The document provides a production schedule and contact information for the film "Don't Worry Be Happy" being filmed from November to December 2012. It details the shooting schedule across 4 days, with locations including a music store, living room, forest, and street in Cambridge. It lists cast and crew contact details and the technical requirements. Emergency contact information is also provided.
This shot list contains 74 shots organized into 13 scenes for the film "Don't Worry Be Happy". Scene 1 takes place on a street and includes long shots of the main character Degree walking from different angles and close-ups. Scene 2 is in a living room and features mid shots, a close-up of shoes, and over the shoulder shots. Scene 3 on a bench includes zooming out to a long shot of Degree and extreme close-ups of his mouth. Additional scenes include shots of a band playing, the forest, close-ups of a drum set and cabinet, a store with close-ups of faces, shots along a street, the beach, sunrise with close-ups of instruments, and a final scene
The document provides a production schedule and contact information for the film "The Pianist". It outlines a 4-day shooting schedule, with Day 1 including outdoor scenes on a street and indoor scenes at a location. It lists the scenes to be shot each day and includes cast and crew call times, location addresses, and technical requirements.
This document provides a production schedule and contact information for the film "The Pianist". It outlines a 4-day shooting schedule, with Day 1 including exterior scenes on a street and at a location. Scene and casting details are provided, as well as technical requirements, emergency contacts and photographs of dressing locations. Contact details are given for the cast and crew.
This shot list contains 74 shots organized into 13 scenes for the film "Pianist". Scene 1 takes place on a street and includes shots of a character named Faye walking. Scene 2 is set in a store and features shots of two characters, Degree and Faye, interacting. Scene 3 on a beach includes shots of Degree playing instruments. Further scenes are set in locations like a living room, forest, and showcase various characters and close-ups.
The document provides production details for the film "The Pianist", including a schedule, crew and cast contact details, location information, scene breakdowns, costume requirements and directions to filming locations. The 4-day shoot will take place in and around Cambridge in December 2012, with scenes filmed at Ken Stevens music store, Luke's living room, Netherhall school, and Cherry Hinton nature reserve. Crew call times, transport plans, and technical requirements are also outlined.
This media pitch proposes a music video for the song "The Pianist" by Black Dynamite, a reggae artist from the 1990s. The narrative involves a girl walking down the street who enters a shop where she meets the man working there, who shows her his band members individually and collectively. The target audience for the creative video is males and females ages 16-25 who enjoy laid back, chilled, and relaxed music.
The document discusses the author's love of various sports such as football, basketball, and watching sports. They enjoy keeping fit and healthy through sports and hope sports will continue for many generations. In their spare time, the author also enjoys fishing and firewooding. The document provides details about the author's family, including their parents' names and the names of their 1 brother and 3 sisters.
This shot list contains 74 shots organized into 13 scenes for the film "Don't Worry Be Happy". Scene 1 takes place on a street and includes long shots of the main character Degree walking from different angles and close-ups. Scene 2 is in a living room and features mid shots, a close-up of shoes, and over the shoulder shots. Scene 3 on a bench includes zooming out to a long shot of Degree and extreme close-ups of his mouth. Additional scenes include shots of a band playing, the forest, close-ups of a drum set and cabinet, a store with close-ups of faces, shots along a street, the beach, sunrise with close-ups of instruments, and a final scene
The document provides a production schedule and contact information for the film "The Pianist". It outlines a 4-day shooting schedule, with Day 1 including outdoor scenes on a street and indoor scenes at a location. It lists the scenes to be shot each day and includes cast and crew call times, location addresses, and technical requirements.
This document provides a production schedule and contact information for the film "The Pianist". It outlines a 4-day shooting schedule, with Day 1 including exterior scenes on a street and at a location. Scene and casting details are provided, as well as technical requirements, emergency contacts and photographs of dressing locations. Contact details are given for the cast and crew.
This shot list contains 74 shots organized into 13 scenes for the film "Pianist". Scene 1 takes place on a street and includes shots of a character named Faye walking. Scene 2 is set in a store and features shots of two characters, Degree and Faye, interacting. Scene 3 on a beach includes shots of Degree playing instruments. Further scenes are set in locations like a living room, forest, and showcase various characters and close-ups.
