1. INTRODUCTION:
• Process planning and cost estimation are two of the most important aspects of the manufacturing
process.
• Process planning involves determining the most efficient way to produce a product, while cost estimation
involves determining the cost of producing the product.
• These two elements are interrelated and must be considered together in order to make informed decisions
about production.
• In the context of manufacturing a bonnet, process planning involves determining the materials, equipment,
and techniques that will be used to produce the bonnet.
• This involves a number of steps, including product design and prototyping, tooling and fixture design, and
machine setup and programming.
• The goal of process planning is to ensure that the production process is efficient, consistent, and capable of
producing high-quality products.
• Cost estimation involves determining the cost of the materials, labor, and overhead required to produce the
bonnet. This includes the cost of the raw materials, such as the metal or plastic used to make the bonnet, as
well as the cost of the labor required to produce the bonnet, including any machining or assembly processes.
• The first step in process planning for the manufacture of the bonnet is product design and prototyping.
Once the design of the bonnet has been finalized, tooling and fixture design can begin. This involves creating
the tools and fixtures that will be used to produce the bonnet, such as dies and molds
• The next step in the process planning of the bonnet is machine setup and programming.
• . This involves setting up the machines that will be used to produce the bonnet, such as presses and CNC
machines.
• Once the production process has been established, cost estimation can begin.
• The cost of the materials used in the production of the bonnet must be determined, including the cost of the
raw materials, such as metal or plastic, as well as the cost of any additional materials required, such as paint
or adhesive.
• The cost of labor must also be considered, including the cost of any machining or assembly processes
required to produce the bonnet
• Overhead costs, such as utilities, rent, and insurance, must also be taken into account when determining the
cost of production.
• These costs are often a significant portion of the total cost of production and must be carefully considered in
order to ensure that the production process is profitable.
2. THEORETICAL BACKGROUND FOR MATERIAL
REMOVAL
• The theoretical background of process planning and cost estimation in manufacturing is a complex
field that draws on a variety of disciplines, including engineering, operations management, and
economics.
• The goal of process planning is to determine the most efficient and cost-effective way to produce a
product, while cost estimation involves determining the cost of producing the product.
• These two elements are interrelated and must be considered together in order to make informed
decisions about production
• The goal of process planning is to ensure that the production process is efficient, consistent, and capable of
producing high-quality products.
• There are several key elements to the process planning process, including product design and prototyping,
tooling and fixture design, and machine setup and programming.
• Product design and prototyping is the first step in the process planning process. This involves creating a
detailed design of the product, including its size, shape, and material specifications.
• Once the design of the product has been finalised, tooling and fixture design can begin. This involves creating
the tools and fixtures that will be used to produce the product, such as dies and moulds.
The next step in the process planning process is machine setup and programming. This involves setting up the
machines that will be used to produce the product, such as presses and CNC machines.
• Cost estimation is the process of determining the cost of producing a product, including the cost of the
materials, labour, and overhead required to produce the product.
• The cost of the materials used in the production of the product must be determined, including the cost of the
raw materials, such as metal or plastic, as well as the cost of any additional materials required, such as paint
or adhesive.
• The cost of labour must also be considered, including the cost of any machining or assembly processes
required to produce the product.
• Overhead costs, such as utilities, rent, and insurance, must also be taken into account when determining the
cost of production.
• The theoretical background of process planning and cost estimation in manufacturing draws on a number of
different disciplines, including engineering, operations management, and economics.
• Engineering provides the technical knowledge needed to design and produce the product, while operations
management provides the knowledge needed to manage the production process.
• Economics provides the framework for understanding the cost of production and making informed decisions
about production.
3. BONNET
Introduction
• The bonnet, also known as a hood, is a component of a vehicle that covers the engine and protects it
from the elements.
• The bonnet is typically made of metal, such as steel or aluminum, and is designed to be durable and
functional, while also complementing the overall appearance of the vehicle.
• The bonnet is an important component of a vehicle, as it protects the engine and other mechanical
components from damage caused by debris, rain, and other elements.
• The bonnet also helps to direct air flow over the engine, which helps to cool it and improve its
performance.
• In addition, the bonnet helps to reduce wind resistance and improve aerodynamics, which can improve
fuel efficiency and overall vehicle performance.
Specifications
• In terms of design, the bonnet can be either flat or curved, and may have a scoop or vents to allow air to
enter and exit. The size and shape of the bonnet are determined by the size and configuration of the engine, as
well as the overall design of the vehicle.
• In terms of materials, the bonnet is typically made of metal, such as steel or aluminum, due to their
