SlideShare a Scribd company logo
1 of 26
Download to read offline
Partnering To
Capitalize On The
  Open Source
  Opportunity




         Presented by CyberOptic Group
                 April 20, 2010
Introduction
Adding New Revenue Streams Through Partnerships
   Small businesses have essentially the EXACT same functional needs as
     large enterprises but have significantly less resources with which to
     provide that function.

    As a result, many small businesses are forced to "piece together“
     systems from multiple vendors causing needless hours to be spent
     rekeying data from one system to the next, critical company
     information to be stored on individual PC's, or even worse, on pieces
     of paper, where the data is not available to others in the organization
     and cannot be accessed in real time.

    These disparate systems not increase support costs and effect
     customer and employee satisfaction, but they also inhibit productivity
     due to the time and resources needed to compile simple but accurate
     management reports or simply close the books every month.



Business Challenge
   Open source software is unique in that it is free to download and use
     for any purpose, permission is given to freely redistribute copies, and
     users/developers have unrestricted access to the source code with the
     freedom to modify and adapt the software for any purpose.

    Today, numerous enterprise-class open source applications exist for
     any business that has the technical abilities to successfully implement,
     the knowledge to use, the experience to train other users, and the
     infrastructure and skill set to manage and support the users and
     application environment.

    This creates a tremendous opportunity for business advisors,
     technology consultants, and computer hardware resellers, to earn
     significant revenue by providing the professional services needed to
     fully implement these enterprise applications in small to mid-sized
     businesses that don’t have the necessary skills internally!

Opportunity Overview
Small US-Based Businesses (typically less than
  CUSTOMERS       250 employees) With Limited IT Staff


  IBM RESELLER/   Resells IBM SMB Solutions, Lotus Foundations &
  PARTNER         CyOp Services. Offers FREE Process Assessment

                  Provides Professional Services To Qualify & Define
  CYOP            Project (PDW); Implements, Configures, Customizes,
                  & Supports Open Source Application Deployments


                                                       CYOP
                                                    SMARTSTART
                   Library of ready-to-use
                                                     SOLUTIONS
                         open source
   OPEN SOURCE     applications that work
     BUSINESS         instantly on Lotus
   APPLICATIONS          Foundations

                  Secure, Autonomic, Cost-Effective, Easy-to-Manage.
  LOTUS           Provides Calendaring, Emails, Contacts, Productivity
  FOUNDATIONS     Tools, Network Security, Remote Access, File & Print
                  Sharing, Backup & Disaster Recovery for Small Businesses



Introduction To CyOp
Market Opportunity
Professional Services To Complement Open Source
                                       Software
OpenbravoERP                   SugarCRM
  Enterprise Resource Planning   Customer Relationship Mgmt




        Kayako Helpdesk                 OrangeHRM
  Service/Support Management     Human Resource Management




                                             AND MORE…

Enterprise-Class Open Source
Business Process & Workflow
       Management (BPM)

       Business Intelligence & Reporting


       Electronic Data Interchange (EDI)

       Enterprise Content Management
       (ECM)

       E-Learning & Course Management


Open Source Enterprise App’s
ENTERPRISE PROJECT IMPLEMENTATION ROADMAP

 Project Implementation Roadmap
  1                      2                           3                           4                 5
  Project                                            Iterative                       Final             Go live &
  Preparation
                             Project Definition
                                                     Prototyping                     Preparation       Adjustments

  • Staffing &                                       •   Initial Configuration
      Detailed                                           and Customizations
      Planning       •   Detailed Requirements                                   •    Integrated
                         Definition                  •   Technical Designs            Testing      •   Go Live
  • Installation
      of Test        •   Functional Design           •   Development of          •    Data         •   Adjustments
      Envmnt.                                            Interfaces, Data-
                     •   Data-Migration strategy                                      Migration    •   Support
  • Kick-off         •   Interfaces Definition and
                                                         Migration Programs
                                                                                 •    End-User
      Meeting                                            and Non-Standard                          •   Troubleshooting
                         Design                          Functionalities              Training
  • Basic
      Training                                       •   Unit Testing



 Management methodology
 Project management

  • Definition of Initial Steps, Planning, Control, Validation and Project Completion
  • Project Progress Monitoring, Team Coordination, Change Management,
  • Risk Management and Scope Modifications (Identification, Monitoring, Evaluation, and Mitigation)




What It Takes To Be Successful
As a CyOp Partner, you DON’T need to understand the roadmap!
  CyOp handles these issues – YOU just need to recognize that there’s
  a HUGE difference between a customer installing enterprise software
  versus actually implementing it in the organization.

