Company basic information

            • Company name:
              CHEMOSERVIS-DWORY S.A.
            • Location:
              Oświęcim, 60 km SW of Cracow
            • Industry sectors:
              chemical, petrochemical, energy
              and environment protection
            • Fundation date:
              January 5th, 1998
Business mission
We want to be a strategic partner, offering innovative
solutions and services to help our customers achieve their
own success. We are taking care of a good business
relationship with customers, which is why we aim to
resolve any problems that arise in a reliable and honest
way. We supply our customers in technologies based on
the latest technical ideas. We understand the needs of our
customers and we use our knowledge to create their
success.
Keys to understanding our business
What we do
The principal activities of the Company is maintaince on
industrial installations as well as repairs of machinery and
equipment, construction and assembling services and the
general implementation of the projects. Wide range of
company services completes the machining of metal parts
and diagnostics of machines and industrial equipment.

Company carries out its services primarily in the
chemical,   petrochemical,    energy    and   environment
protection segments.
Within each segment, the company
offers the following services:
                     • Supervision of the
    Technical          machinery, equipment and
 maintenance for       installation.
 industrial plants   • Monitoring of the machinery
                       and equipment working conditions.
      (24/7)         • Machines and installations
                       troubleshooting.


                     • Recover the ability to the
   Installations,      industrial use,
  equipment and      • Repairs during the installation
 industrial valves     process stops.
      repairs        • Static and dynamic balancing of
                       rotating elements.
Within each segment, the company
offers the following services:
                     • Mass and medium series
                       production from the
                       documentation provided by the
 Metal machining       customer or a pattern.
                     • Turning, milling, slotting, planing
                       and sanding.



                     • Implementation of the construction
                       and modernization tasks of
                       industrial facilities as a General
Construction works     Contractor,
                     • Making and assembling of
                       equipment and pressure vessels.
The story so far
In 1998, as a result of the Oświęcim Chemical Factory privatization
process we became a separate economic entity, taking the legal
form of a limited liability company. After an ownership changes in
2007, company became a joint-stock firm. Since that time the
company began to implement development strategies outlined by
the Management Board, which assumed new markets for services.
Stock Exchange
A key moment in the history of the company was the debut
of the parallel market of the Warsaw Stock Exchange in 2008.




In 2010-2012 the company issued new shares and received
about 14.000.000 € from the stock investors.
Capital Group
CHEMOSERVIS-DWORY Group was established on October 1st,
2009 as a result of the acquisition by the company of a 100% stake
in the Zakład Energetyczny ZEN Sp. z o.o. based in Dąbrowa
Górnicza. In 2010, the Group increased as a consequence of
another acquisition - K-Protos a.s. based in Kralupy on the Vltava
(Czech Republic). In July 2012 company decided to acquire of a
majority stake in Bydgoszcz company MD-PROECO Sp. z o.o.
Capital Group
Zakład Energetyczny ZEN Sp. z o.o. - its core operates at two facilities
located in Dabrowa Górnicza and Świętochłowice. The company
performs work in the field of electricity and energy in the renovation,
modernization and the periodic inspection of machinery and
equipment, as well as building new construction.
Capital Group
K-Protos a.s. - provides comprehensive services in the field of
electrical engineering and maintenance for the chemical and
petrochemical industries in their branches in the Czech Republic
in the Kralupy on Vltava , Neratowice and Kolin.
Capital Group
MD-PROECO Sp. z o.o. – provides disposal services for hazardous
and   non-hazardous     waste   for   industrial   customers   and
institutions. For the thermal disposal company accepts solid
waste, liquid and pasty. The company also deals with the recovery
of energy from all type of waste.
Capital Group structure

                         CHEMOSERVIS-DWORY S.A.




   Zakład Energetyczny                                        MD-Proeco
                                K-Protos a.s.
      ZEN Sp. z o.o.                                           Sp. z o.o.



      Zakład Usług                              PETRO Kor
     Energetycznych
    SERWIS Sp. z o.o.                            Sp. z o.o.



Due to the consolidation in accordance with international financial
reporting standards, companies ZUE SERWIS Sp. z o.o. and PETRO Kor
Sp. z o.o. we do not include into the Capital Group.
Group potential
Employment                 2009    2010      2011

Total, including:          609       836     852

• Project managers           8        16      18

• Technical staff           27        34      36

• Direct workers           497       680      652



 Financial (in thous. €)   2009    2010      2011

 • Income from net sale    9.832   11.103   12.255

 • EBITDA                   188      270      425

 • Net profit                39      160      378

 • Total assets            5.695   13.512   15.032
Group potential
 Capital Group development trend (employment)
1000

 900

 800

 700

 600

 500

 400

 300

 200

 100

   0
                  2009                       2010                             2011

       Direct workers    Total employees   Expon. (Direct workers)   Expon. (Total employees)
Group potential
 Capital Group development trend (financial)
18000000

16000000

14000000

12000000

10000000

8000000

6000000

4000000

2000000

      0
                  2009                      2010                             2011

               Income    Total assets   Expon. (Income)   Expon. (Total assets)
Technical infrastructure
•   Production workshops with over 9000 m2 surface of up to 14 m height.

•   2,5 t; 5,0 t and 10,0 t cranes.

•   Metallic                          carpentry                     machines
    (cutting, drilling, bending, slotting, grinding, planing, boring, vertical
    and universal milling, etc.).