strength and durability. Steel is often used for the main body of the bonnet, while aluminum is used for the
hood scoop or vents. In some cases, composite materials, such as fiberglass, may be used to reduce weight
and improve aerodynamics.
• The manufacturing process for the bonnet typically involves cutting and shaping the metal to the desired
shape, and welding the panels together to form the final product. The bonnet may also be painted or coated
with a corrosion-resistant finish to protect it from the elements.
• The bonnet is an important component of a vehicle that protects the engine and other mechanical components
from damage, improves aerodynamics and fuel efficiency, and enhances the overall appearance of the vehicle.
The design, materials, and manufacturing process for the bonnet must be carefully considered to ensure that it
is durable, functional, and aesthetically pleasing.
4. Tooling Selection Constraints
Tooling selection is an important aspect of the manufacturing
process
The selection of tooling for the production of the bonnet must
take into account several key constraints that can impact the
process.
1. Material Properties: The properties of the material used to
make the bonnet can impact the selection of tooling. For
example, certain materials, such as aluminum, may require
specialized tooling to avoid damage or deformation during
the manufacturing process.
2. Production Volume: The production volume of the bonnet
will impact the selection of tooling, as the cost of the tooling
must be justified by the volume of product produced.
3. Production Speed: The desired production speed will impact the selection of tooling, as high-speed
production processes may require specialized tooling that can handle the high speeds without causing damage to
the material or the tooling itself.
4. Tolerance Requirements: The tolerance requirements for the bonnet will impact the selection of tooling, as
the tooling must be able to produce parts that meet the required tolerances. Tighter tolerances will require
specialized tooling and may result in higher costs.
5. Surface Finish Requirements: The surface finish requirements for the bonnet will impact the selection of
tooling, as the tooling must be able to produce parts with the required surface finish. Higher surface finish
requirements will require specialized tooling and may result in higher costs.
6. Cost: The cost of the tooling is a key constraint in the selection process, as the tooling must be cost-effective
and justified by the volume of product produced and the efficiency of the manufacturing process.
7. Availability: The availability of the tooling is another important constraint in the selection process, as the
tooling must be readily available to support the manufacturing schedule. The lead time for tooling must be
considered when selecting tooling, as long lead times can impact the manufacturing schedule.
8. Maintenance Requirements: The maintenance requirements for the tooling must be considered when
selecting tooling, as regular maintenance will be necessary to ensure the continued efficiency and accuracy of
the tooling.
9. Flexibility: The flexibility of the tooling must also be considered when selecting tooling, as the tooling must
be able to accommodate changes in the design or specifications of the bonnet without requiring significant
modifications.
The selection of tooling for the production of the bonnet must take into account several key
constraints, including material properties, production volume, production speed, tolerance
requirements, surface finish requirements, cost, availability, maintenance requirements, and
flexibility. By considering these constraints, the manufacturer can ensure that the tooling selected
is the best fit for the specific requirements of the production process.
5. Process Planning
Process planning involves several key steps, including product design and analysis, process selection,
tooling selection, and process documentation.
Product Design and Analysis: The first step in process planning is to review and analyze the design
of the bonnet, including the material properties, size, and shape. This information is used to
determine the optimal manufacturing process and to identify any potential issues that may impact the
quality of the final product.
Process Selection: Once the design of the bonnet has been reviewed and analyzed, the next step is to
select the optimal manufacturing process. The process selection will depend on several factors,
including the volume of production, the desired production speed, the material properties, and the
tolerance requirements.
Tooling Selection: After the process has been selected, the next step is to select the necessary
tooling. This includes the selection of cutting tools, jigs, fixtures, and any other equipment required
to produce the bonnet.
Process Documentation: Once the process and tooling have been selected, the final step is to
document the process. This includes the creation of detailed process plans, including process flow
diagrams, and the documentation of the tooling and equipment used.
6. Cost estimation
Cost estimation is a crucial step in the manufacturing of the bonnet, as it determines the overall cost
of producing the product and provides a basis for pricing the final product.
Cost estimation is the process of determining the costs associated with all of the resources required
to produce the bonnet, including materials, labour, and overhead.
Material Costs: The cost of materials is one of the largest components of the cost of producing the
bonnet. This includes the cost of the raw materials used to manufacture the bonnet, as well as the cost
of any additional materials required, such as fasteners, adhesives, and coatings. The cost of materials
can be determined through the use of historical data, market research, and vendor quotes.
Labour Costs: Labor costs are another important component of the cost of producing the bonnet, and
they include the costs of the employees who perform the work, as well as the costs of benefits,
training, and other personnel-related expenses. The cost of labor can be estimated based on the
prevailing wages for the job, the experience level of the workers, and the required skill levels.
Overhead Costs: Overhead costs are the indirect costs associated with the production of the