    The roadmap is valid irrespective of the enterprise application being
     implemented and whether the application is open source,
     proprietary, on-premises, or delivered through a SaaS model. The
     customer (or someone he pays) will still need to perform most, if
     not all, of these steps.

    The roadmap represents the set of services CyOp provides around
     each business application. Not all of the steps need to be done by
     CyOp, but they all need to be done by SOMEBODY to have a
     successful implementation.

    For a variety of reasons, most businesses, and especially small
     businesses, are unable to perform these steps without assistance,
     which is what creates the market opportunity & demand.



Notes About The Roadmap
   CyOp bridges the gap between open source and SaaS by leveraging
    enterprise-class open source software to build for our customers an
    application that they will OWN. Because the application is owned by the
    customer with full access to the source code, there is no vendor lock-in.
    The customer can NOT be forced into having to upgrade hardware or
    software versions and the application can never be made obsolete since
    there is a large community of open source programmers that can ensure
    ongoing development and support.

   Once we build the application, There are numerous options as to how the
    application is supported. For clients with adequate IT staff & facilities,
    CyOp can implement the application as an on-premises solution. For
    customers that lack adequate facilities or IT staff, CyOp can implement
    and support the solution from one of its state-of-the-art data centers,
    from an IBM Managed Hosting Facility, or from the data center of the
    customer's choice.

          CyOp provides enterprise class infrastructure,
           applications, training, service and support –
                   All at small business prices!


Customer Value Proposition
Why Partner With Cyop?
Top Five Benefits To Participating in the CyOp Partner Program
MORE SERVICE OFFERINGS, MORE
     SALES & MORE REVENUE!
  Broaden your range of services and
  your customer set, add significant
  new revenue streams, and have
  new ways to approach existing and
  potential customers. Enable your
  hardware and/or other professional
  services to be competitive in deals
  that were previously cost-
  prohibitive.

Partner Value Proposition #1
SERVICE YOUR CUSTOMERS &
    MAINTAIN ACCOUNT CONTROL!
  Maintain  Account Control and ensure
  customer satisfaction. If you don’t
  provide the customer what he needs, he
  will get it from someone – possibly a
  provider that will attempt to erode your
  other business. By engaging CyOp, your
  customer’s needs will be effectively met
  and you can be assured CyOp will not
  attempt to displace your existing
  business.


Partner Value Proposition #2
HUGE MARKET WITH LITTLE
        COMPETITION!
  There is little to NO competition for
  many of these applications in smaller
  businesses since most “competitors”
  can’t scale down to businesses with
  less than 100 employees - which is
  98% of the market! It’s easy to get to
  the decision maker, rarely if ever is
  there a required bid process or board
  approval needed.


Partner Value Proposition #3
SIGNIFICANT REVENUES WITH
   YOU IN CONTROL YOUR PROFITS!
  Even  at a fraction of the implementation
  costs of proprietary systems, there is
  still large value and profit in CyOp’s
  services which we share with our
  Partners. As a CyOp Partner, when you
  refer an opportunity, you have full
  control over customer pricing and your
  profit. We will never quote your client
  directly without your prior knowledge
  and approval.

Partner Value Proposition #4
RECURRING REVENUE POTENTIAL!

  Because  CyOp specializes in driving
  revenue back to the customer’s
  bottom line, once we complete a
  project, it is very common for the
  customer to engage us for ongoing
  development and support, which
  provides recurring revenue for the
  Partner.


