SlideShare a Scribd company logo
Dear students get fully solved SMU MBA Fall 2014 assignments
Send your semester & Specialization name to our mail id :
“ help.mbaassignments@gmail.com ”
or
Call us at : 08263069601
These are just questions for reference . To check samples see our latest
uploads in blog archive or search assignments .
(Prefer mailing. Call in emergency )
DRIVE-Fall 2014
PROGRAM/SEMESTER-MBADS (SEM 4/SEM 6) MBAFLEX/ MBAN2 (SEM 4) PGDPMN
(SEM 2)
SUBJECT CODE & NAME-PM 0017 –PROJECT QUALITY MANAGEMENT
Q1. What is quality assurance? Explain the inputs , outputs and tools of quality
assurance process.
(Definition of quality assurance, Description of inputs to quality assurance Description
of tools and techniques used for quality assurance, Description of outputs of quality
assurance)1, 3,3,3
Ans.
Quality assurance
Assuranceis the process of gaining stakeholders confidence by providing evidence that
the quality-related activities are being performed effectively and the planned actions
will be completed to produce a product or service that will satisfy the stated quality
requirements.
Q2. Write short notes on
(PDCA cycle, Quality audits)5,5
Ans.
PDCA cycle
The Plan-Do-Check-Act (PDCA) cycle is as follows:
Plan: This is thebeginning point wheretheprocess will haveto be selected. This process
if executed correctly indicates the greatest opportunity for success, at first; it may be
useful to select the process which indicates the biggest potential for the successful
improvement and also maybethe “easiest” one. The team may face less difficulty while
working through themodel the first time, and both the team and the management will
be encouraged by the success. After selecting the right process, the change should be
analysed and planned.
Q3 Describe the Enterprise Project Management Model(EPM)
(Definition-2, Model which supports EPM-2, Implementation of EPM-3, Advantages of
EPM-3) 10 marks
Answer.
Definition
It gives an overall view of the resources and the project management activities and
brings in quality and
success of the project management i organisation. Enterprise project management
operation is a strategic choice by the organisation to modify the way decisions are
made, resources allocated to projects, projects are being selected, and the way projects
are folded down. EPM is the dedication of the organisation to doing work through
projects, where appropriate, and obtaining more benefits from projects.
Q4 Explain the project management value initiative
(General description of project management value initiative-4, six steps in the project
initiative program -6) 10 marks
Answer.
Project management value initiative
The valueinitiativeprogram focuses on educating themeasurementteam on theproject
management value measurement program. This helps the team to understand the
program and enables them to clearly recognise the program’s goals and objectives. The
organizational construct which will affect the project management value measurement
program are the stakeholders, the organisational mission and strategies, the
organisational structure, the key business process, the project
Q5 Briefly explains the seven forces involved in the success of quality in project
management.
(Explanation of: Placing the budgetary considerations ahead of the quality-2, Placing
schedule considerations ahead of quality-1, Placing political considerations ahead of
quality-1, Being arrogant-1, Lack of fundamental knowledge, research or education,
the principles of quality assurance-2, Pervasively believing in entitlement-2, Practicing
autocratic behaviours, resulting in “enrolment”-1) 10 marks
Answer.
Placing the budgetary considerations ahead of the quality: As per this root cause
category, management does not understand the fundamental concept of the cost of
quality, as defined by Philip Crosby and Frank Gryna. Obtaining quality in performance
and service is still viewed as an expense, rather than an indispensable element for
profitability. Major decisions are made based on accounting principles that do not
recognise the idea of the cost of (poor) quality.
Placing schedule considerations ahead of quality: When quality processes are in place,
schedules will be met. But
Q6. UK based Sonifex has been manufacturing equipments to broadcast audio for the
radio, TV, security and telecommunications for more than 40 years. A reputation for
building high quality, reliable professional audio products, 100% engineering and
manufactured in their UK factory and is being used in facilities all over the world has
