La fabrique
des mobilités
Open Source & Mobility
ADEME
The French Environment and Energy Management Agency (ADEME) is active in the implementation
of public policy in the areas of the environment, energy and sustainable development. The Agency
provides expertise and advisory services to businesses, local authorities and communities, govern-
ment bodies and the public at large, to enable them to establish and consolidate their environmental
action. As part of this work ADEME helps finance projects, from research to implementation, in the
areas of waste management, soil conservation, energy efficiency and renewable energy, air quality
and noise abatement.
ADEME is a public agency under the joint authority Ministry for the Environment, Energy, Oceans and
International Climate Relations, and the Ministry for primary, secondary and Higher Education and
Research.
www.ademe.fr/en
Acknowledgments
The final outcome of this guidebook was elaborated by Margot SANCHEZ and would not have been
possible without the assistance from numerous authors and contributors. La Fabrique would like to
thank :
André REINALD, Benoit JONCQUEZ, Bertrand BILLOUD, Cédric BELARDI, Gabriel PLASSAT, Gaël
MUSQUET , Hipolito MARTELL FLORES, Jean-Louis PEYRE, Jean-Marc LAZARD, Jean-Michel FAVRE,
Jean-Remy CAZEAUX, Laurent MAGHDISSIAN, Lomig UNGER, Louis-david BENYAYER, Maud CHIDIAC,
Nicolas D’HAUSSY, Philippe GICQUEL, Pierre SIGRIST, Polen STUDIO, Rahul KUMAR, Simon SARAZIN,
Stéphane MASSON, Stéphane DERVILLE, Sune PEDERSEN, Thierry FARGAS, Thomas CAZADE, Tin
Hang LIU, Vincent LAINE, and Yann LERICHE and Yuki LIU.
The Fabrique des Mobilités is constructed through your reactions, feedback, ideas, and projects. Please
continue to inspire us and surprise us.
La Fabrique des Mobilités
The Fabrique is the first European accelerator dedicated to the rapidly changing ecosystem that is
transportation and mobility. The Fabrique brings together players and projects, capitalizing on expe-
riences, feedback and errors in order to create a common culture of innovative action.
info@lafabriquedesmobilites.fr
www.wiki.lafabriquedesmobilites.fr
www.lafabriquedesmobilites.fr
fabmobteam.slack.com @fab_mob
Open source
perspectives
O
pen source dynamic was
initiated considering
essential human behaviors
: when people have enough to
live decently, some have diffe-
rent personal motivations than
material and want to participate
to collective project.
On the one hand, there is an
innate desire shared by many
of being useful to others. On the
other hand, there is the ego: the
need for peer recognition. The
result in both cases is a desire
to share what is done with the
greatest number.
There is also a macroeconomic
interest in sharing: by enabling
the reuse labor of others, it
avoids duplicating effort, it does
not have to reinvent the wheel in
each new project. Actually, over
the years, most IT projects have
become essentially assemblies
of third-party software compo-
nents, a form of prefabricated.
Create an application or service
start by choosing the compo-
nents and adding some cement
to build the project. The open
source model has greatly contri-
buted to the industrialization of
software development, with the
huge productivity gains.
Participate in open source project
has the advantage, according
to the license that is attached
to the code, to benefit in return,
and without payment, the contri-
bution of other developers. One
must however fit the economic
models more about selling «user
licenses». It leaves free all that is
duplicable, and we can pay what
is not, especially the service,
design, deployment, training,
custom development etc.
It is quite natural that developers
were the first to adopt this mode
of cooperation: the central tool
for open source was the internet
and they were the first to master
it.
Note that in French, the term
«informatique» means infor-
mation science. «informatique»
existed long before the advent of
the computer which is just a tool
for automated processing of data.
Indeed, each program feeds itself
with input data, and provides
other output. It is therefore not
surprising that there is a kind
of contamination of the model
«open» to the data.
I have personally worked for
many years in the mapping (GIS)
and transportation (Mappy).
By joining Mozilla, I deepened
my understanding of the
various issues and models of
«open». Mozilla, which we must
remember, is a foundation, was
a pioneer in this mode, and is
today one of the most famous
players in the open source.
All that is developed at Mozilla
(including Firefox) is totally
open. Thus, tens of thousands
of contributors around the world
participate, according to their
motivation, their availability
and skills to our projects: reports
and investigation of bugs, docu-
mentation, translations (Firefox
By André REINALD, Mozilla
is translated into more than 80
languages), organizing or parti-
cipating in events, public aware-
ness, writing patches, etc.
Based on my experience, I can
identify some strengths and
weaknesses of open source.
Because the same number of
people collaborating on a joint
project would be more effective
if they were divided into several
competing projects. The perma-
nent danger for an open source
project is the «fork»: a subgroup
decides that the project must
take another direction, which
seceded, creating a new project
«clone», but will drift away
from the original over time
(OpenOffice - LibreOffice).
A common question: how to
share the work and who makes
the decisions? The two issues
are linked: the open source gives
pride to meritocracy, «the one
who do» naturally becomes the
one that we respect.
As for the user encountering
a bug or wanting a feature, the
community is often much more
accessible and responsive than
a corporation: it speaks directly
to «those who do.» No customer
service, communicate requests to
a marketing department, submit-
ting proposals to the committees
that decide priorities keeping in
mind that the primary purpose of
a company is to make profit and
bring services to users is just a
task.
For customers who need
guaranteed services, specia-
lized service companies in free
software offer assistance equiva-
lent to those provided by proprie-
tary software vendors.
Finally, in a system using
volunteering, the main challenge
is to attract, motivate and retain
contributors. Wide task that
became a real job, «community
manager». Away from authorita-
rianism and hierarchy, their only
lever remains psychology.
Open source today arrived at
maturity, after overcoming
obstacles of the early years
of governance, sustainability,
credibility, service. Now, this
mode tends to spread to other
sectors. The artistic production
(or Creative Commons licenses),
and of course the data: this
is known as open data. Each
sector has specific needs and
solve their own problems. But
the underlying philosophy and
the benefits remain similar. It is
about common to produce, evan-
gelisation and as the action of la
Fabrique des Mobilités is exem-
plary.
Contents
7>8
Introduction
History
The four Pillars of Open innovation
Workshop - Connected cars & territories
Interview - Yann Leriche - Transdev
Focus on - How Renault is driving innovation
Interview - Bertrand Billoud - Kisio
Workshop - Innovation Summer Camp
Interview - Maud Chidiac - Local Motors
Focus on - How to open data?
Interview - Jean-Marc Lazard - OpenDataSoft
Partnership - The project Catalogue
Focus on - Business Models for Open Source development
Interview - Tin Hang Liu & Yuki Liu - OSVehicle
Community - Schools and students
Interview - Sune Pedersen - Faraday Motion
Workshop - Open software
Focus on - Genivi
Interview - Gaël Musquet an open source genius
Focus on - Commons & Projects
9>10
11>14
15>18
19>20
21>23
24>26
27>29
30>31
32>33
34>35
36>39
40>41
42>43
44>47
48>51
52>54
1>2
3>4
5>6
1
T
he automotive history
has always been linked
to patents and industrial
protection. For years, the inno-
vation has been measured by the
number of patent applications.
At the same time, has grown up
the cross-company cooperation
as a strategic partnership to
share vehicle platforms, engines
or gearboxes and, in doing so,
increase the volume of produc-
tion and cut transactions costs.
Subcontractors also have a
key role to play among vehicle
manufacturers. They foster
sharing and pooling of compo-
nents and even of sub-assem-
blies in their entirety. Research
projects have been conducted by
several manufacturers on some
upstream matters, as an example
the research on new combustion
process. Cooperation is thus
not new and a large number of
alliance are actually forming
visible or discreet links between
these actors.
Recently some car manufac-
turers opened their patents in
order to attract new actors onto
their technologies with the aim
of ensuring minimal volume
and then, offering an acceptable
price. This being the case of
Toyota on hydrogen patents and
Tesla on electric one. Production
volumes are at the heart of effec-
tive strategies so that the auto-
motive industry could be defined
this way : “space science tech-
nology to the price of household
equipment”. All the coopera-
tion schemes are based on the
decrease of the cost of obtaining
upstream scientific knowledge
or reaching volumes which could
ensure standardization of the
process. These schemes are build
“with full background knowledge
of the situation”.
Open innovation, as we envision
it here, and open source have
an another way to proceed. It’s
about opening up knowledge
without knowing where and how
far that will take us. Open source
includes all the advantages cited
previously, but goes further, as
this means that nothing has
already been written and every-
thing has to be built and invented.
It’s a question of
aligning creative
forces
It can therefore be said that an
alignment is possible between
industrial interests wanting to
use open source resources to
pursue their strategy and collec-
tive goals wishing to exploit
these new resources. La Fabrique
aims to investigate and explore
these alignments to foster the
emergence, the referencing, the
development, the protection and
the access to commons in the
field of sustainable mobility.
To deal with the digital platforms
of the GAFA, European industries
of the automotive sector and
more broadly of the transport
field cannot ignore strategies
which are passing through the
Introduction
By Gabriel PLASSAT
2
Open source and the commons.
Our major competitor is time.
Coopetition using open source
can be the fastest way to produce
a new shared culture of innova-
tion and a credible & desirable
vision of our future.
Let us have a closer look at three
examples of industrials maste-
ring vehicle platform and yet
involving in open platform.
1. « Better to do Open than a
rival. »
By launching recently the project
OpenAI, Elon Musk aims to
create the dominant platform for
Artificial Intelligence. In view of
the current involvement in this
sector of Google, Facebook and
Microsoft, Musk has chosen the
Open to go faster, forge strategic
alliances and make the creations
useable as soon as possible. The
purpose is to turn OpenAI into
the most advanced and efficient
platform to prevent competi-
tors from being the focus of our
attention. Before somebody else
does, the Open can fill up quickly
a space which is currently empty
and ready to be conquered.
Nevertheless, be careful, because
not everyone one can be an Elon
Musk. To do that, you need credi-
bility and enough partners to
reach a critical mass interested
in building up a platform.
2. « The Open as a spring-
board for future world
standards.»
After the success of one of his
invention Android (an open-
source operating system for
smartphones) Andy Rubin wants
now to repeat the operation in
the field of Artificial Intelligence.
For that purpose he has a very
specific plan ; open an accele-
rator dedicated to AI, provide the
best commons, mentorship and
funding to startups. Then, after
having reached the critical mass,
open the platform to create new
standards. To be in place before
the others is the goal of Andy
Rubin. And today, openness is
the best solution to do so. But
here too you have to be careful.
To succeed certain conditions
must be fulfilled. Andy Rubin was
in touch with the top specialists
in AI, he managed to get them to
adopt the strategy and create the
largest tech incubator dedicated
to AI.
3. « The Open as a strategy
of conquest to empower
the communities.»
Transdev with the Digital Factory
department, is committed
to create a worldwide Open
Database in Transports, this is
the project Catalogue. The aim is
to set up a platform of reference
within the mobility field to permit
entrepreneurs to reduce time and
effort, gain access to high quality
data and finally to standardize
the work procedures. By doing
so, Catalogue will reveal talents,
projects and with a certain
critical mass it will be indispen-
sable. To guarantee the equitable
access, Transdev is currently
looking for alliance with neutral
and credible stakeholders to
ensure governance and impro-
vement. Many european players
have an interest in supporting
Catalogue.
Open source is at the heart of
La Fabrique development on
three different levels: data,
software, hardware and with
several communities. La
Fabrique proposes to list the
open resources, to assist in their
documentation, to support the
communities in the identifica-
tion of commons and to facilitate
the funding and realisation of
new commons.
A new kind of call for
project dedicated to
open resources.
Based on feedbacks from startups
and industries, FabMob designed
a new kind of call for project dedi-
cated to open resources: a call
for common. Starting from each
community, partners identify
missing resources that are neces-
sary and not competitive. Theses
resources, requested by several
partners, can be developed with
an open source approach. Then
funding from industries and
agencies will support and acce-
lerate commons production with
many advantages:
•	 Commons produced are
directly useful for several
startups and partners, their
projects get advantages,
•	 Commons can be used
and developed by others
stakeholders, creating a
community around them,
with benefits in term of effi-
ciency,
•	 Each common can become
a standard in its domain if
many stakeholders decide to
use it,
•	 Even if the startups invoved
fail in the next year,
commons can still be used
by the ecosystem,
•	 Moreover, each common
become a connector between
several stakeholders, even in
competition, creating a new
culture of innovation.
3
Open software, new
phenomenon?
Open software are not new.
Actually, open source software
are nearly as old as the inven-
tion of science computing. The
A-2 system, released in 1953 and
developed by the UNIVAC divi-
sion of Remington Rand, was
one of the first compiler for an
electronic computer and it might
be the first example of free and
open-source software in the
history. Indeed, the software was
provided with the source-code
and customers were invited to
send their improvements back to
UNIVAC.
Free software for
universities and
researchers.
Let us go to the 60’s when the
first computers appeared on the
university campuses. At this
time, it was usual to share, then
remix everything, like if it was
a cooking recipe. That’s why
software were usually distributed
with the source code. In this way,
it was possible to make modifica-
tions, fix bugs or add new func-
tions. Students and computer
science lovers decided to meet
in open source communities, to
share their ideas, codes and tips
about computer program. The
hackers’ movement was born.
In accordance with the social
movements of the period, the
hackers are mostly distrustful of
the authority. Their ideology is
to promote free and open access
to software. They think that
computer science can advance
scientific research and make the
world a better place.
The decline of free
software.
Towards the end of the 60’s, the
proprietary softwares appeared
because of the increase of
software production cost. It was
observed a growing amount
HISTORY
T
o begin our guidebook,
here a little of history to
understand why do we use
the word open source and since
when.
4
A2 Project
1950
1960
1970
1980
1990
2000
Usenet
Hackers’
movement
Free
Software
Foundation
GNU GPL
license
Linux
RedHat
MySQL
Apache
Http server
« The Cathedral
and the Bazaar »Netscape
open sourced
Mozilla
Ubuntu
Android
Open Source
keep growing
GNU
Project
of software that was for sale
only under restrictive licences.
Actually, the software industries
were competing with compa-
nies which included software
programs with the hardware for
a unique cost.
However, some customers did
not want to pay for software
bundled with hardware product.
Thus, some software continued
to come at no cost.
Usenet is a worldwide distributed
discussion system available on
computers established in 1980.
In other words, it allows people
to speak, exchange and work
together on a worldwide level,
it is like a precursor to Internet
forum. Remember, people are
the key for open source develop-
ment. With usenet they can now
collaborate more efficiently and
share software.
At the beginning,
one man Richard M.
Stallman.
We can see Richard Matthew
Stallman as the founding father
of the free software movement. In
1983, he started the GNU Project
a mass collaboration project for
open and free software that has
never ceased to grow throughout
time. Two years later, he created
the Free Software Foundation
to help and support the free
software community. The Free
Software Foundation has also
permitted in 1989 the creation of
the GNU General Public License
(GPL), one of the most popular
open source license model.
Linux, just a hobby he
said.
In 1991, Linus Torvalds a young
Finnish student decided to
develop, for fun, his own version
of the Minix kernel, he named
his production the Linux kernel.
The open source software resul-
ting from the GNU project trans-
formed the Linux Kernel into a
complete open source Operating
System (OS) GNU/Linux. Linux
kernel passed under the GPL,
which attracted attention from
volunteer programmers all
around the world.
The Cathedral and the
Bazaar
Eric S. Raymond is a famous
lawyer specialist of open source.
Based on his observations of the
Linux Kernel development and
his open source management
project experiences, he publi-
shed in 1997, an essay (and later
a book) named The Cathedral and
the Bazaar. This analysis is about
the open source community and
free software principles.
The essay generated much atten-
tion. What’s more, it definitely
motivated Netscape to release
its web browser and internet
suite and to start an open source
community in 1998. Thanks to
that, we now have Mozilla Firefox
and Mozilla Thunderbird.
In 1998, Eric S. Raymond with
another lawyer Bruce Perens,
co-founded the Open Source
Initiative (OSI), an organization
dedicated to promoting open-
source software which conti-
nues to exist. This is when was
officially created the term open
source. You can find more infor-
mations on opensource.org.
5
Open Innovation can be introduced at different steps in a project, from the early beginning to the industrial
process. We have identified four major ways to open your project: standard, data, software and hardware.
But opening is not only a question of efficiency or rationalisation, it becomes a question of culture. The more you
are involved in open source projects, the more your company will be changed at different levels: relation with
customers, with employees and between employees, your process for hiring, your connexion with the ecosystem
as new contributors are external of your team, your capacity to work at international level. Open innovation
brings more permeability, but you can always decide which partner are in or out. Your project and your team
look more like natural organisms, new connexions are created more quickly without decisions from your side.
Historic competitors become less binary relationships and stakeholders can be seen as potential contributors in
co-opetition.
As a matter of fact, the openness also embraces the hardware. This is a trend that will for sure be further accen-
tuated. But did you know that open hardware had a long history? For instance, in 1911 an independent automaker,
called Henry Ford, won a challenge and invalidated the Selden Patent which was THE gasoline engine patent
controlling all the automotive industry. This led to the creation of an association managing open and at no cost
patents. And everyone knows about the Ford’s success.
Moreover, open hardware doesn’t only work with a specific type of object. You can literally share everything,
under permissive licenses, at the condition that you provide the “source code” of the project also called the
documentation. This means instead of sharing line of code you have to share schematics, blueprints, pictures,
guidelines, Computer Aided Design (CAD) drawings etc. Open hardware, especially in the transport field, has the
wind in its sails with the democratisation of digital manufacturing tools and space. The biggest difference with
open software is that it implies some investissement for physical materials. Let’s go to fully achieve your own
and customizable car, skateboard or scooter!
“Open Source Hardware (OSHW) is a term for tangible artifacts — machines,
devices, or other physical things — whose design has been released to the public
in such a way that anyone can make, modify, distribute, and use those things.”
OSHWA - Open Source Hardware Association
THE FOUR PILLARS OF
OPEN INNOVATION
6
So, open standards mean interoperability and facilitation of data exchange in the mobility sector, provided that
standards are adopted by a large part of the ecosystem. Open standards also imply transparency, availability,
quality, impartiality, support and relevance. The interesting thing is that open standards rely on collaborative
process open to all persons interested. For instance the General Transit Feed Specification (GTFS) is one of the
most common format for public transportation schedules and it all became as a side project of Google.
The importance of open standards for transport is the opportunity to share data without the need of proprietary
solution. Reliability, interoperability and continuous improvement are three advantages among many others.
Travels give a great sense of freedom, that’s why transport system should also be free. These standards exist to
support, fast, flexible and secure implementation into any transport system and by this way promote a faster
mass adoption. Maybe with open standards the dream to have a transport card working all around the world will
come soon true.
«Open Standards are standards made available to the general public and are
developed (or approved) and maintained via a collaborative and consensus
driven process.» ITU - United Nations agency for information and communica-
tion technologies.
This simply means that open data are accessible and useable by all people. This idea seems to come from the
United State of America. Indeed, in 1966 was proclaimed a new law giving the right to access information from
the federal government, the Freedom of Information Act. Later, with digital opportunities, the movement grew
with amazing rapidity worldwide. Although the United States of America may have been the pioneers to do open
data, in France and more generally in Europe the open data movement is fully operational.
The release of data on open platform raised the awareness of the opportunities offered by citizen involvement.
So that open data became a new phenomenon in particular in the mobility field with any kind of data such as
schedules, transports stop, POI and even real-time data. From industrials to government through collectivities
everyone wins. It’s time to innovate with mobility dataset and unlock the tomorrow’s mobility!
“Open data is data that can be freely used, re-used and redistributed by anyone
- subject only, at most, to the requirement to attribute and sharealike.” Open
Definition.
When talking about source code we mean which can be read and understood by a human ( a human who has
some basic computing skills). We called these people the programmers, because they are doing programs. Then
the programs are compiled, which makes them only understable by a computer. By sharing the source code, the
programmers, give you the possibility to use, copy, study, modify and redistribute a program without any restric-
tions. You just have to accept the terms of the license chosen.
UNIX might be the most famous example of the success of open software, but you can find a lot of example in
the domain of mobility such as collaborative map, multimodal trip planner, running application, dashboard car
system etc. In a nutshell, it’s almost the opposite to proprietaries software. Indeed, you can have the control of
your software, you can train yourself on it and it can only be improved etc. Without talking about the economical
advantages. Open software ensure a collaborative experience which benefits everyone.
“Open source software is software with source code that anyone can inspect,
modify, and enhance.” Opensource.com
7
Connected cars & territories
First workshop of the community
When? 17 May 2016
Where? La Fonderie ( Paris)
—
to standardise and facilitate
the communication between
your car and your smartphone.
It provides several tools as a
simulator, documentation, SDK
and even an API. In this way, any
developers that wish to create a
new connected car services, can
access an important set of data
and then share his production to
improve it.
Xee - Eliocity
Eliocity with the Xee project is one
of 10 projects chosen as a winner
for the first call for proposals of
la Fabrique. Xee is an advanced
technology to connect all cars
and create a large community
4 presentations to start
the day
The day started with 4 presen-
tations of la Fabrique partners
about their work on connected
cars and their relation with terri-
tories.
PSA Car Easy Apps
Car Easy Apps is a consortium
started by PSA and companies
and researchers in automotive
industry. Its goal is to look for a
standard way to introduce the car
as another object in the internet
of things, preserving security and
safety concerns. In other words,
Car Easy Apps has the ambition
WORKSHOP
A community in search
of opportunities
The first workshop of the
“Connected cars & Territories”
community took place in June
2016 in the public digital agency
of the Paris Region called la
Fonderie. This community is
involved in search of oppor-
tunities to create added value
with data from cars. They also
devote an in-depth reflection to
open-access resources that can
be shared and the commons.
8
of drivers. Their solution is a full
stack approach, they provide an
open platform, a cloud, sensors,
data, APIs, applications and
services. They are creating an
open environment for developers
to create new services. You can
also join the new accelerator the
XeeDEV App Factory and be part
of the community.
La Fonderie Car
Can you hack your own car? La
Fonderie Car is an open source
connected car, so yes, you can
hack this car. The project is based
on the four pillars of open inno-
vation: open data, open software,
open hardware and open stan-
dard. With this car, you can now
for example access your tire air
pressure or engine consumption,
film while you are driving, check
your heart rate and even commu-
nicate with your smartphone.
You can also find in the car a
solar panel, a 4G antenna, Global
Navigation Satellite System,
an high-speed wireless router
and four open source hardware
servers.
DATACT
DATACT is an innovation program
involving multiple partners in
the urban field. One of the main
projects is “La Régie de données”,
a kind of platform for data regu-
lation. The purpose of the Régie
is not to centralize all the data
but rather for finding a way to
create a sustainable economy
of dataservices suitable for all
urban ecosystem stakeholders.
The Régie is the trust third-party
in this system, it verifies the
integrity of the contributions,
the data process and finally the
cross-referencing of these data.
3 working groups
The workshop was divided into
three sections to work on three
different subjects.
Pleasant journey
Security, prevention, anticipa-
tion, better comfort, etc.
Problem to solve : How to reduce
the time spent to find a parking
spot?
Less cars, more …
Incentive to change, tolls, parking
organized, carpooling, car
sharing, etc.
Problem to solve: How to reduce
CO2-emission, relieve traffic
congestion and reduce unneces-
sary traffic ?
World mapping
Road, environment, pollution,
CO2 emission, motor fuel, etc.
Problem to solve: How to index
the physical world in the nume-
rical one?
Call for contributions
All the groups gave rise to new
matters of shared interest as
open data about parking lot,
emission of pollutants and CO2,
traffic and open source tools to
simulate the traffic.
If you want to join la Fabrique on
these new topics contact us!
You can find more information
on the Fabrique des Mobilités
wiki.
What is the
problem to
solve ?
How they can
be brought
together ?
Are they aware
that they have
to solve this
problem ?
Who might be
willing to pay to
solve the
problem ?
Who are the
stakeholders ?
What are the
solutions to
solve the
problem ?
What are the
existing
commons useful
?
What are the
new commons
we should
develop ?
What are the
management
rules ?
Who are the
stakeholders ?
What is the kind
of opening ?
Methodology
9
a “co-opetition” mode, where
competition and cooperation
both have their place, and it
proves to be efficient.
How did you achieve to change
your business model? I suppose
you did that step-by-step.
Yann: We do not exactly want
to change our business model. I
would rather say that we aim at
adding new activities, with new
business models, to our core
businesses.
We are historically a public
transport operator and a taxi
company. We want to add to
those 2 pillars mobility services
for our clients. No single mode of
simply because there are more
good ideas, more know-how
and more experts in the world
outside Transdev than inside,
whatever the topic we consider.
Not trying to create links with
people around us, sharing with
them, would have meant tremen-
dously reducing our ability to
innovate.
Sharing might seem a counte-
rintuitive idea in a competitive
economy. But if you look at the
the Silicon Valley, it is a place
where people share a lot. Open
source software has enabled
the development of lots of inno-
vations, in the field of big data
for example. People work in
T
ransdev, member of La
Fabrique des Mobilités,
is nowadays one of the
leading companies in the area of
mobility and yet a few years ago
the group was on the verge of a
crisis. How Transdev has been
able to bounce back by placing
Open Innovation and digital
transitions at the heart of its
development strategy? This is
what we will see by interviewing
Yann Leriche Chief Performance
Officer at Transdev.
Hi Yann! Let’s just start off with
a question: why did you decide to
get involved in open innovation?
Yann: We decided to open up
INTERVIEW
Yann Leriche
10
as they involve many players,
with different backgrounds and
objectives. We approach this
complexity with humility and
an open mind: There is no secret
sauce, but there is a sauce, which
needs all its components to mix
well together to be a success.
Just over a year ago, you decided
to launch the digital factory.
Could you tell us what it entails?
Yann: As many large companies,
we have a strong track record of
incremental innovation, but not
of disruptive innovation. Many
people have internally break-
through ideas which are exciting,
but we didn’t have the right struc-
tures and processes to support
them. The digital factory was
created to incubated these inno-
vations. Their project leaders are
intrapreneurs, who work with
the resources they need whether
internally or externally, share
with partners whether inter-
nally or externally, without any
corporate burden. We make sure
they can put their whole focus
and energy on addressing client
needs.
It shows that you are on the same
wavelength as la Fabrique des
Mobilités. Why did you decide
to be a founding member of La
Fabrique? What attracted you to
it?
Yann: The interest was twofold.
We were attracted by the quality
of the ecosystem which was
about to be created, in terms of
participants and of ambition
regardings the commons to be
created. These commons are key
if we want to speed up innova-
tion in the mobility field, and I
am definitely convinced that if
there is a place today where we
will succeed in developing them,
it is at La Fabrique.
We were also attracted by the
vision Gabriel Plassat developed
as to the future of transport and
mobility, which we totally share.
The way to get there might
evolve, but it is key to move with
people with which we share the
same goal.
So does any projects of the digital
factory have to be involved into
the commons?
Yann: All the digital factory
initiatives will not lead to the
creation of commons as some
address Transdev internal
business issues. For the others
our goal is to share as much as
possible by opening our projects
and technologies with APIs, open
source software, or in many other
ways. This is for example the
case with our project “Catalogue”,
which aims at being an open
repository for mobility open data.
Thank you very much Yann.
In conclusion Transdev seems
to have started its digital shift
and paves the way for other
mobility company to rethink
their business model by turning
toward open innovation and
open source.
transportation is able to fulfill all
the needs of an individual, even
the private car. Hence people
use different modes, at different
times of the day or year. We want
to ease this multimodality and
offer our clients mobility “As A
Service”.
We heard you say Mobility As A
Service, can you explain to us
what does that mean? Maybe you
can also give us some examples
to help us understand.
Yann: It all started from our
clients. We used to consider their
travel experience starting when
they planned their trip in one of
our transport network and fini-
shing when they left our vehicle.
But our customer trips are very
often richer than this. They
might take a train that we do not
operate before stepping in one of
our buses. In this case facilitating
and optimizing the connection
is a key topic. We have to look
at their mobility globally, not at
some segments of it.
That’s why we develop
services on top of all trans-
ports modes, whatever the
operator: Information, ticke-
ting, guarantees,... In Lyon for
example with Optimod, we deve-
loped a real time and predictive
triplanner. In Saint-Étienne with
Moovizy we launched a service
which also enable seamless
payments.
In relation to Optimod’Lyon, it
was an innovative public-private
cooperation between startups,
industrials, local governments
and even schools. We saw that
you are repeating the project in
Toronto. So it must have been
a success. Can you reveal the
secret of such a successful
cooperation?
Yann: In Lyon the project started
and succeeded thanks to the
leadership of the public transit
authority who created the condi-
tions for several stakeholders
to work in a collaborative mode.
Those projects are often complex
11
professions” explains Lomig
Unger. This is why, teams, groups
and new places are dedicated
to work on six priority areas
presented on the next figure.
involved in setting up internal
mechanisms such as Fab Labs
in order to drive and support
projects and touch differents
group of people from various
A
t Renault, innovation is a
core value for the company
through partnership with
main key player of the automo-
tive sector, the implementation
of creative lab, the creation of an
innovation community and soon,
a digital garage and an open
hardware project. It is with good
reason that Renault is one of the
member of la Fabrique. Let’s take
a deep dive inside the Renault’s
world with Lomig Unger the man
behind a large number of Renault
innovative projects.
Innovation, a priority
The observation was simple for
Renault, innovation must be at
the heart of the brand identity.
It had to be explored new ways
or methods to foster innovation
in transportation area. “I’ve been
How Renault is driving innovation
FOCUS ON
Innovative
architecture
Innovation
priorities
Electric
vehicle
Combustion
vehicle
New services
Travelling
well-being
12
members and hold topical exhi-
bitions about innovative objects
from every sector of the industry.
Exhibition topics are extremely
varied from Do It Yourself (DIY)
to gamification. By opening such
a place, Renault want to open up
their employees’ mind and give
inspiration to them. Maybe, like
Spencer Silver invented a kind
of adhesive that doesn’t adhere
by accident, aka the Post-it, an
employee of Renault will have a
breakthrough idea.
Pitch & POC
Pitch & POC is an initiative based
upon the company’s informa-
tion technologies such as the
intranet or shared spaces. The
observation is that people from
everywhere inside Renault are
full of ideas. In this way, whether
you are in a factory in France or
in Brazil you can work together
on a innovative project. On an
intranet forum, regularly new
calls for ideas are opened, then a
jury evaluate the differents ideas
and the best among them can be
prototyped in the next step: incu-
bators. The incubators are linked
to the Creative Lab, another
tools provided by Renault and
explained later. Finally, the
subjects studied in incuba-
tors are reviewed each week
in the ideas workshops where
everybody can constructively
exchange about each project. “In
line with our wish to increase
our skills and knowledges, we
decided to launch a second
version of the creative people, by
taking into account what we had
learned.” says Lomig Unger. By
the way, Phillippe Méda, who is
also working with la Fabrique des
Mobilités, helped them to proto-
type this new version which wa
called Creative People before.
Pitch & POC is more entrepre-
neurship-oriented.