Partner Value Proposition #5
The CyOp Process
How CyOp Engages With Customers & Partners
You DON’T need to be a software expert to earn money by
            identifying opportunities to refer to CyOp!
Here’s are TEN easy signs to look for in a prospect:

1.     Running multiple systems and databases that don’t talk to each other or
       performing tasks off of the enterprise system (i.e. QuickBooks & Excel, etc.)
2.     On a legacy proprietary system with discontinued development/support and/or
       anxious to get out of continuous upgrade cycle to keep current support
3.     Lots of time spent re-keying data
4.     Excessive time needed to compile simple but accurate management reports or
       close books at end of month
5.     High volume of email or paper forms containing data that should be in some
       enterprise system
6.     Lack of management reporting on statuses of workflows
7.     Desire to extend function & life of existing systems to better integrate with
       other systems and business processes
8.     Need to better manage & communicate with customers, vendors & partners
9.     Need to facilitate the management & reporting of employees & contractors
10.    Business growth being inhibited by existing system or process limitations



How To Identify Opportunities
• Partner registers opportunity by phone, email, or lead form.
             • CyOp contacts Partner to discuss strategy (if needed)
  Referral




              • CyOp engages with prospect to qualify opportunity and present value proposition.
              • CyOp performs a FREE Business Process Assessment to gain an understanding of
                customer environment, objectives & requirements and determine the best set of tools to
Qualification   propose to the customer.




             • CyOp conducts “Project Definition Workshop (PDW)” which essentially covers the first two
               phases of the project roadmap and is needed to determine exact costs of the project.
               The PDW is a billable engagement and the deliverables include a Functional Design, Gap
  PDW          Analysis, Data Migration Plan, and Systems Interface Design.




             • Based on results of PDW, CyOp will prepare a detailed proposal with DISCOUNTED
               PARTNER PRICING. Partner determines ultimate price to Customer and CyOp & Partner
               decide on best way to present proposal to Customer.
  Project    • Revenue received over and above Partner pricing are remitted to Partner as Commissions




CyOp Engagement Process
Customer Successes
  Here’s What CyOp Does For It’s Customers
SKIN-CARE PRODUCTS MANUFACTURER
COMPANY PROFILE: 5-Person Skin Care Products Manufacturer (StartUp)

ISSUES: Unable to continue to run business on QuickBooks & Excel and
manage products in multiple warehouses, some of which was perishable with
expiration dates. Needed to be able to manage multiple distributors with
multiple price levels.

SOLUTION: Open Source ERP Implementation

COST: $25,000

RESULTS: Company for the first time could view actual and accurate costing
and inventory values and was able to locate over $20,000 in valued un-received
inventory and identify several products where cost of manufacturing exceeded
distributor sales price, prompting a planned price increase. System enabled
multiple price lists with multiple price list versions, provide real-time inventory
valuations on a per-warehouse basis, and enable them to better manage
perishable inventory.


Success Story - ERP
FOOD PRODUCTS MANUFACTURER
COMPANY PROFILE: 400-Person Food Products Manufacturer

ISSUES: The company had NO CRM system and all sales reps were working
on disparate PC-based systems with most on Outlook, others using personal
copies of Act or Goldmine. No information was being retained in company
system, no sales forecasting was possible, and information retrieval was
nearly impossible. Wanted a system that could be expanded company-wide
but had limited available budget.

SOLUTION: Open Source CRM Implementation

COST: $8,995

RESULTS: Sales Reps migrated to enterprise system where they had access
to pre-defined email templates, standard & current company documents, and
the tools to better perform their job. What used to be “Sales Rep Data” is now
company data and Executives have insight into sales activity and forecasts.
The system can be easily expanded company-wide with no licensing costs.


Success Story - CRM
CONCRETE PRODUCTS MANUFACTURER
COMPANY PROFILE: 80-Person Concrete Products Manufacturer

ISSUES: Was a division of a larger company that was being divested and had
90-days to move off of parent company’s AS/400 based JD Edwards system.
Previous system had been highly customized with large amounts of historical
data requiring migration.

SOLUTION: Open Source ERP & EDI Implementation

COST: $80,000 Initial Project - $150,000+ To Date

RESULTS: Was able to migrate customer to new system in “record” time while
streamlining processes to eliminate need for approximately $60,000 in data
collection devices, reducing shipment times, reducing order times, and
providing customers with better levels of service. Customer is so happy with
results, they continue to use CyOp for ongoing developments & improvements
to the system and, to date, have spent over $150,000 with CyOp.



Success Story – ERP & EDI
JOIN THE CYOP PARTNER PROGRAM &
      START EARNING MONEY TODAY!

To enroll as a CyOp Partner and begin earning
substantial revenues By referring CyOp’s open
source consulting & development services, please
call us today at:

                     (800) 376-9704
Or, complete our Partner Application at:

   http://www.cyop.net/partner/cyop_partner_application.php


Getting Started With CyOp
WE LOOK FORWARD TO WORKING WITH YOU!!!

