This document is the first page of a tutorial on PHP and MySQL. It introduces PHP and MySQL as a powerful combination for building database-driven websites. PHP is a server-side scripting language that can be embedded in HTML pages. MySQL is an open-source database management system that is small, compact, and ideal for many applications. The tutorial will cover installing PHP and MySQL, writing basic scripts, loading and retrieving data from a database.