The document provides production details for the film "The Pianist", including a schedule, crew and cast contact details, location information, scene breakdowns, costume requirements and directions to filming locations. The 4-day shoot will take place in and around Cambridge in December 2012, with scenes filmed at Ken Stevens music store, Luke's living room, Netherhall school, and Cherry Hinton nature reserve. Crew call times, transport plans, and technical requirements are also outlined.
This media pitch proposes a music video for the song "The Pianist" by Black Dynamite, a reggae artist from the 1990s. The narrative involves a girl walking down the street who enters a shop where she meets the man working there, who shows her his band members individually and collectively. The target audience for the creative video is males and females ages 16-25 who enjoy laid back, chilled, and relaxed music.
The document discusses the author's love of various sports such as football, basketball, and watching sports. They enjoy keeping fit and healthy through sports and hope sports will continue for many generations. In their spare time, the author also enjoys fishing and firewooding. The document provides details about the author's family, including their parents' names and the names of their 1 brother and 3 sisters.
El documento describe un plan para exportar productos a 28 países de Europa desde China. Se detalla la ruta marítima desde el puerto de Dalian en China al puerto de Rotterdam en los Países Bajos, con paradas en el Canal de Suez y Grecia. También se especifica el tipo de contenedor y transporte terrestre que se utilizará, los costos de distribución por mar y tierra, y los pasos para calcular el precio final de los productos.
Screen Printing: The Ins & Outs of Metal & Flexible MaterialsMcloone
Mike Voss presented on screen printing processes for metal and flexible materials. He discussed the screen printing industry overview including key market segments and applications. He also covered various printing processes and material substrates for metal and flexible materials. Voss compared screen printing to digital printing and discussed factors like color matching, setup time, and ink options. He finished by taking questions from webinar participants.
The impact of innovation on travel and tourism industries (World Travel Marke...Brian Solis
From the impact of Pokemon Go on Silicon Valley to artificial intelligence, futurist Brian Solis talks to Mathew Parsons of World Travel Market about the future of travel, tourism and hospitality.
We’re all trying to find that idea or spark that will turn a good project into a great project. Creativity plays a huge role in the outcome of our work. Harnessing the power of collaboration and open source, we can make great strides towards excellence. Not just for designers, this talk can be applicable to many different roles – even development. In this talk, Seasoned Creative Director Sara Cannon is going to share some secrets about creative methodology, collaboration, and the strong role that open source can play in our work.
Reuters: Pictures of the Year 2016 (Part 2)maditabalnco
This document contains 20 photos from news events around the world between January and November 2016. The photos show international events like the US presidential election, the conflict in Ukraine, the migrant crisis in Europe, the Rio Olympics, and more. They also depict human interest stories and natural phenomena from various countries.
The Six Highest Performing B2B Blog Post FormatsBarry Feldman
If your B2B blogging goals include earning social media shares and backlinks to boost your search rankings, this infographic lists the size best approaches.
1) The document discusses the opportunity for technology to improve organizational efficiency and transition economies into a "smart and clean world."
2) It argues that aggregate efficiency has stalled at around 22% for 30 years due to limitations of the Second Industrial Revolution, but that digitizing transport, energy, and communication through technologies like blockchain can help manage resources and increase efficiency.
3) Technologies like precision agriculture, cloud computing, robotics, and autonomous vehicles may allow for "dematerialization" and do more with fewer physical resources through effects like reduced waste and need for transportation/logistics infrastructure.
The document provides a production schedule and contact information for the short film "The Pianist". It includes a 4-day shooting schedule with 5 locations in and around Cambridge. Scene breakdowns, technical requirements, costume needs and transportation details are outlined for the cast and crew. Emergency contact numbers are also listed.
