The document summarizes the activities of Engineering Plant Group (EP Group), an international consortium specializing in technology transfer for precision engineering. EP Group has offices in Slovakia, Russia, and other locations, employing over 1000 people and completing over 350 projects. In Russia, EP Group works through Engineering Plant Group RUS (EPG) which is part of the Technounity Cluster in Zelenograd, specializing in microelectronics and high technology sectors. EPG provides complete solutions for high-tech industry creation including engineering, construction, equipment installation and more.
Verification Amendment guidelines. An awareness and sensitisation meeting conducted to inform Uganda shippers about the new developments. Container weight verification for July 2016. Summary of requirements.
Website development services_in_delhi_ncrWebsite 999
#Website #Development Services In #DelhiNCR - #Website999 gives you an interactive & customized website development services with latest advanced #technologies. See more @ http://tinyurl.com/oelxw4n
Wsc guidelines for implementing the solas container weight verification requi...Uganda Coffee Federation
Verification Amendment guidelines. An awareness and sensitisation meeting conducted to inform Uganda shippers about the new developments. Guidelines for improving safety and implementing the SOLAS container
Verification Amendment guidelines. An awareness and sensitisation meeting conducted to inform Uganda shippers about the new developments. Container weight verification for July 2016. Summary of requirements.
Website development services_in_delhi_ncrWebsite 999
#Website #Development Services In #DelhiNCR - #Website999 gives you an interactive & customized website development services with latest advanced #technologies. See more @ http://tinyurl.com/oelxw4n
Wsc guidelines for implementing the solas container weight verification requi...Uganda Coffee Federation
Verification Amendment guidelines. An awareness and sensitisation meeting conducted to inform Uganda shippers about the new developments. Guidelines for improving safety and implementing the SOLAS container
2. Engineering Plant Group (EP Group) – International consortium of High Technology
companies specializing in the transfer of Microelectronic and Instrumentation Technologies.
In Russia EP Group presents “Engineering Plant Group RUS” (EPG) – union of Russian
and foreign companies which produce high technological equipment and provide complete
solutions in creation Hi-Tech enterprises of precision engineering industry.
Consortium Details
Main Office:
Slovakia, Bratislava
Russian Office:
Моscow, Zelenograd
Representation :
Europe, North America, Asia
Employees: > 1000
Projects Completed: > 350
3. “Engineering Plant Group RUS” is a part of innovation territorial Cluster of Zelenograd
“Technounity” specialising in the development, production within the Microelectronics and
High technology sectors.
Zelenograd Cluster
Cluster group investment:
Group enterprise companies: ~100
Total Revenue: 24,7 Billion Rubbles.
Export Revenues: 28%
Economic cluster revenue % of SME (Small Medium Enterprises): 21%
Production and Services contribution: 84%
Holding Company operation costs: 4,9 Billion Rubbles.
Total planned investment for the period up to 2017: 153 Billion Rubbles.
4. Business partners in Russia
КАЧЕСТВО – НАША ПОЗИЦИЯ
www.pribor.ru
Universal Pribor (pribor.ru) – Development and manufacture of
test equipment, industrial furniture and technological equipment.
SKTO Promproject (ckto-promproekt.ru) – planning and
design, installation of clean rooms and special engineering
facilities.
Giredmet GN RF (giredmet.ru) – Leading research and
production organisation, material physics and structures.
NT-MDT (ntmdt.ru) – development, manufacture, implementation
of analytical equipment.
Kosmosaviastroy (kasstroy.ru) – implementation of “turn key”
complex projects and innovative enterprises.
NPP ESTO (nppesto.ru) – development, manufacturing and
implementation of technological equipment and services .
5. Our Experts in Russia
Vladimir Kartavtsev
Design and construction
Oleg Vahrushev
Assembly facilities and technologies
Anton Кuznetsov
Technological and analytical
equipment
Matvey Vinokur
Semiconductor Production
Georgy Vinogradov
Plasma-Chemical Technology
Arnold Terra
Research Studies of Physical Technical
properties
6. History
Repair and refurbish of
technology equipment
1991 ..1993 .. 1995 .. 1998
Manufacture of lazer
equipment.
