SlideShare a Scribd company logo
PROJECTS
OUTLINE
ENGINEERING PRODUCTION DELIVERY
CRADLE TO GRAVE
TIMELINE FLOW
Project Cycle
•Purchasing
•Receiving
•Inventory
•Manufacturing
•Production
•QA
•Sales
•Shipping
•Mast Scheduler
•Technical Writer
•Mats Planner
•Proj Manager
•Proj Manager
•Sales - Quoting
•Design Eng
•Mast Scheduler
Engineering Planning
MaterialsExecution
PROJECT MANAGER
ENGINEERING
• QUOTING
– ENGINEERING LEADTIME
– FIRST ARTICLE PROJECT
– MATERIAL AND LABOR
COSTS
– MATERIAL LEADTIME
– PRODUCTION LEADTIME
– QA INSPECTIONS
– BEST ESTIMATES FOR
PROJECT
• DESIGN
– CRITICAL PATH ITEMS
– MATERIAL CHOICES
– DRAWING ACCURACY
– UoM ACCURACY
– RED-LINE DRAWING
UPDATES
– COMPLETE DRAWING
PACKAGE
MASTER SCHEDULER
PLANNING
• TECHNICAL WRITER
– VERIFY DRAWINGS
– ORDER OF OPERATION
– WORK CENTER
– EST. TIME FOR
COMPLETION
• MATERIAL PLANNER
– VERIFY LIST OF
MATERIALS
– VERIFY UoM
– CREATE PART NUMBER
– UNIFORM PART
DESCRIPTIONS*
Part Number DESCRIPTION
CAPST14 CAP, MALLEABLE, .25
CAPST38 CAP, MALLEABLE, .375
CAPST12 CAP, MALLEABLE, .5
CAPST34 CAP, MALLEABLE, .75
CAPST1 CAP, MALLEABLE, 1
CAPST114 CAP, MALLEABLE, 1.25
CAPST112 CAP, MALLEABLE, 1.5
CAPST2 CAP, MALLEABLE, 2
FELBST4512 ELBOW, FEMALE 45°, MALLEABLE, .25
FELBST4538 ELBOW, FEMALE 45°, MALLEABLE, .375
FELBST4512 ELBOW, FEMALE 45°, MALLEABLE, .5
FELBST4534 ELBOW, FEMALE 45°, MALLEABLE, .75
FELBST451 ELBOW, FEMALE 45°, MALLEABLE, 1
FELBST45114 ELBOW, FEMALE 45°, MALLEABLE, 1.25
FELBST45112 ELBOW, FEMALE 45°, MALLEABLE, 1.5
FELBST452 ELBOW, FEMALE 45°, MALLEABLE, 2
FELBST9012 ELBOW, FEMALE 90°, MALLEABLE, .25
FELBST9038 ELBOW, FEMALE 90°, MALLEABLE, .375
FELBST9012 ELBOW, FEMALE 90°, MALLEABLE, .5
FELBST9034 ELBOW, FEMALE 90°, MALLEABLE, .75
FELBST901 ELBOW, FEMALE 90°, MALLEABLE, 1
FELBST90114 ELBOW, FEMALE 90°, MALLEABLE, 1.25
FELBST90112 ELBOW, FEMALE 90°, MALLEABLE, 1.5
FELBST902 ELBOW, FEMALE 90°, MALLEABLE, 2
SUPPLY CHAIN
MATERIALS
• PURCHASING
– CRITICAL
PATH
– SPECIALTY
MATERIAL
– EXTENDED
DELIVERY
– STANDARD
• PRODUCTION
– MACHINING
– WELDING
– SUB-ASSY
– VENDOR
PROCESS
• INVENTORY
– QUANTITY
– ACCURACY
– LOCATION
– DESCRIPTIVE
– QUALITY
ACTION, REACTION
EXECUTION
• PRODUCTION
– MACHINING
– WELDING
– ASSEMBLY
– PAINTING
– FINAL
ASSEMBLY
– REWORK
• SALES
– APPROVAL
– SHIPMENT
– FOLLOW-UP
– NEXT
OPPORTUNITY
• QUALITY
– PROGRESSION
– PROACTIVE
– PERFECT
– PRIDE
– PRECISELY
WHAT THE
CUSTOMER
ORDERED
19 week prep
time before it
makes it to
the execution
stage
Chromium Alloy = 14 weeks
est delivery from foundry
Machining = 2 weeks
to completion
Heat treating = 3 weeks to
completion, including travel
LONG LEAD
SPECIALITY ITEM
COULD BE LAST ITEM REQUIRED FOR THE BUILD…
COULD BE FIRST ITEM REQUIRED FOR THE BUILD…
THE BARS REPRESENT PART REQUIREMENT AND WHEN USED WITH SOUND
JUDGEMENT WILL INFLUENCE THE ENGINEERING COMPLETE TIMELINE
EXAMPLE

