The document introduces Plastech's Premier Duct Access Chamber. It provides contractor benefits such as robust design, light weight and ease of installation. The chamber is suitable for street lighting, traffic signals, and other applications requiring duct access. Its robust design prevents deformation during backfilling, providing peace of mind.
Prevent the formation of lug wear. Lug wear leads to equipment
breakdown, which results in downtime, production shortfalls and in the worst case scenario, injury. Construction, mining and forestry companies across the globe need a solution that permanently eliminates lug wear and empowers them to meet the challenges of everyday industrial operations. Expander System is on a mission to reset the limits of industrial operations.
Prevent the formation of lug wear. Lug wear leads to equipment
breakdown, which results in downtime, production shortfalls and in the worst case scenario, injury. Construction, mining and forestry companies across the globe need a solution that permanently eliminates lug wear and empowers them to meet the challenges of everyday industrial operations. Expander System is on a mission to reset the limits of industrial operations.
Geoquip Water Solutions sister company Hydrodif® has the widest range of metric and imperial MDPE compression fittings, PVC valves and fittings and MDPE compression pipes. We hope this presentation gives more information about our company and product range. If you would like to discuss our range of products further please contact us on tel: +44(0)1473 464546 or email: info@hydrodif.co.uk. You can also visit our website: www.hydrodif.co.uk
Les reprises d'emploi de demandeurs d'emploi au 4ème trimestre 2014France Travail
Au cours du quatrième trimestre 2014, 904.200 demandeurs d’emploi inscrits en catégories A ou B ont repris un emploi d’un mois ou plus, en hausse de 5,6% par rapport au quatrième trimestre 2013. Sur la même période, le nombre de demandeurs d’emploi en catégories A ou B s’est accru de 4,8%.
Geoquip Water Solutions sister company Hydrodif® has the widest range of metric and imperial MDPE compression fittings, PVC valves and fittings and MDPE compression pipes. We hope this presentation gives more information about our company and product range. If you would like to discuss our range of products further please contact us on tel: +44(0)1473 464546 or email: info@hydrodif.co.uk. You can also visit our website: www.hydrodif.co.uk
Les reprises d'emploi de demandeurs d'emploi au 4ème trimestre 2014France Travail
Au cours du quatrième trimestre 2014, 904.200 demandeurs d’emploi inscrits en catégories A ou B ont repris un emploi d’un mois ou plus, en hausse de 5,6% par rapport au quatrième trimestre 2013. Sur la même période, le nombre de demandeurs d’emploi en catégories A ou B s’est accru de 4,8%.
Traders of Grating Machine, Wire Grating Machinery, Complete Welded Wire Mesh/ Fabric Lines, Wire Rolling & Ribbing Plants, Wire Straightening, Cutting-off Machines, Moreover, we also offer various SECO MODEL machines for the production of quality Welded Wire Mesh Fabric for concrete reinforcement and many other domestic, industrial and general applications.
Anchor Channels are rolled channels with swaged studs that are used for connections made to concrete structures. This system allows easy and safe fixations to structures such as concrete slabs, beams and columns.
1. Pre-Formedbaseunits
ContractorBenefits
Thebenefitstothecontractorare:
•RobustDesign
•Speedandeaseofinstallation
•Lightweightsections
•150mmdeepsectionsforgreaterflexibilityandlesswaste
•Pre-Trepannedguideholesforeasyaccess
•Interlockingsections
•Pre-Formedbaseunits
•Costcompetitiveagainsttraditionalproducts
•Canbeinstalledwithorwithoutconcretesurround
benefits
premier
PremierDuctAccessChamber
PlastechisproudtointroducethePremierDuctAccessChamber.
AlthoughitisaimedprimarilyattheStreetLightingandTrafficSignals
industries,itissuitableformostapplicationswhereaductaccesschamber
isrequired.
Therobustdesignmeansthattheboxesarenotpronetodeformationwhilst
beingbackfilledwithconcrete,unlikesomeothersystemsonthemarket,
givingthecontractorandclientpeaceofmind.
Plastech Limited, Park Industrial Estate, Liverpool Road, Ashton-in-Makerfield, Wigan WN4 0YU
Tel: 01942 717110 Fax: 01942 717115 Email: info@plastech-stakka.co.uk Website: www.plastech-stakka.co.uk.
plastech
plastic systems for industry
Recommended Installation Guide
The ‘Premier’ Chamber should be bedded on a base of 100mm thick C20 drymix concrete and the base be
chamfered to obtain a natural soakaway outlet. Alternatively use a ‘Premier’ pre-formed base set in no-fines semi
porous concrete mix.
The sides can be backfilled with dug material, granular material or concrete.
Specification
The duct inspection chamber shall be manufactured from 32mm thick, high density polyethylene and have a
smooth inner wall with reinforcing ribs on the external wall for extra rigidity.
They shall be capable of withstanding a 12.5 tonne wheel load, without the need for structural concrete surround.
They shall be manufactured from separate, interlocking sections and have the capability to be assembled or
disassembled on site without the need for sawing or specialist equipment.
They shall come complete with pre-formed knock out sections to accommodate duct sizes of 50mm, 66mm and
110mm outside diameters.
The chambers shall be supplied with a pre-formed GRP base unit for ease and speed of installation which should be
bedded in a no-fines, semi porous, concrete mix to allow any ground water to flow away.
The chambers shall be supplied with a 150mm long, pre-formed raising pin where required, to enable the
contractor to lift and tilt the frame as required.
The sections shall be 150mm overall depth and be supplied with a locating flange to the top section for ease of
assembly and shall be available in a range of standard sizes, as follows.
Other sizes can be manufactured at short notice.
The duct inspection chamber lid shall be manufactured from high strength, polyester composite material and shall
conform to BSEN 124, 12.5 tonne wheel loading.
The lid shall locate into a 2.5mm thick, lockable, galvanised frame, with a 100mm internal flange which allows for
lift and tilt adjustment and a 70mm external flange to the top section.
Model Number Clear Opening Section Depth Load Rating
Premier P3030 300 x 300 150 B125
Premier P3045 300 x 450 150 B125
Premier P4545 450 x 450 150 B125
Premier P4560 450 x 600 150 B125
Premier P6060 600 x 600 150 B125
Premier P4590 450 x 900 150 B125
Premier P6090 600 x 900 150 B125
All dimensions in mm. Clear Opening measurements are width x length.
The Premier Duct Access Chambers Range
04/1600
Premier Duct Access Chambers
plastech
plastic systems for industry
2. Pre-Formed base units
Contractor Benefits
The benefits to the contractor are:
• Robust Design
• Speed and ease of installation
• Light weight sections
• 150mm deep sections for greater flexibility and less waste
• Pre-Trepanned guide holes for easy access
• Interlocking sections
• Pre-Formed base units
• Cost competitive against traditional products
• Can be installed with or without concrete surround
benefits
premier
Premier Duct Access Chamber
Plastech is proud to introduce the Premier Duct Access Chamber.
Although it is aimed primarily at the Street Lighting and Traffic Signals
industries, it is suitable for most applications where a duct access chamber
is required.
The robust design means that the boxes are not prone to deformation whilst
being backfilled with concrete, unlike some other systems on the market,
giving the contractor and client peace of mind.
PlastechLimited,ParkIndustrialEstate,LiverpoolRoad,Ashton-in-Makerfield,WiganWN40YU
Tel:01942717110Fax:01942717115Email:info@plastech-stakka.co.ukWebsite:www.plastech-stakka.co.uk.
plastech
plasticsystemsforindustry
RecommendedInstallationGuide
The‘Premier’Chambershouldbebeddedonabaseof100mmthickC20drymixconcreteandthebasebe
chamferedtoobtainanaturalsoakawayoutlet.Alternativelyusea‘Premier’pre-formedbasesetinno-finessemi
porousconcretemix.
Thesidescanbebackfilledwithdugmaterial,granularmaterialorconcrete.
Specification
Theductinspectionchambershallbemanufacturedfrom32mmthick,highdensitypolyethyleneandhavea
smoothinnerwallwithreinforcingribsontheexternalwallforextrarigidity.
Theyshallbecapableofwithstandinga12.5tonnewheelload,withouttheneedforstructuralconcretesurround.
Theyshallbemanufacturedfromseparate,interlockingsectionsandhavethecapabilitytobeassembledor
disassembledonsitewithouttheneedforsawingorspecialistequipment.
Theyshallcomecompletewithpre-formedknockoutsectionstoaccommodateductsizesof50mm,66mmand
110mmoutsidediameters.
