CONTRACT NON-CONFORMANCE REPORT (NCR)
1 Effective Date: 1/10/2008
SECTION I
GENERAL INFORMATION
Contract No:
Contractor:
Contractor Department:
Location of Discrepancy:
NCR Control No:
Date Submitted:
PWS/PRS Paragraph #:
COR Name (print & sign):
Phone:
Date :
RESPONSE DUE:
Contractor Representative Acknowledgment:
(print, sign, & date)
SECTION II
DESCRIPTION OF NON-CONFORMANCE
TYPE OF NCR: MAJOR ___ MINOR ___
DESCRIPTION:
CONTRACT NON-CONFORMANCE REPORT (NCR)
2 Effective Date: 1/10/2008
Contract/Modification No: NCR Control No:
SECTION III
ROOT CAUSE CORRECTIVE ACTION
Contractor Corrective Action:
Projected Completion/Implementation Date:
Contractor Representative/Date (print & sign):
CONTRACT NON-CONFORMANCE REPORT (NCR)
3 Effective Date: 1/10/2008
Contract/Modification No: NCR Control No:
SECTION IV
FOLLOW-UP VERIFICATION
NCR Closed: YES ___ NO ___
COR Signature/Date:
Follow-up Comments:

More Related Content

What's hot

ND Official Transcript
ND Official TranscriptND Official Transcript
ND Official Transcript
Andi Noakes
 
The pressure vessel certification mark as per ASME VIII Div.1--Dr. Samir Saad
The pressure vessel certification mark as per ASME VIII Div.1--Dr. Samir Saad The pressure vessel certification mark as per ASME VIII Div.1--Dr. Samir Saad
The pressure vessel certification mark as per ASME VIII Div.1--Dr. Samir Saad
Dr.Samir Saad
 
Master's Degree Official Transcript
Master's Degree Official TranscriptMaster's Degree Official Transcript
Master's Degree Official TranscriptMichael Patterson
 
Academic Transcript
Academic TranscriptAcademic Transcript
Academic Transcript
Chad Wessinger
 
B.COM.PDF
B.COM.PDFB.COM.PDF
B.COM.PDF
Abdul Yakoob
 
MIS Transcript
MIS TranscriptMIS Transcript
MIS Transcript
Kim Lewis
 
GMU transcript
GMU transcriptGMU transcript
GMU transcript
Susan Ramirez
 
B.Sc Academic Transcript 01
B.Sc Academic Transcript 01B.Sc Academic Transcript 01
B.Sc Academic Transcript 01
md.ziaur rahman
 
Virginia Wesleyan College - Official Transcript
Virginia Wesleyan College - Official TranscriptVirginia Wesleyan College - Official Transcript
Virginia Wesleyan College - Official Transcript
Josh Nixon
 
Bachelor Degree Transcript
Bachelor Degree TranscriptBachelor Degree Transcript
Bachelor Degree Transcript
m_mun17
 
Transcripts
TranscriptsTranscripts
Transcripts
debrajean333
 
official transcript
official transcriptofficial transcript
official transcript
Chiao-Yi Chao
 
UHD Transcript
UHD TranscriptUHD Transcript
UHD Transcript
Bilel Bentarzi , MBA
 
Academic Transcript 1 and 2 A
Academic Transcript 1 and 2 AAcademic Transcript 1 and 2 A
Academic Transcript 1 and 2 AJoseph Borland
 
CAT & ACCA Transcript
CAT & ACCA TranscriptCAT & ACCA Transcript
CAT & ACCA Transcript
Tammar Hassan - ACCA, CAT
 
Official.Academic.Transcript.Rhett.Richardson [compressed]
Official.Academic.Transcript.Rhett.Richardson [compressed]Official.Academic.Transcript.Rhett.Richardson [compressed]
Official.Academic.Transcript.Rhett.Richardson [compressed]Rhett Richardson
 
Laurier_Student_Transcript
Laurier_Student_TranscriptLaurier_Student_Transcript
Laurier_Student_Transcript
James Grantis
 
Statement of Service
Statement of ServiceStatement of Service
Statement of ServiceJason Wallace
 

What's hot (20)

ND Official Transcript
ND Official TranscriptND Official Transcript
ND Official Transcript
 
