1.
First,
keep
the
side
beams
horizontal
with
the
pin
holes
on
the
frame(front
or
rear
frame),
attention
to
flush
;
2.
Then
tighten
4pcs
M8*16
hexagon
lobular
socket
countersunk
head
screw
from
the
front
and
rear
frame
direction
to
the
side
beans
;
3.
At
last,
connect
the
other
frame
with
beams
in
the
same
way.
Note
the
notches
on
the
front
and
rear
frame
to
be
symmetrical
。
1.First,
take
out
four
side
beams
;
2.
Then
put
the
pin
into
the
under
hole
on
both
of
side
beams.
;
1.
Using
ST5.5*10
inner
6-angle
B-head
self-drilling
screws
to
fix
the
castors
on
the
bottom
plate
components
2.
Using
ST5.5*10
inner
6-angle
B-head
self-drilling
screws
to
fix
the
bottom
plate
components
on
inside
of
the
frame
1.
Using
ST5.5*10
inner
6-angle
B-head
self-drilling
screws
to
fix
mounting
angles
on
the
inner
two
sides
of
skeleton
Fix
the
spacer
on
the
mounting
angle
with
M6*12
screws
and
M6
flange
nuts
Fix
the
mounting
profile
on
the
spacer
with
M6*12
screws
and
M6
flange
nuts
1.
First
use
a
platen
to
press
and
hold
the
cable
management
ring,
then
fix
it
on
the
posterior
inner-side
of
skeleton
with
ST5.5*10
screws
1.
1Using
ST5.5*10
inner
6-angle
B-head
self-drilling
screws
to
fix
the
fan
plate
on
top
cover
2.
Using
M12*25
screw
to
fix
the
top
over
on
frame
1.
nstall
door
hinges
on
right
side
in
front
and
on
both
side
in
rear,
Using
ST5.5*10
inner
6-angle
B-head
self-drilling
screws
to
fix
locking
device
in
the
left
frame
on
front
2.
Using
ST5.5*10
inner
6-angle
B-head
self-drilling
screws
to
fix
the
quick-open
plate
&
supporting
clod
of
side
panel
in
the
frame
of
both
side
Install
the
front
door,
rear
door
&
side
panels.
(
Finished)

plano gabinete servidores