Renault creative lab
All major companies worthy of
the name now have an inside Fab
Lab to democratize the access
to design methodologies and
digital manufacturing tools. So,
obviously a stakeholder of the
transportation ecosystem such
as Renault had to get a creative
lab. This lab provides all the tools
to make people collaborate on
projects, for instance projects
selected in the Renault Creative
People. We find in this neutral
ground of Renault a full range of
tools for prototyping, a 3D printer,
a laser cutting, ressources and
even a thermoforming machine.
Innovation community
The final tool to imagine the
mobility of the future is the inno-
vation community. Inside this
community we find other corpo-
rations as Michelin or Visteon
or specialists as the SNCF and
EDF and even academics. The
basic idea of the community is
to build a common vision of the
future in the mobility area. Thus,
the community reunites several
times per year to share best prac-
tices in innovation management.
Models that actually
work abroad
The Silicon Valley is a beautiful
region synonym of innovation
which is home to the majority
of the world’s largest high-tech
companies and startup. That’s
exactly why, in 2011 Renault
decided to establish there its
first Open Innovation Lab. As its
name implies, the principle is
based on open innovation and on
the active involvement in a large
ecosystem to source ideas. Each
relevant stakeholders (schools,
startups, industrials etc) can
propose their idea. If it appears
to be a good and a feasible idea,
the lab opens its door to project
initiator. It’s about going outside
of comfort zones and having
the opportunity to prototype
and quickly test an idea without
waiting for. Five years after
Renault is now opening a new
Open Innovation Lab, but this
time in Tel-Aviv (Israel).
A startup inside the
company
Let’s begin with the presentation
of the mechanism promoting
breakthrough innovation: the
LCI. The Cooperative Innovation
Laboratory (LCI) is the think
tank that acts like a start-up
inside the company by brin-
ging together three functions:
Product, Engineering and Design.
The LCI is an independent place
where, about 50 people can,
together, conceive and proto-
type ground-breaking innova-
tions for mobility. The idea is
to create a place of cooperation
with groups inside Renault and
outside, from the transportation
ecosystem, such as specialized
schools or suppliers. By remo-
ving the barriers for innovation,
the lab aims to go faster from
the idea stage to the prototype.
Previously this process could
take months or years, now the
period can be shortened in days
and even hours. This permits to
step out conventional programs
and test faster the real add value
of a product for consumers.
The lab is concentrated on
understanding the change
in user needs and anticipate
it. In this way, projects deve-
loped within the laboratory are
varied. To give the most famous
example, the Twizi, the compact
two-seater 100 % electric vehicle
was born within the Cooperative
Innovation Laboratory.
Tools to imagine the
car of the future
The group relies a lot on the
setting of tools to stimulate the
creativity.
Innovation room
What an interesting name for a
room! The innovation room is
simply a place created in order
to boost the act of finding a
solution by chance, also called
the serendipity. The room is
freely open to all Renault staff
13
EOLAB
1L/100 KM prototype Advanced Driver Assistance
Systems
autonomous car two-stage turbocharging
ADAS NEXT TWO TWIN-TURBO
HEAT PUMP
recover calories from
outside
second generation
regenerative braking
integrated connected tablet speakers, inspired by
aeronautics technology
DECOUPLED PEDAL R-LINK BASS REFLEX
RENAULT INNOVATIONS: AUTONOMOUS VEHICLES AND
ONBOARD MULTIMEDIA SYSTEMS
A new place to rethink the future,
the Square
Who are those partners? Who
can participate?
Lomig: At the beginning we
imagined to work with other
network or ecosystem such
as la Fabrique or the Renault
Innovation Community to
bring together engineering
and business schools, major
companies, sociologist and
philosopher. We try to keep this
heterogeneity which is the iden-
tifying mark of open innova-
tion activities. In theory, almost
everyone can participate to this
open innovation project within
the infrastructure capacity limi-
tations ( between 60 and 100
persons). And yet, this isn’t going
to be open to the general public,
only for the ecosystem.
There will be a kind of
workshop for vehicles where
historic partners of the Renault
or people from Michelin for
instance. The second area is
about new working methods. We
have to rethink the way we are
working and how to be able to
produce new offers and innovate.
How this will work with the
different partners?
Lomig: We are establishing the
project in a new space with
partners. Those partners aren’t
here to pay to enter into the
place, we want them to make
available resources in exchange
for the accommodation and the
chance to participate in this
project. We ensure that the place
is co-governed. So, we ensure
that the partners are also impli-
cated into the governance with
us. We just started to structure
a kind of co-governance. This is
a first step to learn how to work
differently with the ecosystem.
Lomig Unger is now in charge of
the new project, a kind of digital
garage, we wanted to know more
about that, so we asked him.
We heard you will launch pretty
soon a digital garage. What does
that mean?
Lomig: We aim to build with the
ecosystem a kind of open innova-
tion lab that will be able, we hope,
to challenge our manner to work
with our ecosystem. We have a
space of 3000m² at République.
This is really cool because we
have the opportunity to play in
this huge space which was an
old car shop. We have one year to
play, for me playing and working
should be the same thing. This
is focused on two main areas.
First, work on new mobility offer
and explore the future of mobi-
lity. This is why we are working
with la Fabrique des Mobilités
14
we can receive this kind of event.
For us, that will be our non offi-
cial launch. After the differents
organizations of the ecosystem
will make their own communi-
cation about the Square. This is
the job of people inside Renault
to set up a proper communica-
tion plan, so we let them do in
their way. We just want to coor-
dinate how the different parts of
the ecosystem will communicate
about the project about what is
common or what is specific.
When will we see a digital garage
open for the general public?
Lomig: This is a project that still
makes sense. By the way, some
companies and organizations
are doing it. The demarcation
line between what we are doing
and an open garage where we
can tinker on our own car is that
we are not oriented towards the
same public. We have a more
comfortable situation because
we allow to work on our car only
people that have a demonstrated
expertise. So we don’t have to
monitoring them. If we want to
open a garage to the large public
we have to find people such as
mechanics to ensure the proper
handling of dangerous tools and
components. We will see after if
we have the capacity to do that.
For the moment, we just want to
bring together people who have
the capacity to tinker a car, with
skills in business, technologies,
user design, etc. We are currently
focus on create a playground for
the ecosystem, but the idea of an
open garage is really interesting
and could be a project launched
by Renault. One thing at the
time...
So concretely, what type of
projects will we find in the
Square?
Lomig: Renault decided to begin
with the existing intern network
of the Creative Lab. We launched
a first call for innovative projects.
There were several number of
selection steps, pitches and POC
(Proof of Concept) in front of big
bosses. One of this project was
a kind of denuded Twizi one
which the soft and hard parts
have become pluggable. This is
typically the type of project we
want to host into the Square. We
would like to attract students
and companies, through play, to
conceive and build new things
above that. For instance, with the
skills of Visteon we could work
on a SDK. There are so much inte-
resting things we could do and
we haven’t done yet. The Square
opens the field of possibilities,
that’s why we want to invite this
kind of funny project.
Finally, what about open data?
Lomig: At Renault we are at the
zero level. Maybe with the oppor-
tunity to work with la Fabrique,
we will be able to connect with
various project which will
produce or are already using
open data. The idea could be to
invite those project and see how
to contribute. This is one of the
challenges of la Fabrique, we
now have to find resources to
start working on this subject.
Innovation Community will be
working. For instance, people
from Visteon, who have real
skills to tinker vehicles. One of
the challenges for Renault to
bring together people from inside
Renault with people from the
connected car world or students
or designers. Our goal is to set up
a “friction zone” between Renault
and the rest of the ecosystem. We
want to attract the skills that we
lack, like a huge pool of resources
gathering at the same place and
available for all the member of
the ecosystem.
Will the Digital Garage be the
name of the place?
Lomig: No, the name won’t be
the Digital Garage because we
didn’t want people to think it was
just a kind of hybrid area inside
Renault where you can play and
explore things in an agile way. At
first we wanted to keep the name
garage because the place was an
old car shop and we wanted to
highlight the fact that the project
won’t be only focus on digital
transition. Then, as we decided
to work with our partners we
looked for a name which could be
common for everyone and mean
something at the same time. Our
idea is to work on the smart city
issues, so we had to find a name
in relation to that. We proposed
the name “the Square” because
a square is a green space inside
a city. As everyone agreed we
called it like that.
When does it be officially
launched?
Lomig: Actually, it’s not really
official. Indeed, we decided to
work under radar to go faster. We
didn’t have so much time as we
only have the place for one year.
As a consequence, there won’t
be an official announcement.
However, the first event we will
have will be the workshop on
open hardware organized by la
Fabrique November 15th as part
of the Paris Open Source Summit.
That will be our crash test to see if
15
tious idea, a concept to imagine
a better mobility in a responsive
city with the help of big data,
software/algorithms, what we
use to call “soft power”, software
power. Responsive locomotion
is based on two big ideas. The
idea of a customised mobility,
more and more adapted to each
kind of traveller (tourist, worker,
disabled, etc.). It’s a question
of travelling profile taking into
account needs and vulnerabi-
lities faced by travelers at any
time of the day. Second big idea
is context awareness, how can
we take into account real time
informations like weather fore-
Hello Bertrand, I saw that the
motto of your company is “Data
in real-time algorithms and
interfaces treated: here is the
back office of the responsive
locomotion.” A good start might
be made by presenting what is
responsive locomotion and what
is the implication of Kisio Digital
in this field?
Bertrand: In 2014 we decided to
talk about “responsive locomo-
tion” using the responsive web
design analogy: your content
is automatically adapted to the
different screen sizes/devices.
We were searching for an ambi-
INTERVIEW
Bertrand Billoud
Y
ou may not have heard
of them before, yet their
technologies are behind
SNCF Direct, Vianavigo, Mappy
and maybe your local trans-
port network, la Fabrique des
Mobilités has interviewed
Bertrand Billoud head of marke-
ting and communication at Kisio
Digital, part of Keolis group.
16
nized a little seminar of two
days in Paris for the executive
committee. He pulled together
several persons involved into
open source and open data, such
as Gaël Musquet of Open Street
Map (see the interview of Gaël)
and other people who became
collaborators. They explained
to us the benefits possible from
open source. As a result of the
seminar, we started working on
a relevant practical case to figure
out what will happen if tomorrow
we decide to do open source.
We produced a SWOT analysis
to determine risks and opportu-
nities. After that, the executive
committee decided to switch to
open source. We decided to start
with Navitia which is the major
software of the company, like
the reactor core, everything we
produce is made on top of Navitia.
We opened our source code in
April 2014, that was easy. Indeed,
our software had been set up 10
years ago, since he needed a kind
of refreshment, 2 years agos we
had already decided to improve
and clean our code. As a matter
of fact, we just put our source
code on GitHub and pressed a
button to make it accessible to
all. Thas was a Friday. We were
so surprised when we realized
that some people has contri-
buted since the next Saturday, as
Dutch that we had never heard
about before. The world of open
transport route planner is such
a small world! After this small
success, we thought about a way
to meet all these people in Paris.
We wanted to see those Dutch,
Bliksem, which have their own
planner called RRRR based on
OpenTripPlanner. We were so
intrigued, we wanted to meet
them in the real life. We set up a
meeting with OpenTripPlanner,
Tisseo, Bliksem and some others.
This is how we set in motion a
dynamic with a small commu-
nity of people interested in what
we were doing. When you are
in a proprietary logic, nobody
cares about what you are doing,
with the exception of your team.
With the open source that’s the
contrary. As all the data in the
Netherlands are open, they just
needed one week-end to set up
Navitia in all the country. But
beware, our software is not as
easy to install as the Microsoft
Pack Office. It requires a good
overall technical level.
Honestly, did you know where
you were going by doing this?
Did you encounter strong reser-
vations inside your team or with
your clients? Or maybe it was
really simple and everybody
understood the philosophy of
open source and everything
worked as it was planned.
Bertrand: After the decision to
release code was made, we had
to explain at both employees and
shareholders what was about to
change or not. This step worked
out well because we had already
done a significant preparatory
work. During those months of
preparation, we prepared the
Navitia team to what was going
to change in their daily work:
How to work with people who
actually are not in the walls of
the company? How to deal with
cast, traffic jam, disruption on
the public transport network,
pollution peaks, big events with
a lot of people, congestion, etc.
So, responsive locomotion is like
a non ending quest. It’s more a
vision. We would like to reverse
the relationship between trave-
lers and transport networks.
Today you have to define your
travel according to all transpor-
tation modes constraints, and
sometimes it’s complicated. In
the future we should have deve-
loped more and more interactive
relationships between travelers
and all the vehicles they use,
with internet of things, smart
bot, data and software.
We saw that your code is open
source. What does that mean
exactly for the people who may
not understand?
Bertrand: In 2014, we decided
to open the source code of our
software Navitia under an AGPL
licence. This software is avai-
lable on Github plateform with
an interactive documentation to
understand how to reuse it. For
more transparency, it means you
can see how Navitia software is
made, like the secret of the algo-
rithms recipe. Indeed, sharing
source code is quite the same
thing as sharing a recipe.
When and why did you decide
to migrate towards the world of
open source? Did you release
your technologies step by step
or at one go?
Bertrand: The decision has been
made during 2013 summer. Our
DG, Guillaume Crouigneau, orga-
17
those persons who might ask
questions? How to work on the
documentation, to improve it
continually and make it easier
to use the software? We also
worked on overcoming stereo-
types about open source which
are actually wrong. We hired
in the company some persons
who know well the subject. They
came to explain to our employees
their vision. We set up break-
fasts to answer their questions
or fears. Because, yes of course,
some of them were worried. Just
imagine for a second that during
10 years you say “Navitia is a
jealously guarded software, our
gold nugget, nobody must know
what it is inside!” then you finally
changed your idea and open your
source code. It’s quite disruptive
and disturbing for some people.
With the good preparation
that was easy. Actually, we are
wondering why we didn’t do it
before.
You said your software work with
data. How do you collect data? Is
there a huge platform with all
the transport data cleaned and
then stored?
Bertrand: Before opening Navitia,
some of our employees were
already involved into open data
and hackathons. They were
getting tired of seeing people
trying to build their own trans-
port planner in only two days
during an hackathon and failed.
They built an API, Navitia.io with
Navitia which wasn’t open at
the time, and they had the open
data of three cities; NewYork,
Paris and San Francisco. That
was interesting to see that our
software could work with major
cities. We went to another
hackathon organised by the city
of Paris and said “this what we
have done, it’s free, we integrated
the data of RATP, Transilien and
Velib”. We noticed that 5 of the 10
winners used Navitia.io. So we
realised that adding open data to
Navitia had a real interest, to save
time searching for data, cleaning
them etc. We started working on
the data. This isn’t as simple as
find data on a server and copy-
paste on Navitia.io. Today, people
are coming to Navitia.io because
it’s a data hub with more thant
14 000 cities around the world
indexed, mainly in Europe, North
America, Australia, and South-
East Asia. We don’t have much
data in South America and conti-
nental Asia, and no data in Africa.
Even if GTFS (General Transit
Feed Specification) format is
used throughout the world, the
biggest problem is that data are
not structured in the same way
in all the country. We have to
face so technical issues to avoid
compromising data quality.
What is happening is that, each
week or month, new cities or
regions open their data. In this
case, we add it on Navitia.io,
provided that data have a share
alike licence which allows us to
do that. When you go to the API,
there is a google group, which
acts as a support where everyone
can ask questions or make
recommendation. For instance
you can find: “Some new data
are available in Sardinia, could
you add it on the API.”,”You have
something wrong on the UK
data.” etc. All of this help us to
improve our quality. This what
we call our feedbacks. They can
‘tmake these changes by them-
selves, because we own servers.
The API is three things. First
the fuel, it’s our open dataset.
Then the engine, it’s all the web
services of Navitia. Finally the
chassis, this is the cloud where
everything is installed. A simple
Navitia user don’t have to pay our
servers. As a result we provide
three solutions. Experts will use
the open source software Navitia,
lift the hood, play with the engine
and might help so change some
parts. Absolute beginners will
use the API Navitia.io. Finally
between these two categories,
people who just come to pick up
dataset.
Therefore, currently this is not
merely an easy process. Change
of topic, a lot of people think that
if your are a company with open
source philosophy you can’t earn
money at all. So, can you explain
us what is your business model?
Bertrand: We are a SAAS
(Software As A Service) company,
that means we don’t sell software
but services associated to our
software. It could be for instance,
cloud computing, implemen-
tation and configuration of a
software, or IT support. We know
the engine by heart, so we are
the only one able to adapt it to
the local context. The technology
isn’t the most important thing
in our business model, this is
really services that we sell. As a
result, our business model hasn’t
evolved so much in the recent
years. Regions or cities still pay
us to implement multimodal
information services. The only
thing that has changed is that our
softwares are open source and we
have open dataset. We use AGPL
licenses to explain what people
can or cannot do and to protect
us at the same time. However,
there is still a certain risk that
a talented company indicates
“We can do the same thing than
Kisio, with Navitia, but cheaper
and adding new services.”. The
digital removed the barriers for
innovation. Now, if you want to
quickly innovate you have to do
open innovation. In our case, we
saw the open source as a way to
do open innovation. There are
today plenty of business model
for open source (see article about
business model). We could adapt
our business model by adding a
contribution on some services.
For example, the google group
works currently without any
charge. But we want to give a
little to our community. For us,
this is important to train our
users and answer their ques-
tions. That’s the same thing with
our IRC Chat, we could have
made people pay to use it. We
could also have trained software
18
firm implementing Navitia and
make them install the software
in our place. But we didn’t.
In conclusion people are using
for free your technologies and
they made feedback to help you
improve this technologies while
some companies are paying for
using your high-quality services
with their own brand. It seems
a well-rounded affair, just as
a win-win policy. Do you have
any plans for the next few days,
months or years?
Bertrand: We have two important
subjects. The first one is the real-
time data. We started working
on it with the National Society
of French railways (SNCF). We
created an API SNCF based on
Navitia but with real-time data
instead of theoretical. Our aim is
to have more and more real-time
data on Navitia.io because basi-
cally this is what people want. We
have to do more than just theo-
retical data. Our business model
is likely to evolve because with
the API with theoretical data, we
have set the bar high. Currently,
you don’t have to pay until 90
000 requests in our database per
month and the price is really
competitive; 90€ per month. Our
goal is to foster the creation of
new uses. We want people to
innovate with our ressources. We
don’t want to chase after money
for amounts most often ranging
from a few cents to a few euros.
It’s better for us to have on the
one hand 4 or 5 major customers
paying and on the other hand an
active community. We care about
our freemium access. Without
that our customers can’t have
access to some specificities such
analytics. The other important
subject is citizen projects. If a
citizen has a project, he just has
to contact us. If the project bene-
fits the community or is in sync
with our values, our interest is
to not charge him. It could be a
simple citizen but it also could
be a researcher. A good example
of a citizen project is Transportr
by Torsten Grote. It’s an open
source mobile application based
on Navitia that works in several
cities even in Brazil. In conclu-
sion he made open source with
open source and that mobile
application respects user privacy.
This is exactly what makes us
vibrate. This is crazy because
now, people are requesting us to
add new dataset on Navitia.io to
make it available on Transportr.
Don’t you think that your tran-
sition toward open source has
been easier with your acquisi-
tion by SNCF group?
It has existed for several years,
we built our own business model
and we have local customers
such as the SNCF, Kéolis and
french regions. So of course,
it was easier for us to do open
source than for a startup which
doesn’t know what is going to
happen in 6 months. It’s also true
that being a part of a major group
probably helped us even though
we had to explain why we were
doing open source to a larger
group.
A few words to conclude?
Do you know that nowadays,
there are cities that are using
Navitia without knowing it? For
instance the transport operator
of Nantes, the TAN on a Transdev
grid, they are using Navitia
because the Pays de la Loire
region is one of our customer.
This is pretty clever, they mutua-
lized the different systems to
facilitate the interoperability. In
Thau and Sète (south of France)
they are using Navitia too and we
didn’t install them the software.
The important thing is that,
the more people use Navitia,
the faster we will increase our
quality and report bugs.
Thank you very much Bertrand
for having shown that even if
the world of open source could
seem scary for a company which
want to help the community and
be helped in return, she can do
it and have success if she finds
the right business model. Kisio
digital didn’t know exactly where
the company was going by relea-
sing their code, the story was
built a posteriori and it’s a good
story.
19
Innovation Summer Camp
Third edition in partnership with La Fabrique des Mobilités
When? 27 June - 1 July
Where? Estaca campus ( Paris Saclay)
—
nized for the third time by the
ESTACA, an Engineering School
specialized in automotive, aero-
nautical, railway and aerospace.
To assist the participants in their
mission, 10 coaches and experts
were provided with 2 FabLabs
and design centers.
5 days on the theme of
mobility
For 5 days, 50 students and
graduates from 16 schools and
universities, aficionados of
entrepreneurship, were accom-
modated on Paris Saclay Campus
with the sole objective of solving
one of 10 problems proposed.
This edition was about finding
solutions to the firm’s problems
in the field of mobility. The
issues expressed by companies
were broad enough to leave more
room for imagination, innova-
tion, creativity and,even, create a
real startup. The camp was orga-
WORKSHOP
20
Google sprint, a way
to accelerate design-
thinking approach
to innovation and
problem-solving.
In order to solve problems in
an innovative and more effec-
tive manner, the 2016 edition
of Innovation Summer Camp
was based on Google Design
Sprint. This methodology uses
a test-and-learn approach called
Design thinking . Design thinking
is goal oriented method rather
than problem-based approach.
The idea is to consider all the
conditions and parameters of
a problem and explore simul-
taneously alternative solutions.
Design sprints can be used for
almost any idea in any area. This
is a way to compress months of
time into a single week, like a
sprint. Each day is a new step
in the development process. No
waiting for weeks or months
before launching a minimal
product; the aim is to build a
prototype to collect data and
improve the solution right away.
The commons and
open platforms as a
support for innovation
In an Open Innovation approach,
la Fabrique des Mobilités deve-
loped a partnership with the
Innovation Summer Camp. The
aim of la Fabrique was to provide
methods to capitalize and
memorize all the productions, on
an open platform, from concep-
tion to validation. La Fabrique
also provides tools and existing
resources to do more with less :
don’t start from scratch and use
commons, resources not owned
privately, to accelerate the inno-
vation process.
All the productions and resources
collected can be found on the
Fabrique des Mobilités wiki.
5
seminar course
days
Innovation
Summer Camp
2016
50
participating
students
10
project team
16
schools and
universities 2
FabLabs and design
centers
10
coaches and
experts
Day 1
understand
Day 2
diverge
Ideation and develop-
ment of several
solutions.
Day 3
decide
Choosing of the best
solution amongst
others
Day 4
prototype
Realisation of a POC
(Proof of Concept), to
better understand
user reactions.
Day 5
validate
Submission of the project
to real users (colleagues
and companies) and
collections of data.
21
adapt to a changing environment.
Crowdsourcing means bringing
together ideas which come from
everywhere by removing fron-
tier between individuals. In this
way, we can attract talents on a
specific projects.
It all began with the Rally Fighter
a vehicle designed for Arizona
desert, a relevant solution for
Phoenix environment. From
the conception on the online
platform to the production and
the sale it took only 18 months.
In Berlin, we launched the
Urban Mobility Challenge which
called the community to resolve
Maud: The basic idea of Local
Motors is to produce vehicles
collaboratively on an online
platform, comprising 50 000
members whether they are
engineers, designers or idea
owner. The aim is to contribute
to innovative solutions to local
challenges of cities of the future
in terms of mobility by using a
global community. Actually, it’s
a global approach, combining
co-creation and micro factories,
designed to develop suitable
and relevant solutions in a given
environment. The interest of this
combination is to go faster to
the production and being able to
INTERVIEW
Maud Chidiac
A
ccording to them they
aren’t here to build
vehicles; they’re here to
reinvent them. La Fabrique des
Mobilités has interviewed Maud
Chidiac Project Manager at Local
Motors.
Hello Maud, 9 years ago Jay
Rogers wanted to do something
helpful for the society, so he
decided to develop an unusual
idea of crowd-sourced vehicles,
this is how started the story of
Local Motors. Explain us, what
does crowd-sourced vehicles
mean?
22
person who designed an entire
vehicle. This is proportional to
the implication on a project.
Without forget that, the work of
each member is protected under
Creative Common licences. To
find members, at first we went
to universities to show them our
projects. And now, we have a
lot of partnership with students
whether on our online plat-
form to contribute to projects or
directly in our lab where class
of students can use the various
machines and tools. We also
have freelancers and engineers
who feel ready to invest in tech-
nological innovations facing new
challenges.
You reward the member of your
community. This is pretty attrac-
tive. But, some might ask, who
owns all these ideas? I mean,
does someone can steal an idea,
commercialize it and earn money
with it? I heard you spoke about
Creative Common licences.
Maud: The protection of ideas
is based on Creative Common
licences. Co-creators accepte to
post their work online and, as
a result, they also accept itera-
tions on it. However, we can
easily track origins of each idea.
In other words, this means that
each member is playing the game
by proposing ideas knowing very
well that iterations are going to
be made on it. The most impor-
tant thing is that each idea is the
property of the owner.
We talked a lot about conception.
However we didn’t talk about
what is next. Maud, what are the
next step after conception? Do
you build vehicle by yourself?
Could you sell me one of your
vehicle?
Maud: For each challenge it’s the
same chronology. First we post
the challenge on the online plat-
form. Then we receive inputs. The
particularity of those inputs is
that they are just designed. So we
have to send the selected inputs
to our internal engineers so they
can draw more specific plans.
The next phase is the prototy-
ping in our labs. In Local Motors
all is made internally from the
conception to the production. It
permits to adapt our vehicles to
local needs. If the city of Oslo
needs an autonomous vehicle we
are capable to take into account
issues of low temperatures. The
final step is the sale. We have
already sold 5 vehicles in the
European pollution and conges-
tion issues. We gathered an
amazing number of ideas at the
end of the two months challenge.
The first prototype, called Olli,
was generated in only 6 months.
This project will be duplicate in
other cities than Berlin in Europe,
Middle East and east cost of the
United States. Another example;
the DARPA, the Defense Advanced
Research Projects Agency, asked
us to realize a functional proto-
type for the United States Army
in only 5 months. This may seem
incredible for institutions such
as the army. We now have a lot of
examples of this kind of answer
to specific challenge in record
time.
Anecdotally, Jay Rogers was a
member of the United States
Army and in Iraq he realized
that the conception and produc-
tion process of vehicles needed
to be accelerate. That’s why he
decided to develop an automo-
tive industry based on crowd-
sourcing.
The key of the Local Motor’s
success is this community. How
did you manage to build your
community? Above all, how
can you attract and motivate
someone to work on a project
and share idea?
Maud: Usually, in the commu-
nity the work is organized
in challenges. In this case,
winners receive a cash prize. For
example, for the Airbus cargo
drone challenge, a drone for
goods transportation, the total
amount of prizes reached 150k€
with others compensations such
as business trips to show their
prototype to senior executives.
Actually, we also have royalties to
the daily co-creation work on the
platform. The amount of royal-
ties is assessed on a case by case
basis in relation to an analysis of
every input of each co-creator.
In this way, if the co-creator
worked on a rear-view mirror or
on another vehicle component,
he isn’t going to be paid as a
23
Maud: We are not necessarily
removing jobs, because we still
need internal engineers. You
can simply no longer do without
them. The idea is to open up the
field of possibilities. The concep-
tion step is increased as ideas
are coming from everywhere.
However, we still need engineers
during all the steps. We are not
replacing the workers, it’s more
like a transfer of position, they
are evolving. We can’t automate
all the production. We are chan-
ging classical positions of the
assembly lines to new positions
whether they are on software or
hardware.
Local motors is working with
major companies such as Airbus,
Renault or Domino Pizza. How
does the collaboration work? It
might be complicated for a small
and disruptive company like
Local Motors to work with such
company.
Maud: A company such Airbus
will be interested in the dynamic
of co-creation. This is what
allows them to provide the
market with a new drone within
one year. The contract was: one
year to commercialize a new
drone based on the model of
an old one. That’s the process
flexibility which attracted major
companies instead of the scien-
tific expertise. Similarly IBM
with whom we are working to
implement Watson, their arti-
ficial intelligence, in an auto-
nomous car, is really interested
in by the process. After each
challenge, ideas are voted by the
community, internally improved
and we moved to the produc-
tion. This intrigues. Generally
whether it’s the process which
attracts companies or the desire
to implement an innovation,
sometimes both. This works even
for the major automotive compa-
nies. Usually they come to us to
propose challenges, but of course
sometimes we have to look into
new challenges. Domino Pizza
they contacted us to set up an
online challenge about an inno-
vative pizza delivery vehicle.
We have a variety of cases. Our
process allow us to open up the
field of possibilities.
Now, you are more than 100
employees, with 4 microfacto-
ries and an huge community
of transport lovers. Moreover,
you already have projects about
cars, drones, skateboards and
even planes. What are the future
projects for Local Motors in
Europe, or in the world?
Maud: First, we now are about
170 employees after a recruit-
ment campaign. The plan for the
future is to be well established in
Europe, especially with the auto-
nomous shuttle which attracts
airports and shopping centers,
before being able to implement
it into public transport system.
I would say that the priority
is the integration of mature
projects and to move towards
the commercialization. The
long-term strategic objective is
to be fully involved on this local
problem-solving approach, which
can, by the way, apply for any
country with necessarily having
state-of-the-art technologies.
Our global community is solving
local issues with a process that
can apply everywhere. However,
as we just settled in Europe one
year ago, we are now focusing on
Europe.
Do you have something to add?
Maud: Yes. The Lab with the
micro factory inside, will open
its doors early 2017 in Berlin.
For the moment, we have 4 labs;
one in Washington which just
opened in June, one in Vegas,
one in Phoenix and the final one
in Knoxville. The vehicle produc-
tion will now be done in Berlin.
And we respond to tenders for
the whole Europe.
Thank you Maud. Let me say a
few words for our readers, visit
cocreate.localmotors.com, who
knows, your ideas might revolu-
tionize the transport industry!
United States. In Europe, four
autonomous vehicles Olli has
been sold to Copenhagen, we
have a first prototype in Berlin
and another in Washington. We
are currently entering into the
prototyping phase for the Airbus
cargo drone. Indeed, the Berlin
Lab with the micro factory will
open very soon. The aim is to
prototype directly there, with the
community and organize new
challenges in the same format
as online challenges, but inside
the lab so that the community
can participate to the conception
process before the production
inside the micro factory.
Is that what is called Direct
Digital Manufacturing?
Maud: Direct Digital
Manufacturing, also called DDM,
is in the spirit of speed up the
process of produce vehicles. An
example is the 3D printed car we
made in the United States. We
used the DDM, this means we
used a design sketch, a CAD file
that we can modify to accommo-
date local needs. Then you just
have to click on the button and
it prints. The aim was to print
a one piece chassis editable to
desire to allow the customisa-
tion. We are using the DDM for
the autonomous shuttle which is
partly printed in 3D, such as the
floor, seats, the bumper and tires.
One more time, what matters
is to adapt the vehicle. We are
currently working on a prototype
for 8 or maybe 10 passengers,
but in the long-term we will be
able to produce shuttle for 2,4 or
20 passengers to vary the fleet.
So the idea of DDM is to change
a model and customize vehicles,
and it began easier with 3D prin-
ters.
To put it in simple terms, your
goal is to disrupt the transport
industry by suppressing workers
in the construction phase while
you are including more and more
players in the conception. Is that
right?