The pressure vessel certification mark as per ASME VIII Div.1--Dr. Samir Saad
The pressure vessel certification mark as per ASME VIII Div.1--Dr. Samir Saad The pressure vessel certification mark as per ASME VIII Div.1--Dr. Samir Saad
The pressure vessel certification mark as per ASME VIII Div.1--Dr. Samir Saad
 
Master's Degree Official Transcript
Master's Degree Official TranscriptMaster's Degree Official Transcript
Master's Degree Official Transcript
 
Academic Transcript
Academic TranscriptAcademic Transcript
Academic Transcript
 
Academic Transcript
Academic TranscriptAcademic Transcript
Academic Transcript
 
B.COM.PDF
B.COM.PDFB.COM.PDF
B.COM.PDF
 
MIS Transcript
MIS TranscriptMIS Transcript
MIS Transcript
 
GMU transcript
GMU transcriptGMU transcript
GMU transcript
 
B.Sc Academic Transcript 01
B.Sc Academic Transcript 01B.Sc Academic Transcript 01
B.Sc Academic Transcript 01
 
Virginia Wesleyan College - Official Transcript
Virginia Wesleyan College - Official TranscriptVirginia Wesleyan College - Official Transcript
Virginia Wesleyan College - Official Transcript
 
Bachelor Degree Transcript
Bachelor Degree TranscriptBachelor Degree Transcript
Bachelor Degree Transcript
 
Transcripts
TranscriptsTranscripts
Transcripts
 
official transcript
official transcriptofficial transcript
official transcript
 
UHD Transcript
UHD TranscriptUHD Transcript
UHD Transcript
 
Academic Transcript 1 and 2 A
Academic Transcript 1 and 2 AAcademic Transcript 1 and 2 A
Academic Transcript 1 and 2 A
 
CAT & ACCA Transcript
CAT & ACCA TranscriptCAT & ACCA Transcript
CAT & ACCA Transcript
 
Official.Academic.Transcript.Rhett.Richardson [compressed]
Official.Academic.Transcript.Rhett.Richardson [compressed]Official.Academic.Transcript.Rhett.Richardson [compressed]
Official.Academic.Transcript.Rhett.Richardson [compressed]
 
Laurier_Student_Transcript
Laurier_Student_TranscriptLaurier_Student_Transcript
Laurier_Student_Transcript
 
Statement of Service
Statement of ServiceStatement of Service
Statement of Service
 
Damelin certificate 1
Damelin certificate 1Damelin certificate 1
Damelin certificate 1
 

Similar to Nonconformance Report.doc

Appendix K Model Letters For Use By The Engineer
Appendix K Model Letters For Use By The EngineerAppendix K Model Letters For Use By The Engineer
Appendix K Model Letters For Use By The Engineer
Sean Flores
 
E9._Non-Conformity_Report_NCR.doc
E9._Non-Conformity_Report_NCR.docE9._Non-Conformity_Report_NCR.doc
E9._Non-Conformity_Report_NCR.doc
PeterIyere2
 
01 insurance survey
01 insurance survey01 insurance survey
01 insurance survey
spandane
 
4 2018
4 20184 2018
4 2018
AjeeshMT3
 
3 2018
3 20183 2018
3 2018
AjeeshMT3
 
TENDER DOCUMENT
TENDER DOCUMENTTENDER DOCUMENT
TENDER DOCUMENT
Sumaiya Jabin
 
Psscoc 2008 db contract
Psscoc 2008 db contractPsscoc 2008 db contract
Psscoc 2008 db contract
Vance Ang
 
Cm mitemrate ver270206
Cm mitemrate ver270206Cm mitemrate ver270206
Cm mitemrate ver270206
prabandhakavi venkataraju
 
Tender & Tender Notice
Tender & Tender NoticeTender & Tender Notice
Tender & Tender Notice
Sakshi Kirar
 
Complaint to the Haryana Real Estate Regulatory Authority, Gurugram
Complaint to the Haryana Real Estate Regulatory Authority, Gurugram Complaint to the Haryana Real Estate Regulatory Authority, Gurugram
Complaint to the Haryana Real Estate Regulatory Authority, Gurugram
Satish Mishra
 
Ak contract management
Ak contract managementAk contract management
Ak contract management
ManaliChitranshi
 