been earned by Sonifex. Sonifex is in private owned by its directors and headed by
Marcus Brooke. Sonifex’s finest known products comprises of the award winning
Courier portable flash-card recorder, which was chosen as the millennium product by
the UK’s design council. The Red Box range of audio interfaces, that are designed for
systems integrators and the lately introduced referencemonitor range, a new series of
rack-mount audio monitors that utilise the latest DSP (digital signal Processing)
technology is also one of Sonifex’s product.
In the late 1990s, during the drift towards overseas manufacturing, the need to
overhaul its complete operation if it were to maintain its status as a leading UK
manufacture and to retain its expert manufacturing staff was recognised by Sonifex.
Of late, the company realised that a modification needed in the way the
manufacturing process was controlled so that stock control, invoicing and accounts
can be incorporated. An Excel system called EFACS, allowed to do a lot of what was
needed in terms of stock control and production planning. However, the system was
very cumbersome and wasn’t really suited to the needs of a smaller company where
one person usually has more than one task to be performed. Sonifex had its own in-
house software expert that could perform a thorough inspection and take a look at the
system to see how on the improvements. A new front end was created.
Sonifex was the first to invest in Dscope Series III audio analysers. In fact they were
involved in helping to incorporate beta testing in the unit. A prototype was seen at a
broadcast convention and the beta test was advised to perform as a must. The price
was a factor- it is incredibly competitive when compared to the test equipment
offered by other manufactures, but that wasn’t the only reason to be chosen. They
were also convinced by its incredible feature-set and by its user friendliness, but the
main deciding factor was that the system could be easily integrated into their test
systems, enabling them to develop their own user interface, integrating the scope
seamlessly into their own software system.
The company’s Dscope series IIIis an inclusive and powerful measurement system for
analog and digital audio generation and analysis, consisting of digital audio carrier
analysis, acoustic transducer testing and testing of sound devices. The net result of
Dscope III was very a rapid diagnosis and correction of any manufacturing faults, with
detailed test records being written directly into the test system, giving a complete
product that was ever built. This, in turn led to far more effective component batch
control of products on the manufacturing lines, and more efficient technical support of
products in the field. Each and every step of the phase of the Dscope III series had to
undergo a complete inspection, measurementof the devices and testing. Sonifex thus
has been able to standardise on the Dscope III series for both development and testing
purposes, allowing engineers to exchange results and test procedures between
departments. The Dscope III analysis was a important part of the company’s
performance criteria.
Sonifex’s followed automated testing process and is now an integral part of its fresh
software package, which was developed in-house. By doing the right inspection,
measurement and testing at the right time Sonifex has retained their manufacturing
operation in UK when many of the competitors had to move overseas. In spite of all
this Sonifex continued to develop quality design and manufacture the quality products
in such a way that customers come expecting them.
What were the challenges faced by Sonifex’s measurement system? Describe the role
of inspection, measurement and testing in building Sonifex. (Listing of challenges-4,
Description of the role of inspection, measurement and testing-6) 10 marks
Answer.
Challenges faced by Sonifex
· The first challenge is to maintain its status for the need to overhaul its complete
operation in the late 1990’s
· Next challenge is to retain its expert manufacturing process staff.
And also challenge to modify the manufacturing process so that stock control,
Dear students get fully solved SMU MBA Fall 2014 assignments
Send your semester & Specialization name to our mail id :
“ help.mbaassignments@gmail.com ”
or
Call us at : 08263069601
These are just questions for reference . To check samples see our latest
uploads in blog archive or search assignments .
(Prefer mailing. Call in emergency )

