CHAPTER 7
Operational and
Postimplementation
Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall
2
Learning Objectives
• Describe all the components to a successful “Go-live”
and how to determine their readiness.
• Understand what is involved in stabilizing the system
after “Go-live” and how to track and address problems
and issues on a daily basis.
• Value the transition from developing a system to
supporting it in a production environment.
• Understand the process of transferring knowledge to
operational staff and the importance to the long-term
system success.
• Realize the value of training before and after “Go-live.”
Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall
3
Preview
• In assessing an ERP project’s readiness for Go–live,
planned tasks and activities must be completed to allow
project management to address any outstanding issues
that may jeopardize the Go-live date.
• Readiness process needs to include as many team
members, appropriate users, and managers as possible.
• Much of the success of an implementation lies with the
stabilization and post-production support processes.
Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall
4
Preview (Cont’d)
• All resources should be focused on ensuring users
understand how to use the system and that issues and
problems are resolved as quickly as possible.
• Continual monitoring of implementation issues will provide
a basis for moving from stabilization to postproduction
support.
• Training also gears up during the readiness process and
continues through stabilization and post-production
support.
Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall
5
Figure 7-1 Sample Project Methodology
Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall
6
Go-Live Readiness
• An elaborate readiness checkpoint should be in place
for Go-live to make sure steps are not missed.
• Infrastructure, development, configuration, conversion,
testing, training, communications, operations, command
central, reporting, and users must be assessed in the
readiness process.
• Readiness reviews need to be documented and
communicated to the project team and the company.
• A detailed report needs to be available, along with an
executive summary for senior management.
Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall
7
Go-Live Readiness (Cont’d)
• The Go-Live Readiness Review and Status Report is
often a table that shows the status of each area at a
glance, with the key activities that need to be completed
agreed to before going live.
• The process for determining readiness consists of a
series of meetings and discussions on the status of each
area’s tasks and activities.
• If the PMO sees a lot of RED items the first time through,
it will help to focus the project teams on what needs to be
accomplished in the time period between the assessment
and Go-live .
Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall
8
ERP Training
• Training must be provided to everyone that will be using
the system, and should use real data and examples.
• If done correctly training will capture about 90 percent of
what users will see on a daily basis.
• ERP training personnel could include trainers who work
for the software vendor, third-party trainers that have
specific experience in ERP systems.
• Developing a variety of ways to train will better ensure the
effectiveness of training.
• Training needs to be endorsed by senior management
early to ensure adequate funding.
Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall
9
Stabilization
• The stabilization process begins when the ERP system
software is in production, initial training is complete, and
conversion of critical data is done.
• After the ERP system goes live, the organization will need
to shift to stabilization process—60 to 90 days.
• IT staff will be monitoring the infrastructure for response
times and ensure that back-ups are taken appropriately.
• Subject matter experts should be prepared to help many
users from their departments operate the system in the
correct way.
Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall
10
Issues Arising During Stabilization
• Customizations add to the complexity if not documented
and communicated well.
• Not being able to perform ad hoc activities, not because
the system is unable, but more about learning how to
accomplish the activity.
• Users make mistakes as they use the new process for
the first time.
• In a parallel implementation approach, the ERP system
is operated concurrently with the old legacy system,
which is labor-intensive, confusing, and frustrating.
• Reconciliation has to be done between the new ERP
system and the old legacy system to validate the inputs
