Two quantities of the same type so he does not have a measurement or called Yenite is not unity. The ability factor in the exclusive physical loads is equal to one (1) because the actors in this case are the same as the phenomenon as there is no ability to be an inductive or capable. The ability coefficient is sorry for zero zero because zero actors in these loads. The same thing in the capacity is zero capacity for the same reason. The insuptive capacity is a capacity that arises because of rhythm and condensate files and has no specific place because they are frequented back and forth between the generator and pregnancy as they are in the form of SINE WAVE, which is an average that is equal to zero, which is not valuable or beneficial only to the file Or condenser as a result of a current traffic and the presence of voltage teams.
19. 19
يلي كما فهي المقترحة والحلول التوصيات أما
:
1
.
األخرى بالدول أسوة القدرة معامل انخفاض على عقوبات وجود
:
Power factor Penalty
األردن
:
0.85 or more No Penalty
Less than 0.85 to 0.70 Then 0.77 % of the total bill
for every 0.01 of power factor less than 0.85
Less than 0.70 To 0.60 Then 0.95 % of the total bill
for every 0.01 of power factor less than 0.85
Less than 0.60 To 0.50 Then 1.2 % of the total bill
for every 0.01 of power factor less than 0.85
Less than 0.50 Then 1.5 % of the total bill for every
0.01 of power factor less than 0.85 .
20. 20
سوريــــــــــــــــــــــــا
:
1-P.F) *(Total Bill)/ 0.85 =
)
مصـــــــــــــــــــــــــــــــــر
:
IF 0.60< P.F < 0.85 Then (0.85-P.F)/2 * (Total Bill) *0.01
IF 0.40< P.F < 0.60 Then (0.85- P.F)* (Total Bill) *0.01
امريكيـــــــــــــــــــــــــــــــــــــــــة شركات
:
C= Demand *(0.85-P.F)*$(0.10)
C= (Total Bill) *((0.65)*(0.85-P.F))
C) IF(KVAh / KWh) > 32% Then C= KVAh *(1.5)$
21. 21
ماليزيــــــــــــــــــــا
:
Where P.F is below 0.85
:
A) P.F is between 0.85 and
0.75:
=[(0.85 – P.F) x 1.5 x Total Bill]
B) P.F is 0.75 and
below:
=[(0.85 - 0.75) x 1.5 x Total Bill] + [(0.75 – P.F)
x 3 x Total Bill]
22. 22
كــــنـــــــــــــــــــــدية شركة
:
Standard Demand Charge
Less than 60%
$6.85 per kW
At least 60% but less than 70%
$6.15 per
kW
At least 70% but less than 80%
$5.80 per
kW
80% and above
$5.50 per kW
Attention (Most of Company disallowed P.F
less than 40%)