AWARD CONTRACT THIS CONTRACT IS A RATED ORDER UNDER DPAS (15 C.docx
AWARD  CONTRACT THIS CONTRACT IS A RATED ORDER UNDER DPAS (15 C.docxAWARD  CONTRACT THIS CONTRACT IS A RATED ORDER UNDER DPAS (15 C.docx
AWARD CONTRACT THIS CONTRACT IS A RATED ORDER UNDER DPAS (15 C.docx
rock73
 
AWARD CONTRACT THIS CONTRACT IS A RATED ORDER UNDER DPAS (15 C.docx
AWARD  CONTRACT THIS CONTRACT IS A RATED ORDER UNDER DPAS (15 C.docxAWARD  CONTRACT THIS CONTRACT IS A RATED ORDER UNDER DPAS (15 C.docx
AWARD CONTRACT THIS CONTRACT IS A RATED ORDER UNDER DPAS (15 C.docx
jasoninnes20
 
Fidic comparison red yellow - silver book
Fidic comparison red   yellow - silver bookFidic comparison red   yellow - silver book
Fidic comparison red yellow - silver book
Hani Saad
 
FIDIC_Comparison_Red_Book_Yellow_Book_Silver_Book_1704649950.pdf
FIDIC_Comparison_Red_Book_Yellow_Book_Silver_Book_1704649950.pdfFIDIC_Comparison_Red_Book_Yellow_Book_Silver_Book_1704649950.pdf
FIDIC_Comparison_Red_Book_Yellow_Book_Silver_Book_1704649950.pdf
costestimationganesh
 
Fidic comparison red book yellow book_silver book_en_newsletters
Fidic comparison red book yellow book_silver book_en_newslettersFidic comparison red book yellow book_silver book_en_newsletters
Fidic comparison red book yellow book_silver book_en_newsletters
Atul Duggal
 
Extension of Time (EoT) in Construction Project presentation
Extension of Time (EoT) in Construction Project presentationExtension of Time (EoT) in Construction Project presentation
Extension of Time (EoT) in Construction Project presentation
Ayush Joshi
 
Pp2 assignment
Pp2 assignmentPp2 assignment
Pp2 assignment
fareezsham
 
ICM.pptx
ICM.pptxICM.pptx
ICM.pptx
Koul5
 
AN EXAMPLE OF HOW PREPARING A CLAIM STEP BY STEP.pdf
AN EXAMPLE OF HOW PREPARING A CLAIM STEP BY STEP.pdfAN EXAMPLE OF HOW PREPARING A CLAIM STEP BY STEP.pdf
AN EXAMPLE OF HOW PREPARING A CLAIM STEP BY STEP.pdf
HamsathFarludeen
 

Similar to Nonconformance Report.doc (20)

Appendix K Model Letters For Use By The Engineer
Appendix K Model Letters For Use By The EngineerAppendix K Model Letters For Use By The Engineer
Appendix K Model Letters For Use By The Engineer
 
E9._Non-Conformity_Report_NCR.doc
E9._Non-Conformity_Report_NCR.docE9._Non-Conformity_Report_NCR.doc
E9._Non-Conformity_Report_NCR.doc
 
01 insurance survey
01 insurance survey01 insurance survey
01 insurance survey
 
4 2018
4 20184 2018
4 2018
 
3 2018
3 20183 2018
3 2018
 
TENDER DOCUMENT
TENDER DOCUMENTTENDER DOCUMENT
TENDER DOCUMENT
 
Psscoc 2008 db contract
Psscoc 2008 db contractPsscoc 2008 db contract
Psscoc 2008 db contract
 
Cm mitemrate ver270206
Cm mitemrate ver270206Cm mitemrate ver270206
Cm mitemrate ver270206
 
Tender & Tender Notice
Tender & Tender NoticeTender & Tender Notice
Tender & Tender Notice
 
Complaint to the Haryana Real Estate Regulatory Authority, Gurugram
Complaint to the Haryana Real Estate Regulatory Authority, Gurugram Complaint to the Haryana Real Estate Regulatory Authority, Gurugram
Complaint to the Haryana Real Estate Regulatory Authority, Gurugram
 
Ak contract management
Ak contract managementAk contract management
Ak contract management
 