•   Welding equipment (VE, G, TIG, MIG, MAG).

•   Own railroad access as well as heavy road transportation.

•   State-of-art laboratory and diagnostic equipment.

•   Energy and power equipment for high voltage works (110kV).

•   Tanks, pipelines and pressure vessels production equipment.

•   In-house design engineers team.
Technical infrastructure
Good and modern technical infrastructure as well as cooperation
with leading design and project management partners (West
Technologies & Tradings) allows for any type of the
Engineering, Procurement, Construction Management (EPCM)
projects.
Quality Management System
The company pays a strong attention to quality of
works,   resources   planning   and   project    execution
monitoring in accordance with the requirements of ISO
9001, certified by TÜV Rheinland and StavCert.
Quality Management System
• All of the management and operational procedures are
  in accordance to the ISO 9001 standards.

• All employees are obliged to follow ISO 9001
  procedures and related job descriptions.

• The ISO audits are regularly carried out by TÜV
  Rheinland and StavCert.

• Project management procedures and workflow planning
  are performed with support of the MS Project software
  and other electronic tools.
Major technical authorizations
      UDT certificate for repair of
          steam and water                Welding certificate
           boilers, pressure           PN-EN ISO 3834-2:2007
       tanks, dangerous liquids
       tanks and technological
               pipelines.



          UDT certificate to            Non-destructive test
      prefabricate, manufacture         laboratory certificate
           and distribution
       technological pipelines.


                                          UDT certificate to
          UDT certificate to             prefabrication and
      prefabricate, manufacture       manufacturing of pressure
      and distribution pressure            equipment and
       and non-pressure tanks.         technological pipelines
Health and safety standards
•   Health procedures: the company fulfills all necessary
    requirements of the Polish Labor Code and related EU
    regulations. Employees are periodically checked by medical
    doctors and work conditions are constantly monitored.
    Employees with no valid medical permission are not allowed to
    work.

•   Safety procedures: the company annually performs „Professional
    Risk” evaluation to identify all related dangerous factors and risks
    at all work positions. That allows to minimize safety risks and
    losses related to unpredictable situations.

•   Environment protection: the company operates conform all
    related environmental requirements and obligations, holds
    necessary permits for waste generation and monitors current
    waste management. Waste reports are submitted regularly to
    relevant authorities.
Our major clients
Our other clients
Selected experience
Client:             Petro Mechanika S.A.

Object:             Orlen Mozheikiu Rafinery (Lithuania)

Contract value:     460.293 €

Execution period:   September 2007 – November 2007

Scope of work:      Revamp of refining equipment and piping
Selected experience
Client:             Synthos Dwory 7 Sp. z o.o. S.K.A.

Object:             Chemical installations in Oświęcim

Contract value:     10.439.298 €

Execution period:   January 2008 – December 2011

Scope of work:      General maintenance and repair services for one of the largest Polish
                    chemicals manufacturer
Selected experience
Client:             PKN Orlen S.A.

Object:             Diesel fuel ramp in the Ostrów Wielkopolski Fuel Base

Contract value:     52.369 €

Execution period:   March 2008 – July 2008

Scope of work:      Replacement of the upper arm of the fuel pumping installation
Selected experience
Client:             Naftoserwis Sp. z o.o.

Object:             Fuels base in Kawice

Contract value:     42.373 €

Execution period:   March 2009 – April 2009

Scope of work:      Welding and equipment assembly works in the fuel tanks park
Selected experience
Client:             ZAK S.A.

Object:             Nitrogen production plant in Kędzierzyn-Koźle

Contract value:     723.192 €

Execution period:   March 2009 – July 2010

Scope of work:      Design, delivery and replacement of the E-202 cooling unit and
                    the D-201 column together with all related piping and connections
Selected experience
Client:             Bioagra-Oil S.A.

Object:             Methylester (bio-diesel) production plant in Tychy

Contract value:     4.448.778 €

Execution period:   August 2009 – December 2010

Scope of work:      General contractor of the bio-diesel plant, delivery and assembly of
                    steel structures, mechanical and electrical works, etc.
Selected experience
Client:             Veolia Environmental Services Sp. z o.o.

Object:             Waste water treatment plant in Cracow

Contract value:     978.162 €

Execution period:   November 2009 – September 2010

Scope of work:      Production, delivery and assembly of the exhaust piping channels
Selected experience
Client:             Veolia Environmental Services Sp. z o.o.

Object:             Waste water treatment plant in Warsaw

Contract value:     2.493.765 €

Execution period:   March 2010 – September 2011

Scope of work:      Production, delivery and assembly of the technological piping
                    together with all necessary connectors, supports and thermic isolation
Selected experience
Client:             Grupa Lotos S.A.

Object:             Fuels base in Piotrków Trybunalski

Contract value:     53.216 €

Execution period:   July 2010 – December 2010

Scope of work:      Construction and assembly works on the VRU installation and the
                    tanks park
Selected experience
Client:             Grupa Lotos S.A.

Object:             Fuels base in Rypin

Contract value:     705.404 €

Execution period:   July 2010 – December 2010

Scope of work:      Modernization of the hydrocarbon fuels pumping and distribution
                    facility (design and start-up of the installation)
Selected experience
Client:             Stnthos Dwory 7 Sp. z o.o. S.K.A.

