PPT PRA LOKBUL UKM APRIL
2023
PRESENTASI PRA
LOKBUL PROGRAM
GIZI
89.34%
87.32%
86.29%
86.17%
85.56%
84.87%
84.54%
84.36%
83.49%
83.47%
83.42%
83.28%
83.26%
82.28%
78.00%
80.00%
82.00%
84.00%
86.00%
88.00%
90.00%
D/S
4
K/S Target 90%
0%
20%
40%
60%
80%
100%
120%
5
N/D Target 80%
91.2%
90.4% 90.1% 90.1% 89.7% 89.6% 89.6% 89.5% 89.2%
88.3%
87.5% 87.3%
86.7%
85.5%
88.73%
PMT
PEMBERIAN MT BUMIL KEK 100 %
PEMBERIAN PMT KASUS GIZI 100%
Fe REMATRI
Capaian 54,85%
Target 58%
Tindaklanjut
Sosialisasi ke sekolah mengenai Fe Rematri
dan Pelaksanaan Fe Rematri
PEMERIKSAAN HB
REMATRI KELAS 7
DAN 10
PELACAKAN KASUS
GIZI
KONSELING GIZI
DALAM GEDUNG
RTL
1. PMERIKSAAN HB
REMATRI UNTUK
SEMUA KELAS 7
DAN 10
2.SURVEILANS GIZI
AKTIF
KIA
NO INDIKATOR TARGET CAPAIAN
1 K1 33,3 23,1
2 K4 33,3 19,9
3 K6 33,3 18,7
4 LINAKES 33,3 23,2
5 LINFASKES 33,3 21,3
6 KF1 33,3 23,2
7 KFL 33,3 21,7
8 BAYI TIDAK BBLR 33,3 26,1
9 BBLR 0,4
10 KN1 33,3 26,6
11 KNL 33,3 25,4
RTL
• Pelaksanaan USG dan Pemeriksaan Laboratorium ibu hamil ke desa
desa yang jauh
• Pelaksanaan kelas ibu hamil
• Pelaksanaan kelas ibu Balita
• Meningkatkan kerjasama linsek
• Monitoring inovasi Kabandungan
• Pencatatan E kohort tiap bulan
• Pencatatan kohort tiap bulan
Ppt pra lokbul program
TRIPLE ELIMINASI maret 2023
Screening
 .Screening HIV pada ibu hamil sebanyak 154 orang,pasien dengan tb sebanyak 17
orang
 Pencapaian sd bulan april 2023 sekarang sudah mencapai 30,73 % bumil ( yang
diperiksa negative semua)
 Screening ims pada ibu hamil 16,76 %.
 Positip hiv ( 4 orang) non bumil
identifikasi masalah dan prioritas maslah (
target 100%)
 Capaian screening ims pada ibu hamil 16,76 %,adanya kesenjangan 83,24 %.
 Capaian screening hiv dan pada ibu hamil 30,73 % adanya kesenjangan sekitaR
69,27%.
Akar masalah/ pisbond
RENCANA TINDAK LANJUT
1.TETAP MELAKSANAKAN KEGIATAN TRIPLE ELIMINASI SESUAI PROTOKOL KESEHATAN
2.SEMUA BUMIL DAN POPULASI KUNCI WAJIB DIPERIKSA HIV.
3.UNTUK BULAN DEPAN MELAKSANAKAN TRIPLE ELIMINASI DI DESA NEGLASARI
Dokumentasi kegiatan triple e
CAPAIAN IMUNISASI
• IDL 31,6
• SUB PIN POLIO 100,2%
RENCANA IMUNISASI MEI
 SUB PIN POLIO 2 TANGGAL 15 Mei 2023
KESLING
HASIL CAPAIAN KESLING
No. KEGIATAN TARGET CAPAIAN
JANUARI FEBRUARI MARET
1 Akses air minum 90% 75.73 75.73 75.73
2 Desa intervensi STBM 80% 100% 100% 100%
3 Desa SBS 100% 100% 100% 100%
4 TTU dibina 100% 69.41% 69.41% 69.41%
5 TTU sehat 90% 78.22 78.22 78.22
6 TPM dibina 100% 72.41 72.41 72.41
7 TPP memenuhi syarat 50% 42.56 42.56 42.56
8 Rumah sehat 65% 76.92% 76.92% 76.92%
9 SPAL 70% 15.89% 28.23% 38.40%
10 Klinik sanitasi 100%
INSPEKSI KESEHATAN LINGKUNGAN TFU
PENGAMBILAN SAMPEL AIR PAMSIMAS
DESA NEGLASARI
KAMPANYE 5 PILAR STBM
RENCANA KEGIATAN
 MONITORING HASIL KUNJUNGAN INSPEKSI LINGKUNGAN TPP, TFU, SARANA AIR
BERSIH DAN FASYANKES BULAN AGUSTUS
 PENYELIDIKAN EPIDEMIOLOGI DAN PSN BULAN MEI
 KLINIK SANITASI SETIAP HARI RABU
PTM
JANUARI-MARET
Target JAN FEB MAR Capaian %
Skrining usia
produktif 31.347 798 751 843 2392 7,63
Pelayanan
Hipertensi 15.078 391 460 513 1364 9,04
Pelayanan DM
282 17 26 31 74 26,24
RTL
• Kerjasama lintas program (Prolanis, lansia, indera, Ausrem)
• Kegiatan Integrasi Program
• Optimalisasi Kegiatan CEKAS , per posyandu
Kegiatan PTM Bulan MEI
• CEKAS/Skrining PTM
• Posbindu (Kegiatan integrasi program)
• Pemeriksaan Hba1c di Puskesmas ( bersamaan dengan kegiatan
Prolanis) bagi penderita DM
• Skrining/Edukasi ke sekolah (Dengan prog Ausrem)
• Kunjungan Lansia Risti DM,HT (Dengan prog lansia)
Hepatitis JANUARI-MARET
TARGET CAPAIAN %
900 270 30%
KEGIATAN HEP BULAN MEI
• Pemeriksaan rutin di posyandu
• Pemeriksaan bumil di Lab
• Kegiatan integrasi Program
• Pemantauan Bumil dengan hasil reaktif
• Melengkapi persyaratan bumil reaktif (KK, KTP suami istri , BPJS, Buku
pemeriksaan KIA , Materai 10rb 2 lembar)
LANSIA
indikator target capaian
Skrining Lansia 100 % 11,20 %
RTL
- Posbindu (Desa Bojongkasih dan Neglasari)
- Kunjungan Lansia Risti (Kadupandak , Sukaraja)
- Kegiatan Prolanis dan Pemeriksaan Hba1c

PPT LOKBUL UKM APRIL FIX.pptx