24
Quick start rules
Essential rules
Aim
Whether you are a local authority with more than 3 500 inhabitants and consequently with an obligation of
releasing your data or a data holder who don’t know how to open up your data, this game is for you.
How to open data?
FOCUS ON
1. Quality than quantity
It’s at the beginning that you
should learn good habits. The
first rule is to always start small,
simple and fast. Start with a
good dataset than a huge mess.
Remember that the advantage of
open innovation is that you will
learn from your experience.
2. Reassure
Let not the people who you work
for or with get confused. If these
people are not properly briefed,
you will have to deal with their
discontents. From the very start,
you have to respond their various
questions and their misunders-
tandings.
3. Sustainability
After having succeeded in all
the step, this is not the time to
abandon. The release of data is a
long-term process that requires
continuous update and feed-
backs. People have to rely on
your data, some make it sustai-
nable over time.
25
1 Choose dataset
Your first step is to choose a
theme and it may become a real
challenge for you. We advise you
to create a list of the datasets you
want to open and give priorities
to them. You can choose to focus
on car-pooling, parking spot or
maybe the use of public trans-
port, it’s totally up to you. The
key is to find a theme with data
easy to organize. Keep in mind
that you can always return to this
step later. Then choose your first
dataset; timetables, statistiques,
Point Of Interest, etc.
2 Clean the data
It’s important to ensure that
your data are clean before make
it open, otherwise data won’t
be usable. Cleaning consists of
avoiding shaping, suppress blank
cell, distribute tables on diffe-
rents tabs, entitle the top line of
each table etc. If you’re having
trouble cleaning your data, try
Open Refine an open source
software tool designed to deal
with messy data.
3 Document the data
Any further information, called
metadata, are worth conside-
ring: title, description, keywords,
license, date, localisation,
authors etc. You have to enhance
the data to give context. It will
increase your reliability.
4 Choose the right
format
If you want that your data can
be processed you have to make
them available in a standard
and structured format. Indeed,
Game progress
1
Choose
dataset
2
Clean the
data
7
Communicate
5
Apply an
open license
4
Choose the
right format
3
Document
the data
6
Put your
data online
Game board
26
you have to provide a machine
readable format allowing for
re-use. La Fabrique highly
recommends you, before starting
to open your data, to get at least
three stars, based on the 5-star
deployment scheme for open
data. Here are some recommen-
dations of format.
you a set of suitable licenses. All
you need to do now is to choose
which one you want to apply.
Etalab (French Open License)
- It allows all sorts of uses
provided that authorship is attri-
buted (by) and the last updated
date appears.
Public Domain Dedication
and License (PDDL) - This means
putting all your datasets in the
‘Public Domain’ and therefore
renouncing all rights.
Attribution License (ODC-
By) - It allows all sorts of uses
provided that authorship is attri-
buted (by).
Open Database License
(ODC-ODbL) - It allows all sorts of
uses as long as you attribute the
authorship, share-alike and keep
open the datasets.
6 Put your data online
It’s the more obvious step but
this doesn’t mean it’s the easiest.
There are several ways to put
your data online.
Via your existing website
The advantage of this method is
that it’s more familiar to you. You
just have to add a new section
on your website dedicated to the
release of your data. However, it
becomes harder to people to find
your data if they are not specifi-
cally looking for it.
Via a third party site
There are already sites specia-
lized in open data collection in
nearly all fields. You can use
those repositories of data which
provides all the documenta-
tion and information about the
processes of submitting and
using a database. We recom-
mend that because those site
have already pooled together a
community of interested people
and others sets of data. In other
words, it’s a virtuous circle; the
more there are quality datasets,
the more the community grows.
Via API
Another way to publish your
data, that we recommend, are
the Application Programming
Interfaces (API). The use of API
appears to have increased in
recent years. Its strength is that
it makes it easier for program-
mers to develop applications as
it provides all the building blocks
and documentation. Moreover, it
ensures programmers that your
data are updated in real time.
Other ways
Of course, there are other ways
to publish your data. For example
FTP servers, but we don’t recom-
mend it because it’s too compli-
cated for beginners and above all
out-of-date. Nonetheless, for a
large volume of data you can use
torrents, it’s very efficient but it
doesn’t permit the visualisation.
7 Communicate
Finally, you have to find users
to value your data, otherwise all
this work will have been done in
vain. So it’s time to communicate
a lot! Use social networks, talk
about your data around you or
during meetings and activities,
organise hackathons or suggest
your data to existing events. To
summarize, the easier it is to find
your data, the faster innovation
will come up with.
8 Start again
You thought it was finished? NO,
now it’s time to repeat it with
other datasets. Return to the first
step.
Tabular database
.CSV .ODS
Timetable
.GTFS
Text
.ODT
Picture
.PNG
Video
.OGG
Mapping
.GEOJSON .SHP .KML . KMZ
Audio
.WAV
Make it available as structured data (e.g.,
Excel instead of image scan of a table)
Make it available in a non-proprietary
open format (e.g., CSV as well as of Excel)
Link your data to other data to provide
context
5 Apply an Open
License
Find the most suitable license for
your data might be the hardest
step. However, it’s obligatory
and essential to provide clarity.
First, determine what are the
intellectual property rights in
connection with the data. Then,
choose a license that respects
these rights and the definition
of open data. Here, la Fabrique
des Mobilités recommends for
5-star deployment scheme for Open Data - Tim Berners-Lee.
27
But if we don’t connect the data
generated here with people,
what is it to collect them? The
claim we make at OpenDataSoft
is that our platform will process
the data coming in from sensors
in real time to turn them into
visualizations that anyone can
understand.
Our platform is THE platform for
the connected city because it is
the only platform that can keep
up with the dynamic pace of our
urban spaces, while still being
able to display data in a way that
people can easily understand
and connect with. This includes
Hello Jean-Marc. Firstly, thank
you for receiving us. Let me
start with my first question.
OpenDataSoft claims to be THE
platform for the connected cities,
what does that mean?
Jean-Marc: Thank you very much
for having me today! When we talk
about the connected city, we’re
talking about creating connec-
tions in every sense of the word.
In Smart Cities across the world,
we see sensors being installed to
measure urban phenomena such
as traffic circulation, air quality,
noise level, even the number of
pedestrians in given squares.
INTERVIEW
Jean-Marc Lazard
O
penDataSoft, new member
of FabMob, was elected
one of the most innovative
company in France. Their specia-
lity? Facilitate the preparation,
the reuse and the exploitation of
data by providing a turnkey plat-
form. More importantly, they say
they can foster innovation for the
mobility. Certainly, we are going
to check that out by interviewing
Jean-Marc Lazard the co-founder
and CEO of OpenDataSoft.
28
doesn’t stop here. STAR reports to
us that there is significant use of
the platform by the non-technical
community in Rennes, including
by researchers and academics.
This supports their own advo-
cacy work or research to help
to continue to build a better city
through combatting problems
like transportation access.
We see three major victories here
for STAR: increased ridership
from increased transit accessi-
bility, an improved image, and
greater transparency through
providing resources for non-de-
velopers working to improve
their community in other ways.
We saw that OpenDataSoft has
clients such as big operators and
local governments. Whom else
do you work with? And above all,
what is your business model?
Jean-Marc: OpenDataSoft is
really a platform for companies
or governments of any size.
Both private-sector companies
and governments need a way to
easily share and publish data. It
is true that we work with some
very large companies, such as
Endetec Véolia, Saint Gobain,
SNCF and cities as large as Paris,
but we do have startup customers
such as Citilog or M20City, and
cities as small as Agen, or Chapel
Hill, North Carolina in the United
States. We are proud of the wide
range of customers that have
identified our portal as the solu-
tion that meets their needs.
In terms of our business model,
we do provide a Software as a
Service. Our software is enti-
rely hosted in the cloud. Clients
purchase a license to the
software for a period of time, and
pay based on their volume of data
and use of the platform.
Could you explain to us, why
a freemium access is a kind of
open data? Isn’t it another way to
have new revenue? I mean, you
can have a free access to a small
selection of data and then realize
that you can’t do anything useful
without paying?
Jean-Marc: When we speak of
a freemium access to data, we
are speaking of ways for orga-
nizations with large volumes of
data to keep access to them free,
despite the costs associated with
the data upkeep, quality assu-
rance, and infrastructure costs.
For example, we have seen SNCF
put large datasets up online
for free with usage limits. This
ensures free access to the data
for startups and civic technolo-
gists. However, for heavy users
of the data who likely have the
resources to pay, the data can be
used for a fee. This helps share
costs and maintain high data
quality, while still ensuring the
data are available to all to bring
out their maximum value.
Data monetization models are
still quite young, however, and
this is just one type of example
that we have seen. It is quite
realistic to expect these models
to evolve and to see many diffe-
rent kinds in the future.
developers who can literally
connect applications to the data
as well to build more services
with Smart City data. This is
the role of a smart city hub such
as the OpenDataSoft platform:
connecting people with data.
We see in the city of Paris a pilot
project in the Place de la Nation
that perfectly illustrates this.
Sensors there are collecting data
on noise, traffic, and pedestrian
levels, and air quality. In real
time, these data are collected
on the city of Paris’ Open Data
portal, and are then displayed on
visualizations on screens within
the very square itself for people
to see their collective impact as
it happens.
Could you give us a concrete
example of what you have done
in the field of mobility? Maybe
something you are proud of.
Jean-Marc: One of our favo-
rite examples is the Open Data
project led by the STAR Network,
a subsidiary of the Keolis Group,
in Rennes. Here, we’ve watched
a collaborative ecosystem
evolve around the transporta-
tion Open Data. There are data-
sets on the real-time position
of buses, arrival and departures
of the metro, and even datasets
displaying the paths and cove-
rage of the bus network and
metro, and accessibility of the
network.
We have seen the developer
community truly take advan-
tage of these resources, creating
applications like “Where’s my
Bus” to show users in real-time
where their bus is, and when it
will arrive. Services like this can
help increase ridership. In addi-
tion, developers have created
route-planning applications for
people with reduced mobility to
design trips that fit their acces-
sibility needs. In all, 9 applica-
tions have been built within the
community, and have received
official approval by STAR.
But the use of the platform
29
wasted when searching for one,
and improves traffic circula-
tion. As this example shows, it’s
possible!
Let’s play a game. Imagine that
I am the biggest motorway
operator in France. You now
have 60 seconds to convince me
to open my data.
Jean-Marc: Okay, Ms. Motorway
Operator, so you’re clearly inte-
rested in keeping maintenance
costs down, ensuring safety on
your motorway, managing traffic,
and being able to anticipate
spending on roadway projects.
You likely have some systems to
already do this monitoring, but
how good are the visualizations
you’re able to get from them, and
are you able to share them with
your innovative community?
When you open up your data, you
open yourself up to the possibi-
lity of working collaboratively
on future highway projects.
Maybe your data will clearly
show you where traffic jams
most frequently occur. People
that use your highway every day
likely already are aware of it,
but can use the data to come up
with ideas to best redevelop the
road. You’re immediately saving
money on consulting costs,
keeping project costs lower, but
most importantly, you’re working
together with your users ensuring
a more successful project, while
creating a great brand image for
yourself. You can use this posi-
tive image in your favor to help
you win future contracts as well
to manage more highways and
thus help build your business
further. This is just one example
of how you can reuse your data.
Sold?
Ok, let’s say you convinced me.
I’m now ready to open my data.
But what happens after? Where
and how should I start? Some
tips?
Jean-Marc: Why yes of course I
have some tips! I’d tell you to start
off small with just a few data-
sets to learn best practices and
ensure high data quality. You’ll
be able to build up supporters for
your project this way. After that,
you’ll want to pick a topic that
you want to publish data about.
This makes it easier to get data
published at first that you can
then share with your collabora-
tors and ecosystem. After that, be
sure to give context to your data
to make it easy to find, and so
that your users will know what
is contained in the dataset. Give
your dataset structure, give it a
clear reuse license, put it online,
and share it with the world!
My data are now online and
available for all. That might be
pretty cool, but me, I need people
to play with it and foster the
development of innovative new
services. How to proceed?
Jean-Marc:The most important
step in making sure your data
are reused is to make sure that
people know they are there. Be
sure that you have filled out
the metadata to help them to
be found by search engines, for
example, and so that people
know what they are looking at.
You should also make some noise
in local media about the data
project! People need to know that
the data are there before they
can develop ways to reuse them.
Be sure that there’s an API that
can search within the dataset
to sort and filter the records to
build the best, most powerful and
useful applications. Again, it’s
also really important to provide
details about the license with the
data so that people know what
they can and can’t do with the
data.
Finally, my data are online and I
have a community to work on it.
We now have the two key ingre-
dients for successful smart city
innovations. Thank you Jean-
Marc for your time. That’s up to
you, people who are watching us,
to start making cities healthier
and more sustainable places to
live.
What about the storage of data?
For example, some services are
predicting things such as the
way people will move, park their
car or go to the city mall. To be
able to predict such things you
have to store a huge amount of
data and it consumes a lot of
power. How could it be integrated
in a smart city?
Jean-Marc: I want to start off by
saying that we are not primarily
a big data analytics platform,
but we make data available for
sharing, visualization, and reuse.
That being said, we do have some
big data capabilities.
Let me provide this example. In
Paris, there is a dataset contai-
ning data on the amount of cars
recorded by different traffic
sensors spread throughout the
city each hour. It is not updated
in real time, but every month
by the city of Paris. The dataset
contains over 27 million records,
so it is quite large. This dataset
is reused, however, in a parking
application that predicts the
availability of parking spaces
in a given area. It combines this
dataset with others available
on Paris’ Open Data portal and
uses a predictive algorithm inde-
pendent of the portal to predict
available spaces. This fits within
the framework of the Smart City
as it facilitates finding a parking
space, reducing fuel emissions
30
PARTNERSHIP
four key reasons why we need it.
•	 Transparency - By defini-
tion, open data are available
data which are free to access
and free to use: This means
that everyone can reuse
open data with complete
confidence.
•	 Cities of the future need
mobility data - The current
trend for cities is to produce
a huge amount of data.
However, they now require
platforms to collect and
distribute those data so we
can develop new services
and applications to improve
data. It is used to upload, analyse,
store and share open mobility
data while guaranteeing quality
and the maintenance.
“Catalogue is an openly-go-
verned community that relies
on the collaborative input of
its members, with the goal of
boosting innovation in mobi-
lity.“ Rahul Kumar- Senior Vice
President at Transdev
Why do we need it?
First question we could ask
ourselves is, why do you need
an open source platform that
provides open data ? Here are the
The project Catalogue
D
o you ever wonder why it
is so complicated to find
a way to reach a point B
when your point A is in another
city? Why is there no platform
that all the transport data? Why
don’t we have a mobile or web
application that collects all
passenger transport operators?
By the end of 2016, Transdev is
supposed to launch Catalogue,
a project in which la Fabrique
has been invested since the
beginning. Catalogue is there to
help you and tries to solve those
issues at the same time. This
should be the world’s first fully
open source platform for mobility
31
they are using.
A platform only a click
away
Producers are given a guarantee
that they can access to their
data at any time, still free of
charge. Data users can also
access Catalogue’s data without
worrying about out-of-pocket
costs. Catalogue assures you that
all the data are open source and
free to use. People who wish to
have a full access to Catalogue
and its tools, in exchange for a
small fee, can obtain and use an
API.
Real-time data trans-
port
Catalogue also provides real-time
mobility data through instant
sharing or data stream. Therefore,
users can easily create an inno-
vative way to plan a multimodal
trip. It must be emphasised that
the organization of data is driven
by the principle of continuous
improvement in a collaborative
approach.
La Fabrique is proud to take
part in Catalogue. By working
together collaboratively, we can
change the future of mobility.
We hope that Catalogue will lead
the creation of a great number of
innovative transport services for
everyone around the world.
If you want to play with data
and be part of the world’s most
comprehensive global transport
open source data pool, join the
Catalogue community!
lifestyles.
•	 Participation and commit-
ment - Catalogue is based on
collaborative process with
a community of data produ-
cers, data consumers and
developers. Each member of
the community must ensure
the accuracy and update of
data. In return, the commu-
nity can have faster and
easier access to any informa-
tion collected in Catalogue.
•	 Creation of economic and
social value - With open data,
each and every player - inclu-
ding developers, govern-
ments, and even corpora-
tions - has the ability to find
an innovative way to use
data and optimize the way
we move. The new applica-
tions and services will create
new markets, create a more
sustainable way to consume,
and finally improve our
living conditions.
An efficient organiza-
tion
First, producers freely store data
in Catalogue. Then data are iden-
tified and categorized by origin.
To retrieve data more efficiently
and smoothly, an easy-to-use
interface has been developed
and implemented. The users of
Catalogue can easily find what
they are looking for by using key
characteristics and filters, such
as location. Data management
is consistent with the open data
storage rules, as data are stored
in the universal GTFS format.
To ensure data quality
All the data are checked. In this
way, data producers can easily
and quickly correct them. This
is how the data consumers can
rest assured of the data quality.
Moreover, Catalogue is synchro-
nized with only reliable data
sources. Finally, an early warning
system has been set up to notify
both producers and consumers
when there is an update on data
Tools
Data
aggregator
Community
32
“Software, education, industrial design, data, sciences, art and culture,
open models are everywhere. The actors who make use of these open
approaches often question the positions defined by traditional actors.
Communities frequently organize themselves to collectively solve issues
that centralized organizations come up against. Tabby, the car avai-
lable as an open source kit, Protei, the marine open source drone and
OpenStreetMap are just a few examples.
What do these open models teach us? Under which conditions can they
develop their impact? What kind of dialogue and interactions are possible
with traditional actors? Researchers, entrepreneurs, managers in major
companies, designers, experts, writers and philosophers respond to these
questions in Open Models, business models of the open economy.”
Open Models, L.D.Benyayer
Business Models for Open Source
development
FOCUS ON
Louis-David Benyayer in Open
Models proposes 14 very relevant
measures to support open source.
FabMob is starting to produce
some answers in the field of
transportation. We will document
feedbacks from all stakeholders,
iterate to adjust and propose best
solutions to support open source
developments.
33
projects (as opposed to
indicators related to the
number of patents or
scientific papers publi-
shed).
Systematically match
all crowdfunding
campaigns meeting
certain criteria with
equal public funding.
FabMob could, with
the future association,
encourage its partners
to finance equally public
and private. ADEME is
starting by funding at
50% the first call for open
source projects.
Link all - or part - of public
university funding to the
number of open source
and open access projects
developed. ADEME is
starting by funding the
first call for open source
projects in the commu-
nity of ride sharing.
Create an IRC (Individual
Right to Contribution),
based on the model of
the IRT (Individual Right
to Training), to allow
employees to spend time
contributing to open
projects. FabMob is star-
ting to provide profes-
sional training and could
experiment IRC.
Create a fund enti-
rely dedicated to open
projects based on a
business contribution
(the “1% open” contribu-
tion) that could match
funding (on a oneto-one
basis) for open projects
demonstrating a true
benefit for the commu-
nity. Along these lines,
how about creating a
fund at the European
level? FabMob could,
with the future asso-
ciation, aggregate open
contribution coming
from volunteer partners.
Allow the valuation
of open resources in
company balance sheets
(in the same manner as
associations can include
the value of volun-
tary work in their own
balance sheets). Expose
the purpose and impact
of open models: The
benefits of open models
are sometimes unre-
cognized. Popularizing
them, demonstrating
their positive externa-
lities, and promoting
public knowledge about
open strategies can help
to close this gap.
Highlight the value of
contributions to open
approaches, based on the
same model as Corporate
Social Responsibility
(CSR). Create a company
ranking promoting
involvement in open
approaches. FabMob
will promote open
approaches and evaluate
projects. A first ranking
system can be deve-
loped.
Inform companies and
large funding bodies
about the economic
efficiency of open
approaches and prac-
tices, and share advice
on methods to imple-
ment them. FabMob
evangelise major indus-
trial stakeholders in the
ecosystem of transpor-
tation.
Demonstrate the positive
externalities generated
by open approaches by
means of a research
study. FabMob will
evaluate benefits of open
approaches with Nice
University.
Develop new licenses in
line with peer production
& reciprocity licences.
Develop a tool/platform
offering an overview
of all existing licences
and patents. FabMob
supports existing
licences and advices
projects. If needed,
FabMob will study a new
licence.
Not adapted
Organize public tenders
in such a way as to
promote open source
licenses (code, design,
content) and not only
digital aspects. More
drastically, make open
source a mandatory
criteria; or, in a less
radical way, raise the
open share to at least
30% of the project valua-
tion. Similarly, include
an open data section in
each public tender, to at
least allow project mana-
gement transparency
(open data ensures fair
access to public markets
and fosters innovation).
FabMob evangelise and
support open source in
all projects. A specific
action could be deve-
lopped for public tenders
in public transporta-
tion with several cities
partners.
Identify stakeholders
in administrations and
communities willing to
welcome open initia-
tives. FabMob works
with a large networks
of stakeholders and
partners, and identifies
which ones are willing to
contribute.
Develop key indicators
that place value on
contributions to “open”
1
2
4
5
10
11
7
8
13
14
34
INTERVIEW
Tin Hang Liu
&
Yuki Liu
35
When a member of our commu-
nity needs a physical platform
we can provide it at a fraction of
the cost.
Forces and weakness about open
source?
Forces: companies in this closed
and old industry (automotive)
are starting to understand that
sharing and collaboration can
improve products and services,
faster.
Weakness: companies are still
scared since it’s something
totally new for them, so for us it’s
a very big effort to educate them
How did you manage your large
community? How FabMob can
help?
I think every project needs a very
strong marketing and communi-
cation strategy. We worked very
carefully involving influencers
and giving exclusivity to media
and events to showcase our
launch, we also put a lot of effort
on videos to showcase our poten-
tial.
FabMob is acting in a compe-
titive sector with stakeholders
which have few experience on
open source but more on patents.
Your actions of evangelisation
and promotion of open source are
really important. FabMob could
also work on license strategy
to empower open source in new
mobility.
Open Source Vehicle is the
emblematic project for Open
Hardware in the field of transpor-
tation. OSV start few years ago
with a radical approach: develop
a first platform with a modular
technology in order to bootstrap
the 2.0 automotive production.
Small companies, final clients
will be able to participate in the
design and also the production,
to co-create, adapt and up-grade
components or the complete
vehicle to their needs.
By reducing barriers and finan-
cial capacity requested, OSV
create not only a technology
platform but a new pathway to
produce mobility services. The
two co-founders are Italian-born:
Tin Hang Liu and Yuki Liu. Today
OSV project is accelerate at Y
combinator.
You have a great experience both
on open source hardware and
international communities. This
is very interesting for us.
Why did you choose open source
option to build your car?
Because working several years
in the automotive industry
(personally, more than 10 years
now) me and my team saw that
many new vehicles projects have
to start from scratch, so new
entrepreneurs have to invest
a big amount of money (some
million euro) and time (some
years) to have a stable platform
technology. Most of the times
they fail because they don’t have
much expertise or they run out of
budget. It is like asking someone
to develop an operating system
from scratch and then the app,
crazy ! And the big auto OEMs are
not willing to provide them plat-
form technologies because they
don’t want competitors.
So we decided to develop TABBY
EVO, making it available in
open source, so you can down-
load it, hack it, improve it and
start working on it using a CAD
software.
36
COMMUNITY
Schools & Students
S
chools specialized in the
fields of digital, transporta-
tion systems, energy, urban
planning and design may turn
out to be key places to gene-
rate innovation for the mobility
sector. Learning environments
and collaborative approaches are
now core supports for open inno-
vation. “Behind every innovation
attempt, are hidden learning
expectations”.
Why a community of
schools?
Many of the last disruptive breaks
(especially concerning social
innovation) came from students
environments. Schools bring
appropriate environments for
innovation thanks to students’
mindsets: creativity, self appro-
priation needs, openness to fail,
and viral dissemination.
37
private stakeholders, companies,
associations, regional authori-
ties and academics and aims
to create, develop and test new
spaces, services and products
combining user needs and envi-
ronmental and economic requi-
rements. This lab works along-
side the READi Design Lab as
part of a research programme on
Connected environments.
Ecole des Ponts
École des Ponts ParisTech is a
university-level institution of
higher education and research in
the field of science, engineering
and technology located in Marne-
la-Vallée. Historically, its primary
mission was to train engineering
officials and civil engineers but
the school now offers a wide-ran-
ging education including urban
studies, environment and trans-
port engineering. The school is
also part of the Laboratory “Ville,
Mobilité, Transport » (LVMT,
or “City, Mobility, Transport”)
created in 2003 with the Institute
on Technology, Transport and
development (IFSTTAR) and the
Université Paris-Est Marne-la-
Vallée.
UTC
The University of Technology
of Compiègne is both a French
national university and an
engineering school. The depart-
ment of Urban Systems (GSU)
proposes the first generalist trai-
ning combining theory and prac-
tice to gain insights and better
understanding of sustainable
urbanism, mobility, energy and
housing. The GSU students inte-
grate their visions using modern
computer design and analysis
packages, for urban areas, cities
and conurbations. This requires
data base skills, geographic data
collection, modelling techniques,
etc.
IFP School
The IFP School is a graduate
engineering school located in
Rueil-Malmaison, providing
students and young professio-
nals from all over the world
with education in the fields of
energy which meets the needs
of industry and the demands of
society with particular emphasis
on sustainable development
and innovation. Moving towards
a sustainable mobility is a
technical and environmental
challenge for the automotive
sector that the school is trying to
undertake.
Mines Telecom ParisTech
Télécom ParisTech is a French
public institutions of higher
education and research of
engineering in France both
located in Paris-Saclay and
Sophia Antipolis. The school
in association with the Ecole
des Ponts ParisTech, are
teaming their know-how on a
general theme called “Digital &
Transport”.
3 goals: acculturation, expe-
rimentation and knowledge
sharing
How la Fabrique can speed up
and encourage research and
innovation in the field of mobility
based on students, teaching staff
and researchers? This is exactly
the problematic the community
of schools is working on.
During last year, la Fabrique
worked to initiate a collaborative
framework in order to promote
mobility stakes acculturation
and support experimentations.
The main objective is to generate
and disseminate commons (open
asset : data, software, hardware
or knowledge ) to fuel mobility
innovation.
Involvement of both teaching and
students bodies into la Fabrique’s
ecosystem is essential.
Schools already
members
La Fabrique is developing
partnership with schools trai-
ning and working on mobility as
a system. Six schools are already
partners.
ESTACA
The ESTACA school is specia-
lized in the fields of aeronautics,
automotive, space and guided
transport industries based in
Paris area. By the end of the year,
will open a FabMobility, a new
place to invent the mobility of
tomorrow. The aim is to use the
Campus of Paris Saclay as a real
playground to experiment with
the ecosystem in place.
L’Ecole de Design
L’Ecole de design is dedicated
to train students to design as
a trigger for innovation while
considering social, economic
and environmental issues in a
responsible way. It was with this
in mind that was created the
Sustainable City Design research
lab dedicated to urban and
territorial change. The Design
Lab brings together public and
Innovation
communities
Entrepreneurship
support
Syllabus
My ecosystem
My partnership initiatives
Culture
Support in place
Thematic priorities
Teaching tools and
instruments
Join or create new communities?
Student projects with startups
and industry sector?
Initiate?
Strengthen the support?
New scopes?
Workshops? Challenges?
Commons?
TODAY AND TOMORROW?
By 2017, what kind of mobility innovators do you want to be?
38
to incite schools partners to
define their own roadmap for the
year.
For 5 days, 50 students and
graduates from 16 schools and
universities, aficionados of
entrepreneurship, were accom-
modated on Paris Saclay Campus
with the sole objective of solving
one of 10 problems proposed.
This edition was about finding
solutions to the firm’s problems
in the field of mobility (See the
article dedicated on the subject).
Student Demo Cup is a students’
challenge organised every year
during the Paris Open Source
Summit. This challenge intends
to promote and reward inno-
vative open source students’
projects. This year, La Fabrique
is a partner to the event and
directly involved in the steering
committee. We have brought a
partner of La Fabrique as a jury
member, and we offer commu-
nication support, through our
media.
La Fabrique has been provi-
ding support to a student from
the school Ecole de Design de
Nantes, on his last year project.
The project consists in designing
a sustainable vehicle mixing
mobility performance and hand-
made production processes. He
has been advised on the defini-
tion of its topic, and connected
to CODATU to get feedbacks on
concrete needs in emerging
countries.
La Fabrique is also involved into
the establishment of teaching
materials by supporting the
creation of Massive Open Online
Course about mobility : MOOC
IFP school : sustainable Mobility
& MOOC Mines Telecom : Mobilité
2.0
The community of Schools is part
of La Fabrique’s ecosystem, which
gathers industrial partners, cities
and other stakeholders involved
in the field of mobility innova-
tion. We aim to foster cooperation
between Schools and the other
partners, and we are convinced
La Fabrique should ultimately
become a reference platform to
connect partners with students’
environment resources, to boost
What is happening
there?
The approach
The objective is to gather schools
around shared ambition in the
framework of mobility open
innovation.
By sharing knowledge, the inten-
tion is to boost initiatives.
•	 Dedicated workshops
Schools’ partners workshop:
to gather the community and
enable best practice sharing.
Thematic workshop: to deal a
specific topic of common inte-
rest, such as transport taxation,
the need of multidisciplinary etc.
•	 Resources marketplace
•	 Connecting La
Fabrique’stakeholders
Every school of the community
involved in the organisation
of events such as hackathons,
startup weekends, projects,
conferences can rely on the
support of La Fabrique, by:
•	 Giving access to La Fabrique’s
network
•	 Bringing visibility
•	 Offering individual coaching
•	 La Fabrique’ wiki
What has already happened?
At the beginning of the year,
a kick off workshop has been
organised with the schools of the
community in Transdev’offices
in Issy-les-moulineaux. Each
school has been asked to formu-
late a self challenge to address
during the year, with the objec-
tive to cope with the following
question: “By 2017, what kind of
mobility innovators do you want
to be?” This first meeting aimed
Fabrique’s
members
Community
of schools
Ideas
factory
needs
expressed
needs
expressed
data
intern-
-ship
formation
beta
users
...
hard-
-ware
Resources
39
Estaca, according to him “ It’s the
network of La Fabrique which
attracted me. Here at the Estaca,
we usually work a lot with big
stakeholders such as Renault
or PSA. Within la Fabrique, we
see various organizations and
players, whether there are big or
small”. The Estaca was one of the
first schools to join the commu-
nity. Thus, they are moving faster
with the FabMob than some of
the others members by organi-
zing events as the innovation
summer camp. Furthermore, la
Fabrique will be able to propose
new project in the FabMobility,
the new place to invent the mobi-
lity of the future which is going
to open soon on the Paris Saclay
Campus.
The Estaca is paving the ways
for others Schools to be more
involved into the community.
However, as we said earlier, there
are no good or bad ways to get
involved and each member can
participate in his own distinc-
tive way. “What is innovative
at la Fabrique is that we can
easily meet various partners
of the transportation world. Of
course, sometimes you need
a financial support to start a
project, especially in the field of
mobility where it’s harder to get
support. However, if we want
to move towards more rational
mobility, we need organization
such as la Fabrique” says Hipolito
Martell Flores, an academic
teacher-researcher in transports
at the University of Technology
of Compiègne (UTC). The UTC is
now considering the feasibility
to create new projects with the
students and in cooperation with
la Fabrique’s members.
innovation. This platform would
pass on internships opportuni-
ties, teaching specific needs, beta
user experimentation opportuni-
ties, etc.
