SlideShare a Scribd company logo
Construction Law Masterclass:
Project Risks for Developers and Funders
Tuesday, 6 May 2014
Francis Ho, Head of Construction
francis.ho@olswang.com | +44 20 7067 3505 | @fkyh
One project risk …
#olswangconstruction
Types of Project Risk
1.  Design and Construction
2.  Other Party Risks
3.  Environmental and Approvals
4.  Force Majeure
#olswangconstruction#olswangconstruction www.constructiveblog.com
1. Design and Construction
•  Developer risks
•  Design complexity
•  Construction risk:
•  Construction team
•  Site conditions
•  Cost overruns
•  Late completion
#olswangconstruction#olswangconstruction www.constructiveblog.com
2. Other Party Risks
• Sale/letting risk
• Documentation risk
#olswangconstruction#olswangconstruction www.constructiveblog.com
3. Environmental and Approvals
•  Contaminated land
•  Planning permission
•  Listed buildings consent
•  Environmental impact assessment
•  Rights of light, party walls
#olswangconstruction#olswangconstruction www.constructiveblog.com
4. Force Majeure
• Extension of completion date for construction
• Wider than an “Act of God”
• May be a default under credit agreement
#olswangconstruction#olswangconstruction www.constructiveblog.com
Mitigating and Managing Project
Risks
•  Due diligence
•  Turnkey construction contract
•  Fixed price construction contract
•  Guarantees
•  Cost overruns
•  Completion/interest shortfall
•  Liquidated damages
•  Insurances
•  Bonds
•  Credit agreement terms
#olswangconstruction#olswangconstruction www.constructiveblog.com
Turnkey Construction Contract
• Design and construction risk lies with
Contractor
• Contract negotiations more straightforward
• Novation of design professionals to
Contractor
• Suitable for wide range of projects (but not
all)
#olswangconstruction#olswangconstruction www.constructiveblog.com
Turnkey Construction Contract
#olswangconstruction
Sub-Contracts
Direct Contracts
Client
Contractor
Sub-
Contractor
Sub-
Contractor
Sub-
Contractor
Design
Consultant
Design
Consultant
Design
Consultant
Contract
Administrator
Cost
Consultant
CDM Co-
ordinator
#olswangconstruction www.constructiveblog.com
Guarantees
• Sponsors can avoid having to commit finance
to cover key risks
• May vary in nature from letters of comfort to
absolute guarantees
• Ensure drafted to be absolute and
unconditional
• Parent company guarantees
#olswangconstruction#olswangconstruction www.constructiveblog.com
Insurance
•  Works insurance
•  Third party liability
•  Environmental liability
•  Professional indemnity
•  Inherent defects
#olswangconstruction#olswangconstruction www.constructiveblog.com
Bonds
•  Performance bonds
•  Retention bonds (or retention
monies)
•  Advanced payment bonds
#olswangconstruction#olswangconstruction www.constructiveblog.com
Facility Agreement
•  Conditions precedent
•  “Drawstops”
•  Events of default
#olswangconstruction#olswangconstruction www.constructiveblog.com
Closing Thoughts
•  Differing attitudes of Developers and
Funders to risk
•  Consider risks important to Funders
•  Due diligence can identify and manage
risks
#olswangconstruction#olswangconstruction www.constructiveblog.com
Any questions?

More Related Content

Viewers also liked

Curso Html4
Curso Html4Curso Html4
Curso Html4
Luis Paredes Reyes
 
每天第一杯水
每天第一杯水每天第一杯水
每天第一杯水Josephine C
 
Master key system part 15
Master key system   part 15Master key system   part 15
Master key system part 15
canei2day
 
Kind editor设计思路
Kind editor设计思路Kind editor设计思路
Kind editor设计思路taobao.com
 
What Does it Take to Achieve Software License Optimization?
What Does it Take to Achieve Software License Optimization?What Does it Take to Achieve Software License Optimization?
What Does it Take to Achieve Software License Optimization?
Flexera
 
004環境リスクコミュニケーション部会
004環境リスクコミュニケーション部会004環境リスクコミュニケーション部会
004環境リスクコミュニケーション部会
河井 孝仁
 
Banner maker展现端flash性能优化
Banner maker展现端flash性能优化 Banner maker展现端flash性能优化
Banner maker展现端flash性能优化
taobao.com
 