     For More Information regarding CyberOptic Group
  or the points made in this presentation, please contact
                 your CyOp Representative


               Or visit CyOp on the web at:
                   http://www.cyop.net
                      (800) 376-9704




          You may download a copy of this presentation at:
       http://www.cyop.net/partner/presentation_052010.pdf




Closing & References

More Related Content

What's hot

IBM Social Business Agenda template
IBM Social Business Agenda templateIBM Social Business Agenda template
IBM Social Business Agenda template
Flávio Mendes
 
Day 1 p4 - application lifecycle management
Day 1   p4  - application lifecycle managementDay 1   p4  - application lifecycle management
Day 1 p4 - application lifecycle management
Lilian Schaffer
 
Retain Talent and Improve Employee Satisfaction
Retain Talent and Improve Employee SatisfactionRetain Talent and Improve Employee Satisfaction
Retain Talent and Improve Employee Satisfaction
Human Capital Media
 
Astute oracle i participate webinar series - v1
Astute   oracle i participate webinar series - v1Astute   oracle i participate webinar series - v1
Astute oracle i participate webinar series - v1
Arvind Rajan
 
Documenting Business Processes
Documenting Business ProcessesDocumenting Business Processes
Documenting Business Processes
Rachel Houghton
 
Software Solution iRIMS Technology
Software Solution iRIMS Technology Software Solution iRIMS Technology
Software Solution iRIMS Technology
irimstechnology
 
CLM Services Offerings from Rational Lab Services
CLM Services Offerings from Rational Lab ServicesCLM Services Offerings from Rational Lab Services
CLM Services Offerings from Rational Lab Services
IBM Rational software
 

What's hot (19)

Application Lifecycle Management & VSTS
Application Lifecycle Management & VSTSApplication Lifecycle Management & VSTS
Application Lifecycle Management & VSTS
 
Mpower Corporate Profile
Mpower Corporate ProfileMpower Corporate Profile
Mpower Corporate Profile
 
IBM Social Business Agenda template
IBM Social Business Agenda templateIBM Social Business Agenda template
IBM Social Business Agenda template
 
Net@Work Client Presentation with Security
Net@Work Client Presentation with Security Net@Work Client Presentation with Security
Net@Work Client Presentation with Security
 
Udvikling af apps til mobile enheder med IBM Worklight, Christina Møller, IBM
Udvikling af apps til mobile enheder med IBM Worklight, Christina Møller, IBMUdvikling af apps til mobile enheder med IBM Worklight, Christina Møller, IBM
Udvikling af apps til mobile enheder med IBM Worklight, Christina Møller, IBM
 
Abstracting the UI Layer for WebSphere Portal
Abstracting the UI Layer for WebSphere PortalAbstracting the UI Layer for WebSphere Portal
Abstracting the UI Layer for WebSphere Portal
 
Day 1 p4 - application lifecycle management
Day 1   p4  - application lifecycle managementDay 1   p4  - application lifecycle management
Day 1 p4 - application lifecycle management
 
Retain Talent and Improve Employee Satisfaction
Retain Talent and Improve Employee SatisfactionRetain Talent and Improve Employee Satisfaction
Retain Talent and Improve Employee Satisfaction
 
Astute oracle i participate webinar series - v1
Astute   oracle i participate webinar series - v1Astute   oracle i participate webinar series - v1
Astute oracle i participate webinar series - v1
 
Aspirea sales presentation
Aspirea sales presentationAspirea sales presentation
Aspirea sales presentation
 
Application Management and Support - Shared Services Featuring the Pay Per Ti...
Application Management and Support - Shared Services Featuring the Pay Per Ti...Application Management and Support - Shared Services Featuring the Pay Per Ti...
Application Management and Support - Shared Services Featuring the Pay Per Ti...
 