The first step to go through is
to facilitate needs / resources
matching. That’s why we have
initiated the approach of “Idea
Factory”: a database which
compiles students’ competen-
cies needs, students’ projects
opportunities and every other
students’ environment resources
needed (raw material, equip-
ments or tools, information, trai-
ning) from interested partners.
This has been tested first with
Kisio, which lead to an upcoming
first collaboration with the labo-
ratory READi of Ecole de Design
de Nantes.
At la Fabrique and especially
in the community of schools,
we know how important is the
capitalization of knowledge. This
is why, all of our resources are
available on a dedicated page on
la Fabrique’s wiki. You can find
there all the informations to join
us and be part of this community.
Why to get involved?
There are no official ways to get
involved into the community.
As a matter of fact, “Projects
within the community are set
up when there is a match of
opportunities between partners”
explains Cedric Belardi a FabMob
supporter. That’s why we func-
tion on a case by case following
the different opportunities. “We
aim to invite any organizations,
provided they have student
supervision capacity, to share
their issues in the field of mobi-
lity, in a collaborative approach.”
adds Cédric Belardi.
In the community everyone
has his own reasons for embar-
king on the FabMob adventure.
Stéphane Masson, is in charge
of business development and
delegate-general of the new
mobility endowment funds at the
40
are in CC Non commercial, but it
will be changed in the near future
to full open source. Together with
the open source community a
big and accelerated change can
be achieved within the mobility
industry. Besides that, by opening
up our technology we want to
encourage others to build even
more things that the world has
not yet seen. We believe collabo-
ration and open source is the key
to global tech advancement.
Dear Sune, you have launch an
open hardware project for a new
mobility system. Can you tell us
why you have chosen to make it
« open source » ?
Sune: Our belief at Faraday
Motion is that technology should
be available to everyone in
order to maintain its rapid and
continuous development. As
we also ourselves rely on open
source technologies to create our
products it was perfectly clear
that we also will be open sour-
cing our own code and designs.
For now the electronics designs
INTERVIEW
Sune Pedersen
Open Hardware in the sector of
transportation is starting. Many
projects aim to develop next
generation components of our
ecosystem. Open, connected,
electric, distributed, like Local
Motors and Mobotiq. Faraday
Motion is also working on open
source skateboard, and it’s just
the beginning. La Fabrique des
Mobilités organize a dedicated
workshop on OpenHardware
November 15th with Paris Open
Source Summit. We have inter-
viewed Sune Pedersen, founder
of Faraday Motion.
41
communication enabling
communication and control from
a web browser and complete
custom hand controller are just a
few updates that are co ming up,
some of them can be seen on our
new Makerspace.
So you just launch your
MakerSpace. How is it working?
Sune: The online Faraday Motion
Makerspace was prototyped
with the objective to stimulate
collaboration around lightweight
electric vehicles, particularly for
the Spine to begin with. Everyone
is invited to publish ideas for
projects, team up and accomplish
them. Users can contribute their
knowledge and skills to other
projects. For example a developer
can team up with an industrial
designer to create LED lighting
modules for the Spine. Then
others can 3D print the parts
and implement the software to
upgrade their own Spines. We
have seen customers contribute
with brilliant good ideas and
designs already. I.e. One of our
customers, Roman, has publi-
shed his first ever 3d design – a
fender protecting him from rain
when driving. Internally we use
the Makerspace to share projects
that we are working on with the
community. One example is the
Spine’s swappable batteries that
we showcased recently but did
not release yet. We are actively
engaging with all the makers-
pace members and try support
them.
Thank you Sune !
What are the objective of Faraday
Motion? What are your dreams?
Sune: At Faraday Motion we
envision a world of increased
mobility efficiency. A world in
which it’s easy to combine public
city transportation with efficient
last mile vehicles in the city. Our
objective is to create the techno-
logy foundation that will enable
people to exploit modularity and
find solutions to the current and
future mobility challenges.
Can you describe your Spine
project? How long does it take?
how did you work and what are
the news?
Sune: The Spine has a very
interesting story. I will start by
saying that the first prototype
was built in Sweden during an
internal hackathon weekend.
By then we had the Hyperboard
R2, the most advanced electric
skateboard in the world, but it’s
technology complexity felt to
be too challenging for starting
maker enthusiasts. That is how
the decision was made to have a
starter version, hence it’s name.
The first iteration was very basic:
the deck, 3D printed brackets to
hold the motor and the electrics
and surely enough a battery that
was taped to the construction.
Today the Spine is more mature
in it’s design and reliability and
its design. The intense testing we
have been putting it through has
taken it to a whole new level. It
takes around 2 hours to assemble
a Spine, we made it so that you
only need simple tools to do it
and published the manual online
for everyone to contribute to the
documentation. Many customers
print most of the plastic parts
themselves, it will take from
25-100 hours, depending of the
type of 3D printer that is used.
We have many more updates
and upgrades coming to the
Spine. Besides the features of our
Hyperboard R2, we are working
on a belt tightening system,
swappable batteries, websocket
42
Open Software
First workshop of the community
When? 27 September
Where? La Fonderie (Paris)
—
The day was divided into three
major parts.
1. Why is it important
and useful?
The first part of the day was
dedicated to the presentation of
the importance of having open
source software in the field of
mobility. As the workshop was
a preparation for the Paris Open
Source Summit (POSS), the
workshop began with an intro-
duction of POSS which brings
together european Free and Open
Source Software communities
for quality conferences and
business meetings. After a brief
presentation of La Fabrique was
to make open softwares players
work together, because even if
people are in competition they
can have an space to the coope-
ration and share something.
In this way, la Fabrique and
some partners such as KISIO (see
article about KISIO), CEREMA
(Centre for Studies and Expertise
on Risks, Environment, Mobility,
and Urban and Country planning)
and the AFIMB (French agency
for multimodal information and
smart-ticketing) decided to set
up a workshop to gather various
stakeholders directly concerned
by the subject (transport opera-
tors, digital companies, local
governments etc.)
WORKSHOP
Making open softwares
players work together.
Tuesday, 27 September the
community of open software was
reunited for its first workshop.
The fact is that, nowadays, open
software are increasingly being
developed in the area of mobility.
Indeed, la Fabrique has already
listed more than forty examples
on its website dedicated to the
listing of commons. By software
about mobility we mean software
that are focus on mobility offer
description, public transport,
mobility services, traffic infor-
mations or parking spot. The aim
of the community is to manage
43
for mobility data.
•	 Travel Spirit : It’s the world’s
first open source platform for
‘Mobility as a Service’(MaaS)
•	 Ride Connection : RidePilot
is a paratransit trip sche-
duling application of a
Portland-area community
transportation provider. It is
primarily written by hackers
at OpenPlans.
•	 Oslandia : «Tempus», a
framework for multimodal
route planning co-developed
with IFSTTAR (French insti-
tute of science and techno-
logy for transport, spatial
planning, development and
networks).
•	 Transport for Cairo (TfC):
Mapping Cairo opportunities
and issues.
3. Works in group
The final part of the workshop
was devoted to works in group.
The previous presentations have
identified six topics to work
items.
1.	 Governance, confidence,
trust.
2.	 Technical connexion
between software data, inte-
roperability.
3.	 How to convince boss and
clients?
4.	 Open source for all.
5.	 How to encourage organi-
sation to create common?
to contribute? What are the
solutions for funding?
6.	 What are the networks to
improve and reinforce open
source community?
Unfortunately, for lack of time,
only the last four topics were
discussed. You can find all
informations and results of the
workshop on the wiki and the
page dedicated to the commu-
nity.
presented the results of a survey
we launched with our partners
about open source software. For
instance, 100% of those polled
answered that an open software
is important for a community
of contributor. The results also
showed different types of mana-
ging a community such as set
up a committee or just manage
communication tools. The survey
also highlighted that most of
those polled think that open
softwares have a key role for
projects managed by the public
sector and local governments.
2. Overview of open
softwares
The workshop continued with
presentations of existing open
source softwares. Each attendee
made a presentation of his
projects and why he is suppor-
ting Open Source and what are
his project in the next 6 months.
The aim was to identify common
needs.
•	 KISIO : Navitia is an open
source software for building
cool stuff with transport
data.
•	 AFIMB : CHOUETTE is
focused on scheduled data
manipulation and manage-
ment (NEptune and NETEX,
GTFS). You can control your
dataset, visualize, find and
create new data. IRYS it’s for
real time and based on SIRI
(standard european).
•	 Ruter Labs : It’s the public
transport operator in Oslo
and Akershus and they built
a beta journey planner using
open source softwares.
•	 Transfermuga, mobility
assistance across borders,
using open street map, uMap,
Wordpress, Navitia.io
•	 Open Trip Planner : It’s an
open source multi-modal trip
planner
•	 Transdev : Catalogue is an
international open platform
44
A dream to create open
standards for IVI
The automotive industry used
to be: on one side manufactures
giving specifications and on
the other side tier-1 suppliers
working to integrate equipment
such as car radio, a dashboard,
or a communication devices.
“Manufacturers were buying
black-boxes” according to Pierre
Sigrist - Director Research and
Development of Visteon Sophia
Antipolis (06 - France) and
adopted, enhanced, tested and
maintained. In short, GENIVI
is a non-profit automotive
industry alliance committed to
define a standardized common
software platform for developing
In-Vehicle Infotainment.
The alliance was founded in 2009
by eight of the major players
of automotive industry: BMW
Group, Delphi, GM, Intel, Magneti-
Marelli, PSA Peugeot Citroen,
Visteon and Wind River Systems.
They now are more than 166
members.
I
f you are interested in open
standards in the area of
transportation you can’t miss
out on GENIVI Alliance. The
first question might be, what
is exactly GENIVI? If you look
closer to the name you can find
a first hint: Geneva + IVI. Geneva
is the city where the adventure
began and IVI means In-Vehicle
Infotainment. It’s supposed to be
a solution to manage the rapidly
growing amount of software in
a car by setting up a commu-
nity where software could be
GENIVI
FOCUS ON
45
decides whether or not they want
to develop a new application.
With that model you can adopt
and/or adapt an existing open
source software to meet the
defined IVI requirements. Even
more interesting, when there
is no code available, GENIVI is
able to sponsor and launch new
projects to create with the best
practices what it is needed.
Upon the standardized software
platform anyone can build new
solution or have a new innova-
tive approach . The major inte-
rest of the platform is that it’s
fully scalable from the smallest
display in a low-cost car to the
multiple display systems in an
upmarket car model.
In conclusion, GENIVI is a free
and open source IVI platform
that could work with any kind of
interfaces. So, one would think
that the platform would work
with interfaces such as Android
Auto and Car Play. Actually, those
interfaces can work with GENIVI,
provided that you have the
agreement from Google or Apple
to download the fully working
system.
A transition toward the
open source
If you thought the GENIVI wasn’t
an open source project you
weren’t entirely wrong. Indeed,
what was before a closed commu-
nity has evolved over the years to
become an open community. Let
us go back in time. In 2009, the
alliance was made as a consor-
tium with membership fees.
Consequently, that seemed to be
fair to allow the access to internal
resources only to members. The
years passed and GENIVI consor-
tium grew, reaching out new
members around the world. The
consortium was doing well, but
something was missing. They
needed to find a way to bring new
perspective in order to speed up
the time-to-market. That’s why
3 or 4 years ago they decided
to toggle into open community
mode. There still is a consortium
with membership but now both
members and non-members are
invited to host and to develop
automotive software. GENIVI
hosts a suite of Open Source
projects and the major part of
the source code is open. It is
important to note that the entire
member of the alliance.
As a result, automobile manufac-
turers decided to create GENIVI
to attempt to create or harmonise
a unique standard for infotain-
ment platform. By infotainment,
we mean extraneous things rele-
vant to multimedia entertain-
ment such as GPS navigation,
radio, phone communication,
tactile and graphical interfaces
or voice recognition. “Our goal
behind all that, was to define an
architecture as straightforward
as possible with a standardised
interface between the compo-
nents, so that at the end, each
manufacturer can choose a
component from the supplier X
or Y on a transparent manner.”
points out Pierre Sigrist.
From the moment when a
component respects the GENIVI
architecture, it ceases to be a
black-box and becomes a shop
window where a manufacturer
can choose to integrate it with
full knowledge. And even better,
he can choose to go back and
integrate another component as
it is fully interchangeable.
An adopt, adapt and
create model
The GENIVI IVI software platform
is based on a Linux kernel and all
the software components defined
by GENIVI are hosted through
the Linux Foundation in GENIVI
repositories or already in place in
other open source projects of the
community. There are more than
140 components in the GENIVI
baseline. The major deliverable
of the alliance is called the
compliance specification of the
open source IVI middleware and
is updated twice per year.
As a matter of fact, the open
source code is already available
and permits the access to each
piece of the software platform.
Then the community can develop
wide-ranging applications. It’s
important to note that the GENIVI
Alliance doesn’t develop apps,
it’s just the community which
Application & Human Machine Interface
Framework
Multimedia Audio &
Graphics
Navigation &
Location Based
Services
CE Device Connectivity
& Personal Info
Management
Networking &
Internet
System Infrastructure
Linux Kernel
Security
Tools
Utilities
Automotive
GENIVI IVI Software Platform
46
GENIVI Board of Directors
SI
Group
Auto
Group
LBS
Group
Media/Graphics
Group
CE Connectivity
Group
Networking
Group
HMI Framework
Group
Baseline Integration Team
System
Architecture
Team
&Compliance
Team
Marketing
Licence Review Team
IT Infrastructure
projects are freely available and
at no cost. However, as stated by
Pierre Sigrist “Today the access to
a part of the work is still limited
to intern member”. That’s why, to
participate in requirement align-
ment or in the compliance speci-
fication then you have to pay a
fee to become an associate of the
alliance, an intern member. This
fee also includes the access to
benefits of the membership such
as be part of the governance,
propose new projects, contribute,
be categorized as a member, and
participate to events.
The importance of the
cooperation
A good community knows no
borders. People from everywhere
can contribute and accelerate
the process of innovation and
the IVI software production. It’s
in this way that GENIVI is also
working in collaboration with
various other alliances or asso-
ciations. For instance, they are
working with the World Wide
Web Consortium (W3C) which
is oriented on the definition of
the HTML5. According to Pierre
Sigrist “We can see that the car
of tomorrow needs to integrate
more fluid development oppor-
tunities by providing interfaces
usable by web designers. Why not
allow web developers to develop
applications directly downloa-
dable from your car screen? “.
As a consequence, GENIVI works
with the W3C on Web API Vehicle
to access vehicle data from
HTML5. The aim of the coopera-
tion is to simplify the transition
from the web world to the auto-
motive world.
Moreover this kind of cooperation
functions well, that’s why they
repeated it with other alliances
such as Avnu on Ethernet
Audio/Video streaming, the
Traveller Information Services
Association (TISA) on traffic
information (TPEG format) and
the Car Connectivity Consortium
(CCC) on smartphone in-car
connectivity.
An highlighted project
-RVI
To help you understand what
in practice can do the GENIVI
community here an example. The
RVI (Remote Vehicle Interaction)
project is one of the most
important current initiatives.
Jaguar Land Rover put in place
the necessary means to make
progress on this project. The
aim is to provide a free and open
source solution that permits
three important things : securely
remotely control your car, secu-
rely enable a software over the
air (SOTA) updating and finally
remote data logging and moni-
toring. You have always wanted
to send instructions to your
vehicle such as pre-warming
before your arrival? This is now
possible. The RVI project is one
of the first software platform for
connected cars freely downloa-
“GENIVI compliance specifica-
tion” remains only accessible for
members.
GENIVI is changing its
image
“For the moment, the invol-
vement of the members from
outside of the alliance is still low
because of the image conveyed
by GENIVI of a closed commu-
nity. The image is changing
and the community is opening
gradually.” explains Philippe
Gicquel president of GENIVI
from April 2013 to April 2015. The
result is that the major part of
the source code of GENIVI is from
inside members of the alliance.
The constituent members are
actually paying their employees
to work on the standardized plat-
form. GENIVI has increased its
efforts to seduce new members
with a new communications
strategy and the participation in
several events such as conven-
tions and conferences .
“Some individuals who are not
employees of member compa-
nies are now beginning to be
unbelievably invested on the
GENIVI Development Platform
(GDP) “ says Philippe Gicquel.
Unlike other communities where
people are attracted by rewards,
GENIVI relies on actions driven
by self passion.
On the platfom projects.genivi.
org are listed all the key compo-
nents and projects. Those
47
number of informations facilita-
ting hacking.” Philippe Gicquel
Even though the balance between
those two aspects might be
difficult to find, it should not be
forgotten that it becomes harder
to hack something built by a
large number of person among
the best developer in the world.
What’s more, as banking, defence
and aerospace industries, Genivi
is based on a really good encryp-
tion which made it harder to
hack but easier to track a poten-
tial hacker.
“In the worst case scenario, if
you succeed to hack an info-
tainment system you can’t send
a message on the CAN bus.”
explains Pierre Sigrist. Without
forgetting that GENIVI is focused
on Infotainment which doesn’t
allow to take control of the CAN
bus. Indeed, the various system
components or the vehicle
are linked to each other via a
communication bus called the
CAN Bus. By taking control of
this bus you could control the
entire car. Hopefully; that’s at
this time not possible by hacking
an infotainment platform.
Those considerations have led to
an increasing level of manufac-
tures interests in cyber security
which wasn’t a big topic for them
before.
Conclusion? Don’t be afraid of
open source!
dable. “That was the highlighted
project because connected cars
are in fashion? But don’t forget
there are a lot of other projects
in particular on Location Based
Services - LBS.” retorts Philippe
Gicquel.
Why GENIVI and no
one else?
Others have tried to create a
consortium of this kind. However
they didn’t succeed. According
to Pierre Sigrist, GENIVI is the
last one standing because “the
great strength of GENIVI is its
network and above all because
it was a automotive manufactu-
rers initiative. You could have
the best solution in the world if
you don’t have the community
following you risk to miss the
essential!”.
What’s more, over the years
GENIVI has been able to success-
fully reinvent the organisation
and placing open source at the
heart of the process. This is now a
smooth organisation with various
groups and teams overseeing
the strategic, technical, and
commercial components of the
alliance and governed by a Board
of Directors composed of the
top-tier members. For instance
the License Review Team is in
charge of providing training to
help member choose the right
open source licence.
Is that secure?
It’s common to see in movies or
series, cars being hacked. So yes,
it’s normal to be afraid of that.
However there is a misunders-
tanding between open source
and easy to hack.
“There are two aspects of open
source. The first is that if it’s
hackable the community will
find it very quickly, which permit
us to take appropriate counter-
measures faster. This was the
positive aspect. The second one,
which is the negative, is that
there are more people who have
potentially access to a certain
48
or taking care of his childs, Gaël
is a real guy and he sleeps some-
times. “You see this morning
I woke up at 5 am, but I already
took a nap in our energy room” he
explains to us. And we checked
that, at la Fonderie you can find
an energy room to regain some
strength. But to get back to our
first question, Gaël didn’t learn
all by himself: he has a scien-
tific pedigree. “I guess I’m lucky
because I made my preparatory
class, higher maths - special
maths, in Guadeloupe.” Then the
time has come for Gaël to go to
France to pursue his studies in
an engineering school in Rouen
called Esigelec. He decides
A genius inside a
normal guy
We met each other within la
Fonderie, where Gaël had kindly
offered to host a workshop about
open software with la Fabrique.
That event was the perfect
opportunity to ask him some
questions. Obviously, when you
meet a real UFO such as Gaël, the
first question that comes in mind
is how does someone become
such a specialist of open inno-
vation? We were totally sure he
had a secret but we were wrong.
First news, even if he is always
running around, giving confe-
rences, hacking planes, coding
INTERVIEW
Gaël Musquet
B
oth gifted and hyperactive,
Gaël Musquet has already
achieved to build along his
young career an impressive CV :
first open software at 16 years old,
a specialization in meteorology, a
passage through the Ministry of
the Environment, spokesperson
of the french community of Open
Street Map (OSM) and hacker in
residence at the public digital
agency called La Fonderie. La
Fabrique des Mobilités presents
an encounter with this specialist
in open innovation.
An open source genius
49
The Ministry agreed to let him
work 1 week per month at what
became now the Numa (nb: ex
Silicon Sentier), to organize
conferences, work and talk about
OSM. “At that time, I was so tired”
Gaël adds. And honestly we can
understand why. Over the years
he improves his expertise on
various projects; french elec-
tion campaign, fukushima, Arab
Spring, etc. Until the day where
Jean Baptiste Roger comes and
picks him up to la Fonderie. “He
gave me everything to progress
with the communities.”. And
here we are today! Yet, the place
is implementing a social plan.
Gaël is counting his last days
before he had to leave the place.
“Open Source is like politics.
La Fonderie used to be a sort of
Gallic village for the digital, we
have been protected for a long
time, but now it tends to disap-
pear.” he admits with a sort of
melancholy tone.
A new adventure
Of course, he has a back-up plan!
The advantage with doing open
source is that it’s really easy for
anyone to know what you are
working on and assess a potential
candidate. After a conference the
French Air Force were waiting
for him and presented to him an
incredible opportunity that had
his name written all over it. Gaël
exclaims : “I’m creating my own
company, and I’m going to advise
soldiers on open source, open
innovation, open standards and
how to rapidly innovate. After
being a student, an apprentice, a
public employee, an employee in
the private sector I’m now beco-
ming my own boss!”. This is really
an exciting mission for Gaël. He
will work with a special unit,
the EA2CP ( Escale Aérienne de
Commandement et de Conduite
Projetable - Air Command and
Conduct, Deployed), which
protects specific sites whether
there are in France or abroad.
“I even connected the coffee
machine at the military base to
launch a coffee with the wifi.” he
says. The motto of his base is “Ad
impossibilia nemo tenetur” - “No
one can achieve the impossible”
and yet his new colleagues define
themselves as army disobedients
stepping out from the ranks.
The interest of commu-
nities
“We cannot know everything, be
everywhere and talk to every-
body. That’s impossible. Thus if a
task need to be done, you need to
find a community.”explains Gaël.
He began Open Street Map just
for fun, and today it’s kind of a
part of his life. For him, mapping
is strategic, “Did you know that
the army uses OSM? They can’t
use Google maps because they
can let Google have an access
to confidential data.” OSM is
important and could change
the way we will move in the
future. For instance the asso-
ciation organizes carto parties,
“It’s like a surprise party but we
are mapping!” he laughs. Those
parties are a huge success. Two
types exist: party with a thematic
or a specific place. A thematic
can be a very large subject such
as the biodiversity, accessibility,
medical facilities etc. “When
it’s about a specific place, we
improve the map by adding defi-
brillators, street names, transla-
tion in other languages, speed,
defects in the pavement, etc.” The
difference with a surprise party
is that everyone is welcome.
to join the apprenticeship
programme. “Apprenticeship is
what’s is better for me, because
it’s concrete, you can ask ques-
tions to your teacher in func-
tion of what you really need.”
His passion, what makes him to
vibrate, it’s the méteorology and
design sensors. “Furthermore I
installed a weather station on the
roof of la Fonderie” he exclaims
like if he was super proud of him.
Unfortunately, the meteorology
department of his company
has been compelled to close,
leaving him unable to finish his
studies with the apprenticeship
programme. The school offers
him to switch to the ordinary
school programme, provided
that he performs well in exams.
“I only failed for 12 hundredth
of point, can you believe that?”.
Disappointed he decided to
perform the interviews for the
Universities of Technology and
he is admitted à Troyes, the UTT.
The problem is that without
money, with parents remaining in
Guadeloupe, that was very hard.
With his girlfriend they tried
everything, she was working at
McDonald’s and he had a student
job as network admin. “To be
honest, it was awful, we were
countings each coins to eat, and I
had this student loan and my rent
which swallowed everything.”
This is when he decided to stop
with great regret his studies and
pass the examinations for public
positions and start working for
the French Ministry of Ecology in
Aix en Provence. For 6 consecu-
tive years, he worked as a tech-
nician, and that gives him a lot
of time to get more involved into
Open Street Map (OSM). “My job
was offering a good synergy with
this kind of open source project.
When Haiti has been devastated,
my boss said it was awesome
to be able to re-map a country
without financial support and
helping NGO at the same time.”
Partly because of this, he build
the OSM France association
one year later and became the
first president during 3 years.
50
doesn’t like so much this type
of training, he prefers practical
training with material resources.
“You have to touch something
to understand! For me open
source is the gateway between
theory and practice.” He unders-
tands that he needs to transmit.
However, he wants to do it on
his own way, something that
respects his own principles.
Hack your car
With la Fonderie, he set himself
a great challenge: hacking a car
respecting rules of open innova-
tion. For the record, he didn’t just
awoke a morning and realized;
I HAVE TO HACK A CAR. It’s a
project he had in mind for a long
long time. “This is totally crazy
that in a country as France we
still don’t have a vehicle research
lab. Some manufacturers are
tending to do it, but they aren’t
foolish to let us taking parts
apart of their cars.” complains
Gaël. That’s why he decided to
hack a car with the support of la
Fonderie.
Whether you are a technician,
a dentist or a cooker, for Gaël,
everyone should have access
to a place where you are able
to unscrew a wheel, change a
wheel, touch the engine, etc. “In
France when you pimp your car
you are consider as a stupid guy
from the North, and the same
guy in the United States will be
consider as an artist. They have
television programs about that!”.
If we had to summarize what
said Gaël it would be “Let us enter
in our own car! “. His struggle is
to restore the power to consu-
mers on an object they have the
full possession as they bought it.
In order to achieve this, manu-
facturers have to give golden
rules, things you can or cannot
do on your car and how to do it.
“Obviously, you can’t touch secu-
rity organs or warm-up an engine
in a closed space.” he insists.
For the hacking project, as they
needed to innovate rapidly they
bought a second-hand car, a
Citroën Nemo. Huge disappoint-
ment when the access to the
COP21 is denied because it was
a diesel engine. Then, Toyota
proposed a Yaris (hybrid model),
which is produced in France.
“However, as La Fonderie is a
public agency, that was hard to
us to explain that we didn’t use
a french brand, simply because
Toyota was the only one to reply.”
This could last a day, a week and
sometimes months. Sometimes
mapping parties are organized
with other associations like
Wikipedia, botanics as Tela
Botanica and even parliamen-
tary activities as Regard Citoyen.
“Men and women are the fuel of a
community, it’s our aim to train
them”. And those parties are the
perfect opportunity to train new
contributors.
This year the SNCF (French
national railway company) will
celebrate 3 years of partnership
with OSM. “A real success story
for OSM” says Gaël. They even
engaged new people dedicated
at OSM. And guess where they
were trained? Of courses, at la
Fonderie with Gaël. The aim of
the partnership is to facilitate the
mobility, no matter what public,
inside the stations. They mapped
small details as lane markings
for blind or visual impaired, audio
systems, passage for people of
small stature, strollers or wheel-
chair.
A need to transmit
He wants to transmit the
knowledge and experience he
has accumulated over the years.
“When I was a student, some
teachers made me dream and
yet they weren’t really presen-
table because the get their hands
dirty.” It’s thanks to this type
of teachers that Gaël is what
he became. Now, it’s his turn
to transmit and inspire others.
“I began to write about this
human adventure, I now need to
continue. My book is about my
six last years and how after being
a public employee, I became in
charge of the digital aspect of the
election campaign of Hollande,
how I worked at la Fonderie and
finally how I became my own
boss.”He insists on the word
human adventure because each
part of his life relies on the impli-
cation of a man or a woman who
provided him help and advices.
He doesn’t have time to do webi-
nars and MOOC. Moreover, he
51
How la Fabrique can
help
To finish our interview, we
wanted to ask some advices to
Gaël to know, how la Fabrique
could play a role as an effec-
tive mediator between all these
stakeholders. “You need to
provide more concrete resources
to experiment. According to me,
you can’t go on a conference
without a server under your
arm, without a sensor, without
a car, without a place to experi-
ment.” He then congratulates us
for having set up such a huge
network. That was the first step
to create an efficient ecosystem,
and we are now working on provi-
ding new types of resources (see
the article about the commons).
It’s now the time to let go this
fabulous one-man-band, maybe
he will return to the energy room.
One thing for sure, we will listen
to his expert advice.
Rethink the french
automotive industry
It’s not a secret Gaël is angry
and disappointed by french
automotive manufacturers. And
yet, he tried everything, but
didn’t succeed working with
french manufacturers. “They
made big announcement but in
reality there aren’t risk-taking”.
According to him, risk-taking
means much more that letting
engineers taking with students
or technicians in a closed
ecosystem, it has to be cultivate
and stimulate on a large scale
by breaking down the barriers.
“Nowadays, the hierarchy blocks
initiatives. They can do what
they want like set up new open
innovation methodologies, but
actually, heads of those struc-
tures have no idea how people
inside their own company or
communities are innovating.
Caution, there are exceptions and
efforts are being made.” explains
Gaël. As an exception he meant,
for instance the SNCF who tried
to solve some issues with the
OSM community. They realized
that users are at the centre of the
solution. “When major compa-
nies are doing their kind of
beauty contest, they address the
contest to other companies that
looks like them or startups. They
need to address communities.”
The second problem that Gaël
raised is that, it has never be
given real definition to what
exactly means open innovation
for industrials. As a matter of
fact, heads of open innovation
are using buzz words to commu-
nicate between each others. “We
have big data, growth hacking,
barbars, multitude, and all those
words sidetrack us.” Some initia-
tives have been taken by major
automotive industries to really
do open innovation, maybe in a
few years we will see the results.
52
T
he Fabrique launched its first Call for Projects last year, which closed on December
13th 2015. We received 39 projects that corresponded to 7 proposed themes. These
projects were categorized according to transparent criteria: the team, its capacity
to transform mobility usage, synergies with the Fabrique’s partners, commons, agility
and speed. Finally, la Fabrique selected 10 projects with incredible levels of synergy and
started to follow them in March.
Commons & Projects
FOCUS ON
data training software Needs expressed
hardware standards feedback Network
Nine months later, we wanted to provide an update on the projects selected, as regards
to the commons. So, we interviewed some of them, to identify what had been done and
why they had joined the Fabrique’s adventure.
53
This raises the question of
whether we had a good approach
or we now have to determine a
new way to foster the develop-
ment of new commons. Indeed,
we have identified that some of
the projects had fully understood
the interest of the common,
specifically that it not only saves
times and budgets it also permits
to focus on the real added value
of a project. The following are a
few examples to help you unders-
tand, many others exist :
•	 Oui Hop (Smart Auto Stop)
proposed to share times-
tamped journey, provided it
guarantees anonymity.
•	 Olli (Local Motors) opened a
new micro factory in Berlin
where you can prototype
vehicle projects.
•	 PetitBus (Engie) will release a
cleaned database of schools
locations.
•	 Welo (Wecoop) produced
open hardware to manage
connected bicycles.
•	 Mobilise (Mobi-lise) is
researching the possibility
of sharing their application
which tracks people move-
ment, provided that it’s
shared with a trusted third-
party.