Delivery of pilot line
equipment
Manufacture of analytical
equipment
(Microscopes)
Manufacture of vacuum
and Plazmachemical
equipment
SKTO “Promproect” own
Business
.. 2000 .. 2001 .. 2002 .. 2003
.. 2005 .. 2006 .. 2007 .. 2010 .. 2011
Designed and manufacture of a
new series of vacuum and laser
equipment
Process of assembling
specialised engineering systems.
Providing sub contractor support
globally
.. 2012 .. 2014 ..
Company participated
in the implementation
of high technology
equipment for a
1million м2 Facility
First transfer of
technology from STM
Microelectronics
(France) to “ NIIME and
Micron”
Timeline of development and implementation of Group companies and
technologies.
10. Project design
Steps:
Preparing of initial permissive documentation
Preparing of design documents
Governmental audit of documents
Preparing working design documentation
Preparing assembly documentation
Preparing and presentation of Executive
Documentation
12. Reconstruction
Steps:
Document preparation
Clean room assembly
Clean room laminar flow assembly and test
Gas and Chemical system installation
Installation of de-ionisation system
Gas and Chemical waste management
Equipment installation and facilitation of
equipment including Electrical, Mechanical
and gas.
Electrical facilitation
Process qualification and acceptance
13. Heating Supplies
Chillers
Air conditioning Electrical supplies
Conditioning
Automation
Water treatment
Water treatment
Fire prevention
Gasses and
Treatment
Chemical solutions
De-ionisation
Engineering systems and Equipment
14. Technology
Steps:
Design of Technological specification
Equipment manufacturers visiting
Clarify terms and conditions of delivery
Purchasing and logistics
Work flow planning
Сustoms clearance
Equipment installation and acceptance
Process acceptance
Training of engineers and operators
15. Lithography Vacuum Thermal Chemical Analytical
Technical equipment and processes
Assembly and test equipmentEpitaxy
16. Implementation Process
Provide easy access to information about advanced technologies
Help in choosing a new competitive serial product
Flexible financing solutions in the implementation of the transfer of advanced
technologies
A comprehensive integrated approach to the creation of high-tech industries
Work organization within the restrictions imposed by the regime of the
Customer side
Consolidation of responsibility at all stages of implementation of the investment
project
Expert technology and engineering support at all stages of the life cycle of the
technology
18. Foreign Business partners
EP Rožnov, а.s.
Инженерная, проектно-строительная компания – поставщик услуг в
инвестиционном строительстве высокотехнологичных предприятий с
чистыми и кондиционируемыми помещениями.
Компания основана в 1982г. как филиал фирмы Elektroprojekta Praga,
который в 1992 году был акционирован.
Первоначальная специализация - электронная промышленность со
временем расширена на приборостроение, фотовольтаику, фармацевтику
История EP Rožnov, а.s.
19. License and certifications
Engineering Plant Group allowed for works related to the use of information
constituting a state secret, space activities, as well as to serve as general
contractor for the project.
20. Competitive Advantages
Broad technical experience in projects involving fabrication facilities and high
technology processes in Russia.
The Group has many years of experience working together as a team providing
total solutions.
Knowledge of Russian and Foreign regulations associated with many working
standards.
Professional services and specialisations
In-House specialists and technologists
Highly qualified and educated specialists within the team
Positive feedback from customers
Company is located within the Russian Silicon Valley of Zelenograd.
Knowledge of market new and refurbished equipment.
Long established relationship with equipment manufacturers.
22. 2011 – 2012 гг. Contract negotiations for mono crystal fabrication SBIS
for technologies CMOS 200mm/90Nm based in “NIIME and Mikron”, Zelenograd.
Microelectronics
Technology Partner:
STMicroelectronics (France)
Investor: GK “ Rosnanotech”
Investment: 16,5 Billion Rubbles.
