The document is a license issued by PETRONAS, the Malaysian national oil company, to CAM Energy Sdn Bhd. The 3-year license allows CAM Energy to supply products and services to exploration and oil/gas companies in Malaysia. It lists CAM Energy's details and categories of approved licenses. The license is subject to general conditions such as compliance with laws, reporting changes to the company, and restrictions on the use of PETRONAS's trademarks and logo.
If you have recently formed a Private Limited company and started your business, you must get yourself familiar with few important compliances by Companies Act 2013.
Normally, we tend to leave such things to our legal experts but its always good know the basics.
We have listed down 5 such Compliances for Private Limited Companies that are easy to miss out but can attract hefty penalty.
QBIK Project – новый экологичный бизнес, основанный на предоставлении высококачественных услуг по застройке и организации пространства за счет простых архитектурных решений из дерева.
Идея: создание модульных архитектурных решений.
Кубики можно использовать как на открытых площадках (фестивали с уличными маркетами, детская площадка или арт-объект), так и на закрытых (мобильное кафе, выставка, торговые витрины).
www.qbik.pro
If you have recently formed a Private Limited company and started your business, you must get yourself familiar with few important compliances by Companies Act 2013.
Normally, we tend to leave such things to our legal experts but its always good know the basics.
We have listed down 5 such Compliances for Private Limited Companies that are easy to miss out but can attract hefty penalty.
QBIK Project – новый экологичный бизнес, основанный на предоставлении высококачественных услуг по застройке и организации пространства за счет простых архитектурных решений из дерева.
Идея: создание модульных архитектурных решений.
Кубики можно использовать как на открытых площадках (фестивали с уличными маркетами, детская площадка или арт-объект), так и на закрытых (мобильное кафе, выставка, торговые витрины).
www.qbik.pro
Social Media - A Parenting Paradox GuideStephen Jio
A take away guide to compliment talk on Social Media and the paradox it is creating for parents. Contains tips and advice on how to 'manage' a child's Social Media activity to mitigate the risk while allowing the child to achieve their fullest potential on Social Media.
Microsoft loves Android developers. We have a lot of tools for them. This session presents a quick overview of these tools including cross-platform development in C# and Visual Studio thanks to Xamarin, Azure Mobile Services, the Windows Bridge for Android (aka "Project Astoria"), Hockeyapp analytics, Visual Studio Tools for Apache Cordova, and the Visual Studio Emulator for Android. We'll then dive deeper into the latter, covering drag & drop installation of apps, debugging apps from any ADB-compatible IDE, emulating hardware like GPS, cameras, accelerometers, battery, network radios, storage cards and more.
Poster Session 2016 EU PVSEC: Compatibility of PV Ribbons and Fluxes with EVA...ERIKA SEBENS
Poster Session Presentation from 2016 EU PVSEC - Currently the reliability requirements for PV module service life are very high (for 25-30 years of service life) and packaging is the predominant cause of failure in modules. Polymer encapsulants, also known as ‘pottants’, play a key role in protecting the PV cell array modules from environmental effects such as UV radiation, moisture, extreme weather, electric leakage and wind damages. The most common polymer encapsulant in PV industry is ethylene vinyl acetate (EVA). Though EVAs are cheaper and versatile in its usage, they are sensitive to chemicals and other environmental factors. Ribbon and specially, flux manufacturers have to take utmost care in designing their products so that products won’t react with EVA and not suffer from reliability issues such as yellowing, thus affecting efficiency and reduced module life. Considering the flux and polymer encapsulant related compatibility concerns, a detailed study (DOE) was undertaken. The goal of the DOE was to achieve reliable solder joints with reduced yellowing of the PV module by optimizing the solder composition and flux chemistries.
Anda Membutuhkan jasa sopir Panggilan/harian...?
Silahkan hubungi kami. Kami siap mengantarkan perjalanan Anda ke tempat tujuan dengan aman dan nyaman.
Tujuan Dalam ataopun Luar Kota.
Analisis Penerapan Sistem Informasi Desa untuk Mendukung Tata Kelola Sumber ...Pradna Paramita
Keberhasilan desa dalam mengelola sumberdaya diukur dari
ketepatan dan akurasi data pendukung. Sistem Informasi Desa (SID) mendukung sejumlah kerja yang terkait dengan pengolahan data penduduk, data peristiwa, data layanan publik, dan laporan.
Best quality Plywood Manufacturers in IndiaLavinaSharma6
Best quality Plywood Manufacturers in India & Plywood Suppliers? We are India's largest Manufacturer of Plywood in Mumbai, Delhi, Chennai, Hyderabad, Pune,
Find the top quality plywood in Delhi by Archidply We have one of the best plywood manufacturer and supplier in India. To know more about visit at https://www.archidply.com/
A. OverviewThe Real Estate Commission is delegated the authority.docxrobert345678
A. Overview
The Real Estate Commission is delegated the authority to adopt rules governing the conduct of real estate licensees. The rules are all contained in Chapter 2 of the Colorado Real Estate Manual.