bonnet, and they include costs such as utilities, rent, insurance, and maintenance. These
costs must be estimated and included in the overall cost of production in order to accurately
reflect the total cost of producing the bonnet.
Equipment Costs: The cost of equipment is another important component of the cost of producing
the bonnet, and it includes the cost of the tools and equipment required to produce the product, as
well as the cost of maintenance and repair. The cost of equipment can be estimated based on
historical data, vendor quotes, and depreciation schedules.
Scrap and Waste Costs: The costs of scrap and waste materials must also be included in the cost of
producing the bonnet, as these materials represent a cost to the manufacturer that must be recovered
through the sale of the product. These costs can be estimated based on the historical experience of the
manufacturer and the expected yield of the manufacturing process.
The cost of production includes the costs of materials, labour, overhead, equipment, and
scrap and waste materials, and these costs must be accurately estimated in order to ensure
that the final price of the product is competitive and that the manufacturer is able to make a
profit.
By using a systematic approach to cost estimation, the manufacturer can ensure that the
most accurate estimate of the cost of production possible is determined, and that the final
price of the product is based on a solid foundation of data and analysis.
7. EVALUATION :
In this article, we will evaluate various cost estimation methods used in the aerospace industry
BOTTOM-UP ESTIMATION :
This method involves breaking down a project into smaller, manageable components and estimating the cost of
each component. The costs of these components are then aggregated to obtain the estimated cost of the entire
project. This method is particularly useful for projects with a well-defined scope and detailed information about
the components. The bottom-up estimation method is time-consuming, but it provides a high level of accuracy
in the cost estimate.
TOP-DOWN ESTIMATION :
This method involves using historical data and expert judgment to make a rough estimate of the project cost.
This method is less detailed and less time-consuming than the bottom-up estimation method, but it provides a
rough estimate of the project cost. This method is particularly useful for projects with a high level of uncertainty
and limited information about the components.
PARAMETRIC COST ESTIMATION :
This method involves using mathematical models to estimate the cost of a project based on a set of
parameters such as weight, size, and performance specifications. The models are developed using
historical data and cost information. This method provides a more accurate cost estimate than the top-
down method,
ANALOGOUS COST ESTIMATION :
This method involves using the cost data from similar projects to estimate the cost of a new project. This method
is less time-consuming than the bottom-up or parametric methods, and it can provide a quick estimate of the
project cost. However, this method is only useful if the similar projects are closely related in terms of size,
complexity, and other relevant parameters.
EXPERT JUDGMENT :
This method involves using the experience and judgement of experts in the aerospace industry to estimate the
cost of a project. The experts use their knowledge of past projects, industry practices, and other relevant factors
to make an estimate. This method is useful for projects with a high level of uncertainty, and it can provide a
quick estimate of the project cost. However, the accuracy of this method depends on the expertise and
experience of the experts involved.
8. Analysis
Materials: The cost of materials is one of the largest components of the cost of producing a
bonnet, and it includes the cost of the raw materials used to manufacture the product, as well as the
cost of any additional materials required, such as fasteners, adhesives, and coatings. The cost of
materials can be determined through the use of historical data, market research, and vendor quotes.
Labour: Labor costs are another important component of the cost of producing a bonnet, and
they include the costs of the employees who perform the work, as well as the costs of benefits,
training, and other personnel-related expenses. The cost of labour can be estimated based on the
prevailing wages for the job, the experience level of the workers, and the required skill levels.
Overhead: Overhead costs are the indirect costs associated with the production of a bonnet, and
they include costs such as utilities, rent, insurance, and maintenance. These costs must be
estimated and included in the overall cost of production in order to accurately reflect the total cost
of producing the bonnet.
Equipment: The cost of equipment is another important component of the cost of producing a
bonnet, and it includes the cost of the tools and equipment required to produce the product, as well as
the cost of maintenance and repair. The cost of equipment can be estimated based on historical data,
vendor quotes, and depreciation schedules.
Scrap and Waste: The costs of scrap and waste materials must also be included in the cost of
producing a bonnet, as these materials represent a cost to the manufacturer that must be recovered
through the sale of the product. These costs can be estimated based on the historical experience of the
manufacturer and the expected yield of the manufacturing process.
9. Survey Report and Data
10. Conclusion:
• In conclusion, process planning and cost estimation are crucial steps in the
manufacturing of a bonnet.
• Process planning involves the selection of appropriate tools and techniques for the
production process and determining the most efficient way to produce the bonnet.
• Cost estimation involves determining the costs associated with the production
process, including direct and indirect costs, and determining the total cost of
manufacturing the bonnet.
• By conducting a thorough process planning and cost estimation analysis,
manufacturers can ensure that the production process is efficient and cost-
effective, leading to improved profitability and competitiveness in the market.