and outputs.
Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall
11
Postproduction Support
• Managing the daily system operations and ensuring
that the system is doing what it needs to do is really the
purpose of post-production support.
• If the post-production process is inadequate, then the
implementation may be considered a failure.
• Many of the risks associated with cutting over to the
new ERP can be reduced by appropriate pre–Go-live
and end-user training.
• Subject matter experts and core project team members
should be used to provide general support to answer
simple process and system questions.
Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall
12
Figure 7-2 Product Life Cycle Chart
Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall
13
Postimplementation Support
• Postimplementation support is generally divided into the
following points:
– Training
– Go-Live Support
– Data Validation
– Data Correction
– Patches and Fixes
– New Features
• By clearly defining and communicating Go-live and the
ongoing support processes, overall expectations will be
better set to realize measurable business benefits and
ROI from the ERP project.
Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall
14
Knowledge Transfer
• There must be a well-defined process in place to transfer
knowledge and skill to new or existing staff or team
members during and after the implementation process.
• Project monitoring and tracking, collaboration and
communication, subject matter expertise, and lesson-
learned repository should be documented.
• A knowledge management plan should be in place to
monitor the transition from one phase of the
implementation to the other, which enables a smooth
transfer of knowledge.
Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall
15
Knowledge Transfer (Cont’d)
• A knowledge management plan will:
– Ensure knowledge is retained.
– Reduce the cost of support due to lower number of support
calls.
– Facilitate faster learning.
– Better maximize the capabilities of the system.
– Cut time in troubleshooting problems.
– Ensure a correct use of the system.
• One centralized data repository can then be used to
store documents which will eliminate confusion,
duplication, and losing data.
Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall
16
Implications for Management
• The closer an ERP implementation gets to its Go-live
date the more project management must focus on the
issues, tasks, and activities to identify the issues and
help focus resources and efforts.
• To ensure a successful and sustainable ERP
implementation, there must be a well thought-out and
understood knowledge transfer process when
consultants, implementation partner staff, full-time and
part-time staff, and even end-users leave.
Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall
17
Summary
• Assessing readiness in an ERP implementation is
critical to the overall implementation process. Without
the readiness process in place, it will be difficult to meet
the Go-live date with any assurance.
• For the readiness process, project managers need to
focus on the high-priority tasks and activities and
identify where workarounds are possible.
• Just-in-time and continual training is the mark of a good
ERP implementation training plan.
Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall
18
Summary (Cont’d)
• Stabilization is generally a 60 to 90 day period of time
that takes place after Go-live depending on the number
of issues that arise.
• Post production support helps the production staff,
users, and information technology staff to know what to
expect daily, weekly, monthly, and yearly from the
system.
• A roll-on and roll-off process for consultants and staff is
needed to ensure the long-term system sustainability in
the Knowledge Transfer process.
Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall
19
Review Questions
1. Why is the readiness process so important to an ERP
implementation?
2. What project areas need to be assessed in a
readiness process?
3. What is included (and not included) during the
stabilization timeframe?
4. Why is the knowledge transfer important to the long-
term stability of the ERP system?
5. What are the five areas addressed in postproduction
support?
Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall
20
All rights reserved. No part of this publication may be reproduced, stored in a
retrieval system, or transmitted, in any form or by any means, electronic,
mechanical, photocopying, recording, or otherwise, without the prior written
permission of the publisher. Printed in the United States of America.
Copyright © 2012 Pearson Education, Inc.
Publishing as Prentice Hall