More Related Content

Viewers also liked

Informe tecnico
Informe tecnicoInforme tecnico
Informe tecnico
Nicol España Morales
 
Colegio de educación profesional técnica karla estefania rubio barajas 203
Colegio de educación profesional técnica karla estefania rubio barajas 203Colegio de educación profesional técnica karla estefania rubio barajas 203
Colegio de educación profesional técnica karla estefania rubio barajas 203
kaarlaarubio
 
Proyecto de vida
Proyecto de vidaProyecto de vida
Proyecto de vida
melidsaduarte
 
Controles de Lectura
Controles de Lectura  Controles de Lectura
Controles de Lectura
Patricia Vásquez Espinoza
 
Cem perguntas e respostas 2 edi ca o
Cem perguntas e respostas 2 edi ca oCem perguntas e respostas 2 edi ca o
Cem perguntas e respostas 2 edi ca o
Fabiana Inácio
 
Comprensión Lectora Niveles Transición
Comprensión Lectora Niveles TransiciónComprensión Lectora Niveles Transición
Comprensión Lectora Niveles Transición
Patricia Vásquez Espinoza
 

Viewers also liked (6)

Informe tecnico
Informe tecnicoInforme tecnico
Informe tecnico
 
Colegio de educación profesional técnica karla estefania rubio barajas 203
Colegio de educación profesional técnica karla estefania rubio barajas 203Colegio de educación profesional técnica karla estefania rubio barajas 203
Colegio de educación profesional técnica karla estefania rubio barajas 203
 
Proyecto de vida
Proyecto de vidaProyecto de vida
Proyecto de vida
 
Controles de Lectura
Controles de Lectura  Controles de Lectura
Controles de Lectura
 
Cem perguntas e respostas 2 edi ca o
Cem perguntas e respostas 2 edi ca oCem perguntas e respostas 2 edi ca o
Cem perguntas e respostas 2 edi ca o
 
Comprensión Lectora Niveles Transición
Comprensión Lectora Niveles TransiciónComprensión Lectora Niveles Transición
Comprensión Lectora Niveles Transición
 

Similar to Postable Projects Outline

RBS Group Introduction
RBS Group IntroductionRBS Group Introduction
RBS Group Introduction
RBS Group
 
What is the Future for Magnetite Projects in Australia
What is the Future for Magnetite Projects in AustraliaWhat is the Future for Magnetite Projects in Australia
What is the Future for Magnetite Projects in Australia
Midas Engineering Group
 
APC Corporative Presentation
APC Corporative PresentationAPC Corporative Presentation
APC Corporative Presentation
Ana Piumbini
 
Nickel Processing and The Rise of Laterites
Nickel Processing and The Rise of LateritesNickel Processing and The Rise of Laterites
Nickel Processing and The Rise of Laterites
Midas Engineering Group
 
engineering portfolio 26-11-22.pdf
engineering portfolio 26-11-22.pdfengineering portfolio 26-11-22.pdf
engineering portfolio 26-11-22.pdf
bilal masood
 
Manufacturing+process+selection+and+design.ppt
Manufacturing+process+selection+and+design.pptManufacturing+process+selection+and+design.ppt
Manufacturing+process+selection+and+design.ppt
videoaakash15
 
Nagarajan Saravanan
Nagarajan SaravananNagarajan Saravanan
Nagarajan Saravanan
Nagarajan Saravanan
 
HCS Custom Process Equipment
HCS Custom Process EquipmentHCS Custom Process Equipment
HCS Custom Process Equipment
Alex Mustatea
 
LOOK BOOK HB3 low res
LOOK BOOK HB3 low resLOOK BOOK HB3 low res
LOOK BOOK HB3 low res
Simon Botes
 
Topfibra company profile
Topfibra company profileTopfibra company profile
Topfibra company profile
Mauricio Facchinetti
 
Removing Uranium & Thorium From Zircon
Removing Uranium & Thorium From ZirconRemoving Uranium & Thorium From Zircon
Removing Uranium & Thorium From Zircon
Midas Engineering Group
 
HPGR and Iron Ore Processing
HPGR and Iron Ore ProcessingHPGR and Iron Ore Processing
HPGR and Iron Ore Processing
Midas Engineering Group
 
Presentacion Navaliber Abril 2007
Presentacion Navaliber Abril 2007Presentacion Navaliber Abril 2007
Presentacion Navaliber Abril 2007
navaliber
 