Total Area : 9477 м2
Clean Room ISO : 5/6
Since the establishment of the manufacturing facility
it has doubled its manufacturing by approximately
36,000, 200 mm ingots per year..
Applications:
Production market plan is for digital TV, Mobile
devices, GPS/GLONASS, navigation, systems
automation, automobile electronics and smart
cards..
Scope of work:
projection/ planning, quality control of technology
equipment installation and performance
23. 2013 – 2014. Contract negotiations for SBIS and SNK
for technologies CMOS 200mm/130+65 Nm based in “Angstrem-T”
Technology Partner :
AMD (USA)
Investor: GK “ “Vnesheconombank”
Investment: 45 billion Rubbles
Total Area – approx. - 50000 м2
Clean Rooms 5/6 ISO , 7500 м2
Technology: CMOS, 130 ÷ 65 nm
Production Output :
12 ÷ 15 thousand 200 мм wafers per month
Application :
products that will be manufactured with our
technologies targeted for domestic and international
markets of micro chips and telecommunication
systems, navigations and identification products.
Scope of work:
projection/ planning, quality control of technology
equipment installation and performance
Microelectronics
24. 2008 – 2010 гг. Created new manufacturing products through using experimental
sciences and technologies in RFYATS –VNIIEF, Sarov city.
Technology Partner:
NPP “ ESTO” ( Russia “)
Equipment Investment
1 Billion Rubbles.
Construction and technical equipment
Clean Rooms standards : 7/8/9 ISO
Applications:
Creative manufacturing GIS
on ceramic substrates 60х48 мм
Scope of work-
Supply, installation, hook-up and service of
technological equipment
Microelectronics
25. Technology Partner : LPE
Investors: Clean investments
Clean rooms Standards: 4/5/6 ISO, module 1000
м2
Technology: Gas phase epitaxial layers
Substrate: Silicon Sapphire
Applications:
products that will be manufactured with our
technologies targeted for domestic and international
markets of micro chips and telecommunication
systems, navigations and identification products.
Scope of work :
planning / installation of gas systems and combining
epitaxial reactors.
Microelectronics
2001, 2004, 2006, 2010, 2012 – created manufacture of gas phase epitaxial layers on
150 / 200мм substrates in “EPIEL” company
26. Technical Partner:
NPP “ESTO” ( Russia)
Investment:
1 Billion Rubbles.
Construction and Technology Equipment
Clean Rooms standard : 7/8/9 ISO
Applications:
Construction manufacture GIS on polycrystal
60х48 мм
Scope of work :
Construction and supply, installation, hook-up and
service of technological equipment
Microelectronics
2013 – to date. Construction of Telemetric equipment in “NPO IT”, Korolyov city.
27. 2012 – 2013 Deliver, start up and maintenance of Crystal growing equipment for PVA
TePla FZ-30 in FGUB “ NIIP” Moscow region city Lytkarino.
Technology Partner:
NPP “ ESTO” ( Russia )
Investment:
in technical equipment 150 million.
Clean room standards: 5/6/7 ISO
Applications:
manufacture of mono polycrystalline semiconductor
materials
Scope of work:
Construction and Supply, installation, hook-up and
service of technological equipment
Microelectronics
28. 2013 – to date. Manufacturing MEMS for “Konsern SNII Electropribor”
in St.Petersburg.
Instrumentation
Technical Partner:
TRONICS (France)
Investment:
2,5 Billion rubbles.
Construction area and technical equipment
: 4000 м2
Clean Room standard : ISO 5/6/7/8
Applications:
This product is used for naval navigation systems, in
national systems, Hydroscopic equipment..
Scope of work:
Planning, construction and Supply, installation,
hook-up and service of technological equipment
29. 2013 – 2014. assembly of radio electronic modules on “NPP BRESLER” city
Chiboksary.
