NOORUL AMEEN .M.S
E-mail: msnoorulameen@gmail.com
Mobile: +91-9962733683
OBJECTIVE
To fit myself in a role, where I can contribute and learn to “Engineer the tool”. I set my
vision, in enhancing and expertise my skills in the complete life cycle of performance
engineering right from requirement to performance tuning.
PROFILE SUMMARY
 3 years and 8 months of experience in Performance Testing using LoadRunner.
 Good Knowledge on Performance Engineering Life Cycle.
 Experience in creating and customization of scripts using Vugen.
 Experience on preparing and executing the test cases.
 Experience in scheduling the Load Pattern for different Scenario’s.
 Participated in Performance Testing like Load, Stress and Endurance test.
 Experience in executing the tests using Controller and Performance Center.
 Experience in preparing Test Reports.
 Quick learner and excellent team player having ability to meet tight deadlines and work
under pressure.
EXPERIENCE
SNo Organization Designation From Date To Date
1 Polaris Financial Technology Ltd Stipendary
General Trainee
29/Aug/2011 06/Nov/201
2
2 Polaris Financial Technology Ltd Systems
Engineer
12/Nov/2012 Till Date
SKILL SETS
Operating System : Windows 2000/XP and Windows7
Protocols : HTTP/HTML and AJAX Truclient.
Performance Tools : HP LoadRunner and J-meter
Language : C,C++
PROJECT PROFILE
Project Name : Performance Testing of CITS TAMPA Feb 2013 to till date
Client : CITI Bank
Role : Performance Test Engineer
Tools Used : HP LoadRunner 9.5, 11
Project Description:
It involves performance testing for CITI’s in house applications. Around 40 applications with
various technologies are tested. Tests like Load and Stress are carried out based on the
requirements.
Responsibilities:
 Understand the Application functionality, architecture details and components metrics
along with workload characterization.
 Coordinate with the application team to resolve the application issues.
 Prepare business flow documents for identified transactions.
 Build the scripts using Load Runner tool (Protocols like Web(HTTP/HTML) and AJAX
Truclient were used).
 Designing and executing the scenarios as per schedule.
 Monitoring the application server and database server parameters.
 Publishing the Analysis Report at the end of every Performance run.
Project Name : Centralized core banking of RBI Dec 2011 to Jan 2013
Client : Reserve Bank of India
Role : Performance Test Engineer
Tools Used : HP LoadRunner 9.5
Project Description:
The Reserve Bank of India (RBI) is India's central banking institution, which controls the
Monetary policy of the Indian rupee, plays an important part in the development strategy of
the Government of India. RBI acts as a supervisor to all banks. The Reserve Bank provides
short-term loans and advances to banks / financial institutions, when necessary, to facilitate
lending for specified purposes. Provide depository services for government securities for
institutions and service Government loans.
Responsibilities:
 Analyzing the work load characteristics and design to simulate pattern’s for
performance engineering.
 Designing different types of scenarios in the Controller based on the production
scenario.
 Creation/Validating LR scripts (with perfect error handling) for the identified 69
business process and creation of test data (Web HTTP) using Load Runner.
 Preparation of test scenarios , test cases and test data.
 Executing the load/Volume/Stress/Benchmark tests and analyze the performance
bottlenecks along with infrastructural behaviour of the underlying systems components.
 Preparation of Customized LR reports as per customer requirements.
 Direct and Single point of contact with development team & Business Team
 Involved in project timeline estimation and resource allocation
 Participating in Client calls , Reviews & Meetings
 Responsible for monitoring overall testing progress and report status to project
stakeholders.
 Strong Functional Experience on domain in Banking.
Project Name : Adrenalin HRMS Oct 2011 to Dec 2011
Client : Polaris
Role : Back-up support as Performance Engineer
Tools Used : JMeter
Project Description:
Adrenalin is a Human Resource Management tool used by all the associates in Polaris, which is
being upgraded from adrenalin 1.0 version to adrenalin 4.0 version. Depending on the user
groups viewable modules will be varying. For all associates the common modules like personal
data, employment data, selftask, hr task, and misc reports are visible. For HR group along with
the common modules addition modules will be available.
Responsibilities:
 Understand the Adrenalin HRMS server architecture and hardware partitions.
 Assist the business application team in identification of business scenarios for
performance testing.
 Test client and server performance by replicating the real time user load from JMeter
tool.
 Conduct Load Testing on HRMS server with 25%, 50% and 100% of simultaneous users
load (Max of 500).
 Collect the transaction metrics of business flows using the tool.
 Collect server side metrics (Utilization of CPU, Memory and Disk) using PERFMON
utility.
 Prepare and publish the test summary reports.
EDUCATIONAL PROFILE
 B.E in Electronics and Communication Engineering from AALIM MUHAMMED SALEGH
COLLEGE OF ENGINEERING, AVADI-IAF, (2005-2009)
TECHNICAL CERTIFICATIONS
 International Software Testing Qualifications Board (ISTQB) Foundation Level Certified
(Reg. No.: 69858).
 Completed L0 and L1 certification from Polaris.
KEY STRENGTHS
 Flexible and adaptable to the expectations of the employer.
 Willing to take additional responsibilities and deliver additional values to the team.
 Able to foresee the long-term vision of the Organization/Project and align personal
goals.
 Exposure to Key Testing Tools in Market.
PERSONAL PROFILE
Passport number : H4779225
Marital status : Married
Preferred Location : Chennai
Permanent address : #51/27 Katchaleeswarar Agraharam Street, Mannady,
Chennai-600001.