More Related Content

Similar to Operational and Postimplementation in enterprise systems erp.ppt

Erp Implementation: Your 12 step Implementation Stratergy
Erp Implementation: Your 12 step Implementation StratergyErp Implementation: Your 12 step Implementation Stratergy
Erp Implementation: Your 12 step Implementation Stratergywww.hashcodesolutions.com
 
The 4 ERP governance best practices you can’t ignore
The 4 ERP governance best practices you can’t ignoreThe 4 ERP governance best practices you can’t ignore
The 4 ERP governance best practices you can’t ignoreGrant Thornton LLP
 
Enterprise Resource Planning Unit 4 post implementation on ERP
Enterprise Resource Planning Unit 4 post implementation on ERPEnterprise Resource Planning Unit 4 post implementation on ERP
Enterprise Resource Planning Unit 4 post implementation on ERPGanesha Pandian
 
UMT_PMI-ATL Governance Agility_Final
UMT_PMI-ATL Governance Agility_FinalUMT_PMI-ATL Governance Agility_Final
UMT_PMI-ATL Governance Agility_FinalLudvic Baquie
 
Starting the ERP Discsussion
Starting the ERP DiscsussionStarting the ERP Discsussion
Starting the ERP DiscsussionBarry Cole
 
The_8_Successful_Steps_for_ERP_Implementation.pptx
The_8_Successful_Steps_for_ERP_Implementation.pptxThe_8_Successful_Steps_for_ERP_Implementation.pptx
The_8_Successful_Steps_for_ERP_Implementation.pptxRedhaElhuni
 
ERP Implementation from feasibility Report : An Information System Study
ERP Implementation from feasibility Report : An Information System StudyERP Implementation from feasibility Report : An Information System Study
ERP Implementation from feasibility Report : An Information System StudyKunal Gawade, CFE
 
ASAP-01 Implementaion.pptx
ASAP-01 Implementaion.pptxASAP-01 Implementaion.pptx
ASAP-01 Implementaion.pptxAshraf206702
 
Change management apty
Change management   aptyChange management   apty
Change management aptyAptyDM
 
Lessons Learned from Failed ERP Implementation - Webinar Presentation
Lessons Learned from Failed ERP Implementation - Webinar PresentationLessons Learned from Failed ERP Implementation - Webinar Presentation
Lessons Learned from Failed ERP Implementation - Webinar Presentationsbandarkar
 
Lessons Learned from Failed ERP Implementation
Lessons Learned from Failed ERP ImplementationLessons Learned from Failed ERP Implementation
Lessons Learned from Failed ERP Implementationsbandarkar
 
Enterprise Resource Planning(ERP)
Enterprise Resource Planning(ERP)Enterprise Resource Planning(ERP)
Enterprise Resource Planning(ERP)Tej Kiran
 
Do You Need A Release Manager For Your SDLC Workflow?
Do You Need A Release Manager For Your SDLC Workflow?Do You Need A Release Manager For Your SDLC Workflow?
Do You Need A Release Manager For Your SDLC Workflow?Enov8
 
Failed ERP lessons - Webinar Take aways by Bista Solutions
Failed ERP lessons - Webinar Take aways by Bista SolutionsFailed ERP lessons - Webinar Take aways by Bista Solutions
Failed ERP lessons - Webinar Take aways by Bista SolutionsBista Solutions
 
Lessons learned comm_industry
Lessons learned comm_industryLessons learned comm_industry
Lessons learned comm_industryfrmichler
 
Practical tips for implementing corporate performance management system
Practical tips for implementing corporate performance management systemPractical tips for implementing corporate performance management system
Practical tips for implementing corporate performance management systemKetan Parekh
 

Similar to Operational and Postimplementation in enterprise systems erp.ppt (20)

ERP implementation
ERP implementationERP implementation
ERP implementation
 
Erp Implementation: Your 12 step Implementation Stratergy
Erp Implementation: Your 12 step Implementation StratergyErp Implementation: Your 12 step Implementation Stratergy
Erp Implementation: Your 12 step Implementation Stratergy
 
The 4 ERP governance best practices you can’t ignore
The 4 ERP governance best practices you can’t ignoreThe 4 ERP governance best practices you can’t ignore
The 4 ERP governance best practices you can’t ignore
 
Enterprise Resource Planning Unit 4 post implementation on ERP
Enterprise Resource Planning Unit 4 post implementation on ERPEnterprise Resource Planning Unit 4 post implementation on ERP
Enterprise Resource Planning Unit 4 post implementation on ERP
 
Bharat
BharatBharat
Bharat
 
UMT_PMI-ATL Governance Agility_Final
UMT_PMI-ATL Governance Agility_FinalUMT_PMI-ATL Governance Agility_Final
UMT_PMI-ATL Governance Agility_Final
 
Starting the ERP Discsussion
Starting the ERP DiscsussionStarting the ERP Discsussion
Starting the ERP Discsussion
 
The_8_Successful_Steps_for_ERP_Implementation.pptx
The_8_Successful_Steps_for_ERP_Implementation.pptxThe_8_Successful_Steps_for_ERP_Implementation.pptx
The_8_Successful_Steps_for_ERP_Implementation.pptx
 