SEO, LLC dba Www.Splinternet Marketing.Com Search Engine Rankings 6-28-2011
SEO, LLC dba Www.Splinternet Marketing.Com Search Engine Rankings 6-28-2011SEO, LLC dba Www.Splinternet Marketing.Com Search Engine Rankings 6-28-2011
SEO, LLC dba Www.Splinternet Marketing.Com Search Engine Rankings 6-28-2011
SEO, LLC dba www.SplinternetMarketing.com
 
Chartered Institute of Building - Launch of Complex Projects Contract 2013 - ...
Chartered Institute of Building - Launch of Complex Projects Contract 2013 - ...Chartered Institute of Building - Launch of Complex Projects Contract 2013 - ...
Chartered Institute of Building - Launch of Complex Projects Contract 2013 - ...
Francis Ho
 
Social Monitoring Tools -- Considerations and Selection
Social Monitoring Tools -- Considerations and SelectionSocial Monitoring Tools -- Considerations and Selection
Social Monitoring Tools -- Considerations and Selection
Kathy Herrmann
 
Windows 10 One Year Later: What’s Holding You Back?
Windows 10 One Year Later: What’s Holding You Back? Windows 10 One Year Later: What’s Holding You Back?
Windows 10 One Year Later: What’s Holding You Back?
Flexera
 
菱角田才有的臺灣水雉
菱角田才有的臺灣水雉菱角田才有的臺灣水雉
菱角田才有的臺灣水雉
Josephine C
 
Flash对象在(X)Html中的格式和参数及安全性
Flash对象在(X)Html中的格式和参数及安全性Flash对象在(X)Html中的格式和参数及安全性
Flash对象在(X)Html中的格式和参数及安全性
taobao.com
 
F tower2
F tower2F tower2
F tower2
S M
 
SEO, LLC dba Www.Splinternet Marketing.Com Search Engine Rankings On 4 16 2011
SEO, LLC dba Www.Splinternet Marketing.Com Search Engine Rankings On 4 16 2011SEO, LLC dba Www.Splinternet Marketing.Com Search Engine Rankings On 4 16 2011
SEO, LLC dba Www.Splinternet Marketing.Com Search Engine Rankings On 4 16 2011
SEO, LLC dba www.SplinternetMarketing.com
 
Master key system part 05
Master key system   part 05Master key system   part 05
Master key system part 05
canei2day
 
Opening Remarks - 2014 OIswang Construction Law Conference
Opening Remarks - 2014 OIswang Construction Law ConferenceOpening Remarks - 2014 OIswang Construction Law Conference
Opening Remarks - 2014 OIswang Construction Law Conference
Francis Ho
 

Viewers also liked (18)

Curso Html4
Curso Html4Curso Html4
Curso Html4
 
每天第一杯水
每天第一杯水每天第一杯水
每天第一杯水
 
Master key system part 15
Master key system   part 15Master key system   part 15
Master key system part 15
 
詩意中國
詩意中國詩意中國
詩意中國
 
Kind editor设计思路
Kind editor设计思路Kind editor设计思路
Kind editor设计思路
 
What Does it Take to Achieve Software License Optimization?
What Does it Take to Achieve Software License Optimization?What Does it Take to Achieve Software License Optimization?
What Does it Take to Achieve Software License Optimization?
 
004環境リスクコミュニケーション部会
004環境リスクコミュニケーション部会004環境リスクコミュニケーション部会
004環境リスクコミュニケーション部会
 
Banner maker展现端flash性能优化
Banner maker展现端flash性能优化 Banner maker展现端flash性能优化
Banner maker展现端flash性能优化
 
SEO, LLC dba Www.Splinternet Marketing.Com Search Engine Rankings 6-28-2011
SEO, LLC dba Www.Splinternet Marketing.Com Search Engine Rankings 6-28-2011SEO, LLC dba Www.Splinternet Marketing.Com Search Engine Rankings 6-28-2011
SEO, LLC dba Www.Splinternet Marketing.Com Search Engine Rankings 6-28-2011
 
Chartered Institute of Building - Launch of Complex Projects Contract 2013 - ...
Chartered Institute of Building - Launch of Complex Projects Contract 2013 - ...Chartered Institute of Building - Launch of Complex Projects Contract 2013 - ...
Chartered Institute of Building - Launch of Complex Projects Contract 2013 - ...
 