Eliminate SaaS Sprawl with Cloud Integration
Eliminate SaaS Sprawl with Cloud IntegrationEliminate SaaS Sprawl with Cloud Integration
Eliminate SaaS Sprawl with Cloud Integration
 
Documenting Business Processes
Documenting Business ProcessesDocumenting Business Processes
Documenting Business Processes
 
Software Solution iRIMS Technology
Software Solution iRIMS Technology Software Solution iRIMS Technology
Software Solution iRIMS Technology
 
Software Quality Df
Software Quality DfSoftware Quality Df
Software Quality Df
 
SEC Presentation V2
SEC Presentation V2SEC Presentation V2
SEC Presentation V2
 
Corporate Overview
Corporate Overview Corporate Overview
Corporate Overview
 
Cast Company Overview
Cast Company OverviewCast Company Overview
Cast Company Overview
 
CLM Services Offerings from Rational Lab Services
CLM Services Offerings from Rational Lab ServicesCLM Services Offerings from Rational Lab Services
CLM Services Offerings from Rational Lab Services
 

Similar to Monetizing Open Source Software

Website Design and Development
Website Design and DevelopmentWebsite Design and Development
Website Design and Development
Gaurav Kumar
 
[Webinar] - Using RPA to Accelerate the Benefits from Shared Services
[Webinar] - Using RPA to Accelerate the Benefits from Shared Services[Webinar] - Using RPA to Accelerate the Benefits from Shared Services
[Webinar] - Using RPA to Accelerate the Benefits from Shared Services
JK Tech
 

Similar to Monetizing Open Source Software (20)

Crecer Corporate Deck
Crecer Corporate DeckCrecer Corporate Deck
Crecer Corporate Deck
 
Pure App + Patterns + Prolifics = Feeding Change
Pure App + Patterns + Prolifics = Feeding Change Pure App + Patterns + Prolifics = Feeding Change
Pure App + Patterns + Prolifics = Feeding Change
 
Inspire for Solutions Development: Company Profile
Inspire for Solutions Development: Company ProfileInspire for Solutions Development: Company Profile
Inspire for Solutions Development: Company Profile
 
DevOps101 (version 2)
DevOps101 (version 2)DevOps101 (version 2)
DevOps101 (version 2)
 
DevOps for Enterprise Systems - Rosalind Radcliffe
DevOps for Enterprise Systems - Rosalind RadcliffeDevOps for Enterprise Systems - Rosalind Radcliffe
DevOps for Enterprise Systems - Rosalind Radcliffe
 
Bob Tech Solutions Company Reviews
Bob Tech Solutions Company ReviewsBob Tech Solutions Company Reviews
Bob Tech Solutions Company Reviews
 
Challenges of Mobile HR framework and program
Challenges of Mobile HR framework and programChallenges of Mobile HR framework and program
Challenges of Mobile HR framework and program
 
Best Practices for Managing IaaS, PaaS, and Container-Based Deployments - App...
Best Practices for Managing IaaS, PaaS, and Container-Based Deployments - App...Best Practices for Managing IaaS, PaaS, and Container-Based Deployments - App...
Best Practices for Managing IaaS, PaaS, and Container-Based Deployments - App...
 
Website Design and Development
Website Design and DevelopmentWebsite Design and Development
Website Design and Development
 
Bob Tech Solutions Pvt Ltd Bangalore Reviews
Bob Tech Solutions Pvt Ltd Bangalore ReviewsBob Tech Solutions Pvt Ltd Bangalore Reviews
Bob Tech Solutions Pvt Ltd Bangalore Reviews
 
PureApp Presentation
PureApp PresentationPureApp Presentation
PureApp Presentation
 
Fresche Solutions Company Overview 2017
Fresche Solutions Company Overview 2017Fresche Solutions Company Overview 2017
Fresche Solutions Company Overview 2017
 
Amazing Winter Keynote - IT as a Team Sport
Amazing Winter Keynote - IT as a Team SportAmazing Winter Keynote - IT as a Team Sport
Amazing Winter Keynote - IT as a Team Sport
 
SA 2014 - Integrating the heterogeneous enterprise
SA 2014 - Integrating the heterogeneous enterpriseSA 2014 - Integrating the heterogeneous enterprise
SA 2014 - Integrating the heterogeneous enterprise
 
Sparkhound Consulting Services Overview 2020
Sparkhound Consulting Services Overview 2020Sparkhound Consulting Services Overview 2020
Sparkhound Consulting Services Overview 2020
 
IBM Z for the Digital Enterprise 2018 - Automate Delivery Pipeline
IBM Z for the Digital Enterprise 2018 - Automate Delivery PipelineIBM Z for the Digital Enterprise 2018 - Automate Delivery Pipeline
IBM Z for the Digital Enterprise 2018 - Automate Delivery Pipeline
 