Cv
CvCv
Cbgl company overview1
Cbgl company overview1Cbgl company overview1
Cbgl company overview1
MyQlique
 
Kaysun overview
Kaysun overviewKaysun overview
Kaysun overview
mdelrealkc
 
PERUMIN 31: Modern Practices for the Design and Planning Underground Mines
PERUMIN 31: Modern Practices for the Design and Planning Underground MinesPERUMIN 31: Modern Practices for the Design and Planning Underground Mines
PERUMIN 31: Modern Practices for the Design and Planning Underground Mines
PERUMIN - Convención Minera
 
CV_ak_2015EN
CV_ak_2015ENCV_ak_2015EN
CV_ak_2015EN
Alen Kova?evi?
 
NAIYAR CV 1st FEB 2015
NAIYAR CV 1st  FEB 2015NAIYAR CV 1st  FEB 2015
NAIYAR CV 1st FEB 2015
naiyar yazdani
 
Quanzhou xuanfeng profile (Comfort shoes manufaturer from China)
Quanzhou xuanfeng profile (Comfort shoes manufaturer from China)Quanzhou xuanfeng profile (Comfort shoes manufaturer from China)
Quanzhou xuanfeng profile (Comfort shoes manufaturer from China)
Lynn Woo
 

Similar to Postable Projects Outline (20)

RBS Group Introduction
RBS Group IntroductionRBS Group Introduction
RBS Group Introduction
 
What is the Future for Magnetite Projects in Australia
What is the Future for Magnetite Projects in AustraliaWhat is the Future for Magnetite Projects in Australia
What is the Future for Magnetite Projects in Australia
 
APC Corporative Presentation
APC Corporative PresentationAPC Corporative Presentation
APC Corporative Presentation
 
Nickel Processing and The Rise of Laterites
Nickel Processing and The Rise of LateritesNickel Processing and The Rise of Laterites
Nickel Processing and The Rise of Laterites
 
engineering portfolio 26-11-22.pdf
engineering portfolio 26-11-22.pdfengineering portfolio 26-11-22.pdf
engineering portfolio 26-11-22.pdf
 
Manufacturing+process+selection+and+design.ppt
Manufacturing+process+selection+and+design.pptManufacturing+process+selection+and+design.ppt
Manufacturing+process+selection+and+design.ppt
 
Nagarajan Saravanan
Nagarajan SaravananNagarajan Saravanan
Nagarajan Saravanan
 
HCS Custom Process Equipment
HCS Custom Process EquipmentHCS Custom Process Equipment
HCS Custom Process Equipment
 
LOOK BOOK HB3 low res
LOOK BOOK HB3 low resLOOK BOOK HB3 low res
LOOK BOOK HB3 low res
 
Topfibra company profile
Topfibra company profileTopfibra company profile
Topfibra company profile
 
Removing Uranium & Thorium From Zircon
Removing Uranium & Thorium From ZirconRemoving Uranium & Thorium From Zircon
Removing Uranium & Thorium From Zircon
 
HPGR and Iron Ore Processing
HPGR and Iron Ore ProcessingHPGR and Iron Ore Processing
HPGR and Iron Ore Processing
 
Presentacion Navaliber Abril 2007
Presentacion Navaliber Abril 2007Presentacion Navaliber Abril 2007
Presentacion Navaliber Abril 2007
 
Cv
CvCv
Cv
 
Cbgl company overview1
Cbgl company overview1Cbgl company overview1
Cbgl company overview1
 
Kaysun overview
Kaysun overviewKaysun overview
Kaysun overview
 
PERUMIN 31: Modern Practices for the Design and Planning Underground Mines
PERUMIN 31: Modern Practices for the Design and Planning Underground MinesPERUMIN 31: Modern Practices for the Design and Planning Underground Mines
PERUMIN 31: Modern Practices for the Design and Planning Underground Mines
 
CV_ak_2015EN
CV_ak_2015ENCV_ak_2015EN
CV_ak_2015EN
 
NAIYAR CV 1st FEB 2015
NAIYAR CV 1st  FEB 2015NAIYAR CV 1st  FEB 2015
NAIYAR CV 1st FEB 2015
 
Quanzhou xuanfeng profile (Comfort shoes manufaturer from China)
Quanzhou xuanfeng profile (Comfort shoes manufaturer from China)Quanzhou xuanfeng profile (Comfort shoes manufaturer from China)
Quanzhou xuanfeng profile (Comfort shoes manufaturer from China)
 