More Related Content

Similar to PROCESS PLANNING AND COST ESTIMATION OF MANUFACTURING THEBONNET.pptx

Process Planning & Cost Estimation
Process Planning & Cost Estimation Process Planning & Cost Estimation
Process Planning & Cost Estimation Prabhu Bose
 
B7 PROGRESSSSSS [Autosaved] (1).pptx
B7 PROGRESSSSSS [Autosaved] (1).pptxB7 PROGRESSSSSS [Autosaved] (1).pptx
B7 PROGRESSSSSS [Autosaved] (1).pptxZoicGaming
 
ME6005 pit - By EasyEngineering.net.pdf
ME6005 pit - By EasyEngineering.net.pdfME6005 pit - By EasyEngineering.net.pdf
ME6005 pit - By EasyEngineering.net.pdfRavichandran R
 
Process_Planning_and_Cost_Estimation- notes guna 26.04.17 - BY Civildatas.com...
Process_Planning_and_Cost_Estimation- notes guna 26.04.17 - BY Civildatas.com...Process_Planning_and_Cost_Estimation- notes guna 26.04.17 - BY Civildatas.com...
Process_Planning_and_Cost_Estimation- notes guna 26.04.17 - BY Civildatas.com...Ravichandran R
 
Unit 5 design for manufacturing
Unit 5 design for manufacturing Unit 5 design for manufacturing
Unit 5 design for manufacturing arivumani ravanan
 
Company Presentation 2015
Company Presentation 2015Company Presentation 2015
Company Presentation 2015Mach Cao Xuan
 
Lecture_1_J_Tanyanyiwa.pptx
Lecture_1_J_Tanyanyiwa.pptxLecture_1_J_Tanyanyiwa.pptx
Lecture_1_J_Tanyanyiwa.pptxBekithemba2
 
Lo # 1 manufacturing process selection design part 1
Lo # 1 manufacturing process selection design part 1Lo # 1 manufacturing process selection design part 1
Lo # 1 manufacturing process selection design part 1Abdulaziz AlSuwaidi
 
Cut & bend rebars
Cut & bend rebarsCut & bend rebars
Cut & bend rebarsParam Saxena
 
Manufacturing of Toggle Jack
Manufacturing of Toggle JackManufacturing of Toggle Jack
Manufacturing of Toggle JackIRJET Journal
 
product design and process selection
product design and  process selectionproduct design and  process selection
product design and process selectionLEADS123
 
MFG 240 - Manufacturing DesignFinal ProjectScope of Project.docx
MFG 240 - Manufacturing DesignFinal ProjectScope of Project.docxMFG 240 - Manufacturing DesignFinal ProjectScope of Project.docx
MFG 240 - Manufacturing DesignFinal ProjectScope of Project.docxARIV4
 

Similar to PROCESS PLANNING AND COST ESTIMATION OF MANUFACTURING THEBONNET.pptx (20)

Updated resume 31 may 15
Updated resume 31 may 15Updated resume 31 may 15
Updated resume 31 may 15
 
Process Planning & Cost Estimation
Process Planning & Cost Estimation Process Planning & Cost Estimation
Process Planning & Cost Estimation
 
UNIT-1.pptx
UNIT-1.pptxUNIT-1.pptx
UNIT-1.pptx
 
Dfma
DfmaDfma
Dfma
 
B7 PROGRESSSSSS [Autosaved] (1).pptx
B7 PROGRESSSSSS [Autosaved] (1).pptxB7 PROGRESSSSSS [Autosaved] (1).pptx
B7 PROGRESSSSSS [Autosaved] (1).pptx
 
ME6005 pit - By EasyEngineering.net.pdf
ME6005 pit - By EasyEngineering.net.pdfME6005 pit - By EasyEngineering.net.pdf
ME6005 pit - By EasyEngineering.net.pdf
 
Process_Planning_and_Cost_Estimation- notes guna 26.04.17 - BY Civildatas.com...
Process_Planning_and_Cost_Estimation- notes guna 26.04.17 - BY Civildatas.com...Process_Planning_and_Cost_Estimation- notes guna 26.04.17 - BY Civildatas.com...
Process_Planning_and_Cost_Estimation- notes guna 26.04.17 - BY Civildatas.com...
 