There are 5 rules, lettered from “A” through “E” and Rule I. Each of these lettered headings is broken down into numbered rules. For example, rules under A would be identified as Rule A-1, A-2, A-3, etc.
Some rules may not directly apply to you as a real estate broker. We will distill, paraphrase, and summarize the rules as we consider them individually. Some of the rules are self-explanatory. Others have some background or extension that requires further explanation.
The actual rule language is in Chapter 2 of the Colorado Real Estate Manual. The actual text is considerably longer than what we present here, although not necessarily more essential to your licensure or practice of real estate. A gap in the rule numbering herein simply means that the particular rule(s) has minimal effect on your licensure, has been repealed, or is internal to the workings of the Commission. As with the license law, outline numbering within a rule below may not match the outline numbering/lettering in the actual rule.
By the end of this unit, you will be able to:
· Recognize and list the Colorado Rules
· Explain license qualifications, application requirements, examinations and continuing education requirements
· Describe Errors and Omissions insurance purpose and requirements
End of Page
Unit 2-2 Rule A
COMMISSION RULE A - QUALIFICATIONS, APPLICATIONS AND EXAMINATIONS
A-2. Pre-license education must be completed before taking the state exam or applying for a license. The part about schools electronically reporting evidence of candidate's having successfully completed the course has not yet been implemented by the Commission.
A-5. The state broker-licensing exam has two parts, the national part and the state-specific part. You may pass the two parts on separate dates. If you fail one part, you only need to retake the failed part. You must submit passing grades for both parts dated less than one year prior to applying for your license.
A-9. The Commission is to issue you a license within 10 days of receipt of your complete application and satisfactory criminal background (fingerprint) results. They will notify you of an incomplete or unsatisfactory application. If a license is approved pending the Commission receiving specified compliance items, you have 20 days to submit or your license may be issued on inactive status.
A-12(b). You may apply to the Commission at any time for a "Preliminary Advisory Opinion." This commission form will require all of the same detailed information as for the application above, but does not require completion of pre-license education nor a license application fee. The Commission's opinion as to whether they would grant a license if applied for is not binding, but unless you lie or omit information t.
The guide provides an overview of the business environment in Thailand, with information about company establishment, taxation, intellectual property rights, and legal issues.
Objective and Agenda:
In order to bring flexibility and to monitor the activities of the charitable organisations in India, non-governmental organisations are given the corporate status by forming companies under Section 8 of the Companies Act, 2013. The scope of the webinar is to cover the objects of forming a Section 8 Company, procedure to obtain license, benefits of forming a Section 8 Company, conversion of Section 8 Company into any other company, effects of non-compliance of objects and the tax benefits available to such companies.
Dear Readers,
We are pleased to present ‘TransPrice Times’ for the first fortnight of June, 2015.
As a focus point, we provide an insight into recent clarifications made on Advance Pricing Agreements (APA) Rollback rules and its implications.
Further, we also aim to shed light on significant case laws pronounced to equip you with latest happenings in India.
We hope you find this newsletter useful.
Happy reading !!!
1. In exercising the powers conferred by Section 7, Petroleum Development Act 1974 and in accordance to Regulation 5 of the Petroleum Regulation 1974,
delegated to me by the Prime Minister of Malaysia, I hereby issue the license under Regulation 3 of the Petroleum Regulation for the purpose of the above to:
Printed Date: 06.01.2016
CAM ENERGY SDN BHD (561014-W)
NO 24, JALAN APOLLO U5/193, BANDAR PINGGIRAN SUBANG,
40150 SHAH ALAM
SELANGOR
Details of License are as follows:-
Company's No : 561014-W
Type of Company : LICENSE
Duration of License : 03.12.2014 - 19.10.2017
License Fee : RM 750
Categories of Product/Service : As attached in 'CATEGORIES OF LICENSE / REGISTRATION'.
Special Conditions impose onto this license:-
Subject to the special conditions as attached.
General requirements of this License are as stated in the next page.
LICENSE TO SUPPLY PRODUCT/SERVICE TO EXPLORATION AND
OIL/GAS COMPANIES IN MALAYSIA
Reminder: License Must Apply For Renewal 3 Months Before The Expiry Date.