AWARD CONTRACT THIS CONTRACT IS A RATED ORDER UNDER DPAS (15 C.docx
AWARD  CONTRACT THIS CONTRACT IS A RATED ORDER UNDER DPAS (15 C.docxAWARD  CONTRACT THIS CONTRACT IS A RATED ORDER UNDER DPAS (15 C.docx
AWARD CONTRACT THIS CONTRACT IS A RATED ORDER UNDER DPAS (15 C.docx
 
AWARD CONTRACT THIS CONTRACT IS A RATED ORDER UNDER DPAS (15 C.docx
AWARD  CONTRACT THIS CONTRACT IS A RATED ORDER UNDER DPAS (15 C.docxAWARD  CONTRACT THIS CONTRACT IS A RATED ORDER UNDER DPAS (15 C.docx
AWARD CONTRACT THIS CONTRACT IS A RATED ORDER UNDER DPAS (15 C.docx
 
Fidic comparison red yellow - silver book
Fidic comparison red   yellow - silver bookFidic comparison red   yellow - silver book
Fidic comparison red yellow - silver book
 
FIDIC_Comparison_Red_Book_Yellow_Book_Silver_Book_1704649950.pdf
FIDIC_Comparison_Red_Book_Yellow_Book_Silver_Book_1704649950.pdfFIDIC_Comparison_Red_Book_Yellow_Book_Silver_Book_1704649950.pdf
FIDIC_Comparison_Red_Book_Yellow_Book_Silver_Book_1704649950.pdf
 
Fidic comparison red book yellow book_silver book_en_newsletters
Fidic comparison red book yellow book_silver book_en_newslettersFidic comparison red book yellow book_silver book_en_newsletters
Fidic comparison red book yellow book_silver book_en_newsletters
 
Extension of Time (EoT) in Construction Project presentation
Extension of Time (EoT) in Construction Project presentationExtension of Time (EoT) in Construction Project presentation
Extension of Time (EoT) in Construction Project presentation
 
Pp2 assignment
Pp2 assignmentPp2 assignment
Pp2 assignment
 
ICM.pptx
ICM.pptxICM.pptx
ICM.pptx
 
AN EXAMPLE OF HOW PREPARING A CLAIM STEP BY STEP.pdf
AN EXAMPLE OF HOW PREPARING A CLAIM STEP BY STEP.pdfAN EXAMPLE OF HOW PREPARING A CLAIM STEP BY STEP.pdf
AN EXAMPLE OF HOW PREPARING A CLAIM STEP BY STEP.pdf
 

Recently uploaded

Eric Nizeyimana's document 2006 from gicumbi to ttc nyamata handball play
Eric Nizeyimana's document 2006 from gicumbi to ttc nyamata handball playEric Nizeyimana's document 2006 from gicumbi to ttc nyamata handball play
Eric Nizeyimana's document 2006 from gicumbi to ttc nyamata handball play
enizeyimana36
 
官方认证美国密歇根州立大学毕业证学位证书原版一模一样
官方认证美国密歇根州立大学毕业证学位证书原版一模一样官方认证美国密歇根州立大学毕业证学位证书原版一模一样
官方认证美国密歇根州立大学毕业证学位证书原版一模一样
171ticu
 
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student MemberIEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
VICTOR MAESTRE RAMIREZ
 
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECTCHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
jpsjournal1
 
Comparative analysis between traditional aquaponics and reconstructed aquapon...
Comparative analysis between traditional aquaponics and reconstructed aquapon...Comparative analysis between traditional aquaponics and reconstructed aquapon...
Comparative analysis between traditional aquaponics and reconstructed aquapon...
bijceesjournal
 
Literature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptxLiterature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptx
Dr Ramhari Poudyal
 
CSM Cloud Service Management Presentarion
CSM Cloud Service Management PresentarionCSM Cloud Service Management Presentarion
CSM Cloud Service Management Presentarion
rpskprasana
 
Engineering Drawings Lecture Detail Drawings 2014.pdf
Engineering Drawings Lecture Detail Drawings 2014.pdfEngineering Drawings Lecture Detail Drawings 2014.pdf
Engineering Drawings Lecture Detail Drawings 2014.pdf
abbyasa1014
 
22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt
KrishnaveniKrishnara1
 
A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...
nooriasukmaningtyas
 
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODELDEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
gerogepatton
 
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.pptUnit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
KrishnaveniKrishnara1
 