Session 18
Session 18Session 18
Session 18
 
Unit 5 design for manufacturing
Unit 5 design for manufacturing Unit 5 design for manufacturing
Unit 5 design for manufacturing
 
Company Presentation 2015
Company Presentation 2015Company Presentation 2015
Company Presentation 2015
 
Lecture_1_J_Tanyanyiwa.pptx
Lecture_1_J_Tanyanyiwa.pptxLecture_1_J_Tanyanyiwa.pptx
Lecture_1_J_Tanyanyiwa.pptx
 
PEPD MODULE 1.pdf
PEPD MODULE 1.pdfPEPD MODULE 1.pdf
PEPD MODULE 1.pdf
 
Lo # 1 manufacturing process selection design part 1
Lo # 1 manufacturing process selection design part 1Lo # 1 manufacturing process selection design part 1
Lo # 1 manufacturing process selection design part 1
 
Facility Layout,PPT.pptx
Facility Layout,PPT.pptxFacility Layout,PPT.pptx
Facility Layout,PPT.pptx
 
Chapter 1 design stages
Chapter 1  design stagesChapter 1  design stages
Chapter 1 design stages
 
Cut & bend rebars
Cut & bend rebarsCut & bend rebars
Cut & bend rebars
 
Manufacturing of Toggle Jack
Manufacturing of Toggle JackManufacturing of Toggle Jack
Manufacturing of Toggle Jack
 
product design and process selection
product design and  process selectionproduct design and  process selection
product design and process selection
 
Unit 3
Unit 3Unit 3
Unit 3
 
MFG 240 - Manufacturing DesignFinal ProjectScope of Project.docx
MFG 240 - Manufacturing DesignFinal ProjectScope of Project.docxMFG 240 - Manufacturing DesignFinal ProjectScope of Project.docx
MFG 240 - Manufacturing DesignFinal ProjectScope of Project.docx
 

Recently uploaded

Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxDeepakSakkari2
 
power system scada applications and uses
power system scada applications and usespower system scada applications and uses
power system scada applications and usesDevarapalliHaritha
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.eptoze12
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionDr.Costas Sachpazis
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024hassan khalil
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort servicejennyeacort
 
microprocessor 8085 and its interfacing
microprocessor 8085  and its interfacingmicroprocessor 8085  and its interfacing
microprocessor 8085 and its interfacingjaychoudhary37
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile servicerehmti665
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx959SahilShah
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxPoojaBan
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLDeelipZope
 
Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxbritheesh05
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfAsst.prof M.Gokilavani
 
Introduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptxIntroduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptxvipinkmenon1
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
chaitra-1.pptx fake news detection using machine learning
chaitra-1.pptx  fake news detection using machine learningchaitra-1.pptx  fake news detection using machine learning
chaitra-1.pptx fake news detection using machine learningmisbanausheenparvam
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 

Recently uploaded (20)

Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptx
 
power system scada applications and uses
power system scada applications and usespower system scada applications and uses
power system scada applications and uses
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
 
microprocessor 8085 and its interfacing
microprocessor 8085  and its interfacingmicroprocessor 8085  and its interfacing
microprocessor 8085 and its interfacing
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
 
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptx
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCL
 
Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptx
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
 
Introduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptxIntroduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptx
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
chaitra-1.pptx fake news detection using machine learning
chaitra-1.pptx  fake news detection using machine learningchaitra-1.pptx  fake news detection using machine learning
chaitra-1.pptx fake news detection using machine learning
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 

PROCESS PLANNING AND COST ESTIMATION OF MANUFACTURING THEBONNET.pptx

  • 1. PROCESS PLANNING AND COST ESTIMATION OF MANUFACTURING THE BONNET ⮚ ATHERSH N.G 191914068L
  • 2. 1. INTRODUCTION: • Process planning and cost estimation are two of the most important aspects of the manufacturing process. • Process planning involves determining the most efficient way to produce a product, while cost estimation involves determining the cost of producing the product. • These two elements are interrelated and must be considered together in order to make informed decisions about production. • In the context of manufacturing a bonnet, process planning involves determining the materials, equipment, and techniques that will be used to produce the bonnet. • This involves a number of steps, including product design and prototyping, tooling and fixture design, and machine setup and programming. • The goal of process planning is to ensure that the production process is efficient, consistent, and capable of producing high-quality products. • Cost estimation involves determining the cost of the materials, labor, and overhead required to produce the bonnet. This includes the cost of the raw materials, such as the metal or plastic used to make the bonnet, as well as the cost of the labor required to produce the bonnet, including any machining or assembly processes. • The first step in process planning for the manufacture of the bonnet is product design and prototyping.
  • 3. Once the design of the bonnet has been finalized, tooling and fixture design can begin. This involves creating the tools and fixtures that will be used to produce the bonnet, such as dies and molds • The next step in the process planning of the bonnet is machine setup and programming. • . This involves setting up the machines that will be used to produce the bonnet, such as presses and CNC machines. • Once the production process has been established, cost estimation can begin. • The cost of the materials used in the production of the bonnet must be determined, including the cost of the raw materials, such as metal or plastic, as well as the cost of any additional materials required, such as paint or adhesive. • The cost of labor must also be considered, including the cost of any machining or assembly processes required to produce the bonnet • Overhead costs, such as utilities, rent, and insurance, must also be taken into account when determining the cost of production. • These costs are often a significant portion of the total cost of production and must be carefully considered in order to ensure that the production process is profitable.
  • 4. 2. THEORETICAL BACKGROUND FOR MATERIAL REMOVAL • The theoretical background of process planning and cost estimation in manufacturing is a complex field that draws on a variety of disciplines, including engineering, operations management, and economics. • The goal of process planning is to determine the most efficient and cost-effective way to produce a product, while cost estimation involves determining the cost of producing the product. • These two elements are interrelated and must be considered together in order to make informed decisions about production • The goal of process planning is to ensure that the production process is efficient, consistent, and capable of producing high-quality products. • There are several key elements to the process planning process, including product design and prototyping, tooling and fixture design, and machine setup and programming. • Product design and prototyping is the first step in the process planning process. This involves creating a detailed design of the product, including its size, shape, and material specifications. • Once the design of the product has been finalised, tooling and fixture design can begin. This involves creating the tools and fixtures that will be used to produce the product, such as dies and moulds.
  • 5. The next step in the process planning process is machine setup and programming. This involves setting up the machines that will be used to produce the product, such as presses and CNC machines. • Cost estimation is the process of determining the cost of producing a product, including the cost of the materials, labour, and overhead required to produce the product. • The cost of the materials used in the production of the product must be determined, including the cost of the raw materials, such as metal or plastic, as well as the cost of any additional materials required, such as paint or adhesive. • The cost of labour must also be considered, including the cost of any machining or assembly processes required to produce the product. • Overhead costs, such as utilities, rent, and insurance, must also be taken into account when determining the cost of production. • The theoretical background of process planning and cost estimation in manufacturing draws on a number of different disciplines, including engineering, operations management, and economics. • Engineering provides the technical knowledge needed to design and produce the product, while operations management provides the knowledge needed to manage the production process. • Economics provides the framework for understanding the cost of production and making informed decisions about production.
  • 6. 3. BONNET Introduction • The bonnet, also known as a hood, is a component of a vehicle that covers the engine and protects it from the elements. • The bonnet is typically made of metal, such as steel or aluminum, and is designed to be durable and functional, while also complementing the overall appearance of the vehicle. • The bonnet is an important component of a vehicle, as it protects the engine and other mechanical components from damage caused by debris, rain, and other elements. • The bonnet also helps to direct air flow over the engine, which helps to cool it and improve its performance. • In addition, the bonnet helps to reduce wind resistance and improve aerodynamics, which can improve fuel efficiency and overall vehicle performance.