This document provides a production schedule and contact information for a student film. It includes:
- Contact details for cast and crew and their roles
- Shooting locations over two days, including a school and park
- Scene breakdown with descriptions and page references
- Technical requirements and notes from the school media department
- Emergency contact information
- Information on the main actors, including experience levels
- A call sheet with shooting times, parking and transport details
- Requirements for props, costumes and design for each scene
This document provides the schedule and contact information for the short film "Rockabye Baby". It details the shooting dates, locations, cast and crew contact information, and technical requirements. The schedule outlines that filming will take place over two days, with interior and exterior scenes shot at Tadlow Granary and locations around Wandlebury Country Park.
Please arrive 15 minutes early to help set up
START FINISH
SETUP 3:00 3:30
BEGIN SHOOTING 4:00 6:00
(with principles)
MOVE LOCATIONS
LOCATION 2 – Scene Breakdown
SCENE SET D/N PAGE(S) CAST
2 EXT. Wandlebury Day 2 Saskia Bailie, Hannah Evans
3 EXT. Wandlebury Day 3 Saskia Bailie, Hannah Evans
4 EXT. Wandlebury Day 4 Saskia Bailie, Hannah Evans
5 EXT. Wandlebury Day 5 Sask
This document provides a production schedule and contact information for the film "Hero" being filmed over two days in and around Cambridge. It includes a cast and crew call sheet with contact details, locations, scene breakdown, shooting schedule, transport details and emergency contact information. The production will film scenes at 29 Sterne Close on Day 1 and in Cambridge town center. It will also film exterior scenes at Nightingale Park on Day 2. The shoot requires costumes, props and no production design for the scenes.
This document provides production details for a music video shoot over three days. It includes contact information for the cast and crew, location details and directions, scene breakdowns, and shooting schedules. The shoot will take place at various outdoor locations in and around Cambridge, including Magdalene Street, Silver Street, Coe Fen, and Lammas Land.
The document provides production details for the short film "The Next Stop" including contact information for the cast and crew, filming schedule and locations, and scene breakdown. It will be filmed on November 15th in Barrington, Cambridgeshire. The film consists of a single scene of a man waiting at a bus stop who pulls up his hood and lights a cigarette as a car drives by.
The document provides production details for the filming of a music video titled "Closer - Obstacle of Dementia" taking place on December 8-9, 2012. It includes schedules, crew and cast contact details, location information, and technical requirements. The film will be shot at Bartlow Kennels House and Bartlow Forest over two days and features a band performing.
The document provides production details for the film "Blackmail" including contact information for cast and crew, the shooting schedule and locations, technical requirements, emergency contact information, location photographs, directions to filming locations, and costume requirements by scene. Filming will take place over one day at two locations - exterior street scenes and interior office scenes at the Cintra offices in Wellington Street. The cast includes Hannah Evans as Alexis and Paul Andrews as the Security Guard. Scarlett Diver is the producer/director.
El documento describe un plan para exportar productos a 28 países de Europa desde China. Se detalla la ruta marítima desde el puerto de Dalian en China al puerto de Rotterdam en los Países Bajos, con paradas en el Canal de Suez y Grecia. También se especifica el tipo de contenedor y transporte terrestre que se utilizará, los costos de distribución por mar y tierra, y los pasos para calcular el precio final de los productos.
Screen Printing: The Ins & Outs of Metal & Flexible MaterialsMcloone
Mike Voss presented on screen printing processes for metal and flexible materials. He discussed the screen printing industry overview including key market segments and applications. He also covered various printing processes and material substrates for metal and flexible materials. Voss compared screen printing to digital printing and discussed factors like color matching, setup time, and ink options. He finished by taking questions from webinar participants.
The impact of innovation on travel and tourism industries (World Travel Marke...Brian Solis
From the impact of Pokemon Go on Silicon Valley to artificial intelligence, futurist Brian Solis talks to Mathew Parsons of World Travel Market about the future of travel, tourism and hospitality.
We’re all trying to find that idea or spark that will turn a good project into a great project. Creativity plays a huge role in the outcome of our work. Harnessing the power of collaboration and open source, we can make great strides towards excellence. Not just for designers, this talk can be applicable to many different roles – even development. In this talk, Seasoned Creative Director Sara Cannon is going to share some secrets about creative methodology, collaboration, and the strong role that open source can play in our work.
Reuters: Pictures of the Year 2016 (Part 2)maditabalnco
This document contains 20 photos from news events around the world between January and November 2016. The photos show international events like the US presidential election, the conflict in Ukraine, the migrant crisis in Europe, the Rio Olympics, and more. They also depict human interest stories and natural phenomena from various countries.
The Six Highest Performing B2B Blog Post FormatsBarry Feldman
If your B2B blogging goals include earning social media shares and backlinks to boost your search rankings, this infographic lists the size best approaches.
1) The document discusses the opportunity for technology to improve organizational efficiency and transition economies into a "smart and clean world."
2) It argues that aggregate efficiency has stalled at around 22% for 30 years due to limitations of the Second Industrial Revolution, but that digitizing transport, energy, and communication through technologies like blockchain can help manage resources and increase efficiency.
3) Technologies like precision agriculture, cloud computing, robotics, and autonomous vehicles may allow for "dematerialization" and do more with fewer physical resources through effects like reduced waste and need for transportation/logistics infrastructure.
The document provides a production schedule and contact information for the short film "The Pianist". It includes a 4-day shooting schedule with 5 locations in and around Cambridge. Scene breakdowns, technical requirements, costume needs and transportation details are outlined for the cast and crew. Emergency contact numbers are also listed.
This document provides a production schedule and contact information for a student film. It includes:
- Contact details for cast and crew and their roles
- Shooting locations over two days, including a school and park
- Scene breakdown with descriptions and page references
- Technical requirements and notes from the school media department
- Emergency contact information
- Information on the main actors, including experience levels
- A call sheet with shooting times, parking and transport details
- Requirements for props, costumes and design for each scene
This document provides the schedule and contact information for the short film "Rockabye Baby". It details the shooting dates, locations, cast and crew contact information, and technical requirements. The schedule outlines that filming will take place over two days, with interior and exterior scenes shot at Tadlow Granary and locations around Wandlebury Country Park.
Please arrive 15 minutes early to help set up
START FINISH
SETUP 3:00 3:30
BEGIN SHOOTING 4:00 6:00
(with principles)
MOVE LOCATIONS
LOCATION 2 – Scene Breakdown
SCENE SET D/N PAGE(S) CAST
2 EXT. Wandlebury Day 2 Saskia Bailie, Hannah Evans
3 EXT. Wandlebury Day 3 Saskia Bailie, Hannah Evans
4 EXT. Wandlebury Day 4 Saskia Bailie, Hannah Evans
5 EXT. Wandlebury Day 5 Sask
This document provides a production schedule and contact information for the film "Hero" being filmed over two days in and around Cambridge. It includes a cast and crew call sheet with contact details, locations, scene breakdown, shooting schedule, transport details and emergency contact information. The production will film scenes at 29 Sterne Close on Day 1 and in Cambridge town center. It will also film exterior scenes at Nightingale Park on Day 2. The shoot requires costumes, props and no production design for the scenes.
This document provides production details for a music video shoot over three days. It includes contact information for the cast and crew, location details and directions, scene breakdowns, and shooting schedules. The shoot will take place at various outdoor locations in and around Cambridge, including Magdalene Street, Silver Street, Coe Fen, and Lammas Land.
The document provides production details for the short film "The Next Stop" including contact information for the cast and crew, filming schedule and locations, and scene breakdown. It will be filmed on November 15th in Barrington, Cambridgeshire. The film consists of a single scene of a man waiting at a bus stop who pulls up his hood and lights a cigarette as a car drives by.
The document provides production details for the filming of a music video titled "Closer - Obstacle of Dementia" taking place on December 8-9, 2012. It includes schedules, crew and cast contact details, location information, and technical requirements. The film will be shot at Bartlow Kennels House and Bartlow Forest over two days and features a band performing.
The document provides production details for the film "Blackmail" including contact information for cast and crew, the shooting schedule and locations, technical requirements, emergency contact information, location photographs, directions to filming locations, and costume requirements by scene. Filming will take place over one day at two locations - exterior street scenes and interior office scenes at the Cintra offices in Wellington Street. The cast includes Hannah Evans as Alexis and Paul Andrews as the Security Guard. Scarlett Diver is the producer/director.