More Related Content

What's hot

SW K-Tec Contract Manufacturing Services
SW K-Tec Contract Manufacturing ServicesSW K-Tec Contract Manufacturing Services
SW K-Tec Contract Manufacturing Services
HTCS LLC
 
Chetan QA & MR resume
Chetan QA & MR resumeChetan QA & MR resume
Chetan QA & MR resumechetan naidu
 
Robert Ginn Resume - 2015
Robert Ginn Resume - 2015Robert Ginn Resume - 2015
Robert Ginn Resume - 2015Robert Ginn
 
FULL CV PRESENTATION - FRANCISCO DOMINGUEZ - APRIL 2016
FULL CV PRESENTATION - FRANCISCO DOMINGUEZ - APRIL 2016FULL CV PRESENTATION - FRANCISCO DOMINGUEZ - APRIL 2016
FULL CV PRESENTATION - FRANCISCO DOMINGUEZ - APRIL 2016
★ Francisco Domínguez Bueno
 
CV - FRANCISCO DOMINGUEZ - JULY 2018
CV - FRANCISCO DOMINGUEZ - JULY 2018CV - FRANCISCO DOMINGUEZ - JULY 2018
CV - FRANCISCO DOMINGUEZ - JULY 2018
★ Francisco Domínguez Bueno
 
Lead Regulatory Engineer
Lead Regulatory EngineerLead Regulatory Engineer
Lead Regulatory Engineerstephen ferris
 
Psd presentation 2
Psd presentation 2Psd presentation 2
Psd presentation 2semirahid21
 
Pfeiffer Juergen 2015-04-28 REV01
Pfeiffer Juergen 2015-04-28 REV01Pfeiffer Juergen 2015-04-28 REV01
Pfeiffer Juergen 2015-04-28 REV01Juergen Pfeiffer
 
Case study manual testing web application
Case study manual testing web applicationCase study manual testing web application
Case study manual testing web application
Krishna Gurjar
 
Resume john howe_r25_2-18-17
Resume john howe_r25_2-18-17Resume john howe_r25_2-18-17
Resume john howe_r25_2-18-17
John Howe
 
1 JimRinehart ResumeQE 15 12-4-15
1 JimRinehart ResumeQE 15 12-4-151 JimRinehart ResumeQE 15 12-4-15
1 JimRinehart ResumeQE 15 12-4-15Jim Rinehart
 
resume Larry Arnold August 2016
resume Larry Arnold August 2016resume Larry Arnold August 2016
resume Larry Arnold August 2016Larry Arnold
 
Skatiyar CV latest date 02.05.2015.doc
Skatiyar CV latest date 02.05.2015.docSkatiyar CV latest date 02.05.2015.doc
Skatiyar CV latest date 02.05.2015.docSaurabh Katiyar
 
Giff gaff casestudy_v5_[tcl03]
Giff gaff casestudy_v5_[tcl03]Giff gaff casestudy_v5_[tcl03]
Giff gaff casestudy_v5_[tcl03]
Transition Consulting Limited, India
 
Lohbauer resume 021717
Lohbauer resume 021717Lohbauer resume 021717
Lohbauer resume 021717
Dave Lohbauer
 
FCS Resume 2016 English ENG
FCS Resume 2016 English ENGFCS Resume 2016 English ENG
FCS Resume 2016 English ENGFelipe Calleros
 

What's hot (20)

Resume 2016 PH Updated
Resume 2016  PH UpdatedResume 2016  PH Updated
Resume 2016 PH Updated
 
SW K-Tec Contract Manufacturing Services
SW K-Tec Contract Manufacturing ServicesSW K-Tec Contract Manufacturing Services
SW K-Tec Contract Manufacturing Services
 
Chetan QA & MR resume
Chetan QA & MR resumeChetan QA & MR resume
Chetan QA & MR resume
 
Robert Ginn Resume - 2015
Robert Ginn Resume - 2015Robert Ginn Resume - 2015
Robert Ginn Resume - 2015
 
FULL CV PRESENTATION - FRANCISCO DOMINGUEZ - APRIL 2016
FULL CV PRESENTATION - FRANCISCO DOMINGUEZ - APRIL 2016FULL CV PRESENTATION - FRANCISCO DOMINGUEZ - APRIL 2016
FULL CV PRESENTATION - FRANCISCO DOMINGUEZ - APRIL 2016
 
CV - FRANCISCO DOMINGUEZ - JULY 2018
CV - FRANCISCO DOMINGUEZ - JULY 2018CV - FRANCISCO DOMINGUEZ - JULY 2018
CV - FRANCISCO DOMINGUEZ - JULY 2018
 
