norman a. glavas a.i.a.   norman a. glavas a.i.a.
A R C H I T E C T         A R C H I T E C T
about the


                     firm
Norman Glavas Architects (NGA) is an            An accomplished and growing firm, NGA        to look through this promotional book-
integrated    multi-disciplinary    architec-   has a professional staff that includes       let that highlights our services and some
tural firm based in Manhasset, New York.        technical staff, project management, and     of our work. We look forward to working
Specializing in design relationships with       administration personnel. Cumulatively,      with you in the future and appreciate
corporations, small business owners and         expertise is applied in a team approach to   your consideration.
home owners, NGA provides over 22 years         every undertaking with the assignment
of experience to each client.                   of a project manager, who coordinates
The principal of the firm is instrumental in    the   other   roles   throughout     the
every phase of    management, providing         architectural process. Norman Glavas es-
personal attention to each project and          tablished NGA in 1988 and brings over
overseeing all elements of design and pro-      33 years of architectural knowledge to
gramming. With a value - added, hands           his practice. NGA brings a specialized and
on   team approach, the firm prides itself      personal process and product to every
on essential attention to detail.               client we work with. We encourage you
Principal’s


              curriculum vitae
Norman Glavas, Principal, is a registered architect and member of the American Institute of Ar-       registration & certification:      professional affiliations:
chitects. Since the beginning of his architectural career he has worked for various firms including   Architecture license               American Institute of Architects (AIA)
Bankers Trust, J. Gordon Carr Associates, Peter Chipouras Associates, Raymond Irrera & Asso-          • New York, 1986                   Port Washington chamber of commerce
ciates and Westerman & Miller before starting NGA in 1998. Mr. Glavas designs projects with a         • New Jersey, 1997                 CCNY alumni association
commitment to the highest quality design through a sophisticated urderstanding of client objec-                                          Port Washington education foundation
tives, technological requirements and the complex demands of user needs. Mr. Glavas’ command                                             Board Member
of construction technology and budgetary Knowledge compliments his sensitivity to corporate                                              Village of flower hill
goals while creating unique and dramatic enviroments.                                                                                    •   Elected trustee since 1996
                                                                                                      education:                         •   Flower hill building review committee
                                                                                                      City university of New York,       •   Chairman of re-codification committee
                                                                                                      School of architecture             •   Chairman of 75th anniversary ( F.H )
                                                                                                      • Bachelor of science, 1972            St. Francis Hospital institutional review
                                                                                                      • Bachelor of architecture, 1973       board member.
available


                       services
architecture & interiors               space analysis                            furnishings & equipment                       ADA services
•   Commercial & corporate interiors   •   Massing & building evaluation         •   Office furniture and building standards   •   Evaluation of existing conditions
•   Institutional                      •   Feasibility studies                   •   Interior design                           •   Recommendations for compliance
•   Religious                          •   Lease and tenant work letter review   •   Office equipment                          •   Architectural design services
•   Residential                        •   Space programming & planning          •   Architectural signage                     •   Signage programs
                                       •   Computer-raised flooring design
                                       •   Security design                       construction services
                                                                                 •   Technical consultants coordination
                                                                                 •   Building representative coordination
                                                                                 •   Engineering services coordination
                                                                                 •   Value engineering
                                                                                 •   Cost estimation
the


          architectural process
Comprised of multiple phases, the archi-      phase I: programming                     phase III: schematic design                 phase V: construction plans
tectural process has numerous associated      • Assessment of needs                    • Scope of program                          • Construction drawings and specifications
activities that ensure the success of every                                            • Graphic functional design schemes         • Contractor recommendations and
project. The architect is instrumental in     phase II: feasibility                    • Preliminary sketches that graphically         selection
all phases of this work, and oversees the     • Schedule and budget                        describe proposals                      • Bidding, bid review and negotiation.
completion of these tasks. The following      • State and local building codes                                                     • Technical consultation
list details the six phases connected to        and regulations                        phase IV: design development
the project cycle and the related activi-     • Circulation and functional relation-   •   Preliminary construction cost           phase VI: contract administration
ties of that phase.                             ships of site requirements                 estimates                               •   Building department permits
                                              • Space and volume requirements          •   Interior and exterior finishes,         •   Shop drawings review
                                              • Tenant work letter review                  furnishings, acoustical and landscape   •   Field observations during construction
                                                                                           systems                                 •   Contractor payment review
                                                                                       •   Mechanical, electric and plumbing
                                                                                                                                   •   Punch lists.
                                                                                           systems components
noted