Postable Projects Outline

  • 2. ENGINEERING PRODUCTION DELIVERY CRADLE TO GRAVE TIMELINE FLOW
  • 3. Project Cycle •Purchasing •Receiving •Inventory •Manufacturing •Production •QA •Sales •Shipping •Mast Scheduler •Technical Writer •Mats Planner •Proj Manager •Proj Manager •Sales - Quoting •Design Eng •Mast Scheduler Engineering Planning MaterialsExecution
  • 4. PROJECT MANAGER ENGINEERING • QUOTING – ENGINEERING LEADTIME – FIRST ARTICLE PROJECT – MATERIAL AND LABOR COSTS – MATERIAL LEADTIME – PRODUCTION LEADTIME – QA INSPECTIONS – BEST ESTIMATES FOR PROJECT • DESIGN – CRITICAL PATH ITEMS – MATERIAL CHOICES – DRAWING ACCURACY – UoM ACCURACY – RED-LINE DRAWING UPDATES – COMPLETE DRAWING PACKAGE
  • 5. MASTER SCHEDULER PLANNING • TECHNICAL WRITER – VERIFY DRAWINGS – ORDER OF OPERATION – WORK CENTER – EST. TIME FOR COMPLETION • MATERIAL PLANNER – VERIFY LIST OF MATERIALS – VERIFY UoM – CREATE PART NUMBER – UNIFORM PART DESCRIPTIONS*
  • 6. Part Number DESCRIPTION CAPST14 CAP, MALLEABLE, .25 CAPST38 CAP, MALLEABLE, .375 CAPST12 CAP, MALLEABLE, .5 CAPST34 CAP, MALLEABLE, .75 CAPST1 CAP, MALLEABLE, 1 CAPST114 CAP, MALLEABLE, 1.25 CAPST112 CAP, MALLEABLE, 1.5 CAPST2 CAP, MALLEABLE, 2 FELBST4512 ELBOW, FEMALE 45°, MALLEABLE, .25 FELBST4538 ELBOW, FEMALE 45°, MALLEABLE, .375 FELBST4512 ELBOW, FEMALE 45°, MALLEABLE, .5 FELBST4534 ELBOW, FEMALE 45°, MALLEABLE, .75 FELBST451 ELBOW, FEMALE 45°, MALLEABLE, 1 FELBST45114 ELBOW, FEMALE 45°, MALLEABLE, 1.25 FELBST45112 ELBOW, FEMALE 45°, MALLEABLE, 1.5 FELBST452 ELBOW, FEMALE 45°, MALLEABLE, 2 FELBST9012 ELBOW, FEMALE 90°, MALLEABLE, .25 FELBST9038 ELBOW, FEMALE 90°, MALLEABLE, .375 FELBST9012 ELBOW, FEMALE 90°, MALLEABLE, .5 FELBST9034 ELBOW, FEMALE 90°, MALLEABLE, .75 FELBST901 ELBOW, FEMALE 90°, MALLEABLE, 1 FELBST90114 ELBOW, FEMALE 90°, MALLEABLE, 1.25 FELBST90112 ELBOW, FEMALE 90°, MALLEABLE, 1.5 FELBST902 ELBOW, FEMALE 90°, MALLEABLE, 2
  • 7. SUPPLY CHAIN MATERIALS • PURCHASING – CRITICAL PATH – SPECIALTY MATERIAL – EXTENDED DELIVERY – STANDARD • PRODUCTION – MACHINING – WELDING – SUB-ASSY – VENDOR PROCESS • INVENTORY – QUANTITY – ACCURACY – LOCATION – DESCRIPTIVE – QUALITY
  • 8. ACTION, REACTION EXECUTION • PRODUCTION – MACHINING – WELDING – ASSEMBLY – PAINTING – FINAL ASSEMBLY – REWORK • SALES – APPROVAL – SHIPMENT – FOLLOW-UP – NEXT OPPORTUNITY • QUALITY – PROGRESSION – PROACTIVE – PERFECT – PRIDE – PRECISELY WHAT THE CUSTOMER ORDERED
  • 9. 19 week prep time before it makes it to the execution stage Chromium Alloy = 14 weeks est delivery from foundry Machining = 2 weeks to completion Heat treating = 3 weeks to completion, including travel LONG LEAD SPECIALITY ITEM COULD BE LAST ITEM REQUIRED FOR THE BUILD… COULD BE FIRST ITEM REQUIRED FOR THE BUILD… THE BARS REPRESENT PART REQUIREMENT AND WHEN USED WITH SOUND JUDGEMENT WILL INFLUENCE THE ENGINEERING COMPLETE TIMELINE EXAMPLE