Lead Regulatory Engineer
Lead Regulatory EngineerLead Regulatory Engineer
Lead Regulatory Engineer
 
resume-april-2016
resume-april-2016resume-april-2016
resume-april-2016
 
DOUGLAS D 2
DOUGLAS D 2DOUGLAS D 2
DOUGLAS D 2
 
Psd presentation 2
Psd presentation 2Psd presentation 2
Psd presentation 2
 
Pfeiffer Juergen 2015-04-28 REV01
Pfeiffer Juergen 2015-04-28 REV01Pfeiffer Juergen 2015-04-28 REV01
Pfeiffer Juergen 2015-04-28 REV01
 
Resume
ResumeResume
Resume
 
Case study manual testing web application
Case study manual testing web applicationCase study manual testing web application
Case study manual testing web application
 
Resume john howe_r25_2-18-17
Resume john howe_r25_2-18-17Resume john howe_r25_2-18-17
Resume john howe_r25_2-18-17
 
1 JimRinehart ResumeQE 15 12-4-15
1 JimRinehart ResumeQE 15 12-4-151 JimRinehart ResumeQE 15 12-4-15
1 JimRinehart ResumeQE 15 12-4-15
 
resume Larry Arnold August 2016
resume Larry Arnold August 2016resume Larry Arnold August 2016
resume Larry Arnold August 2016
 
Skatiyar CV latest date 02.05.2015.doc
Skatiyar CV latest date 02.05.2015.docSkatiyar CV latest date 02.05.2015.doc
Skatiyar CV latest date 02.05.2015.doc
 
Giff gaff casestudy_v5_[tcl03]
Giff gaff casestudy_v5_[tcl03]Giff gaff casestudy_v5_[tcl03]
Giff gaff casestudy_v5_[tcl03]
 
Lohbauer resume 021717
Lohbauer resume 021717Lohbauer resume 021717
Lohbauer resume 021717
 
FCS Resume 2016 English ENG
FCS Resume 2016 English ENGFCS Resume 2016 English ENG
FCS Resume 2016 English ENG
 

Viewers also liked

Benefits of coffee for runners
Benefits of coffee for runnersBenefits of coffee for runners
Benefits of coffee for runners
Office Coffee Services
 
Software01
Software01Software01
Software01
alviluna08
 
Capacitacindocenterutasdeaprendizaje2014edhl 140302222730-phpapp02
Capacitacindocenterutasdeaprendizaje2014edhl 140302222730-phpapp02Capacitacindocenterutasdeaprendizaje2014edhl 140302222730-phpapp02
Capacitacindocenterutasdeaprendizaje2014edhl 140302222730-phpapp02Alfredo Castro
 
Design Psychology: Concepts
Design Psychology: ConceptsDesign Psychology: Concepts
Design Psychology: Concepts
Mark Wilson
 
Amerikanci prisluskivanje radi materijalne koristi
Amerikanci prisluskivanje radi materijalne koristiAmerikanci prisluskivanje radi materijalne koristi
Amerikanci prisluskivanje radi materijalne koristi
aleksandarsatara
 
News of the week 6.9.13 abp majha
News of the week 6.9.13   abp majhaNews of the week 6.9.13   abp majha
JSM Central Government Payroll Software as per VI and VII Pay Commission Pres...
JSM Central Government Payroll Software as per VI and VII Pay Commission Pres...JSM Central Government Payroll Software as per VI and VII Pay Commission Pres...
JSM Central Government Payroll Software as per VI and VII Pay Commission Pres...
JSM Technologies Pvt. Ltd
 

Viewers also liked (7)

Benefits of coffee for runners
Benefits of coffee for runnersBenefits of coffee for runners
Benefits of coffee for runners
 
Software01
Software01Software01
Software01
 
Capacitacindocenterutasdeaprendizaje2014edhl 140302222730-phpapp02
Capacitacindocenterutasdeaprendizaje2014edhl 140302222730-phpapp02Capacitacindocenterutasdeaprendizaje2014edhl 140302222730-phpapp02
Capacitacindocenterutasdeaprendizaje2014edhl 140302222730-phpapp02
 
Design Psychology: Concepts
Design Psychology: ConceptsDesign Psychology: Concepts
Design Psychology: Concepts
 
Amerikanci prisluskivanje radi materijalne koristi
Amerikanci prisluskivanje radi materijalne koristiAmerikanci prisluskivanje radi materijalne koristi
Amerikanci prisluskivanje radi materijalne koristi
 
News of the week 6.9.13 abp majha
News of the week 6.9.13   abp majhaNews of the week 6.9.13   abp majha
News of the week 6.9.13 abp majha
 
JSM Central Government Payroll Software as per VI and VII Pay Commission Pres...
JSM Central Government Payroll Software as per VI and VII Pay Commission Pres...JSM Central Government Payroll Software as per VI and VII Pay Commission Pres...
JSM Central Government Payroll Software as per VI and VII Pay Commission Pres...
 

Similar to Pm0017 –project quality management

Software Quality Assurance Model for Software Excellence with Its Requirements
Software Quality Assurance Model for Software Excellence with Its RequirementsSoftware Quality Assurance Model for Software Excellence with Its Requirements
Software Quality Assurance Model for Software Excellence with Its Requirements
United International Journal for Research & Technology
 
Tukko Labs Testing Services Presentation 1 May 21, 2010
Tukko Labs Testing Services Presentation 1  May 21, 2010Tukko Labs Testing Services Presentation 1  May 21, 2010
Tukko Labs Testing Services Presentation 1 May 21, 2010
awolfson
 
Telelogic
TelelogicTelelogic
TelelogicUmesh
 
DELIVER QUALITY SOFTWARE PRODUCTS BY FOLLOWING SIMPLE STEPS
DELIVER QUALITY SOFTWARE PRODUCTS BY FOLLOWING SIMPLE STEPSDELIVER QUALITY SOFTWARE PRODUCTS BY FOLLOWING SIMPLE STEPS
DELIVER QUALITY SOFTWARE PRODUCTS BY FOLLOWING SIMPLE STEPS
Techahead Software
 
Pm0017 project quality management
Pm0017 project quality managementPm0017 project quality management
Pm0017 project quality managementsmumbahelp
 
Process & Quality Assurance Strategy for Infotainment Platform_Suresh_v2.pptx
Process & Quality Assurance Strategy for Infotainment Platform_Suresh_v2.pptxProcess & Quality Assurance Strategy for Infotainment Platform_Suresh_v2.pptx
Process & Quality Assurance Strategy for Infotainment Platform_Suresh_v2.pptx
Suresh Babu Sathiyakumar
 
CV Alan Leakey v9_3
CV Alan Leakey v9_3CV Alan Leakey v9_3
CV Alan Leakey v9_3Alan Leakey
 
Cv francisco dominguez december 2014
Cv francisco dominguez   december 2014Cv francisco dominguez   december 2014
Cv francisco dominguez december 2014
Fran D. Bueno
 
Strategies and Process Improvement with Enterprise SPICE®
Strategies and Process Improvement with Enterprise SPICE®Strategies and Process Improvement with Enterprise SPICE®
Strategies and Process Improvement with Enterprise SPICE®
Ernest Wallmueller
 
Architecting Industry 4.0 on tradition and know-how
Architecting Industry 4.0 on tradition and know-howArchitecting Industry 4.0 on tradition and know-how
Architecting Industry 4.0 on tradition and know-how
TOPP Tactical Intelligence Ltd
 
Root Cause and Corrective Action (RCCA) Workshop
Root Cause and Corrective Action (RCCA) WorkshopRoot Cause and Corrective Action (RCCA) Workshop
Root Cause and Corrective Action (RCCA) Workshop
Accendo Reliability
 
Qm0026 quality concepts, tasks and development methods
Qm0026   quality concepts, tasks and development methodsQm0026   quality concepts, tasks and development methods
Qm0026 quality concepts, tasks and development methods
smumbahelp
 
Fixed Price Distributed Agile Projects
Fixed Price Distributed Agile ProjectsFixed Price Distributed Agile Projects
Fixed Price Distributed Agile Projects
Raja Bavani
 