                       projects
Verizon                                             J P Morgan Chase Bank                     Chemical Bank
• Massing and stacking of entire corporate          •   New signage program – seventeen       • 4 branch renovations
  head quaters building.                                branch locations
• Redesign of 17 floors in corporate head           •   2 teller training schools             Adelphi University
   quaters building.                                •   6 branch renovations                  • Renovation of 20,000 square feet
• Lead Architect on 5- year, 40 building program    •   Corporate interiors for five floors
  incorporating local Law #5 requirements.              (various locations)
• Lead Architect for disposition of 4 major
  buildings with relocation of 12,000 people thr-   Marathon Bank
  oughout Verizon real estate holdings.             •   Four locations within Queens,
• Additional 22 locations of work over 20 years.        Brooklyn and Manhattan.
effective
         commercial design


Chase, Jericho NY


          NGA specializes in the upgrading of raw and existing space into human-scale environments through the
          use of aesthetic design skills, innovative lighting, contemporary materials and office landscape design
          techniques. Creating a comfortable setting is essential in making the workplace environment habitable
          for the individual and productive for the client.


          NGA has worked on specialty offices for the telecommunications, medical, financial, jewelry, foodservice
          and numismatic industries. Unique criteria for small businesses are always taken into consideration by
          our firm. The challenge of personnel and programmatic needs are given special attention in this type of
          work.


                                                                                                                     Marathon Bank- Bayside Queens
efficient corporate interiors


                                                                                                                                    Pre-existing Conditions   Completed Project




Verizon: Flatbush Ave, NYC




NGA has worked in the past with large-scale corporations like AT&T, Hitachi, Northrup Grumman and Verizon. Over the past 22
years, the firm has successfully completed over one million square feet of interiors for Verizon in over 40 buildings, within
the tri-state area, including 17 floors in their former corporate headquarters.


NGA also served as the lead architecture firm in the disposition of 4 main office buildings previously owned by Verizon, with the
relocation of approximately 12,000 personnel throughout Verizon’s real estate holdings in New York City.
life, health and safety
compliance


                                                                                                          Archangel Michael Greek Orthodox Church. Roslyn NY.

Verizon:
Custom Fire Command Station


Creating an environment that protects the life, health and safety of individuals within a business or a
home is an essential component to sustainable design. NGA works with all types of clients in assisting
them with code compliance relative to City, State and National Building codes. Code compliance work is
comprised of assessment, surveying, recommendations and implementation of modifications.


Recently, NGA worked with Verizon in updating 90% of their New York City locations to meet
Local Law #5, a city - wide fire safety standard for commercial spaces. In the past, the firm has
also worked with local businesses and churches in complying with American Disabilities Act
(ADA) regulations related to access and usability standards.

                                                                                                          Verizon- 36th St. ( ADA Bathroom )
customized residential
design
attention to detail and the importance of personal family space


                                                                                                                          Sands Point, NY




New construction, additions and renovations are all part of residential services provided by NGA. The firm      Manhasset, NY               Lake Success, NY
will assist you in visualizing the potential of your home with special attention to detail and the importance
of personal family space. Expertise in high-end design is applied to any project - big or small.


The majority of work undertaken by NGA has been located in the North Shore region of Long
Island, with projects ranging from 700 to 5,000+ square feet. Sensitivity to existing conditions,
in order to maintain a continuity of appearance while enhancing function, is always considered
along with strict adherence to zoning and building codes.



                                                                                                                Flower Hill, NY             Flower Hill, NY
Pre- Existing Conditions   Pre- Existing Conditions




foodservice
establishment




Europa Cafe, NYC



NGA developed a new branded look for the Europa Cafe chain in New York City through a sustainable design approach
that incorporated today’s modern materials. A new lighting concept was implemented using the latest technology of
LED, Ceramic Metal Halide and Halogen lights thereby reducing the client’s energy consumption. The introduction of
recycled-content solid surface countertops, together with the use of Armstrong’s Curved Infusion Panels, reinforced
the client’s program of creating a “Fast Casual” enviroment. NGA was featured in Armstrong’s product literature for
the creative use of these panels.
religious facilities
Main Entrance Rendering