Alternate mail ID : ms_noorulameen@yahoo.com
Place: Chennai
Date:
(Noorul Ameen .M.S)

Noorul Ameen - Performance Test Engineer

  • 1.
    NOORUL AMEEN .M.S E-mail:msnoorulameen@gmail.com Mobile: +91-9962733683 OBJECTIVE To fit myself in a role, where I can contribute and learn to “Engineer the tool”. I set my vision, in enhancing and expertise my skills in the complete life cycle of performance engineering right from requirement to performance tuning. PROFILE SUMMARY  3 years and 8 months of experience in Performance Testing using LoadRunner.  Good Knowledge on Performance Engineering Life Cycle.  Experience in creating and customization of scripts using Vugen.  Experience on preparing and executing the test cases.  Experience in scheduling the Load Pattern for different Scenario’s.  Participated in Performance Testing like Load, Stress and Endurance test.  Experience in executing the tests using Controller and Performance Center.  Experience in preparing Test Reports.  Quick learner and excellent team player having ability to meet tight deadlines and work under pressure. EXPERIENCE SNo Organization Designation From Date To Date 1 Polaris Financial Technology Ltd Stipendary General Trainee 29/Aug/2011 06/Nov/201 2 2 Polaris Financial Technology Ltd Systems Engineer 12/Nov/2012 Till Date SKILL SETS Operating System : Windows 2000/XP and Windows7 Protocols : HTTP/HTML and AJAX Truclient. Performance Tools : HP LoadRunner and J-meter Language : C,C++
  • 2.
    PROJECT PROFILE Project Name: Performance Testing of CITS TAMPA Feb 2013 to till date Client : CITI Bank Role : Performance Test Engineer Tools Used : HP LoadRunner 9.5, 11 Project Description: It involves performance testing for CITI’s in house applications. Around 40 applications with various technologies are tested. Tests like Load and Stress are carried out based on the requirements. Responsibilities:  Understand the Application functionality, architecture details and components metrics along with workload characterization.  Coordinate with the application team to resolve the application issues.  Prepare business flow documents for identified transactions.  Build the scripts using Load Runner tool (Protocols like Web(HTTP/HTML) and AJAX Truclient were used).  Designing and executing the scenarios as per schedule.  Monitoring the application server and database server parameters.  Publishing the Analysis Report at the end of every Performance run. Project Name : Centralized core banking of RBI Dec 2011 to Jan 2013 Client : Reserve Bank of India Role : Performance Test Engineer Tools Used : HP LoadRunner 9.5 Project Description: The Reserve Bank of India (RBI) is India's central banking institution, which controls the Monetary policy of the Indian rupee, plays an important part in the development strategy of the Government of India. RBI acts as a supervisor to all banks. The Reserve Bank provides short-term loans and advances to banks / financial institutions, when necessary, to facilitate lending for specified purposes. Provide depository services for government securities for institutions and service Government loans. Responsibilities:  Analyzing the work load characteristics and design to simulate pattern’s for performance engineering.
  • 3.
     Designing differenttypes of scenarios in the Controller based on the production scenario.  Creation/Validating LR scripts (with perfect error handling) for the identified 69 business process and creation of test data (Web HTTP) using Load Runner.  Preparation of test scenarios , test cases and test data.  Executing the load/Volume/Stress/Benchmark tests and analyze the performance bottlenecks along with infrastructural behaviour of the underlying systems components.  Preparation of Customized LR reports as per customer requirements.  Direct and Single point of contact with development team & Business Team  Involved in project timeline estimation and resource allocation  Participating in Client calls , Reviews & Meetings  Responsible for monitoring overall testing progress and report status to project stakeholders.  Strong Functional Experience on domain in Banking. Project Name : Adrenalin HRMS Oct 2011 to Dec 2011 Client : Polaris Role : Back-up support as Performance Engineer Tools Used : JMeter Project Description: Adrenalin is a Human Resource Management tool used by all the associates in Polaris, which is being upgraded from adrenalin 1.0 version to adrenalin 4.0 version. Depending on the user groups viewable modules will be varying. For all associates the common modules like personal data, employment data, selftask, hr task, and misc reports are visible. For HR group along with the common modules addition modules will be available. Responsibilities:  Understand the Adrenalin HRMS server architecture and hardware partitions.  Assist the business application team in identification of business scenarios for performance testing.  Test client and server performance by replicating the real time user load from JMeter tool.  Conduct Load Testing on HRMS server with 25%, 50% and 100% of simultaneous users load (Max of 500).  Collect the transaction metrics of business flows using the tool.  Collect server side metrics (Utilization of CPU, Memory and Disk) using PERFMON utility.  Prepare and publish the test summary reports.
  • 4.
    EDUCATIONAL PROFILE  B.Ein Electronics and Communication Engineering from AALIM MUHAMMED SALEGH COLLEGE OF ENGINEERING, AVADI-IAF, (2005-2009) TECHNICAL CERTIFICATIONS  International Software Testing Qualifications Board (ISTQB) Foundation Level Certified (Reg. No.: 69858).  Completed L0 and L1 certification from Polaris. KEY STRENGTHS  Flexible and adaptable to the expectations of the employer.  Willing to take additional responsibilities and deliver additional values to the team.  Able to foresee the long-term vision of the Organization/Project and align personal goals.  Exposure to Key Testing Tools in Market. PERSONAL PROFILE Passport number : H4779225 Marital status : Married Preferred Location : Chennai Permanent address : #51/27 Katchaleeswarar Agraharam Street, Mannady, Chennai-600001. Alternate mail ID : ms_noorulameen@yahoo.com Place: Chennai Date: (Noorul Ameen .M.S)