Enterprise Mobile Strategy Framework - I
Enterprise Mobile Strategy Framework - IEnterprise Mobile Strategy Framework - I
Enterprise Mobile Strategy Framework - I
 
Enterprise mobile strategy framework- I
Enterprise mobile strategy framework- IEnterprise mobile strategy framework- I
Enterprise mobile strategy framework- I
 
Learn Best Practices of a True Hybrid IT Management Approach
Learn Best Practices of a True Hybrid IT Management ApproachLearn Best Practices of a True Hybrid IT Management Approach
Learn Best Practices of a True Hybrid IT Management Approach
 
[Webinar] - Using RPA to Accelerate the Benefits from Shared Services
[Webinar] - Using RPA to Accelerate the Benefits from Shared Services[Webinar] - Using RPA to Accelerate the Benefits from Shared Services
[Webinar] - Using RPA to Accelerate the Benefits from Shared Services
 

Monetizing Open Source Software

  • 1. Partnering To Capitalize On The Open Source Opportunity Presented by CyberOptic Group April 20, 2010
  • 2. Introduction Adding New Revenue Streams Through Partnerships
  • 3. Small businesses have essentially the EXACT same functional needs as large enterprises but have significantly less resources with which to provide that function.  As a result, many small businesses are forced to "piece together“ systems from multiple vendors causing needless hours to be spent rekeying data from one system to the next, critical company information to be stored on individual PC's, or even worse, on pieces of paper, where the data is not available to others in the organization and cannot be accessed in real time.  These disparate systems not increase support costs and effect customer and employee satisfaction, but they also inhibit productivity due to the time and resources needed to compile simple but accurate management reports or simply close the books every month. Business Challenge
  • 4. Open source software is unique in that it is free to download and use for any purpose, permission is given to freely redistribute copies, and users/developers have unrestricted access to the source code with the freedom to modify and adapt the software for any purpose.  Today, numerous enterprise-class open source applications exist for any business that has the technical abilities to successfully implement, the knowledge to use, the experience to train other users, and the infrastructure and skill set to manage and support the users and application environment.  This creates a tremendous opportunity for business advisors, technology consultants, and computer hardware resellers, to earn significant revenue by providing the professional services needed to fully implement these enterprise applications in small to mid-sized businesses that don’t have the necessary skills internally! Opportunity Overview
  • 5. Small US-Based Businesses (typically less than CUSTOMERS 250 employees) With Limited IT Staff IBM RESELLER/ Resells IBM SMB Solutions, Lotus Foundations & PARTNER CyOp Services. Offers FREE Process Assessment Provides Professional Services To Qualify & Define CYOP Project (PDW); Implements, Configures, Customizes, & Supports Open Source Application Deployments CYOP SMARTSTART Library of ready-to-use SOLUTIONS open source OPEN SOURCE applications that work BUSINESS instantly on Lotus APPLICATIONS Foundations Secure, Autonomic, Cost-Effective, Easy-to-Manage. LOTUS Provides Calendaring, Emails, Contacts, Productivity FOUNDATIONS Tools, Network Security, Remote Access, File & Print Sharing, Backup & Disaster Recovery for Small Businesses Introduction To CyOp
  • 6. Market Opportunity Professional Services To Complement Open Source Software
  • 7. OpenbravoERP SugarCRM Enterprise Resource Planning Customer Relationship Mgmt Kayako Helpdesk OrangeHRM Service/Support Management Human Resource Management AND MORE… Enterprise-Class Open Source
  • 8. Business Process & Workflow Management (BPM) Business Intelligence & Reporting Electronic Data Interchange (EDI) Enterprise Content Management (ECM) E-Learning & Course Management Open Source Enterprise App’s
  • 9. ENTERPRISE PROJECT IMPLEMENTATION ROADMAP Project Implementation Roadmap 1 2 3 4 5 Project Iterative Final Go live & Preparation Project Definition Prototyping Preparation Adjustments • Staffing & • Initial Configuration Detailed and Customizations Planning • Detailed Requirements • Integrated Definition • Technical Designs Testing • Go Live • Installation of Test • Functional Design • Development of • Data • Adjustments Envmnt. Interfaces, Data- • Data-Migration strategy Migration • Support • Kick-off • Interfaces Definition and Migration Programs • End-User Meeting and Non-Standard • Troubleshooting Design Functionalities Training • Basic Training • Unit Testing Management methodology Project management • Definition of Initial Steps, Planning, Control, Validation and Project Completion • Project Progress Monitoring, Team Coordination, Change Management, • Risk Management and Scope Modifications (Identification, Monitoring, Evaluation, and Mitigation) What It Takes To Be Successful
  • 10. As a CyOp Partner, you DON’T need to understand the roadmap! CyOp handles these issues – YOU just need to recognize that there’s a HUGE difference between a customer installing enterprise software versus actually implementing it in the organization.  The roadmap is valid irrespective of the enterprise application being implemented and whether the application is open source, proprietary, on-premises, or delivered through a SaaS model. The customer (or someone he pays) will still need to perform most, if not all, of these steps.  The roadmap represents the set of services CyOp provides around each business application. Not all of the steps need to be done by CyOp, but they all need to be done by SOMEBODY to have a successful implementation.  For a variety of reasons, most businesses, and especially small businesses, are unable to perform these steps without assistance, which is what creates the market opportunity & demand. Notes About The Roadmap
  • 11. CyOp bridges the gap between open source and SaaS by leveraging enterprise-class open source software to build for our customers an application that they will OWN. Because the application is owned by the customer with full access to the source code, there is no vendor lock-in. The customer can NOT be forced into having to upgrade hardware or software versions and the application can never be made obsolete since there is a large community of open source programmers that can ensure ongoing development and support.  Once we build the application, There are numerous options as to how the application is supported. For clients with adequate IT staff & facilities, CyOp can implement the application as an on-premises solution. For customers that lack adequate facilities or IT staff, CyOp can implement and support the solution from one of its state-of-the-art data centers, from an IBM Managed Hosting Facility, or from the data center of the customer's choice. CyOp provides enterprise class infrastructure, applications, training, service and support – All at small business prices! Customer Value Proposition
  • 12. Why Partner With Cyop? Top Five Benefits To Participating in the CyOp Partner Program
  • 13. MORE SERVICE OFFERINGS, MORE SALES & MORE REVENUE!  Broaden your range of services and your customer set, add significant new revenue streams, and have new ways to approach existing and potential customers. Enable your hardware and/or other professional services to be competitive in deals that were previously cost- prohibitive. Partner Value Proposition #1
  • 14. SERVICE YOUR CUSTOMERS & MAINTAIN ACCOUNT CONTROL!  Maintain Account Control and ensure customer satisfaction. If you don’t provide the customer what he needs, he will get it from someone – possibly a provider that will attempt to erode your other business. By engaging CyOp, your customer’s needs will be effectively met and you can be assured CyOp will not attempt to displace your existing business. Partner Value Proposition #2
  • 15. HUGE MARKET WITH LITTLE COMPETITION!  There is little to NO competition for many of these applications in smaller businesses since most “competitors” can’t scale down to businesses with less than 100 employees - which is 98% of the market! It’s easy to get to the decision maker, rarely if ever is there a required bid process or board approval needed. Partner Value Proposition #3
  • 16. SIGNIFICANT REVENUES WITH YOU IN CONTROL YOUR PROFITS!  Even at a fraction of the implementation costs of proprietary systems, there is still large value and profit in CyOp’s services which we share with our Partners. As a CyOp Partner, when you refer an opportunity, you have full control over customer pricing and your profit. We will never quote your client directly without your prior knowledge and approval. Partner Value Proposition #4
  • 17. RECURRING REVENUE POTENTIAL!  Because CyOp specializes in driving revenue back to the customer’s bottom line, once we complete a project, it is very common for the customer to engage us for ongoing development and support, which provides recurring revenue for the Partner. Partner Value Proposition #5
  • 18. The CyOp Process How CyOp Engages With Customers & Partners
  • 19. You DON’T need to be a software expert to earn money by identifying opportunities to refer to CyOp! Here’s are TEN easy signs to look for in a prospect: 1. Running multiple systems and databases that don’t talk to each other or performing tasks off of the enterprise system (i.e. QuickBooks & Excel, etc.) 2. On a legacy proprietary system with discontinued development/support and/or anxious to get out of continuous upgrade cycle to keep current support 3. Lots of time spent re-keying data 4. Excessive time needed to compile simple but accurate management reports or close books at end of month 5. High volume of email or paper forms containing data that should be in some enterprise system 6. Lack of management reporting on statuses of workflows 7. Desire to extend function & life of existing systems to better integrate with other systems and business processes 8. Need to better manage & communicate with customers, vendors & partners 9. Need to facilitate the management & reporting of employees & contractors 10. Business growth being inhibited by existing system or process limitations How To Identify Opportunities
