The document discusses a student project to grow plants using a hydroponic method without soil. It describes traditional plant growing which requires soil, nutrients, water, and sunlight. Hydroponics uses a nutrient solution in water instead of soil. The student project aims to study plant growth using hydroponics and relate it to biology topics like nutrient cycles, photosynthesis, cell processes, genetics, and evolution. The students designed nutrient solutions, collected data on plant growth, and analyzed results to determine if hydroponics is a viable solution for plant cultivation.