Social Monitoring Tools -- Considerations and Selection
Social Monitoring Tools -- Considerations and SelectionSocial Monitoring Tools -- Considerations and Selection
Social Monitoring Tools -- Considerations and Selection
 
Windows 10 One Year Later: What’s Holding You Back?
Windows 10 One Year Later: What’s Holding You Back? Windows 10 One Year Later: What’s Holding You Back?
Windows 10 One Year Later: What’s Holding You Back?
 
菱角田才有的臺灣水雉
菱角田才有的臺灣水雉菱角田才有的臺灣水雉
菱角田才有的臺灣水雉
 
Flash对象在(X)Html中的格式和参数及安全性
Flash对象在(X)Html中的格式和参数及安全性Flash对象在(X)Html中的格式和参数及安全性
Flash对象在(X)Html中的格式和参数及安全性
 
F tower2
F tower2F tower2
F tower2
 
SEO, LLC dba Www.Splinternet Marketing.Com Search Engine Rankings On 4 16 2011
SEO, LLC dba Www.Splinternet Marketing.Com Search Engine Rankings On 4 16 2011SEO, LLC dba Www.Splinternet Marketing.Com Search Engine Rankings On 4 16 2011
SEO, LLC dba Www.Splinternet Marketing.Com Search Engine Rankings On 4 16 2011
 
Master key system part 05
Master key system   part 05Master key system   part 05
Master key system part 05
 
Opening Remarks - 2014 OIswang Construction Law Conference
Opening Remarks - 2014 OIswang Construction Law ConferenceOpening Remarks - 2014 OIswang Construction Law Conference
Opening Remarks - 2014 OIswang Construction Law Conference
 

More from Francis Ho

COP26: Eating for the Planet
COP26: Eating for the PlanetCOP26: Eating for the Planet
COP26: Eating for the Planet
Francis Ho
 
City of London Law Society - Submittal to BEIS on Statutory Retention Deposit...
City of London Law Society - Submittal to BEIS on Statutory Retention Deposit...City of London Law Society - Submittal to BEIS on Statutory Retention Deposit...
City of London Law Society - Submittal to BEIS on Statutory Retention Deposit...
Francis Ho
 
City of London Law Society - Construction Law Committee - Response to Retenti...
City of London Law Society - Construction Law Committee - Response to Retenti...City of London Law Society - Construction Law Committee - Response to Retenti...
City of London Law Society - Construction Law Committee - Response to Retenti...
Francis Ho
 
How will Brexit impact on Construction?
How will Brexit impact on Construction?How will Brexit impact on Construction?
How will Brexit impact on Construction?
Francis Ho
 
Variations and their Consequences - Olswang Construction Law Masterclass - 5 ...
Variations and their Consequences - Olswang Construction Law Masterclass - 5 ...Variations and their Consequences - Olswang Construction Law Masterclass - 5 ...
Variations and their Consequences - Olswang Construction Law Masterclass - 5 ...
Francis Ho
 
Construction Insolvency
Construction InsolvencyConstruction Insolvency
Construction Insolvency
Francis Ho
 
The Management of Complex Contracts
The Management of Complex ContractsThe Management of Complex Contracts
The Management of Complex Contracts
Francis Ho
 
Key Developments in Emerging Markets
Key Developments in Emerging MarketsKey Developments in Emerging Markets
Key Developments in Emerging Markets
Francis Ho
 
Using Two-Stage Tendering Effectively
Using Two-Stage Tendering EffectivelyUsing Two-Stage Tendering Effectively
Using Two-Stage Tendering Effectively
Francis Ho
 
Managing the Risks of Delay in Construction Projects
Managing the Risks of Delay in Construction ProjectsManaging the Risks of Delay in Construction Projects
Managing the Risks of Delay in Construction Projects
Francis Ho
 
It Pays to Be Right: Payment in Construction Contracts
It Pays to Be Right: Payment in Construction ContractsIt Pays to Be Right: Payment in Construction Contracts
It Pays to Be Right: Payment in Construction Contracts
Francis Ho
 
Adjudication: Tips, Traps and Tactics
Adjudication: Tips, Traps and TacticsAdjudication: Tips, Traps and Tactics
Adjudication: Tips, Traps and Tactics
Francis Ho
 
Contractual Options for Procuring Major Projects in the UK
Contractual Options for Procuring Major Projects in the UKContractual Options for Procuring Major Projects in the UK
Contractual Options for Procuring Major Projects in the UK
Francis Ho
 