Object:             Chemical installations in Oświęcim

Contract value:     638.554 €

Execution period:   August 2010 – September 2010

Scope of work:      Colophonic emulsifier installation revamp
Selected experience
Client:             ZBACH Sp. z o.o.

Object:             Sulfur production plant in Grzybów

Contract value:     903.614 €

Execution period:   September 2010 – October 2010

Scope of work:      Steel structures production and assembly
Selected experience
Client:             MPOŚ Sp. z o.o.

Object:             Waste water treatment plant in Oświęcim

Contract value:     1.626.506 €

Execution period:   February 2011 – March 2012

Scope of work:      Turn-key extention project - methane fermentation unit and
                    auxilary infrastructure
Selected experience
Client:             Synthos Dwory 5 Sp. z o.o.

Object:             Cogeneration power plant in Oświęcim

Contract value:     10.610.003 €

Execution period:   May 2011– currently in execution

Scope of work:      Cogeneration plant (including exhaust fumes recovdery unit)
                    - new block transformers plant
Selected experience
Client:             Armatury Group a.s.

Object:             Manufacture of valves in own workshop in Oświęcim

Contract value:     1.223.274 €

Execution period:   October 2011 – March 2012

Scope of work:      production of a S61 barrier gate valve for DN 1000, DN 800 and DN 700,
                    designed for the Russian market
Strategic vision
The company strategic vision is to maintain a high position in the
domestic market for the maintenance of industrial installations
services. Our company seeks to further enhance its efficiency and
competitiveness. On the other hand, the company is looking for
new and interesting projects as a General Contractor, especially
for renewable energy and waste management.
For more details visit our website
    www.en.chemoservis.pl
Thank you for your attention
ul. Chemików 1, 32-600 Oświęcim
tel. +48 33 480 20 00, fax +48 33 444 60 59
         sekretariat@chemoservis.pl

More Related Content

Similar to Project management, supervision, welding, assembly and commissioning works.Client: PKN Orlen S.A.Object: Orlen Płock Rafinery (Poland)Contract value: 1.200.000 € Execution period: May 2008 – December 2008 Scope of work: Revamp of hydrocracking unit, piping works and electrical installations

Profil b&b en @
Profil b&b en @Profil b&b en @
Profil b&b en @EUROPAGES
 
Industrial Construction- Holding LTD
Industrial Construction-  Holding LTDIndustrial Construction-  Holding LTD
Industrial Construction- Holding LTDZHPStroyAD
 
Presentation ep corporate src rev9 eng
Presentation ep corporate src rev9 engPresentation ep corporate src rev9 eng
Presentation ep corporate src rev9 engheavyindustry
 
E profiil-presentation
E profiil-presentationE profiil-presentation
E profiil-presentationheavyindustry
 
Presentation of Engineering Plant Group_10_eng_150310
Presentation of Engineering Plant Group_10_eng_150310Presentation of Engineering Plant Group_10_eng_150310
Presentation of Engineering Plant Group_10_eng_150310Anton Kuznetsov
 
company product profile spreads
company product profile spreadscompany product profile spreads
company product profile spreads?? ?
 
Citec Group brochure 2016_lowres
Citec Group brochure 2016_lowresCitec Group brochure 2016_lowres
Citec Group brochure 2016_lowresAustin Antony
 
Presentation Vodstroj 98 AD
Presentation Vodstroj 98 ADPresentation Vodstroj 98 AD
Presentation Vodstroj 98 ADZHPStroyAD
 
Bkt elektronik company presentation 2019
Bkt elektronik company presentation   2019Bkt elektronik company presentation   2019
Bkt elektronik company presentation 2019Andrew Wilson
 
SORALUCE Milling Boring Machines
SORALUCE Milling Boring MachinesSORALUCE Milling Boring Machines
SORALUCE Milling Boring MachinesSORALUCE S.COOP-
 
Introduction to Innoval Technology 2014
Introduction to Innoval Technology 2014Introduction to Innoval Technology 2014
Introduction to Innoval Technology 2014Innoval Technology
 
Arslan Enginery EPC Turnkey Projects and Profile.
Arslan Enginery EPC Turnkey Projects and Profile.Arslan Enginery EPC Turnkey Projects and Profile.
Arslan Enginery EPC Turnkey Projects and Profile.Arbaaz Malik
 
Welltehnoloogia presentation (2)
Welltehnoloogia presentation (2)Welltehnoloogia presentation (2)
Welltehnoloogia presentation (2)Kristina Kreiter
 
DEKE Precision Tooling_Molding 2020.6 v1.1
DEKE Precision Tooling_Molding 2020.6 v1.1DEKE Precision Tooling_Molding 2020.6 v1.1
DEKE Precision Tooling_Molding 2020.6 v1.1Jiewen Li
 
CWG Waste water solutions
CWG Waste water solutionsCWG Waste water solutions
CWG Waste water solutionsMario Skrapec
 

Similar to Project management, supervision, welding, assembly and commissioning works.Client: PKN Orlen S.A.Object: Orlen Płock Rafinery (Poland)Contract value: 1.200.000 € Execution period: May 2008 – December 2008 Scope of work: Revamp of hydrocracking unit, piping works and electrical installations (20)

Profil b&b en @
Profil b&b en @Profil b&b en @
Profil b&b en @
 
DDC
DDCDDC
DDC
 
Industrial Construction- Holding LTD
Industrial Construction-  Holding LTDIndustrial Construction-  Holding LTD
Industrial Construction- Holding LTD
 
