PORTFOLIO AS QUANTITY SURVEYOR AND ESTIMATOR
1. PORTFOLIO AS QUANTITY SURVEYOR AND ESTIMATOR
*HERE IS COLLECTED A BRIEF DESCRIPTION OF ALL THE PROJECTS THAT I STUDIED AS
QUANTITY SURVEYOR AND ESTIMATOR DURING MY STAY IN SERINCO. JUST INCLUDED
THE PROJECT WHERE I WAS THE MAIN QUANTITY SURVEYOR.
* ALL THE BUDGETS ARE A DIRECT CURRENCY EXCHANGE. CONSIDER THAT THE
CHILEAN CONSTRUCTION MARKET IS NOT THE BRITISH.
2. 50 APARTMENTS
TOTAL SURFACE: 8,200 m2
TOTAL BUDGET: £ 5,555,504
14 FLOORS
GROUND FLOOR
2 UNDERGROUND FLOORS
CONCRETE STRUCTURE
GYM
SWIMMING POOL
EVENT ROOM
59 PARKING SPACES
59 STORE ROOMS
LOCATION: VIÑA DEL MAR, VALPARAISO, CHILE
4. 7 APARTMENT MODELS
108 APARTMENTS
TOTAL SURFACE: 6,900 m2
TOTAL BUDGET: £ 5,055,709
10 FLOORS
2 UNDERGROUND FLOORS
CONCRETE STRUCTURE
GYM
SWIMMING POOL
2 EVENT ROOMS
BARBECUE AND GREEN AREA
LOCATION: LAS CONDES, SANTIAGO DE CHILE, CHILE
6. REFURBISHMENT "NAVY COMMAND
TALCAHUANO"
After the earthquake that took place in Concepción in February 2010. The
main facade of this building was seriously damaged. The project proposed the
removal of all the elements to be conserved, propping up of the structure,
demolition of all the structural elements damaged, rebuilding, restoration and
reinstatement of all the elements conserved.
8. SECOND PHASE (W2)
66m2apa a 304m2
APARTMENTS FROM 166 m2 to 304 m2
8 BUILDINGS
23 APARTMENTS
TOTAL BUDGET: £ 6,482,756
CONCRETE STRUCTURE
URBANIZATION AND GARDENS
SWIMMING POOL
BARBECUE AREA
LOCATION: CACHAGUA, VALPARAISO, CHILE
9. BUDGET SUMMARY
THIRD PHASE (W3)
APARTMENTS FROM 166 m2 to 304 m2
8 BUILDINGS
23 APARTMENTS
TOTAL BUDGET: £ 6,480,762
CONCRETE STRUCTURE
URBANIZATION AND GARDENS
LOCATION: CACHAGUA, VALPARAISO, CHILE