ERP Implementation from feasibility Report : An Information System Study
ERP Implementation from feasibility Report : An Information System StudyERP Implementation from feasibility Report : An Information System Study
ERP Implementation from feasibility Report : An Information System Study
 
Enterprise resource planning
Enterprise resource planning Enterprise resource planning
Enterprise resource planning
 
ASAP-01 Implementaion.pptx
ASAP-01 Implementaion.pptxASAP-01 Implementaion.pptx
ASAP-01 Implementaion.pptx
 
Change management apty
Change management   aptyChange management   apty
Change management apty
 
Lessons Learned from Failed ERP Implementation - Webinar Presentation
Lessons Learned from Failed ERP Implementation - Webinar PresentationLessons Learned from Failed ERP Implementation - Webinar Presentation
Lessons Learned from Failed ERP Implementation - Webinar Presentation
 
Lessons Learned from Failed ERP Implementation
Lessons Learned from Failed ERP ImplementationLessons Learned from Failed ERP Implementation
Lessons Learned from Failed ERP Implementation
 
Enterprise Resource Planning(ERP)
Enterprise Resource Planning(ERP)Enterprise Resource Planning(ERP)
Enterprise Resource Planning(ERP)
 
Do You Need A Release Manager For Your SDLC Workflow?
Do You Need A Release Manager For Your SDLC Workflow?Do You Need A Release Manager For Your SDLC Workflow?
Do You Need A Release Manager For Your SDLC Workflow?
 
Introduction to ERP Concept
Introduction to ERP ConceptIntroduction to ERP Concept
Introduction to ERP Concept
 
Failed ERP lessons - Webinar Take aways by Bista Solutions
Failed ERP lessons - Webinar Take aways by Bista SolutionsFailed ERP lessons - Webinar Take aways by Bista Solutions
Failed ERP lessons - Webinar Take aways by Bista Solutions
 
Lessons learned comm_industry
Lessons learned comm_industryLessons learned comm_industry
Lessons learned comm_industry
 
Practical tips for implementing corporate performance management system
Practical tips for implementing corporate performance management systemPractical tips for implementing corporate performance management system
Practical tips for implementing corporate performance management system
 

Recently uploaded

[BuildWithAI] Introduction to Gemini.pdf
[BuildWithAI] Introduction to Gemini.pdf[BuildWithAI] Introduction to Gemini.pdf
[BuildWithAI] Introduction to Gemini.pdfSandro Moreira
 
Mcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Mcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot ModelMcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Mcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot ModelDeepika Singh
 
WSO2 Micro Integrator for Enterprise Integration in a Decentralized, Microser...
WSO2 Micro Integrator for Enterprise Integration in a Decentralized, Microser...WSO2 Micro Integrator for Enterprise Integration in a Decentralized, Microser...
WSO2 Micro Integrator for Enterprise Integration in a Decentralized, Microser...WSO2
 
Elevate Developer Efficiency & build GenAI Application with Amazon Q​
Elevate Developer Efficiency & build GenAI Application with Amazon Q​Elevate Developer Efficiency & build GenAI Application with Amazon Q​
Elevate Developer Efficiency & build GenAI Application with Amazon Q​Bhuvaneswari Subramani
 
WSO2's API Vision: Unifying Control, Empowering Developers
WSO2's API Vision: Unifying Control, Empowering DevelopersWSO2's API Vision: Unifying Control, Empowering Developers
WSO2's API Vision: Unifying Control, Empowering DevelopersWSO2
 
Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Finding Java's Hidden Performance Traps @ DevoxxUK 2024Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Finding Java's Hidden Performance Traps @ DevoxxUK 2024Victor Rentea
 
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data DiscoveryTrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data DiscoveryTrustArc
 
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin WoodPolkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin WoodJuan lago vázquez
 
Choreo: Empowering the Future of Enterprise Software Engineering
Choreo: Empowering the Future of Enterprise Software EngineeringChoreo: Empowering the Future of Enterprise Software Engineering
Choreo: Empowering the Future of Enterprise Software EngineeringWSO2
 
AWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAndrey Devyatkin
 
JohnPollard-hybrid-app-RailsConf2024.pptx
JohnPollard-hybrid-app-RailsConf2024.pptxJohnPollard-hybrid-app-RailsConf2024.pptx
JohnPollard-hybrid-app-RailsConf2024.pptxJohnPollard37
 
Introduction to Multilingual Retrieval Augmented Generation (RAG)
Introduction to Multilingual Retrieval Augmented Generation (RAG)Introduction to Multilingual Retrieval Augmented Generation (RAG)
Introduction to Multilingual Retrieval Augmented Generation (RAG)Zilliz
 
Vector Search -An Introduction in Oracle Database 23ai.pptx
Vector Search -An Introduction in Oracle Database 23ai.pptxVector Search -An Introduction in Oracle Database 23ai.pptx
Vector Search -An Introduction in Oracle Database 23ai.pptxRemote DBA Services
 
Why Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businessWhy Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businesspanagenda
 
Quantum Leap in Next-Generation Computing
Quantum Leap in Next-Generation ComputingQuantum Leap in Next-Generation Computing
Quantum Leap in Next-Generation ComputingWSO2
 
DEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
DEV meet-up UiPath Document Understanding May 7 2024 AmsterdamDEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
DEV meet-up UiPath Document Understanding May 7 2024 AmsterdamUiPathCommunity
 
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...Jeffrey Haguewood
 
AI in Action: Real World Use Cases by Anitaraj
AI in Action: Real World Use Cases by AnitarajAI in Action: Real World Use Cases by Anitaraj
AI in Action: Real World Use Cases by AnitarajAnitaRaj43
 
Introduction to use of FHIR Documents in ABDM
Introduction to use of FHIR Documents in ABDMIntroduction to use of FHIR Documents in ABDM
Introduction to use of FHIR Documents in ABDMKumar Satyam
 
Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherRemote DBA Services
 

Recently uploaded (20)

[BuildWithAI] Introduction to Gemini.pdf
[BuildWithAI] Introduction to Gemini.pdf[BuildWithAI] Introduction to Gemini.pdf
[BuildWithAI] Introduction to Gemini.pdf
 
Mcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Mcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot ModelMcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Mcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot Model
 
WSO2 Micro Integrator for Enterprise Integration in a Decentralized, Microser...
WSO2 Micro Integrator for Enterprise Integration in a Decentralized, Microser...WSO2 Micro Integrator for Enterprise Integration in a Decentralized, Microser...
WSO2 Micro Integrator for Enterprise Integration in a Decentralized, Microser...
 
Elevate Developer Efficiency & build GenAI Application with Amazon Q​
Elevate Developer Efficiency & build GenAI Application with Amazon Q​Elevate Developer Efficiency & build GenAI Application with Amazon Q​
Elevate Developer Efficiency & build GenAI Application with Amazon Q​
 
WSO2's API Vision: Unifying Control, Empowering Developers
WSO2's API Vision: Unifying Control, Empowering DevelopersWSO2's API Vision: Unifying Control, Empowering Developers
WSO2's API Vision: Unifying Control, Empowering Developers
 
Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Finding Java's Hidden Performance Traps @ DevoxxUK 2024Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Finding Java's Hidden Performance Traps @ DevoxxUK 2024
 
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data DiscoveryTrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
 
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin WoodPolkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
 
Choreo: Empowering the Future of Enterprise Software Engineering
Choreo: Empowering the Future of Enterprise Software EngineeringChoreo: Empowering the Future of Enterprise Software Engineering
Choreo: Empowering the Future of Enterprise Software Engineering
 
AWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of Terraform
 
JohnPollard-hybrid-app-RailsConf2024.pptx
JohnPollard-hybrid-app-RailsConf2024.pptxJohnPollard-hybrid-app-RailsConf2024.pptx
JohnPollard-hybrid-app-RailsConf2024.pptx
 