This document provides a production schedule and contact information for a student film. It includes a cast and crew list with contact details, filming locations and dates, scene descriptions, and a shooting schedule. The film will be shot over three days and will feature scenes at three locations: Nicole's house, Cherry Hinton Hall park, and James' house. The schedule outlines what will be filmed each day, the scenes, setup and filming times, and includes notes on required costumes, properties, and parking.
The document provides a schedule and technical requirements for the film shoot of "Never Ending" taking place on February 23rd. It includes a list of required equipment, emergency contact information, location photos, scene breakdown, shooting schedule and requirements for properties, design, and costumes. The one-day shoot will film scenes at an alleyway and a house involving three actors and requiring specific props and wardrobe for each scene.
This document provides production information for the film "Rewind" being filmed from March 18-21, 2010. It includes contact details for cast and crew, useful phone numbers, the shooting schedule and locations for Day 1 which will take place in an alleyway and bedroom to film scenes 1, 3-4 and 5. Emergency response numbers are also listed.
This document provides the schedule and contact information for the film production "Hero" taking place over October half term in 2013. It outlines the shooting locations, dates, times, crew roles and contact details, technical requirements, emergency procedures, actor information, scene breakdown, and call sheet with shooting times. The production will film scenes at 29 Sterne Close in Cambridge on Day 1 and in Cambridge town center. It lists the scenes, set details, times and actors involved. Transportation and parking details are also provided.
The document provides a production schedule and contact information for the short film "Lazarus" being filmed over two days at The Netherhall School & Sixth Form College in Cambridge. It includes a cast and crew call sheet, scene and location details, technical requirements, and emergency contact information. Shooting will take place in the school's atrium hall and involve a scene depicting a circus performer portrayed by actress Sophie Butler.
The document provides production details for the film "CLOCKWORK" including contact information for the cast and crew, locations, technical requirements, emergency contact information, scene breakdown, shooting schedule and call sheet. It details that filming will take place over one day at two locations - St. Margaret's Church in Chippenham and the Co-operative store in Isleham. The lead actor is Harold Hermance and he will be wearing a grey hoodie, jeans and trainers.
The document provides production details for the film "CLOCKWORK" including contact information for the cast and crew, locations, technical requirements, emergency contact information, scene breakdown, shooting schedule and call sheet. It details that filming will take place over one day at two locations - St. Margaret's Church in Chippenham and the Co-operative store in Isleham. The lead actor is Harold Hermance and he will wear a grey hoodie, jeans and trainers.
The document is a production schedule for the film "Lazarus" being filmed over three days at The Netherhall School and Sixth Form College in Cambridge. It includes contact details for the cast and crew, shooting locations and schedules, technical requirements, and scene and costume breakdowns. The film tells the story of Elizabeth, played by Maddy Taylor, and will be shot over three nights on the school's stage and in its atrium hall.
This document provides production details for a music video shoot, including contact information for cast and crew, locations, schedules, and scene breakdowns. The shoot will take place over two days at two locations - Ciarras house on the first day and a dance studio the second day. The music video stars Kathryn Fisher as Zoe, a teenage girl who dances through her emotions after a breakup. Matt Peet also stars as her ex-boyfriend Alfie.
The document provides a production schedule and contact details for the film "The Sinking of the Liberty". It outlines that filming will take place over one day at Cherry Hinton Cemetery. It lists the cast and crew involved and their roles. It also provides technical requirements, emergency contact information, and a scene breakdown with 14 scenes to be shot at the cemetery.
The document provides production details for the film "The Guilty" including cast and crew contact information, the filming schedule over three days with scene breakdowns, location details, technical requirements, and emergency contact information. Filming will take place in Cambridge at Anglia Ruskin University and other local locations. The schedule outlines the scenes to be shot each day along with setup and filming times.
The document describes Tom Brice, a 17-year-old male with brown hair and eyes, slim build, and 6'3" height. Tom was chosen for a music video role as a pianist because he matches the stereotypical look of one. His character will be an outcast throughout the video but ultimately victorious, and though inexperienced as an actor, Tom feels confident in the role since he is actually a pianist.