Thechambersshallbesuppliedwithapre-formedGRPbaseunitforeaseandspeedofinstallationwhichshouldbe
beddedinano-fines,semiporous,concretemixtoallowanygroundwatertoflowaway.
Thechambersshallbesuppliedwitha150mmlong,pre-formedraisingpinwhererequired,toenablethe
contractortoliftandtilttheframeasrequired.
Thesectionsshallbe150mmoveralldepthandbesuppliedwithalocatingflangetothetopsectionforeaseof
assemblyandshallbeavailableinarangeofstandardsizes,asfollows.
Othersizescanbemanufacturedatshortnotice.
Theductinspectionchamberlidshallbemanufacturedfromhighstrength,polyestercompositematerialandshall
conformtoBSEN124,12.5tonnewheelloading.
Thelidshalllocateintoa2.5mmthick,lockable,galvanisedframe,witha100mminternalflangewhichallowsfor
liftandtiltadjustmentanda70mmexternalflangetothetopsection.
ModelNumberClearOpeningSectionDepthLoadRating
PremierP3030300x300150B125
PremierP3045300x450150B125
PremierP4545450x450150B125
PremierP4560450x600150B125
PremierP6060600x600150B125
PremierP4590450x900150B125
PremierP6090600x900150B125
Alldimensionsinmm.ClearOpeningmeasurementsarewidthxlength.
ThePremierDuctAccessChambersRange
04/1600
PremierDuctAccessChambers
plastech
plasticsystemsforindustry
3. Pre-Formed base units
Contractor Benefits
The benefits to the contractor are:
• Robust Design
• Speed and ease of installation
• Light weight sections
• 150mm deep sections for greater flexibility and less waste
• Pre-Trepanned guide holes for easy access
• Interlocking sections
• Pre-Formed base units
• Cost competitive against traditional products
• Can be installed with or without concrete surround
benefits
premier
Premier Duct Access Chamber
Plastech is proud to introduce the Premier Duct Access Chamber.
Although it is aimed primarily at the Street Lighting and Traffic Signals
industries, it is suitable for most applications where a duct access chamber
is required.
The robust design means that the boxes are not prone to deformation whilst
being backfilled with concrete, unlike some other systems on the market,
giving the contractor and client peace of mind.
PlastechLimited,ParkIndustrialEstate,LiverpoolRoad,Ashton-in-Makerfield,WiganWN40YU
Tel:01942717110Fax:01942717115Email:info@plastech-stakka.co.ukWebsite:www.plastech-stakka.co.uk.
plastech
plasticsystemsforindustry
RecommendedInstallationGuide
The‘Premier’Chambershouldbebeddedonabaseof100mmthickC20drymixconcreteandthebasebe
chamferedtoobtainanaturalsoakawayoutlet.Alternativelyusea‘Premier’pre-formedbasesetinno-finessemi
porousconcretemix.
Thesidescanbebackfilledwithdugmaterial,granularmaterialorconcrete.
Specification
Theductinspectionchambershallbemanufacturedfrom32mmthick,highdensitypolyethyleneandhavea
smoothinnerwallwithreinforcingribsontheexternalwallforextrarigidity.
Theyshallbecapableofwithstandinga12.5tonnewheelload,withouttheneedforstructuralconcretesurround.
Theyshallbemanufacturedfromseparate,interlockingsectionsandhavethecapabilitytobeassembledor
disassembledonsitewithouttheneedforsawingorspecialistequipment.
Theyshallcomecompletewithpre-formedknockoutsectionstoaccommodateductsizesof50mm,66mmand
110mmoutsidediameters.
Thechambersshallbesuppliedwithapre-formedGRPbaseunitforeaseandspeedofinstallationwhichshouldbe
beddedinano-fines,semiporous,concretemixtoallowanygroundwatertoflowaway.
Thechambersshallbesuppliedwitha150mmlong,pre-formedraisingpinwhererequired,toenablethe
contractortoliftandtilttheframeasrequired.
Thesectionsshallbe150mmoveralldepthandbesuppliedwithalocatingflangetothetopsectionforeaseof
assemblyandshallbeavailableinarangeofstandardsizes,asfollows.
Othersizescanbemanufacturedatshortnotice.
Theductinspectionchamberlidshallbemanufacturedfromhighstrength,polyestercompositematerialandshall
conformtoBSEN124,12.5tonnewheelloading.
Thelidshalllocateintoa2.5mmthick,lockable,galvanisedframe,witha100mminternalflangewhichallowsfor
liftandtiltadjustmentanda70mmexternalflangetothetopsection.
ModelNumberClearOpeningSectionDepthLoadRating
PremierP3030300x300150B125
PremierP3045300x450150B125
PremierP4545450x450150B125
PremierP4560450x600150B125
PremierP6060600x600150B125
PremierP4590450x900150B125
PremierP6090600x900150B125
Alldimensionsinmm.ClearOpeningmeasurementsarewidthxlength.
ThePremierDuctAccessChambersRange
04/1600
PremierDuctAccessChambers
plastech
plasticsystemsforindustry
4. Pre-Formedbaseunits
ContractorBenefits
Thebenefitstothecontractorare:
•RobustDesign
•Speedandeaseofinstallation
•Lightweightsections
•150mmdeepsectionsforgreaterflexibilityandlesswaste
•Pre-Trepannedguideholesforeasyaccess
•Interlockingsections
•Pre-Formedbaseunits
•Costcompetitiveagainsttraditionalproducts
•Canbeinstalledwithorwithoutconcretesurround
benefits
premier
PremierDuctAccessChamber
PlastechisproudtointroducethePremierDuctAccessChamber.
AlthoughitisaimedprimarilyattheStreetLightingandTrafficSignals
industries,itissuitableformostapplicationswhereaductaccesschamber
isrequired.
Therobustdesignmeansthattheboxesarenotpronetodeformationwhilst
beingbackfilledwithconcrete,unlikesomeothersystemsonthemarket,
givingthecontractorandclientpeaceofmind.
Plastech Limited, Park Industrial Estate, Liverpool Road, Ashton-in-Makerfield, Wigan WN4 0YU
Tel: 01942 717110 Fax: 01942 717115 Email: info@plastech-stakka.co.uk Website: www.plastech-stakka.co.uk.
plastech
plastic systems for industry
Recommended Installation Guide
The ‘Premier’ Chamber should be bedded on a base of 100mm thick C20 drymix concrete and the base be
chamfered to obtain a natural soakaway outlet. Alternatively use a ‘Premier’ pre-formed base set in no-fines semi
porous concrete mix.
The sides can be backfilled with dug material, granular material or concrete.
Specification
The duct inspection chamber shall be manufactured from 32mm thick, high density polyethylene and have a
smooth inner wall with reinforcing ribs on the external wall for extra rigidity.
They shall be capable of withstanding a 12.5 tonne wheel load, without the need for structural concrete surround.
They shall be manufactured from separate, interlocking sections and have the capability to be assembled or
disassembled on site without the need for sawing or specialist equipment.
They shall come complete with pre-formed knock out sections to accommodate duct sizes of 50mm, 66mm and
110mm outside diameters.
The chambers shall be supplied with a pre-formed GRP base unit for ease and speed of installation which should be
bedded in a no-fines, semi porous, concrete mix to allow any ground water to flow away.
The chambers shall be supplied with a 150mm long, pre-formed raising pin where required, to enable the
contractor to lift and tilt the frame as required.
The sections shall be 150mm overall depth and be supplied with a locating flange to the top section for ease of
assembly and shall be available in a range of standard sizes, as follows.
Other sizes can be manufactured at short notice.
The duct inspection chamber lid shall be manufactured from high strength, polyester composite material and shall
conform to BSEN 124, 12.5 tonne wheel loading.
The lid shall locate into a 2.5mm thick, lockable, galvanised frame, with a 100mm internal flange which allows for
lift and tilt adjustment and a 70mm external flange to the top section.
Model Number Clear Opening Section Depth Load Rating
Premier P3030 300 x 300 150 B125
Premier P3045 300 x 450 150 B125
Premier P4545 450 x 450 150 B125
Premier P4560 450 x 600 150 B125
Premier P6060 600 x 600 150 B125
Premier P4590 450 x 900 150 B125
Premier P6090 600 x 900 150 B125
All dimensions in mm. Clear Opening measurements are width x length.
The Premier Duct Access Chambers Range
04/1600
Premier Duct Access Chambers
plastech
plastic systems for industry