Introduction to Multilingual Retrieval Augmented Generation (RAG)
Introduction to Multilingual Retrieval Augmented Generation (RAG)Introduction to Multilingual Retrieval Augmented Generation (RAG)
Introduction to Multilingual Retrieval Augmented Generation (RAG)
 
Vector Search -An Introduction in Oracle Database 23ai.pptx
Vector Search -An Introduction in Oracle Database 23ai.pptxVector Search -An Introduction in Oracle Database 23ai.pptx
Vector Search -An Introduction in Oracle Database 23ai.pptx
 
Why Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businessWhy Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire business
 
Quantum Leap in Next-Generation Computing
Quantum Leap in Next-Generation ComputingQuantum Leap in Next-Generation Computing
Quantum Leap in Next-Generation Computing
 
DEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
DEV meet-up UiPath Document Understanding May 7 2024 AmsterdamDEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
DEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
 
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
 
AI in Action: Real World Use Cases by Anitaraj
AI in Action: Real World Use Cases by AnitarajAI in Action: Real World Use Cases by Anitaraj
AI in Action: Real World Use Cases by Anitaraj
 
Introduction to use of FHIR Documents in ABDM
Introduction to use of FHIR Documents in ABDMIntroduction to use of FHIR Documents in ABDM
Introduction to use of FHIR Documents in ABDM
 
Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a Fresher
 

Operational and Postimplementation in enterprise systems erp.ppt

  • 1. Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall 1 CHAPTER 7 Operational and Postimplementation
  • 2. Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall 2 Learning Objectives • Describe all the components to a successful “Go-live” and how to determine their readiness. • Understand what is involved in stabilizing the system after “Go-live” and how to track and address problems and issues on a daily basis. • Value the transition from developing a system to supporting it in a production environment. • Understand the process of transferring knowledge to operational staff and the importance to the long-term system success. • Realize the value of training before and after “Go-live.”
  • 3. Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall 3 Preview • In assessing an ERP project’s readiness for Go–live, planned tasks and activities must be completed to allow project management to address any outstanding issues that may jeopardize the Go-live date. • Readiness process needs to include as many team members, appropriate users, and managers as possible. • Much of the success of an implementation lies with the stabilization and post-production support processes.
  • 4. Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall 4 Preview (Cont’d) • All resources should be focused on ensuring users understand how to use the system and that issues and problems are resolved as quickly as possible. • Continual monitoring of implementation issues will provide a basis for moving from stabilization to postproduction support. • Training also gears up during the readiness process and continues through stabilization and post-production support.
  • 5. Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall 5 Figure 7-1 Sample Project Methodology
  • 6. Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall 6 Go-Live Readiness • An elaborate readiness checkpoint should be in place for Go-live to make sure steps are not missed. • Infrastructure, development, configuration, conversion, testing, training, communications, operations, command central, reporting, and users must be assessed in the readiness process. • Readiness reviews need to be documented and communicated to the project team and the company. • A detailed report needs to be available, along with an executive summary for senior management.
  • 7. Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall 7 Go-Live Readiness (Cont’d) • The Go-Live Readiness Review and Status Report is often a table that shows the status of each area at a glance, with the key activities that need to be completed agreed to before going live. • The process for determining readiness consists of a series of meetings and discussions on the status of each area’s tasks and activities. • If the PMO sees a lot of RED items the first time through, it will help to focus the project teams on what needs to be accomplished in the time period between the assessment and Go-live .
  • 8. Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall 8 ERP Training • Training must be provided to everyone that will be using the system, and should use real data and examples. • If done correctly training will capture about 90 percent of what users will see on a daily basis. • ERP training personnel could include trainers who work for the software vendor, third-party trainers that have specific experience in ERP systems. • Developing a variety of ways to train will better ensure the effectiveness of training. • Training needs to be endorsed by senior management early to ensure adequate funding.
  • 9. Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall 9 Stabilization • The stabilization process begins when the ERP system software is in production, initial training is complete, and conversion of critical data is done. • After the ERP system goes live, the organization will need to shift to stabilization process—60 to 90 days. • IT staff will be monitoring the infrastructure for response times and ensure that back-ups are taken appropriately. • Subject matter experts should be prepared to help many users from their departments operate the system in the correct way.
  • 10. Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall 10 Issues Arising During Stabilization • Customizations add to the complexity if not documented and communicated well. • Not being able to perform ad hoc activities, not because the system is unable, but more about learning how to accomplish the activity. • Users make mistakes as they use the new process for the first time. • In a parallel implementation approach, the ERP system is operated concurrently with the old legacy system, which is labor-intensive, confusing, and frustrating. • Reconciliation has to be done between the new ERP system and the old legacy system to validate the inputs and outputs.
  • 11. Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall 11 Postproduction Support • Managing the daily system operations and ensuring that the system is doing what it needs to do is really the purpose of post-production support. • If the post-production process is inadequate, then the implementation may be considered a failure. • Many of the risks associated with cutting over to the new ERP can be reduced by appropriate pre–Go-live and end-user training. • Subject matter experts and core project team members should be used to provide general support to answer simple process and system questions.
  • 12. Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall 12 Figure 7-2 Product Life Cycle Chart
  • 13. Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall 13 Postimplementation Support • Postimplementation support is generally divided into the following points: – Training – Go-Live Support – Data Validation – Data Correction – Patches and Fixes – New Features • By clearly defining and communicating Go-live and the ongoing support processes, overall expectations will be better set to realize measurable business benefits and ROI from the ERP project.
  • 14. Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall 14 Knowledge Transfer • There must be a well-defined process in place to transfer knowledge and skill to new or existing staff or team members during and after the implementation process. • Project monitoring and tracking, collaboration and communication, subject matter expertise, and lesson- learned repository should be documented. • A knowledge management plan should be in place to monitor the transition from one phase of the implementation to the other, which enables a smooth transfer of knowledge.
  • 15. Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall 15 Knowledge Transfer (Cont’d) • A knowledge management plan will: – Ensure knowledge is retained. – Reduce the cost of support due to lower number of support calls. – Facilitate faster learning. – Better maximize the capabilities of the system. – Cut time in troubleshooting problems. – Ensure a correct use of the system. • One centralized data repository can then be used to store documents which will eliminate confusion, duplication, and losing data.
  • 16. Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall 16 Implications for Management • The closer an ERP implementation gets to its Go-live date the more project management must focus on the issues, tasks, and activities to identify the issues and help focus resources and efforts. • To ensure a successful and sustainable ERP implementation, there must be a well thought-out and understood knowledge transfer process when consultants, implementation partner staff, full-time and part-time staff, and even end-users leave.
  • 17. Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall 17 Summary • Assessing readiness in an ERP implementation is critical to the overall implementation process. Without the readiness process in place, it will be difficult to meet the Go-live date with any assurance. • For the readiness process, project managers need to focus on the high-priority tasks and activities and identify where workarounds are possible. • Just-in-time and continual training is the mark of a good ERP implementation training plan.
  • 18. Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall 18 Summary (Cont’d) • Stabilization is generally a 60 to 90 day period of time that takes place after Go-live depending on the number of issues that arise. • Post production support helps the production staff, users, and information technology staff to know what to expect daily, weekly, monthly, and yearly from the system. • A roll-on and roll-off process for consultants and staff is needed to ensure the long-term system sustainability in the Knowledge Transfer process.
  • 19. Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall 19 Review Questions 1. Why is the readiness process so important to an ERP implementation? 2. What project areas need to be assessed in a readiness process? 3. What is included (and not included) during the stabilization timeframe? 4. Why is the knowledge transfer important to the long- term stability of the ERP system? 5. What are the five areas addressed in postproduction support?
  • 20. Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall 20 All rights reserved. No part of this publication may be reproduced, stored in a retrieval system, or transmitted, in any form or by any means, electronic, mechanical, photocopying, recording, or otherwise, without the prior written permission of the publisher. Printed in the United States of America. Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall