The document discusses Nussli's modular stadium solutions. It describes their modular stadium concept as offering flexibility in capacity and functionality over the lifetime of the stadium. The modular designs allow for quick, cost-effective construction and expansion. Nussli provides modular stadium options for both permanent steel construction and temporary scaffolding construction. Their modular designs can be adapted to client needs and budgets.
SCentre Infra- The Leading Steel Construction Company In Indiaseo2artistonk
With decades of expertise in creating turnkey solutions in the construction industry, SCentre Infra is one of the leading steel building manufacturers & steel construction company. As your ideal partner for steel construction, we help you bring your vision to life, right from initial planning to final execution and completion of the project.
We have the expertise, resources, and state-of-the-art technology to tackle the most extreme conditions and highly complex construction projects.
https://scentreinfra.com/
The smartfix® fixing system has been developed to introduce a more efficient way of creating a facade free of exposed fixings and sealants, acknowledging the importance of architectural and aesthetic demands.
With and emphasis on flexibility, a wide range of smartfix® extruded profiles have been developed to provide the designer with a number of fixing options for both internal and external applications.
A stockless anchor is a type of anchoring system that does not require the use of a traditional anchor rod stock. The Hall Stockless Anchor is a patented and innovative anchoring solution designed and expertly manufactured by Hall Industries, a leading name in the construction anchors market.
Set up and commissioned in 2011, Exeed Precast is one of the largest precast production facilities in the region, covering an area of over 200,000 sq. m. located in ICAD 2 with an additional manufacturing facility, Exeed Aswar located in ICAD 1 covering and area of 21,000 sq. m.
SCentre Infra- The Leading Steel Construction Company In Indiaseo2artistonk
With decades of expertise in creating turnkey solutions in the construction industry, SCentre Infra is one of the leading steel building manufacturers & steel construction company. As your ideal partner for steel construction, we help you bring your vision to life, right from initial planning to final execution and completion of the project.
We have the expertise, resources, and state-of-the-art technology to tackle the most extreme conditions and highly complex construction projects.
https://scentreinfra.com/
The smartfix® fixing system has been developed to introduce a more efficient way of creating a facade free of exposed fixings and sealants, acknowledging the importance of architectural and aesthetic demands.
With and emphasis on flexibility, a wide range of smartfix® extruded profiles have been developed to provide the designer with a number of fixing options for both internal and external applications.
A stockless anchor is a type of anchoring system that does not require the use of a traditional anchor rod stock. The Hall Stockless Anchor is a patented and innovative anchoring solution designed and expertly manufactured by Hall Industries, a leading name in the construction anchors market.
Set up and commissioned in 2011, Exeed Precast is one of the largest precast production facilities in the region, covering an area of over 200,000 sq. m. located in ICAD 2 with an additional manufacturing facility, Exeed Aswar located in ICAD 1 covering and area of 21,000 sq. m.
Wheelchair Tennis: Clubhouses And PavillionsScott Rains
1
Introduction
The purpose of the tennis court building brief is to provide a guide to the
minimum standards to which new outdoor courts should be constructed.
This information should not be considered to be a complete building
brief in itself but the basis from which a full project brief, design and
specification can be evolved.
It should be noted that the dimensions contained in this document are
for recreational play and many require to be exceeded for specialist
events and tournaments. In these instances further advice should be
sought from the LTA.
ANZ Tower is one of the newest additions to the Sydney skyline and has been awarded the highest possible 6 Star Green Star – Office Design v2 rating by the Green Building Council of Australia.
mySmart is immensely proud to be associated with ANZ Tower and has relished the opportunity to deliver an iconic KNX project of such size, scale and performance.
The global demand for food is becoming greater and greater with an ever-increasing population, which is why companies will have to produce more efficiently and effectively. SCE are playing an active part in helping companies with this by designing silos that take up little space and are quick to assemble in any production unit.
K-Home Steelstructure is the top Relocatable building manufacturer in China. Relocatable buildings are units created to be repurposed and transported to varied building sites. Buildings are used for different purposes like medical clinics, schools, sales centers, and construction website offices, among others.
2. 2 3
Future-oriented.
During times of fluid changes and limited resources, demands with regards to
modern arenas and stadia change as well. NUSSLI plans and constructs state-
of-the-art modular stadium solutions for permanent as well as temporary use
around the world.
The Modular Stadium® concept offers unrivalled flexibility in terms of capacity
and functionality across the entire lifecycle. The concept was expanded and
developed further based on extensive project experience, and with the support
of latest construction technology and integrated construction implementation
processes. The result is a stadium that is both cost-efficient and highly versatile.
These customer-specific and turnkey structures can be designed in such a way as
to allow the implementation of any additional specifications the client requires.
Cover picture: “Nuevo estadio de Bata“ 2011, Bata (AQ)
Left: Rendering, Baku Crystal Hall, Baku (AZ) // Rendering: gmp Architekten von Gerkan, Marg und Partner
A1 Beach Volleyball Grand Slam 2000 - 2011, Klagenfurt (AT); Right: airberlin world 2011, Dusseldorf (DE)
3. 4 5
Unique and Sustainable.
1
Experience is twice as valuable when it is available to a relatively new
d
iscipline. Our pioneering work in the area of modular stadium construction
allows us to find the right solution for individual customer requests; without
any inefficiencies – cost effectively and on time.
The Modular Stadium® concept was created specifically for the development
of stadia of various sizes and functions and for different levels of usage, so
that they could be adapted to the changing requirements and specifications of
sports authorities and clients.
Benefits:
2
Time/ Speed
• Short procurement times
• Systems with type approval (systems with permission for a type of building)
• Planning with optimized modules
• Short planning and installation times
Versatility
• Temporary extensions and adjustments
• Implementation for a variety of sports
• Complete reassignment of purpose
Flexibility
3
• Complete or partial implementation
• Implementation in line with available budget
• Easily dismantled, stored, and reused
Costs
• Shorter financing due to quicker construction times
• Fast ROI
• Design-to-cost value analysis
• Minimized operating costs
Sustainability
• Resource saving manufacture and installation
4
• Reusable components
• Economically sustainable concepts due to better adaptability
• Integration of future-oriented energy concepts
4. 6 7
Modular Stadium® Steel Construction.
For permanent structures, NUSSLI creates modular stadia in steel. The custom
prefabricated modules allow particularly fast and cost-efficient completion.
Any of the modules can be expanded in retrospect as needed – much like a
football club winning a place in the big leagues. The structure remains flexible
and adaptable.
All pictures: “Nuevo estadio de Bata“ 2011, Bata (AQ)
5. 8 9
Taylor-made.
NUSSLI developed a taylor-made grandstand system for `The Royal Edinburgh
Military Tattoo‘ in Scotland, provided everything from VIP rooms to the crowd
control measures. The system was purchased by the client outright, and is
dismantled and stored after each annual event.
The location posed a particular challenge in this case. The structure is located
on Edinburgh Castle’s Esplanade which steeply slopes away towards the eastern
side. Extensive piling and foundation work were needed to secure the structure
in place. The southern grandstand protrudes out over The Esplanade by 9 meters
along its length.
The grandstand itself offers a capacity for 8,800 spectators together with
disabled spectator positions in all ticket categories. The two-storey, modular
VIP and production structure also offers an accessible roof terrace and is
complimented with a fully automated elevator. The grandstand’s understructure
is designed to provide sufficient open space to locate modular buildings to house
performers rest areas, toilet facilities, security offices and concessions.
The entire seating structure was designed and constructed as a permanent,
steel and aluminium structure but with special connection nodes that enables
easy dismantle and re-erection. It offers the highest possible standards in safety,
comfort, and functionality.
All pictures: The Royal Edinburgh Military Tattoo 2011, Edinburgh (UK)
6. 10 11
Modular Stadium® Scaffold Construction.
In the temporary stadium structures market, NUSSLI utilizes their own rental
material and systems for the required duration. Our systems allow us to offer
solutions that suit all client requirements that can include different seat options,
VIP boxes, changing rooms, concessions, toilet facilities and ticket offices, etc.
NUSSLI’s seating systems complies with the highest safety standards together
with detailed design, engineering and functionality.
Our experience and knowledge drawn from many successful projects in this
market makes NUSSLI the ideal partner at locations without pre-existing
infrastructure.
Benefits:
• Pre-designed systems result in cost security
• Overall costs are approx. 30 - 40% below permanent concrete structures
• Solutions include rentals, purchase, hire-purchase and leasing models
• Short planning and installation times
• Short approval times
• Compliance with necessary requirements of e.g. FIFA, DFL, DFB and DIN
• Fast and secure financing
• Flexibility in terms of adaptation to current requirements
Right: Empire Field Stadium 2010, Vancouver (CA); BRITA-Arena 2007, Wiesbaden (DE)
7. 12 13
Efficient Stadium Extensions. Additional services.
NUSSLI provides extensions to existing facilities and structures efficiently • Technical structures
and affordably. Our tried and tested modular designs and system materials • Team facilities
allow us to react quickly. We extend existing structures with additional grand- • VIP boxes
stand capacity, VIP boxes, roof systems, or ancillary structures as required, • Business and office areas
while always complying with strict safety standards. • Shops, merchandising
• Toilet facilities
Our stadium extensions are available for rental or outright purchase. Other • Floodlights, stadium lighting, architectural lighting
options include hire-purchase or leasing models. • Video walls, displays
• Exterior design
Left: Stadium extension Hardtwald Stadium, 2010, Sandhausen (DE); Extension Olympiastadium Berlin 2011, Berlin (DE); Extension Cape Town Stadium 2010, Cape Town (ZA)
Right: UEFA EURO 08, Zurich (CH); Davis Cup semi final 2011, Cordoba (ES); BRITA-Arena 2007, Wiesbaden (DE)
8. 14 15
Stadium solutions overview.
Steel construction Modular scaffolding
construction
Recommended for use From approx. 2 years Up to approx. 2 years
Planning time Approx. 4 - 6 months Approx. 1 - 2 months
Construction time 6 - 18 months 4 - 16 weeks
(Seats: 10,000 / 20,000 / 30,000)
Compliance with standards / FIFA, DFL, DFB, DIN and others FIFA, DFL, DFB, DIN and others
requirements
Approval process Local Local, reduced approval time by type
permissions
Later expansion possible Yes Yes
Dismantling capability Yes Yes
Number of tiers 1 or 2 tiers 1 tier
Roofing Complete Depending on size: complete / partial
Roofing type Bespoke options System roofing with intermediate
support columns
Technical / ancillery structures Bespoke options (beneath the tiers) Limited integration
Right: “Eidgenössisches Schwing- & Älplerfest“ 2010, Frauenfeld (CH)
Back Cover: Stadium Extension, Khalifa Arena 2008, Doha (QA)
9. StB 08/2011 en // All pictures: NUSSLI
Member companies in:
Switzerland (Headquarters), Germany, Austria,
Italy, Spain, United Kingdom, USA and Middle East.
In addition, we are represented by our partners and
our own sales and project offices around the world. nussli.com