Presentation ep corporate src rev9 eng
Presentation ep corporate src rev9 engPresentation ep corporate src rev9 eng
Presentation ep corporate src rev9 eng
 
E profiil-presentation
E profiil-presentationE profiil-presentation
E profiil-presentation
 
Presentation of Engineering Plant Group_10_eng_150310
Presentation of Engineering Plant Group_10_eng_150310Presentation of Engineering Plant Group_10_eng_150310
Presentation of Engineering Plant Group_10_eng_150310
 
company product profile spreads
company product profile spreadscompany product profile spreads
company product profile spreads
 
Citec Group brochure 2016_lowres
Citec Group brochure 2016_lowresCitec Group brochure 2016_lowres
Citec Group brochure 2016_lowres
 
Presentation Vodstroj 98 AD
Presentation Vodstroj 98 ADPresentation Vodstroj 98 AD
Presentation Vodstroj 98 AD
 
Rockfin 2015
Rockfin 2015Rockfin 2015
Rockfin 2015
 
Bkt elektronik company presentation 2019
Bkt elektronik company presentation   2019Bkt elektronik company presentation   2019
Bkt elektronik company presentation 2019
 
SORALUCE Milling Boring Machines
SORALUCE Milling Boring MachinesSORALUCE Milling Boring Machines
SORALUCE Milling Boring Machines
 
Introduction to Innoval Technology 2014
Introduction to Innoval Technology 2014Introduction to Innoval Technology 2014
Introduction to Innoval Technology 2014
 
Arslan Enginery EPC Turnkey Projects and Profile.
Arslan Enginery EPC Turnkey Projects and Profile.Arslan Enginery EPC Turnkey Projects and Profile.
Arslan Enginery EPC Turnkey Projects and Profile.
 
Welltehnoloogia presentation (2)
Welltehnoloogia presentation (2)Welltehnoloogia presentation (2)
Welltehnoloogia presentation (2)
 
Eig General Contracting
Eig General ContractingEig General Contracting
Eig General Contracting
 
2015 Company Profile
2015 Company Profile2015 Company Profile
2015 Company Profile
 
Door Systems Presentation 2012
Door Systems Presentation 2012Door Systems Presentation 2012
Door Systems Presentation 2012
 
DEKE Precision Tooling_Molding 2020.6 v1.1
DEKE Precision Tooling_Molding 2020.6 v1.1DEKE Precision Tooling_Molding 2020.6 v1.1
DEKE Precision Tooling_Molding 2020.6 v1.1
 
CWG Waste water solutions
CWG Waste water solutionsCWG Waste water solutions
CWG Waste water solutions
 

Recently uploaded

VIP 7001035870 Find & Meet Hyderabad Call Girls Shamshabad high-profile Call ...
VIP 7001035870 Find & Meet Hyderabad Call Girls Shamshabad high-profile Call ...VIP 7001035870 Find & Meet Hyderabad Call Girls Shamshabad high-profile Call ...
VIP 7001035870 Find & Meet Hyderabad Call Girls Shamshabad high-profile Call ...aditipandeya
 
VIP Kolkata Call Girl Rishra 👉 8250192130 Available With Room
VIP Kolkata Call Girl Rishra 👉 8250192130  Available With RoomVIP Kolkata Call Girl Rishra 👉 8250192130  Available With Room
VIP Kolkata Call Girl Rishra 👉 8250192130 Available With Roomdivyansh0kumar0
 
如何办理北卡罗来纳大学教堂山分校毕业证(文凭)UNC学位证书
如何办理北卡罗来纳大学教堂山分校毕业证(文凭)UNC学位证书如何办理北卡罗来纳大学教堂山分校毕业证(文凭)UNC学位证书
如何办理北卡罗来纳大学教堂山分校毕业证(文凭)UNC学位证书Fir La
 
如何办理密苏里大学堪萨斯分校毕业证(文凭)UMKC学位证书
如何办理密苏里大学堪萨斯分校毕业证(文凭)UMKC学位证书如何办理密苏里大学堪萨斯分校毕业证(文凭)UMKC学位证书
如何办理密苏里大学堪萨斯分校毕业证(文凭)UMKC学位证书Fir La
 
VIP Kolkata Call Girls Bidhannagar 8250192130 Available With Room
VIP Kolkata Call Girls Bidhannagar 8250192130 Available With RoomVIP Kolkata Call Girls Bidhannagar 8250192130 Available With Room
VIP Kolkata Call Girls Bidhannagar 8250192130 Available With Roomrran7532
 
✂️ 👅 Independent Goregaon Escorts With Room Vashi Call Girls 💃 9004004663
✂️ 👅 Independent Goregaon Escorts With Room Vashi Call Girls 💃 9004004663✂️ 👅 Independent Goregaon Escorts With Room Vashi Call Girls 💃 9004004663
✂️ 👅 Independent Goregaon Escorts With Room Vashi Call Girls 💃 9004004663Call Girls Mumbai
 
slideshare Call girls Noida Escorts 9999965857 henakhan
slideshare Call girls Noida Escorts 9999965857 henakhanslideshare Call girls Noida Escorts 9999965857 henakhan
slideshare Call girls Noida Escorts 9999965857 henakhanhanshkumar9870
 
