SlideShare a Scribd company logo
PHOTOLUMINESCENT EXIT SIGNS.
              No Wiring. No Operating Costs. No Maintenance.
                                                                                                                                     EXIT
               If you install lighted EXIT SIGNS, eventually your installation
                                                                                                                                   UL 924 Approved
               work will be done by a carpenter. Unless you use                                                                    ROI - 6 months*
               Photoluminescent Exit Signs. The future of Egress Safety.

               Code compliant for 2012 NFPA Life Safety 101,IBC, IFC requirements.
                                                                                              LEED Credits:
                                                                                              EA Credit #1 - energy and Atomosphere: Optimizing Energy Performance.
  Trademarked by iLuminate Products.
                                                                                              MR Credit #4 - Materials and Resources: Recycled Content
* Based on retail price for Ecoglo single sided PL Exit Sign Model
Costs factored are: electricity costs, maintenance and bi-yearly back up battery inspection   ID Credit #1.1 - Innovation in Design: Excpetional Performance

More Related Content

Viewers also liked

Course 2-Unit 4: Have and has. affirmative statements
Course 2-Unit 4: Have and has. affirmative statementsCourse 2-Unit 4: Have and has. affirmative statements
Course 2-Unit 4: Have and has. affirmative statementsMartin Caicedo
 
Overview of SNC Oil & Gas Middle East Final
Overview of SNC Oil & Gas Middle East FinalOverview of SNC Oil & Gas Middle East Final
Overview of SNC Oil & Gas Middle East FinalJohn Jeffers
 
Low Power Design Techniques for ASIC / SOC Design
Low Power Design Techniques for ASIC / SOC DesignLow Power Design Techniques for ASIC / SOC Design
Low Power Design Techniques for ASIC / SOC Design
Rajesh_navandar
 
Informe de practica.
Informe de practica.Informe de practica.
Informe de practica.
Gaby OM
 
Flourescence & Phosphorescence
Flourescence & PhosphorescenceFlourescence & Phosphorescence
Flourescence & Phosphorescence
Sidra Safdar Durrani
 
6º basico a 30 de octubre
6º basico a  30 de octubre6º basico a  30 de octubre
6º basico a 30 de octubre
Colegio Camilo Henríquez
 

Viewers also liked (6)

Course 2-Unit 4: Have and has. affirmative statements
Course 2-Unit 4: Have and has. affirmative statementsCourse 2-Unit 4: Have and has. affirmative statements
Course 2-Unit 4: Have and has. affirmative statements
 
Overview of SNC Oil & Gas Middle East Final
Overview of SNC Oil & Gas Middle East FinalOverview of SNC Oil & Gas Middle East Final
Overview of SNC Oil & Gas Middle East Final
 
Low Power Design Techniques for ASIC / SOC Design
Low Power Design Techniques for ASIC / SOC DesignLow Power Design Techniques for ASIC / SOC Design
Low Power Design Techniques for ASIC / SOC Design
 
Informe de practica.
Informe de practica.Informe de practica.
Informe de practica.
 
Flourescence & Phosphorescence
Flourescence & PhosphorescenceFlourescence & Phosphorescence
Flourescence & Phosphorescence
 
6º basico a 30 de octubre
6º basico a  30 de octubre6º basico a  30 de octubre
6º basico a 30 de octubre
 

Similar to Photoluminescent Exit Signs

Guardian Eco Guard Anti Reflective Solar Glass
Guardian Eco Guard Anti Reflective Solar GlassGuardian Eco Guard Anti Reflective Solar Glass
Guardian Eco Guard Anti Reflective Solar GlassSam Malty
 
Guardian Eco Guard Pattern Anti Reflective Solar Glass
Guardian Eco Guard Pattern Anti Reflective Solar GlassGuardian Eco Guard Pattern Anti Reflective Solar Glass
Guardian Eco Guard Pattern Anti Reflective Solar GlassSam Malty
 
SGS Battery Testing Flyer
SGS Battery Testing FlyerSGS Battery Testing Flyer
SGS Battery Testing Flyermctavano
 
