or machine-run-based schedule that detect, preclude, or mitigate degradation of a component or system with the aim of sustaining or extending its useful life through controlling degradation to an acceptable level. (Definition Source: SMRP Best Practices)
Maintenance Skills Training for industry is a hot subject right now. In many areas of the country, companies are competing for skilled maintenance personnel.
“A Deloitte study found that the skills gap may leave an estimated 2.4 million positions unfilled between 2018 and 2028, with a potential economic impact of $2.5 trillion”
The skill level of the maintenance personnel in most companies is well below what industry would say is acceptable. In the past, I have been involved with the assessment of the skill level for hundreds of maintenance personnel in the U.S. and Canada and found 80% of the people assessed scored less than 50% of where they need to be in the basic technical skills to perform their jobs. The literacy level of maintenance personnel is also a problem. In some areas of the United States we find that up to 40% of maintenance personnel in a plant are reading below the eighth grade level. After performing the Gunning FOG index, we find the reading level for mechanical maintenance personnel should be the twelfth year level and electrical maintenance personnel the fourteenth year level (associate degree).
Much has been written about lean manufacturing and the lean enterprise—enough that nearly all readers are familiar with the concepts as well as the phrases themselves. But what about lean maintenance?
Is it merely a subset of lean manufacturing? Is it a natural fall-in-behind spinoff result of adopting lean manufacturing practices?
Much to the chagrin of many manufacturing companies, whose attempts at implementing lean practices have failed ignominiously, lean maintenance is neither a subset nor a spinoff of lean manufacturing. It is instead a prerequisite for success as a lean manufacturer. This article will explain why.
Every wondered what the life of a Proactive Maintenance Technician looks like. This article was written based on my experience as a Proactive Maintenance Technician.
How does anyone Optimize their current CMMS? What is the path forward to success with our CMMS. John Day, former Engineering / Maintenance Manager for Alcoa Mt Holly is quoted in this presentation.
Preventive Maintenance Best Practices plus PM Optimization Workshop BrochureRicky Smith CMRP, CMRT
Join Ricky Smith for his Preventive Maintenance Best Practices plus PM Optimization Workshop, October 19-21 "Live" and "Virtual" (via internet). Check out the attached brochure.
Maintenance Planning and Scheduling Workshop - Greenvile, SC November 12-14,...
Process Plot
1. The Reliability Index – Process Improvement Success
1999 to 2004
Product PR% Beta Reliability Production
Year Index Losses
1999 50.1 31.7 15.9 8,345,350 units
2003 50.6 32.4 16.4 4,210,200 units
2004 67.5 44.1 29.8 1,893,000 units
Management is managing the Equipment in 2004
Based @ $1/bushel gross margin
Page 1