Heat Resistant Concrete Presentation ppt
Heat Resistant Concrete Presentation pptHeat Resistant Concrete Presentation ppt
Heat Resistant Concrete Presentation ppt
mamunhossenbd75
 
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdfIron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
RadiNasr
 
Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...
IJECEIAES
 
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
insn4465
 
Properties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptxProperties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptx
MDSABBIROJJAMANPAYEL
 
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Sinan KOZAK
 
Computational Engineering IITH Presentation
Computational Engineering IITH PresentationComputational Engineering IITH Presentation
Computational Engineering IITH Presentation
co23btech11018
 
New techniques for characterising damage in rock slopes.pdf
New techniques for characterising damage in rock slopes.pdfNew techniques for characterising damage in rock slopes.pdf
New techniques for characterising damage in rock slopes.pdf
wisnuprabawa3
 

Recently uploaded (20)

Eric Nizeyimana's document 2006 from gicumbi to ttc nyamata handball play
Eric Nizeyimana's document 2006 from gicumbi to ttc nyamata handball playEric Nizeyimana's document 2006 from gicumbi to ttc nyamata handball play
Eric Nizeyimana's document 2006 from gicumbi to ttc nyamata handball play
 
官方认证美国密歇根州立大学毕业证学位证书原版一模一样
官方认证美国密歇根州立大学毕业证学位证书原版一模一样官方认证美国密歇根州立大学毕业证学位证书原版一模一样
官方认证美国密歇根州立大学毕业证学位证书原版一模一样
 
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student MemberIEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
 
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECTCHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
 
Comparative analysis between traditional aquaponics and reconstructed aquapon...
Comparative analysis between traditional aquaponics and reconstructed aquapon...Comparative analysis between traditional aquaponics and reconstructed aquapon...
Comparative analysis between traditional aquaponics and reconstructed aquapon...
 
Literature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptxLiterature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptx
 
CSM Cloud Service Management Presentarion
CSM Cloud Service Management PresentarionCSM Cloud Service Management Presentarion
CSM Cloud Service Management Presentarion
 
Engineering Drawings Lecture Detail Drawings 2014.pdf
Engineering Drawings Lecture Detail Drawings 2014.pdfEngineering Drawings Lecture Detail Drawings 2014.pdf
Engineering Drawings Lecture Detail Drawings 2014.pdf
 
22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt
 
A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...
 
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODELDEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
 
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.pptUnit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
 
Heat Resistant Concrete Presentation ppt
Heat Resistant Concrete Presentation pptHeat Resistant Concrete Presentation ppt
Heat Resistant Concrete Presentation ppt
 
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdfIron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
 
Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...
 
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
 
Properties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptxProperties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptx
 
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
 
Computational Engineering IITH Presentation
Computational Engineering IITH PresentationComputational Engineering IITH Presentation
Computational Engineering IITH Presentation
 
New techniques for characterising damage in rock slopes.pdf
New techniques for characterising damage in rock slopes.pdfNew techniques for characterising damage in rock slopes.pdf
New techniques for characterising damage in rock slopes.pdf
 

Nonconformance Report.doc

  • 1. CONTRACT NON-CONFORMANCE REPORT (NCR) 1 Effective Date: 1/10/2008 SECTION I GENERAL INFORMATION Contract No: Contractor: Contractor Department: Location of Discrepancy: NCR Control No: Date Submitted: PWS/PRS Paragraph #: COR Name (print & sign): Phone: Date : RESPONSE DUE: Contractor Representative Acknowledgment: (print, sign, & date) SECTION II DESCRIPTION OF NON-CONFORMANCE TYPE OF NCR: MAJOR ___ MINOR ___ DESCRIPTION:
  • 2. CONTRACT NON-CONFORMANCE REPORT (NCR) 2 Effective Date: 1/10/2008 Contract/Modification No: NCR Control No: SECTION III ROOT CAUSE CORRECTIVE ACTION Contractor Corrective Action: Projected Completion/Implementation Date: Contractor Representative/Date (print & sign):
  • 3. CONTRACT NON-CONFORMANCE REPORT (NCR) 3 Effective Date: 1/10/2008 Contract/Modification No: NCR Control No: SECTION IV FOLLOW-UP VERIFICATION NCR Closed: YES ___ NO ___ COR Signature/Date: Follow-up Comments: