BHARAT SANCHAR NIGAMLIMITED
O/O THE DIVISIONAL ENGINEER, TELECOM, PURI
WORK ORDER FOR OFC CABLE LAYING
W.O No:- N-8/17-18 Dated04.03.2018
1. Work order issuedto : Sri BiswajitPattnaik
2. Route Name : Layingof OFC at Raibidharof BRM-KHJ6F OFC
3. Route detail : Same
4. Estimate No : 5263N(b)/2017-18, WBS No- FA/17/011342.01
5 AgreementNo&date : N-122/2016-17 dated05.08.2017
6. Time fixedof the work : 20 days
Detail of the work
i) Diggingof trench onsoft soil surface : 500 mtr (Approx)
of 45cm width*165cm depth( Approx)
ii) Diggingof trenchon asphalted soil : 80 mtr ( Approx)
of 45cm width*15 cm depth( Approx)
iii) Diggingof soil onasphaltedsurface : 80 mtr(Approx)
of 45cm width*145cm depth( Approx)
iv) Diggingof trenchon concrete surface of : Nil
15 cm width*30 cm depth(approx) :
v) Layingof PLB Pipe ( approx) : 600 mtr
vi) Layingof RCC pipesatroad crossing& underculvert: Nil
vii) Makingof splice chamberasperdept
specificationandrequirement : 02 Nos
viii) Pullingof 24 F OFC cable/blowingOFC : 660 Mtr
ix) Plantingroute/jointindicator : 06 Nos
x) Concreting : 0 cum
xi) Roadboring : 20 mtr ( Approx)
xii) HDD : Nil
xiv) Puttingbamboo : Nil
xv) Testpit : Nil
8.Site Engineer/supervisingofficer : Sri S.KSahu, SDOT,Puri
9. Engineerincharge/D.E.Telecom : Sri B.D.Mishra,DET, Puri
Copyto: D E Telecom,Puri
1. Sri BiswajitPattnaik,Contractor
2. The Dy GM(Rural),O/o The PGMTD, Bhubaneswar
3. Sri S.K.Sahu,SDOT,Puri( Site Engineer)
4. Sr A.O.Cash,O/o The PGMTD, Bhubaneswar
D E Telecom,Puri
Ofc new work order

Ofc new work order

  • 1.
    BHARAT SANCHAR NIGAMLIMITED O/OTHE DIVISIONAL ENGINEER, TELECOM, PURI WORK ORDER FOR OFC CABLE LAYING W.O No:- N-8/17-18 Dated04.03.2018 1. Work order issuedto : Sri BiswajitPattnaik 2. Route Name : Layingof OFC at Raibidharof BRM-KHJ6F OFC 3. Route detail : Same 4. Estimate No : 5263N(b)/2017-18, WBS No- FA/17/011342.01 5 AgreementNo&date : N-122/2016-17 dated05.08.2017 6. Time fixedof the work : 20 days Detail of the work i) Diggingof trench onsoft soil surface : 500 mtr (Approx) of 45cm width*165cm depth( Approx) ii) Diggingof trenchon asphalted soil : 80 mtr ( Approx) of 45cm width*15 cm depth( Approx) iii) Diggingof soil onasphaltedsurface : 80 mtr(Approx) of 45cm width*145cm depth( Approx) iv) Diggingof trenchon concrete surface of : Nil 15 cm width*30 cm depth(approx) : v) Layingof PLB Pipe ( approx) : 600 mtr vi) Layingof RCC pipesatroad crossing& underculvert: Nil vii) Makingof splice chamberasperdept specificationandrequirement : 02 Nos viii) Pullingof 24 F OFC cable/blowingOFC : 660 Mtr ix) Plantingroute/jointindicator : 06 Nos x) Concreting : 0 cum xi) Roadboring : 20 mtr ( Approx) xii) HDD : Nil xiv) Puttingbamboo : Nil xv) Testpit : Nil 8.Site Engineer/supervisingofficer : Sri S.KSahu, SDOT,Puri 9. Engineerincharge/D.E.Telecom : Sri B.D.Mishra,DET, Puri Copyto: D E Telecom,Puri 1. Sri BiswajitPattnaik,Contractor 2. The Dy GM(Rural),O/o The PGMTD, Bhubaneswar 3. Sri S.K.Sahu,SDOT,Puri( Site Engineer) 4. Sr A.O.Cash,O/o The PGMTD, Bhubaneswar D E Telecom,Puri