[Webinar] Visa's Journey to a Culture of Experimentation
[Webinar] Visa's Journey to a Culture of Experimentation[Webinar] Visa's Journey to a Culture of Experimentation
[Webinar] Visa's Journey to a Culture of Experimentation
Optimizely
 
Making quality visible in Product Engineering
Making quality visible in Product EngineeringMaking quality visible in Product Engineering
Making quality visible in Product Engineering
Jan Petter Hagberg
 
QFD-COVID TEST KIT updated-converted.pdf
QFD-COVID TEST KIT updated-converted.pdfQFD-COVID TEST KIT updated-converted.pdf
QFD-COVID TEST KIT updated-converted.pdf
SachinShishodia4
 
Quality & Reliability Consultant
Quality & Reliability ConsultantQuality & Reliability Consultant
Quality & Reliability Consultant
Munirhaq
 
ISO9000&Feasibility Study
ISO9000&Feasibility StudyISO9000&Feasibility Study
ISO9000&Feasibility Study
Prakriti Sharma
 

Similar to Pm0017 –project quality management (20)

Software Quality Assurance Model for Software Excellence with Its Requirements
Software Quality Assurance Model for Software Excellence with Its RequirementsSoftware Quality Assurance Model for Software Excellence with Its Requirements
Software Quality Assurance Model for Software Excellence with Its Requirements
 
Tukko Labs Testing Services Presentation 1 May 21, 2010
Tukko Labs Testing Services Presentation 1  May 21, 2010Tukko Labs Testing Services Presentation 1  May 21, 2010
Tukko Labs Testing Services Presentation 1 May 21, 2010
 
Telelogic
TelelogicTelelogic
Telelogic
 
DELIVER QUALITY SOFTWARE PRODUCTS BY FOLLOWING SIMPLE STEPS
DELIVER QUALITY SOFTWARE PRODUCTS BY FOLLOWING SIMPLE STEPSDELIVER QUALITY SOFTWARE PRODUCTS BY FOLLOWING SIMPLE STEPS
DELIVER QUALITY SOFTWARE PRODUCTS BY FOLLOWING SIMPLE STEPS
 
Pm0017 project quality management
Pm0017 project quality managementPm0017 project quality management
Pm0017 project quality management
 
Process & Quality Assurance Strategy for Infotainment Platform_Suresh_v2.pptx
Process & Quality Assurance Strategy for Infotainment Platform_Suresh_v2.pptxProcess & Quality Assurance Strategy for Infotainment Platform_Suresh_v2.pptx
Process & Quality Assurance Strategy for Infotainment Platform_Suresh_v2.pptx
 
CV Alan Leakey v9_3
CV Alan Leakey v9_3CV Alan Leakey v9_3
CV Alan Leakey v9_3
 
Cv francisco dominguez december 2014
Cv francisco dominguez   december 2014Cv francisco dominguez   december 2014
Cv francisco dominguez december 2014
 
Strategies and Process Improvement with Enterprise SPICE®
Strategies and Process Improvement with Enterprise SPICE®Strategies and Process Improvement with Enterprise SPICE®
Strategies and Process Improvement with Enterprise SPICE®
 
Architecting Industry 4.0 on tradition and know-how
Architecting Industry 4.0 on tradition and know-howArchitecting Industry 4.0 on tradition and know-how
Architecting Industry 4.0 on tradition and know-how
 
Root Cause and Corrective Action (RCCA) Workshop
Root Cause and Corrective Action (RCCA) WorkshopRoot Cause and Corrective Action (RCCA) Workshop
Root Cause and Corrective Action (RCCA) Workshop
 
KY Wong Resume-2014
KY Wong Resume-2014KY Wong Resume-2014
KY Wong Resume-2014
 
Qm0026 quality concepts, tasks and development methods
Qm0026   quality concepts, tasks and development methodsQm0026   quality concepts, tasks and development methods
Qm0026 quality concepts, tasks and development methods
 
Fixed Price Distributed Agile Projects
Fixed Price Distributed Agile ProjectsFixed Price Distributed Agile Projects
Fixed Price Distributed Agile Projects
 