Introductory Note on International Construction Contracts
Introductory Note on International Construction ContractsIntroductory Note on International Construction Contracts
Introductory Note on International Construction Contracts
Francis Ho
 
Works Insurance and Latent Defects Insurance
Works Insurance and Latent Defects InsuranceWorks Insurance and Latent Defects Insurance
Works Insurance and Latent Defects Insurance
Francis Ho
 
Third Party Rights and Why They Matter
Third Party Rights and Why They MatterThird Party Rights and Why They Matter
Third Party Rights and Why They Matter
Francis Ho
 
A Practical Guide to the Construction (Design and Management) Regulations 2015
A Practical Guide to the Construction (Design and Management) Regulations 2015A Practical Guide to the Construction (Design and Management) Regulations 2015
A Practical Guide to the Construction (Design and Management) Regulations 2015
Francis Ho
 
Construction Dispute Resolution and Avoidance in a Boom Market
Construction Dispute Resolution and Avoidance in a Boom MarketConstruction Dispute Resolution and Avoidance in a Boom Market
Construction Dispute Resolution and Avoidance in a Boom Market
Francis Ho
 
Letters of Intent
Letters of IntentLetters of Intent
Letters of Intent
Francis Ho
 
Collateral Warranties and Third Party Rights
Collateral Warranties and Third Party RightsCollateral Warranties and Third Party Rights
Collateral Warranties and Third Party Rights
Francis Ho
 

More from Francis Ho (20)

COP26: Eating for the Planet
COP26: Eating for the PlanetCOP26: Eating for the Planet
COP26: Eating for the Planet
 
City of London Law Society - Submittal to BEIS on Statutory Retention Deposit...
City of London Law Society - Submittal to BEIS on Statutory Retention Deposit...City of London Law Society - Submittal to BEIS on Statutory Retention Deposit...
City of London Law Society - Submittal to BEIS on Statutory Retention Deposit...
 
City of London Law Society - Construction Law Committee - Response to Retenti...
City of London Law Society - Construction Law Committee - Response to Retenti...City of London Law Society - Construction Law Committee - Response to Retenti...
City of London Law Society - Construction Law Committee - Response to Retenti...
 
How will Brexit impact on Construction?
How will Brexit impact on Construction?How will Brexit impact on Construction?
How will Brexit impact on Construction?
 
Variations and their Consequences - Olswang Construction Law Masterclass - 5 ...
Variations and their Consequences - Olswang Construction Law Masterclass - 5 ...Variations and their Consequences - Olswang Construction Law Masterclass - 5 ...
Variations and their Consequences - Olswang Construction Law Masterclass - 5 ...
 
Construction Insolvency
Construction InsolvencyConstruction Insolvency
Construction Insolvency
 
The Management of Complex Contracts
The Management of Complex ContractsThe Management of Complex Contracts
The Management of Complex Contracts
 
Key Developments in Emerging Markets
Key Developments in Emerging MarketsKey Developments in Emerging Markets
Key Developments in Emerging Markets
 
Using Two-Stage Tendering Effectively
Using Two-Stage Tendering EffectivelyUsing Two-Stage Tendering Effectively
Using Two-Stage Tendering Effectively
 
Managing the Risks of Delay in Construction Projects
Managing the Risks of Delay in Construction ProjectsManaging the Risks of Delay in Construction Projects
Managing the Risks of Delay in Construction Projects
 
It Pays to Be Right: Payment in Construction Contracts
It Pays to Be Right: Payment in Construction ContractsIt Pays to Be Right: Payment in Construction Contracts
It Pays to Be Right: Payment in Construction Contracts
 
Adjudication: Tips, Traps and Tactics
Adjudication: Tips, Traps and TacticsAdjudication: Tips, Traps and Tactics
Adjudication: Tips, Traps and Tactics
 
Contractual Options for Procuring Major Projects in the UK
Contractual Options for Procuring Major Projects in the UKContractual Options for Procuring Major Projects in the UK
Contractual Options for Procuring Major Projects in the UK
 
Introductory Note on International Construction Contracts
Introductory Note on International Construction ContractsIntroductory Note on International Construction Contracts
Introductory Note on International Construction Contracts
 
Works Insurance and Latent Defects Insurance
Works Insurance and Latent Defects InsuranceWorks Insurance and Latent Defects Insurance
Works Insurance and Latent Defects Insurance
 