•	 Zouzoucar wants to share
the knowledge he learned
from a Stanford training on
entrepreneurship.
However, some others projects
were slightly at a loss to know
exactly what means contribute
to a common or mutualise a
resource. This is why la Fabrique
decided to change its strategy
in order to accelerate the deve-
lopment of new commons by
bringing together different orga-
nizations and projects with a
joint interest in developing the
same common. We launched
a new type of call for propo-
sals and called it : “Open Call
for Commons”. The commons
proposed have to be related to
“La Fabrique is a convergence
accelerator.” Thierry Fargas, CEO
of Clean-Data Innov
“When you look for the fabrication
of shared services with particular
property, you need to pool ideas, la
Fabrique provide the infrastruc-
ture to do it!” Laurent Maghdissian,
co-founder of OuiHop’.
“It’s a great initiative which fede-
rate different stakeholders. But
it needs to step up the effort to
explain what is or not a common
and the notion of openness.”
Stephane Derville, CEO of Eliocity
(Xee).
“The notion of common is a
sharing philosophy which must
provide a more collaborative mode
of action.” Jean-Remy Cazeaux,
CEO of Wecoop
“I’m satisfied to be able to come
together around various issues. It
is important to federate.” Nicolas
D’Haussy, CEO of Zouzoucar
“We saw la Fabrique as a vector
of connection between various
parties involved in the ecosystem”
Benoit Joncquez, CEO of Truckfly
“We instantly agreed with
the basic notion of commons
proposed by la Fabrique. However,
in practice, it’s difficult to contri-
bute to new commons or use the
existing one.” Thomas Cazade,
co-funder of PetitBus
“The commons provide a better
availability and use resources.
It’s the library 3.0 to build appli-
cations of tomorrow” Jean-Louis
Peyre, CEO of Comthings
LA VOIE EST LIBRE
54
interesting thing with a common
is that everyone from everywhere
can join a project. It must be
emphasized that, there will be
no difference between a project
supported by a startup already
accompanied by la Fabrique and
another unaccompanied. Some
of the propositions listed on our
website have already more than 5
organizations involved whether
they are Fabrique’s partners or
not.
All deliverables produced will
remain your property, but it will
be put under a free licence giving
the right to anyone to freely use
it.
Why apply?
The french agency for environ-
ment and energy management
(ADEME ) will then assess ways
in which they can help either
finance and/or provide skilled
resource to support those
projects. The award criteria are
based on:
•	 adequacy of available
challenges,
•	 involvement of all stakehol-
ders,
•	 neutrality of deliverables,
ability to be shared,
•	 size and community engage-
ment around deliverables,
•	 opening of deliverables and
type of license,
•	 ability to start and deliver
operational deliverables.
All the projects of commons
selected will benefit from visibi-
lity they will get by the network
of la Fabrique and communities
involved into the creation of
commons.
How can I invest in
this call?
La Fabrique would also welcome
to hear from organisations and
individuals willing to make
contributions to this call. By
contributing to this call you
will help the creation of new
commons. Your contribution
could be in form of :
•	 Project management and
communications support.
•	 Financial donations and
promoting crowd funding
campaigns.
•	 Test-bed: access to trial areas
and populations and gover-
nance support.
•	 Co-create: connect to a fablab
to means testing, calculation
means.
•	 Moderation / facilitation of
code-development.
•	 Co-creation: expertise and
time offered in kind.
So many other ideas of commons
are waiting for you on the site of
our Open Call For Commons.
one of the two challenges that
have been identified.
Two challenges
The first one, is dedicated on
how accelerate the deployment
of daily carpooling. Actually,
when we received the answer to
the Call of projects we counted
that about 10 projects were
about daily carpooling. None of
those projects have succeeded
to impose itself as a leader in
that field. Our reasoning is that
maybe by sharing something,
one project will become the
new Blablacar of the daily and
dynamic carpooling. We already
received some interesting propo-
sitions. For instance, the creation
of a common proof of carpooling,
no matter the company used to
make the reservation. The aim
is to provide a proof to get bene-
fits such as an access to specific
parking spots or a reduction for
motorway tolls. Another example
is the creation of a common
database for carpooling stop. The
aim is to map the real Point of
Interest related to carpooling.
The second challenge identi-
fied is about the development
of low-cost and sustainable
personal mobility solutions. The
goal is to provide affordable solu-
tion for wide-spread distribution
into small to medium communi-
ties. One example of a common
proposed by the community is
the creation of a bikesharing
service for individuals. This
project could enrich the number
of bicycle available for renting.
How can I apply?
You have two options to apply
to this Open Call. The first one
is by suggesting a new common
project. Because doing so, check
out that no one else has already
suggest this idea for the call.
You don’t have any idea but you
truly believe in the commons and
want to contribute? That’s ok, the
second way to get involved into
this call is by contributing to a
project already proposed. The
Michelin
Vulog
Mop EASY
Visteon
Communauté
d’agglomération
Sophia-Antipolis
Club des villes
et territoires
cyclables
Sophia Club
Entreprises
Incubateur
Paca-Est
IFSTTAR
IFP
Energies
nouvelles
IFP School
ESTACAFreshmile
Groupe
Moviken
Pôle Véhicule
du Futur
ATEC ITS
CNPA
Cityway
CEREMA
Caisse
des Dépôts
Total
Engie
TOPOS
Aquitaine
Transalley
Tractebel
Engineering
Cofely Ineo
Via ID
Polis
Ville d’Issy-
les-Moulineaux
Ville
d’Antony
Région
Île-de-France
UFO
Air
Liquide
Ville
de Paris
Grand Lyon
Nod-A
Mov’eo
Télécom
ParisTech
Systra
Vinci
Colas
Transdev
Akka
Technologies
Dassault
Systèmes
MAIF
BlaBlaCar
Orange
Canal TP
VIANEO
Fing
Aquinetic
Koolicar
Université
Nice Sophia
IMREDD
Mozilla
SMTC de
l’agglomération
Clermontoise
Wimoov
UTC
ADEME-Novembre2016-8830-979-10-297-0618-9®

Open source & Mobility - FabMob guide

  • 1.
  • 2.
    ADEME The French Environmentand Energy Management Agency (ADEME) is active in the implementation of public policy in the areas of the environment, energy and sustainable development. The Agency provides expertise and advisory services to businesses, local authorities and communities, govern- ment bodies and the public at large, to enable them to establish and consolidate their environmental action. As part of this work ADEME helps finance projects, from research to implementation, in the areas of waste management, soil conservation, energy efficiency and renewable energy, air quality and noise abatement. ADEME is a public agency under the joint authority Ministry for the Environment, Energy, Oceans and International Climate Relations, and the Ministry for primary, secondary and Higher Education and Research. www.ademe.fr/en Acknowledgments The final outcome of this guidebook was elaborated by Margot SANCHEZ and would not have been possible without the assistance from numerous authors and contributors. La Fabrique would like to thank : André REINALD, Benoit JONCQUEZ, Bertrand BILLOUD, Cédric BELARDI, Gabriel PLASSAT, Gaël MUSQUET , Hipolito MARTELL FLORES, Jean-Louis PEYRE, Jean-Marc LAZARD, Jean-Michel FAVRE, Jean-Remy CAZEAUX, Laurent MAGHDISSIAN, Lomig UNGER, Louis-david BENYAYER, Maud CHIDIAC, Nicolas D’HAUSSY, Philippe GICQUEL, Pierre SIGRIST, Polen STUDIO, Rahul KUMAR, Simon SARAZIN, Stéphane MASSON, Stéphane DERVILLE, Sune PEDERSEN, Thierry FARGAS, Thomas CAZADE, Tin Hang LIU, Vincent LAINE, and Yann LERICHE and Yuki LIU. The Fabrique des Mobilités is constructed through your reactions, feedback, ideas, and projects. Please continue to inspire us and surprise us. La Fabrique des Mobilités The Fabrique is the first European accelerator dedicated to the rapidly changing ecosystem that is transportation and mobility. The Fabrique brings together players and projects, capitalizing on expe- riences, feedback and errors in order to create a common culture of innovative action. info@lafabriquedesmobilites.fr www.wiki.lafabriquedesmobilites.fr www.lafabriquedesmobilites.fr fabmobteam.slack.com @fab_mob
  • 3.
    Open source perspectives O pen sourcedynamic was initiated considering essential human behaviors : when people have enough to live decently, some have diffe- rent personal motivations than material and want to participate to collective project. On the one hand, there is an innate desire shared by many of being useful to others. On the other hand, there is the ego: the need for peer recognition. The result in both cases is a desire to share what is done with the greatest number. There is also a macroeconomic interest in sharing: by enabling the reuse labor of others, it avoids duplicating effort, it does not have to reinvent the wheel in each new project. Actually, over the years, most IT projects have become essentially assemblies of third-party software compo- nents, a form of prefabricated. Create an application or service start by choosing the compo- nents and adding some cement to build the project. The open source model has greatly contri- buted to the industrialization of software development, with the huge productivity gains. Participate in open source project has the advantage, according to the license that is attached to the code, to benefit in return, and without payment, the contri- bution of other developers. One must however fit the economic models more about selling «user licenses». It leaves free all that is duplicable, and we can pay what is not, especially the service, design, deployment, training, custom development etc. It is quite natural that developers were the first to adopt this mode of cooperation: the central tool for open source was the internet and they were the first to master it. Note that in French, the term «informatique» means infor- mation science. «informatique» existed long before the advent of the computer which is just a tool for automated processing of data. Indeed, each program feeds itself with input data, and provides other output. It is therefore not surprising that there is a kind of contamination of the model «open» to the data. I have personally worked for many years in the mapping (GIS) and transportation (Mappy). By joining Mozilla, I deepened my understanding of the various issues and models of «open». Mozilla, which we must remember, is a foundation, was a pioneer in this mode, and is today one of the most famous players in the open source. All that is developed at Mozilla (including Firefox) is totally open. Thus, tens of thousands of contributors around the world participate, according to their motivation, their availability and skills to our projects: reports and investigation of bugs, docu- mentation, translations (Firefox By André REINALD, Mozilla
  • 4.
    is translated intomore than 80 languages), organizing or parti- cipating in events, public aware- ness, writing patches, etc. Based on my experience, I can identify some strengths and weaknesses of open source. Because the same number of people collaborating on a joint project would be more effective if they were divided into several competing projects. The perma- nent danger for an open source project is the «fork»: a subgroup decides that the project must take another direction, which seceded, creating a new project «clone», but will drift away from the original over time (OpenOffice - LibreOffice). A common question: how to share the work and who makes the decisions? The two issues are linked: the open source gives pride to meritocracy, «the one who do» naturally becomes the one that we respect. As for the user encountering a bug or wanting a feature, the community is often much more accessible and responsive than a corporation: it speaks directly to «those who do.» No customer service, communicate requests to a marketing department, submit- ting proposals to the committees that decide priorities keeping in mind that the primary purpose of a company is to make profit and bring services to users is just a task. For customers who need guaranteed services, specia- lized service companies in free software offer assistance equiva- lent to those provided by proprie- tary software vendors. Finally, in a system using volunteering, the main challenge is to attract, motivate and retain contributors. Wide task that became a real job, «community manager». Away from authorita- rianism and hierarchy, their only lever remains psychology. Open source today arrived at maturity, after overcoming obstacles of the early years of governance, sustainability, credibility, service. Now, this mode tends to spread to other sectors. The artistic production (or Creative Commons licenses), and of course the data: this is known as open data. Each sector has specific needs and solve their own problems. But the underlying philosophy and the benefits remain similar. It is about common to produce, evan- gelisation and as the action of la Fabrique des Mobilités is exem- plary.
  • 5.
    Contents 7>8 Introduction History The four Pillarsof Open innovation Workshop - Connected cars & territories Interview - Yann Leriche - Transdev Focus on - How Renault is driving innovation Interview - Bertrand Billoud - Kisio Workshop - Innovation Summer Camp Interview - Maud Chidiac - Local Motors Focus on - How to open data? Interview - Jean-Marc Lazard - OpenDataSoft Partnership - The project Catalogue Focus on - Business Models for Open Source development Interview - Tin Hang Liu & Yuki Liu - OSVehicle Community - Schools and students Interview - Sune Pedersen - Faraday Motion Workshop - Open software Focus on - Genivi Interview - Gaël Musquet an open source genius Focus on - Commons & Projects 9>10 11>14 15>18 19>20 21>23 24>26 27>29 30>31 32>33 34>35 36>39 40>41 42>43 44>47 48>51 52>54 1>2 3>4 5>6
  • 6.
    1 T he automotive history hasalways been linked to patents and industrial protection. For years, the inno- vation has been measured by the number of patent applications. At the same time, has grown up the cross-company cooperation as a strategic partnership to share vehicle platforms, engines or gearboxes and, in doing so, increase the volume of produc- tion and cut transactions costs. Subcontractors also have a key role to play among vehicle manufacturers. They foster sharing and pooling of compo- nents and even of sub-assem- blies in their entirety. Research projects have been conducted by several manufacturers on some upstream matters, as an example the research on new combustion process. Cooperation is thus not new and a large number of alliance are actually forming visible or discreet links between these actors. Recently some car manufac- turers opened their patents in order to attract new actors onto their technologies with the aim of ensuring minimal volume and then, offering an acceptable price. This being the case of Toyota on hydrogen patents and Tesla on electric one. Production volumes are at the heart of effec- tive strategies so that the auto- motive industry could be defined this way : “space science tech- nology to the price of household equipment”. All the coopera- tion schemes are based on the decrease of the cost of obtaining upstream scientific knowledge or reaching volumes which could ensure standardization of the process. These schemes are build “with full background knowledge of the situation”. Open innovation, as we envision it here, and open source have an another way to proceed. It’s about opening up knowledge without knowing where and how far that will take us. Open source includes all the advantages cited previously, but goes further, as this means that nothing has already been written and every- thing has to be built and invented. It’s a question of aligning creative forces It can therefore be said that an alignment is possible between industrial interests wanting to use open source resources to pursue their strategy and collec- tive goals wishing to exploit these new resources. La Fabrique aims to investigate and explore these alignments to foster the emergence, the referencing, the development, the protection and the access to commons in the field of sustainable mobility. To deal with the digital platforms of the GAFA, European industries of the automotive sector and more broadly of the transport field cannot ignore strategies which are passing through the Introduction By Gabriel PLASSAT
  • 7.
    2 Open source andthe commons. Our major competitor is time. Coopetition using open source can be the fastest way to produce a new shared culture of innova- tion and a credible & desirable vision of our future. Let us have a closer look at three examples of industrials maste- ring vehicle platform and yet involving in open platform. 1. « Better to do Open than a rival. » By launching recently the project OpenAI, Elon Musk aims to create the dominant platform for Artificial Intelligence. In view of the current involvement in this sector of Google, Facebook and Microsoft, Musk has chosen the Open to go faster, forge strategic alliances and make the creations useable as soon as possible. The purpose is to turn OpenAI into the most advanced and efficient platform to prevent competi- tors from being the focus of our attention. Before somebody else does, the Open can fill up quickly a space which is currently empty and ready to be conquered. Nevertheless, be careful, because not everyone one can be an Elon Musk. To do that, you need credi- bility and enough partners to reach a critical mass interested in building up a platform. 2. « The Open as a spring- board for future world standards.» After the success of one of his invention Android (an open- source operating system for smartphones) Andy Rubin wants now to repeat the operation in the field of Artificial Intelligence. For that purpose he has a very specific plan ; open an accele- rator dedicated to AI, provide the best commons, mentorship and funding to startups. Then, after having reached the critical mass, open the platform to create new standards. To be in place before the others is the goal of Andy Rubin. And today, openness is the best solution to do so. But here too you have to be careful. To succeed certain conditions must be fulfilled. Andy Rubin was in touch with the top specialists in AI, he managed to get them to adopt the strategy and create the largest tech incubator dedicated to AI. 3. « The Open as a strategy of conquest to empower the communities.» Transdev with the Digital Factory department, is committed to create a worldwide Open Database in Transports, this is the project Catalogue. The aim is to set up a platform of reference within the mobility field to permit entrepreneurs to reduce time and effort, gain access to high quality data and finally to standardize the work procedures. By doing so, Catalogue will reveal talents, projects and with a certain critical mass it will be indispen- sable. To guarantee the equitable access, Transdev is currently looking for alliance with neutral and credible stakeholders to ensure governance and impro- vement. Many european players have an interest in supporting Catalogue. Open source is at the heart of La Fabrique development on three different levels: data, software, hardware and with several communities. La Fabrique proposes to list the open resources, to assist in their documentation, to support the communities in the identifica- tion of commons and to facilitate the funding and realisation of new commons. A new kind of call for project dedicated to open resources. Based on feedbacks from startups and industries, FabMob designed a new kind of call for project dedi- cated to open resources: a call for common. Starting from each community, partners identify missing resources that are neces- sary and not competitive. Theses resources, requested by several partners, can be developed with an open source approach. Then funding from industries and agencies will support and acce- lerate commons production with many advantages: • Commons produced are directly useful for several startups and partners, their projects get advantages, • Commons can be used and developed by others stakeholders, creating a community around them, with benefits in term of effi- ciency, • Each common can become a standard in its domain if many stakeholders decide to use it, • Even if the startups invoved fail in the next year, commons can still be used by the ecosystem, • Moreover, each common become a connector between several stakeholders, even in competition, creating a new culture of innovation.
  • 8.
    3 Open software, new phenomenon? Opensoftware are not new. Actually, open source software are nearly as old as the inven- tion of science computing. The A-2 system, released in 1953 and developed by the UNIVAC divi- sion of Remington Rand, was one of the first compiler for an electronic computer and it might be the first example of free and open-source software in the history. Indeed, the software was provided with the source-code and customers were invited to send their improvements back to UNIVAC. Free software for universities and researchers. Let us go to the 60’s when the first computers appeared on the university campuses. At this time, it was usual to share, then remix everything, like if it was a cooking recipe. That’s why software were usually distributed with the source code. In this way, it was possible to make modifica- tions, fix bugs or add new func- tions. Students and computer science lovers decided to meet in open source communities, to share their ideas, codes and tips about computer program. The hackers’ movement was born. In accordance with the social movements of the period, the hackers are mostly distrustful of the authority. Their ideology is to promote free and open access to software. They think that computer science can advance scientific research and make the world a better place. The decline of free software. Towards the end of the 60’s, the proprietary softwares appeared because of the increase of software production cost. It was observed a growing amount HISTORY T o begin our guidebook, here a little of history to understand why do we use the word open source and since when.
  • 9.
    4 A2 Project 1950 1960 1970 1980 1990 2000 Usenet Hackers’ movement Free Software Foundation GNU GPL license Linux RedHat MySQL Apache Httpserver « The Cathedral and the Bazaar »Netscape open sourced Mozilla Ubuntu Android Open Source keep growing GNU Project of software that was for sale only under restrictive licences. Actually, the software industries were competing with compa- nies which included software programs with the hardware for a unique cost. However, some customers did not want to pay for software bundled with hardware product. Thus, some software continued to come at no cost. Usenet is a worldwide distributed discussion system available on computers established in 1980. In other words, it allows people to speak, exchange and work together on a worldwide level, it is like a precursor to Internet forum. Remember, people are the key for open source develop- ment. With usenet they can now collaborate more efficiently and share software. At the beginning, one man Richard M. Stallman. We can see Richard Matthew Stallman as the founding father of the free software movement. In 1983, he started the GNU Project a mass collaboration project for open and free software that has never ceased to grow throughout time. Two years later, he created the Free Software Foundation to help and support the free software community. The Free Software Foundation has also permitted in 1989 the creation of the GNU General Public License (GPL), one of the most popular open source license model. Linux, just a hobby he said. In 1991, Linus Torvalds a young Finnish student decided to develop, for fun, his own version of the Minix kernel, he named his production the Linux kernel. The open source software resul- ting from the GNU project trans- formed the Linux Kernel into a complete open source Operating System (OS) GNU/Linux. Linux kernel passed under the GPL, which attracted attention from volunteer programmers all around the world. The Cathedral and the Bazaar Eric S. Raymond is a famous lawyer specialist of open source. Based on his observations of the Linux Kernel development and his open source management project experiences, he publi- shed in 1997, an essay (and later a book) named The Cathedral and the Bazaar. This analysis is about the open source community and free software principles. The essay generated much atten- tion. What’s more, it definitely motivated Netscape to release its web browser and internet suite and to start an open source community in 1998. Thanks to that, we now have Mozilla Firefox and Mozilla Thunderbird. In 1998, Eric S. Raymond with another lawyer Bruce Perens, co-founded the Open Source Initiative (OSI), an organization dedicated to promoting open- source software which conti- nues to exist. This is when was officially created the term open source. You can find more infor- mations on opensource.org.
  • 10.
    5 Open Innovation canbe introduced at different steps in a project, from the early beginning to the industrial process. We have identified four major ways to open your project: standard, data, software and hardware. But opening is not only a question of efficiency or rationalisation, it becomes a question of culture. The more you are involved in open source projects, the more your company will be changed at different levels: relation with customers, with employees and between employees, your process for hiring, your connexion with the ecosystem as new contributors are external of your team, your capacity to work at international level. Open innovation brings more permeability, but you can always decide which partner are in or out. Your project and your team look more like natural organisms, new connexions are created more quickly without decisions from your side. Historic competitors become less binary relationships and stakeholders can be seen as potential contributors in co-opetition. As a matter of fact, the openness also embraces the hardware. This is a trend that will for sure be further accen- tuated. But did you know that open hardware had a long history? For instance, in 1911 an independent automaker, called Henry Ford, won a challenge and invalidated the Selden Patent which was THE gasoline engine patent controlling all the automotive industry. This led to the creation of an association managing open and at no cost patents. And everyone knows about the Ford’s success. Moreover, open hardware doesn’t only work with a specific type of object. You can literally share everything, under permissive licenses, at the condition that you provide the “source code” of the project also called the documentation. This means instead of sharing line of code you have to share schematics, blueprints, pictures, guidelines, Computer Aided Design (CAD) drawings etc. Open hardware, especially in the transport field, has the wind in its sails with the democratisation of digital manufacturing tools and space. The biggest difference with open software is that it implies some investissement for physical materials. Let’s go to fully achieve your own and customizable car, skateboard or scooter! “Open Source Hardware (OSHW) is a term for tangible artifacts — machines, devices, or other physical things — whose design has been released to the public in such a way that anyone can make, modify, distribute, and use those things.” OSHWA - Open Source Hardware Association THE FOUR PILLARS OF OPEN INNOVATION
  • 11.
    6 So, open standardsmean interoperability and facilitation of data exchange in the mobility sector, provided that standards are adopted by a large part of the ecosystem. Open standards also imply transparency, availability, quality, impartiality, support and relevance. The interesting thing is that open standards rely on collaborative process open to all persons interested. For instance the General Transit Feed Specification (GTFS) is one of the most common format for public transportation schedules and it all became as a side project of Google. The importance of open standards for transport is the opportunity to share data without the need of proprietary solution. Reliability, interoperability and continuous improvement are three advantages among many others. Travels give a great sense of freedom, that’s why transport system should also be free. These standards exist to support, fast, flexible and secure implementation into any transport system and by this way promote a faster mass adoption. Maybe with open standards the dream to have a transport card working all around the world will come soon true. «Open Standards are standards made available to the general public and are developed (or approved) and maintained via a collaborative and consensus driven process.» ITU - United Nations agency for information and communica- tion technologies. This simply means that open data are accessible and useable by all people. This idea seems to come from the United State of America. Indeed, in 1966 was proclaimed a new law giving the right to access information from the federal government, the Freedom of Information Act. Later, with digital opportunities, the movement grew with amazing rapidity worldwide. Although the United States of America may have been the pioneers to do open data, in France and more generally in Europe the open data movement is fully operational. The release of data on open platform raised the awareness of the opportunities offered by citizen involvement. So that open data became a new phenomenon in particular in the mobility field with any kind of data such as schedules, transports stop, POI and even real-time data. From industrials to government through collectivities everyone wins. It’s time to innovate with mobility dataset and unlock the tomorrow’s mobility! “Open data is data that can be freely used, re-used and redistributed by anyone - subject only, at most, to the requirement to attribute and sharealike.” Open Definition. When talking about source code we mean which can be read and understood by a human ( a human who has some basic computing skills). We called these people the programmers, because they are doing programs. Then the programs are compiled, which makes them only understable by a computer. By sharing the source code, the programmers, give you the possibility to use, copy, study, modify and redistribute a program without any restric- tions. You just have to accept the terms of the license chosen. UNIX might be the most famous example of the success of open software, but you can find a lot of example in the domain of mobility such as collaborative map, multimodal trip planner, running application, dashboard car system etc. In a nutshell, it’s almost the opposite to proprietaries software. Indeed, you can have the control of your software, you can train yourself on it and it can only be improved etc. Without talking about the economical advantages. Open software ensure a collaborative experience which benefits everyone. “Open source software is software with source code that anyone can inspect, modify, and enhance.” Opensource.com
  • 12.
    7 Connected cars &territories First workshop of the community When? 17 May 2016 Where? La Fonderie ( Paris) — to standardise and facilitate the communication between your car and your smartphone. It provides several tools as a simulator, documentation, SDK and even an API. In this way, any developers that wish to create a new connected car services, can access an important set of data and then share his production to improve it. Xee - Eliocity Eliocity with the Xee project is one of 10 projects chosen as a winner for the first call for proposals of la Fabrique. Xee is an advanced technology to connect all cars and create a large community 4 presentations to start the day The day started with 4 presen- tations of la Fabrique partners about their work on connected cars and their relation with terri- tories. PSA Car Easy Apps Car Easy Apps is a consortium started by PSA and companies and researchers in automotive industry. Its goal is to look for a standard way to introduce the car as another object in the internet of things, preserving security and safety concerns. In other words, Car Easy Apps has the ambition WORKSHOP A community in search of opportunities The first workshop of the “Connected cars & Territories” community took place in June 2016 in the public digital agency of the Paris Region called la Fonderie. This community is involved in search of oppor- tunities to create added value with data from cars. They also devote an in-depth reflection to open-access resources that can be shared and the commons.
  • 13.
    8 of drivers. Theirsolution is a full stack approach, they provide an open platform, a cloud, sensors, data, APIs, applications and services. They are creating an open environment for developers to create new services. You can also join the new accelerator the XeeDEV App Factory and be part of the community. La Fonderie Car Can you hack your own car? La Fonderie Car is an open source connected car, so yes, you can hack this car. The project is based on the four pillars of open inno- vation: open data, open software, open hardware and open stan- dard. With this car, you can now for example access your tire air pressure or engine consumption, film while you are driving, check your heart rate and even commu- nicate with your smartphone. You can also find in the car a solar panel, a 4G antenna, Global Navigation Satellite System, an high-speed wireless router and four open source hardware servers. DATACT DATACT is an innovation program involving multiple partners in the urban field. One of the main projects is “La Régie de données”, a kind of platform for data regu- lation. The purpose of the Régie is not to centralize all the data but rather for finding a way to create a sustainable economy of dataservices suitable for all urban ecosystem stakeholders. The Régie is the trust third-party in this system, it verifies the integrity of the contributions, the data process and finally the cross-referencing of these data. 3 working groups The workshop was divided into three sections to work on three different subjects. Pleasant journey Security, prevention, anticipa- tion, better comfort, etc. Problem to solve : How to reduce the time spent to find a parking spot? Less cars, more … Incentive to change, tolls, parking organized, carpooling, car sharing, etc. Problem to solve: How to reduce CO2-emission, relieve traffic congestion and reduce unneces- sary traffic ? World mapping Road, environment, pollution, CO2 emission, motor fuel, etc. Problem to solve: How to index the physical world in the nume- rical one? Call for contributions All the groups gave rise to new matters of shared interest as open data about parking lot, emission of pollutants and CO2, traffic and open source tools to simulate the traffic. If you want to join la Fabrique on these new topics contact us! You can find more information on the Fabrique des Mobilités wiki. What is the problem to solve ? How they can be brought together ? Are they aware that they have to solve this problem ? Who might be willing to pay to solve the problem ? Who are the stakeholders ? What are the solutions to solve the problem ? What are the existing commons useful ? What are the new commons we should develop ? What are the management rules ? Who are the stakeholders ? What is the kind of opening ? Methodology
  • 14.
    9 a “co-opetition” mode,where competition and cooperation both have their place, and it proves to be efficient. How did you achieve to change your business model? I suppose you did that step-by-step. Yann: We do not exactly want to change our business model. I would rather say that we aim at adding new activities, with new business models, to our core businesses. We are historically a public transport operator and a taxi company. We want to add to those 2 pillars mobility services for our clients. No single mode of simply because there are more good ideas, more know-how and more experts in the world outside Transdev than inside, whatever the topic we consider. Not trying to create links with people around us, sharing with them, would have meant tremen- dously reducing our ability to innovate. Sharing might seem a counte- rintuitive idea in a competitive economy. But if you look at the the Silicon Valley, it is a place where people share a lot. Open source software has enabled the development of lots of inno- vations, in the field of big data for example. People work in T ransdev, member of La Fabrique des Mobilités, is nowadays one of the leading companies in the area of mobility and yet a few years ago the group was on the verge of a crisis. How Transdev has been able to bounce back by placing Open Innovation and digital transitions at the heart of its development strategy? This is what we will see by interviewing Yann Leriche Chief Performance Officer at Transdev. Hi Yann! Let’s just start off with a question: why did you decide to get involved in open innovation? Yann: We decided to open up INTERVIEW Yann Leriche
  • 15.
    10 as they involvemany players, with different backgrounds and objectives. We approach this complexity with humility and an open mind: There is no secret sauce, but there is a sauce, which needs all its components to mix well together to be a success. Just over a year ago, you decided to launch the digital factory. Could you tell us what it entails? Yann: As many large companies, we have a strong track record of incremental innovation, but not of disruptive innovation. Many people have internally break- through ideas which are exciting, but we didn’t have the right struc- tures and processes to support them. The digital factory was created to incubated these inno- vations. Their project leaders are intrapreneurs, who work with the resources they need whether internally or externally, share with partners whether inter- nally or externally, without any corporate burden. We make sure they can put their whole focus and energy on addressing client needs. It shows that you are on the same wavelength as la Fabrique des Mobilités. Why did you decide to be a founding member of La Fabrique? What attracted you to it? Yann: The interest was twofold. We were attracted by the quality of the ecosystem which was about to be created, in terms of participants and of ambition regardings the commons to be created. These commons are key if we want to speed up innova- tion in the mobility field, and I am definitely convinced that if there is a place today where we will succeed in developing them, it is at La Fabrique. We were also attracted by the vision Gabriel Plassat developed as to the future of transport and mobility, which we totally share. The way to get there might evolve, but it is key to move with people with which we share the same goal. So does any projects of the digital factory have to be involved into the commons? Yann: All the digital factory initiatives will not lead to the creation of commons as some address Transdev internal business issues. For the others our goal is to share as much as possible by opening our projects and technologies with APIs, open source software, or in many other ways. This is for example the case with our project “Catalogue”, which aims at being an open repository for mobility open data. Thank you very much Yann. In conclusion Transdev seems to have started its digital shift and paves the way for other mobility company to rethink their business model by turning toward open innovation and open source. transportation is able to fulfill all the needs of an individual, even the private car. Hence people use different modes, at different times of the day or year. We want to ease this multimodality and offer our clients mobility “As A Service”. We heard you say Mobility As A Service, can you explain to us what does that mean? Maybe you can also give us some examples to help us understand. Yann: It all started from our clients. We used to consider their travel experience starting when they planned their trip in one of our transport network and fini- shing when they left our vehicle. But our customer trips are very often richer than this. They might take a train that we do not operate before stepping in one of our buses. In this case facilitating and optimizing the connection is a key topic. We have to look at their mobility globally, not at some segments of it. That’s why we develop services on top of all trans- ports modes, whatever the operator: Information, ticke- ting, guarantees,... In Lyon for example with Optimod, we deve- loped a real time and predictive triplanner. In Saint-Étienne with Moovizy we launched a service which also enable seamless payments. In relation to Optimod’Lyon, it was an innovative public-private cooperation between startups, industrials, local governments and even schools. We saw that you are repeating the project in Toronto. So it must have been a success. Can you reveal the secret of such a successful cooperation? Yann: In Lyon the project started and succeeded thanks to the leadership of the public transit authority who created the condi- tions for several stakeholders to work in a collaborative mode. Those projects are often complex
  • 16.