Technical Partners:
YAMAHA MOTOR GROUP and i-PULSE (Japan),
SEHO (Germany), DCT (Chez Republic), AIM
(Canada)
Investment:
25 million rubbles.
Technical equipment area: 200 м2
Clean rooms standard: 8 ISO
Application :
This product is used for the implementation in
manufacturing of micro processor protection
systems.
Scope of work.
Supply, installation, hook-up and service of
technological equipment
Instrumentation
30. 2004 – 2012. assembly of technical equipment of radio electronic modules on “ Russian
University radio navigation and time, city St.Petersburg.
Technology Partner:
YAMAHA MOTOR GROUP and i-PULSE (Japan),
SEHO (Germany), DCT (Chex republic), AIM
(Canada)
Investment:
150 million Rubbles.
High technology Area: 200 м2
Clean Room Standard ISO : 8
Application :
This product is used for manufacturing systems and
system integration of information and radio
navigation systems including global navigations
satellite systems. (GNSS) GLONASS and GPS.
Scope of work
Supply, installation, hook-up and service of
technological equipment
Instrumentation
31. 2005 – 2014. Construct a high technology manufacturing assembly line of high
technology radio electronic modules on FGUP “ SPO “ Analitpribo, city: Smolensk.
Technical parners:
YAMAHA MOTOR GROUP and i-PULSE (Japan),
SEHO (Germany), DCT (Chez Republic), AIM
(Canada)
Investment:
100 Million rubbles.
High Technology Area: 250 м2
Clean room standard ISO: 8
Application :
Products are used for gas analytical technologies .
Scope of work:
Supply, installation, hook-up and service of
technological equipment
Instrumentation
32. 2013 – 2014. constructed a manufacturing line for drawing fibre optic gyro scopes
(BOG) on “ Konsern SNII Elektropribor” in St.Petersburg.
Fibre production
Technical Partner
NEXTROM (Finland)
Investment:
1,5 Billion Rubbles.
Assemble and High technology area : 3000 м2
Clean Room Standards ISO : 6/7/8
Application:
This product is used for Naval navigation systems,
inertial systems and high gyroscopy systems..
Scope of work:
Planning, construction and high technology
Equipment
33. 2012 г. – 2013 г. Constructed research complex “NanoPro” with Zone “Nanofab” in
NBIKS-Center based on NIS “Kurchatov university”, Moscow.
Research Studies
Technical Partner:
NT-MDT (Russia)
Trend:
“Industrial Nanosystems”, “Research Complex», IK
“ Nano Pro” with Zone “Nano Fab”,
Area: 1600 м2
Clean room standard: ISO 4/5/6/7/8
Application :
NBIKS-Centre created for research in the area of
Nano, Bio, information of cognitive science
Social academic science and technologies
with x –ray synchrotron and neutron radiation
.
Scope of work:
Planning and high technology Equipment
34. 2009 . Research Centre of high Temperature transfer and nano structures in FIAN of
P.N. Labedev.
Research Studies
Technical Partner:
Massachusetts University of technology ( USA)
Construction and high technology equipment:
Institute of Nuclear research
Total Area: 6500 м2
Clean room standards: ISO 5/6/7
Gel and gas Liquefaction with N2/ H2O phases
Application :
Centre was created for researching into high
temperature transfer and Nano Structure
applications
Scope of work:
Planning and Supply, installation, hook-up and
service of technological equipment
35. 2013 – 2017. Construction of technical laboratories complex for location NIOKR- centre
in FTI of A.F. IOFFE RAN, St. Petersburg.
Technolgy Partners:
RIBER, AIXTRON and Oxford Instruments
Total Investment: 3,7 Billion Rubbles.
Construction area and High Technology
equipment.: 24000 м2
Clean room Standard: ISO 5/6/7/8
Hydrogen generation, Nitrogen gasification and
Nitrogen cryogenic station, DI Water stations system
Application :
Process technology with wide manufacturing
applications
Scope of work:
Planning and Supply, installation, hook-up and
service of technological equipment.
Research Studies