Third Party Rights and Why They Matter
Third Party Rights and Why They MatterThird Party Rights and Why They Matter
Third Party Rights and Why They Matter
 
A Practical Guide to the Construction (Design and Management) Regulations 2015
A Practical Guide to the Construction (Design and Management) Regulations 2015A Practical Guide to the Construction (Design and Management) Regulations 2015
A Practical Guide to the Construction (Design and Management) Regulations 2015
 
Construction Dispute Resolution and Avoidance in a Boom Market
Construction Dispute Resolution and Avoidance in a Boom MarketConstruction Dispute Resolution and Avoidance in a Boom Market
Construction Dispute Resolution and Avoidance in a Boom Market
 
Letters of Intent
Letters of IntentLetters of Intent
Letters of Intent
 
Collateral Warranties and Third Party Rights
Collateral Warranties and Third Party RightsCollateral Warranties and Third Party Rights
Collateral Warranties and Third Party Rights
 

Recently uploaded

一比一原版牛津布鲁克斯大学毕业证(牛布毕业证)如何办理
一比一原版牛津布鲁克斯大学毕业证(牛布毕业证)如何办理一比一原版牛津布鲁克斯大学毕业证(牛布毕业证)如何办理
一比一原版牛津布鲁克斯大学毕业证(牛布毕业证)如何办理
meboh
 
Safeguarding Against Financial Crime: AML Compliance Regulations Demystified
Safeguarding Against Financial Crime: AML Compliance Regulations DemystifiedSafeguarding Against Financial Crime: AML Compliance Regulations Demystified
Safeguarding Against Financial Crime: AML Compliance Regulations Demystified
PROF. PAUL ALLIEU KAMARA
 
一比一原版(ual毕业证书)伦敦艺术大学毕业证如何办理
一比一原版(ual毕业证书)伦敦艺术大学毕业证如何办理一比一原版(ual毕业证书)伦敦艺术大学毕业证如何办理
一比一原版(ual毕业证书)伦敦艺术大学毕业证如何办理
ayvace
 
Corporate Governance : Scope and Legal Framework
Corporate Governance : Scope and Legal FrameworkCorporate Governance : Scope and Legal Framework
Corporate Governance : Scope and Legal Framework
devaki57
 
一比一原版朴次茅斯大学毕业证(uop毕业证)如何办理
一比一原版朴次茅斯大学毕业证(uop毕业证)如何办理一比一原版朴次茅斯大学毕业证(uop毕业证)如何办理
一比一原版朴次茅斯大学毕业证(uop毕业证)如何办理
onduyv
 
快速办理(SCU毕业证书)澳洲南十字星大学毕业证文凭证书一模一样
快速办理(SCU毕业证书)澳洲南十字星大学毕业证文凭证书一模一样快速办理(SCU毕业证书)澳洲南十字星大学毕业证文凭证书一模一样
快速办理(SCU毕业证书)澳洲南十字星大学毕业证文凭证书一模一样
15e6o6u
 
THE CONCEPT OF RIGHT TO DEFAULT BAIL.pptx
THE CONCEPT OF RIGHT TO DEFAULT BAIL.pptxTHE CONCEPT OF RIGHT TO DEFAULT BAIL.pptx
THE CONCEPT OF RIGHT TO DEFAULT BAIL.pptx
Namrata Chakraborty
 
San Remo Manual on International Law Applicable to Armed Conflict at Sea
San Remo Manual on International Law Applicable to Armed Conflict at SeaSan Remo Manual on International Law Applicable to Armed Conflict at Sea
San Remo Manual on International Law Applicable to Armed Conflict at Sea
Justin Ordoyo
 
在线办理(UNE毕业证书)新英格兰大学毕业证成绩单一模一样
在线办理(UNE毕业证书)新英格兰大学毕业证成绩单一模一样在线办理(UNE毕业证书)新英格兰大学毕业证成绩单一模一样
在线办理(UNE毕业证书)新英格兰大学毕业证成绩单一模一样
15e6o6u
 
一比一原版(liverpool毕业证书)利物浦大学毕业证如何办理
一比一原版(liverpool毕业证书)利物浦大学毕业证如何办理一比一原版(liverpool毕业证书)利物浦大学毕业证如何办理
一比一原版(liverpool毕业证书)利物浦大学毕业证如何办理
aypxuyw
 
一比一原版(glasgow毕业证书)格拉斯哥大学毕业证如何办理
一比一原版(glasgow毕业证书)格拉斯哥大学毕业证如何办理一比一原版(glasgow毕业证书)格拉斯哥大学毕业证如何办理
一比一原版(glasgow毕业证书)格拉斯哥大学毕业证如何办理
ooqzo
 
Asian legal busiess india you are invited
Asian legal busiess india you are invitedAsian legal busiess india you are invited
Asian legal busiess india you are invited
digitalrashi12
 
suture removal ppt.pptx medical surgical
suture removal ppt.pptx medical surgicalsuture removal ppt.pptx medical surgical
suture removal ppt.pptx medical surgical
AlanSudhan
 
一比一原版(ua毕业证书)加拿大阿尔伯塔大学毕业证如何办理
一比一原版(ua毕业证书)加拿大阿尔伯塔大学毕业证如何办理一比一原版(ua毕业证书)加拿大阿尔伯塔大学毕业证如何办理
一比一原版(ua毕业证书)加拿大阿尔伯塔大学毕业证如何办理
ubype
 
V.-SENTHIL-BALAJI-SLP-C-8939-8940-2023-SC-Judgment-07-August-2023.pdf
V.-SENTHIL-BALAJI-SLP-C-8939-8940-2023-SC-Judgment-07-August-2023.pdfV.-SENTHIL-BALAJI-SLP-C-8939-8940-2023-SC-Judgment-07-August-2023.pdf
V.-SENTHIL-BALAJI-SLP-C-8939-8940-2023-SC-Judgment-07-August-2023.pdf
bhavenpr
 
A Critical Study of ICC Prosecutor's Move on GAZA War
A Critical Study of ICC Prosecutor's Move on GAZA WarA Critical Study of ICC Prosecutor's Move on GAZA War
A Critical Study of ICC Prosecutor's Move on GAZA War
Nilendra Kumar
 
一比一原版加拿大多伦多大学毕业证(uoft毕业证书)如何办理
一比一原版加拿大多伦多大学毕业证(uoft毕业证书)如何办理一比一原版加拿大多伦多大学毕业证(uoft毕业证书)如何办理
一比一原版加拿大多伦多大学毕业证(uoft毕业证书)如何办理
onduyv
 
Indonesian Manpower Regulation on Severance Pay for Retiring Private Sector E...
Indonesian Manpower Regulation on Severance Pay for Retiring Private Sector E...Indonesian Manpower Regulation on Severance Pay for Retiring Private Sector E...
Indonesian Manpower Regulation on Severance Pay for Retiring Private Sector E...
AHRP Law Firm
 
production-orders-under-article-18-of-the-budapest-convention-on-cybercrime-a...
production-orders-under-article-18-of-the-budapest-convention-on-cybercrime-a...production-orders-under-article-18-of-the-budapest-convention-on-cybercrime-a...
production-orders-under-article-18-of-the-budapest-convention-on-cybercrime-a...
ElenaLazr2
 
一比一原版新加坡南洋理工大学毕业证(本硕)ntu学位证书如何办理
一比一原版新加坡南洋理工大学毕业证(本硕)ntu学位证书如何办理一比一原版新加坡南洋理工大学毕业证(本硕)ntu学位证书如何办理
一比一原版新加坡南洋理工大学毕业证(本硕)ntu学位证书如何办理
hedonxu
 

Recently uploaded (20)

一比一原版牛津布鲁克斯大学毕业证(牛布毕业证)如何办理
一比一原版牛津布鲁克斯大学毕业证(牛布毕业证)如何办理一比一原版牛津布鲁克斯大学毕业证(牛布毕业证)如何办理
一比一原版牛津布鲁克斯大学毕业证(牛布毕业证)如何办理
 
Safeguarding Against Financial Crime: AML Compliance Regulations Demystified
Safeguarding Against Financial Crime: AML Compliance Regulations DemystifiedSafeguarding Against Financial Crime: AML Compliance Regulations Demystified
Safeguarding Against Financial Crime: AML Compliance Regulations Demystified
 
一比一原版(ual毕业证书)伦敦艺术大学毕业证如何办理
一比一原版(ual毕业证书)伦敦艺术大学毕业证如何办理一比一原版(ual毕业证书)伦敦艺术大学毕业证如何办理
一比一原版(ual毕业证书)伦敦艺术大学毕业证如何办理
 
Corporate Governance : Scope and Legal Framework
Corporate Governance : Scope and Legal FrameworkCorporate Governance : Scope and Legal Framework
Corporate Governance : Scope and Legal Framework
 
一比一原版朴次茅斯大学毕业证(uop毕业证)如何办理
一比一原版朴次茅斯大学毕业证(uop毕业证)如何办理一比一原版朴次茅斯大学毕业证(uop毕业证)如何办理
一比一原版朴次茅斯大学毕业证(uop毕业证)如何办理
 
快速办理(SCU毕业证书)澳洲南十字星大学毕业证文凭证书一模一样
快速办理(SCU毕业证书)澳洲南十字星大学毕业证文凭证书一模一样快速办理(SCU毕业证书)澳洲南十字星大学毕业证文凭证书一模一样
快速办理(SCU毕业证书)澳洲南十字星大学毕业证文凭证书一模一样
 
THE CONCEPT OF RIGHT TO DEFAULT BAIL.pptx
THE CONCEPT OF RIGHT TO DEFAULT BAIL.pptxTHE CONCEPT OF RIGHT TO DEFAULT BAIL.pptx
THE CONCEPT OF RIGHT TO DEFAULT BAIL.pptx
 
San Remo Manual on International Law Applicable to Armed Conflict at Sea
San Remo Manual on International Law Applicable to Armed Conflict at SeaSan Remo Manual on International Law Applicable to Armed Conflict at Sea
San Remo Manual on International Law Applicable to Armed Conflict at Sea
 
在线办理(UNE毕业证书)新英格兰大学毕业证成绩单一模一样
在线办理(UNE毕业证书)新英格兰大学毕业证成绩单一模一样在线办理(UNE毕业证书)新英格兰大学毕业证成绩单一模一样
在线办理(UNE毕业证书)新英格兰大学毕业证成绩单一模一样
 
一比一原版(liverpool毕业证书)利物浦大学毕业证如何办理
一比一原版(liverpool毕业证书)利物浦大学毕业证如何办理一比一原版(liverpool毕业证书)利物浦大学毕业证如何办理
一比一原版(liverpool毕业证书)利物浦大学毕业证如何办理
 
一比一原版(glasgow毕业证书)格拉斯哥大学毕业证如何办理
一比一原版(glasgow毕业证书)格拉斯哥大学毕业证如何办理一比一原版(glasgow毕业证书)格拉斯哥大学毕业证如何办理
一比一原版(glasgow毕业证书)格拉斯哥大学毕业证如何办理
 
Asian legal busiess india you are invited
Asian legal busiess india you are invitedAsian legal busiess india you are invited
Asian legal busiess india you are invited
 
suture removal ppt.pptx medical surgical
suture removal ppt.pptx medical surgicalsuture removal ppt.pptx medical surgical
suture removal ppt.pptx medical surgical
 
一比一原版(ua毕业证书)加拿大阿尔伯塔大学毕业证如何办理
一比一原版(ua毕业证书)加拿大阿尔伯塔大学毕业证如何办理一比一原版(ua毕业证书)加拿大阿尔伯塔大学毕业证如何办理
一比一原版(ua毕业证书)加拿大阿尔伯塔大学毕业证如何办理
 
V.-SENTHIL-BALAJI-SLP-C-8939-8940-2023-SC-Judgment-07-August-2023.pdf
V.-SENTHIL-BALAJI-SLP-C-8939-8940-2023-SC-Judgment-07-August-2023.pdfV.-SENTHIL-BALAJI-SLP-C-8939-8940-2023-SC-Judgment-07-August-2023.pdf
V.-SENTHIL-BALAJI-SLP-C-8939-8940-2023-SC-Judgment-07-August-2023.pdf
 
A Critical Study of ICC Prosecutor's Move on GAZA War
A Critical Study of ICC Prosecutor's Move on GAZA WarA Critical Study of ICC Prosecutor's Move on GAZA War
A Critical Study of ICC Prosecutor's Move on GAZA War
 
一比一原版加拿大多伦多大学毕业证(uoft毕业证书)如何办理
一比一原版加拿大多伦多大学毕业证(uoft毕业证书)如何办理一比一原版加拿大多伦多大学毕业证(uoft毕业证书)如何办理
一比一原版加拿大多伦多大学毕业证(uoft毕业证书)如何办理
 
Indonesian Manpower Regulation on Severance Pay for Retiring Private Sector E...
Indonesian Manpower Regulation on Severance Pay for Retiring Private Sector E...Indonesian Manpower Regulation on Severance Pay for Retiring Private Sector E...
Indonesian Manpower Regulation on Severance Pay for Retiring Private Sector E...
 
production-orders-under-article-18-of-the-budapest-convention-on-cybercrime-a...
production-orders-under-article-18-of-the-budapest-convention-on-cybercrime-a...production-orders-under-article-18-of-the-budapest-convention-on-cybercrime-a...
production-orders-under-article-18-of-the-budapest-convention-on-cybercrime-a...
 
一比一原版新加坡南洋理工大学毕业证(本硕)ntu学位证书如何办理
一比一原版新加坡南洋理工大学毕业证(本硕)ntu学位证书如何办理一比一原版新加坡南洋理工大学毕业证(本硕)ntu学位证书如何办理
一比一原版新加坡南洋理工大学毕业证(本硕)ntu学位证书如何办理
 

Olswang Construction Law Masterclass: Project Risks for Developers and Funders - Francis Ho

  • 1. Construction Law Masterclass: Project Risks for Developers and Funders Tuesday, 6 May 2014 Francis Ho, Head of Construction francis.ho@olswang.com | +44 20 7067 3505 | @fkyh
  • 2. One project risk … #olswangconstruction
  • 3. Types of Project Risk 1.  Design and Construction 2.  Other Party Risks 3.  Environmental and Approvals 4.  Force Majeure #olswangconstruction#olswangconstruction www.constructiveblog.com
  • 4. 1. Design and Construction •  Developer risks •  Design complexity •  Construction risk: •  Construction team •  Site conditions •  Cost overruns •  Late completion #olswangconstruction#olswangconstruction www.constructiveblog.com
  • 5. 2. Other Party Risks • Sale/letting risk • Documentation risk #olswangconstruction#olswangconstruction www.constructiveblog.com
  • 6. 3. Environmental and Approvals •  Contaminated land •  Planning permission •  Listed buildings consent •  Environmental impact assessment •  Rights of light, party walls #olswangconstruction#olswangconstruction www.constructiveblog.com
  • 7. 4. Force Majeure • Extension of completion date for construction • Wider than an “Act of God” • May be a default under credit agreement #olswangconstruction#olswangconstruction www.constructiveblog.com
  • 8. Mitigating and Managing Project Risks •  Due diligence •  Turnkey construction contract •  Fixed price construction contract •  Guarantees •  Cost overruns •  Completion/interest shortfall •  Liquidated damages •  Insurances •  Bonds •  Credit agreement terms #olswangconstruction#olswangconstruction www.constructiveblog.com
  • 9. Turnkey Construction Contract • Design and construction risk lies with Contractor • Contract negotiations more straightforward • Novation of design professionals to Contractor • Suitable for wide range of projects (but not all) #olswangconstruction#olswangconstruction www.constructiveblog.com
  • 10. Turnkey Construction Contract #olswangconstruction Sub-Contracts Direct Contracts Client Contractor Sub- Contractor Sub- Contractor Sub- Contractor Design Consultant Design Consultant Design Consultant Contract Administrator Cost Consultant CDM Co- ordinator #olswangconstruction www.constructiveblog.com
  • 11. Guarantees • Sponsors can avoid having to commit finance to cover key risks • May vary in nature from letters of comfort to absolute guarantees • Ensure drafted to be absolute and unconditional • Parent company guarantees #olswangconstruction#olswangconstruction www.constructiveblog.com
  • 12. Insurance •  Works insurance •  Third party liability •  Environmental liability •  Professional indemnity •  Inherent defects #olswangconstruction#olswangconstruction www.constructiveblog.com
  • 13. Bonds •  Performance bonds •  Retention bonds (or retention monies) •  Advanced payment bonds #olswangconstruction#olswangconstruction www.constructiveblog.com
  • 14. Facility Agreement •  Conditions precedent •  “Drawstops” •  Events of default #olswangconstruction#olswangconstruction www.constructiveblog.com
  • 15. Closing Thoughts •  Differing attitudes of Developers and Funders to risk •  Consider risks important to Funders •  Due diligence can identify and manage risks #olswangconstruction#olswangconstruction www.constructiveblog.com