    11 professions” explains Lomig Unger.This is why, teams, groups and new places are dedicated to work on six priority areas presented on the next figure. involved in setting up internal mechanisms such as Fab Labs in order to drive and support projects and touch differents group of people from various A t Renault, innovation is a core value for the company through partnership with main key player of the automo- tive sector, the implementation of creative lab, the creation of an innovation community and soon, a digital garage and an open hardware project. It is with good reason that Renault is one of the member of la Fabrique. Let’s take a deep dive inside the Renault’s world with Lomig Unger the man behind a large number of Renault innovative projects. Innovation, a priority The observation was simple for Renault, innovation must be at the heart of the brand identity. It had to be explored new ways or methods to foster innovation in transportation area. “I’ve been How Renault is driving innovation FOCUS ON Innovative architecture Innovation priorities Electric vehicle Combustion vehicle New services Travelling well-being
  • 17.
    12 members and holdtopical exhi- bitions about innovative objects from every sector of the industry. Exhibition topics are extremely varied from Do It Yourself (DIY) to gamification. By opening such a place, Renault want to open up their employees’ mind and give inspiration to them. Maybe, like Spencer Silver invented a kind of adhesive that doesn’t adhere by accident, aka the Post-it, an employee of Renault will have a breakthrough idea. Pitch & POC Pitch & POC is an initiative based upon the company’s informa- tion technologies such as the intranet or shared spaces. The observation is that people from everywhere inside Renault are full of ideas. In this way, whether you are in a factory in France or in Brazil you can work together on a innovative project. On an intranet forum, regularly new calls for ideas are opened, then a jury evaluate the differents ideas and the best among them can be prototyped in the next step: incu- bators. The incubators are linked to the Creative Lab, another tools provided by Renault and explained later. Finally, the subjects studied in incuba- tors are reviewed each week in the ideas workshops where everybody can constructively exchange about each project. “In line with our wish to increase our skills and knowledges, we decided to launch a second version of the creative people, by taking into account what we had learned.” says Lomig Unger. By the way, Phillippe Méda, who is also working with la Fabrique des Mobilités, helped them to proto- type this new version which wa called Creative People before. Pitch & POC is more entrepre- neurship-oriented. Renault creative lab All major companies worthy of the name now have an inside Fab Lab to democratize the access to design methodologies and digital manufacturing tools. So, obviously a stakeholder of the transportation ecosystem such as Renault had to get a creative lab. This lab provides all the tools to make people collaborate on projects, for instance projects selected in the Renault Creative People. We find in this neutral ground of Renault a full range of tools for prototyping, a 3D printer, a laser cutting, ressources and even a thermoforming machine. Innovation community The final tool to imagine the mobility of the future is the inno- vation community. Inside this community we find other corpo- rations as Michelin or Visteon or specialists as the SNCF and EDF and even academics. The basic idea of the community is to build a common vision of the future in the mobility area. Thus, the community reunites several times per year to share best prac- tices in innovation management. Models that actually work abroad The Silicon Valley is a beautiful region synonym of innovation which is home to the majority of the world’s largest high-tech companies and startup. That’s exactly why, in 2011 Renault decided to establish there its first Open Innovation Lab. As its name implies, the principle is based on open innovation and on the active involvement in a large ecosystem to source ideas. Each relevant stakeholders (schools, startups, industrials etc) can propose their idea. If it appears to be a good and a feasible idea, the lab opens its door to project initiator. It’s about going outside of comfort zones and having the opportunity to prototype and quickly test an idea without waiting for. Five years after Renault is now opening a new Open Innovation Lab, but this time in Tel-Aviv (Israel). A startup inside the company Let’s begin with the presentation of the mechanism promoting breakthrough innovation: the LCI. The Cooperative Innovation Laboratory (LCI) is the think tank that acts like a start-up inside the company by brin- ging together three functions: Product, Engineering and Design. The LCI is an independent place where, about 50 people can, together, conceive and proto- type ground-breaking innova- tions for mobility. The idea is to create a place of cooperation with groups inside Renault and outside, from the transportation ecosystem, such as specialized schools or suppliers. By remo- ving the barriers for innovation, the lab aims to go faster from the idea stage to the prototype. Previously this process could take months or years, now the period can be shortened in days and even hours. This permits to step out conventional programs and test faster the real add value of a product for consumers. The lab is concentrated on understanding the change in user needs and anticipate it. In this way, projects deve- loped within the laboratory are varied. To give the most famous example, the Twizi, the compact two-seater 100 % electric vehicle was born within the Cooperative Innovation Laboratory. Tools to imagine the car of the future The group relies a lot on the setting of tools to stimulate the creativity. Innovation room What an interesting name for a room! The innovation room is simply a place created in order to boost the act of finding a solution by chance, also called the serendipity. The room is freely open to all Renault staff
  • 18.
    13 EOLAB 1L/100 KM prototypeAdvanced Driver Assistance Systems autonomous car two-stage turbocharging ADAS NEXT TWO TWIN-TURBO HEAT PUMP recover calories from outside second generation regenerative braking integrated connected tablet speakers, inspired by aeronautics technology DECOUPLED PEDAL R-LINK BASS REFLEX RENAULT INNOVATIONS: AUTONOMOUS VEHICLES AND ONBOARD MULTIMEDIA SYSTEMS A new place to rethink the future, the Square Who are those partners? Who can participate? Lomig: At the beginning we imagined to work with other network or ecosystem such as la Fabrique or the Renault Innovation Community to bring together engineering and business schools, major companies, sociologist and philosopher. We try to keep this heterogeneity which is the iden- tifying mark of open innova- tion activities. In theory, almost everyone can participate to this open innovation project within the infrastructure capacity limi- tations ( between 60 and 100 persons). And yet, this isn’t going to be open to the general public, only for the ecosystem. There will be a kind of workshop for vehicles where historic partners of the Renault or people from Michelin for instance. The second area is about new working methods. We have to rethink the way we are working and how to be able to produce new offers and innovate. How this will work with the different partners? Lomig: We are establishing the project in a new space with partners. Those partners aren’t here to pay to enter into the place, we want them to make available resources in exchange for the accommodation and the chance to participate in this project. We ensure that the place is co-governed. So, we ensure that the partners are also impli- cated into the governance with us. We just started to structure a kind of co-governance. This is a first step to learn how to work differently with the ecosystem. Lomig Unger is now in charge of the new project, a kind of digital garage, we wanted to know more about that, so we asked him. We heard you will launch pretty soon a digital garage. What does that mean? Lomig: We aim to build with the ecosystem a kind of open innova- tion lab that will be able, we hope, to challenge our manner to work with our ecosystem. We have a space of 3000m² at République. This is really cool because we have the opportunity to play in this huge space which was an old car shop. We have one year to play, for me playing and working should be the same thing. This is focused on two main areas. First, work on new mobility offer and explore the future of mobi- lity. This is why we are working with la Fabrique des Mobilités
  • 19.
    14 we can receivethis kind of event. For us, that will be our non offi- cial launch. After the differents organizations of the ecosystem will make their own communi- cation about the Square. This is the job of people inside Renault to set up a proper communica- tion plan, so we let them do in their way. We just want to coor- dinate how the different parts of the ecosystem will communicate about the project about what is common or what is specific. When will we see a digital garage open for the general public? Lomig: This is a project that still makes sense. By the way, some companies and organizations are doing it. The demarcation line between what we are doing and an open garage where we can tinker on our own car is that we are not oriented towards the same public. We have a more comfortable situation because we allow to work on our car only people that have a demonstrated expertise. So we don’t have to monitoring them. If we want to open a garage to the large public we have to find people such as mechanics to ensure the proper handling of dangerous tools and components. We will see after if we have the capacity to do that. For the moment, we just want to bring together people who have the capacity to tinker a car, with skills in business, technologies, user design, etc. We are currently focus on create a playground for the ecosystem, but the idea of an open garage is really interesting and could be a project launched by Renault. One thing at the time... So concretely, what type of projects will we find in the Square? Lomig: Renault decided to begin with the existing intern network of the Creative Lab. We launched a first call for innovative projects. There were several number of selection steps, pitches and POC (Proof of Concept) in front of big bosses. One of this project was a kind of denuded Twizi one which the soft and hard parts have become pluggable. This is typically the type of project we want to host into the Square. We would like to attract students and companies, through play, to conceive and build new things above that. For instance, with the skills of Visteon we could work on a SDK. There are so much inte- resting things we could do and we haven’t done yet. The Square opens the field of possibilities, that’s why we want to invite this kind of funny project. Finally, what about open data? Lomig: At Renault we are at the zero level. Maybe with the oppor- tunity to work with la Fabrique, we will be able to connect with various project which will produce or are already using open data. The idea could be to invite those project and see how to contribute. This is one of the challenges of la Fabrique, we now have to find resources to start working on this subject. Innovation Community will be working. For instance, people from Visteon, who have real skills to tinker vehicles. One of the challenges for Renault to bring together people from inside Renault with people from the connected car world or students or designers. Our goal is to set up a “friction zone” between Renault and the rest of the ecosystem. We want to attract the skills that we lack, like a huge pool of resources gathering at the same place and available for all the member of the ecosystem. Will the Digital Garage be the name of the place? Lomig: No, the name won’t be the Digital Garage because we didn’t want people to think it was just a kind of hybrid area inside Renault where you can play and explore things in an agile way. At first we wanted to keep the name garage because the place was an old car shop and we wanted to highlight the fact that the project won’t be only focus on digital transition. Then, as we decided to work with our partners we looked for a name which could be common for everyone and mean something at the same time. Our idea is to work on the smart city issues, so we had to find a name in relation to that. We proposed the name “the Square” because a square is a green space inside a city. As everyone agreed we called it like that. When does it be officially launched? Lomig: Actually, it’s not really official. Indeed, we decided to work under radar to go faster. We didn’t have so much time as we only have the place for one year. As a consequence, there won’t be an official announcement. However, the first event we will have will be the workshop on open hardware organized by la Fabrique November 15th as part of the Paris Open Source Summit. That will be our crash test to see if
  • 20.
    15 tious idea, aconcept to imagine a better mobility in a responsive city with the help of big data, software/algorithms, what we use to call “soft power”, software power. Responsive locomotion is based on two big ideas. The idea of a customised mobility, more and more adapted to each kind of traveller (tourist, worker, disabled, etc.). It’s a question of travelling profile taking into account needs and vulnerabi- lities faced by travelers at any time of the day. Second big idea is context awareness, how can we take into account real time informations like weather fore- Hello Bertrand, I saw that the motto of your company is “Data in real-time algorithms and interfaces treated: here is the back office of the responsive locomotion.” A good start might be made by presenting what is responsive locomotion and what is the implication of Kisio Digital in this field? Bertrand: In 2014 we decided to talk about “responsive locomo- tion” using the responsive web design analogy: your content is automatically adapted to the different screen sizes/devices. We were searching for an ambi- INTERVIEW Bertrand Billoud Y ou may not have heard of them before, yet their technologies are behind SNCF Direct, Vianavigo, Mappy and maybe your local trans- port network, la Fabrique des Mobilités has interviewed Bertrand Billoud head of marke- ting and communication at Kisio Digital, part of Keolis group.
  • 21.
    16 nized a littleseminar of two days in Paris for the executive committee. He pulled together several persons involved into open source and open data, such as Gaël Musquet of Open Street Map (see the interview of Gaël) and other people who became collaborators. They explained to us the benefits possible from open source. As a result of the seminar, we started working on a relevant practical case to figure out what will happen if tomorrow we decide to do open source. We produced a SWOT analysis to determine risks and opportu- nities. After that, the executive committee decided to switch to open source. We decided to start with Navitia which is the major software of the company, like the reactor core, everything we produce is made on top of Navitia. We opened our source code in April 2014, that was easy. Indeed, our software had been set up 10 years ago, since he needed a kind of refreshment, 2 years agos we had already decided to improve and clean our code. As a matter of fact, we just put our source code on GitHub and pressed a button to make it accessible to all. Thas was a Friday. We were so surprised when we realized that some people has contri- buted since the next Saturday, as Dutch that we had never heard about before. The world of open transport route planner is such a small world! After this small success, we thought about a way to meet all these people in Paris. We wanted to see those Dutch, Bliksem, which have their own planner called RRRR based on OpenTripPlanner. We were so intrigued, we wanted to meet them in the real life. We set up a meeting with OpenTripPlanner, Tisseo, Bliksem and some others. This is how we set in motion a dynamic with a small commu- nity of people interested in what we were doing. When you are in a proprietary logic, nobody cares about what you are doing, with the exception of your team. With the open source that’s the contrary. As all the data in the Netherlands are open, they just needed one week-end to set up Navitia in all the country. But beware, our software is not as easy to install as the Microsoft Pack Office. It requires a good overall technical level. Honestly, did you know where you were going by doing this? Did you encounter strong reser- vations inside your team or with your clients? Or maybe it was really simple and everybody understood the philosophy of open source and everything worked as it was planned. Bertrand: After the decision to release code was made, we had to explain at both employees and shareholders what was about to change or not. This step worked out well because we had already done a significant preparatory work. During those months of preparation, we prepared the Navitia team to what was going to change in their daily work: How to work with people who actually are not in the walls of the company? How to deal with cast, traffic jam, disruption on the public transport network, pollution peaks, big events with a lot of people, congestion, etc. So, responsive locomotion is like a non ending quest. It’s more a vision. We would like to reverse the relationship between trave- lers and transport networks. Today you have to define your travel according to all transpor- tation modes constraints, and sometimes it’s complicated. In the future we should have deve- loped more and more interactive relationships between travelers and all the vehicles they use, with internet of things, smart bot, data and software. We saw that your code is open source. What does that mean exactly for the people who may not understand? Bertrand: In 2014, we decided to open the source code of our software Navitia under an AGPL licence. This software is avai- lable on Github plateform with an interactive documentation to understand how to reuse it. For more transparency, it means you can see how Navitia software is made, like the secret of the algo- rithms recipe. Indeed, sharing source code is quite the same thing as sharing a recipe. When and why did you decide to migrate towards the world of open source? Did you release your technologies step by step or at one go? Bertrand: The decision has been made during 2013 summer. Our DG, Guillaume Crouigneau, orga-
  • 22.
    17 those persons whomight ask questions? How to work on the documentation, to improve it continually and make it easier to use the software? We also worked on overcoming stereo- types about open source which are actually wrong. We hired in the company some persons who know well the subject. They came to explain to our employees their vision. We set up break- fasts to answer their questions or fears. Because, yes of course, some of them were worried. Just imagine for a second that during 10 years you say “Navitia is a jealously guarded software, our gold nugget, nobody must know what it is inside!” then you finally changed your idea and open your source code. It’s quite disruptive and disturbing for some people. With the good preparation that was easy. Actually, we are wondering why we didn’t do it before. You said your software work with data. How do you collect data? Is there a huge platform with all the transport data cleaned and then stored? Bertrand: Before opening Navitia, some of our employees were already involved into open data and hackathons. They were getting tired of seeing people trying to build their own trans- port planner in only two days during an hackathon and failed. They built an API, Navitia.io with Navitia which wasn’t open at the time, and they had the open data of three cities; NewYork, Paris and San Francisco. That was interesting to see that our software could work with major cities. We went to another hackathon organised by the city of Paris and said “this what we have done, it’s free, we integrated the data of RATP, Transilien and Velib”. We noticed that 5 of the 10 winners used Navitia.io. So we realised that adding open data to Navitia had a real interest, to save time searching for data, cleaning them etc. We started working on the data. This isn’t as simple as find data on a server and copy- paste on Navitia.io. Today, people are coming to Navitia.io because it’s a data hub with more thant 14 000 cities around the world indexed, mainly in Europe, North America, Australia, and South- East Asia. We don’t have much data in South America and conti- nental Asia, and no data in Africa. Even if GTFS (General Transit Feed Specification) format is used throughout the world, the biggest problem is that data are not structured in the same way in all the country. We have to face so technical issues to avoid compromising data quality. What is happening is that, each week or month, new cities or regions open their data. In this case, we add it on Navitia.io, provided that data have a share alike licence which allows us to do that. When you go to the API, there is a google group, which acts as a support where everyone can ask questions or make recommendation. For instance you can find: “Some new data are available in Sardinia, could you add it on the API.”,”You have something wrong on the UK data.” etc. All of this help us to improve our quality. This what we call our feedbacks. They can ‘tmake these changes by them- selves, because we own servers. The API is three things. First the fuel, it’s our open dataset. Then the engine, it’s all the web services of Navitia. Finally the chassis, this is the cloud where everything is installed. A simple Navitia user don’t have to pay our servers. As a result we provide three solutions. Experts will use the open source software Navitia, lift the hood, play with the engine and might help so change some parts. Absolute beginners will use the API Navitia.io. Finally between these two categories, people who just come to pick up dataset. Therefore, currently this is not merely an easy process. Change of topic, a lot of people think that if your are a company with open source philosophy you can’t earn money at all. So, can you explain us what is your business model? Bertrand: We are a SAAS (Software As A Service) company, that means we don’t sell software but services associated to our software. It could be for instance, cloud computing, implemen- tation and configuration of a software, or IT support. We know the engine by heart, so we are the only one able to adapt it to the local context. The technology isn’t the most important thing in our business model, this is really services that we sell. As a result, our business model hasn’t evolved so much in the recent years. Regions or cities still pay us to implement multimodal information services. The only thing that has changed is that our softwares are open source and we have open dataset. We use AGPL licenses to explain what people can or cannot do and to protect us at the same time. However, there is still a certain risk that a talented company indicates “We can do the same thing than Kisio, with Navitia, but cheaper and adding new services.”. The digital removed the barriers for innovation. Now, if you want to quickly innovate you have to do open innovation. In our case, we saw the open source as a way to do open innovation. There are today plenty of business model for open source (see article about business model). We could adapt our business model by adding a contribution on some services. For example, the google group works currently without any charge. But we want to give a little to our community. For us, this is important to train our users and answer their ques- tions. That’s the same thing with our IRC Chat, we could have made people pay to use it. We could also have trained software
  • 23.
    18 firm implementing Navitiaand make them install the software in our place. But we didn’t. In conclusion people are using for free your technologies and they made feedback to help you improve this technologies while some companies are paying for using your high-quality services with their own brand. It seems a well-rounded affair, just as a win-win policy. Do you have any plans for the next few days, months or years? Bertrand: We have two important subjects. The first one is the real- time data. We started working on it with the National Society of French railways (SNCF). We created an API SNCF based on Navitia but with real-time data instead of theoretical. Our aim is to have more and more real-time data on Navitia.io because basi- cally this is what people want. We have to do more than just theo- retical data. Our business model is likely to evolve because with the API with theoretical data, we have set the bar high. Currently, you don’t have to pay until 90 000 requests in our database per month and the price is really competitive; 90€ per month. Our goal is to foster the creation of new uses. We want people to innovate with our ressources. We don’t want to chase after money for amounts most often ranging from a few cents to a few euros. It’s better for us to have on the one hand 4 or 5 major customers paying and on the other hand an active community. We care about our freemium access. Without that our customers can’t have access to some specificities such analytics. The other important subject is citizen projects. If a citizen has a project, he just has to contact us. If the project bene- fits the community or is in sync with our values, our interest is to not charge him. It could be a simple citizen but it also could be a researcher. A good example of a citizen project is Transportr by Torsten Grote. It’s an open source mobile application based on Navitia that works in several cities even in Brazil. In conclu- sion he made open source with open source and that mobile application respects user privacy. This is exactly what makes us vibrate. This is crazy because now, people are requesting us to add new dataset on Navitia.io to make it available on Transportr. Don’t you think that your tran- sition toward open source has been easier with your acquisi- tion by SNCF group? It has existed for several years, we built our own business model and we have local customers such as the SNCF, Kéolis and french regions. So of course, it was easier for us to do open source than for a startup which doesn’t know what is going to happen in 6 months. It’s also true that being a part of a major group probably helped us even though we had to explain why we were doing open source to a larger group. A few words to conclude? Do you know that nowadays, there are cities that are using Navitia without knowing it? For instance the transport operator of Nantes, the TAN on a Transdev grid, they are using Navitia because the Pays de la Loire region is one of our customer. This is pretty clever, they mutua- lized the different systems to facilitate the interoperability. In Thau and Sète (south of France) they are using Navitia too and we didn’t install them the software. The important thing is that, the more people use Navitia, the faster we will increase our quality and report bugs. Thank you very much Bertrand for having shown that even if the world of open source could seem scary for a company which want to help the community and be helped in return, she can do it and have success if she finds the right business model. Kisio digital didn’t know exactly where the company was going by relea- sing their code, the story was built a posteriori and it’s a good story.
  • 24.
    19 Innovation Summer Camp Thirdedition in partnership with La Fabrique des Mobilités When? 27 June - 1 July Where? Estaca campus ( Paris Saclay) — nized for the third time by the ESTACA, an Engineering School specialized in automotive, aero- nautical, railway and aerospace. To assist the participants in their mission, 10 coaches and experts were provided with 2 FabLabs and design centers. 5 days on the theme of mobility For 5 days, 50 students and graduates from 16 schools and universities, aficionados of entrepreneurship, were accom- modated on Paris Saclay Campus with the sole objective of solving one of 10 problems proposed. This edition was about finding solutions to the firm’s problems in the field of mobility. The issues expressed by companies were broad enough to leave more room for imagination, innova- tion, creativity and,even, create a real startup. The camp was orga- WORKSHOP
  • 25.
    20 Google sprint, away to accelerate design- thinking approach to innovation and problem-solving. In order to solve problems in an innovative and more effec- tive manner, the 2016 edition of Innovation Summer Camp was based on Google Design Sprint. This methodology uses a test-and-learn approach called Design thinking . Design thinking is goal oriented method rather than problem-based approach. The idea is to consider all the conditions and parameters of a problem and explore simul- taneously alternative solutions. Design sprints can be used for almost any idea in any area. This is a way to compress months of time into a single week, like a sprint. Each day is a new step in the development process. No waiting for weeks or months before launching a minimal product; the aim is to build a prototype to collect data and improve the solution right away. The commons and open platforms as a support for innovation In an Open Innovation approach, la Fabrique des Mobilités deve- loped a partnership with the Innovation Summer Camp. The aim of la Fabrique was to provide methods to capitalize and memorize all the productions, on an open platform, from concep- tion to validation. La Fabrique also provides tools and existing resources to do more with less : don’t start from scratch and use commons, resources not owned privately, to accelerate the inno- vation process. All the productions and resources collected can be found on the Fabrique des Mobilités wiki. 5 seminar course days Innovation Summer Camp 2016 50 participating students 10 project team 16 schools and universities 2 FabLabs and design centers 10 coaches and experts Day 1 understand Day 2 diverge Ideation and develop- ment of several solutions. Day 3 decide Choosing of the best solution amongst others Day 4 prototype Realisation of a POC (Proof of Concept), to better understand user reactions. Day 5 validate Submission of the project to real users (colleagues and companies) and collections of data.
  • 26.
    21 adapt to achanging environment. Crowdsourcing means bringing together ideas which come from everywhere by removing fron- tier between individuals. In this way, we can attract talents on a specific projects. It all began with the Rally Fighter a vehicle designed for Arizona desert, a relevant solution for Phoenix environment. From the conception on the online platform to the production and the sale it took only 18 months. In Berlin, we launched the Urban Mobility Challenge which called the community to resolve Maud: The basic idea of Local Motors is to produce vehicles collaboratively on an online platform, comprising 50 000 members whether they are engineers, designers or idea owner. The aim is to contribute to innovative solutions to local challenges of cities of the future in terms of mobility by using a global community. Actually, it’s a global approach, combining co-creation and micro factories, designed to develop suitable and relevant solutions in a given environment. The interest of this combination is to go faster to the production and being able to INTERVIEW Maud Chidiac A ccording to them they aren’t here to build vehicles; they’re here to reinvent them. La Fabrique des Mobilités has interviewed Maud Chidiac Project Manager at Local Motors. Hello Maud, 9 years ago Jay Rogers wanted to do something helpful for the society, so he decided to develop an unusual idea of crowd-sourced vehicles, this is how started the story of Local Motors. Explain us, what does crowd-sourced vehicles mean?
  • 27.
    22 person who designedan entire vehicle. This is proportional to the implication on a project. Without forget that, the work of each member is protected under Creative Common licences. To find members, at first we went to universities to show them our projects. And now, we have a lot of partnership with students whether on our online plat- form to contribute to projects or directly in our lab where class of students can use the various machines and tools. We also have freelancers and engineers who feel ready to invest in tech- nological innovations facing new challenges. You reward the member of your community. This is pretty attrac- tive. But, some might ask, who owns all these ideas? I mean, does someone can steal an idea, commercialize it and earn money with it? I heard you spoke about Creative Common licences. Maud: The protection of ideas is based on Creative Common licences. Co-creators accepte to post their work online and, as a result, they also accept itera- tions on it. However, we can easily track origins of each idea. In other words, this means that each member is playing the game by proposing ideas knowing very well that iterations are going to be made on it. The most impor- tant thing is that each idea is the property of the owner. We talked a lot about conception. However we didn’t talk about what is next. Maud, what are the next step after conception? Do you build vehicle by yourself? Could you sell me one of your vehicle? Maud: For each challenge it’s the same chronology. First we post the challenge on the online plat- form. Then we receive inputs. The particularity of those inputs is that they are just designed. So we have to send the selected inputs to our internal engineers so they can draw more specific plans. The next phase is the prototy- ping in our labs. In Local Motors all is made internally from the conception to the production. It permits to adapt our vehicles to local needs. If the city of Oslo needs an autonomous vehicle we are capable to take into account issues of low temperatures. The final step is the sale. We have already sold 5 vehicles in the European pollution and conges- tion issues. We gathered an amazing number of ideas at the end of the two months challenge. The first prototype, called Olli, was generated in only 6 months. This project will be duplicate in other cities than Berlin in Europe, Middle East and east cost of the United States. Another example; the DARPA, the Defense Advanced Research Projects Agency, asked us to realize a functional proto- type for the United States Army in only 5 months. This may seem incredible for institutions such as the army. We now have a lot of examples of this kind of answer to specific challenge in record time. Anecdotally, Jay Rogers was a member of the United States Army and in Iraq he realized that the conception and produc- tion process of vehicles needed to be accelerate. That’s why he decided to develop an automo- tive industry based on crowd- sourcing. The key of the Local Motor’s success is this community. How did you manage to build your community? Above all, how can you attract and motivate someone to work on a project and share idea? Maud: Usually, in the commu- nity the work is organized in challenges. In this case, winners receive a cash prize. For example, for the Airbus cargo drone challenge, a drone for goods transportation, the total amount of prizes reached 150k€ with others compensations such as business trips to show their prototype to senior executives. Actually, we also have royalties to the daily co-creation work on the platform. The amount of royal- ties is assessed on a case by case basis in relation to an analysis of every input of each co-creator. In this way, if the co-creator worked on a rear-view mirror or on another vehicle component, he isn’t going to be paid as a
  • 28.
    23 Maud: We arenot necessarily removing jobs, because we still need internal engineers. You can simply no longer do without them. The idea is to open up the field of possibilities. The concep- tion step is increased as ideas are coming from everywhere. However, we still need engineers during all the steps. We are not replacing the workers, it’s more like a transfer of position, they are evolving. We can’t automate all the production. We are chan- ging classical positions of the assembly lines to new positions whether they are on software or hardware. Local motors is working with major companies such as Airbus, Renault or Domino Pizza. How does the collaboration work? It might be complicated for a small and disruptive company like Local Motors to work with such company. Maud: A company such Airbus will be interested in the dynamic of co-creation. This is what allows them to provide the market with a new drone within one year. The contract was: one year to commercialize a new drone based on the model of an old one. That’s the process flexibility which attracted major companies instead of the scien- tific expertise. Similarly IBM with whom we are working to implement Watson, their arti- ficial intelligence, in an auto- nomous car, is really interested in by the process. After each challenge, ideas are voted by the community, internally improved and we moved to the produc- tion. This intrigues. Generally whether it’s the process which attracts companies or the desire to implement an innovation, sometimes both. This works even for the major automotive compa- nies. Usually they come to us to propose challenges, but of course sometimes we have to look into new challenges. Domino Pizza they contacted us to set up an online challenge about an inno- vative pizza delivery vehicle. We have a variety of cases. Our process allow us to open up the field of possibilities. Now, you are more than 100 employees, with 4 microfacto- ries and an huge community of transport lovers. Moreover, you already have projects about cars, drones, skateboards and even planes. What are the future projects for Local Motors in Europe, or in the world? Maud: First, we now are about 170 employees after a recruit- ment campaign. The plan for the future is to be well established in Europe, especially with the auto- nomous shuttle which attracts airports and shopping centers, before being able to implement it into public transport system. I would say that the priority is the integration of mature projects and to move towards the commercialization. The long-term strategic objective is to be fully involved on this local problem-solving approach, which can, by the way, apply for any country with necessarily having state-of-the-art technologies. Our global community is solving local issues with a process that can apply everywhere. However, as we just settled in Europe one year ago, we are now focusing on Europe. Do you have something to add? Maud: Yes. The Lab with the micro factory inside, will open its doors early 2017 in Berlin. For the moment, we have 4 labs; one in Washington which just opened in June, one in Vegas, one in Phoenix and the final one in Knoxville. The vehicle produc- tion will now be done in Berlin. And we respond to tenders for the whole Europe. Thank you Maud. Let me say a few words for our readers, visit cocreate.localmotors.com, who knows, your ideas might revolu- tionize the transport industry! United States. In Europe, four autonomous vehicles Olli has been sold to Copenhagen, we have a first prototype in Berlin and another in Washington. We are currently entering into the prototyping phase for the Airbus cargo drone. Indeed, the Berlin Lab with the micro factory will open very soon. The aim is to prototype directly there, with the community and organize new challenges in the same format as online challenges, but inside the lab so that the community can participate to the conception process before the production inside the micro factory. Is that what is called Direct Digital Manufacturing? Maud: Direct Digital Manufacturing, also called DDM, is in the spirit of speed up the process of produce vehicles. An example is the 3D printed car we made in the United States. We used the DDM, this means we used a design sketch, a CAD file that we can modify to accommo- date local needs. Then you just have to click on the button and it prints. The aim was to print a one piece chassis editable to desire to allow the customisa- tion. We are using the DDM for the autonomous shuttle which is partly printed in 3D, such as the floor, seats, the bumper and tires. One more time, what matters is to adapt the vehicle. We are currently working on a prototype for 8 or maybe 10 passengers, but in the long-term we will be able to produce shuttle for 2,4 or 20 passengers to vary the fleet. So the idea of DDM is to change a model and customize vehicles, and it began easier with 3D prin- ters. To put it in simple terms, your goal is to disrupt the transport industry by suppressing workers in the construction phase while you are including more and more players in the conception. Is that right?
  • 29.
    24 Quick start rules Essentialrules Aim Whether you are a local authority with more than 3 500 inhabitants and consequently with an obligation of releasing your data or a data holder who don’t know how to open up your data, this game is for you. How to open data? FOCUS ON 1. Quality than quantity It’s at the beginning that you should learn good habits. The first rule is to always start small, simple and fast. Start with a good dataset than a huge mess. Remember that the advantage of open innovation is that you will learn from your experience. 2. Reassure Let not the people who you work for or with get confused. If these people are not properly briefed, you will have to deal with their discontents. From the very start, you have to respond their various questions and their misunders- tandings. 3. Sustainability After having succeeded in all the step, this is not the time to abandon. The release of data is a long-term process that requires continuous update and feed- backs. People have to rely on your data, some make it sustai- nable over time.
  • 30.
    25 1 Choose dataset Yourfirst step is to choose a theme and it may become a real challenge for you. We advise you to create a list of the datasets you want to open and give priorities to them. You can choose to focus on car-pooling, parking spot or maybe the use of public trans- port, it’s totally up to you. The key is to find a theme with data easy to organize. Keep in mind that you can always return to this step later. Then choose your first dataset; timetables, statistiques, Point Of Interest, etc. 2 Clean the data It’s important to ensure that your data are clean before make it open, otherwise data won’t be usable. Cleaning consists of avoiding shaping, suppress blank cell, distribute tables on diffe- rents tabs, entitle the top line of each table etc. If you’re having trouble cleaning your data, try Open Refine an open source software tool designed to deal with messy data. 3 Document the data Any further information, called metadata, are worth conside- ring: title, description, keywords, license, date, localisation, authors etc. You have to enhance the data to give context. It will increase your reliability. 4 Choose the right format If you want that your data can be processed you have to make them available in a standard and structured format. Indeed, Game progress 1 Choose dataset 2 Clean the data 7 Communicate 5 Apply an open license 4 Choose the right format 3 Document the data 6 Put your data online Game board
  • 31.
    26 you have toprovide a machine readable format allowing for re-use. La Fabrique highly recommends you, before starting to open your data, to get at least three stars, based on the 5-star deployment scheme for open data. Here are some recommen- dations of format. you a set of suitable licenses. All you need to do now is to choose which one you want to apply. Etalab (French Open License) - It allows all sorts of uses provided that authorship is attri- buted (by) and the last updated date appears. Public Domain Dedication and License (PDDL) - This means putting all your datasets in the ‘Public Domain’ and therefore renouncing all rights. Attribution License (ODC- By) - It allows all sorts of uses provided that authorship is attri- buted (by). Open Database License (ODC-ODbL) - It allows all sorts of uses as long as you attribute the authorship, share-alike and keep open the datasets. 6 Put your data online It’s the more obvious step but this doesn’t mean it’s the easiest. There are several ways to put your data online. Via your existing website The advantage of this method is that it’s more familiar to you. You just have to add a new section on your website dedicated to the release of your data. However, it becomes harder to people to find your data if they are not specifi- cally looking for it. Via a third party site There are already sites specia- lized in open data collection in nearly all fields. You can use those repositories of data which provides all the documenta- tion and information about the processes of submitting and using a database. We recom- mend that because those site have already pooled together a community of interested people and others sets of data. In other words, it’s a virtuous circle; the more there are quality datasets, the more the community grows. Via API Another way to publish your data, that we recommend, are the Application Programming Interfaces (API). The use of API appears to have increased in recent years. Its strength is that it makes it easier for program- mers to develop applications as it provides all the building blocks and documentation. Moreover, it ensures programmers that your data are updated in real time. Other ways Of course, there are other ways to publish your data. For example FTP servers, but we don’t recom- mend it because it’s too compli- cated for beginners and above all out-of-date. Nonetheless, for a large volume of data you can use torrents, it’s very efficient but it doesn’t permit the visualisation. 7 Communicate Finally, you have to find users to value your data, otherwise all this work will have been done in vain. So it’s time to communicate a lot! Use social networks, talk about your data around you or during meetings and activities, organise hackathons or suggest your data to existing events. To summarize, the easier it is to find your data, the faster innovation will come up with. 8 Start again You thought it was finished? NO, now it’s time to repeat it with other datasets. Return to the first step. Tabular database .CSV .ODS Timetable .GTFS Text .ODT Picture .PNG Video .OGG Mapping .GEOJSON .SHP .KML . KMZ Audio .WAV Make it available as structured data (e.g., Excel instead of image scan of a table) Make it available in a non-proprietary open format (e.g., CSV as well as of Excel) Link your data to other data to provide context 5 Apply an Open License Find the most suitable license for your data might be the hardest step. However, it’s obligatory and essential to provide clarity. First, determine what are the intellectual property rights in connection with the data. Then, choose a license that respects these rights and the definition of open data. Here, la Fabrique des Mobilités recommends for 5-star deployment scheme for Open Data - Tim Berners-Lee.
  • 32.
    27 But if wedon’t connect the data generated here with people, what is it to collect them? The claim we make at OpenDataSoft is that our platform will process the data coming in from sensors in real time to turn them into visualizations that anyone can understand. Our platform is THE platform for the connected city because it is the only platform that can keep up with the dynamic pace of our urban spaces, while still being able to display data in a way that people can easily understand and connect with. This includes Hello Jean-Marc. Firstly, thank you for receiving us. Let me start with my first question. OpenDataSoft claims to be THE platform for the connected cities, what does that mean? Jean-Marc: Thank you very much for having me today! When we talk about the connected city, we’re talking about creating connec- tions in every sense of the word. In Smart Cities across the world, we see sensors being installed to measure urban phenomena such as traffic circulation, air quality, noise level, even the number of pedestrians in given squares. INTERVIEW Jean-Marc Lazard O penDataSoft, new member of FabMob, was elected one of the most innovative company in France. Their specia- lity? Facilitate the preparation, the reuse and the exploitation of data by providing a turnkey plat- form. More importantly, they say they can foster innovation for the mobility. Certainly, we are going to check that out by interviewing Jean-Marc Lazard the co-founder and CEO of OpenDataSoft.
  • 33.
    28 doesn’t stop here.STAR reports to us that there is significant use of the platform by the non-technical community in Rennes, including by researchers and academics. This supports their own advo- cacy work or research to help to continue to build a better city through combatting problems like transportation access. We see three major victories here for STAR: increased ridership from increased transit accessi- bility, an improved image, and greater transparency through providing resources for non-de- velopers working to improve their community in other ways. We saw that OpenDataSoft has clients such as big operators and local governments. Whom else do you work with? And above all, what is your business model? Jean-Marc: OpenDataSoft is really a platform for companies or governments of any size. Both private-sector companies and governments need a way to easily share and publish data. It is true that we work with some very large companies, such as Endetec Véolia, Saint Gobain, SNCF and cities as large as Paris, but we do have startup customers such as Citilog or M20City, and cities as small as Agen, or Chapel Hill, North Carolina in the United States. We are proud of the wide range of customers that have identified our portal as the solu- tion that meets their needs. In terms of our business model, we do provide a Software as a Service. Our software is enti- rely hosted in the cloud. Clients purchase a license to the software for a period of time, and pay based on their volume of data and use of the platform. Could you explain to us, why a freemium access is a kind of open data? Isn’t it another way to have new revenue? I mean, you can have a free access to a small selection of data and then realize that you can’t do anything useful without paying? Jean-Marc: When we speak of a freemium access to data, we are speaking of ways for orga- nizations with large volumes of data to keep access to them free, despite the costs associated with the data upkeep, quality assu- rance, and infrastructure costs. For example, we have seen SNCF put large datasets up online for free with usage limits. This ensures free access to the data for startups and civic technolo- gists. However, for heavy users of the data who likely have the resources to pay, the data can be used for a fee. This helps share costs and maintain high data quality, while still ensuring the data are available to all to bring out their maximum value. Data monetization models are still quite young, however, and this is just one type of example that we have seen. It is quite realistic to expect these models to evolve and to see many diffe- rent kinds in the future. developers who can literally connect applications to the data as well to build more services with Smart City data. This is the role of a smart city hub such as the OpenDataSoft platform: connecting people with data. We see in the city of Paris a pilot project in the Place de la Nation that perfectly illustrates this. Sensors there are collecting data on noise, traffic, and pedestrian levels, and air quality. In real time, these data are collected on the city of Paris’ Open Data portal, and are then displayed on visualizations on screens within the very square itself for people to see their collective impact as it happens. Could you give us a concrete example of what you have done in the field of mobility? Maybe something you are proud of. Jean-Marc: One of our favo- rite examples is the Open Data project led by the STAR Network, a subsidiary of the Keolis Group, in Rennes. Here, we’ve watched a collaborative ecosystem evolve around the transporta- tion Open Data. There are data- sets on the real-time position of buses, arrival and departures of the metro, and even datasets displaying the paths and cove- rage of the bus network and metro, and accessibility of the network. We have seen the developer community truly take advan- tage of these resources, creating applications like “Where’s my Bus” to show users in real-time where their bus is, and when it will arrive. Services like this can help increase ridership. In addi- tion, developers have created route-planning applications for people with reduced mobility to design trips that fit their acces- sibility needs. In all, 9 applica- tions have been built within the community, and have received official approval by STAR. But the use of the platform
  • 34.
    29 wasted when searchingfor one, and improves traffic circula- tion. As this example shows, it’s possible! Let’s play a game. Imagine that I am the biggest motorway operator in France. You now have 60 seconds to convince me to open my data. Jean-Marc: Okay, Ms. Motorway Operator, so you’re clearly inte- rested in keeping maintenance costs down, ensuring safety on your motorway, managing traffic, and being able to anticipate spending on roadway projects. You likely have some systems to already do this monitoring, but how good are the visualizations you’re able to get from them, and are you able to share them with your innovative community? When you open up your data, you open yourself up to the possibi- lity of working collaboratively on future highway projects. Maybe your data will clearly show you where traffic jams most frequently occur. People that use your highway every day likely already are aware of it, but can use the data to come up with ideas to best redevelop the road. You’re immediately saving money on consulting costs, keeping project costs lower, but most importantly, you’re working together with your users ensuring a more successful project, while creating a great brand image for yourself. You can use this posi- tive image in your favor to help you win future contracts as well to manage more highways and thus help build your business further. This is just one example of how you can reuse your data. Sold? Ok, let’s say you convinced me. I’m now ready to open my data. But what happens after? Where and how should I start? Some tips? Jean-Marc: Why yes of course I have some tips! I’d tell you to start off small with just a few data- sets to learn best practices and ensure high data quality. You’ll be able to build up supporters for your project this way. After that, you’ll want to pick a topic that you want to publish data about. This makes it easier to get data published at first that you can then share with your collabora- tors and ecosystem. After that, be sure to give context to your data to make it easy to find, and so that your users will know what is contained in the dataset. Give your dataset structure, give it a clear reuse license, put it online, and share it with the world! My data are now online and available for all. That might be pretty cool, but me, I need people to play with it and foster the development of innovative new services. How to proceed? Jean-Marc:The most important step in making sure your data are reused is to make sure that people know they are there. Be sure that you have filled out the metadata to help them to be found by search engines, for example, and so that people know what they are looking at. You should also make some noise in local media about the data project! People need to know that the data are there before they can develop ways to reuse them. Be sure that there’s an API that can search within the dataset to sort and filter the records to build the best, most powerful and useful applications. Again, it’s also really important to provide details about the license with the data so that people know what they can and can’t do with the data. Finally, my data are online and I have a community to work on it. We now have the two key ingre- dients for successful smart city innovations. Thank you Jean- Marc for your time. That’s up to you, people who are watching us, to start making cities healthier and more sustainable places to live. What about the storage of data? For example, some services are predicting things such as the way people will move, park their car or go to the city mall. To be able to predict such things you have to store a huge amount of data and it consumes a lot of power. How could it be integrated in a smart city? Jean-Marc: I want to start off by saying that we are not primarily a big data analytics platform, but we make data available for sharing, visualization, and reuse. That being said, we do have some big data capabilities. Let me provide this example. In Paris, there is a dataset contai- ning data on the amount of cars recorded by different traffic sensors spread throughout the city each hour. It is not updated in real time, but every month by the city of Paris. The dataset contains over 27 million records, so it is quite large. This dataset is reused, however, in a parking application that predicts the availability of parking spaces in a given area. It combines this dataset with others available on Paris’ Open Data portal and uses a predictive algorithm inde- pendent of the portal to predict available spaces. This fits within the framework of the Smart City as it facilitates finding a parking space, reducing fuel emissions
  • 35.
    30 PARTNERSHIP four key reasonswhy we need it. • Transparency - By defini- tion, open data are available data which are free to access and free to use: This means that everyone can reuse open data with complete confidence. • Cities of the future need mobility data - The current trend for cities is to produce a huge amount of data. However, they now require platforms to collect and distribute those data so we can develop new services and applications to improve data. It is used to upload, analyse, store and share open mobility data while guaranteeing quality and the maintenance. “Catalogue is an openly-go- verned community that relies on the collaborative input of its members, with the goal of boosting innovation in mobi- lity.“ Rahul Kumar- Senior Vice President at Transdev Why do we need it? First question we could ask ourselves is, why do you need an open source platform that provides open data ? Here are the The project Catalogue D o you ever wonder why it is so complicated to find a way to reach a point B when your point A is in another city? Why is there no platform that all the transport data? Why don’t we have a mobile or web application that collects all passenger transport operators? By the end of 2016, Transdev is supposed to launch Catalogue, a project in which la Fabrique has been invested since the beginning. Catalogue is there to help you and tries to solve those issues at the same time. This should be the world’s first fully open source platform for mobility
  • 36.
    31 they are using. Aplatform only a click away Producers are given a guarantee that they can access to their data at any time, still free of charge. Data users can also access Catalogue’s data without worrying about out-of-pocket costs. Catalogue assures you that all the data are open source and free to use. People who wish to have a full access to Catalogue and its tools, in exchange for a small fee, can obtain and use an API. Real-time data trans- port Catalogue also provides real-time mobility data through instant sharing or data stream. Therefore, users can easily create an inno- vative way to plan a multimodal trip. It must be emphasised that the organization of data is driven by the principle of continuous improvement in a collaborative approach. La Fabrique is proud to take part in Catalogue. By working together collaboratively, we can change the future of mobility. We hope that Catalogue will lead the creation of a great number of innovative transport services for everyone around the world. If you want to play with data and be part of the world’s most comprehensive global transport open source data pool, join the Catalogue community! lifestyles. • Participation and commit- ment - Catalogue is based on collaborative process with a community of data produ- cers, data consumers and developers. Each member of the community must ensure the accuracy and update of data. In return, the commu- nity can have faster and easier access to any informa- tion collected in Catalogue. • Creation of economic and social value - With open data, each and every player - inclu- ding developers, govern- ments, and even corpora- tions - has the ability to find an innovative way to use data and optimize the way we move. The new applica- tions and services will create new markets, create a more sustainable way to consume, and finally improve our living conditions. An efficient organiza- tion First, producers freely store data in Catalogue. Then data are iden- tified and categorized by origin. To retrieve data more efficiently and smoothly, an easy-to-use interface has been developed and implemented. The users of Catalogue can easily find what they are looking for by using key characteristics and filters, such as location. Data management is consistent with the open data storage rules, as data are stored in the universal GTFS format. To ensure data quality All the data are checked. In this way, data producers can easily and quickly correct them. This is how the data consumers can rest assured of the data quality. Moreover, Catalogue is synchro- nized with only reliable data sources. Finally, an early warning system has been set up to notify both producers and consumers when there is an update on data Tools Data aggregator Community
  • 37.
    32 “Software, education, industrialdesign, data, sciences, art and culture, open models are everywhere. The actors who make use of these open approaches often question the positions defined by traditional actors. Communities frequently organize themselves to collectively solve issues that centralized organizations come up against. Tabby, the car avai- lable as an open source kit, Protei, the marine open source drone and OpenStreetMap are just a few examples. What do these open models teach us? Under which conditions can they develop their impact? What kind of dialogue and interactions are possible with traditional actors? Researchers, entrepreneurs, managers in major companies, designers, experts, writers and philosophers respond to these questions in Open Models, business models of the open economy.” Open Models, L.D.Benyayer Business Models for Open Source development FOCUS ON Louis-David Benyayer in Open Models proposes 14 very relevant measures to support open source. FabMob is starting to produce some answers in the field of transportation. We will document feedbacks from all stakeholders, iterate to adjust and propose best solutions to support open source developments.
  • 38.
    33 projects (as opposedto indicators related to the number of patents or scientific papers publi- shed). Systematically match all crowdfunding campaigns meeting certain criteria with equal public funding. FabMob could, with the future association, encourage its partners to finance equally public and private. ADEME is starting by funding at 50% the first call for open source projects. Link all - or part - of public university funding to the number of open source and open access projects developed. ADEME is starting by funding the first call for open source projects in the commu- nity of ride sharing. Create an IRC (Individual Right to Contribution), based on the model of the IRT (Individual Right to Training), to allow employees to spend time contributing to open projects. FabMob is star- ting to provide profes- sional training and could experiment IRC. Create a fund enti- rely dedicated to open projects based on a business contribution (the “1% open” contribu- tion) that could match funding (on a oneto-one basis) for open projects demonstrating a true benefit for the commu- nity. Along these lines, how about creating a fund at the European level? FabMob could, with the future asso- ciation, aggregate open contribution coming from volunteer partners. Allow the valuation of open resources in company balance sheets (in the same manner as associations can include the value of volun- tary work in their own balance sheets). Expose the purpose and impact of open models: The benefits of open models are sometimes unre- cognized. Popularizing them, demonstrating their positive externa- lities, and promoting public knowledge about open strategies can help to close this gap. Highlight the value of contributions to open approaches, based on the same model as Corporate Social Responsibility (CSR). Create a company ranking promoting involvement in open approaches. FabMob will promote open approaches and evaluate projects. A first ranking system can be deve- loped. Inform companies and large funding bodies about the economic efficiency of open approaches and prac- tices, and share advice on methods to imple- ment them. FabMob evangelise major indus- trial stakeholders in the ecosystem of transpor- tation. Demonstrate the positive externalities generated by open approaches by means of a research study. FabMob will evaluate benefits of open approaches with Nice University. Develop new licenses in line with peer production & reciprocity licences. Develop a tool/platform offering an overview of all existing licences and patents. FabMob supports existing licences and advices projects. If needed, FabMob will study a new licence. Not adapted Organize public tenders in such a way as to promote open source licenses (code, design, content) and not only digital aspects. More drastically, make open source a mandatory criteria; or, in a less radical way, raise the open share to at least 30% of the project valua- tion. Similarly, include an open data section in each public tender, to at least allow project mana- gement transparency (open data ensures fair access to public markets and fosters innovation). FabMob evangelise and support open source in all projects. A specific action could be deve- lopped for public tenders in public transporta- tion with several cities partners. Identify stakeholders in administrations and communities willing to welcome open initia- tives. FabMob works with a large networks of stakeholders and partners, and identifies which ones are willing to contribute. Develop key indicators that place value on contributions to “open” 1 2 4 5 10 11 7 8 13 14
  • 39.
  • 40.
    35 When a memberof our commu- nity needs a physical platform we can provide it at a fraction of the cost. Forces and weakness about open source? Forces: companies in this closed and old industry (automotive) are starting to understand that sharing and collaboration can improve products and services, faster. Weakness: companies are still scared since it’s something totally new for them, so for us it’s a very big effort to educate them How did you manage your large community? How FabMob can help? I think every project needs a very strong marketing and communi- cation strategy. We worked very carefully involving influencers and giving exclusivity to media and events to showcase our launch, we also put a lot of effort on videos to showcase our poten- tial. FabMob is acting in a compe- titive sector with stakeholders which have few experience on open source but more on patents. Your actions of evangelisation and promotion of open source are really important. FabMob could also work on license strategy to empower open source in new mobility. Open Source Vehicle is the emblematic project for Open Hardware in the field of transpor- tation. OSV start few years ago with a radical approach: develop a first platform with a modular technology in order to bootstrap the 2.0 automotive production. Small companies, final clients will be able to participate in the design and also the production, to co-create, adapt and up-grade components or the complete vehicle to their needs. By reducing barriers and finan- cial capacity requested, OSV create not only a technology platform but a new pathway to produce mobility services. The two co-founders are Italian-born: Tin Hang Liu and Yuki Liu. Today OSV project is accelerate at Y combinator. You have a great experience both on open source hardware and international communities. This is very interesting for us. Why did you choose open source option to build your car? Because working several years in the automotive industry (personally, more than 10 years now) me and my team saw that many new vehicles projects have to start from scratch, so new entrepreneurs have to invest a big amount of money (some million euro) and time (some years) to have a stable platform technology. Most of the times they fail because they don’t have much expertise or they run out of budget. It is like asking someone to develop an operating system from scratch and then the app, crazy ! And the big auto OEMs are not willing to provide them plat- form technologies because they don’t want competitors. So we decided to develop TABBY EVO, making it available in open source, so you can down- load it, hack it, improve it and start working on it using a CAD software.
  • 41.
    36 COMMUNITY Schools & Students S choolsspecialized in the fields of digital, transporta- tion systems, energy, urban planning and design may turn out to be key places to gene- rate innovation for the mobility sector. Learning environments and collaborative approaches are now core supports for open inno- vation. “Behind every innovation attempt, are hidden learning expectations”. Why a community of schools? Many of the last disruptive breaks (especially concerning social innovation) came from students environments. Schools bring appropriate environments for innovation thanks to students’ mindsets: creativity, self appro- priation needs, openness to fail, and viral dissemination.
  • 42.
    37 private stakeholders, companies, associations,regional authori- ties and academics and aims to create, develop and test new spaces, services and products combining user needs and envi- ronmental and economic requi- rements. This lab works along- side the READi Design Lab as part of a research programme on Connected environments. Ecole des Ponts École des Ponts ParisTech is a university-level institution of higher education and research in the field of science, engineering and technology located in Marne- la-Vallée. Historically, its primary mission was to train engineering officials and civil engineers but the school now offers a wide-ran- ging education including urban studies, environment and trans- port engineering. The school is also part of the Laboratory “Ville, Mobilité, Transport » (LVMT, or “City, Mobility, Transport”) created in 2003 with the Institute on Technology, Transport and development (IFSTTAR) and the Université Paris-Est Marne-la- Vallée. UTC The University of Technology of Compiègne is both a French national university and an engineering school. The depart- ment of Urban Systems (GSU) proposes the first generalist trai- ning combining theory and prac- tice to gain insights and better understanding of sustainable urbanism, mobility, energy and housing. The GSU students inte- grate their visions using modern computer design and analysis packages, for urban areas, cities and conurbations. This requires data base skills, geographic data collection, modelling techniques, etc. IFP School The IFP School is a graduate engineering school located in Rueil-Malmaison, providing students and young professio- nals from all over the world with education in the fields of energy which meets the needs of industry and the demands of society with particular emphasis on sustainable development and innovation. Moving towards a sustainable mobility is a technical and environmental challenge for the automotive sector that the school is trying to undertake. Mines Telecom ParisTech Télécom ParisTech is a French public institutions of higher education and research of engineering in France both located in Paris-Saclay and Sophia Antipolis. The school in association with the Ecole des Ponts ParisTech, are teaming their know-how on a general theme called “Digital & Transport”. 3 goals: acculturation, expe- rimentation and knowledge sharing How la Fabrique can speed up and encourage research and innovation in the field of mobility based on students, teaching staff and researchers? This is exactly the problematic the community of schools is working on. During last year, la Fabrique worked to initiate a collaborative framework in order to promote mobility stakes acculturation and support experimentations. The main objective is to generate and disseminate commons (open asset : data, software, hardware or knowledge ) to fuel mobility innovation. Involvement of both teaching and students bodies into la Fabrique’s ecosystem is essential. Schools already members La Fabrique is developing partnership with schools trai- ning and working on mobility as a system. Six schools are already partners. ESTACA The ESTACA school is specia- lized in the fields of aeronautics, automotive, space and guided transport industries based in Paris area. By the end of the year, will open a FabMobility, a new place to invent the mobility of tomorrow. The aim is to use the Campus of Paris Saclay as a real playground to experiment with the ecosystem in place. L’Ecole de Design L’Ecole de design is dedicated to train students to design as a trigger for innovation while considering social, economic and environmental issues in a responsible way. It was with this in mind that was created the Sustainable City Design research lab dedicated to urban and territorial change. The Design Lab brings together public and Innovation communities Entrepreneurship support Syllabus My ecosystem My partnership initiatives Culture Support in place Thematic priorities Teaching tools and instruments Join or create new communities? Student projects with startups and industry sector? Initiate? Strengthen the support? New scopes? Workshops? Challenges? Commons? TODAY AND TOMORROW? By 2017, what kind of mobility innovators do you want to be?
  • 43.
    38 to incite schoolspartners to define their own roadmap for the year. For 5 days, 50 students and graduates from 16 schools and universities, aficionados of entrepreneurship, were accom- modated on Paris Saclay Campus with the sole objective of solving one of 10 problems proposed. This edition was about finding solutions to the firm’s problems in the field of mobility (See the article dedicated on the subject). Student Demo Cup is a students’ challenge organised every year during the Paris Open Source Summit. This challenge intends to promote and reward inno- vative open source students’ projects. This year, La Fabrique is a partner to the event and directly involved in the steering committee. We have brought a partner of La Fabrique as a jury member, and we offer commu- nication support, through our media. La Fabrique has been provi- ding support to a student from the school Ecole de Design de Nantes, on his last year project. The project consists in designing a sustainable vehicle mixing mobility performance and hand- made production processes. He has been advised on the defini- tion of its topic, and connected to CODATU to get feedbacks on concrete needs in emerging countries. La Fabrique is also involved into the establishment of teaching materials by supporting the creation of Massive Open Online Course about mobility : MOOC IFP school : sustainable Mobility & MOOC Mines Telecom : Mobilité 2.0 The community of Schools is part of La Fabrique’s ecosystem, which gathers industrial partners, cities and other stakeholders involved in the field of mobility innova- tion. We aim to foster cooperation between Schools and the other partners, and we are convinced La Fabrique should ultimately become a reference platform to connect partners with students’ environment resources, to boost What is happening there? The approach The objective is to gather schools around shared ambition in the framework of mobility open innovation. By sharing knowledge, the inten- tion is to boost initiatives. • Dedicated workshops Schools’ partners workshop: to gather the community and enable best practice sharing. Thematic workshop: to deal a specific topic of common inte- rest, such as transport taxation, the need of multidisciplinary etc. • Resources marketplace • Connecting La Fabrique’stakeholders Every school of the community involved in the organisation of events such as hackathons, startup weekends, projects, conferences can rely on the support of La Fabrique, by: • Giving access to La Fabrique’s network • Bringing visibility • Offering individual coaching • La Fabrique’ wiki What has already happened? At the beginning of the year, a kick off workshop has been organised with the schools of the community in Transdev’offices in Issy-les-moulineaux. Each school has been asked to formu- late a self challenge to address during the year, with the objec- tive to cope with the following question: “By 2017, what kind of mobility innovators do you want to be?” This first meeting aimed Fabrique’s members Community of schools Ideas factory needs expressed needs expressed data intern- -ship formation beta users ... hard- -ware Resources
  • 44.
    39 Estaca, according tohim “ It’s the network of La Fabrique which attracted me. Here at the Estaca, we usually work a lot with big stakeholders such as Renault or PSA. Within la Fabrique, we see various organizations and players, whether there are big or small”. The Estaca was one of the first schools to join the commu- nity. Thus, they are moving faster with the FabMob than some of the others members by organi- zing events as the innovation summer camp. Furthermore, la Fabrique will be able to propose new project in the FabMobility, the new place to invent the mobi- lity of the future which is going to open soon on the Paris Saclay Campus. The Estaca is paving the ways for others Schools to be more involved into the community. However, as we said earlier, there are no good or bad ways to get involved and each member can participate in his own distinc- tive way. “What is innovative at la Fabrique is that we can easily meet various partners of the transportation world. Of course, sometimes you need a financial support to start a project, especially in the field of mobility where it’s harder to get support. However, if we want to move towards more rational mobility, we need organization such as la Fabrique” says Hipolito Martell Flores, an academic teacher-researcher in transports at the University of Technology of Compiègne (UTC). The UTC is now considering the feasibility to create new projects with the students and in cooperation with la Fabrique’s members. innovation. This platform would pass on internships opportuni- ties, teaching specific needs, beta user experimentation opportuni- ties, etc. The first step to go through is to facilitate needs / resources matching. That’s why we have initiated the approach of “Idea Factory”: a database which compiles students’ competen- cies needs, students’ projects opportunities and every other students’ environment resources needed (raw material, equip- ments or tools, information, trai- ning) from interested partners. This has been tested first with Kisio, which lead to an upcoming first collaboration with the labo- ratory READi of Ecole de Design de Nantes. At la Fabrique and especially in the community of schools, we know how important is the capitalization of knowledge. This is why, all of our resources are available on a dedicated page on la Fabrique’s wiki. You can find there all the informations to join us and be part of this community. Why to get involved? There are no official ways to get involved into the community. As a matter of fact, “Projects within the community are set up when there is a match of opportunities between partners” explains Cedric Belardi a FabMob supporter. That’s why we func- tion on a case by case following the different opportunities. “We aim to invite any organizations, provided they have student supervision capacity, to share their issues in the field of mobi- lity, in a collaborative approach.” adds Cédric Belardi. In the community everyone has his own reasons for embar- king on the FabMob adventure. Stéphane Masson, is in charge of business development and delegate-general of the new mobility endowment funds at the
  • 45.
    40 are in CCNon commercial, but it will be changed in the near future to full open source. Together with the open source community a big and accelerated change can be achieved within the mobility industry. Besides that, by opening up our technology we want to encourage others to build even more things that the world has not yet seen. We believe collabo- ration and open source is the key to global tech advancement. Dear Sune, you have launch an open hardware project for a new mobility system. Can you tell us why you have chosen to make it « open source » ? Sune: Our belief at Faraday Motion is that technology should be available to everyone in order to maintain its rapid and continuous development. As we also ourselves rely on open source technologies to create our products it was perfectly clear that we also will be open sour- cing our own code and designs. For now the electronics designs INTERVIEW Sune Pedersen Open Hardware in the sector of transportation is starting. Many projects aim to develop next generation components of our ecosystem. Open, connected, electric, distributed, like Local Motors and Mobotiq. Faraday Motion is also working on open source skateboard, and it’s just the beginning. La Fabrique des Mobilités organize a dedicated workshop on OpenHardware November 15th with Paris Open Source Summit. We have inter- viewed Sune Pedersen, founder of Faraday Motion.
  • 46.
    41 communication enabling communication andcontrol from a web browser and complete custom hand controller are just a few updates that are co ming up, some of them can be seen on our new Makerspace. So you just launch your MakerSpace. How is it working? Sune: The online Faraday Motion Makerspace was prototyped with the objective to stimulate collaboration around lightweight electric vehicles, particularly for the Spine to begin with. Everyone is invited to publish ideas for projects, team up and accomplish them. Users can contribute their knowledge and skills to other projects. For example a developer can team up with an industrial designer to create LED lighting modules for the Spine. Then others can 3D print the parts and implement the software to upgrade their own Spines. We have seen customers contribute with brilliant good ideas and designs already. I.e. One of our customers, Roman, has publi- shed his first ever 3d design – a fender protecting him from rain when driving. Internally we use the Makerspace to share projects that we are working on with the community. One example is the Spine’s swappable batteries that we showcased recently but did not release yet. We are actively engaging with all the makers- pace members and try support them. Thank you Sune ! What are the objective of Faraday Motion? What are your dreams? Sune: At Faraday Motion we envision a world of increased mobility efficiency. A world in which it’s easy to combine public city transportation with efficient last mile vehicles in the city. Our objective is to create the techno- logy foundation that will enable people to exploit modularity and find solutions to the current and future mobility challenges. Can you describe your Spine project? How long does it take? how did you work and what are the news? Sune: The Spine has a very interesting story. I will start by saying that the first prototype was built in Sweden during an internal hackathon weekend. By then we had the Hyperboard R2, the most advanced electric skateboard in the world, but it’s technology complexity felt to be too challenging for starting maker enthusiasts. That is how the decision was made to have a starter version, hence it’s name. The first iteration was very basic: the deck, 3D printed brackets to hold the motor and the electrics and surely enough a battery that was taped to the construction. Today the Spine is more mature in it’s design and reliability and its design. The intense testing we have been putting it through has taken it to a whole new level. It takes around 2 hours to assemble a Spine, we made it so that you only need simple tools to do it and published the manual online for everyone to contribute to the documentation. Many customers print most of the plastic parts themselves, it will take from 25-100 hours, depending of the type of 3D printer that is used. We have many more updates and upgrades coming to the Spine. Besides the features of our Hyperboard R2, we are working on a belt tightening system, swappable batteries, websocket
  • 47.
    42 Open Software First workshopof the community When? 27 September Where? La Fonderie (Paris) — The day was divided into three major parts. 1. Why is it important and useful? The first part of the day was dedicated to the presentation of the importance of having open source software in the field of mobility. As the workshop was a preparation for the Paris Open Source Summit (POSS), the workshop began with an intro- duction of POSS which brings together european Free and Open Source Software communities for quality conferences and business meetings. After a brief presentation of La Fabrique was to make open softwares players work together, because even if people are in competition they can have an space to the coope- ration and share something. In this way, la Fabrique and some partners such as KISIO (see article about KISIO), CEREMA (Centre for Studies and Expertise on Risks, Environment, Mobility, and Urban and Country planning) and the AFIMB (French agency for multimodal information and smart-ticketing) decided to set up a workshop to gather various stakeholders directly concerned by the subject (transport opera- tors, digital companies, local governments etc.) WORKSHOP Making open softwares players work together. Tuesday, 27 September the community of open software was reunited for its first workshop. The fact is that, nowadays, open software are increasingly being developed in the area of mobility. Indeed, la Fabrique has already listed more than forty examples on its website dedicated to the listing of commons. By software about mobility we mean software that are focus on mobility offer description, public transport, mobility services, traffic infor- mations or parking spot. The aim of the community is to manage
  • 48.
    43 for mobility data. • Travel Spirit : It’s the world’s first open source platform for ‘Mobility as a Service’(MaaS) • Ride Connection : RidePilot is a paratransit trip sche- duling application of a Portland-area community transportation provider. It is primarily written by hackers at OpenPlans. • Oslandia : «Tempus», a framework for multimodal route planning co-developed with IFSTTAR (French insti- tute of science and techno- logy for transport, spatial planning, development and networks). • Transport for Cairo (TfC): Mapping Cairo opportunities and issues. 3. Works in group The final part of the workshop was devoted to works in group. The previous presentations have identified six topics to work items. 1. Governance, confidence, trust. 2. Technical connexion between software data, inte- roperability. 3. How to convince boss and clients? 4. Open source for all. 5. How to encourage organi- sation to create common? to contribute? What are the solutions for funding? 6. What are the networks to improve and reinforce open source community? Unfortunately, for lack of time, only the last four topics were discussed. You can find all informations and results of the workshop on the wiki and the page dedicated to the commu- nity. presented the results of a survey we launched with our partners about open source software. For instance, 100% of those polled answered that an open software is important for a community of contributor. The results also showed different types of mana- ging a community such as set up a committee or just manage communication tools. The survey also highlighted that most of those polled think that open softwares have a key role for projects managed by the public sector and local governments. 2. Overview of open softwares The workshop continued with presentations of existing open source softwares. Each attendee made a presentation of his projects and why he is suppor- ting Open Source and what are his project in the next 6 months. The aim was to identify common needs. • KISIO : Navitia is an open source software for building cool stuff with transport data. • AFIMB : CHOUETTE is focused on scheduled data manipulation and manage- ment (NEptune and NETEX, GTFS). You can control your dataset, visualize, find and create new data. IRYS it’s for real time and based on SIRI (standard european). • Ruter Labs : It’s the public transport operator in Oslo and Akershus and they built a beta journey planner using open source softwares. • Transfermuga, mobility assistance across borders, using open street map, uMap, Wordpress, Navitia.io • Open Trip Planner : It’s an open source multi-modal trip planner • Transdev : Catalogue is an international open platform
  • 49.
    44 A dream tocreate open standards for IVI The automotive industry used to be: on one side manufactures giving specifications and on the other side tier-1 suppliers working to integrate equipment such as car radio, a dashboard, or a communication devices. “Manufacturers were buying black-boxes” according to Pierre Sigrist - Director Research and Development of Visteon Sophia Antipolis (06 - France) and adopted, enhanced, tested and maintained. In short, GENIVI is a non-profit automotive industry alliance committed to define a standardized common software platform for developing In-Vehicle Infotainment. The alliance was founded in 2009 by eight of the major players of automotive industry: BMW Group, Delphi, GM, Intel, Magneti- Marelli, PSA Peugeot Citroen, Visteon and Wind River Systems. They now are more than 166 members. I f you are interested in open standards in the area of transportation you can’t miss out on GENIVI Alliance. The first question might be, what is exactly GENIVI? If you look closer to the name you can find a first hint: Geneva + IVI. Geneva is the city where the adventure began and IVI means In-Vehicle Infotainment. It’s supposed to be a solution to manage the rapidly growing amount of software in a car by setting up a commu- nity where software could be GENIVI FOCUS ON
  • 50.
    45 decides whether ornot they want to develop a new application. With that model you can adopt and/or adapt an existing open source software to meet the defined IVI requirements. Even more interesting, when there is no code available, GENIVI is able to sponsor and launch new projects to create with the best practices what it is needed. Upon the standardized software platform anyone can build new solution or have a new innova- tive approach . The major inte- rest of the platform is that it’s fully scalable from the smallest display in a low-cost car to the multiple display systems in an upmarket car model. In conclusion, GENIVI is a free and open source IVI platform that could work with any kind of interfaces. So, one would think that the platform would work with interfaces such as Android Auto and Car Play. Actually, those interfaces can work with GENIVI, provided that you have the agreement from Google or Apple to download the fully working system. A transition toward the open source If you thought the GENIVI wasn’t an open source project you weren’t entirely wrong. Indeed, what was before a closed commu- nity has evolved over the years to become an open community. Let us go back in time. In 2009, the alliance was made as a consor- tium with membership fees. Consequently, that seemed to be fair to allow the access to internal resources only to members. The years passed and GENIVI consor- tium grew, reaching out new members around the world. The consortium was doing well, but something was missing. They needed to find a way to bring new perspective in order to speed up the time-to-market. That’s why 3 or 4 years ago they decided to toggle into open community mode. There still is a consortium with membership but now both members and non-members are invited to host and to develop automotive software. GENIVI hosts a suite of Open Source projects and the major part of the source code is open. It is important to note that the entire member of the alliance. As a result, automobile manufac- turers decided to create GENIVI to attempt to create or harmonise a unique standard for infotain- ment platform. By infotainment, we mean extraneous things rele- vant to multimedia entertain- ment such as GPS navigation, radio, phone communication, tactile and graphical interfaces or voice recognition. “Our goal behind all that, was to define an architecture as straightforward as possible with a standardised interface between the compo- nents, so that at the end, each manufacturer can choose a component from the supplier X or Y on a transparent manner.” points out Pierre Sigrist. From the moment when a component respects the GENIVI architecture, it ceases to be a black-box and becomes a shop window where a manufacturer can choose to integrate it with full knowledge. And even better, he can choose to go back and integrate another component as it is fully interchangeable. An adopt, adapt and create model The GENIVI IVI software platform is based on a Linux kernel and all the software components defined by GENIVI are hosted through the Linux Foundation in GENIVI repositories or already in place in other open source projects of the community. There are more than 140 components in the GENIVI baseline. The major deliverable of the alliance is called the compliance specification of the open source IVI middleware and is updated twice per year. As a matter of fact, the open source code is already available and permits the access to each piece of the software platform. Then the community can develop wide-ranging applications. It’s important to note that the GENIVI Alliance doesn’t develop apps, it’s just the community which Application & Human Machine Interface Framework Multimedia Audio & Graphics Navigation & Location Based Services CE Device Connectivity & Personal Info Management Networking & Internet System Infrastructure Linux Kernel Security Tools Utilities Automotive GENIVI IVI Software Platform
  • 51.
    46 GENIVI Board ofDirectors SI Group Auto Group LBS Group Media/Graphics Group CE Connectivity Group Networking Group HMI Framework Group Baseline Integration Team System Architecture Team &Compliance Team Marketing Licence Review Team IT Infrastructure projects are freely available and at no cost. However, as stated by Pierre Sigrist “Today the access to a part of the work is still limited to intern member”. That’s why, to participate in requirement align- ment or in the compliance speci- fication then you have to pay a fee to become an associate of the alliance, an intern member. This fee also includes the access to benefits of the membership such as be part of the governance, propose new projects, contribute, be categorized as a member, and participate to events. The importance of the cooperation A good community knows no borders. People from everywhere can contribute and accelerate the process of innovation and the IVI software production. It’s in this way that GENIVI is also working in collaboration with various other alliances or asso- ciations. For instance, they are working with the World Wide Web Consortium (W3C) which is oriented on the definition of the HTML5. According to Pierre Sigrist “We can see that the car of tomorrow needs to integrate more fluid development oppor- tunities by providing interfaces usable by web designers. Why not allow web developers to develop applications directly downloa- dable from your car screen? “. As a consequence, GENIVI works with the W3C on Web API Vehicle to access vehicle data from HTML5. The aim of the coopera- tion is to simplify the transition from the web world to the auto- motive world. Moreover this kind of cooperation functions well, that’s why they repeated it with other alliances such as Avnu on Ethernet Audio/Video streaming, the Traveller Information Services Association (TISA) on traffic information (TPEG format) and the Car Connectivity Consortium (CCC) on smartphone in-car connectivity. An highlighted project -RVI To help you understand what in practice can do the GENIVI community here an example. The RVI (Remote Vehicle Interaction) project is one of the most important current initiatives. Jaguar Land Rover put in place the necessary means to make progress on this project. The aim is to provide a free and open source solution that permits three important things : securely remotely control your car, secu- rely enable a software over the air (SOTA) updating and finally remote data logging and moni- toring. You have always wanted to send instructions to your vehicle such as pre-warming before your arrival? This is now possible. The RVI project is one of the first software platform for connected cars freely downloa- “GENIVI compliance specifica- tion” remains only accessible for members. GENIVI is changing its image “For the moment, the invol- vement of the members from outside of the alliance is still low because of the image conveyed by GENIVI of a closed commu- nity. The image is changing and the community is opening gradually.” explains Philippe Gicquel president of GENIVI from April 2013 to April 2015. The result is that the major part of the source code of GENIVI is from inside members of the alliance. The constituent members are actually paying their employees to work on the standardized plat- form. GENIVI has increased its efforts to seduce new members with a new communications strategy and the participation in several events such as conven- tions and conferences . “Some individuals who are not employees of member compa- nies are now beginning to be unbelievably invested on the GENIVI Development Platform (GDP) “ says Philippe Gicquel. Unlike other communities where people are attracted by rewards, GENIVI relies on actions driven by self passion. On the platfom projects.genivi. org are listed all the key compo- nents and projects. Those
  • 52.
    47 number of informationsfacilita- ting hacking.” Philippe Gicquel Even though the balance between those two aspects might be difficult to find, it should not be forgotten that it becomes harder to hack something built by a large number of person among the best developer in the world. What’s more, as banking, defence and aerospace industries, Genivi is based on a really good encryp- tion which made it harder to hack but easier to track a poten- tial hacker. “In the worst case scenario, if you succeed to hack an info- tainment system you can’t send a message on the CAN bus.” explains Pierre Sigrist. Without forgetting that GENIVI is focused on Infotainment which doesn’t allow to take control of the CAN bus. Indeed, the various system components or the vehicle are linked to each other via a communication bus called the CAN Bus. By taking control of this bus you could control the entire car. Hopefully; that’s at this time not possible by hacking an infotainment platform. Those considerations have led to an increasing level of manufac- tures interests in cyber security which wasn’t a big topic for them before. Conclusion? Don’t be afraid of open source! dable. “That was the highlighted project because connected cars are in fashion? But don’t forget there are a lot of other projects in particular on Location Based Services - LBS.” retorts Philippe Gicquel. Why GENIVI and no one else? Others have tried to create a consortium of this kind. However they didn’t succeed. According to Pierre Sigrist, GENIVI is the last one standing because “the great strength of GENIVI is its network and above all because it was a automotive manufactu- rers initiative. You could have the best solution in the world if you don’t have the community following you risk to miss the essential!”. What’s more, over the years GENIVI has been able to success- fully reinvent the organisation and placing open source at the heart of the process. This is now a smooth organisation with various groups and teams overseeing the strategic, technical, and commercial components of the alliance and governed by a Board of Directors composed of the top-tier members. For instance the License Review Team is in charge of providing training to help member choose the right open source licence. Is that secure? It’s common to see in movies or series, cars being hacked. So yes, it’s normal to be afraid of that. However there is a misunders- tanding between open source and easy to hack. “There are two aspects of open source. The first is that if it’s hackable the community will find it very quickly, which permit us to take appropriate counter- measures faster. This was the positive aspect. The second one, which is the negative, is that there are more people who have potentially access to a certain
  • 53.
    48 or taking careof his childs, Gaël is a real guy and he sleeps some- times. “You see this morning I woke up at 5 am, but I already took a nap in our energy room” he explains to us. And we checked that, at la Fonderie you can find an energy room to regain some strength. But to get back to our first question, Gaël didn’t learn all by himself: he has a scien- tific pedigree. “I guess I’m lucky because I made my preparatory class, higher maths - special maths, in Guadeloupe.” Then the time has come for Gaël to go to France to pursue his studies in an engineering school in Rouen called Esigelec. He decides A genius inside a normal guy We met each other within la Fonderie, where Gaël had kindly offered to host a workshop about open software with la Fabrique. That event was the perfect opportunity to ask him some questions. Obviously, when you meet a real UFO such as Gaël, the first question that comes in mind is how does someone become such a specialist of open inno- vation? We were totally sure he had a secret but we were wrong. First news, even if he is always running around, giving confe- rences, hacking planes, coding INTERVIEW Gaël Musquet B oth gifted and hyperactive, Gaël Musquet has already achieved to build along his young career an impressive CV : first open software at 16 years old, a specialization in meteorology, a passage through the Ministry of the Environment, spokesperson of the french community of Open Street Map (OSM) and hacker in residence at the public digital agency called La Fonderie. La Fabrique des Mobilités presents an encounter with this specialist in open innovation. An open source genius
  • 54.
    49 The Ministry agreedto let him work 1 week per month at what became now the Numa (nb: ex Silicon Sentier), to organize conferences, work and talk about OSM. “At that time, I was so tired” Gaël adds. And honestly we can understand why. Over the years he improves his expertise on various projects; french elec- tion campaign, fukushima, Arab Spring, etc. Until the day where Jean Baptiste Roger comes and picks him up to la Fonderie. “He gave me everything to progress with the communities.”. And here we are today! Yet, the place is implementing a social plan. Gaël is counting his last days before he had to leave the place. “Open Source is like politics. La Fonderie used to be a sort of Gallic village for the digital, we have been protected for a long time, but now it tends to disap- pear.” he admits with a sort of melancholy tone. A new adventure Of course, he has a back-up plan! The advantage with doing open source is that it’s really easy for anyone to know what you are working on and assess a potential candidate. After a conference the French Air Force were waiting for him and presented to him an incredible opportunity that had his name written all over it. Gaël exclaims : “I’m creating my own company, and I’m going to advise soldiers on open source, open innovation, open standards and how to rapidly innovate. After being a student, an apprentice, a public employee, an employee in the private sector I’m now beco- ming my own boss!”. This is really an exciting mission for Gaël. He will work with a special unit, the EA2CP ( Escale Aérienne de Commandement et de Conduite Projetable - Air Command and Conduct, Deployed), which protects specific sites whether there are in France or abroad. “I even connected the coffee machine at the military base to launch a coffee with the wifi.” he says. The motto of his base is “Ad impossibilia nemo tenetur” - “No one can achieve the impossible” and yet his new colleagues define themselves as army disobedients stepping out from the ranks. The interest of commu- nities “We cannot know everything, be everywhere and talk to every- body. That’s impossible. Thus if a task need to be done, you need to find a community.”explains Gaël. He began Open Street Map just for fun, and today it’s kind of a part of his life. For him, mapping is strategic, “Did you know that the army uses OSM? They can’t use Google maps because they can let Google have an access to confidential data.” OSM is important and could change the way we will move in the future. For instance the asso- ciation organizes carto parties, “It’s like a surprise party but we are mapping!” he laughs. Those parties are a huge success. Two types exist: party with a thematic or a specific place. A thematic can be a very large subject such as the biodiversity, accessibility, medical facilities etc. “When it’s about a specific place, we improve the map by adding defi- brillators, street names, transla- tion in other languages, speed, defects in the pavement, etc.” The difference with a surprise party is that everyone is welcome. to join the apprenticeship programme. “Apprenticeship is what’s is better for me, because it’s concrete, you can ask ques- tions to your teacher in func- tion of what you really need.” His passion, what makes him to vibrate, it’s the méteorology and design sensors. “Furthermore I installed a weather station on the roof of la Fonderie” he exclaims like if he was super proud of him. Unfortunately, the meteorology department of his company has been compelled to close, leaving him unable to finish his studies with the apprenticeship programme. The school offers him to switch to the ordinary school programme, provided that he performs well in exams. “I only failed for 12 hundredth of point, can you believe that?”. Disappointed he decided to perform the interviews for the Universities of Technology and he is admitted à Troyes, the UTT. The problem is that without money, with parents remaining in Guadeloupe, that was very hard. With his girlfriend they tried everything, she was working at McDonald’s and he had a student job as network admin. “To be honest, it was awful, we were countings each coins to eat, and I had this student loan and my rent which swallowed everything.” This is when he decided to stop with great regret his studies and pass the examinations for public positions and start working for the French Ministry of Ecology in Aix en Provence. For 6 consecu- tive years, he worked as a tech- nician, and that gives him a lot of time to get more involved into Open Street Map (OSM). “My job was offering a good synergy with this kind of open source project. When Haiti has been devastated, my boss said it was awesome to be able to re-map a country without financial support and helping NGO at the same time.” Partly because of this, he build the OSM France association one year later and became the first president during 3 years.
  • 55.
    50 doesn’t like somuch this type of training, he prefers practical training with material resources. “You have to touch something to understand! For me open source is the gateway between theory and practice.” He unders- tands that he needs to transmit. However, he wants to do it on his own way, something that respects his own principles. Hack your car With la Fonderie, he set himself a great challenge: hacking a car respecting rules of open innova- tion. For the record, he didn’t just awoke a morning and realized; I HAVE TO HACK A CAR. It’s a project he had in mind for a long long time. “This is totally crazy that in a country as France we still don’t have a vehicle research lab. Some manufacturers are tending to do it, but they aren’t foolish to let us taking parts apart of their cars.” complains Gaël. That’s why he decided to hack a car with the support of la Fonderie. Whether you are a technician, a dentist or a cooker, for Gaël, everyone should have access to a place where you are able to unscrew a wheel, change a wheel, touch the engine, etc. “In France when you pimp your car you are consider as a stupid guy from the North, and the same guy in the United States will be consider as an artist. They have television programs about that!”. If we had to summarize what said Gaël it would be “Let us enter in our own car! “. His struggle is to restore the power to consu- mers on an object they have the full possession as they bought it. In order to achieve this, manu- facturers have to give golden rules, things you can or cannot do on your car and how to do it. “Obviously, you can’t touch secu- rity organs or warm-up an engine in a closed space.” he insists. For the hacking project, as they needed to innovate rapidly they bought a second-hand car, a Citroën Nemo. Huge disappoint- ment when the access to the COP21 is denied because it was a diesel engine. Then, Toyota proposed a Yaris (hybrid model), which is produced in France. “However, as La Fonderie is a public agency, that was hard to us to explain that we didn’t use a french brand, simply because Toyota was the only one to reply.” This could last a day, a week and sometimes months. Sometimes mapping parties are organized with other associations like Wikipedia, botanics as Tela Botanica and even parliamen- tary activities as Regard Citoyen. “Men and women are the fuel of a community, it’s our aim to train them”. And those parties are the perfect opportunity to train new contributors. This year the SNCF (French national railway company) will celebrate 3 years of partnership with OSM. “A real success story for OSM” says Gaël. They even engaged new people dedicated at OSM. And guess where they were trained? Of courses, at la Fonderie with Gaël. The aim of the partnership is to facilitate the mobility, no matter what public, inside the stations. They mapped small details as lane markings for blind or visual impaired, audio systems, passage for people of small stature, strollers or wheel- chair. A need to transmit He wants to transmit the knowledge and experience he has accumulated over the years. “When I was a student, some teachers made me dream and yet they weren’t really presen- table because the get their hands dirty.” It’s thanks to this type of teachers that Gaël is what he became. Now, it’s his turn to transmit and inspire others. “I began to write about this human adventure, I now need to continue. My book is about my six last years and how after being a public employee, I became in charge of the digital aspect of the election campaign of Hollande, how I worked at la Fonderie and finally how I became my own boss.”He insists on the word human adventure because each part of his life relies on the impli- cation of a man or a woman who provided him help and advices. He doesn’t have time to do webi- nars and MOOC. Moreover, he
  • 56.
    51 How la Fabriquecan help To finish our interview, we wanted to ask some advices to Gaël to know, how la Fabrique could play a role as an effec- tive mediator between all these stakeholders. “You need to provide more concrete resources to experiment. According to me, you can’t go on a conference without a server under your arm, without a sensor, without a car, without a place to experi- ment.” He then congratulates us for having set up such a huge network. That was the first step to create an efficient ecosystem, and we are now working on provi- ding new types of resources (see the article about the commons). It’s now the time to let go this fabulous one-man-band, maybe he will return to the energy room. One thing for sure, we will listen to his expert advice. Rethink the french automotive industry It’s not a secret Gaël is angry and disappointed by french automotive manufacturers. And yet, he tried everything, but didn’t succeed working with french manufacturers. “They made big announcement but in reality there aren’t risk-taking”. According to him, risk-taking means much more that letting engineers taking with students or technicians in a closed ecosystem, it has to be cultivate and stimulate on a large scale by breaking down the barriers. “Nowadays, the hierarchy blocks initiatives. They can do what they want like set up new open innovation methodologies, but actually, heads of those struc- tures have no idea how people inside their own company or communities are innovating. Caution, there are exceptions and efforts are being made.” explains Gaël. As an exception he meant, for instance the SNCF who tried to solve some issues with the OSM community. They realized that users are at the centre of the solution. “When major compa- nies are doing their kind of beauty contest, they address the contest to other companies that looks like them or startups. They need to address communities.” The second problem that Gaël raised is that, it has never be given real definition to what exactly means open innovation for industrials. As a matter of fact, heads of open innovation are using buzz words to commu- nicate between each others. “We have big data, growth hacking, barbars, multitude, and all those words sidetrack us.” Some initia- tives have been taken by major automotive industries to really do open innovation, maybe in a few years we will see the results.
  • 57.
    52 T he Fabrique launchedits first Call for Projects last year, which closed on December 13th 2015. We received 39 projects that corresponded to 7 proposed themes. These projects were categorized according to transparent criteria: the team, its capacity to transform mobility usage, synergies with the Fabrique’s partners, commons, agility and speed. Finally, la Fabrique selected 10 projects with incredible levels of synergy and started to follow them in March. Commons & Projects FOCUS ON data training software Needs expressed hardware standards feedback Network Nine months later, we wanted to provide an update on the projects selected, as regards to the commons. So, we interviewed some of them, to identify what had been done and why they had joined the Fabrique’s adventure.
  • 58.
    53 This raises thequestion of whether we had a good approach or we now have to determine a new way to foster the develop- ment of new commons. Indeed, we have identified that some of the projects had fully understood the interest of the common, specifically that it not only saves times and budgets it also permits to focus on the real added value of a project. The following are a few examples to help you unders- tand, many others exist : • Oui Hop (Smart Auto Stop) proposed to share times- tamped journey, provided it guarantees anonymity. • Olli (Local Motors) opened a new micro factory in Berlin where you can prototype vehicle projects. • PetitBus (Engie) will release a cleaned database of schools locations. • Welo (Wecoop) produced open hardware to manage connected bicycles. • Mobilise (Mobi-lise) is researching the possibility of sharing their application which tracks people move- ment, provided that it’s shared with a trusted third- party. • Zouzoucar wants to share the knowledge he learned from a Stanford training on entrepreneurship. However, some others projects were slightly at a loss to know exactly what means contribute to a common or mutualise a resource. This is why la Fabrique decided to change its strategy in order to accelerate the deve- lopment of new commons by bringing together different orga- nizations and projects with a joint interest in developing the same common. We launched a new type of call for propo- sals and called it : “Open Call for Commons”. The commons proposed have to be related to “La Fabrique is a convergence accelerator.” Thierry Fargas, CEO of Clean-Data Innov “When you look for the fabrication of shared services with particular property, you need to pool ideas, la Fabrique provide the infrastruc- ture to do it!” Laurent Maghdissian, co-founder of OuiHop’. “It’s a great initiative which fede- rate different stakeholders. But it needs to step up the effort to explain what is or not a common and the notion of openness.” Stephane Derville, CEO of Eliocity (Xee). “The notion of common is a sharing philosophy which must provide a more collaborative mode of action.” Jean-Remy Cazeaux, CEO of Wecoop “I’m satisfied to be able to come together around various issues. It is important to federate.” Nicolas D’Haussy, CEO of Zouzoucar “We saw la Fabrique as a vector of connection between various parties involved in the ecosystem” Benoit Joncquez, CEO of Truckfly “We instantly agreed with the basic notion of commons proposed by la Fabrique. However, in practice, it’s difficult to contri- bute to new commons or use the existing one.” Thomas Cazade, co-funder of PetitBus “The commons provide a better availability and use resources. It’s the library 3.0 to build appli- cations of tomorrow” Jean-Louis Peyre, CEO of Comthings LA VOIE EST LIBRE
  • 59.
    54 interesting thing witha common is that everyone from everywhere can join a project. It must be emphasized that, there will be no difference between a project supported by a startup already accompanied by la Fabrique and another unaccompanied. Some of the propositions listed on our website have already more than 5 organizations involved whether they are Fabrique’s partners or not. All deliverables produced will remain your property, but it will be put under a free licence giving the right to anyone to freely use it. Why apply? The french agency for environ- ment and energy management (ADEME ) will then assess ways in which they can help either finance and/or provide skilled resource to support those projects. The award criteria are based on: • adequacy of available challenges, • involvement of all stakehol- ders, • neutrality of deliverables, ability to be shared, • size and community engage- ment around deliverables, • opening of deliverables and type of license, • ability to start and deliver operational deliverables. All the projects of commons selected will benefit from visibi- lity they will get by the network of la Fabrique and communities involved into the creation of commons. How can I invest in this call? La Fabrique would also welcome to hear from organisations and individuals willing to make contributions to this call. By contributing to this call you will help the creation of new commons. Your contribution could be in form of : • Project management and communications support. • Financial donations and promoting crowd funding campaigns. • Test-bed: access to trial areas and populations and gover- nance support. • Co-create: connect to a fablab to means testing, calculation means. • Moderation / facilitation of code-development. • Co-creation: expertise and time offered in kind. So many other ideas of commons are waiting for you on the site of our Open Call For Commons. one of the two challenges that have been identified. Two challenges The first one, is dedicated on how accelerate the deployment of daily carpooling. Actually, when we received the answer to the Call of projects we counted that about 10 projects were about daily carpooling. None of those projects have succeeded to impose itself as a leader in that field. Our reasoning is that maybe by sharing something, one project will become the new Blablacar of the daily and dynamic carpooling. We already received some interesting propo- sitions. For instance, the creation of a common proof of carpooling, no matter the company used to make the reservation. The aim is to provide a proof to get bene- fits such as an access to specific parking spots or a reduction for motorway tolls. Another example is the creation of a common database for carpooling stop. The aim is to map the real Point of Interest related to carpooling. The second challenge identi- fied is about the development of low-cost and sustainable personal mobility solutions. The goal is to provide affordable solu- tion for wide-spread distribution into small to medium communi- ties. One example of a common proposed by the community is the creation of a bikesharing service for individuals. This project could enrich the number of bicycle available for renting. How can I apply? You have two options to apply to this Open Call. The first one is by suggesting a new common project. Because doing so, check out that no one else has already suggest this idea for the call. You don’t have any idea but you truly believe in the commons and want to contribute? That’s ok, the second way to get involved into this call is by contributing to a project already proposed. The
  • 60.
    Michelin Vulog Mop EASY Visteon Communauté d’agglomération Sophia-Antipolis Club desvilles et territoires cyclables Sophia Club Entreprises Incubateur Paca-Est IFSTTAR IFP Energies nouvelles IFP School ESTACAFreshmile Groupe Moviken Pôle Véhicule du Futur ATEC ITS CNPA Cityway CEREMA Caisse des Dépôts Total Engie TOPOS Aquitaine Transalley Tractebel Engineering Cofely Ineo Via ID Polis Ville d’Issy- les-Moulineaux Ville d’Antony Région Île-de-France UFO Air Liquide Ville de Paris Grand Lyon Nod-A Mov’eo Télécom ParisTech Systra Vinci Colas Transdev Akka Technologies Dassault Systèmes MAIF BlaBlaCar Orange Canal TP VIANEO Fing Aquinetic Koolicar Université Nice Sophia IMREDD Mozilla SMTC de l’agglomération Clermontoise Wimoov UTC ADEME-Novembre2016-8830-979-10-297-0618-9®