Patlite Presentation July 2009
Patlite Presentation   July 2009Patlite Presentation   July 2009
Patlite Presentation July 2009Formula1r
 
Why le LEds cannot light the prisons
Why le LEds cannot light the prisonsWhy le LEds cannot light the prisons
Why le LEds cannot light the prisons
BizLed
 
Case 3 street lighting_eng
Case 3 street lighting_engCase 3 street lighting_eng
Case 3 street lighting_eng
DEG Licht GmbH
 
Crystalsol Overview - Developing Next Generation Photovoltaics - Thomas Badeg...
Crystalsol Overview - Developing Next Generation Photovoltaics - Thomas Badeg...Crystalsol Overview - Developing Next Generation Photovoltaics - Thomas Badeg...
Crystalsol Overview - Developing Next Generation Photovoltaics - Thomas Badeg...
Burton Lee
 
EPRI Low CO2 Emission Coal R&D For Kpic
EPRI Low CO2 Emission Coal R&D For KpicEPRI Low CO2 Emission Coal R&D For Kpic
EPRI Low CO2 Emission Coal R&D For Kpic
Jeffrey Phillips
 
Fluke Industrial Thermal Imagers
Fluke Industrial Thermal ImagersFluke Industrial Thermal Imagers
Fluke Industrial Thermal ImagersFlukeinMalta
 
Kmw | GigaTera Lighting Catalog 2014
Kmw | GigaTera Lighting Catalog 2014Kmw | GigaTera Lighting Catalog 2014
Kmw | GigaTera Lighting Catalog 2014
Chung Ju Yung: The Great Challenger and Master of Crisis
 
TALAT Lecture 2102.01: A Floodlight for an Offshore Oil Platform, Special Stu...
TALAT Lecture 2102.01: A Floodlight for an Offshore Oil Platform, Special Stu...TALAT Lecture 2102.01: A Floodlight for an Offshore Oil Platform, Special Stu...
TALAT Lecture 2102.01: A Floodlight for an Offshore Oil Platform, Special Stu...
CORE-Materials
 
CM4 Four-Point Continuous Monitor
CM4 Four-Point Continuous MonitorCM4 Four-Point Continuous Monitor
CM4 Four-Point Continuous Monitor
ro19hit
 
I heat2012 areftaidi-neweracontrols
I heat2012 areftaidi-neweracontrolsI heat2012 areftaidi-neweracontrols
I heat2012 areftaidi-neweracontrols
Justin Hayward
 
Ssl Training December 2009 [Compatibility Mode]
Ssl Training   December 2009 [Compatibility Mode]Ssl Training   December 2009 [Compatibility Mode]
Ssl Training December 2009 [Compatibility Mode]Claudio Pineda
 
EkoPLC Smart City Proposal
EkoPLC Smart City ProposalEkoPLC Smart City Proposal
EkoPLC Smart City Proposal
Josep Pocalles
 
My energy carports (1)
My energy carports (1)My energy carports (1)
My energy carports (1)
Martin Werner
 
ROOBUCK - "BUCKLITE"
ROOBUCK - "BUCKLITE"ROOBUCK - "BUCKLITE"
ROOBUCK - "BUCKLITE"
Nishant Singh
 

Similar to Photoluminescent Exit Signs (20)

Guardian Eco Guard Anti Reflective Solar Glass
Guardian Eco Guard Anti Reflective Solar GlassGuardian Eco Guard Anti Reflective Solar Glass
Guardian Eco Guard Anti Reflective Solar Glass
 
Guardian Eco Guard Pattern Anti Reflective Solar Glass
Guardian Eco Guard Pattern Anti Reflective Solar GlassGuardian Eco Guard Pattern Anti Reflective Solar Glass
Guardian Eco Guard Pattern Anti Reflective Solar Glass
 
SGS Battery Testing Flyer
SGS Battery Testing FlyerSGS Battery Testing Flyer
SGS Battery Testing Flyer
 