This is a computer generated printout and no signature from PETRONAS is required. Page 1 / 3
2. PETRONAS LICENSE GENERAL CONDITIONS
1. Company is required to register, obtain a license, permit or authorization from the relevant authority
to carry out the services or supply of product or material used in company's operation and activities;
2. This license is not transferable to any company/other party;
3. This license will be revoked if the company is found to be in the process of liquidation, winding-up
or dissolution;
4. Company shall inform PETRONAS on any changes related to company's position such as equity
ownership, board of directors and management staff within fourteen (14) days. Failure to do so can
result in revoke of License;
5. Company should take immediate action to adhere to the special conditions imposed as stated in the
appendix of the PETRONAS license certificate and to inform PETRONAS on the progress of this
action;
6. Company is not allowed to take another company as principal, agent, sub-contractor or otherwise to
provide any service or supply of any facility, fittings or equipment on its behalf without prior
written consent from PETRONAS;
7. Company shall allow PETRONAS representatives for inspection visit / site / company audit and
review / copy of documents and interviewing employees and related parties;
8. This License must be shown to PETRONAS's officers when it is required for inspection;
9. This License is only valid for services and supply of products as stated in the appendix of the
PETRONAS license certificate;
10. This company can be penalised if in PETRONAS' opinion, it has conducted one or more of the
following;
a. Failed to execute the award job until completion.
b. Failed to perform a contractual obligation or any other obligation under the law to partners,
principals, agents, sub-contractors and others.
c. Received garnishee order.
d. Facing bankruptcy action.
e. Cannot be traced through the last address.
f. Sub-contract work to another contractor without written permission from PETRONAS.
g. Reject any contract or tender awarded.
h. Entering or accepting contract or tender during the license suspension period.
i. Provide false, inaccurate or misleading information.
j. Does not follow tender's regulations and ethics including but not only limited to sending
poison-pen letters, bribing or lobbying.
k. Engaged in any impropriate activities with this License.
11. According to Act 9, Petroleum Acts 1974, a person who initiate or continue any business or
continue providing services as mentioned in Act 3 without a license or do not comply with any
condition of the license is committing a crime and can be fined not exceeding RM50,000.00 (Fifty
Thousand Ringgit) or imprisonment for a period not more than two (2) years or both and in respect
of each continuous crime, it is subject to further fine of RM1,000.00 (One Thousand Ringgit) for
every one (1) day or any part of one (1) day which the offense continues after the first conviction is
recorded;
12. This approval is not an agreement/guarantee that your company will be called to participate in a
tender or quotation of PETRONAS or its subsidiaries;
13. The company either by itself, through its employees, directors, agents or its employees;
a. Not allow to use the logo of the PETRONAS's oil drop or the word "PETRONAS" or use any
mark, logo or words or wearing typeface, font, which resembles the appearance or colour
trademarks owned or used by PETRONAS or its subsidiaries ("the PETRONAS trademarks") in
any form whether in printing materials, websites or hand board; and
b. Not allow to perform any act or in any way either directly or indirectly admits that it is a partner
or have any connection/relationship with PETRONAS and/or its subsidiaries, UNLESS AND
EXCEPT company is allowed to use reference [Company] is licensed by PETRONAS [No.
license], under Act 3 Petroleum Act 1974.
14. This License may be revoked, suspended or blacklisted at any time if any of the above conditions,
general conditions of PETRONAS license and registration and any other conditionsset in
PETRONAS License and Registration General Guidelines are not fulfilled.
Page 2 / 3
3. COMPANY'S NAME : CAM ENERGY SDN BHD (561014-W)
LICENSE NO : 561014-W
LICENSE PERIOD : 03.12.2014 - 19.10.2017
S P E C I A L C O N D I T I O N S
OTHERS Company is required to submit list of company's experience related to the scope applied as specified in the 'Minimum Technical Requirement' (MTR) before 20 November 2014.
Failing which, the company will no longer be listed in the PETRONAS List of Licensed / Registered Companies (LLRC) for the relevant field.
OTHERS Company is required to submit a copy of the Quality Management System Policy (ISO 9001) before 15 February 2015. Failing which, the company will no longer be listed in the
PETRONAS List of Licensed / Registered Companies (LLRC) for the relevant SWEC.
C A T E G O R I E S O F L I C E N S E / R E G I S T R A T I O N
APPROVED LICENSE CATEGORIES
L/R Service / Supplier Code Mode of Operation Name of Product / Rig / Vessel
(Which applicable)
Approval Date /
Time
Expiry Date
L SI2010100
INSTRUMENTATION MAINT- PNEUMATIC ACTUATED VALVE (Reclassified from
SI2010100, SI2010200 & SI2010300)
SELF-OPERATED NOT APPLICABLE 09.12.2014
09:16:31
19.10.2017
L SI2010400
INSTRUMENTATION MAINT-MOTOR OPERATED VALVE
SELF-OPERATED NOT APPLICABLE 20.10.2014
16:08:56
19.10.2017
L SL2020100
LEASING & RENTAL-ROTATING EQUIPS LEASING/RENTAL
SELF-OPERATED NOT APPLICABLE 20.10.2014
16:08:57
19.10.2017
*** END ***
This is a computer generated printout and no signature from PETRONAS is required. Page 3 / 3