  • 7. Specifications • In terms of design, the bonnet can be either flat or curved, and may have a scoop or vents to allow air to enter and exit. The size and shape of the bonnet are determined by the size and configuration of the engine, as well as the overall design of the vehicle. • In terms of materials, the bonnet is typically made of metal, such as steel or aluminum, due to their strength and durability. Steel is often used for the main body of the bonnet, while aluminum is used for the hood scoop or vents. In some cases, composite materials, such as fiberglass, may be used to reduce weight and improve aerodynamics. • The manufacturing process for the bonnet typically involves cutting and shaping the metal to the desired shape, and welding the panels together to form the final product. The bonnet may also be painted or coated with a corrosion-resistant finish to protect it from the elements. • The bonnet is an important component of a vehicle that protects the engine and other mechanical components from damage, improves aerodynamics and fuel efficiency, and enhances the overall appearance of the vehicle. The design, materials, and manufacturing process for the bonnet must be carefully considered to ensure that it is durable, functional, and aesthetically pleasing.
  • 8. 4. Tooling Selection Constraints Tooling selection is an important aspect of the manufacturing process The selection of tooling for the production of the bonnet must take into account several key constraints that can impact the process. 1. Material Properties: The properties of the material used to make the bonnet can impact the selection of tooling. For example, certain materials, such as aluminum, may require specialized tooling to avoid damage or deformation during the manufacturing process. 2. Production Volume: The production volume of the bonnet will impact the selection of tooling, as the cost of the tooling must be justified by the volume of product produced.
  • 9. 3. Production Speed: The desired production speed will impact the selection of tooling, as high-speed production processes may require specialized tooling that can handle the high speeds without causing damage to the material or the tooling itself. 4. Tolerance Requirements: The tolerance requirements for the bonnet will impact the selection of tooling, as the tooling must be able to produce parts that meet the required tolerances. Tighter tolerances will require specialized tooling and may result in higher costs. 5. Surface Finish Requirements: The surface finish requirements for the bonnet will impact the selection of tooling, as the tooling must be able to produce parts with the required surface finish. Higher surface finish requirements will require specialized tooling and may result in higher costs. 6. Cost: The cost of the tooling is a key constraint in the selection process, as the tooling must be cost-effective and justified by the volume of product produced and the efficiency of the manufacturing process. 7. Availability: The availability of the tooling is another important constraint in the selection process, as the tooling must be readily available to support the manufacturing schedule. The lead time for tooling must be considered when selecting tooling, as long lead times can impact the manufacturing schedule.
  • 10. 8. Maintenance Requirements: The maintenance requirements for the tooling must be considered when selecting tooling, as regular maintenance will be necessary to ensure the continued efficiency and accuracy of the tooling. 9. Flexibility: The flexibility of the tooling must also be considered when selecting tooling, as the tooling must be able to accommodate changes in the design or specifications of the bonnet without requiring significant modifications. The selection of tooling for the production of the bonnet must take into account several key constraints, including material properties, production volume, production speed, tolerance requirements, surface finish requirements, cost, availability, maintenance requirements, and flexibility. By considering these constraints, the manufacturer can ensure that the tooling selected is the best fit for the specific requirements of the production process.
  • 12. Process planning involves several key steps, including product design and analysis, process selection, tooling selection, and process documentation. Product Design and Analysis: The first step in process planning is to review and analyze the design of the bonnet, including the material properties, size, and shape. This information is used to determine the optimal manufacturing process and to identify any potential issues that may impact the quality of the final product. Process Selection: Once the design of the bonnet has been reviewed and analyzed, the next step is to select the optimal manufacturing process. The process selection will depend on several factors, including the volume of production, the desired production speed, the material properties, and the tolerance requirements. Tooling Selection: After the process has been selected, the next step is to select the necessary tooling. This includes the selection of cutting tools, jigs, fixtures, and any other equipment required to produce the bonnet. Process Documentation: Once the process and tooling have been selected, the final step is to document the process. This includes the creation of detailed process plans, including process flow diagrams, and the documentation of the tooling and equipment used.
  • 13. 6. Cost estimation Cost estimation is a crucial step in the manufacturing of the bonnet, as it determines the overall cost of producing the product and provides a basis for pricing the final product. Cost estimation is the process of determining the costs associated with all of the resources required to produce the bonnet, including materials, labour, and overhead. Material Costs: The cost of materials is one of the largest components of the cost of producing the bonnet. This includes the cost of the raw materials used to manufacture the bonnet, as well as the cost of any additional materials required, such as fasteners, adhesives, and coatings. The cost of materials can be determined through the use of historical data, market research, and vendor quotes. Labour Costs: Labor costs are another important component of the cost of producing the bonnet, and they include the costs of the employees who perform the work, as well as the costs of benefits, training, and other personnel-related expenses. The cost of labor can be estimated based on the prevailing wages for the job, the experience level of the workers, and the required skill levels.