Patlite Presentation July 2009
Patlite Presentation   July 2009Patlite Presentation   July 2009
Patlite Presentation July 2009
 
Why le LEds cannot light the prisons
Why le LEds cannot light the prisonsWhy le LEds cannot light the prisons
Why le LEds cannot light the prisons
 
Case 3 street lighting_eng
Case 3 street lighting_engCase 3 street lighting_eng
Case 3 street lighting_eng
 
Crystalsol Overview - Developing Next Generation Photovoltaics - Thomas Badeg...
Crystalsol Overview - Developing Next Generation Photovoltaics - Thomas Badeg...Crystalsol Overview - Developing Next Generation Photovoltaics - Thomas Badeg...
Crystalsol Overview - Developing Next Generation Photovoltaics - Thomas Badeg...
 
EPRI Low CO2 Emission Coal R&D For Kpic
EPRI Low CO2 Emission Coal R&D For KpicEPRI Low CO2 Emission Coal R&D For Kpic
EPRI Low CO2 Emission Coal R&D For Kpic
 
Ikon Semiconductor
Ikon SemiconductorIkon Semiconductor
Ikon Semiconductor
 
Electrical Engineer
Electrical EngineerElectrical Engineer
Electrical Engineer
 
Fluke Industrial Thermal Imagers
Fluke Industrial Thermal ImagersFluke Industrial Thermal Imagers
Fluke Industrial Thermal Imagers
 
Kmw | GigaTera Lighting Catalog 2014
Kmw | GigaTera Lighting Catalog 2014Kmw | GigaTera Lighting Catalog 2014
Kmw | GigaTera Lighting Catalog 2014
 
TALAT Lecture 2102.01: A Floodlight for an Offshore Oil Platform, Special Stu...
TALAT Lecture 2102.01: A Floodlight for an Offshore Oil Platform, Special Stu...TALAT Lecture 2102.01: A Floodlight for an Offshore Oil Platform, Special Stu...
TALAT Lecture 2102.01: A Floodlight for an Offshore Oil Platform, Special Stu...
 
CM4 Four-Point Continuous Monitor
CM4 Four-Point Continuous MonitorCM4 Four-Point Continuous Monitor
CM4 Four-Point Continuous Monitor
 
I heat2012 areftaidi-neweracontrols
I heat2012 areftaidi-neweracontrolsI heat2012 areftaidi-neweracontrols
I heat2012 areftaidi-neweracontrols
 
Ssl Training December 2009 [Compatibility Mode]
Ssl Training   December 2009 [Compatibility Mode]Ssl Training   December 2009 [Compatibility Mode]
Ssl Training December 2009 [Compatibility Mode]
 
EkoPLC Smart City Proposal
EkoPLC Smart City ProposalEkoPLC Smart City Proposal
EkoPLC Smart City Proposal
 
My energy carports (1)
My energy carports (1)My energy carports (1)
My energy carports (1)
 
ROOBUCK - "BUCKLITE"
ROOBUCK - "BUCKLITE"ROOBUCK - "BUCKLITE"
ROOBUCK - "BUCKLITE"
 
Amko induction lamp
Amko induction lampAmko induction lamp
Amko induction lamp
 

Photoluminescent Exit Signs

  • 1. PHOTOLUMINESCENT EXIT SIGNS. No Wiring. No Operating Costs. No Maintenance. EXIT If you install lighted EXIT SIGNS, eventually your installation UL 924 Approved work will be done by a carpenter. Unless you use ROI - 6 months* Photoluminescent Exit Signs. The future of Egress Safety. Code compliant for 2012 NFPA Life Safety 101,IBC, IFC requirements. LEED Credits: EA Credit #1 - energy and Atomosphere: Optimizing Energy Performance. Trademarked by iLuminate Products. MR Credit #4 - Materials and Resources: Recycled Content * Based on retail price for Ecoglo single sided PL Exit Sign Model Costs factored are: electricity costs, maintenance and bi-yearly back up battery inspection ID Credit #1.1 - Innovation in Design: Excpetional Performance