[Webinar] Visa's Journey to a Culture of Experimentation
[Webinar] Visa's Journey to a Culture of Experimentation[Webinar] Visa's Journey to a Culture of Experimentation
[Webinar] Visa's Journey to a Culture of Experimentation
 
Making quality visible in Product Engineering
Making quality visible in Product EngineeringMaking quality visible in Product Engineering
Making quality visible in Product Engineering
 
QFD-COVID TEST KIT updated-converted.pdf
QFD-COVID TEST KIT updated-converted.pdfQFD-COVID TEST KIT updated-converted.pdf
QFD-COVID TEST KIT updated-converted.pdf
 
Harvinder Singh-Resume
Harvinder Singh-ResumeHarvinder Singh-Resume
Harvinder Singh-Resume
 
Quality & Reliability Consultant
Quality & Reliability ConsultantQuality & Reliability Consultant
Quality & Reliability Consultant
 
ISO9000&Feasibility Study
ISO9000&Feasibility StudyISO9000&Feasibility Study
ISO9000&Feasibility Study
 

Pm0017 –project quality management

  • 1. Dear students get fully solved SMU MBA Fall 2014 assignments Send your semester & Specialization name to our mail id : “ help.mbaassignments@gmail.com ” or Call us at : 08263069601 These are just questions for reference . To check samples see our latest uploads in blog archive or search assignments . (Prefer mailing. Call in emergency ) DRIVE-Fall 2014 PROGRAM/SEMESTER-MBADS (SEM 4/SEM 6) MBAFLEX/ MBAN2 (SEM 4) PGDPMN (SEM 2) SUBJECT CODE & NAME-PM 0017 –PROJECT QUALITY MANAGEMENT Q1. What is quality assurance? Explain the inputs , outputs and tools of quality assurance process. (Definition of quality assurance, Description of inputs to quality assurance Description of tools and techniques used for quality assurance, Description of outputs of quality assurance)1, 3,3,3 Ans. Quality assurance Assuranceis the process of gaining stakeholders confidence by providing evidence that the quality-related activities are being performed effectively and the planned actions will be completed to produce a product or service that will satisfy the stated quality requirements. Q2. Write short notes on (PDCA cycle, Quality audits)5,5 Ans. PDCA cycle The Plan-Do-Check-Act (PDCA) cycle is as follows:
  • 2. Plan: This is thebeginning point wheretheprocess will haveto be selected. This process if executed correctly indicates the greatest opportunity for success, at first; it may be useful to select the process which indicates the biggest potential for the successful improvement and also maybethe “easiest” one. The team may face less difficulty while working through themodel the first time, and both the team and the management will be encouraged by the success. After selecting the right process, the change should be analysed and planned. Q3 Describe the Enterprise Project Management Model(EPM) (Definition-2, Model which supports EPM-2, Implementation of EPM-3, Advantages of EPM-3) 10 marks Answer. Definition It gives an overall view of the resources and the project management activities and brings in quality and success of the project management i organisation. Enterprise project management operation is a strategic choice by the organisation to modify the way decisions are made, resources allocated to projects, projects are being selected, and the way projects are folded down. EPM is the dedication of the organisation to doing work through projects, where appropriate, and obtaining more benefits from projects. Q4 Explain the project management value initiative (General description of project management value initiative-4, six steps in the project initiative program -6) 10 marks Answer. Project management value initiative The valueinitiativeprogram focuses on educating themeasurementteam on theproject management value measurement program. This helps the team to understand the program and enables them to clearly recognise the program’s goals and objectives. The organizational construct which will affect the project management value measurement program are the stakeholders, the organisational mission and strategies, the organisational structure, the key business process, the project Q5 Briefly explains the seven forces involved in the success of quality in project management.
  • 3. (Explanation of: Placing the budgetary considerations ahead of the quality-2, Placing schedule considerations ahead of quality-1, Placing political considerations ahead of quality-1, Being arrogant-1, Lack of fundamental knowledge, research or education, the principles of quality assurance-2, Pervasively believing in entitlement-2, Practicing autocratic behaviours, resulting in “enrolment”-1) 10 marks Answer. Placing the budgetary considerations ahead of the quality: As per this root cause category, management does not understand the fundamental concept of the cost of quality, as defined by Philip Crosby and Frank Gryna. Obtaining quality in performance and service is still viewed as an expense, rather than an indispensable element for profitability. Major decisions are made based on accounting principles that do not recognise the idea