  • 14. Overhead Costs: Overhead costs are the indirect costs associated with the production of the bonnet, and they include costs such as utilities, rent, insurance, and maintenance. These costs must be estimated and included in the overall cost of production in order to accurately reflect the total cost of producing the bonnet. Equipment Costs: The cost of equipment is another important component of the cost of producing the bonnet, and it includes the cost of the tools and equipment required to produce the product, as well as the cost of maintenance and repair. The cost of equipment can be estimated based on historical data, vendor quotes, and depreciation schedules. Scrap and Waste Costs: The costs of scrap and waste materials must also be included in the cost of producing the bonnet, as these materials represent a cost to the manufacturer that must be recovered through the sale of the product. These costs can be estimated based on the historical experience of the manufacturer and the expected yield of the manufacturing process.
  • 15. The cost of production includes the costs of materials, labour, overhead, equipment, and scrap and waste materials, and these costs must be accurately estimated in order to ensure that the final price of the product is competitive and that the manufacturer is able to make a profit. By using a systematic approach to cost estimation, the manufacturer can ensure that the most accurate estimate of the cost of production possible is determined, and that the final price of the product is based on a solid foundation of data and analysis.
  • 16. 7. EVALUATION : In this article, we will evaluate various cost estimation methods used in the aerospace industry BOTTOM-UP ESTIMATION : This method involves breaking down a project into smaller, manageable components and estimating the cost of each component. The costs of these components are then aggregated to obtain the estimated cost of the entire project. This method is particularly useful for projects with a well-defined scope and detailed information about the components. The bottom-up estimation method is time-consuming, but it provides a high level of accuracy in the cost estimate. TOP-DOWN ESTIMATION : This method involves using historical data and expert judgment to make a rough estimate of the project cost. This method is less detailed and less time-consuming than the bottom-up estimation method, but it provides a rough estimate of the project cost. This method is particularly useful for projects with a high level of uncertainty and limited information about the components.
  • 17. PARAMETRIC COST ESTIMATION : This method involves using mathematical models to estimate the cost of a project based on a set of parameters such as weight, size, and performance specifications. The models are developed using historical data and cost information. This method provides a more accurate cost estimate than the top- down method, ANALOGOUS COST ESTIMATION : This method involves using the cost data from similar projects to estimate the cost of a new project. This method is less time-consuming than the bottom-up or parametric methods, and it can provide a quick estimate of the project cost. However, this method is only useful if the similar projects are closely related in terms of size, complexity, and other relevant parameters. EXPERT JUDGMENT : This method involves using the experience and judgement of experts in the aerospace industry to estimate the cost of a project. The experts use their knowledge of past projects, industry practices, and other relevant factors to make an estimate. This method is useful for projects with a high level of uncertainty, and it can provide a quick estimate of the project cost. However, the accuracy of this method depends on the expertise and experience of the experts involved.
  • 18. 8. Analysis Materials: The cost of materials is one of the largest components of the cost of producing a bonnet, and it includes the cost of the raw materials used to manufacture the product, as well as the cost of any additional materials required, such as fasteners, adhesives, and coatings. The cost of materials can be determined through the use of historical data, market research, and vendor quotes. Labour: Labor costs are another important component of the cost of producing a bonnet, and they include the costs of the employees who perform the work, as well as the costs of benefits, training, and other personnel-related expenses. The cost of labour can be estimated based on the prevailing wages for the job, the experience level of the workers, and the required skill levels.
  • 19. Overhead: Overhead costs are the indirect costs associated with the production of a bonnet, and they include costs such as utilities, rent, insurance, and maintenance. These costs must be estimated and included in the overall cost of production in order to accurately reflect the total cost of producing the bonnet. Equipment: The cost of equipment is another important component of the cost of producing a bonnet, and it includes the cost of the tools and equipment required to produce the product, as well as the cost of maintenance and repair. The cost of equipment can be estimated based on historical data, vendor quotes, and depreciation schedules. Scrap and Waste: The costs of scrap and waste materials must also be included in the cost of producing a bonnet, as these materials represent a cost to the manufacturer that must be recovered through the sale of the product. These costs can be estimated based on the historical experience of the manufacturer and the expected yield of the manufacturing process.
  • 20. 9. Survey Report and Data
  • 21. 10. Conclusion: • In conclusion, process planning and cost estimation are crucial steps in the manufacturing of a bonnet. • Process planning involves the selection of appropriate tools and techniques for the production process and determining the most efficient way to produce the bonnet. • Cost estimation involves determining the costs associated with the production process, including direct and indirect costs, and determining the total cost of manufacturing the bonnet. • By conducting a thorough process planning and cost estimation analysis, manufacturers can ensure that the production process is efficient and cost- effective, leading to improved profitability and competitiveness in the market.