  • 20. • Partner registers opportunity by phone, email, or lead form. • CyOp contacts Partner to discuss strategy (if needed) Referral • CyOp engages with prospect to qualify opportunity and present value proposition. • CyOp performs a FREE Business Process Assessment to gain an understanding of customer environment, objectives & requirements and determine the best set of tools to Qualification propose to the customer. • CyOp conducts “Project Definition Workshop (PDW)” which essentially covers the first two phases of the project roadmap and is needed to determine exact costs of the project. The PDW is a billable engagement and the deliverables include a Functional Design, Gap PDW Analysis, Data Migration Plan, and Systems Interface Design. • Based on results of PDW, CyOp will prepare a detailed proposal with DISCOUNTED PARTNER PRICING. Partner determines ultimate price to Customer and CyOp & Partner decide on best way to present proposal to Customer. Project • Revenue received over and above Partner pricing are remitted to Partner as Commissions CyOp Engagement Process
  • 21. Customer Successes Here’s What CyOp Does For It’s Customers
  • 22. SKIN-CARE PRODUCTS MANUFACTURER COMPANY PROFILE: 5-Person Skin Care Products Manufacturer (StartUp) ISSUES: Unable to continue to run business on QuickBooks & Excel and manage products in multiple warehouses, some of which was perishable with expiration dates. Needed to be able to manage multiple distributors with multiple price levels. SOLUTION: Open Source ERP Implementation COST: $25,000 RESULTS: Company for the first time could view actual and accurate costing and inventory values and was able to locate over $20,000 in valued un-received inventory and identify several products where cost of manufacturing exceeded distributor sales price, prompting a planned price increase. System enabled multiple price lists with multiple price list versions, provide real-time inventory valuations on a per-warehouse basis, and enable them to better manage perishable inventory. Success Story - ERP
  • 23. FOOD PRODUCTS MANUFACTURER COMPANY PROFILE: 400-Person Food Products Manufacturer ISSUES: The company had NO CRM system and all sales reps were working on disparate PC-based systems with most on Outlook, others using personal copies of Act or Goldmine. No information was being retained in company system, no sales forecasting was possible, and information retrieval was nearly impossible. Wanted a system that could be expanded company-wide but had limited available budget. SOLUTION: Open Source CRM Implementation COST: $8,995 RESULTS: Sales Reps migrated to enterprise system where they had access to pre-defined email templates, standard & current company documents, and the tools to better perform their job. What used to be “Sales Rep Data” is now company data and Executives have insight into sales activity and forecasts. The system can be easily expanded company-wide with no licensing costs. Success Story - CRM
  • 24. CONCRETE PRODUCTS MANUFACTURER COMPANY PROFILE: 80-Person Concrete Products Manufacturer ISSUES: Was a division of a larger company that was being divested and had 90-days to move off of parent company’s AS/400 based JD Edwards system. Previous system had been highly customized with large amounts of historical data requiring migration. SOLUTION: Open Source ERP & EDI Implementation COST: $80,000 Initial Project - $150,000+ To Date RESULTS: Was able to migrate customer to new system in “record” time while streamlining processes to eliminate need for approximately $60,000 in data collection devices, reducing shipment times, reducing order times, and providing customers with better levels of service. Customer is so happy with results, they continue to use CyOp for ongoing developments & improvements to the system and, to date, have spent over $150,000 with CyOp. Success Story – ERP & EDI
  • 25. JOIN THE CYOP PARTNER PROGRAM & START EARNING MONEY TODAY! To enroll as a CyOp Partner and begin earning substantial revenues By referring CyOp’s open source consulting & development services, please call us today at: (800) 376-9704 Or, complete our Partner Application at: http://www.cyop.net/partner/cyop_partner_application.php Getting Started With CyOp
  • 26. WE LOOK FORWARD TO WORKING WITH YOU!!! For More Information regarding CyberOptic Group or the points made in this presentation, please contact your CyOp Representative Or visit CyOp on the web at: http://www.cyop.net (800) 376-9704 You may download a copy of this presentation at: http://www.cyop.net/partner/presentation_052010.pdf Closing & References