of the cost of (poor) quality. Placing schedule considerations ahead of quality: When quality processes are in place, schedules will be met. But Q6. UK based Sonifex has been manufacturing equipments to broadcast audio for the radio, TV, security and telecommunications for more than 40 years. A reputation for building high quality, reliable professional audio products, 100% engineering and manufactured in their UK factory and is being used in facilities all over the world has been earned by Sonifex. Sonifex is in private owned by its directors and headed by Marcus Brooke. Sonifex’s finest known products comprises of the award winning Courier portable flash-card recorder, which was chosen as the millennium product by the UK’s design council. The Red Box range of audio interfaces, that are designed for systems integrators and the lately introduced referencemonitor range, a new series of rack-mount audio monitors that utilise the latest DSP (digital signal Processing) technology is also one of Sonifex’s product. In the late 1990s, during the drift towards overseas manufacturing, the need to overhaul its complete operation if it were to maintain its status as a leading UK manufacture and to retain its expert manufacturing staff was recognised by Sonifex. Of late, the company realised that a modification needed in the way the manufacturing process was controlled so that stock control, invoicing and accounts can be incorporated. An Excel system called EFACS, allowed to do a lot of what was needed in terms of stock control and production planning. However, the system was very cumbersome and wasn’t really suited to the needs of a smaller company where one person usually has more than one task to be performed. Sonifex had its own in- house software expert that could perform a thorough inspection and take a look at the system to see how on the improvements. A new front end was created.
  • 4. Sonifex was the first to invest in Dscope Series III audio analysers. In fact they were involved in helping to incorporate beta testing in the unit. A prototype was seen at a broadcast convention and the beta test was advised to perform as a must. The price was a factor- it is incredibly competitive when compared to the test equipment offered by other manufactures, but that wasn’t the only reason to be chosen. They were also convinced by its incredible feature-set and by its user friendliness, but the main deciding factor was that the system could be easily integrated into their test systems, enabling them to develop their own user interface, integrating the scope seamlessly into their own software system. The company’s Dscope series IIIis an inclusive and powerful measurement system for analog and digital audio generation and analysis, consisting of digital audio carrier analysis, acoustic transducer testing and testing of sound devices. The net result of Dscope III was very a rapid diagnosis and correction of any manufacturing faults, with detailed test records being written directly into the test system, giving a complete product that was ever built. This, in turn led to far more effective component batch control of products on the manufacturing lines, and more efficient technical support of products in the field. Each and every step of the phase of the Dscope III series had to undergo a complete inspection, measurementof the devices and testing. Sonifex thus has been able to standardise on the Dscope III series for both development and testing purposes, allowing engineers to exchange results and test procedures between departments. The Dscope III analysis was a important part of the company’s performance criteria. Sonifex’s followed automated testing process and is now an integral part of its fresh software package, which was developed in-house. By doing the right inspection, measurement and testing at the right time Sonifex has retained their manufacturing operation in UK when many of the competitors had to move overseas. In spite of all this Sonifex continued to develop quality design and manufacture the quality products in such a way that customers come expecting them. What were the challenges faced by Sonifex’s measurement system? Describe the role of inspection, measurement and testing in building Sonifex. (Listing of challenges-4, Description of the role of inspection, measurement and testing-6) 10 marks Answer. Challenges faced by Sonifex · The first challenge is to maintain its status for the need to overhaul its complete operation in the late 1990’s · Next challenge is to retain its expert manufacturing process staff.
  • 5. And also challenge to modify the manufacturing process so that stock control, Dear students get fully solved SMU MBA Fall 2014 assignments Send your semester & Specialization name to our mail id : “ help.mbaassignments@gmail.com ” or Call us at : 08263069601 These are just questions for reference . To check samples see our latest uploads in blog archive or search assignments . (Prefer mailing. Call in emergency )