The document describes Dom, an 18-year-old male with black hair and brown eyes who is slim and 5'8". He is being considered for a music video because his appearance fits the stereotype of reggae musicians, who are often small in build like Beenie Man and Buju Banton. Although Dom has no acting experience, he feels comfortable in front of the camera.
The document describes Tom Brice, a 17-year-old male with brown hair and eyes, slim build, and 6'3" height. Tom was chosen for a music video because he looks stereotypically like a pianist, which will create comedic irony as no one else in the video looks the part, and Tom is portrayed as the outcast throughout but victorious at the end.
The document describes an 18-year-old male named Dominic Airoll with black hair and black/brown eyes who is slim and 5'8" tall. He is being selected for a music video because his appearance fits the stereotype of reggae musicians, who are often not very tall like Beenie Man and Buju Banton.
The document is a song lyric describing a girl named Faye who meets the singer Degree at his work and asks to be introduced to the members of his band. When Degree introduces Faye to the pianist, she expresses a strong interest in him, saying she "got to have" the pianist and would "die for the pianist". The lyrics then describe Faye repeatedly expressing her desire for the pianist to play her favorite songs for her.
This media pitch proposes a music video for the reggae song "The Pianist" by General Degree. The narrative will follow a girl visiting a shop to see a boy and his band. As he introduces each band member by position, like "Here is my bassist", that person will appear. At the end, the girl leaves with the pianist, leaving the main character alone. The video will be in widescreen format with varied shots to demonstrate creativity. The target audience is males and females aged 16-25 who like relaxing music.
1. - Film Schedule
PRODUCTION SCHEDULE& INFORMATION PACK
“Don’t Worry Be Happy”
RX Date: Friday, November, 2012 to December, 2012
-1-
2. - Film Schedule
CAST CONTACT DETAILS
Degree ................................................................................ Joe Esgate
............................................................................................ 07957900285
Pianist ................................................................................. Max Jackson
............................................................................................ 07807004412
CREW CONTACT DETAILS
Producer/Director ................................................................ Francis Mendoza
............................................................................................ 077564108612
Camera Assistant ........................................................................... Mel Ruvolo
............................................................................................ 07742167563
USEFUL NUMBERS
Cambridgeshire District Council .......................................... 01223 717 111
National rail enquiries ..................................................................... 08457 48 49 50
Congestion Charge ......................................................................... 0845 900 1234
-2-
3. - Film Schedule
LOCATION
DAY ONE: Ken Stevens music store
Sussex Street
DAY TWO: Maxs Living room,
Cherry Hinton Nature Reserve
DAY THREE:Kings Parade, Cambridge
-3-
4. - Film Schedule
TECHNICAL REQUIREMENTS
THE PIANIST: TECHNICAL DEPARTMENT BRIEF
SUMMARY AS OF 7/03/2009
Item Source Dept Notes
2x Panisonic Camera NT MED
1x Tripod NT MED
1x Kodak Camera FM
1 x Battery Charger BS CAM SUPPLIED BY PRODUCTION
SHOOT 16:9 FHA PROTECT 2.35:1 1080 24p
-4-
5. - Film Schedule
IN AN EMERGENCY
In case of emergency during location filming, you must contact one of the following people:-
Producer
Luke Mcgachen............................................................................. 07788255493
Producer & Director
Francis Mendoza .......................................................................... 077564108612
EMERGENCY SERVICES IN FILMING LOCATIONS
Standard Emergency Number ....................................................... 999
Fire CAMBRIDGE ...................................................................... 01223 376200
............................................................................................ 43 Parkside
............................................................................................ Cambridge
............................................................................................ CB1 1JF
Police CAMBRIDGE ..................................................................... 01223 358 966
............................................................................................ Parkside Police Station
............................................................................................ Parkside, City Centre
............................................................................................ Cambridge, CB1 1JG
A&E CAMBRIDGE ...................................................................... 01223 245151
............................................................................................ Addenbrookes Hospital
............................................................................................ Hills Road, Cambridge
............................................................................................ CB2 0QQ
-5-
6. - Film Schedule
LOCATION PHOTOGRAPHS
LivingRooom – Verulum way
Dressing Required: Arbiters Table, pinboard and papers, more books, pens, desklamp, telephone.
-6-
11. - Film Schedule
SHOOTING SCHEDULE
PRODUCTION The Pianist
RX DATE: 9thDecember, 2012 Day 1 of 4
FILMING LOCATION 1: Sussex Street City Centre, Cambridge
FILMING LOCATION 2: 12A Ken Stevens, Sussex Street, Cambridge CB1 1PW
CREW CALL TIME
15:00 17:00
PRINCIPLE CALL
14:30 17:15
SUNRISE: 8:10 SUNSET 16:30
LOCATION 1 – Sussex Street, Cambridge
START FINISH
SETUP
BEGIN SHOOTING 15:00 17:00
MOVE LOCATIONS 15:30 17:00
LOCATION 1 – Scene Breakdown
SCENE SET D/N PAGE (S) CAST
1 Day Degree
LOCATION 2 – Ken Stevens, 12A Sussex Street, Cambridge
START FINISH
ARRIVE 15:30 17:00
SET UP
NOTE:
Costume Requirements
SCENE ACTOR COSTUME
Joe Esgate Baggy Jeans, Brown Hoodie,High tops, Bandana
-11-
12. - Film Schedule
Transport
All crew and casts to use their own vehicles, do let the production know in advance please as you
will need parking permits and they are in limited supply
-12-
13. - Film Schedule
PRODUCTION
RX DATE: Friday7th, December 2012 Day 2 of 4
FILMING LOCATION 1: Verulum Way
FILMING LOCATION 2:
CREW CALL TIME
12:00 14:00
PRINCIPLE CALL
5.00
SUNRISE: SUNSET
PARKING LOCATION:
LOCATION 3 – 53Verulum Way, Cherry Hinton, Cambridge
START FINISH
SETUP 2.30 5.00
LOCATION 3 – Scene Breakdown
SCENE SET D/N PAGE(S) CAST
Day
Day
Day
Day
Day
LOCATION 4 – Kings Parade,Cambridge
START FINISH NOTE:
ARRIVE 15:30 17:00 Sunset 16:15
LOCATION 4 – Scene Breakdown
SCENE SET D/N PAGE(S) CAST
Day
Day
Day
Day
Production Design & Properties Requirements
SCENE PROPERTIES DESIGN
-13-
14. - Film Schedule
Costume Requirements
SCENE ACTOR COSTUME
ALL Joe Esgate Baggy jeans, grey hoodie
SCENES Smart jeans, red hoodie
Transport
All crew and casts to use their own vehicles, do let the production know in advance please as you
will need parking permits and they are in limited supply
-14-
15. - Film Schedule
PRODUCTION Don’t worry be happy
RX DATE: Sunday, December 2012 Day 3 of 4
FILMING LOCATION 1:
CREW CALL TIME
12:00
PRINCIPLE CALL
SUNRISE: 8:20 SUNSET 16:30
PARKING LOCATION:
LOCATION 5 – Cherry Hinton nature reserve
START FINISH DESIGN TEAM:
SETUP 7:00 8:30
Scene
PRODUCTION The Pianist
RX DATE: Sunday, December Day 4 of 4
FILMING LOCATION 1:
CREW CALL TIME
PRINCIPLE CALL
SUNRISE: 0604 SUNSET 1813
PARKING LOCATION:
-15-
16. - Film Schedule
Costume Requirements
SCENE ACTOR COSTUME
ALL Joe Bandana, Baggy Trouses, Brown hoodie, High tops
SCENES
Plain white shirt, Baggy jeans, High tops and sunglasses
Tom
Aaron
Max
Transport
All crew and casts to use their own vehicles, do let the production know in advance please as you
will need parking permits and they are in limited supply
DIRECTIONS
LOCATION 1,2
LOCATION 3
LOCATION 4,
LOCATION 5
-16-