Collective Mining | Corporate Presentation - April 2024
Collective Mining | Corporate Presentation - April 2024Collective Mining | Corporate Presentation - April 2024
Collective Mining | Corporate Presentation - April 2024CollectiveMining1
 
Malad Escorts, (Pooja 09892124323), Malad Call Girls Service
Malad Escorts, (Pooja 09892124323), Malad Call Girls ServiceMalad Escorts, (Pooja 09892124323), Malad Call Girls Service
Malad Escorts, (Pooja 09892124323), Malad Call Girls ServicePooja Nehwal
 
Sustainability Leadership, April 26 2024
Sustainability Leadership, April 26 2024Sustainability Leadership, April 26 2024
Sustainability Leadership, April 26 2024TeckResourcesLtd
 
Call Girl Kolkata Sia 🤌 8250192130 🚀 Vip Call Girls Kolkata
Call Girl Kolkata Sia 🤌  8250192130 🚀 Vip Call Girls KolkataCall Girl Kolkata Sia 🤌  8250192130 🚀 Vip Call Girls Kolkata
Call Girl Kolkata Sia 🤌 8250192130 🚀 Vip Call Girls Kolkataanamikaraghav4
 
VIP Kolkata Call Girl Entally 👉 8250192130 Available With Room
VIP Kolkata Call Girl Entally 👉 8250192130  Available With RoomVIP Kolkata Call Girl Entally 👉 8250192130  Available With Room
VIP Kolkata Call Girl Entally 👉 8250192130 Available With Roomdivyansh0kumar0
 
VIP 7001035870 Find & Meet Hyderabad Call Girls Miyapur high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Miyapur high-profile Call GirlVIP 7001035870 Find & Meet Hyderabad Call Girls Miyapur high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Miyapur high-profile Call Girladitipandeya
 
VIP 7001035870 Find & Meet Hyderabad Call Girls Banjara Hills high-profile Ca...
VIP 7001035870 Find & Meet Hyderabad Call Girls Banjara Hills high-profile Ca...VIP 7001035870 Find & Meet Hyderabad Call Girls Banjara Hills high-profile Ca...
VIP 7001035870 Find & Meet Hyderabad Call Girls Banjara Hills high-profile Ca...aditipandeya
 
Russian Call Girls Kolkata Amaira 🤌 8250192130 🚀 Vip Call Girls Kolkata
Russian Call Girls Kolkata Amaira 🤌  8250192130 🚀 Vip Call Girls KolkataRussian Call Girls Kolkata Amaira 🤌  8250192130 🚀 Vip Call Girls Kolkata
Russian Call Girls Kolkata Amaira 🤌 8250192130 🚀 Vip Call Girls Kolkataanamikaraghav4
 
Nicola Mining Inc. Corporate Presentation April 2024
Nicola Mining Inc. Corporate Presentation April 2024Nicola Mining Inc. Corporate Presentation April 2024
Nicola Mining Inc. Corporate Presentation April 2024nicola_mining
 

Recently uploaded (20)

VIP 7001035870 Find & Meet Hyderabad Call Girls Shamshabad high-profile Call ...
VIP 7001035870 Find & Meet Hyderabad Call Girls Shamshabad high-profile Call ...VIP 7001035870 Find & Meet Hyderabad Call Girls Shamshabad high-profile Call ...
VIP 7001035870 Find & Meet Hyderabad Call Girls Shamshabad high-profile Call ...
 
VIP Kolkata Call Girl Rishra 👉 8250192130 Available With Room
VIP Kolkata Call Girl Rishra 👉 8250192130  Available With RoomVIP Kolkata Call Girl Rishra 👉 8250192130  Available With Room
VIP Kolkata Call Girl Rishra 👉 8250192130 Available With Room
 
如何办理北卡罗来纳大学教堂山分校毕业证(文凭)UNC学位证书
如何办理北卡罗来纳大学教堂山分校毕业证(文凭)UNC学位证书如何办理北卡罗来纳大学教堂山分校毕业证(文凭)UNC学位证书
如何办理北卡罗来纳大学教堂山分校毕业证(文凭)UNC学位证书
 
如何办理密苏里大学堪萨斯分校毕业证(文凭)UMKC学位证书
如何办理密苏里大学堪萨斯分校毕业证(文凭)UMKC学位证书如何办理密苏里大学堪萨斯分校毕业证(文凭)UMKC学位证书
如何办理密苏里大学堪萨斯分校毕业证(文凭)UMKC学位证书
 
VIP Kolkata Call Girls Bidhannagar 8250192130 Available With Room
VIP Kolkata Call Girls Bidhannagar 8250192130 Available With RoomVIP Kolkata Call Girls Bidhannagar 8250192130 Available With Room
VIP Kolkata Call Girls Bidhannagar 8250192130 Available With Room
 
✂️ 👅 Independent Goregaon Escorts With Room Vashi Call Girls 💃 9004004663
✂️ 👅 Independent Goregaon Escorts With Room Vashi Call Girls 💃 9004004663✂️ 👅 Independent Goregaon Escorts With Room Vashi Call Girls 💃 9004004663
✂️ 👅 Independent Goregaon Escorts With Room Vashi Call Girls 💃 9004004663
 
Russian Call Girls Rohini Sector 22 💓 Delhi 9999965857 @Sabina Modi VVIP MODE...
Russian Call Girls Rohini Sector 22 💓 Delhi 9999965857 @Sabina Modi VVIP MODE...Russian Call Girls Rohini Sector 22 💓 Delhi 9999965857 @Sabina Modi VVIP MODE...
Russian Call Girls Rohini Sector 22 💓 Delhi 9999965857 @Sabina Modi VVIP MODE...
 
slideshare Call girls Noida Escorts 9999965857 henakhan
slideshare Call girls Noida Escorts 9999965857 henakhanslideshare Call girls Noida Escorts 9999965857 henakhan
slideshare Call girls Noida Escorts 9999965857 henakhan
 
Collective Mining | Corporate Presentation - April 2024
Collective Mining | Corporate Presentation - April 2024Collective Mining | Corporate Presentation - April 2024
Collective Mining | Corporate Presentation - April 2024
 
Malad Escorts, (Pooja 09892124323), Malad Call Girls Service
Malad Escorts, (Pooja 09892124323), Malad Call Girls ServiceMalad Escorts, (Pooja 09892124323), Malad Call Girls Service
Malad Escorts, (Pooja 09892124323), Malad Call Girls Service
 
Escort Service Call Girls In Shalimar Bagh, 99530°56974 Delhi NCR
Escort Service Call Girls In Shalimar Bagh, 99530°56974 Delhi NCREscort Service Call Girls In Shalimar Bagh, 99530°56974 Delhi NCR
Escort Service Call Girls In Shalimar Bagh, 99530°56974 Delhi NCR
 
Sustainability Leadership, April 26 2024
Sustainability Leadership, April 26 2024Sustainability Leadership, April 26 2024
Sustainability Leadership, April 26 2024
 
Call Girl Kolkata Sia 🤌 8250192130 🚀 Vip Call Girls Kolkata
Call Girl Kolkata Sia 🤌  8250192130 🚀 Vip Call Girls KolkataCall Girl Kolkata Sia 🤌  8250192130 🚀 Vip Call Girls Kolkata
Call Girl Kolkata Sia 🤌 8250192130 🚀 Vip Call Girls Kolkata
 
VIP Kolkata Call Girl Entally 👉 8250192130 Available With Room
VIP Kolkata Call Girl Entally 👉 8250192130  Available With RoomVIP Kolkata Call Girl Entally 👉 8250192130  Available With Room
VIP Kolkata Call Girl Entally 👉 8250192130 Available With Room
 
VIP 7001035870 Find & Meet Hyderabad Call Girls Miyapur high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Miyapur high-profile Call GirlVIP 7001035870 Find & Meet Hyderabad Call Girls Miyapur high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Miyapur high-profile Call Girl
 
Falcon Invoice Discounting - Best Platform
Falcon Invoice Discounting - Best PlatformFalcon Invoice Discounting - Best Platform
Falcon Invoice Discounting - Best Platform
 
VIP 7001035870 Find & Meet Hyderabad Call Girls Banjara Hills high-profile Ca...
VIP 7001035870 Find & Meet Hyderabad Call Girls Banjara Hills high-profile Ca...VIP 7001035870 Find & Meet Hyderabad Call Girls Banjara Hills high-profile Ca...
VIP 7001035870 Find & Meet Hyderabad Call Girls Banjara Hills high-profile Ca...
 
Russian Call Girls Kolkata Amaira 🤌 8250192130 🚀 Vip Call Girls Kolkata
Russian Call Girls Kolkata Amaira 🤌  8250192130 🚀 Vip Call Girls KolkataRussian Call Girls Kolkata Amaira 🤌  8250192130 🚀 Vip Call Girls Kolkata
Russian Call Girls Kolkata Amaira 🤌 8250192130 🚀 Vip Call Girls Kolkata
 
Nicola Mining Inc. Corporate Presentation April 2024
Nicola Mining Inc. Corporate Presentation April 2024Nicola Mining Inc. Corporate Presentation April 2024
Nicola Mining Inc. Corporate Presentation April 2024
 
Rohini Sector 17 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
Rohini Sector 17 Call Girls Delhi 9999965857 @Sabina Saikh No AdvanceRohini Sector 17 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
Rohini Sector 17 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
 

Project management, supervision, welding, assembly and commissioning works.Client: PKN Orlen S.A.Object: Orlen Płock Rafinery (Poland)Contract value: 1.200.000 € Execution period: May 2008 – December 2008 Scope of work: Revamp of hydrocracking unit, piping works and electrical installations

  • 1. Company & Capital Group Presentation PREZENTACJA Oświęcim 2012
  • 2. Company basic information • Company name: CHEMOSERVIS-DWORY S.A. • Location: Oświęcim, 60 km SW of Cracow • Industry sectors: chemical, petrochemical, energy and environment protection • Fundation date: January 5th, 1998
  • 3. Business mission We want to be a strategic partner, offering innovative solutions and services to help our customers achieve their own success. We are taking care of a good business relationship with customers, which is why we aim to resolve any problems that arise in a reliable and honest way. We supply our customers in technologies based on the latest technical ideas. We understand the needs of our customers and we use our knowledge to create their success.
  • 4. Keys to understanding our business
  • 5. What we do The principal activities of the Company is maintaince on industrial installations as well as repairs of machinery and equipment, construction and assembling services and the general implementation of the projects. Wide range of company services completes the machining of metal parts and diagnostics of machines and industrial equipment. Company carries out its services primarily in the chemical, petrochemical, energy and environment protection segments.
  • 6. Within each segment, the company offers the following services: • Supervision of the Technical machinery, equipment and maintenance for installation. industrial plants • Monitoring of the machinery and equipment working conditions. (24/7) • Machines and installations troubleshooting. • Recover the ability to the Installations, industrial use, equipment and • Repairs during the installation industrial valves process stops. repairs • Static and dynamic balancing of rotating elements.
  • 7. Within each segment, the company offers the following services: • Mass and medium series production from the documentation provided by the Metal machining customer or a pattern. • Turning, milling, slotting, planing and sanding. • Implementation of the construction and modernization tasks of industrial facilities as a General Construction works Contractor, • Making and assembling of equipment and pressure vessels.
  • 8. The story so far In 1998, as a result of the Oświęcim Chemical Factory privatization process we became a separate economic entity, taking the legal form of a limited liability company. After an ownership changes in 2007, company became a joint-stock firm. Since that time the company began to implement development strategies outlined by the Management Board, which assumed new markets for services.
  • 9. Stock Exchange A key moment in the history of the company was the debut of the parallel market of the Warsaw Stock Exchange in 2008. In 2010-2012 the company issued new shares and received about 14.000.000 € from the stock investors.
  • 10. Capital Group CHEMOSERVIS-DWORY Group was established on October 1st, 2009 as a result of the acquisition by the company of a 100% stake in the Zakład Energetyczny ZEN Sp. z o.o. based in Dąbrowa Górnicza. In 2010, the Group increased as a consequence of another acquisition - K-Protos a.s. based in Kralupy on the Vltava (Czech Republic). In July 2012 company decided to acquire of a majority stake in Bydgoszcz company MD-PROECO Sp. z o.o.
  • 11. Capital Group Zakład Energetyczny ZEN Sp. z o.o. - its core operates at two facilities located in Dabrowa Górnicza and Świętochłowice. The company performs work in the field of electricity and energy in the renovation, modernization and the periodic inspection of machinery and equipment, as well as building new construction.
  • 12. Capital Group K-Protos a.s. - provides comprehensive services in the field of electrical engineering and maintenance for the chemical and petrochemical industries in their branches in the Czech Republic in the Kralupy on Vltava , Neratowice and Kolin.
  • 13. Capital Group MD-PROECO Sp. z o.o. – provides disposal services for hazardous and non-hazardous waste for industrial customers and institutions. For the thermal disposal company accepts solid waste, liquid and pasty. The company also deals with the recovery of energy from all type of waste.
  • 14. Capital Group structure CHEMOSERVIS-DWORY S.A. Zakład Energetyczny MD-Proeco K-Protos a.s. ZEN Sp. z o.o. Sp. z o.o. Zakład Usług PETRO Kor Energetycznych SERWIS Sp. z o.o. Sp. z o.o. Due to the consolidation in accordance with international financial reporting standards, companies ZUE SERWIS Sp. z o.o. and PETRO Kor Sp. z o.o. we do not include into the Capital Group.
  • 15. Group potential Employment 2009 2010 2011 Total, including: 609 836 852 • Project managers 8 16 18 • Technical staff 27 34 36 • Direct workers 497 680 652 Financial (in thous. €) 2009 2010 2011 • Income from net sale 9.832 11.103 12.255 • EBITDA 188 270 425 • Net profit 39 160 378 • Total assets 5.695 13.512 15.032
  • 16. Group potential Capital Group development trend (employment) 1000 900 800 700 600 500 400 300 200 100 0 2009 2010 2011 Direct workers Total employees Expon. (Direct workers) Expon. (Total employees)
  • 17. Group potential Capital Group development trend (financial) 18000000 16000000 14000000 12000000 10000000 8000000 6000000 4000000 2000000 0 2009 2010 2011 Income Total assets Expon. (Income) Expon. (Total assets)
  • 18. Technical infrastructure • Production workshops with over 9000 m2 surface of up to 14 m height. • 2,5 t; 5,0 t and 10,0 t cranes. • Metallic carpentry machines (cutting, drilling, bending, slotting, grinding, planing, boring, vertical and universal milling, etc.). • Welding equipment (VE, G, TIG, MIG, MAG). • Own railroad access as well as heavy road transportation. • State-of-art laboratory and diagnostic equipment. • Energy and power equipment for high voltage works (110kV). • Tanks, pipelines and pressure vessels production equipment. • In-house design engineers team.
  • 19. Technical infrastructure Good and modern technical infrastructure as well as cooperation with leading design and project management partners (West Technologies & Tradings) allows for any type of the Engineering, Procurement, Construction Management (EPCM) projects.
  • 20. Quality Management System The company pays a strong attention to quality of works, resources planning and project execution monitoring in accordance with the requirements of ISO 9001, certified by TÜV Rheinland and StavCert.
  • 21. Quality Management System • All of the management and operational procedures are in accordance to the ISO 9001 standards. • All employees are obliged to follow ISO 9001 procedures and related job descriptions. • The ISO audits are regularly carried out by TÜV Rheinland and StavCert. • Project management procedures and workflow planning are performed with support of the MS Project software and other electronic tools.
  • 22. Major technical authorizations UDT certificate for repair of steam and water Welding certificate boilers, pressure PN-EN ISO 3834-2:2007 tanks, dangerous liquids tanks and technological pipelines. UDT certificate to Non-destructive test prefabricate, manufacture laboratory certificate and distribution technological pipelines. UDT certificate to UDT certificate to prefabrication and prefabricate, manufacture manufacturing of pressure and distribution pressure equipment and and non-pressure tanks. technological pipelines
  • 23. Health and safety standards • Health procedures: the company fulfills all necessary requirements of the Polish Labor Code and related EU regulations. Employees are periodically checked by medical doctors and work conditions are constantly monitored. Employees with no valid medical permission are not allowed to work. • Safety procedures: the company annually performs „Professional Risk” evaluation to identify all related dangerous factors and risks at all work positions. That allows to minimize safety risks and losses related to unpredictable situations. • Environment protection: the company operates conform all related environmental requirements and obligations, holds necessary permits for waste generation and monitors current waste management. Waste reports are submitted regularly to relevant authorities.
  • 26. Selected experience Client: Petro Mechanika S.A. Object: Orlen Mozheikiu Rafinery (Lithuania) Contract value: 460.293 € Execution period: September 2007 – November 2007 Scope of work: Revamp of refining equipment and piping
  • 27. Selected experience Client: Synthos Dwory 7 Sp. z o.o. S.K.A. Object: Chemical installations in Oświęcim Contract value: 10.439.298 € Execution period: January 2008 – December 2011 Scope of work: General maintenance and repair services for one of the largest Polish chemicals manufacturer
  • 28. Selected experience Client: PKN Orlen S.A. Object: Diesel fuel ramp in the Ostrów Wielkopolski Fuel Base Contract value: 52.369 € Execution period: March 2008 – July 2008 Scope of work: Replacement of the upper arm of the fuel pumping installation
  • 29. Selected experience Client: Naftoserwis Sp. z o.o. Object: Fuels base in Kawice Contract value: 42.373 € Execution period: March 2009 – April 2009 Scope of work: Welding and equipment assembly works in the fuel tanks park
  • 30. Selected experience Client: ZAK S.A. Object: Nitrogen production plant in Kędzierzyn-Koźle Contract value: 723.192 € Execution period: March 2009 – July 2010 Scope of work: Design, delivery and replacement of the E-202 cooling unit and the D-201 column together with all related piping and connections
  • 31. Selected experience Client: Bioagra-Oil S.A. Object: Methylester (bio-diesel) production plant in Tychy Contract value: 4.448.778 € Execution period: August 2009 – December 2010 Scope of work: General contractor of the bio-diesel plant, delivery and assembly of steel structures, mechanical and electrical works, etc.
  • 32. Selected experience Client: Veolia Environmental Services Sp. z o.o. Object: Waste water treatment plant in Cracow Contract value: 978.162 € Execution period: November 2009 – September 2010 Scope of work: Production, delivery and assembly of the exhaust piping channels
  • 33. Selected experience Client: Veolia Environmental Services Sp. z o.o. Object: Waste water treatment plant in Warsaw Contract value: 2.493.765 € Execution period: March 2010 – September 2011 Scope of work: Production, delivery and assembly of the technological piping together with all necessary connectors, supports and thermic isolation
  • 34. Selected experience Client: Grupa Lotos S.A. Object: Fuels base in Piotrków Trybunalski Contract value: 53.216 € Execution period: July 2010 – December 2010 Scope of work: Construction and assembly works on the VRU installation and the tanks park
  • 35. Selected experience Client: Grupa Lotos S.A. Object: Fuels base in Rypin Contract value: 705.404 € Execution period: July 2010 – December 2010 Scope of work: Modernization of the hydrocarbon fuels pumping and distribution facility (design and start-up of the installation)
  • 36. Selected experience Client: Stnthos Dwory 7 Sp. z o.o. S.K.A. Object: Chemical installations in Oświęcim Contract value: 638.554 € Execution period: August 2010 – September 2010 Scope of work: Colophonic emulsifier installation revamp
  • 37. Selected experience Client: ZBACH Sp. z o.o. Object: Sulfur production plant in Grzybów Contract value: 903.614 € Execution period: September 2010 – October 2010 Scope of work: Steel structures production and assembly
  • 38. Selected experience Client: MPOŚ Sp. z o.o. Object: Waste water treatment plant in Oświęcim Contract value: 1.626.506 € Execution period: February 2011 – March 2012 Scope of work: Turn-key extention project - methane fermentation unit and auxilary infrastructure
  • 39. Selected experience Client: Synthos Dwory 5 Sp. z o.o. Object: Cogeneration power plant in Oświęcim Contract value: 10.610.003 € Execution period: May 2011– currently in execution Scope of work: Cogeneration plant (including exhaust fumes recovdery unit) - new block transformers plant
  • 40. Selected experience Client: Armatury Group a.s. Object: Manufacture of valves in own workshop in Oświęcim Contract value: 1.223.274 € Execution period: October 2011 – March 2012 Scope of work: production of a S61 barrier gate valve for DN 1000, DN 800 and DN 700, designed for the Russian market
  • 41. Strategic vision The company strategic vision is to maintain a high position in the domestic market for the maintenance of industrial installations services. Our company seeks to further enhance its efficiency and competitiveness. On the other hand, the company is looking for new and interesting projects as a General Contractor, especially for renewable energy and waste management.
  • 42. For more details visit our website www.en.chemoservis.pl
  • 43. Thank you for your attention
  • 44. ul. Chemików 1, 32-600 Oświęcim tel. +48 33 480 20 00, fax +48 33 444 60 59 sekretariat@chemoservis.pl