                                                                                  Construction Image




      Most recently, the firm began work          • Church for 500 parishioners
      on the Archangel Michael Greek              • High School sized Gym.
      Orthodox Church complex on Long             • Fellowship hall
      Island.                                     • 15 classrooms
      With an estimated construction cost of 15   • Administrative area
      million dollars, the designed complex       • Chapel
      includes the following facilities:          • Bell tower
                                                                                  Construction Image
Congregational Church of
Manhasset
•   New choir addition
•   Redesign of front elevation
•   Redesign of existing 55 ft steeple to
    incorporate multiple cell phone
    reception sites.
•   Addition of ADA H.C. elevator




                                            Telecommunications tower   Music room   Front Entrance
162 boulder road
manhasset, ny 11030
      tel 516.365.5111
     fax 516.365.5197
 office@nglavas.com
  www.nglavas.com

Norman Glavas Architects Catalog

  • 1.
    norman a. glavasa.i.a. norman a. glavas a.i.a. A R C H I T E C T A R C H I T E C T
  • 2.
    about the firm Norman Glavas Architects (NGA) is an An accomplished and growing firm, NGA to look through this promotional book- integrated multi-disciplinary architec- has a professional staff that includes let that highlights our services and some tural firm based in Manhasset, New York. technical staff, project management, and of our work. We look forward to working Specializing in design relationships with administration personnel. Cumulatively, with you in the future and appreciate corporations, small business owners and expertise is applied in a team approach to your consideration. home owners, NGA provides over 22 years every undertaking with the assignment of experience to each client. of a project manager, who coordinates The principal of the firm is instrumental in the other roles throughout the every phase of management, providing architectural process. Norman Glavas es- personal attention to each project and tablished NGA in 1988 and brings over overseeing all elements of design and pro- 33 years of architectural knowledge to gramming. With a value - added, hands his practice. NGA brings a specialized and on team approach, the firm prides itself personal process and product to every on essential attention to detail. client we work with. We encourage you
  • 3.
    Principal’s curriculum vitae Norman Glavas, Principal, is a registered architect and member of the American Institute of Ar- registration & certification: professional affiliations: chitects. Since the beginning of his architectural career he has worked for various firms including Architecture license American Institute of Architects (AIA) Bankers Trust, J. Gordon Carr Associates, Peter Chipouras Associates, Raymond Irrera & Asso- • New York, 1986 Port Washington chamber of commerce ciates and Westerman & Miller before starting NGA in 1998. Mr. Glavas designs projects with a • New Jersey, 1997 CCNY alumni association commitment to the highest quality design through a sophisticated urderstanding of client objec- Port Washington education foundation tives, technological requirements and the complex demands of user needs. Mr. Glavas’ command Board Member of construction technology and budgetary Knowledge compliments his sensitivity to corporate Village of flower hill goals while creating unique and dramatic enviroments. • Elected trustee since 1996 education: • Flower hill building review committee City university of New York, • Chairman of re-codification committee School of architecture • Chairman of 75th anniversary ( F.H ) • Bachelor of science, 1972 St. Francis Hospital institutional review • Bachelor of architecture, 1973 board member.
  • 4.
    available services architecture & interiors space analysis furnishings & equipment ADA services • Commercial & corporate interiors • Massing & building evaluation • Office furniture and building standards • Evaluation of existing conditions • Institutional • Feasibility studies • Interior design • Recommendations for compliance • Religious • Lease and tenant work letter review • Office equipment • Architectural design services • Residential • Space programming & planning • Architectural signage • Signage programs • Computer-raised flooring design • Security design construction services • Technical consultants coordination • Building representative coordination • Engineering services coordination • Value engineering • Cost estimation
  • 5.
    the architectural process Comprised of multiple phases, the archi- phase I: programming phase III: schematic design phase V: construction plans tectural process has numerous associated • Assessment of needs • Scope of program • Construction drawings and specifications activities that ensure the success of every • Graphic functional design schemes • Contractor recommendations and project. The architect is instrumental in phase II: feasibility • Preliminary sketches that graphically selection all phases of this work, and oversees the • Schedule and budget describe proposals • Bidding, bid review and negotiation. completion of these tasks. The following • State and local building codes • Technical consultation list details the six phases connected to and regulations phase IV: design development the project cycle and the related activi- • Circulation and functional relation- • Preliminary construction cost phase VI: contract administration ties of that phase. ships of site requirements estimates • Building department permits • Space and volume requirements • Interior and exterior finishes, • Shop drawings review • Tenant work letter review furnishings, acoustical and landscape • Field observations during construction systems • Contractor payment review • Mechanical, electric and plumbing • Punch lists. systems components
  • 6.
    noted projects Verizon J P Morgan Chase Bank Chemical Bank • Massing and stacking of entire corporate • New signage program – seventeen • 4 branch renovations head quaters building. branch locations • Redesign of 17 floors in corporate head • 2 teller training schools Adelphi University quaters building. • 6 branch renovations • Renovation of 20,000 square feet • Lead Architect on 5- year, 40 building program • Corporate interiors for five floors incorporating local Law #5 requirements. (various locations) • Lead Architect for disposition of 4 major buildings with relocation of 12,000 people thr- Marathon Bank oughout Verizon real estate holdings. • Four locations within Queens, • Additional 22 locations of work over 20 years. Brooklyn and Manhattan.
  • 7.
    effective commercial design Chase, Jericho NY NGA specializes in the upgrading of raw and existing space into human-scale environments through the use of aesthetic design skills, innovative lighting, contemporary materials and office landscape design techniques. Creating a comfortable setting is essential in making the workplace environment habitable for the individual and productive for the client. NGA has worked on specialty offices for the telecommunications, medical, financial, jewelry, foodservice and numismatic industries. Unique criteria for small businesses are always taken into consideration by our firm. The challenge of personnel and programmatic needs are given special attention in this type of work. Marathon Bank- Bayside Queens
  • 8.
    efficient corporate interiors Pre-existing Conditions Completed Project Verizon: Flatbush Ave, NYC NGA has worked in the past with large-scale corporations like AT&T, Hitachi, Northrup Grumman and Verizon. Over the past 22 years, the firm has successfully completed over one million square feet of interiors for Verizon in over 40 buildings, within the tri-state area, including 17 floors in their former corporate headquarters. NGA also served as the lead architecture firm in the disposition of 4 main office buildings previously owned by Verizon, with the relocation of approximately 12,000 personnel throughout Verizon’s real estate holdings in New York City.
  • 9.
    life, health andsafety compliance Archangel Michael Greek Orthodox Church. Roslyn NY. Verizon: Custom Fire Command Station Creating an environment that protects the life, health and safety of individuals within a business or a home is an essential component to sustainable design. NGA works with all types of clients in assisting them with code compliance relative to City, State and National Building codes. Code compliance work is comprised of assessment, surveying, recommendations and implementation of modifications. Recently, NGA worked with Verizon in updating 90% of their New York City locations to meet Local Law #5, a city - wide fire safety standard for commercial spaces. In the past, the firm has also worked with local businesses and churches in complying with American Disabilities Act (ADA) regulations related to access and usability standards. Verizon- 36th St. ( ADA Bathroom )
  • 10.
    customized residential design attention todetail and the importance of personal family space Sands Point, NY New construction, additions and renovations are all part of residential services provided by NGA. The firm Manhasset, NY Lake Success, NY will assist you in visualizing the potential of your home with special attention to detail and the importance of personal family space. Expertise in high-end design is applied to any project - big or small. The majority of work undertaken by NGA has been located in the North Shore region of Long Island, with projects ranging from 700 to 5,000+ square feet. Sensitivity to existing conditions, in order to maintain a continuity of appearance while enhancing function, is always considered along with strict adherence to zoning and building codes. Flower Hill, NY Flower Hill, NY
  • 11.
    Pre- Existing Conditions Pre- Existing Conditions foodservice establishment Europa Cafe, NYC NGA developed a new branded look for the Europa Cafe chain in New York City through a sustainable design approach that incorporated today’s modern materials. A new lighting concept was implemented using the latest technology of LED, Ceramic Metal Halide and Halogen lights thereby reducing the client’s energy consumption. The introduction of recycled-content solid surface countertops, together with the use of Armstrong’s Curved Infusion Panels, reinforced the client’s program of creating a “Fast Casual” enviroment. NGA was featured in Armstrong’s product literature for the creative use of these panels.
  • 12.
    religious facilities Main EntranceRendering Construction Image Most recently, the firm began work • Church for 500 parishioners on the Archangel Michael Greek • High School sized Gym. Orthodox Church complex on Long • Fellowship hall Island. • 15 classrooms With an estimated construction cost of 15 • Administrative area million dollars, the designed complex • Chapel includes the following facilities: • Bell tower Construction Image
  • 13.
    Congregational Church of Manhasset • New choir addition • Redesign of front elevation • Redesign of existing 55 ft steeple to incorporate multiple cell phone reception sites. • Addition of ADA H.C. elevator Telecommunications tower Music room Front Entrance
  • 14.
    162 boulder road manhasset,ny 11030 tel 516.365.5111 fax 516.365.5197 office@nglavas.com www.nglavas.com