SlideShare a Scribd company logo
NEED-4-SEAT
GROUP LEADER - LAI YIMEI
GROUP MEMBERS:
SHAHRUL HADI
SABRINA ZAMRI
RIDHUAN RAHIMAN
FADLI ELIAS
FIKRI RAHMAN
AL-NISA MAJEED
RAIHAN MANSOR
Problem statement
 Misuse of priority seats in Bus/MRT.
 Abuse of privilege.
Introduction
Reserved seat being misused.
Grumpy old man enters and passenger
fails to give up seat.
Unnecessary rage outbreak.
Current Situation
October 2015, train
employee occupies 2
seats, leaving an old
man to squeeze at the
corner.
September 2013, being
totally ignorant of an old
woman standing.
OBJECTIVE & GOALS
Objective:
 Provide a hassle free priority seat for senior citizens.
 To provide everyone a safe and enjoyable ride to their
destination.
Goals:
 Make positive impression at the end of the project.
 Garner attention from interested 3rd parties.
RFID
• Tap
• (RFID is always on standby)
Servo
motor
• Unlock
Limit switch
• When the seats is
close
Servo
motor
• Lock
Working Principles
RFID
3. Chair opens.
1. Tap card
Servo motor
2. Unlock
Metal bracket
4. Acts as support
when weight is
exerted.
Programming
1. 2.
3. 4.
Fabrication process
Servo motor extension
Fabrication process
Designing
Process Making
Process Making
Assembly of parts
Final Product
CHALLENGES FACED
o Programming.
o Limited knowledge on electrical.
o Troubleshoot with product.
o Constant changes in design.
GANTT CHART
Bill of materials
Materials Quantity
Wooden plank 2
Wood 1
Screws 24
Metal brackets 13
Double hinge 2
Servo motor 1
Copper board 1
Limit switch 1
Resistor 10,000 Ω 1
Arduino 1
Wires 2 metres
Container 1
= $156.40
Feedback
YES – 82.76%
NO – 13.79%
OTHERS – 3.45%
0 10 20 30 40 50 60 70 80 90
OTHERS
NO
YES
Do you think a card accessible priority seat is
elderly/disabled friendly?
YES – 63.33%
NO – 26.67%
OTHERS – 10%
0 10 20 30 40 50 60 70
OTHERS
NO
YES
Do you think this is a need in our public transport
system?
0.00% 10.00% 20.00% 30.00% 40.00% 50.00% 60.00% 70.00%
50/50
BAD
GOOD
Is this a good or bad initiative to have?
GOOD – 62.05%
BAD – 3.45%
50/50 – 34.48%
Future Improvements
 Applicable for a wider audience.
 Better security system.
 Use a proximity sensor , instead of the limit switch.
Presentation Slide

More Related Content

Viewers also liked

1edit
1edit1edit
Chapter 22
Chapter 22Chapter 22
Chapter 22
ezasso
 
Innovative Zoning Strategies Workshop - Transit Oriented Development
Innovative Zoning Strategies Workshop - Transit Oriented DevelopmentInnovative Zoning Strategies Workshop - Transit Oriented Development
Innovative Zoning Strategies Workshop - Transit Oriented Development
American Planning Association - Massachusetts Chapter
 
Diabetes
DiabetesDiabetes
Diabetes
Poonam Singh
 
Human Business Design SXSW
Human Business Design SXSWHuman Business Design SXSW
Human Business Design SXSW
BatesHook
 
L1 Planning for Earthwork Construction
L1 Planning for Earthwork ConstructionL1 Planning for Earthwork Construction
L1 Planning for Earthwork Construction
Don W. Lewis
 
ArcGIS: mapas inteligentes para todos
ArcGIS: mapas inteligentes para todosArcGIS: mapas inteligentes para todos
ArcGIS: mapas inteligentes para todos
Esri
 
Ejercicios arte renacimiento.
Ejercicios arte renacimiento.Ejercicios arte renacimiento.
Ejercicios arte renacimiento.
Muchoarte
 
Critical Path Method (CPM) & Network Analysis
Critical Path Method (CPM) & Network AnalysisCritical Path Method (CPM) & Network Analysis
Critical Path Method (CPM) & Network Analysis
Asif Sultan Razu
 
DARPNotes_Fall2013
DARPNotes_Fall2013DARPNotes_Fall2013
DARPNotes_Fall2013
Gerard Francis Sales
 
Neundenker
NeundenkerNeundenker
Neundenker
Neundenker Ag
 

Viewers also liked (11)

1edit
1edit1edit
1edit
 
Chapter 22
Chapter 22Chapter 22
Chapter 22
 
Innovative Zoning Strategies Workshop - Transit Oriented Development
Innovative Zoning Strategies Workshop - Transit Oriented DevelopmentInnovative Zoning Strategies Workshop - Transit Oriented Development
Innovative Zoning Strategies Workshop - Transit Oriented Development
 
Diabetes
DiabetesDiabetes
Diabetes
 
Human Business Design SXSW
Human Business Design SXSWHuman Business Design SXSW
Human Business Design SXSW
 
L1 Planning for Earthwork Construction
L1 Planning for Earthwork ConstructionL1 Planning for Earthwork Construction
L1 Planning for Earthwork Construction
 
ArcGIS: mapas inteligentes para todos
ArcGIS: mapas inteligentes para todosArcGIS: mapas inteligentes para todos
ArcGIS: mapas inteligentes para todos
 
Ejercicios arte renacimiento.
Ejercicios arte renacimiento.Ejercicios arte renacimiento.
Ejercicios arte renacimiento.
 
Critical Path Method (CPM) & Network Analysis
Critical Path Method (CPM) & Network AnalysisCritical Path Method (CPM) & Network Analysis
Critical Path Method (CPM) & Network Analysis
 
DARPNotes_Fall2013
DARPNotes_Fall2013DARPNotes_Fall2013
DARPNotes_Fall2013
 
Neundenker
NeundenkerNeundenker
Neundenker
 

Presentation Slide

Editor's Notes

  1. yimei
  2. yimei
  3. yimei
  4. Stomp pictures and descriptionn. SHAHRUL
  5. SHAHRUL
  6. SAB
  7. sab
  8. SAB
  9. Sab
  10. raihan
  11. raihan
  12. 2d drawing. raihan
  13. FIKRI
  14. FIKRI
  15. FIKRI
  16. fikri
  17. rid
  18. rid
  19. rid
  20. rid
  21. rid
  22. fad
  23. fad
  24. fad
  25. EXPLAIN WHAT ARE THE OTHERS IN PRESENTATION. nisa
  26. EXPLAIN WHAT ARE THE OTHERS IN PRESENTATION. nisa
  27. nisa